ANALISA TEKNIS
S TATA KOTA
ANALISA TEKNIS
SATUAN PEKERJAAN
N ANGGARAN 2008
REKAPITULASI
PERENCANAAN REHABILITASI GEDUNG DI WILAYAH KECAMATAN CIPUTAT TIMUR
No.
I
II
II
Uraian Pekerjaan
Jumlah Harga
Rp.
Rp.
Rp.
39,312,000.00
86,281,000.00
52,056,000.00
Rp.
177,649,000.00
PERENCANA
CIR
No
Uraian pekerjaan
PEKERJAAN PERSIAPAN
1 Papan nama proyek
II
PEKERJAAN BANGUNAN
1 PEKERJAAN TANAH
- Pas. Bouwplank
- Galian tanah pondasi dan Sloof
- Urugan pasir bawah pondasi t = 5 cm
- Urugan tanah kembali
1 PEKERJAAN PONDASI
- Pasangan Batu Kosong
- Pondasi Batu Kali 1 : 5
- Sloof beton
a. Sloof beton 20/30 - K.125
2 PEKERJAAN ARSITEKTUR
- Pekerjaan pasangan dinding dan Railing
a. Pas.Batu bata, t = 1 / 2 bata ad. 1 : 2
b. Plesteran dinding ad 1 : 5
c. Plesteran Beton, Kolom dan Balok ad 1 : 5
d. Acian Dinding, kolom dan balok
e. Railing Kayu - Balok Kayu Meranti (oven) - 400 cm
f. Railing Tangga Kayu- -Balok Kayu Meranti (oven) - 400 cm
No
Uraian pekerjaan
2
d. Plin Lantai 10x40 cm
- Pekerjaan finishing
a. Pengecatan dinding luar (Weathershield,3x) Dulux/Mowilex
c. Pengecatan dinding Interior Vinilex/Catylac/Properti
e. Pengecatan kayu F-Talit, Avian, Glotex
IV PEKERJAAN ATAP
a. Kuda-kuda rangka Baja Ringan Zinc Alume Profil Z ( Terma
b. Genteng Metal Berpasir tebal: 0,35 mm
d. Alumunium Foil
e. Listplank GRC t = 12 mm lebar 30 cm
Uraian pekerjaan
Satuan
RSIAPAN
a proyek
bh
NGUNAN
AN TANAH
Bouwplank
n tanah pondasi dan Sloof
an pasir bawah pondasi t = 5 cm
an tanah kembali
AN PONDASI
ngan Batu Kosong
asi Batu Kali 1 : 5
beton
Sloof beton 20/30 - K.125
NTAI I DAN 2
AN STRUKTUR
m beton struktur
Kolom beton 20/20 - K.125
k beton struktur
Balok beton 20/20 - K.125
antai kayu -Papan Kayu Meranti (oven) - 400 cm
ga kayu - Papan dan balok Kayu Meranti (oven) - 400 cm
m1
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
AN ARSITEKTUR
rjaan pasangan dinding dan Railing
Pas.Batu bata, t = 1 / 2 bata ad. 1 : 2
Plesteran dinding ad 1 : 5
Plesteran Beton, Kolom dan Balok ad 1 : 5
Acian Dinding, kolom dan balok
Railing Kayu - Balok Kayu Meranti (oven) - 400 cm
Railing Tangga Kayu- -Balok Kayu Meranti (oven) - 400 cm
m2
m2
m2
m2
m3
m3
m2
Uraian pekerjaan
Satuan
3
m1
rjaan finishing
Pengecatan dinding luar (Weathershield,3x) Dulux/Mowilex/Jotun
Pengecatan dinding Interior Vinilex/Catylac/Properti
Pengecatan kayu F-Talit, Avian, Glotex
m2
m2
m2
Kuda-kuda rangka Baja Ringan Zinc Alume Profil Z ( Termasuk Rangka Atap )
Genteng Metal Berpasir tebal: 0,35 mm
Alumunium Foil
Listplank GRC t = 12 mm lebar 30 cm
m2
m2
m2
m1
BIAYA ( R A B )
N TEMPAT SERBAGUNA
ERANG SELATAN
Volume
6=4x5
1.00
346,333.00
346,333.00
346,333.00
16.00
3.82
0.15
3.82
29,011.00
51,725.00
157,163.00
67,062.00
464,176.00
197,589.50
23,102.96
256,176.84
941,045.30
0.44
1.51
276,565.00
671,133.00
121,965.17
1,014,753.10
1.27
777,649.00
984,363.66
2,121,081.92
0.84
777,649.00
653,225.16
0.84
0.34
0.18
777,649.00
5,920,692.00
5,920,692.00
656,242.44
2,013,035.28
1,042,041.79
4,364,544.67
32.55
32.55
8.42
40.97
0.20
0.07
134,427.00
48,058.00
48,058.00
25,341.00
5,920,692.00
5,920,692.00
4,375,598.85
1,564,287.90
404,648.36
1,038,220.77
1,184,138.40
414,448.44
8,981,342.72
20.09
117,608.00
2,362,744.72
Volume
3.00
50,710.00
32.55
32.55
0.27
68,543.56
52,057.00
99,882.15
2,231,092.88
1,694,455.35
26,968.18
3,952,516.41
30.23
30.23
30.23
27.42
140,000.00
129,999.00
54,966.00
98,231.00
4,232,200.00
3,929,869.77
1,661,622.18
2,693,494.02
12,517,185.97
JUMLAH
PPN 10 %
TOTAL
DIBULATKAN
35,738,924.71
3,573,892.47
39,312,817.18
39,312,000.00
336
106,365.85
19.20
PER
JALAN GUNUN
No
Uraian pekerjaan
II
PEKERJAAN PERSIAPAN
1 Papan nama proyek
PEKERJAAN ARSITEKTUR
- Pekerjaan Kusen pintu, jendela dan kaca
a. Kusen Pintu kayu meranti
b. Daun pintu panel kayu meranti
c. Kusen Jendela kayu meranti
d. Daun Jendela + kaca
- Pekerjaan kunci dan aksesoris pintu jendela
a. Engsel Pintu uk. 4 " Stainless Steel Solid/dekson/paloma
b. Kunci double slaag Solid/dekson/paloma
c. Pasang Engsel jendela
- Pekerjaan Plafond
a. Plafond GRC t =5 mm+ rangka Galvalum 0.35 mm Grid 60
- Pekerjaan pasangan keramik
a. Lantai keramik 40x40 cm, Kw1 setara Roman, Ex. Mulia, M
d. Plin Lantai 10x40 cm
- Pekerjaan finishing
a. Pengecatan dinding luar (Weathershield,3x) Dulux/Mowilex
c. Pengecatan dinding Interior Vinilex/Catylac/Properti
e. Pengecatan kayu F-Talit, Avian, Glotex
No
Uraian pekerjaan
Uraian pekerjaan
Satuan
RSIAPAN
a proyek
bh
AN ARSITEKTUR
jaan Kusen pintu, jendela dan kaca
Kusen Pintu kayu meranti
Daun pintu panel kayu meranti
Kusen Jendela kayu meranti
Daun Jendela + kaca
m3
m2
m3
unit
bh
bh
bh
rjaan Plafond
Plafond GRC t =5 mm+ rangka Galvalum 0.35 mm Grid 60 x 120
rjaan pasangan keramik
Lantai keramik 40x40 cm, Kw1 setara Roman, Ex. Mulia, Masterina
Plin Lantai 10x40 cm
m2
m1
rjaan finishing
Pengecatan dinding luar (Weathershield,3x) Dulux/Mowilex/Jotun
Pengecatan dinding Interior Vinilex/Catylac/Properti
Pengecatan kayu F-Talit, Avian, Glotex
m2
m2
m2
Kuda-kuda rangka Baja Ringan Zinc Alume Profil Z ( Termasuk Rangka Atap )
Genteng Metal Berpasir tebal: 0,35 mm
Alumunium Foil
Listplank GRC t = 12 mm lebar 30 cm
m2
m2
m2
m1
m2
Uraian pekerjaan
Satuan
BIAYA ( R A B )
NG PERTEMUAN
OTA TANGERANG SELATAN
Volume
6=4x5
1.00
346,333.00
346,333.00
346,333.00
0.02
2.00
0.30
20.00
6,647,938.00
610,736.00
6,647,938.00
194,168.00
152,902.57
1,221,472.00
2,026,291.50
3,883,360.00
7,284,026.08
2.00
1.00
40.00
58,282.00
177,991.00
20,938.00
116,564.00
177,991.00
837,520.00
1,132,075.00
69.96
184,399.00
12,900,554.04
69.96
4.06
117,608.00
50,710.00
8,227,855.68
205,882.60
8,433,738.28
141.99
144.99
0.27
68,543.56
52,057.00
99,882.15
9,732,500.08
7,547,744.43
26,968.18
17,307,212.69
82.50
82.50
82.50
43.00
140,000.00
129,999.00
54,966.00
98,231.00
11,550,000.00
10,724,917.50
4,534,695.00
4,223,933.00
31,033,545.50
JUMLAH
PPN 10 %
78,437,484.59
7,843,748.46
Volume
5
TOTAL
DIBULATKAN
PER
JALA
No
Uraian pekerjaan
PEKERJAAN PERSIAPAN
1 Papan nama proyek
II
PEKERJAAN BANGUNAN
1 PEKERJAAN TANAH
- Pas. Bouwplank
- Galian tanah pondasi dan Sloof
- Urugan pasir bawah pondasi t = 5 cm
- Urugan tanah kembali
- Urugan tanah peninggian lantai
1 PEKERJAAN PONDASI
- Pasangan Batu Kosong
- Pondasi Batu Kali 1 : 5
- Sloof beton
a. Sloof beton 15/30 - K.125
III PEKERJAAN LANTAI I DAN 2
1 PEKERJAAN STRUKTUR
- Kolom beton struktur
a. Kolom beton 15/15 - K.125
- Balok beton struktur
a. Ring balok beton 15/15 - K.125
2 PEKERJAAN ARSITEKTUR
- Pekerjaan pasangan dinding dan Railing
a. Pas.Batu bata, t = 1 / 2 bata ad. 1 : 2
b. Plesteran dinding ad 1 : 5
c. Plesteran Beton, Kolom dan Balok ad 1 : 5
d. Acian Dinding, kolom dan balok
e. Kisi-kisi kayu - Balok Kayu Meranti (oven) - 400 cm
- Pekerjaan Kusen
a. Kusen Pintu kayu meranti
b. Daun pintu panel kayu meranti
No
Uraian pekerjaan
- Pekerjaan Plafond
a. Plafond GRC t =5 mm+ rangka Galvalum 0.35 mm Grid 60
- Pekerjaan finishing
a. Pengecatan dinding luar (Weathershield,3x) Dulux/Mowilex
c. Pengecatan dinding Interior Vinilex/Catylac/Properti
e. Pengecatan kayu F-Talit, Avian, Glotex
IV PEKERJAAN ATAP
a. Kuda-kuda rangka Baja Ringan Zinc Alume Profil Z ( Terma
b. Atap genteng beton (polos)
d. Alumunium Foil
e. Listplank GRC t = 12 mm lebar 30 cm
Uraian pekerjaan
Satuan
RSIAPAN
a proyek
bh
NGUNAN
AN TANAH
Bouwplank
n tanah pondasi dan Sloof
an pasir bawah pondasi t = 5 cm
an tanah kembali
an tanah peninggian lantai
m1
m3
m3
m3
m3
AN PONDASI
ngan Batu Kosong
asi Batu Kali 1 : 5
beton
Sloof beton 15/30 - K.125
NTAI I DAN 2
AN STRUKTUR
m beton struktur
Kolom beton 15/15 - K.125
k beton struktur
Ring balok beton 15/15 - K.125
m3
m3
m3
m3
m3
AN ARSITEKTUR
rjaan pasangan dinding dan Railing
Pas.Batu bata, t = 1 / 2 bata ad. 1 : 2
Plesteran dinding ad 1 : 5
Plesteran Beton, Kolom dan Balok ad 1 : 5
Acian Dinding, kolom dan balok
Kisi-kisi kayu - Balok Kayu Meranti (oven) - 400 cm
m2
m2
m2
m2
m3
rjaan Kusen
Kusen Pintu kayu meranti
Daun pintu panel kayu meranti
m3
m2
Uraian pekerjaan
Satuan
rjaan Plafond
Plafond GRC t =5 mm+ rangka Galvalum 0.35 mm Grid 60 x 120
m2
m2
m1
rjaan finishing
Pengecatan dinding luar (Weathershield,3x) Dulux/Mowilex/Jotun
Pengecatan dinding Interior Vinilex/Catylac/Properti
Pengecatan kayu F-Talit, Avian, Glotex
m2
m2
m2
Kuda-kuda rangka Baja Ringan Zinc Alume Profil Z ( Termasuk Rangka Atap )
Atap genteng beton (polos)
Alumunium Foil
Listplank GRC t = 12 mm lebar 30 cm
m2
m2
m2
m
BIAYA ( R A B )
NG PERTEMUAN
OTA TANGERANG
Volume
6=4x5
1.00
346,333.00
346,333.00
346,333.00
10.00
1.50
0.10
1.52
2.85
29,011.00
51,725.00
157,163.00
67,062.00
83,450.00
290,110.00
77,587.50
15,401.97
101,934.24
237,832.50
722,866.21
0.29
1.01
276,565.00
671,133.00
81,310.11
676,502.06
0.60
777,649.00
464,256.45
1,222,068.63
0.32
777,649.00
244,959.44
0.26
777,649.00
200,633.44
445,592.88
26.88
53.76
14.00
67.76
0.02
134,427.00
48,058.00
48,058.00
25,341.00
5,920,692.00
3,613,397.76
2,583,598.08
672,812.00
1,717,106.16
132,327.47
8,719,241.47
0.02
2.00
6,647,938.00
632,715.00
152,902.57
1,265,430.00
1,418,332.57
Volume
6=4x5
13.95
184,399.00
2,572,181.65
50.28
12.97
117,608.00
50,710.00
5,913,330.24
657,455.15
6,570,785.39
29.35
16.20
1.79
68,543.56
52,057.00
99,882.15
2,011,753.49
843,323.40
178,789.05
3,033,865.93
53.49
58.74
58.74
42.88
140,000.00
125,029.00
54,966.00
98,231.00
7,487,942.00
7,343,615.82
3,228,702.84
4,212,145.28
22,272,405.94
JUMLAH
PPN 10 %
TOTAL
DIBULATKAN
47,323,673.68
4,732,367.37
52,056,041.05
52,056,000.00
336
140,844.27
19.20
NO.
BAGIAN PEKERJAAN
PEKERJAAN PERSIAPAN
Pembersihan Lokasi
Pengukuran & pemasangan bouwplank
Pagar Pengaman Proyek
Pagar BRC tinggi 90 cm
Papan nama proyek
Direksekeet ( Lantai diplester )
PEKERJAAN TANAH
Perataan Tanah
Galian Tanah Biasa Kedalaman 1 m
Galian Tanah Biasa Kedalaman 1 m - 2 m
Galian Tanah Biasa Kedalaman 2 m - 3 m
Galian Tanah Biasa Kedalaman 3 m - 4 m
Galian tanah kedalaman 1 - 5 m dengan alat besar
Galian Tanah Keras
Galian Tanah Berbatu
Galian Tanah Lumpur
Galian Tanah Sumuran Kedalaman Max. 10 m
Angkutan Galian Jarak Max. 30 m
Urugan Kembali Galian Tanah
Urugan Tanah bahan dari luar dipadatkan dg stamper tiap 20 cm (tanah biasa)
Urugan Tanah bahan dari luar pakai alat besar ( tiap 20 cm ) tanah biasa
Urugan tanah bahan dari luar pakai alat besar ( tiap 20 cm) tanah berbatu
Urugan pasir bawah lantai & pondasi
Urugan Sirtu
Pemadatan Tanah ( tiap 20 cm ) dengan stamper
Galian tanah borfile dengan mesin bor
PEKERJAAN PONDASI
Lantai kerja, mutu fc = 7.4 MPa (K.100)
Pas.Pondasi batu kali 1 : 2
Pas.Pondasi batu kali 1 : 3
Pas.Pondasi batu kali 1 : 4
Pas.Pondasi batu kali 1 : 5
Pas.Batu kosong
NO.
BAGIAN PEKERJAAN
NO.
BAGIAN PEKERJAAN
PEKERJAAN BETON
Cor beton K.125 ( manual )
Cor beton K.175 ( manual )
Cor beton K.225 ( manual )
Cor beton K.250 ( manual )
Cor beton K.125 dengan readymix
Cor beton K.225 dengan readymix
Cor beton K.250 dengan readymix
Cor beton K.300 dengan readymix
Cor beton K.350 dengan readymix
Cor beton K.400 dengan readymix
Pembesian ( besi polos )
Pembesian ( besi ulir )
Bekisting dengan papan + bongkaran dan penyiraman
Bekisting dengan triplex 9 mm + bongkaran dan penyiraman
Bekisting kolom beton struktur
Bekisting balok beton struktur
Bekisting lantai beton
Perancah kayu / stoot werk - tinggi s/d 2 m
Perancah kayu / stoot werk - tinggi s/d 3 m
Perancah kayu / stoot werk - tinggi s/d 4 m
Perancah kayu / stoot werk - tinggi s/d 5 m
Balok beton praktis K.175
Kolom beton praktis K.175
Pondasi beton setapak K.225
Pondasi beton bored pile 40 cm K.225
Sloof beton 20/40 K-225
Sloof beton 25/40 K.225
Sloof beton 20/30 K-225
Sloof beton 20/25 K.225
Sloof beton 15/20 K.175
Kolom beton 40/40 K-225
Kolom beton 30/40 K.225
Kolom beton 30/30 K.225
Kolom beton 15/30 K.225
Balok beton 30/50 K-225
Balok beton 25/60 K.225
Balok beton 25/50 K-225
Balok beton 25/35 K.225
Balok beton 20/40 K-225
( untuk dak selasar penghubung antar bangunan )
Balok beton 25/25 K-225
Balok beton 20/25 K-225
Balok beton 15/20 K.225
NO.
BAGIAN PEKERJAAN
NO.
BAGIAN PEKERJAAN
NO.
BAGIAN PEKERJAAN
PEKERJAAN DINDING
Pas.Batu bata, t = 1 / 2 bata ad. 1 : 2
Pas.Batu bata, t = 1 / 2 bata ad. 1 : 3
Pas.Batu bata, t = 1 / 2 bata ad. 1 : 4
Pas.Batu bata, t = 1 / 2 bata ad. 1 : 5
Pas.Batako beton ad. 1 : 2
Pas. Hebel 10.20.60 ad. 1 : 3
Pas.Batako beton ad. 1 : 4
Pas.Batako beton ad. 1 : 5
Plesteran & acian tebal 1,5 cm ad. 1 : 2
Plesteran & acian tebal 1,5 cm ad. 1 : 3
Plesteran & acian tebal 1,5 cm ad. 1 : 4
Plesteran & acian tebal 1,5 cm ad. 1 : 5
Pek.Acian
Rabat beton 7 cm + plester dan acian
Pasang Dinding Rooster / Terawang, Natural, uk. 12x11x24 cm, Ad. 1Pc : 4Ps
Pasang Dinding Batu Tempel Palimanan Kuning, 20 x 20 cm Texture Kasar
Pas. Hebel 10.20.60 ad. 1 : 5
Hand Ralling Tangga
PEKERJAAN ATAP
Kuda - kuda kayu kamper kruing
Kuda - kuda kayu kamper banjar
Kuda - kuda kayu meranti
Rangka atap ( kaso 5/7 dan reng 3/4 ) kayu meranti
Listplank 3 / 30 + 3 / 15 kayu kamper banjar
Listplank 3 / 30 kayu kamper banjar
Atap genteng morando glasuur
Karpusan genteng morando glasuur
Atap genteng beton (polos)
Karpusan genteng beton
Atap genteng metal berpasir
Bubungan genteng metal berpasir
Pasang atap asbes gelombang 5 mm
Pasang bubungan/nok stel 1.05 m
Konstruksi baja H - beam / WF ( termasuk plat simpul,las & zinkchromate )
Konstruksi besi siku ( termasuk plat simpul,las & zinkchromate )
Konstruksi gording besi ( termasuk plat simpul,las & zinkchromate )
Talang datar / jurai seng tebal 0.3 mm
Pas. Kembali listplank 3 / 30 + 3 / 15 kayu kamper banjar
NO.
BAGIAN PEKERJAAN
PEKERJAAN KAYU
Kusen kayu kamper samarinda
Kusen kayu kamper banjar
Kusen kayu kamper kruing
Kusen kayu meranti
Daun pintu double teakwood
Daun pintu double teakwood lapis formika ( untuk KM/WC )
Daun pintu kaca polos
Daun pintu kaca rayben
Daun pintu kaca es
Daun pintu panel kayu samarinda + Kaca
Daun pintu panel kayu banjar
Daun pintu panel kayu meranti
Daun pintu double triplek
Daun pintu / jendela krepyak ( jalusi ) kamper samarinda
Daun pintu / jendela krepyak ( jalusi ) kamper banjar
Kusen Jendela Alumunium (J1)
Kusen Jendela Alumunium (J2)
Kusen Bouvenligh Alumunium (BV)
Kusen Bouvenligh Alumunium (BV1)
Kusen Bouvenligh Alumunium (BV2)
PEKERJAAN LANTAI
Rabat beton 7 cm + plester dan acian
Lantai keramik 20 x 20 ad.1 : 3
Lantai keramik 40 x 40 ad.1 : 3 KW 1 ( Setara Roman )
Keramik dinding 20 x 20 KW1
Keramik dinding 20x25 KW1
Plint keramik standar
Plint kayu standar
Plint keramik 10x20 dinding Kamar mandi
Border 7x20 / Plint keramik dinding Kamar mandi
PEKERJAAN PLAFOND
Rangka plafond gird 50 x 100 cm ( kayu meranti )
Rangka plafond gird 50 x 100 cm ( kayu kamper banjar )
Plafond asbes 5 mm + rangka kayu meranti
Plafond gysum 9 mm + rangka kayu meranti
Plafond triplek 4 mm + rangka kayu meranti
Plafond asbes 5 mm + rangka kayu meranti
List Plafond Kayu Kamper Samarinda 5 cm
List Plafond Gypsum
NO.
10
BAGIAN PEKERJAAN
PEKERJAAN CAT
Cat dinding dalam interior
Cat dinding dalam interior
Cat dinding luar exterior
Cat dinding interior
Cat dinding interior
Cat plafond interior
Cat plafond interior
Cat besi memakai kuas
Cat kayu memakai kuas
Cat plafond setara Vinilex
Water proofing memakai kuas
11
PEKERJAAN SANITER
Closet jongkok standar
Bak air fiber glass kap. 200 ltr
Floor drain
Kran air 1/2"
Pompa air jet pump + Instalasi dan pengeboran
Water tower rangka besi siku
Tangki air kapasitas 1 m3
Septictank & Rembesan + Instalasi
Instalasi air bersih, dari water tower ke - kran air
Instalasi air kotor, dari closet & Floor Drain ke Septictank
12
PEKERJAAN ASESORIS
Pasang Engsel pintu nilon 4"
Pasang Engsel jendela
Pasang hak angin
Pasang slot / grendel pintu
Pasang kunci double slaag
Hand Ralling Tangga
Hand Ralling Tangga Stainelss Steel
NO.
13
BAGIAN PEKERJAAN
14
PEKERJAAN BONGKARAN
Bongkar bangunan total (manual)
Bongkar struktur Bangunan ( dengan alat berat )
Bongkar dinding bata merah
Bongkar lantai keramik
Bongkar genteng
Bongkar rangka atap
Bongkar plafond
Pekerjaan kupasan dinding
Bongkar dinding bata
Bongkar pintu besi
Bongkaran karpusan genteng morando glasuur
Bongkaran listplank 3 / 30 + 3 / 15 kayu kamper banjar
Bongkar konstruksi gording besi
AN
NG SELATAN
SAT
NILAI
1 m2
1 m1
1 m1
1 m1
1 bh
1 m2
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,283.00
29,011.00
224,006.00
79,579.00
346,333.00
373,828.00
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,606.00
51,725.00
62,212.00
68,728.00
71,256.00
33,676.00
66,678.00
130,738.00
67,062.00
83,450.00
17,477.00
21,050.00
157,163.00
145,605.00
158,525.00
225,050.00
208,033.00
54,349.00
345,666.00
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
773,636.00
787,316.00
717,669.00
704,273.00
671,133.00
276,565.00
SAT
1 m2
NILAI
Rp.
371,336.00
SAT
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 kg
1 kg
1 m2
1 m2
1 m3
1 m3
1 m3
1 m2
1 m2
1 m2
1 m2
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
NILAI
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
777,649.00
1,029,161.00
1,173,189.00
1,206,650.00
716,757.00
753,494.00
767,661.00
818,328.00
876,494.00
916,494.00
13,299.00
13,667.00
159,406.00
152,414.00
1,351,580.00
1,004,754.00
1,245,890.00
209,088.00
292,681.00
376,274.00
480,818.00
3,426,271.00
4,234,158.00
4,996,427.00
2,883,119.00
3,886,318.00
4,518,653.00
3,534,958.00
4,354,970.00
4,152,068.00
4,701,804.00
5,019,110.00
4,857,785.00
4,595,710.00
4,615,514.00
5,422,072.00
4,916,966.00
5,094,280.00
4,885,653.00
4,716,600.00
4,900,806.00
5,313,394.00
SAT
1 m3
1 m3
NILAI
Rp.
Rp.
3,981,188.00
3,426,271.00
SAT
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
set
m1
1 m3
1 m3
1 m3
1 m3
1 m2
1 m2
1 m3
1 m3
1 m3
1 m3
NILAI
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,803,651.00
5,115,958.00
6,026,228.00
3,464,422.00
3,373,083.00
3,395,779.00
5,146,620.00
4,996,427.00
2,735,449.00
2,883,119.00
3,286,215.00
3,966,934.00
4,155,124.00
3,981,188.00
5,146,620.00
3,474,463.00
911,000.00
259,000.00
4,019,078.00
3,286,215.00
4,018,454.00
2,539,379.00
418,429.00
453,349.00
4,359,929.00
2,977,769.00
3,003,190.00
3,167,194.00
SAT
NILAI
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m'
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
134,427.00
128,682.00
124,982.00
122,304.00
98,027.00
143,201.00
94,905.00
93,883.00
52,229.00
51,632.00
49,904.00
48,058.00
25,341.00
49,046.00
303,053.00
182,359.00
138,134.00
132,031.00
1 m3
1 m3
1 m3
1 m2
1 m'
1 m'
1 m2
1 m'
1 m2
1 m'
1 m2
1 m'
1 m2
1 m1
1 kg
1 kg
1 kg
1 m'
1 m'
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
8,971,871.00
8,971,871.00
5,836,871.00
82,962.00
184,743.00
106,370.00
80,029.00
76,248.00
125,029.00
97,248.00
129,999.00
90,666.00
64,006.00
123,033.00
29,547.00
29,722.00
29,287.00
72,693.00
35,625.00
SAT
NILAI
1 m3
1 m3
1 m3
1 m3
1 bh
1 bh
1 bh
1 bh
1 bh
1 Unit
1 m2
1 m2
1 bh
1 m2
1 m2
1 bh
1 bh
1 bh
1 bh
1 bh
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,920,692.00
6,647,938.00
9,782,938.00
6,647,938.00
558,736.00
621,986.00
547,959.00
563,109.00
571,959.00
1,159,184.00
610,736.00
610,736.00
558,736.00
720,915.00
632,715.00
2,902,735.00
2,251,943.00
560,581.00
634,593.00
620,971.00
1 m2
1 m2
1 m2
1 m2
1 m2
1 m1
1 m1
1 m'
1 m'
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
49,046.00
86,458.00
117,608.00
98,522.00
114,623.00
50,710.00
51,743.00
46,131.00
48,881.00
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m1
1m'
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
59,373.00
90,573.00
86,329.00
105,235.00
91,946.00
97,008.00
24,347.00
21,950.00
SAT
NILAI
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
52,057.00
36,004.00
62,884.00
35,257.00
39,597.00
52,752.00
35,552.00
46,520.00
91,635.00
34,752.00
58,740.00
1 unit
1 unit
1 buah
1 buah
1 unit
1 unit
1 buah
1 unit
1m'
1m'
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
389,408.00
389,908.00
38,621.00
35,129.00
5,389,600.00
5,370,594.00
1,357,216.00
4,374,711.00
37,409.00
85,539.00
1 bh
1 bh
1 bh
1 bh
1 bh
1 m'
1m'
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
30,532.00
20,938.00
16,354.00
26,354.00
177,991.00
132,031.00
482,993.59
SAT
NILAI
1 m'
1 m2
1 m2
1 m'
1 m'
1 m'
1 m'
1 m'
1 m2
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
121,553.00
76,530.00
102,994.00
45,732.00
319,834.00
358,834.00
1,195,037.00
238,350.00
365,332.00
509,197.00
1 m2
1 m3
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m'
1 m'
1 kg
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
156,170.00
137,927.00
9,091.00
7,798.00
4,636.00
20,779.00
14,333.00
6,858.00
26,805.00
26,805.00
6,595.00
20,607.00
14,477.00
NO.
NAMA BAHAN/MATERIAL
II
PAVING BLOCK
Kastin Abu-abu ukr. 10.20.40 K250
Kastin Abu-abu ukr. 10.20.40 K 300
Paving Block K 250 Tebal 6 Abu-abu
Paving Block K 250 Tebal 8 Abu-abu
Paving Block K 350 Tebal 6 Abu-abu
Paving Block K 350 Tebal 8 Abu-abu
Grass Block K 350 Tebal 6 cm
Grass Block K 350 Tebal 8 cm
Grass Block K 350 Tebal 10 cm
III
NO.
NAMA BAHAN/MATERIAL
IV
KAYU
Kaso kayu Meranti Jambi/Palembang - 400 cm
Balok Kayu Kamper Kruing/ Medan / Banjar - 400 cm ( bukan Oven )
Balok Kayu Meranti Jambi/palembang - 400 cm
Papan Kayu Kamper Kruing/ Medan/Banjar (oven) - 400 cm
Papan Kayu Kamper Singkil (oven) - 400 cm
Papan Kayu Meranti (oven) - 400 cm
Papan Kayu Terentang - 400 cm
Dolken 5 - 7 cm ukr. 300 - 400 cm
Dolken 8 - 10 cm ukr. 350 - 400 cm
List Gypsum 7 cm
List Gypsum 10 cm
List profil kamper 5 Cm
List Profil Kamper 2 cm
Balok Kayu Kamper Samarinda Oven : 6x15x400 cm
Papan Kayu Kamper Samarinda Oven : 3x30x400 cm
Daun Pintu Kayu Kamper Samarinda (Bukan Oven)
Daun Pintu Kayu Kamper Samarinda Kualitas Export (Oven)
Bahan plafond hardplex 5 mm 120x240
Bahan plafond asbes semen 5 mm
Block teak 122 x 244 tebal 18 mm 1 muka
Formika ukr. 90 x 210 x 3 mm
Formika ukr. 122 x 244 x 3 mm
Gypsum 9 mm 120 x 240 ex. DN
Gypsum 12 mm 120 x 240 ex. DN
Kusen dan Daun Pintu PVC ukuran standar
Melamin ukr. 90 x 210 x 3 mm
Melamin 122 x 244 x 3 mm
Multiplek ukr. 122 x 244 x 9 mm
Multiplek ukr. 122 x 244 x 12 mm
Multiplek ukr. 122 x 244 x 15 mm
Multiplek ukr. 122 x 244 x 18 mm
Teak Wood ukr. 90 x 210 x 3 mm
Teak Wood ukr. 122 x 244 x 3 mm
Teakwood ukr. 90 x 210 x 4 mm
Teakwood ukr. 122 x 244 x 4 mm
Triplek ukr. 122 x 244 x 3 mm
Triplek ukr. 122 x 244 x 4 mm
Triplek ukr. 122 x 244 x 6 mm
NO.
NAMA BAHAN/MATERIAL
READYMIX
Readymix beton K-125 tanpa pompa
Readymix beton K-175 tanpa pompa
Readymix beton K-225 tanpa pompa
Readymix beton K-250 tanpa pompa
Readymix beton K-300 tanpa pompa
Readymix beton K-350 tanpa pompa
Readymix beton K-400 tanpa pompa
Readymix beton B-0 tanpa pompa
Dengan pompa ditambah sewa pompa standar
VI
BETON
Buis Beton
Buis Beton Ukuran . 20 cm tanpa tulangan panjang 1,00 m Lokal
Buis Beton Ukuran . 30 cm tanpa tulangan panjang 1,00 m lokal
Buis Beton Ukuran . 40 cm tanpa tulangan panjang 1,00 m Lokal
Buis Beton Ukuran . 50 cm tanpa tulangan panjang 1,00 m Lokal
Buis Beton Ukuran . 60 cm tanpa tulangan panjang 1,00 m Lokal
Buis Beton Ukuran . 80 cm tanpa tulangan panjang 1,00 m Lokal
Buis Beton Ukuran . 100 cm tanpa tulangan panjang 1,00 m Lokal
Buis beton bertulang panjang 2,50 m .uk. 60 cm
Buis beton bertulang panjang 2,50 m .uk. 70 cm
Buis beton bertulang panjang 2,50 m .uk. 80 cm
Buis beton bertulang panjang 2,50 m .uk. 90 cm
Buis beton bertulang panjang 2,50 m .uk. 100 cm
Buis beton bertulang panjang 2,50 m .uk. 110 cm
Buis beton bertulang panjang 2,50 m .uk. 120 cm
Buis beton bertulang panjang 2,50 m .uk. 130 cm
Buis beton bertulang panjang 2,50 m .uk. 140 cm
Buis beton bertulang panjang 2,50 m .uk. 150 cm
Buis Beton Ukuran .1/2 100 cm tanpa tulangan panjang 1,00 m lokal
Buis Beton Ukuran .1/2 80 cm tanpa tulangan panjang 1,00 m lokal
Buis Beton Ukuran .1/2 20 cm tanpa tulangan panjang 1,00 m lokal
Buis Beton Ukuran .1/2 30 cm tanpa tulangan panjang 1,00 m lokal
Buis Beton Ukuran .1/2 40 cm tanpa tulangan panjang 1,00 m lokal
Buis Beton Ukuran .1/2 50 cm tanpa tulangan panjang 1,00 m lokal
Buis Beton Ukuran .1/2 60 cm tanpa tulangan panjang 1,00 m lokal
NO.
NAMA BAHAN/MATERIAL
VII
CAT
Amplas Kayu, Besar
Ampelas Besi, halus
Bahan pelitur Kripik ( sirlak india)
Cat besi setara F Talit
Cat Besi setara Glotek
Cat besi setara seiv
Cat tembok setara Jotun Interior
Cat tembok setara Jotun Exterior
Cat tembok Dulux/ICI interior
Cat tembok Dulux/ICI exterior
Cat tembok setara Vinilex
Cat tembok setara Metrolith
Cat dasar setara Dulux/ICI
Dempul halus/Infra
Dempul plitur
Ijuk
Kwas 3"
Melamik
Meni Besi setara Nippon
Meni Kayu setara Nippon
Minyak Cat/Tinner
Minyak Solar
Minyak Tanah
Minyak Tanah Industri
Oker
Pelamir Tembok
Pelitur
Pelumas
Plamur Tembok setara Matek/Metrolite
Plamur Kayu/Dempul Kayu
Residu
Rool cat tembok
Sapu Lidi
Soda Api
Spirtus
Thiner A
Thiner B
Vernis Bee Brand 66 (kayu/besi)
NO.
NAMA BAHAN/MATERIAL
VIII
IX
LANTAI
Ubin Keramik Ukr. 10x40 Standar KW 1
Ubin Keramik Ukr. 20x20 Standar KW 1
Ubin Keramik Ukr. 40x40 Standar KW 1 ( SETARA ROMAN )
Ubin Keramik 10x20 dan 20x20 KW1 DN Standar
Ubin Keramik 20 x 25 Standar KW 1
ALAT PENGUNCI
Engsel Pintu Nilon ukuran 3"
Engsel Pintu Nilon ukuran 4"
Engsel Piano (RRC)
Engsel Stainless Stell setara YANK 3"
Engsel Stainless Stell setara YANK 4"
Engsel Stainless stell setara Dekon/Poloma uk. 3"
Engsel Stainless stell setara Dekon/Poloma uk. 4"
Kunci Double Slaag setara Solid
Gembok 60 mm merk AXEL
Grendel Ukuran 4" setara Solid
Grendel Ukuran 6" setara Solid
Grendel Ukuran 4" setara Dekon
Grendel Ukuran 6" setara Dekon
NO.
NAMA BAHAN/MATERIAL
SANITASI AIR
Bak mandi Alco Fiber uk. 65x65 cm
Closet Duduk CW 660 J/ SW 660 J Rough - in : 230 m
Colset Jongkok Merk Toto Tipe Standar
Tower Tank Merk Excel Cap. 1000 liter
Pipa PVC dia.1/2" AW. P=4 m
Pipa PVC dia.1/2" AW
Pipa PVC dia.3/4" AW. P=4 m
Pipa PVC dia.3/4" AW
Pipa PVC dia.1" AW. P=4 m
Pipa PVC dia.1" AW
Pipa PVC dia.2" AW. P=4 m
Pipa PVC dia.2" AW
Pipa PVC dia.3" AW. P=4 m
Pipa PVC dia.3" AW
Pipa PVC dia.4" AW. P=4 m
Pipa PVC dia.4" AW
Pipa PVC dia.6" AW. P=4 m
Pipa PVC dia.6" AW
Knee PVC 3/4"
Knee PVC 1/2"
Knee PVC 4"
Pipa Parous 6"
Seal Tape pipa
Lem pipa
NO.
NAMA BAHAN/MATERIAL
XI
ATAP
Rangka atap baja ringan profil
Atap genteng metal
Bubungan genteng metal
Alumunium Foil 1 muka, medium weight (HF 404)
Bubungan genteng beton
Bubungan Genteng ex. Jatiwangi
Bubungan Genteng Kanmuri
Bubungan Genteng Kodok Plentong Natural
Bubungan Genteng Marundo
Bubungan Genteng Marundo Glasur
Bubungan Genteng Glasur Pelita
Fiber / Asbes semen gelombang 150x105x0,4 cm
Fiber / Asbes semen gelombang 240x105x0,4 cm
Fiber / Asbes semen gelombang 270x105x0,4 cm
Fiber / Asbes semen gelombang 300x105x0,4 cm
Fiber / Asbes semen gelombang 180x108x0,5 cm
Fiber / Asbes semen gelombang 250x92x0,5 cm
Fiber / Asbes semen gelombang 210x108x0,5 cm
Fiber / Asbes semen gelombang 240x108x0,5 cm
Fiber / Asbes semen gelombang 270x108x0,5 cm
Fiber / Asbes semen gelombang 300x108x0,5 cm
Genteng Beton Polos
Genteng beton warna
Genteng Glasur setara Pelita
Genteng Kanmuri Espanila Natural
Genteng Kodok, Plentong Natural
Genteng Morando
Genteng Morando Glasur
Genteng List plang Marundo Glasur setara Pelita
Genteng plentong ex. Jatiwangi
Genteng metal
Bubungan genteng metal
NO.
NAMA BAHAN/MATERIAL
2
Kusen
Kusen Alumunium Natural Ukuran 3" x 1 1/2"
Kusen Alumunium Natural Ukuran 4" x 1 3/4"
Kusen Alumunium Warna Ukuran 4" x 1 3/4"
Nok stil rata 92 cm
Nok stil rata 105 cm
Nok stil rata 108 cm
Pintu P.V.C. ex. Moradon Typ 105 E Polos lengkap kunci + Engsel
Pintu P.V.C. ex. Moradon Typ 104 D Polos lengkap kunci + Engsel
Plat Asbes 100 x 100 tebal 5 mm
Plat Asbes 100 x 100 tebal 6 mm
Plat Fiber Semen Harflek 100x100 cm tbl. 5 mm
Plat seng tebal 0,020 cm lebar 0,90
Plat seng tebal 0,030 cm lebar 0,90
Sealent
Seng gelombang 180 x 90 x 0,20
Plat Bondex
NO.
NAMA BAHAN/MATERIAL
XII
XIII
KAWAT
Kawat beton
Kawat las harmonika
Kawat las listrik
Paku segala ukuran (rata-rata)
Wiremesh M8 uk 5.4 x 2.1 m
Pipa Galv Medium dia 2 inch
Pagar BRC t = 0.9 m 6
XIV
KACA
Kaca bening 2 mm
Kaca bening 3 mm
Kaca bening 5 mm
Kaca bening 8 mm
Kaca bening 10 mm
Kaca Es 3 mm
Kaca Es 5 mm
Kaca Rayben 5 mm
Kaca Rayben 8 mm
Kaca Rayben 10 mm
Kaca Rayben 12 mm
XV
LISTRIK
Kabel NYM 3x2.5 mm
Klem kabel
Pipa AW 1/2"
Saklar tunggal
Saklar double
Box Panel
Saklar double
Stop Kontak
Lampu TL 2 x 18 watt, armatur, komplit philips
Lampu SL 18 watt, komplit philips
Fitting Keramik
Rumah lampu bared
Lampu SL 40 watt, komplit philips
NO.
NAMA BAHAN/MATERIAL
XV
SEWA ALAT
Buldozer 100 - 150 HP
Compressor 4000-6500 liter/menit
Concrete Vibrator
Excavator 80 - 120 HP
Generator Set 125 KVA
Jack Hammer
Stamper
XVI
UPAH
Pekerja / knek
Tukang gali
Tukang Batu
Tukang Kayu
Tukang Besi
Tukang Cat
Kepala Tukang Batu
Kepala Tukang Kayu
Kepala Tukang Besi
Kepala Tukang Cat
Pembantu Instalator
Instalator
Mandor / pengawas
NO.
NAMA BAHAN/MATERIAL
XVII
TAMBAHAN
Tiang pancang 30x30
Karet List
Plint Keramik Standart 10 x 20 cm
Border Keramik Dinding 7 x 20
Cat Kayu setara F Talit
Lem Putih
Penangkal Petir
Tinggi pagar 5 panel/ 2 m, panjang kolom 3 m, mutu beton K225
Tinggi pagar 6 panel/ 2.4 m, panjang kolom 3.5 m, mutu beton K225
Tinggi pagar 7 panel/ 2.8 m, panjang kolom 4 m, mutu beton K225
Tinggi pagar 8 panel/ 3.2 m, panjang kolom 4.5 m, mutu beton K225
Besi Hollow 4 X 4 Cm
Catur kayu kamper
Hand Ralling
Melamin
Dyna Bolt
Kunci KM / WC
Kait Angin
Slot Tanam pada pintu double, 2 bh perpintu
Urinoir
Pipa Galv Medium dia 2 inch
Alat Bantu
Alat Bantu Railling Tangga
Besi pengikat kuda-kuda
Zinchromate
Erection
Jalusi Alumunium
Holo Galvanis 0,35 (4 x 4 x 400)
GRC Board uk. 5 mm x1220 mm x 2440 mm berat 20 kg/lembar
SATUAN
151,667.00
82,500.00
163,333.00
201,667.00
210,000.00
210,000.00
190,000.00
125,000.00
209,167.00
249,167.00
244,333.00
170,000.00
144,167.00
95,500.00
m2
m2
m3
m3
m3
m3
m3
m2
m3
m3
m3
m3
m3
m3
32,500.00
34,667.00
55,300.00
81,000.00
71,167.00
81,167.00
21,000.00
27,667.00
29,333.00
m1
ml
m2
m2
m2
m2
bh
bh
bh
700.00
11,167.00
3,833.00
6,917.00
60,333.00
63,333.00
80,333.00
15,500.00
bh
bh
bh
bh
zak
zak
zak
kg
HARGA
SATUAN
SATUAN
2,583,333.00
6,483,333.00
3,633,333.00
7,083,333.00
7,083,333.00
4,050,000.00
2,116,667.00
18,167.00
23,167.00
15,000.00
17,833.00
14,917.00
7,717.00
8,550,000.00
9,183,333.00
1,716,667.00
2,258,333.00
70,833.00
65,000.00
242,000.00
110,000.00
61,167.00
178,167.00
95,333.00
125,167.00
165,000.00
209,000.00
231,500.00
71,500.00
107,333.00
92,500.00
110,667.00
50,467.00
59,167.00
75,667.00
m3
m3
m3
m3
m3
m3
m3
btg
btg
m1
m1
m1
m1
m3
m3
Unit
Unit
lbr
lbr
lbr
lbr
lbr
lbr
lbr
Unit
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
HARGA
SATUAN
SATUAN
652,000.00
658,333.00
679,833.00
694,000.00
744,667.00
802,833.00
842,833.00
575,667.00
2,757,333.00
m3
m3
m3
m3
m3
m3
m3
m3
8 jam
128,333.00
128,500.00
193,833.00
281,333.00
289,333.00
329,000.00
523,500.00
m1
m1
m1
m1
m1
m1
m1
587,400.00
782,540.00
957,990.00
1,155,000.00
1,483,900.00
1,813,680.00
2,246,090.00
2,615,910.00
3,052,500.00
3,331,900.00
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
266,166.00
219,000.00
74,500.00
82,500.00
114,166.00
146,333.00
206,500.00
btg
btg
btg
btg
btg
btg
btg
HARGA
SATUAN
SATUAN
4,500.00
9,750.00
123,000.00
55,833.00
45,500.00
97,800.00
23,500.00
48,500.00
lbr
lbr
kg
kg
kg
kg
kg
kg
80,833.00
119,500.00
20,833.00
36,333.00
kg
kg
kg
kg
59,167.00
25,333.00
35,167.00
7,667.00
30,167.00
43,667.00
20,167.00
20,333.00
23,333.00
kg
kg
kg
ikat
bh
kg
kg
kg
ltr
ltr
ltr
ltr
kg
kg
kg
ltr
kg
kg
kg
bh
ikat
kg
ltr
ltr
ltr
ltr
13,667.00
15,033.00
44,833.00
47,500.00
15,033.00
22,700.00
10,050.00
16,667.00
11,875.00
13,000.00
10,333.00
17,167.00
25,583.00
47,333.00
HARGA
SATUAN
SATUAN
73,500.00
43,833.00
73,500.00
47,833.00
59,167.00
m2
m2
m2
m2
m2
24,167.00
34,500.00
37,500.00
23,125.00
42,200.00
37,500.00
45,000.00
154,500.00
66,500.00
25,333.00
37,167.00
45,200.00
59,400.00
ps
ps
ps
ps
ps
ps
ps
bh
bh
bh
bh
bh
bh
HARGA
SATUAN
SATUAN
290,000.00
2,324,000.00
289,500.00
1,329,500.00
11,333.00
2,833.25
18,500.00
4,625.00
23,000.00
5,750.00
53,000.00
13,250.00
76,000.00
19,000.00
172,667.00
43,166.75
403,000.00
100,750.00
2,880.00
1,920.00
12,280.00
60,000.00
14,300.00
10,200.00
bh
bh
bh
bh
btg
m'
btg
m'
btg
m'
btg
m'
btg
m'
btg
m'
btg
m'
bh
bh
bh
m'
roll
tube
HARGA
SATUAN
SATUAN
128,000.00
111,500.00
55,700.00
20,000.00
12,000.00
6,833.00
13,917.00
4,000.00
4,000.00
6,000.00
6,750.00
m2
m2
m'
m2
bh
bh
bh
bh
bh
bh
bh
35,083.00
50,167.00
57,000.00
67,333.00
lbr
lbr
lbr
lbr
51,333.00
72,667.00
58,500.00
68,500.00
77,000.00
86,333.00
lbr
lbr
lbr
lbr
lbr
lbr
6,000.00
10,150.00
2,667.00
6,500.00
2,000.00
2,333.00
3,500.00
7,000.00
1,500.00
111,500.00
55,700.00
bh
bh
Bh
bh
bh
bh
Bh
bh
bh
m2
m'
HARGA
SATUAN
SATUAN
95,000.00
95,000.00
120,700.00
m'
m'
m'
60,000.00
50,000.00
60,200.00
lbr
lbr
lbr
203,667.00
383,333.00
bh
bh
16,167.00
19,667.00
23,500.00
26,833.00
39,833.00
12,333.00
47,667.00
lb
lb
lb
m1
m1
tube
lbr
HARGA
SATUAN
SATUAN
7,833.00
8,167.00
14,333.00
14,500.00
kg
kg
kg
kg
15,800.00
28,000.00
25,200.00
12,250.00
484,000.00
490,700.00
168,400.00
kg
m
kg
kg
lbr
btg
m1
93,000.00
75,000.00
108,333.00
163,000.00
220,000.00
137,583.00
148,833.00
125,167.00
250,000.00
321,667.00
531,667.00
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
25,000.00
9,200.00
9,062.00
27,000.00
27,000.00
950,500.00
57,175.00
44,085.00
210,865.00
43,750.00
m
dus
m
bh
bh
bh
HARGA
SATUAN
SATUAN
222,667.00
58,467.00
19,000.00
202,333.00
156,333.00
19,417.00
37,583.00
Jam
Jam
Jam
Jam
Jam
Jam
Jam
64,667.00
75,833.00
74,500.00
76,833.00
74,500.00
74,500.00
85,167.00
85,167.00
85,167.00
90,167.00
67,500.00
85,167.00
105,000.00
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
HARGA
SATUAN
SATUAN
259,000.00
3,500.00
7,700.00
41,250.00
55,833.00
15,166.00
1,893,000.00
221,000.00
260,000.00
305,000.00
360,000.00
121,600.00
50,050.00
30,250.00
80,600.00
1,500.00
35,000.00
29,250.00
38,125.00
1,250,000.00
m'
m'
bh
m'
kg
Kg
titik
m
m
m
m
btg
bh
m'
m2
bh
bh
bh
bh
bh
1,000.00
10,000.00
11,000.00
500.00
10,000.00
28,000.00
27,583
99,000.00
lbr
ANALISA TEKNIS
NO.
URAIAN
KOEF.
SAT.
PEKERJAAN PERSIAPAN
1 m2
- Pembersihan Lokasi
Pekerja
Mandor
0.0500
0.0100
hr
hr
JUMLAH
DIBULATKAN
1 m1
0.0040
0.0060
0.0200
0.0500
0.0500
0.0050
m3
m3
kg
hr
hr
hr
JUMLAH
DIBULATKAN
1 m1
Pasir Beton
Batu kali
Semen PC ( 50 kg )
Kaso Meranti Jambi Basah uk. 5 x 10 x 400 cm
Seng Gelombang BJLS 28 (80x180) cm
Paku Kayu Segala uk.
Pekerja
Tukang Batu
Tukang Kayu
Mandor
0.0012
0.0048
0.0170
0.0360
1.4300
0.0200
0.3000
0.3750
0.1500
0.0150
m
m
zak
m
lbr
kg
hr
hr
hr
hr
JUMLAH
DIBULATKAN
1 m1
BRC t = 0.9 m 6
Pekerja
Tukang Kayu
Kepala Tukang Kayu
0.4340
0.0420
0.0420
0.0040
lbr
hr
hr
hr
NO.
URAIAN
Mandor
KOEF.
0.0020
SAT.
hr
JUMLAH
DIBULATKAN
NO.
URAIAN
1 bh
KOEF.
SAT.
0.5000
1.1000
0.0280
1.0000
1.0000
lbr
kg
m3
ls
ls
JUMLAH
DIBULATKAN
1 m2
Pair pasang
Pasir beton
Batu bata merah
Semen PC 50 kg
Kayu kaso meranti
Triplek 122 x 244 x 4 mm
Engsel pintu uk 3 "
Asbes semen gelombang 250x92 x 0. 5 cm
Kaca polos 5 mm
Rangka teralis nako
Paku segala ukuran ( rata-rata)
Kunci gembok kecil
Pekerja
Tukang batu
Tukang kayu
Mandor
0.2500
0.0517
25.0000
0.2500
0.0300
1.0000
0.1667
0.5000
0.2917
0.2917
0.5000
0.0834
0.4000
0.0834
0.3340
0.0200
m3
m3
bh
zak
m3
lbr
bh
lbr
m2
bh
kg
bh
hr
hr
hr
hr
JUMLAH
DIBULATKAN
ANALISA TEKNIS
GA SATUAN PEKERJAAN
HARGA SATUAN
64,667.00
105,000.00
JUMLAH
3,233.35
1,050.00
JUMLAH
4,283.35
DIBULATKAN
4,283.00
2,116,667.00
2,116,667.00
12,250.00
64,667.00
76,833.00
105,000.00
8,466.67
12,700.00
245.00
3,233.35
3,841.65
525.00
JUMLAH
29,011.67
DIBULATKAN
29,011.00
249,167.00
163,333.00
63,333.00
2,583,333.00
47,667.00
12,250.00
64,667.00
74,500.00
76,833.00
105,000.00
299.00
784.00
1,076.66
92,999.99
68,163.81
245.00
19,400.10
27,937.50
11,524.95
1,575.00
JUMLAH
224,006.01
DIBULATKAN
224,006.00
168,400.00
64,667.00
76,833.00
85,167.00
73,085.60
2,716.01
3,226.99
340.67
HARGA SATUAN
105,000.00
JUMLAH
210.00
JUMLAH
79,579.27
DIBULATKAN
79,579.00
HARGA SATUAN
125,167.00
55,833.00
2,583,333.00
100,000.00
50,000.00
JUMLAH
62,583.50
61,416.30
72,333.32
100,000.00
50,000.00
JUMLAH
346,333.12
DIBULATKAN
346,333.00
244,333.00
249,167.00
700.00
63,333.00
2,583,333.00
59,167.00
60,000.00
35,083.00
108,333.00
12,000.00
12,250.00
15,000.00
64,667.00
74,500.00
76,833.00
105,000.00
61,083.25
12,881.93
17,500.00
15,833.25
77,499.99
59,167.00
10,002.00
17,541.50
31,600.74
3,500.40
6,125.00
1,251.00
25,866.80
6,213.30
25,662.22
2,100.00
JUMLAH
373,828.38
DIBULATKAN
373,828.00
NO.
URAIAN
KOEF.
SAT.
PEKERJAAN TANAH
1
1 m3
- Perataan Tanah
Pekerja
Mandor
Alat bantu
0.0400
0.0040
0.6000
hr
hr
set
JUMLAH
DIBULATKAN
1 m3
Pekerja
Mandor
Alat bantu
0.7500
0.0250
0.6000
hr
hr
set
JUMLAH
DIBULATKAN
1 m3
Pekerja
Mandor
Alat bantu
0.9000
0.0325
0.6000
m3
hr
set
JUMLAH
DIBULATKAN
1 m3
Pekerja
Mandor
Alat bantu
0.9350
0.0730
0.6000
hr
hr
set
JUMLAH
DIBULATKAN
1 m3
Pekerja
Mandor
Alat bantu
0.9400
0.0940
0.6000
hr
hr
set
JUMLAH
DIBULATKAN
1 m3
Pekerja
hr
NO.
URAIAN
Mandor
Excavator kap. 80 - 120 HP
Alat bantu
KOEF.
0.0020
0.1000
0.3000
SAT.
hr
jam
hr
JUMLAH
DIBULATKAN
NO.
7
URAIAN
1 m3
KOEF.
SAT.
Pekerja
Mandor
Alat bantu
0.9650
0.0350
0.6000
hr
hr
set
JUMLAH
DIBULATKAN
1 m3
Pekerja
Mandor
Alat bantu
1.9600
0.0323
0.6000
hr
hr
set
JUMLAH
DIBULATKAN
1 m3
Pekerja
Mandor
Alat bantu
0.9750
0.0325
0.6000
hr
hr
set
JUMLAH
DIBULATKAN
10
1 m3
Pekerja
Mandor
Alat bantu
1.2000
0.0500
0.6000
hr
hr
set
JUMLAH
DIBULATKAN
11
1 m3
Pekerja
Mandor
Alat bantu
0.2480
0.0080
0.6000
hr
hr
set
JUMLAH
DIBULATKAN
12
1 m3
Pekerja
Mandor
Alat bantu
hr
hr
set
NO.
URAIAN
KOEF.
SAT.
JUMLAH
DIBULATKAN
NO.
13
URAIAN
1 m3
KOEF.
SAT.
- Urugan Tanah bahan dari luar dipadatkan dg stamper tiap 20 cm (tanah biasa)
Tanah Urug
Pekerja
Mandor
Stamper, 5 HP, Kap. 0.17 ton
Alat bantu
1.2000
0.1240
0.0040
0.9000
0.3000
m3
hr
hr
jam
set
JUMLAH
DIBULATKAN
14
1 m3
- Urugan Tanah bahan dari luar pakai alat besar ( tiap 20 cm ) tanah biasa
Tanah Urug
Pekerja
Mandor
Buldozer kap. 100 - 150 HP
Alat bantu
1.2000
0.1240
0.0040
0.1000
0.3000
m3
hr
hr
jam
set
JUMLAH
DIBULATKAN
15
1 m3
- Urugan tanah bahan dari luar pakai alat besar ( tiap 20 cm) tanah berbatu
Tanah Urug
Pekerja
Mandor
Buldozer kap. 100 - 150 HP
Alat bantu
1.2000
0.1500
0.0050
0.1500
0.3000
m3
hr
hr
jam
set
JUMLAH
DIBULATKAN
16
1 m3
Pasir Urug
Pekerja
Mandor
Alat bantu
1.2000
0.3000
0.0100
0.6000
m3
hr
hr
set
JUMLAH
DIBULATKAN
17
1 m3
Sirtu
Pekerja
Mandor
Alat bantu
- Urugan Sirtu
1.2000
0.5000
0.0200
0.6000
m3
hr
hr
set
NO.
URAIAN
KOEF.
SAT.
JUMLAH
DIBULATKAN
NO.
18
URAIAN
1 m3
KOEF.
SAT.
Pekerja
Mandor
Stamper
Alat bantu
0.3000
0.0050
0.9000
0.6000
hr
hr
jam
set
JUMLAH
DIBULATKAN
19
1 m3
Pekerja
Mandor
Mesin bor
Alat bantu
0.4000
0.0400
3.0000
0.6000
hr
hr
jam
set
JUMLAH
DIBULATKAN
1 m3
Abu Batu/Screening 5 mm
Pekerja
Mandor
Alat bantu
1.2000
0.3000
0.0100
0.6000
m3
hr
hr
set
JUMLAH
DIBULATKAN
HARGA
SATUAN
64,667.00
105,000.00
1,000.00
JUMLAH
2,586.68
420.00
600.00
JUMLAH
3,606.68
DIBULATKAN
3,606.00
64,667.00
105,000.00
1,000.00
48,500.25
2,625.00
600.00
JUMLAH
51,725.25
DIBULATKAN
51,725.00
64,667.00
105,000.00
1,000.00
58,200.30
3,412.50
600.00
JUMLAH
62,212.80
DIBULATKAN
62,212.00
64,667.00
105,000.00
1,000.00
60,463.65
7,665.00
600.00
JUMLAH
68,728.65
DIBULATKAN
68,728.00
64,667.00
105,000.00
1,000.00
60,786.98
9,870.00
600.00
JUMLAH
71,256.98
DIBULATKAN
71,256.00
64,667.00
12,933.40
HARGA
SATUAN
105,000.00
202,333.00
1,000.00
JUMLAH
210.00
20,233.30
300.00
JUMLAH
33,676.70
DIBULATKAN
33,676.00
HARGA
SATUAN
64,667.00
105,000.00
1,000.00
JUMLAH
62,403.66
3,675.00
600.00
JUMLAH
66,678.66
DIBULATKAN
66,678.00
64,667.00
105,000.00
1,000.00
126,747.32
3,391.50
600.00
JUMLAH
130,738.82
DIBULATKAN
130,738.00
64,667.00
105,000.00
1,000.00
63,050.33
3,412.50
600.00
JUMLAH
67,062.83
DIBULATKAN
67,062.00
64,667.00
105,000.00
1,000.00
77,600.40
5,250.00
600.00
JUMLAH
83,450.40
DIBULATKAN
83,450.00
64,667.00
105,000.00
1,000.00
16,037.42
840.00
600.00
JUMLAH
17,477.42
DIBULATKAN
17,477.00
64,667.00
105,000.00
1,000.00
19,400.10
1,050.00
600.00
HARGA
SATUAN
JUMLAH
JUMLAH
21,050.10
DIBULATKAN
21,050.00
HARGA
SATUAN
95,500.00
64,667.00
105,000.00
37,583.00
1,000.00
JUMLAH
114,600.00
8,018.71
420.00
33,824.70
300.00
JUMLAH
157,163.41
DIBULATKAN
157,163.00
95,500.00
64,667.00
105,000.00
222,667.00
1,000.00
114,600.00
8,018.71
420.00
22,266.70
300.00
JUMLAH
145,605.41
DIBULATKAN
145,605.00
95,500.00
64,667.00
105,000.00
222,667.00
1,000.00
114,600.00
9,700.05
525.00
33,400.05
300.00
JUMLAH
158,525.10
DIBULATKAN
158,525.00
170,000.00
64,667.00
105,000.00
1,000.00
204,000.00
19,400.10
1,050.00
600.00
JUMLAH
225,050.10
DIBULATKAN
225,050.00
144,167.00
64,667.00
105,000.00
1,000.00
173,000.40
32,333.50
2,100.00
600.00
HARGA
SATUAN
JUMLAH
JUMLAH
208,033.90
DIBULATKAN
208,033.00
HARGA
SATUAN
64,667.00
105,000.00
37,583.00
1,000.00
JUMLAH
19,400.10
525.00
33,824.70
600.00
JUMLAH
54,349.80
DIBULATKAN
54,349.00
64,667.00
105,000.00
105,000.00
1,000.00
25,866.80
4,200.00
315,000.00
600.00
JUMLAH
345,666.80
DIBULATKAN
345,666.00
152,000.00
64,667.00
105,000.00
1,000.00
JUMLAH
DIBULATKAN
182,400.00
19,400.10
1,050.00
600.00
203,450.10
203,450.00
NO.
URAIAN
KOEF.
SAT.
PEKERJAAN PONDASI
1
1 m3
Pasir beton
Split pecah mesin 2/3
Semen PC ( 50 kg )
Pekerja
Tukang batu
Kepala Tukang
Mandor
Sewa molen
0.6200
0.7400
4.9400
1.6500
0.2500
0.0250
0.0800
0.4000
m3
m3
zak
hr
hr
hr
hr
jam
JUMLAH
DIBULATKAN
1 m3
Pasir Pasang
Batu Kali
Semen PC ( 50 kg )
Pekerja
Tukang Batu
Mandor
Alat Bantu
0.4300
1.2000
5.2000
1.6500
0.5775
0.0495
2.0000
m3
m3
zak
hr
hr
hr
set
JUMLAH
DIBULATKAN
1 m3
Pasir Pasang
Batu Kali
Semen PC ( 50 kg )
Pekerja
Tukang Batu
Mandor
Alat Bantu
0.4560
1.2000
4.0000
1.6500
0.5775
0.0495
2.0000
m3
m3
zak
hr
hr
hr
set
JUMLAH
DIBULATKAN
1 m3
Pasir Pasang
Batu Kali
Semen PC ( 50 kg )
Pekerja
Tukang Batu
Mandor
Alat Bantu
0.3910
1.2000
3.5280
1.6500
0.8000
0.2000
2.0000
m3
m3
zak
hr
hr
hr
set
NO.
URAIAN
KOEF.
SAT.
JUMLAH
DIBULATKAN
NO.
5
URAIAN
1 m3
KOEF.
SAT.
Pasir Pasang
Batu Kali
Semen PC ( 50 kg )
Pekerja
Tukang Batu
Mandor
Alat Bantu
0.5600
1.2000
2.8640
1.6500
0.5775
0.0495
2.0000
m3
m3
zak
hr
hr
hr
set
JUMLAH
DIBULATKAN
1 m3
- Pas.Batu kosong
Batu Kali
Pekerja
Mandor
Alat Bantu
1.2000
1.1240
0.0560
2.0000
m3
hr
hr
set
JUMLAH
DIBULATKAN
1 m2
4.0000
0.7500
0.2625
2.0000
btg
hr
hr
hr
JUMLAH
DIBULATKAN
HARGA
SATUAN
249,167.00
210,000.00
63,333.00
64,667.00
74,500.00
85,167.00
105,000.00
37,583.00
JUMLAH
154,483.54
155,400.00
312,865.02
106,700.55
18,625.00
2,129.18
8,400.00
15,033.20
JUMLAH
773,636.49
DIBULATKAN
773,636.00
244,333.00
163,333.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00
105,063.19
195,999.60
329,331.60
106,700.55
43,023.75
5,197.50
2,000.00
JUMLAH
787,316.19
DIBULATKAN
787,316.00
244,333.00
163,333.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00
111,415.85
195,999.60
253,332.00
106,700.55
43,023.75
5,197.50
2,000.00
JUMLAH
717,669.25
DIBULATKAN
717,669.00
244,333.00
163,333.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00
95,534.20
195,999.60
223,438.82
106,700.55
59,600.00
21,000.00
2,000.00
HARGA
SATUAN
JUMLAH
JUMLAH
704,273.18
DIBULATKAN
704,273.00
HARGA
SATUAN
244,333.00
163,333.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00
JUMLAH
136,826.48
195,999.60
181,385.71
106,700.55
43,023.75
5,197.50
2,000.00
JUMLAH
671,133.59
DIBULATKAN
671,133.00
163,333.00
64,667.00
105,000.00
1,000.00
195,999.60
72,685.71
5,880.00
2,000.00
JUMLAH
276,565.31
DIBULATKAN
276,565.00
23,167.00
64,667.00
76,833.00
105,000.00
92,668.00
48,500.25
20,168.66
210,000.00
JUMLAH
371,336.91
DIBULATKAN
371,336.00
NO.
URAIAN
KOEF.
SAT.
PEKERJAAN BETON
1
1 m3
Pasir beton
Split pecah mesin 2/3
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu
0.5070
0.7160
5.0000
1.8000
0.4750
0.2858
2.5000
m3
m3
zak
hr
hr
hr
set
JUMLAH
DIBULATKAN
1 m3
Pasir beton
Split pecah mesin 2/3
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu
0.5070
0.7160
9.0000
1.8000
0.4858
0.2608
2.5000
m3
m3
zak
hr
hr
hr
set
JUMLAH
DIBULATKAN
1 m3
Pasir beton
Split pecah mesin 2/3
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu
0.5070
0.7160
11.0000
1.8000
0.2608
0.5858
2.5000
m3
m3
zak
hr
hr
hr
set
JUMLAH
DIBULATKAN
1 m3
Pasir beton
Split pecah mesin 2/3
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu
0.4000
0.7400
11.8000
1.8000
0.2620
0.6270
2.5000
m3
m3
zak
hr
hr
hr
set
JUMLAH
NO.
URAIAN
KOEF.
SAT.
DIBULATKAN
NO.
5
URAIAN
1 m3
KOEF.
SAT.
1.0000
0.5508
0.1377
0.0688
0.4819
2.5000
m3
hr
hr
hr
jam
set
JUMLAH
DIBULATKAN
1 m3
1.0000
0.6885
0.1377
0.0688
0.4819
2.5000
m3
hr
hr
hr
jam
set
JUMLAH
DIBULATKAN
1 m3
1.0000
0.6885
0.1377
0.0688
0.4819
2.5000
m3
hr
hr
hr
jam
set
JUMLAH
DIBULATKAN
1 m3
1.0000
0.6885
0.1377
0.0688
0.4819
2.5000
m3
hr
hr
hr
jam
set
JUMLAH
DIBULATKAN
NO.
9
URAIAN
1 m3
KOEF.
SAT.
1.0000
0.6885
0.1377
0.0688
0.4819
2.5000
m3
hr
hr
hr
jam
set
JUMLAH
DIBULATKAN
10
1 m3
1.0000
0.6885
0.1377
0.0688
0.4819
2.5000
m3
hr
hr
hr
jam
set
JUMLAH
DIBULATKAN
11
1 kg
Kawat beton
Besi beton polos
Pekerja
Tukang besi
Mandor
Alat bantu
0.0200
1.1000
0.0150
0.0050
0.0050
2.5000
kg
kg
hr
hr
hr
set
JUMLAH
DIBULATKAN
12
1 kg
Kawat beton
Besi beton ulir
Pekerja
Tukang besi
Mandor
Alat bantu
0.0200
1.1000
0.0150
0.0050
0.0050
2.5000
kg
kg
hr
hr
hr
set
JUMLAH
DIBULATKAN
13
1 m2
0.0240
0.0280
0.2500
m3
m3
kg
NO.
URAIAN
Pekerja
Tukang kayu
Mandor
Alat bantu
KOEF.
0.1650
0.3940
0.0270
2.5000
SAT.
hr
hr
hr
set
NO.
URAIAN
KOEF.
SAT.
JUMLAH
DIBULATKAN
14
1 m2
0.0280
0.3500
0.2500
0.1650
0.3940
0.0270
2.5000
m3
lbr
kg
bh
hr
hr
set
JUMLAH
DIBULATKAN
15
1 m3
0.2520
3.1500
2.2500
1.4850
3.5440
0.2430
2.5000
m3
lbr
kg
hr
hr
hr
set
JUMLAH
DIBULATKAN
16
1 m3
0.1870
2.3500
1.6680
1.1010
2.6260
0.1800
2.5000
m3
lbr
kg
hr
hr
hr
set
JUMLAH
DIBULATKAN
17
1 m3
0.2320
2.9050
2.0750
1.3700
3.2685
0.2245
2.5000
m3
lbr
kg
hr
hr
hr
set
NO.
URAIAN
KOEF.
SAT.
JUMLAH
DIBULATKAN
NO.
18
URAIAN
1 m2
KOEF.
SAT.
0.0608
0.3000
0.6000
0.4200
0.0300
2.5000
m3
kg
hr
hr
hr
set
JUMLAH
DIBULATKAN
19
1 m2
0.0851
0.4200
0.8400
0.5880
0.0420
3.5000
m3
kg
hr
hr
hr
set
JUMLAH
DIBULATKAN
20
1 m2
0.1094
0.5400
1.0800
0.7560
0.0540
4.5000
m3
kg
hr
hr
hr
set
JUMLAH
DIBULATKAN
21
1 m2
0.1398
0.6900
1.3800
0.9660
0.0690
5.7500
m3
kg
hr
hr
hr
set
JUMLAH
DIBULATKAN
22
1 m3
1.0000
120.0000
5.0000
m3
kg
m2
NO.
URAIAN
Alat bantu
KOEF.
4.2000
SAT.
set
JUMLAH
DIBULATKAN
NO.
23
URAIAN
1 m3
KOEF.
SAT.
1.0000
180.7480
5.0000
4.2000
m3
kg
m2
set
JUMLAH
DIBULATKAN
24
1 m3
1.0000
250.0000
2.6670
m3
kg
m2
JUMLAH
DIBULATKAN
25
1 m3
1.0000
125.0000
1.0000
m3
kg
m3
JUMLAH
DIBULATKAN
26
1 m3
1.0000
201.9760
1.0000
m3
kg
m3
JUMLAH
DIBULATKAN
27
1 m3
1.0000
130.0000
1.0000
m3
kg
m3
JUMLAH
DIBULATKAN
28
1 m3
1.0000
190.0000
1.0000
m3
kg
m3
JUMLAH
DIBULATKAN
NO.
URAIAN
KOEF.
SAT.
NO.
29
URAIAN
1 m3
KOEF.
SAT.
1.0000
180.0000
1.0000
m3
kg
m3
JUMLAH
DIBULATKAN
30
1 m3
1.0000
190.0000
1.0000
m3
kg
m3
JUMLAH
DIBULATKAN
31
1 m3
1.0000
213.2170
1.0000
m3
kg
m3
JUMLAH
DIBULATKAN
32
1 m3
1.0000
201.4130
1.0000
m3
kg
m2
JUMLAH
DIBULATKAN
33
1 m3
1.0000
187.2800
1.0000
m3
kg
m3
JUMLAH
DIBULATKAN
34
1 m3
1.0000
154.0000
2.0000
1.0000
m3
kg
m2
m3
JUMLAH
DIBULATKAN
NO.
URAIAN
KOEF.
SAT.
NO.
35
URAIAN
1 m3
KOEF.
SAT.
1.0000
228.3170
1.6675
1.0000
m3
kg
m2
m3
JUMLAH
DIBULATKAN
36
1 m3
1.0000
170.0000
2.2200
1.0000
m3
kg
m2
m3
JUMLAH
DIBULATKAN
37
1 m3
1.0000
170.0000
2.8575
1.0000
m3
kg
m2
m3
JUMLAH
DIBULATKAN
38
1 m3
m3
kg
m2
m3
JUMLAH
DIBULATKAN
39
1 m3
1.0000
138.1750
3.3330
1.0000
m3
kg
m2
m3
JUMLAH
DIBULATKAN
40
1 m3
1.0000
150.0000
m3
kg
NO.
URAIAN
Perancah kayu / stoot werk - tinggi s / d 4 m
Bekisting balok
KOEF.
4.0000
1.0000
SAT.
m2
m3
JUMLAH
DIBULATKAN
NO.
41
URAIAN
1 m3
KOEF.
SAT.
1.0000
120.0000
1.6665
1.0000
m3
kg
m2
m3
JUMLAH
DIBULATKAN
42
1 m3
1.0000
154.0000
2.5000
1.0000
m3
kg
m2
m3
JUMLAH
DIBULATKAN
43
1 m3
1.0000
154.0000
3.3300
1.0000
m3
kg
m2
m3
JUMLAH
DIBULATKAN
44
1 m3
1.0000
126.0300
6.2475
1.0000
m3
kg
m2
m3
JUMLAH
DIBULATKAN
45
1 m3
1.0000
100.0000
1.0000
1.0000
m3
kg
m2
m3
JUMLAH
DIBULATKAN
46
1 m3
1.0000
m3
NO.
URAIAN
Pembesian
Perancah kayu / stoot werk - tinggi s/d 4 m
Bekisting pelat lantai
KOEF.
75.0000
1.0000
1.0000
SAT.
kg
m2
m3
JUMLAH
DIBULATKAN
NO.
47
URAIAN
1 m3
KOEF.
SAT.
1.0000
105.0000
1.0000
m3
kg
m3
JUMLAH
DIBULATKAN
48
1 m3
1.0000
230.2800
1.0000
m3
kg
m3
JUMLAH
DIBULATKAN
49
1 m3
1.0000
100.0000
100.0000
1.0000
m3
kg
kg
m3
JUMLAH
DIBULATKAN
50
1 m3
1.0000
110.0000
110.0000
1.0000
m3
kg
kg
m3
JUMLAH
DIBULATKAN
51
1 m3
1.0000
140.0000
1.0000
m3
kg
m3
JUMLAH
DIBULATKAN
52
1 m3
1.0000
150.0000
1.0000
m3
kg
m3
JUMLAH
DIBULATKAN
NO.
53
URAIAN
1 m3
KOEF.
SAT.
1.0000
170.0000
1.0000
m3
kg
m3
JUMLAH
DIBULATKAN
54
1 m3
1.0000
110.0000
4.0000
m3
kg
m2
JUMLAH
DIBULATKAN
55
1 m3
1.0000
140.0000
1.0000
m3
kg
m3
JUMLAH
DIBULATKAN
56
1 m3
1.0000
110.0000
2.1192
m3
kg
m2
JUMLAH
DIBULATKAN
57
1 m2
0.0700
0.0882
2.1192
m3
lbr
m2
JUMLAH
DIBULATKAN
NO.
58
URAIAN
1 m2
KOEF.
SAT.
0.1000
0.0882
2.2000
m3
lbr
m2
JUMLAH
DIBULATKAN
59
1 m3
1.0000
0.7349
6.2475
1.0000
m3
lbr
m2
m3
JUMLAH
DIBULATKAN
60
1 m3
1.0000
100.0000
1.0000
m3
kg
m3
JUMLAH
DIBULATKAN
61
1 m3
1.0000
175.0000
1.0000
m3
kg
m3
JUMLAH
DIBULATKAN
62
1 m3
1.0000
165.0000
1.0000
m3
kg
m3
JUMLAH
DIBULATKAN
55
1 m3
1.0000
160.0000
1.0000
m3
kg
m3
JUMLAH
DIBULATKAN
NO.
30
URAIAN
1 m3
KOEF.
SAT.
1.0000
215.0000
m3
kg
NO.
URAIAN
Bekisting Kolom
KOEF.
1.0000
SAT.
m3
JUMLAH
DIBULATKAN
54
1 m3
1.0000
118.1400
4.0000
m3
kg
m2
JUMLAH
DIBULATKAN
54
1 m3
1.0000
120.0000
4.0000
m3
kg
m2
JUMLAH
DIBULATKAN
54
1 m3
1.0000
132.0000
4.0000
m3
kg
m2
JUMLAH
DIBULATKAN
48
1 m3
1.0000
107.9300
1.0000
m3
kg
m3
JUMLAH
DIBULATKAN
NO.
38
URAIAN
1 m3
KOEF.
SAT.
1.0000
170.0000
1.6875
1.0000
m3
kg
m2
m3
JUMLAH
DIBULATKAN
HARGA
SATUAN
249,167.00
210,000.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00
JUMLAH
126,327.67
150,360.00
316,665.00
116,400.60
35,387.50
30,009.00
2,500.00
JUMLAH
777,649.77
DIBULATKAN
777,649.00
249,167.00
210,000.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00
126,327.67
150,360.00
569,997.00
116,400.60
36,192.10
27,384.00
2,500.00
JUMLAH
1,029,161.37
DIBULATKAN
1,029,161.00
249,167.00
210,000.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00
126,327.67
150,360.00
696,663.00
116,400.60
19,429.60
61,509.00
2,500.00
JUMLAH
1,173,189.87
DIBULATKAN
1,173,189.00
249,167.00
210,000.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00
JUMLAH
99,666.80
155,400.00
747,329.40
116,400.60
19,519.00
65,835.00
2,500.00
1,206,650.80
HARGA
SATUAN
DIBULATKAN
JUMLAH
1,206,650.00
HARGA
SATUAN
652,000.00
64,667.00
74,500.00
105,000.00
19,000.00
1,000.00
JUMLAH
652,000.00
35,618.58
10,258.65
7,224.00
9,156.10
2,500.00
JUMLAH
716,757.33
DIBULATKAN
716,757.00
679,833.00
64,667.00
74,500.00
105,000.00
19,000.00
1,000.00
679,833.00
44,523.23
10,258.65
7,224.00
9,156.10
2,500.00
JUMLAH
753,494.98
DIBULATKAN
753,494.00
694,000.00
64,667.00
74,500.00
105,000.00
19,000.00
1,000.00
694,000.00
44,523.23
10,258.65
7,224.00
9,156.10
2,500.00
JUMLAH
767,661.98
DIBULATKAN
767,661.00
744,667.00
64,667.00
74,500.00
105,000.00
19,000.00
1,000.00
744,667.00
44,523.23
10,258.65
7,224.00
9,156.10
2,500.00
JUMLAH
818,328.98
DIBULATKAN
818,328.00
HARGA
SATUAN
802,833.00
64,667.00
74,500.00
105,000.00
19,000.00
1,000.00
JUMLAH
802,833.00
44,523.23
10,258.65
7,224.00
9,156.10
2,500.00
JUMLAH
876,494.98
DIBULATKAN
876,494.00
842,833.00
64,667.00
74,500.00
105,000.00
19,000.00
1,000.00
842,833.00
44,523.23
10,258.65
7,224.00
9,156.10
2,500.00
JUMLAH
916,494.98
DIBULATKAN
916,494.00
15,800.00
7,833.00
64,667.00
74,500.00
105,000.00
1,000.00
316.00
8,616.30
970.01
372.50
525.00
2,500.00
JUMLAH
13,299.81
DIBULATKAN
13,299.00
15,800.00
8,167.00
64,667.00
74,500.00
105,000.00
1,000.00
316.00
8,983.70
970.01
372.50
525.00
2,500.00
JUMLAH
13,667.21
DIBULATKAN
13,667.00
2,116,667.00
2,116,667.00
12,250.00
50,800.01
59,266.68
3,062.50
HARGA
SATUAN
64,667.00
76,833.00
105,000.00
1,000.00
JUMLAH
10,670.06
30,272.20
2,835.00
2,500.00
HARGA
SATUAN
JUMLAH
JUMLAH
159,406.44
DIBULATKAN
159,406.00
2,116,667.00
125,167.00
12,250.00
64,667.00
76,833.00
105,000.00
1,000.00
59,266.68
43,808.45
3,062.50
10,670.06
30,272.20
2,835.00
2,500.00
JUMLAH
152,414.88
DIBULATKAN
152,414.00
2,116,667.00
125,167.00
12,250.00
64,667.00
76,833.00
105,000.00
1,000.00
533,400.08
394,276.05
27,562.50
96,030.50
272,296.15
25,515.00
2,500.00
JUMLAH
1,351,580.28
DIBULATKAN
1,351,580.00
2,116,667.00
125,167.00
12,250.00
64,667.00
76,833.00
105,000.00
1,000.00
395,816.73
294,142.45
20,433.00
71,198.37
201,763.46
18,900.00
2,500.00
JUMLAH
1,004,754.00
DIBULATKAN
1,004,754.00
2,116,667.00
125,167.00
12,250.00
64,667.00
76,833.00
105,000.00
1,000.00
491,066.74
363,610.14
25,418.75
88,593.79
251,128.66
23,572.50
2,500.00
HARGA
SATUAN
JUMLAH
JUMLAH
1,245,890.58
DIBULATKAN
1,245,890.00
HARGA
SATUAN
2,116,667.00
12,250.00
64,667.00
76,833.00
105,000.00
1,000.00
JUMLAH
128,693.35
3,675.00
38,800.20
32,269.86
3,150.00
2,500.00
JUMLAH
209,088.41
DIBULATKAN
209,088.00
2,116,667.00
12,250.00
64,667.00
76,833.00
105,000.00
1,000.00
180,128.36
5,145.00
54,320.28
45,177.80
4,410.00
3,500.00
JUMLAH
292,681.45
DIBULATKAN
292,681.00
2,116,667.00
12,250.00
64,667.00
76,833.00
105,000.00
1,000.00
231,563.37
6,615.00
69,840.36
58,085.75
5,670.00
4,500.00
JUMLAH
376,274.48
DIBULATKAN
376,274.00
2,116,667.00
12,250.00
64,667.00
76,833.00
105,000.00
1,000.00
295,910.05
8,452.50
89,240.46
74,220.68
7,245.00
5,750.00
JUMLAH
480,818.68
DIBULATKAN
480,818.00
1,029,161.00
13,299.00
159,406.00
1,029,161.00
1,595,880.00
797,030.00
HARGA
SATUAN
1,000.00
JUMLAH
4,200.00
JUMLAH
3,426,271.00
DIBULATKAN
3,426,271.00
HARGA
SATUAN
1,029,161.00
13,299.00
159,406.00
1,000.00
JUMLAH
1,029,161.00
2,403,767.65
797,030.00
4,200.00
JUMLAH
4,234,158.65
DIBULATKAN
4,234,158.00
1,173,189.00
13,667.00
152,414.00
1,173,189.00
3,416,750.00
406,488.14
JUMLAH
4,996,427.14
DIBULATKAN
4,996,427.00
1,173,189.00
13,667.00
1,004,754.00
1,173,189.00
1,708,375.00
1,004,754.00
JUMLAH
3,886,318.00
DIBULATKAN
3,886,318.00
753,494.00
13,667.00
1,004,754.00
753,494.00
2,760,405.99
1,004,754.00
JUMLAH
4,518,653.99
DIBULATKAN
4,518,653.00
753,494.00
13,667.00
1,004,754.00
753,494.00
1,776,710.00
1,004,754.00
JUMLAH
3,534,958.00
DIBULATKAN
3,534,958.00
753,494.00
13,667.00
1,004,754.00
753,494.00
2,596,730.00
1,004,754.00
JUMLAH
4,354,978.00
DIBULATKAN
4,354,970.00
HARGA
SATUAN
JUMLAH
HARGA
SATUAN
753,494.00
13,299.00
1,004,754.00
JUMLAH
753,494.00
2,393,820.00
1,004,754.00
JUMLAH
4,152,068.00
DIBULATKAN
4,152,068.00
753,494.00
13,667.00
1,351,580.00
753,494.00
2,596,730.00
1,351,580.00
JUMLAH
4,701,804.00
DIBULATKAN
4,701,804.00
753,494.00
13,667.00
1,351,580.00
753,494.00
2,914,036.74
1,351,580.00
JUMLAH
5,019,110.74
DIBULATKAN
5,019,110.00
753,494.00
13,667.00
1,351,580.00
753,494.00
2,752,711.47
1,351,580.00
JUMLAH
4,857,785.47
DIBULATKAN
4,857,785.00
753,494.00
13,299.00
1,351,580.00
753,494.00
2,490,636.72
1,351,580.00
JUMLAH
4,595,710.72
DIBULATKAN
4,595,710.00
753,494.00
13,667.00
376,274.00
1,004,754.00
753,494.00
2,104,718.00
752,548.00
1,004,754.00
JUMLAH
4,615,514.00
DIBULATKAN
4,615,514.00
HARGA
SATUAN
JUMLAH
HARGA
SATUAN
753,494.00
13,299.00
376,274.00
1,004,754.00
JUMLAH
753,494.00
3,036,387.78
627,436.90
1,004,754.00
JUMLAH
5,422,072.68
DIBULATKAN
5,422,072.00
753,494.00
13,667.00
376,274.00
1,004,754.00
753,494.00
2,323,390.00
835,328.28
1,004,754.00
JUMLAH
4,916,966.28
DIBULATKAN
4,916,966.00
753,494.00
13,299.00
376,274.00
1,004,754.00
753,494.00
2,260,830.00
1,075,202.96
1,004,754.00
JUMLAH
5,094,280.96
DIBULATKAN
5,094,280.00
753,494.00
13,667.00
376,274.00
1,004,754.00
753,494.00
2,186,720.00
940,685.00
1,004,754.00
JUMLAH
4,885,653.00
DIBULATKAN
4,885,653.00
753,494.00
13,667.00
376,274.00
1,004,754.00
753,494.00
1,888,437.73
1,254,121.24
1,004,754.00
JUMLAH
4,900,806.97
DIBULATKAN
4,900,806.00
753,494.00
13,667.00
753,494.00
2,050,050.00
HARGA
SATUAN
376,274.00
1,004,754.00
JUMLAH
1,505,096.00
1,004,754.00
JUMLAH
5,313,394.00
DIBULATKAN
5,313,394.00
HARGA
SATUAN
753,494.00
13,299.00
376,274.00
1,004,754.00
JUMLAH
753,494.00
1,595,880.00
627,060.62
1,004,754.00
JUMLAH
3,981,188.62
DIBULATKAN
3,981,188.00
753,494.00
13,667.00
376,274.00
1,004,754.00
753,494.00
2,104,718.00
940,685.00
1,004,754.00
JUMLAH
4,803,651.00
DIBULATKAN
4,803,651.00
753,494.00
13,667.00
376,274.00
1,004,754.00
753,494.00
2,104,718.00
1,252,992.42
1,004,754.00
JUMLAH
5,115,958.42
DIBULATKAN
5,115,958.00
753,494.00
13,299.00
376,274.00
1,245,890.00
753,494.00
1,676,072.97
2,350,771.82
1,245,890.00
JUMLAH
6,026,228.79
DIBULATKAN
6,026,228.00
753,494.00
13,299.00
376,274.00
1,004,754.00
753,494.00
1,329,900.00
376,274.00
1,004,754.00
JUMLAH
3,464,422.00
DIBULATKAN
3,464,422.00
753,494.00
753,494.00
HARGA
SATUAN
13,299.00
376,274.00
1,245,890.00
JUMLAH
997,425.00
376,274.00
1,245,890.00
JUMLAH
3,373,083.00
DIBULATKAN
3,373,083.00
HARGA
SATUAN
753,494.00
13,299.00
1,245,890.00
JUMLAH
753,494.00
1,396,395.00
1,245,890.00
JUMLAH
3,395,779.00
DIBULATKAN
3,395,779.00
753,494.00
13,667.00
1,245,890.00
753,494.00
3,147,236.76
1,245,890.00
JUMLAH
5,146,620.76
DIBULATKAN
5,146,620.00
1,173,189.00
13,667.00
1,100.00
85,560.00
1,173,189.00
1,366,700.00
110,000.00
85,560.00
JUMLAH
2,735,449.00
DIBULATKAN
2,735,449.00
1,173,189.00
13,667.00
1,100.00
85,560.00
1,173,189.00
1,503,370.00
121,000.00
85,560.00
JUMLAH
2,883,119.00
DIBULATKAN
2,883,119.00
753,494.00
13,299.00
1,351,580.00
753,494.00
1,861,860.00
1,351,580.00
JUMLAH
3,966,934.00
DIBULATKAN
3,966,934.00
753,494.00
13,667.00
1,351,580.00
753,494.00
2,050,050.00
1,351,580.00
JUMLAH
4,155,124.00
DIBULATKAN
4,155,124.00
HARGA
SATUAN
753,494.00
13,299.00
1,004,754.00
JUMLAH
753,494.00
2,260,830.00
1,004,754.00
JUMLAH
4,019,078.00
DIBULATKAN
4,019,078.00
1,173,189.00
13,667.00
152,414.00
1,173,189.00
1,503,370.00
609,656.00
JUMLAH
3,286,215.00
DIBULATKAN
3,286,215.00
753,494.00
13,667.00
1,351,580.00
753,494.00
1,913,380.00
1,351,580.00
JUMLAH
4,018,454.00
DIBULATKAN
4,018,454.00
753,494.00
13,299.00
152,414.00
753,494.00
1,462,890.00
322,995.75
JUMLAH
2,539,379.75
DIBULATKAN
2,539,379.00
753,494.00
484,000.00
152,414.00
52,744.58
42,688.80
322,995.75
JUMLAH
418,429.13
DIBULATKAN
418,429.00
HARGA
SATUAN
753,494.00
484,000.00
152,414.00
JUMLAH
75,349.40
42,688.80
335,310.80
JUMLAH
453,349.00
DIBULATKAN
453,349.00
753,494.00
13,299.00
376,274.00
1,245,890.00
753,494.00
9,773.44
2,350,771.82
1,245,890.00
JUMLAH
4,359,929.25
DIBULATKAN
4,359,929.00
753,494.00
13,667.00
1,351,580.00
753,494.00
1,366,700.00
1,351,580.00
JUMLAH
3,471,774.00
DIBULATKAN
3,471,774.00
753,494.00
13,299.00
1,351,580.00
753,494.00
2,327,325.00
1,351,580.00
JUMLAH
4,432,399.00
DIBULATKAN
4,432,399.00
753,494.00
13,667.00
1,351,580.00
753,494.00
2,255,055.00
1,351,580.00
JUMLAH
4,360,129.00
DIBULATKAN
4,360,129.00
753,494.00
13,667.00
1,351,580.00
753,494.00
2,186,720.00
1,351,580.00
JUMLAH
4,291,794.00
DIBULATKAN
4,291,794.00
HARGA
SATUAN
753,494.00
13,667.00
JUMLAH
753,494.00
2,938,405.00
HARGA
SATUAN
1,351,580.00
JUMLAH
1,351,580.00
JUMLAH
5,043,479.00
DIBULATKAN
5,043,479.00
753,494.00
13,667.00
152,414.00
753,494.00
1,614,619.38
609,656.00
JUMLAH
2,977,769.38
DIBULATKAN
2,977,769.00
753,494.00
13,667.00
152,414.00
753,494.00
1,640,040.00
609,656.00
JUMLAH
3,003,190.00
DIBULATKAN
3,003,190.00
753,494.00
13,667.00
152,414.00
753,494.00
1,804,044.00
609,656.00
JUMLAH
3,167,194.00
DIBULATKAN
3,167,194.00
753,494.00
13,667.00
1,245,890.00
753,494.00
1,475,079.31
1,245,890.00
JUMLAH
3,474,463.31
DIBULATKAN
3,474,463.00
HARGA
SATUAN
753,494.00
13,667.00
376,274.00
1,004,754.00
JUMLAH
753,494.00
2,323,390.00
634,962.38
1,004,754.00
JUMLAH
4,716,600.38
DIBULATKAN
4,716,600.00
NO.
URAIAN
KOEF.
SAT.
PEKERJAAN DINDING
1 m2
Pasir pasang
Bata merah
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu
0.0380
75.0000
0.4700
0.3600
0.1875
0.0155
4.0000
m3
bh
zak
hr
hr
hr
set
JUMLAH
DIBULATKAN
1 m2
Pasir pasang
Bata merah
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu
0.0430
75.0000
0.3600
0.3600
0.1875
0.0155
4.0000
m3
bh
zak
hr
hr
hr
set
JUMLAH
DIBULATKAN
1 m2
Pasir pasang
Bata merah
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu
0.0460
75.0000
0.2900
0.3600
0.1875
0.0155
4.0000
m3
bh
zak
hr
hr
hr
set
JUMLAH
DIBULATKAN
1 m2
Pasir pasang
Bata merah
Semen PC ( 50 kg )
Pekerja
Tukang batu
0.0480
75.0000
0.2400
0.3600
0.1875
m3
bh
zak
hr
hr
NO.
URAIAN
Mandor
Alat bantu
KOEF.
0.0155
4.0000
SAT.
hr
set
JUMLAH
DIBULATKAN
NO.
URAIAN
1 m2
KOEF.
SAT.
Pasir pasang
Batako beton 20 / 40
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu
0.0130
13.0000
0.1570
0.2900
0.1500
0.0300
2.0000
m3
bh
zak
hr
hr
hr
set
JUMLAH
DIBULATKAN
1 m2
Pasir pasang
Hebel 10.20.60
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu
0.0150
8.3333
0.1800
0.2900
0.1500
0.0300
2.0000
m3
bh
zak
hr
hr
hr
set
JUMLAH
DIBULATKAN
1 m2
Pasir pasang
Batako beton 20 / 40
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu
0.0150
13.0000
0.1000
0.2900
0.1500
0.0300
2.0000
m3
bh
zak
hr
hr
hr
set
JUMLAH
DIBULATKAN
1 m2
Pasir pasang
Batako beton 20 / 40
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu
0.0160
13.0000
0.0800
0.2900
0.1500
0.0300
2.0000
m3
bh
zak
hr
hr
hr
set
NO.
URAIAN
KOEF.
SAT.
JUMLAH
DIBULATKAN
NO.
URAIAN
1 m2
KOEF.
SAT.
Pasir pasang
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu
0.0180
0.2130
0.3000
0.1575
0.0115
2.0000
m3
zak
hr
hr
hr
set
JUMLAH
DIBULATKAN
1 m2
Pasir pasang
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu
0.0210
0.1920
0.3000
0.1575
0.0115
2.0000
m3
zak
hr
hr
hr
set
JUMLAH
DIBULATKAN
1 m2
Pasir pasang
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu
0.0230
0.1570
0.3000
0.1575
0.0115
2.0000
m3
zak
hr
hr
hr
set
JUMLAH
DIBULATKAN
1 m2
Pasir pasang
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu
0.0240
0.1240
0.3000
0.1575
0.0115
2.0000
m3
zak
hr
hr
hr
set
JUMLAH
DIBULATKAN
NO.
URAIAN
1 m2
KOEF.
SAT.
- Pek.Acian
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu
0.0800
0.1430
0.1123
0.0063
2.0000
zak
hr
hr
hr
set
JUMLAH
DIBULATKAN
NO.
URAIAN
1 m2
KOEF.
SAT.
- Pasang Dinding Rooster / Terawang, Natural, uk. 12x11x24 cm, Ad. 1Pc : 4Ps
Rooster
Pasir pasang
Semen PC ( 50 kg )
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
36.0000
0.0350
0.2560
0.3000
0.1000
0.0100
0.0150
bh
m3
zak
hr
hr
hr
hr
JUMLAH
DIBULATKAN
1 m2
1.0500
0.0350
0.2350
0.6200
0.3500
0.0350
0.0300
m2
m3
zak
hr
hr
hr
hr
JUMLAH
DIBULATKAN
1 m2
Pasir pasang
Batako beton 20 / 40
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu
0.0150
8.3333
0.1000
0.2900
0.1500
0.0300
2.0000
m3
bh
zak
hr
hr
hr
set
JUMLAH
DIBULATKAN
1 m2
Pasir pasang
Tukang batu
Mandor
Alat bantu
0.1500
0.2500
0.0250
2.0000
Zak
hr
hr
set
JUMLAH
NO.
URAIAN
KOEF.
SAT.
DIBULATKAN
HARGA
SATUAN
244,333.00
700.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00
JUMLAH
9,284.65
52,500.00
29,766.51
23,280.12
13,968.75
1,627.50
4,000.00
JUMLAH
134,427.53
DIBULATKAN
134,427.00
244,333.00
700.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00
10,506.32
52,500.00
22,799.88
23,280.12
13,968.75
1,627.50
4,000.00
JUMLAH
128,682.57
DIBULATKAN
128,682.00
244,333.00
700.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00
11,239.32
52,500.00
18,366.57
23,280.12
13,968.75
1,627.50
4,000.00
JUMLAH
124,982.26
DIBULATKAN
124,982.00
244,333.00
700.00
63,333.00
64,667.00
74,500.00
11,727.98
52,500.00
15,199.92
23,280.12
13,968.75
HARGA
SATUAN
105,000.00
1,000.00
JUMLAH
1,627.50
4,000.00
JUMLAH
122,304.27
DIBULATKAN
122,304.00
HARGA
SATUAN
244,333.00
3,833.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00
JUMLAH
3,176.33
49,829.00
9,943.28
18,753.43
11,175.00
3,150.00
2,000.00
JUMLAH
98,027.04
DIBULATKAN
98,027.00
244,333.00
11,167.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00
3,665.00
93,057.96
11,399.94
18,753.43
11,175.00
3,150.00
2,000.00
JUMLAH
143,201.33
DIBULATKAN
143,201.00
244,333.00
3,833.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00
3,665.00
49,829.00
6,333.30
18,753.43
11,175.00
3,150.00
2,000.00
JUMLAH
94,905.73
DIBULATKAN
94,905.00
244,333.00
3,833.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00
3,909.33
49,829.00
5,066.64
18,753.43
11,175.00
3,150.00
2,000.00
HARGA
SATUAN
JUMLAH
JUMLAH
93,883.40
DIBULATKAN
93,883.00
HARGA
SATUAN
244,333.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00
JUMLAH
4,397.99
13,489.93
19,400.10
11,733.75
1,207.50
2,000.00
JUMLAH
52,229.27
DIBULATKAN
52,229.00
244,333.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00
5,130.99
12,159.94
19,400.10
11,733.75
1,207.50
2,000.00
JUMLAH
51,632.28
DIBULATKAN
51,632.00
244,333.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00
5,619.66
9,943.28
19,400.10
11,733.75
1,207.50
2,000.00
JUMLAH
49,904.29
DIBULATKAN
49,904.00
244,333.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00
5,863.99
7,853.29
19,400.10
11,733.75
1,207.50
2,000.00
JUMLAH
48,058.63
DIBULATKAN
48,058.00
HARGA
SATUAN
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00
JUMLAH
5,066.64
9,247.38
8,366.35
661.50
2,000.00
JUMLAH
25,341.87
DIBULATKAN
25,341.00
HARGA
SATUAN
6,917.00
244,333.00
63,333.00
64,667.00
74,500.00
85,167.00
105,000.00
JUMLAH
249,012.00
8,551.66
16,213.25
19,400.10
7,450.00
851.67
1,575.00
JUMLAH
303,053.67
DIBULATKAN
303,053.00
82,500.00
244,333.00
63,333.00
64,667.00
74,500.00
85,167.00
105,000.00
86,625.00
8,551.66
14,883.26
40,093.54
26,075.00
2,980.85
3,150.00
JUMLAH
182,359.30
DIBULATKAN
182,359.00
244,333.00
11,167.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00
3,665.00
93,057.96
6,333.30
18,753.43
11,175.00
3,150.00
2,000.00
JUMLAH
138,134.69
DIBULATKAN
138,134.00
63,333.00
74,500.00
105,000.00
1,000.00
JUMLAH
9,499.95
18,625.00
2,625.00
2,000.00
32,749.95
HARGA
SATUAN
DIBULATKAN
JUMLAH
32,749.00
NO.
URAIAN
KOEF.
SAT.
PEKERJAAN ATAP
1 m3
1.1000
3.0000
15.0000
5.0000
15.7500
1.0000
m3
kg
kg
hr
hr
hr
JUMLAH
DIBULATKAN
1 m3
1.1000
3.0000
15.0000
5.0000
15.7500
1.0000
m3
kg
kg
hr
hr
hr
JUMLAH
DIBULATKAN
1 m3
Kayu meranti
Paku 8 - 12
Besi pengikat kuda - kuda
Pekerja
Tukang kayu
Mandor
1.1000
3.0000
15.0000
5.0000
15.7500
1.0000
m3
kg
kg
hr
hr
hr
JUMLAH
DIBULATKAN
1 m2
Kayu meranti
Paku 8 - 12
Pekerja
Tukang kayu
Mandor
0.0180
0.1500
0.1000
0.1000
0.0150
m3
kg
hr
hr
hr
JUMLAH
DIBULATKAN
NO.
URAIAN
1 m'
KOEF.
SAT.
0.0150
0.8000
0.2800
0.5600
0.0720
m3
kg
hr
hr
hr
JUMLAH
DIBULATKAN
1 m'
0.0100
0.0500
0.1430
0.2850
0.0360
m3
kg
hr
hr
hr
JUMLAH
DIBULATKAN
1 m2
18.0000
0.1500
0.0790
0.0120
bh
hr
hr
hr
JUMLAH
DIBULATKAN
1 m'
Pasir pasang
Semen PC ( 50 kg )
Genteng bubungan / nok
Pekerja
Tukang batu
Mandor
0.0320
0.2200
3.5000
0.3000
0.1575
0.0225
m3
zak
bh
hr
hr
hr
JUMLAH
DIBULATKAN
1 m2
18.0000
0.1500
0.0790
bh
hr
hr
NO.
URAIAN
Mandor
KOEF.
0.0120
SAT.
hr
JUMLAH
DIBULATKAN
NO.
URAIAN
1 m'
KOEF.
SAT.
Pasir pasang
Semen PC ( 50 kg )
Genteng bubungan / nok
Pekerja
Tukang batu
Mandor
0.0320
0.2200
3.5000
0.3000
0.1575
0.0225
m3
zak
bh
hr
hr
hr
JUMLAH
DIBULATKAN
1 m2
0.9000
0.1200
0.1400
0.0750
0.0080
0.0080
lbr
kg
hr
hr
hr
hr
JUMLAH
DIBULATKAN
1 m1
2.1000
0.1200
0.0840
0.1250
0.0130
0.0040
lbr
kg
hr
hr
hr
hr
JUMLAH
DIBULATKAN
1 kg
Zinkcchromate
Besi WF ex. DN SII
Pekerja
Tukang besi
Mandor
Erection
0.0400
1.0500
0.0600
0.0045
0.0025
1.0000
m2
kg
hr
hr
hr
kg
JUMLAH
DIBULATKAN
NO.
URAIAN
1 kg
KOEF.
SAT.
Zinkcchromate
Besi siku ex. DN SII
Pekerja
Tukang besi
Mandor
Erection
0.0400
1.0500
0.0600
0.0045
0.0025
1.0000
m2
kg
hr
hr
hr
kg
JUMLAH
DIBULATKAN
1 kg
Zinkcchromate
Gording besi
Pekerja
Tukang besi
Mandor
Erection
0.0400
1.0200
0.0600
0.0045
0.0025
1.0000
m2
kg
hr
hr
hr
kg
JUMLAH
DIBULATKAN
1 m'
0.0096
0.5000
0.0150
0.0500
0.1200
0.0120
m3
m'
kg
hr
hr
hr
JUMLAH
DIBULATKAN
1 m'
Paku 8 - 12
Pekerja
Tukang kayu
Mandor
0.4000
0.0840
0.2800
0.0360
kg
hr
hr
hr
JUMLAH
DIBULATKAN
NO.
URAIAN
1 m2
KOEF.
SAT.
1.0000
0.1200
0.1500
0.0790
0.0120
m2
kg
hr
hr
hr
JUMLAH
DIBULATKAN
1 m'
1.0000
0.1200
0.3000
0.1575
0.0225
m'
kg
hr
hr
hr
JUMLAH
DIBULATKAN
1 m2
Alumunium Foil
Paku
Pekerja
Tukang
Mandor
1.0000
0.1200
0.3000
0.1575
0.0225
m2
kg
hr
hr
hr
JUMLAH
DIBULATKAN
1 m'
1.0000
0.1200
0.2800
0.5600
0.0720
m1
kg
hr
hr
hr
JUMLAH
DIBULATKAN
HARGA
SATUAN
6,483,333.00
12,250.00
11,000.00
64,667.00
76,833.00
105,000.00
JUMLAH
7,131,666.30
36,750.00
165,000.00
323,335.00
1,210,119.75
105,000.00
JUMLAH
8,971,871.05
DIBULATKAN
8,971,871.00
6,483,333.00
12,250.00
11,000.00
64,667.00
76,833.00
105,000.00
7,131,666.30
36,750.00
165,000.00
323,335.00
1,210,119.75
105,000.00
JUMLAH
8,971,871.05
DIBULATKAN
8,971,871.00
3,633,333.00
12,250.00
11,000.00
64,667.00
76,833.00
105,000.00
3,996,666.30
36,750.00
165,000.00
323,335.00
1,210,119.75
105,000.00
JUMLAH
5,836,871.05
DIBULATKAN
5,836,871.00
3,633,333.00
12,250.00
64,667.00
76,833.00
105,000.00
65,399.99
1,837.50
6,466.70
7,683.30
1,575.00
JUMLAH
82,962.49
DIBULATKAN
82,962.00
HARGA
SATUAN
7,083,333.00
12,250.00
64,667.00
76,833.00
105,000.00
JUMLAH
106,250.00
9,800.00
18,106.76
43,026.48
7,560.00
JUMLAH
184,743.24
DIBULATKAN
184,743.00
7,083,333.00
12,250.00
64,667.00
76,833.00
105,000.00
70,833.33
612.50
9,247.38
21,897.41
3,780.00
JUMLAH
106,370.62
DIBULATKAN
106,370.00
3,500.00
64,667.00
76,833.00
105,000.00
63,000.00
9,700.05
6,069.81
1,260.00
JUMLAH
80,029.86
DIBULATKAN
80,029.00
244,333.00
63,333.00
6,000.00
64,667.00
74,500.00
105,000.00
7,818.66
13,933.26
21,000.00
19,400.10
11,733.75
2,362.50
JUMLAH
76,248.27
DIBULATKAN
76,248.00
6,000.00
64,667.00
76,833.00
108,000.00
9,700.05
6,069.81
HARGA
SATUAN
105,000.00
JUMLAH
1,260.00
JUMLAH
125,029.86
DIBULATKAN
125,029.00
HARGA
SATUAN
244,333.00
63,333.00
12,000.00
64,667.00
74,500.00
105,000.00
JUMLAH
7,818.66
13,933.26
42,000.00
19,400.10
11,733.75
2,362.50
JUMLAH
97,248.27
DIBULATKAN
97,248.00
51,333.00
12,250.00
64,667.00
76,833.00
85,167.00
105,000.00
46,199.70
1,470.00
9,053.38
5,762.48
681.34
840.00
JUMLAH
64,006.89
DIBULATKAN
64,006.00
50,000.00
12,250.00
64,667.00
76,833.00
85,167.00
105,000.00
105,000.00
1,470.00
5,432.03
9,604.13
1,107.17
420.00
JUMLAH
123,033.32
DIBULATKAN
123,033.00
500.00
14,333.00
64,667.00
74,500.00
105,000.00
10,000.00
20.00
15,049.65
3,880.02
335.25
262.50
10,000.00
JUMLAH
29,547.42
DIBULATKAN
29,547.00
HARGA
SATUAN
500.00
14,500.00
64,667.00
74,500.00
105,000.00
10,000.00
JUMLAH
20.00
15,225.00
3,880.02
335.25
262.50
10,000.00
JUMLAH
29,722.77
DIBULATKAN
29,722.00
500.00
14,500.00
64,667.00
74,500.00
105,000.00
10,000.00
20.00
14,790.00
3,880.02
335.25
262.50
10,000.00
JUMLAH
29,287.77
DIBULATKAN
29,287.00
4,050,000.00
39,833.00
12,250.00
64,667.00
76,833.00
105,000.00
38,880.00
19,916.50
183.75
3,233.35
9,219.96
1,260.00
JUMLAH
72,693.56
DIBULATKAN
72,693.00
12,250.00
64,667.00
76,833.00
105,000.00
4,900.00
5,432.03
21,513.24
3,780.00
JUMLAH
35,625.27
DIBULATKAN
35,625.00
HARGA
SATUAN
111,500.00
12,250.00
64,667.00
76,833.00
105,000.00
JUMLAH
111,500.00
1,470.00
9,700.05
6,069.81
1,260.00
JUMLAH
129,999.86
DIBULATKAN
129,999.00
55,700.00
12,250.00
64,667.00
74,500.00
105,000.00
55,700.00
1,470.00
19,400.10
11,733.75
2,362.50
JUMLAH
90,666.35
DIBULATKAN
90,666.00
20,000.00
12,250.00
64,667.00
74,500.00
105,000.00
20,000.00
1,470.00
19,400.10
11,733.75
2,362.50
JUMLAH
54,966.35
DIBULATKAN
54,966.00
29,375.00
12,250.00
64,667.00
74,500.00
105,000.00
JUMLAH
DIBULATKAN
29,375.00
1,470.00
18,106.76
41,720.00
7,560.00
98,231.76
98,231.00
NO.
URAIAN
KOEF.
SAT.
PEKERJAAN KAYU
1 m3
1.0000
2.0000
5.5600
7.2000
15.2000
1.5600
m2
kg
kg
hr
hr
hr
JUMLAH
DIBULATKAN
1 m3
1.1000
3.0000
5.5600
7.2000
25.2000
1.5600
m3
kg
kg
hr
hr
hr
JUMLAH
DIBULATKAN
1 m3
1.1000
3.0000
5.5600
7.2000
25.2000
1.5600
m3
kg
kg
hr
hr
hr
JUMLAH
DIBULATKAN
1 m3
1.1000
3.0000
5.5600
7.2000
25.2000
1.5600
m3
kg
kg
hr
hr
hr
JUMLAH
DIBULATKAN
NO.
URAIAN
1 bh
KOEF.
SAT.
0.0400
1.0000
0.3000
0.0300
0.4800
1.6000
0.1840
m3
lbr
kg
kg
hr
hr
hr
JUMLAH
DIBULATKAN
1 bh
0.0400
1.0000
0.3000
0.0300
0.4800
1.6000
0.1840
m3
lbr
kg
kg
hr
hr
hr
JUMLAH
DIBULATKAN
1 bh
0.0400
1.0000
0.5000
0.8000
0.0300
0.4800
1.6000
0.1840
m3
lbr
lbr
kg
kg
hr
hr
hr
JUMLAH
DIBULATKAN
1 bh
0.0300
0.4000
0.0300
0.9000
0.8000
2.0000
0.2400
m3
kg
kg
m2
hr
hr
hr
JUMLAH
DIBULATKAN
NO.
URAIAN
1 bh
KOEF.
SAT.
0.0300
0.4000
0.0300
0.9000
0.8000
2.0000
0.2400
m3
kg
kg
m2
hr
hr
hr
JUMLAH
DIBULATKAN
1 bh
0.0300
0.4000
0.0300
0.9000
0.8000
2.0000
0.2400
m3
kg
kg
m2
hr
hr
hr
JUMLAH
DIBULATKAN
1 Unit
0.0850
1.1600
0.5000
0.4500
1.2150
2.4300
0.2590
m3
kg
m2
kg
hr
hr
hr
JUMLAH
DIBULATKAN
1 m2
0.0440
0.4000
1.2150
2.4300
0.2590
m3
kg
hr
hr
hr
JUMLAH
DIBULATKAN
NO.
URAIAN
1 m2
KOEF.
SAT.
0.0440
0.4000
1.2150
2.4300
0.2590
m3
kg
hr
hr
hr
JUMLAH
DIBULATKAN
1 m2
0.0420
0.2000
1.0000
3.0000
0.3500
m3
kg
hr
hr
hr
JUMLAH
DIBULATKAN
1 m2
0.0420
0.2000
1.0000
3.0000
0.3500
m3
kg
hr
hr
hr
JUMLAH
DIBULATKAN
1 bh
9.0000
12.0000
5.8000
0.4350
1.7307
13.5000
0.2028
m'
m'
m'
m2
tube
m'
hr
NO.
URAIAN
Tukang
Mandor
KOEF.
0.7453
0.0426
SAT.
hr
hr
JUMLAH
DIBULATKAN
1 bh
3.9000
0.6604
0.3200
3.8000
0.0800
0.5856
0.0335
m'
m2
tube
m'
hr
hr
hr
JUMLAH
DIBULATKAN
1 bh
3.4000
0.5564
0.9650
9.6000
0.1304
0.4791
0.0274
m'
m2
tube
m'
hr
hr
hr
JUMLAH
DIBULATKAN
1 bh
9.0000
12.0000
1.6900
1.7307
10.0000
0.2028
0.7453
0.0426
m'
m'
m2
tube
m'
hr
hr
hr
JUMLAH
DIBULATKAN
1 bh
12.0000
21.0000
1.6900
1.7307
5.0000
m'
m'
m2
tube
m'
NO.
URAIAN
Pekerja
Tukang
Mandor
KOEF.
0.1250
0.4360
0.0426
SAT.
hr
hr
hr
JUMLAH
DIBULATKAN
1 bh
9.0000
1.5200
1.5000
9.0000
0.1028
0.3453
0.0426
m'
m'
m2
tube
m'
hr
hr
hr
JUMLAH
1 m3
1 bh
1.0000
0.2028
0.7453
0.0426
unit
hr
hr
hr
JUMLAH
DIBULATKAN
2.8000
1.0192
0.3200
3.8000
0.0800
0.5856
0.0335
m'
m2
tube
m'
hr
hr
hr
JUMLAH
DIBULATKAN
1 bh
21.2000
6.6600
0.3200
12.0000
0.0800
0.5856
0.0335
m'
m2
tube
m'
hr
hr
hr
NO.
URAIAN
KOEF.
SAT.
JUMLAH
DIBULATKAN
1 m2
0.0055
0.3025
0.2000
0.6500
1.0000
0.0350
m3
m2
kg
hr
hr
hr
JUMLAH
DIBULATKAN
HARGA
SATUAN
4,050,000.00
12,250.00
8,800.00
64,667.00
76,833.00
105,000.00
JUMLAH
4,050,000.00
24,500.00
48,928.00
465,602.40
1,167,861.60
163,800.00
JUMLAH
5,920,692.00
DIBULATKAN
5,920,692.00
3,633,333.00
12,250.00
8,800.00
64,667.00
76,833.00
105,000.00
3,996,666.30
36,750.00
48,928.00
465,602.40
1,936,191.60
163,800.00
JUMLAH
6,647,938.30
DIBULATKAN
6,647,938.00
6,483,333.00
12,250.00
8,800.00
64,667.00
76,833.00
105,000.00
7,131,666.30
36,750.00
48,928.00
465,602.40
1,936,191.60
163,800.00
JUMLAH
9,782,938.30
DIBULATKAN
9,782,938.00
3,633,333.00
12,250.00
8,800.00
64,667.00
76,833.00
105,000.00
3,996,666.30
36,750.00
48,928.00
465,602.40
1,936,191.60
163,800.00
JUMLAH
6,647,938.30
DIBULATKAN
6,647,938.00
HARGA
SATUAN
7,083,333.00
96,400.00
16,500.00
25,333.33
64,667.00
76,833.00
105,000.00
JUMLAH
283,333.32
96,400.00
4,950.00
760.00
31,040.16
122,932.80
19,320.00
JUMLAH
558,736.28
DIBULATKAN
558,736.00
7,083,333.00
96,400.00
16,500.00
25,333.33
64,667.00
76,833.00
105,000.00
283,333.32
96,400.00
4,950.00
760.00
31,040.16
122,932.80
19,320.00
JUMLAH
558,736.28
DIBULATKAN
558,736.00
7,083,333.00
96,400.00
110,000.00
16,500.00
25,333.33
64,667.00
76,833.00
105,000.00
283,333.32
96,400.00
55,000.00
13,200.00
760.00
31,040.16
122,932.80
19,320.00
JUMLAH
621,986.28
DIBULATKAN
621,986.00
7,083,333.00
16,500.00
25,333.33
108,333.00
64,667.00
76,833.00
105,000.00
212,499.99
6,600.00
760.00
97,499.70
51,733.60
153,666.00
25,200.00
JUMLAH
547,959.29
DIBULATKAN
547,959.00
HARGA
SATUAN
7,083,333.00
16,500.00
25,333.33
125,167.00
64,667.00
76,833.00
105,000.00
JUMLAH
212,499.99
6,600.00
760.00
112,650.30
51,733.60
153,666.00
25,200.00
JUMLAH
563,109.89
DIBULATKAN
563,109.00
7,083,333.00
16,500.00
25,333.33
135,000.00
64,667.00
76,833.00
105,000.00
212,499.99
6,600.00
760.00
121,500.00
51,733.60
153,666.00
25,200.00
JUMLAH
571,959.59
DIBULATKAN
571,959.00
9,183,333.00
16,500.00
108,333.00
28,500.00
64,667.00
76,833.00
105,000.00
780,583.31
19,140.00
54,166.50
12,825.00
78,570.41
186,704.19
27,195.00
JUMLAH
1,159,184.40
DIBULATKAN
1,159,184.00
7,083,333.00
16,500.00
64,667.00
76,833.00
105,000.00
311,666.65
6,600.00
78,570.41
186,704.19
27,195.00
JUMLAH
610,736.25
DIBULATKAN
610,736.00
HARGA
SATUAN
7,083,333.00
16,500.00
64,667.00
76,833.00
105,000.00
JUMLAH
311,666.65
6,600.00
78,570.41
186,704.19
27,195.00
JUMLAH
610,736.25
DIBULATKAN
610,736.00
9,183,333.00
16,500.00
64,667.00
76,833.00
105,000.00
385,699.99
3,300.00
64,667.00
230,499.00
36,750.00
JUMLAH
720,915.99
DIBULATKAN
720,915.00
7,083,333.00
16,500.00
64,667.00
76,833.00
105,000.00
297,499.99
3,300.00
64,667.00
230,499.00
36,750.00
JUMLAH
632,715.99
DIBULATKAN
632,715.00
120,700.00
65,000.00
131,000.00
108,333.00
29,300.00
7,700.00
64,667.00
1,086,300.00
780,000.00
759,800.00
47,124.86
50,709.51
103,950.00
13,114.47
HARGA
SATUAN
76,833.00
105,000.00
JUMLAH
57,263.63
4,473.00
JUMLAH
2,902,735.47
DIBULATKAN
2,902,735.00
120,700.00
108,333.00
29,300.00
7,700.00
64,667.00
76,833.00
105,000.00
470,730.00
71,543.11
9,376.00
29,260.00
5,173.36
44,993.40
3,517.50
JUMLAH
634,593.38
DIBULATKAN
634,593.00
120,700.00
108,333.00
29,300.00
7,700.00
64,667.00
76,833.00
105,000.00
410,380.00
60,276.48
28,274.50
73,920.00
8,432.58
36,810.69
2,877.00
JUMLAH
620,971.25
DIBULATKAN
620,971.00
120,700.00
65,000.00
108,333.00
29,300.00
7,700.00
64,667.00
76,833.00
105,000.00
1,086,300.00
780,000.00
183,082.77
50,709.51
77,000.00
13,114.47
57,263.63
4,473.00
JUMLAH
2,251,943.38
DIBULATKAN
2,251,943.00
120,700.00
65,000.00
108,333.00
29,300.00
7,700.00
1,448,400.00
1,365,000.00
183,082.77
50,709.51
38,500.00
HARGA
SATUAN
64,667.00
76,833.00
105,000.00
JUMLAH
8,083.38
33,499.19
4,473.00
JUMLAH
3,131,747.84
DIBULATKAN
3,131,747.00
120,700.00
131,000.00
108,333.00
29,300.00
7,700.00
64,667.00
76,833.00
105,000.00
JUMLAH
1,086,300.00
164,666.16
43,950.00
69,300.00
6,647.77
26,530.43
4,473.00
1,401,867.36
160,000.00
64,667.00
76,833.00
105,000.00
160,000.00
13,114.47
57,263.63
4,473.00
234,851.10
234,851.00
120,700.00
337,960.00
151,690.59
3,946.56
13,300.00
5,173.36
44,993.40
3,517.50
JUMLAH
DIBULATKAN
148,833.00
12,333.00
3,500.00
64,667.00
76,833.00
105,000.00
JUMLAH
560,581.42
DIBULATKAN
560,581.00
120,700.00
108,333.00
29,300.00
7,700.00
64,667.00
76,833.00
105,000.00
2,558,840.00
721,497.78
9,376.00
92,400.00
5,173.36
44,993.40
3,517.50
HARGA
SATUAN
JUMLAH
JUMLAH
3,435,798.04
DIBULATKAN
3,435,798.00
7,200,000.00
108,333.00
15,166.00
64,667.00
73,400.00
103,400.00
39,312.00
32,770.73
3,033.20
42,033.55
73,400.00
3,619.00
JUMLAH
194,168.48
DIBULATKAN
194,168.00
NO.
URAIAN
KOEF.
SAT.
PEKERJAAN LANTAI
1 m2
Pasir pasang
Pasir beton
Kerikil / split
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
0.0030
0.0330
0.0650
0.2760
0.1150
0.0120
0.0060
m3
m3
m3
zak
hr
hr
hr
JUMLAH
DIBULATKAN
1 m2
Pasir pasang
Semen PC ( 50 kg )
Semen warna ( cor nat )
Keramik 20 x 20 standar
Pekerja
Tukang batu
Mandor
Alat bantu
0.0300
0.0337
0.0125
1.0500
0.2816
0.1320
0.0203
0.6000
m3
zak
kg
m2
hr
hr
hr
set
JUMLAH
DIBULATKAN
1 m2
Pasir pasang
Semen PC ( 50 kg )
Semen warna ( cor nat )
Keramik 40 x 40
Pekerja
Tukang batu
Mandor
Alat bantu
0.0300
0.0337
0.0125
1.0500
0.2816
0.1320
0.0203
0.6000
m3
zak
kg
m2
hr
hr
hr
set
JUMLAH
DIBULATKAN
NO.
URAIAN
1 m2
KOEF.
SAT.
Pasir pasang
Semen PC ( 50 kg )
Semen warna ( cor nat )
Keramik 20 x 20 standar
Pekerja
Tukang batu
Mandor
Alat bantu
0.0380
0.0340
0.0125
1.0500
0.2620
0.2760
0.0263
0.6000
m3
zak
kg
m2
hr
hr
hr
set
JUMLAH
DIBULATKAN
1 m2
Pasir pasang
Semen PC ( 50 kg )
Semen warna ( cor nat )
Keramik 20/25
Pekerja
Tukang batu
Mandor
Alat bantu
0.0380
0.0340
0.0125
1.0500
0.2620
0.2760
0.0263
0.6000
m3
zak
kg
m2
hr
hr
hr
set
JUMLAH
DIBULATKAN
1 m1
Pasir pasang
Semen PC ( 50 kg )
Plint keramik standar
Semen warna ( cor nat )
Pekerja
Tukang batu
Mandor
Alat bantu
0.0030
0.0353
0.1100
0.0500
0.4000
0.1300
0.0260
0.6000
m3
zak
m2
kg
hr
hr
hr
set
JUMLAH
DIBULATKAN
1 m1
0.0016
0.1000
0.4000
0.1300
m3
kg
hr
hr
NO.
URAIAN
Mandor
Alat bantu
KOEF.
0.0260
0.6000
SAT.
hr
set
JUMLAH
DIBULATKAN
NO.
URAIAN
1 m'
KOEF.
SAT.
Pasir pasang
Semen PC ( 50 kg )
Plint keramik standar
Semen warna ( cor nat )
Pekerja
Tukang batu
Mandor
Alat bantu
0.0030
0.0353
5.0000
0.0500
0.0400
0.0130
0.0026
0.0600
m3
zak
bh
kg
hr
hr
hr
set
JUMLAH
DIBULATKAN
1 m'
Pasir pasang
Semen PC ( 50 kg )
Border Keramik Dinding 7/20
Semen warna ( cor nat )
Pekerja
Tukang batu
Mandor
Alat bantu
0.0030
0.0353
1.0000
0.0500
0.0400
0.0130
0.0026
0.0600
m3
zak
m'
kg
hr
hr
hr
set
JUMLAH
DIBULATKAN
1 m1
- Stepnosing
Stepnosing
Pekerja
Tukang batu
Mandor
Alat bantu
1.0000
0.1200
0.2300
0.0260
0.6000
m1
hr
hr
hr
set
JUMLAH
DIBULATKAN
HARGA
SATUAN
244,333.00
249,167.00
210,000.00
63,333.00
64,667.00
74,500.00
105,000.00
JUMLAH
733.00
8,222.51
13,650.00
17,479.91
7,436.71
894.00
630.00
JUMLAH
49,046.12
DIBULATKAN
49,046.00
244,333.00
63,333.00
15,500.00
43,833.00
64,667.00
74,500.00
105,000.00
1,000.00
7,329.99
2,134.32
193.75
46,024.65
18,210.23
9,834.00
2,131.50
600.00
JUMLAH
86,458.44
DIBULATKAN
86,458.00
244,333.00
63,333.00
15,500.00
73,500.00
64,667.00
74,500.00
105,000.00
1,000.00
7,329.99
2,134.32
193.75
77,175.00
18,210.23
9,834.00
2,131.50
600.00
JUMLAH
117,608.79
DIBULATKAN
117,608.00
HARGA
SATUAN
244,333.00
63,333.00
15,500.00
43,833.00
64,667.00
74,500.00
105,000.00
1,000.00
JUMLAH
9,284.65
2,153.32
193.75
46,024.65
16,942.75
20,562.00
2,761.50
600.00
JUMLAH
98,522.63
DIBULATKAN
98,522.00
244,333.00
63,333.00
15,500.00
59,167.00
64,667.00
74,500.00
105,000.00
1,000.00
9,284.65
2,153.32
193.75
62,125.35
16,942.75
20,562.00
2,761.50
600.00
JUMLAH
114,623.33
DIBULATKAN
114,623.00
244,333.00
63,333.00
73,500.00
15,500.00
64,667.00
74,500.00
105,000.00
1,000.00
733.00
2,235.65
8,085.00
775.00
25,866.80
9,685.00
2,730.00
600.00
JUMLAH
50,710.45
DIBULATKAN
50,710.00
7,083,333.00
12,250.00
64,667.00
76,833.00
11,333.33
1,225.00
25,866.80
9,988.29
HARGA
SATUAN
105,000.00
1,000.00
JUMLAH
2,730.00
600.00
JUMLAH
51,743.42
DIBULATKAN
51,743.00
HARGA
SATUAN
244,333.00
63,333.00
7,700.00
15,500.00
64,667.00
74,500.00
105,000.00
1,000.00
JUMLAH
733.00
2,235.65
38,500.00
775.00
2,586.68
968.50
273.00
60.00
JUMLAH
46,131.83
DIBULATKAN
46,131.00
244,333.00
63,333.00
41,250.00
15,500.00
64,667.00
74,500.00
105,000.00
1,000.00
733.00
2,235.65
41,250.00
775.00
2,586.68
968.50
273.00
60.00
JUMLAH
48,881.83
DIBULATKAN
48,881.00
30,000.00
64,667.00
74,500.00
105,000.00
1,000.00
30,000.00
7,760.04
17,135.00
2,730.00
600.00
JUMLAH
58,225.04
DIBULATKAN
58,225.00
NO.
URAIAN
KOEF.
SAT.
PEKERJAAN PLAFOND
1 m2
Kayu meranti
Paku
Pekerja
Tukang kayu
Mandor
Alat bantu
0.0080
0.1400
0.1700
0.2800
0.0370
0.6000
m3
kg
hr
hr
hr
set
JUMLAH
DIBULATKAN
1 m2
0.0080
0.1400
0.1700
0.2800
0.0370
0.6000
m3
kg
hr
hr
hr
set
JUMLAH
DIBULATKAN
1 m2
Kayu meranti
Plat asbes semen 100 x 100 cm, t = 5 mm
Paku
Pekerja
Tukang kayu
Mandor
Alat bantu
0.0080
1.0250
0.1750
0.2200
0.3500
0.0460
1.0000
m3
lbr
kg
hr
hr
hr
set
JUMLAH
DIBULATKAN
1 m2
Kayu meranti
Gypsum 9 mm
Paku
Pekerja
Tukang kayu
Mandor
Alat bantu
0.0080
0.5800
0.1750
0.2200
0.3500
0.0460
1.0000
m3
lbr
kg
hr
hr
hr
set
NO.
URAIAN
KOEF.
SAT.
JUMLAH
DIBULATKAN
NO.
URAIAN
1 m2
KOEF.
SAT.
Kayu meranti
Triplek 4 mm
Paku
Pekerja
Tukang kayu
Mandor
Alat bantu
0.0080
0.3750
0.1750
0.2200
0.3500
0.0460
1.0000
m3
lbr
kg
hr
hr
hr
set
JUMLAH
DIBULATKAN
1 m2
Kayu meranti
Asbes 5 mm
Paku
Pekerja
Tukang kayu
Mandor
Alat bantu
0.0080
0.3750
0.1750
0.2200
0.3500
0.0460
1.0000
m3
lbr
kg
hr
hr
hr
set
JUMLAH
DIBULATKAN
1 m1
1.1000
0.0100
0.0500
0.0500
0.0050
0.0030
m1
kg
hr
hr
hr
hr
JUMLAH
DIBULATKAN
1 m1
- List Plafond gypsum 7 cm
List Profil gypsum 7 cm
Paku
Pekerja
Tukang kayu
Kepala Tukang Kayu
Mandor
1.1000
0.0100
0.0500
0.0500
0.0050
0.0030
m1
kg
hr
hr
hr
hr
JUMLAH
DIBULATKAN
NO.
URAIAN
1 m2
KOEF.
SAT.
Besi Hollow 4 x 4
GRC Board t = 5 mm
Paku
Pekerja
Tukang kayu
Mandor
Alat bantu
0.9375
0.3472
0.1750
0.2200
0.3500
0.0460
1.0000
btg
lbr
kg
hr
hr
hr
set
JUMLAH
DIBULATKAN
HARGA
SATUAN
2,583,333.00
12,250.00
64,667.00
76,833.00
105,000.00
1,000.00
JUMLAH
20,666.66
1,715.00
10,993.39
21,513.24
3,885.00
600.00
JUMLAH
59,373.29
DIBULATKAN
59,373.00
6,483,333.00
12,250.00
64,667.00
76,833.00
105,000.00
1,000.00
51,866.66
1,715.00
10,993.39
21,513.24
3,885.00
600.00
JUMLAH
90,573.29
DIBULATKAN
90,573.00
2,583,333.00
16,167.00
12,250.00
64,667.00
76,833.00
105,000.00
1,000.00
20,666.66
16,571.18
2,143.75
14,226.74
26,891.55
4,830.00
1,000.00
JUMLAH
86,329.88
DIBULATKAN
86,329.00
2,583,333.00
61,167.00
12,250.00
64,667.00
76,833.00
105,000.00
1,000.00
20,666.66
35,476.86
2,143.75
14,226.74
26,891.55
4,830.00
1,000.00
HARGA
SATUAN
JUMLAH
JUMLAH
105,235.56
DIBULATKAN
105,235.00
HARGA
SATUAN
2,583,333.00
59,167.00
12,250.00
64,667.00
76,833.00
105,000.00
1,000.00
JUMLAH
20,666.66
22,187.63
2,143.75
14,226.74
26,891.55
4,830.00
1,000.00
JUMLAH
91,946.33
DIBULATKAN
91,946.00
2,583,333.00
72,667.00
12,250.00
64,667.00
76,833.00
105,000.00
1,000.00
20,666.66
27,250.13
2,143.75
14,226.74
26,891.55
4,830.00
1,000.00
JUMLAH
97,008.83
DIBULATKAN
97,008.00
14,917.00
12,250.00
64,667.00
76,833.00
85,167.00
105,000.00
16,408.70
122.50
3,233.35
3,841.65
425.84
315.00
JUMLAH
24,347.04
DIBULATKAN
24,347.00
16,500.00
12,250.00
64,667.00
76,833.00
85,167.00
105,000.00
DIBULATKAN
14,300.00
253.33
3,000.00
3,670.00
417.00
310.20
21,950.53
21,950.00
HARGA
SATUAN
27,583.33
99,000.00
12,250.00
64,667.00
76,833.00
105,000.00
1,000.00
JUMLAH
DIBULATKAN
JUMLAH
25,859.38
34,372.80
2,143.75
14,226.74
26,891.55
4,830.00
1,000.00
109,324.22
109,324.00
NO.
URAIAN
KOEF.
SAT.
PEKERJAAN CAT
1 m2
0.2800
0.0100
0.1600
0.5000
0.2950
0.0250
kg
bh
kg
lbr
hr
hr
JUMLAH
DIBULATKAN
1 m2
Cat tembok
Roll cat + bak
Plamur / dempul tembok
Ampelas
Tukang cat
Mandor
0.2800
0.0100
0.1600
0.5000
0.2950
0.0250
kg
bh
kg
lbr
hr
hr
JUMLAH
DIBULATKAN
1 m2
0.2800
0.0100
0.1600
0.5000
0.2950
0.0250
kg
bh
kg
lbr
hr
hr
JUMLAH
DIBULATKAN
1 m2
0.2800
0.0100
0.1600
0.5000
0.2950
0.0250
kg
bh
kg
lbr
hr
hr
JUMLAH
NO.
URAIAN
KOEF.
SAT.
DIBULATKAN
NO.
URAIAN
1 m2
KOEF.
SAT.
0.2800
0.0100
0.1600
0.5000
0.2950
0.0250
kg
bh
kg
lbr
hr
hr
JUMLAH
DIBULATKAN
1 m2
0.3000
0.0500
0.0450
0.2000
0.3150
0.0250
kg
bh
kg
lbr
hr
hr
JUMLAH
DIBULATKAN
1 m2
0.3000
0.0500
0.0450
0.2000
0.3150
0.0250
kg
bh
kg
lbr
hr
hr
JUMLAH
DIBULATKAN
1 m2
0.2000
0.0500
0.1500
0.1675
0.4000
0.3150
0.0250
kg
bh
lt
kg
lbr
hr
hr
JUMLAH
DIBULATKAN
NO.
URAIAN
1 m2
KOEF.
SAT.
0.2000
0.0500
0.0630
1.0000
0.1670
0.4000
0.1500
0.3150
0.0250
kg
bh
kg
m2
kg
lbr
lt
hr
hr
JUMLAH
DIBULATKAN
1 m2
0.3000
0.0500
0.0450
0.2000
0.3150
0.0250
kg
bh
kg
lbr
hr
hr
JUMLAH
DIBULATKAN
1 m2
Water proofing
Kuas 3"
Ampelas
Tukang cat
Mandor
0.3000
0.0500
0.4000
0.3150
0.0250
kg
bh
lbr
hr
hr
JUMLAH
DIBULATKAN
1 m2
0.07 kg
0.05 bh
0.05 lt
0.021 kg
0.28 lbr
0.21 hr
0.0166666667 hr
NO.
URAIAN
KOEF.
SAT.
Jumlah
Dibulatkan
HARGA
SATUAN
80,833.00
16,667.00
15,033.00
4,500.00
74,500.00
105,000.00
JUMLAH
22,633.24
166.67
2,405.28
2,250.00
21,977.50
2,625.00
JUMLAH
52,057.69
DIBULATKAN
52,057.00
23,500.00
16,667.00
15,033.00
4,500.00
74,500.00
105,000.00
6,580.00
166.67
2,405.28
2,250.00
21,977.50
2,625.00
JUMLAH
36,004.45
DIBULATKAN
36,004.00
119,500.00
16,667.00
15,033.00
4,500.00
74,500.00
105,000.00
33,460.00
166.67
2,405.28
2,250.00
21,977.50
2,625.00
JUMLAH
62,884.45
DIBULATKAN
62,884.00
20,833.00
16,667.00
15,033.00
4,500.00
74,500.00
105,000.00
JUMLAH
5,833.24
166.67
2,405.28
2,250.00
21,977.50
2,625.00
35,257.69
HARGA
SATUAN
DIBULATKAN
JUMLAH
35,257.00
HARGA
SATUAN
36,333.00
16,667.00
15,033.00
4,500.00
74,500.00
105,000.00
JUMLAH
10,173.24
166.67
2,405.28
2,250.00
21,977.50
2,625.00
JUMLAH
39,597.69
DIBULATKAN
39,597.00
80,833.00
16,667.00
15,033.00
4,500.00
74,500.00
105,000.00
24,249.90
833.35
676.49
900.00
23,467.50
2,625.00
JUMLAH
52,752.24
DIBULATKAN
52,752.00
23,500.00
16,667.00
15,033.00
4,500.00
74,500.00
105,000.00
7,050.00
833.35
676.49
900.00
23,467.50
2,625.00
JUMLAH
35,552.34
DIBULATKAN
35,552.00
55,833.00
30,167.00
17,167.00
20,167.00
4,500.00
74,500.00
105,000.00
11,166.60
1,508.35
2,575.05
3,377.97
1,800.00
23,467.50
2,625.00
JUMLAH
46,520.47
DIBULATKAN
46,520.00
HARGA
SATUAN
55,833.00
30,167.00
22,700.00
43,667.00
20,333.00
4,500.00
17,167.00
74,500.00
105,000.00
JUMLAH
11,166.60
1,508.35
1,430.10
43,667.00
3,395.61
1,800.00
2,575.05
23,467.50
2,625.00
JUMLAH
91,635.21
DIBULATKAN
91,635.00
20,833.00
16,667.00
15,033.00
4,500.00
74,500.00
105,000.00
6,249.90
833.35
676.49
900.00
23,467.50
2,625.00
JUMLAH
34,752.24
DIBULATKAN
34,752.00
97,800.00
30,167.00
4,500.00
74,500.00
105,000.00
29,340.00
1,508.35
1,800.00
23,467.50
2,625.00
JUMLAH
58,740.85
DIBULATKAN
58,740.00
55,833.00
16,065.00
15,120.00
19,372.50
4,725.00
61,425.00
99,225.00
3,908.31
803.25
756.00
406.82
1,323.00
12,899.25
1,653.75
HARGA
SATUAN
Dibulatkan
JUMLAH
21,750.38
21,750.00
NO.
URAIAN
KOEF.
SAT.
PEKERJAAN SANITER
1 unit
Pasir pasang
Semen PC ( 50 kg )
Closet jongkok standar
Pekerja
Tukang batu
Mandor
0.1500
0.1000
1.0000
0.3000
0.2500
0.1800
m3
zak
bh
hr
hr
hr
JUMLAH
DIBULATKAN
1 unit
Pasir pasang
Semen PC ( 50 kg )
Bak air fiber glass kap. 200 ltr
Pekerja
Tukang batu
Mandor
0.1500
0.1000
1.0000
0.3000
0.2500
0.1800
m3
zak
bh
hr
hr
hr
JUMLAH
DIBULATKAN
1 buah
- Floor drain
1.0000
0.0100
0.1000
0.0050
bh
hr
hr
hr
JUMLAH
DIBULATKAN
1 buah
1.0000
0.0250
0.1250
0.0100
0.1000
0.0050
bh
roll
tube
hr
hr
hr
JUMLAH
DIBULATKAN
NO.
URAIAN
1 unit
KOEF.
SAT.
1.0000
40.0000
16.0000
6.0000
2.0000
1.0000
bh
m'
m'
bh
bh
ls
JUMLAH
DIBULATKAN
1 unit
275.0000
0.7665
2.5000
3.0000
3.0000
0.3000
kg
m3
hr
hr
hr
hr
JUMLAH
DIBULATKAN
1 buah
1.0000
0.1000
0.2500
0.0250
bh
hr
hr
hr
JUMLAH
DIBULATKAN
1 unit
12.5000
0.3000
1.5080
11.3400
0.3600
47.4000
0.5000
3.0000
30.0000
2.5000
3.0000
0.0500
m2
m3
m3
m2
m3
kg
m'
m'
ikt
hr
hr
hr
JUMLAH
NO.
URAIAN
KOEF.
SAT.
DIBULATKAN
NO.
URAIAN
1m'
KOEF.
SAT.
1.2000
0.2000
0.2500
0.0500
0.3000
0.0300
m'
bh
tube
hr
hr
hr
JUMLAH
DIBULATKAN
1m'
1.2000
0.2000
0.2500
0.0500
0.3000
0.0300
m'
bh
tube
hr
hr
hr
JUMLAH
DIBULATKAN
1 unit
Pasir pasang
Semen PC ( 50 kg )
Closet duduk standar
Pekerja
Tukang batu
Mandor
0.1500
0.1000
1.0000
0.3000
0.2500
0.1800
m3
zak
bh
hr
hr
hr
JUMLAH
DIBULATKAN
1 unit
- Sumur Resapan
12.5000
0.3000
1.5080
11.3400
m2
m3
m3
m2
NO.
URAIAN
Pipa PVC 1 "
Pipa porous 4 "
Ijuk
Pekerja
Tukang batu
Mandor
KOEF.
0.5000
3.0000
30.0000
2.5000
3.0000
0.0500
SAT.
m'
m'
ikt
hr
hr
hr
JUMLAH
DIBULATKAN
1 bh
- Kitchenzink + Accessories
Kitchen zink lengkap + Accessories
Kran Kitchen zink
Pekerja
Tukang ledeng
Mandor
1 unit
1.0000
1.0000
0.2975
0.2715
0.4121
bh
bh
hr
hr
hr
JUMLAH
DIBULATKAN
- washtafel + Accessories
Washtafel
Kran Wastafel SAN-EI Tipe Y50JSX
Flexibel
Pekerja
Tukang batu
Mandor
1.0000
1.0000
1.0000
0.1500
0.1750
0.0800
set
bh
bh
hr
hr
hr
JUMLAH
DIBULATKAN
HARGA
SATUAN
244,333.00
63,333.00
289,500.00
64,667.00
74,500.00
105,000.00
JUMLAH
36,649.95
6,333.30
289,500.00
19,400.10
18,625.00
18,900.00
JUMLAH
389,408.35
DIBULATKAN
389,408.00
244,333.00
63,333.00
290,000.00
64,667.00
74,500.00
105,000.00
36,649.95
6,333.30
290,000.00
19,400.10
18,625.00
18,900.00
JUMLAH
389,908.35
DIBULATKAN
389,908.00
30,000.00
64,667.00
74,500.00
105,000.00
30,000.00
646.67
7,450.00
525.00
JUMLAH
38,621.67
DIBULATKAN
38,621.00
25,000.00
9,300.00
10,200.00
64,667.00
74,500.00
105,000.00
25,000.00
232.50
1,275.00
646.67
7,450.00
525.00
JUMLAH
35,129.17
DIBULATKAN
35,129.00
HARGA
SATUAN
2,950,000.00
5,200.00
41,250.00
25,100.00
60,500.00
1,300,000.00
JUMLAH
2,950,000.00
208,000.00
660,000.00
150,600.00
121,000.00
1,300,000.00
JUMLAH
5,389,600.00
DIBULATKAN
5,389,600.00
14,333.00
1,029,161.00
64,667.00
74,500.00
74,500.00
105,000.00
3,941,575.00
788,851.91
161,667.50
223,500.00
223,500.00
31,500.00
JUMLAH
5,370,594.41
DIBULATKAN
5,370,594.00
1,329,500.00
64,667.00
74,500.00
105,000.00
1,329,500.00
6,466.70
18,625.00
2,625.00
JUMLAH
1,357,216.70
DIBULATKAN
1,357,216.00
134,427.00
225,050.00
208,033.00
51,632.00
1,029,161.00
13,299.00
5,200.00
41,250.00
7,000.00
64,667.00
74,500.00
105,000.00
JUMLAH
1,680,337.50
67,515.00
313,713.76
585,506.88
370,497.96
630,372.60
2,600.00
123,750.00
210,000.00
161,667.50
223,500.00
5,250.00
4,374,711.20
HARGA
SATUAN
DIBULATKAN
JUMLAH
4,374,711.00
HARGA
SATUAN
4,625.00
2,880.00
10,200.00
64,667.00
74,500.00
105,000.00
JUMLAH
5,550.00
576.00
2,550.00
3,233.35
22,350.00
3,150.00
JUMLAH
37,409.35
DIBULATKAN
37,409.00
43,166.75
12,280.00
10,200.00
64,667.00
74,500.00
105,000.00
51,800.10
2,456.00
2,550.00
3,233.35
22,350.00
3,150.00
JUMLAH
85,539.45
DIBULATKAN
85,539.00
244,333.00
63,333.00
2,324,000.00
64,667.00
74,500.00
105,000.00
36,649.95
6,333.30
2,324,000.00
19,400.10
18,625.00
18,900.00
JUMLAH
2,423,908.35
DIBULATKAN
2,423,908.00
134,427.00
225,050.00
208,033.00
51,632.00
1,680,337.50
67,515.00
313,713.76
585,506.88
HARGA
SATUAN
5,200.00
41,250.00
7,000.00
64,667.00
74,500.00
105,000.00
JUMLAH
2,600.00
123,750.00
210,000.00
161,667.50
223,500.00
5,250.00
JUMLAH
3,373,840.64
DIBULATKAN
3,373,840.00
200,000.00
135,000.00
64,667.00
74,500.00
105,000.00
200,000.00
135,000.00
19,238.43
20,226.75
43,270.50
417,735.68
417,735.00
810,000.00
210,000.00
35,000.00
64,667.00
74,500.00
105,000.00
810,000.00
210,000.00
35,000.00
9,700.05
13,037.50
8,400.00
JUMLAH
DIBULATKAN
JUMLAH
1,086,137.55
DIBULATKAN
1,086,137.00
NO.
URAIAN
KOEF.
SAT.
PEKERJAAN ASESORIS
1 bh
1.0000
0.0150
0.1500
0.0075
bh
hr
hr
hr
JUMLAH
DIBULATKAN
1 bh
1.0000
0.0100
0.1000
0.0050
bh
hr
hr
hr
JUMLAH
DIBULATKAN
1 bh
Hak angin
Pekerja
Tukang kayu
Mandor
1.0000
0.0100
0.1000
0.0050
bh
hr
hr
hr
JUMLAH
DIBULATKAN
1 bh
Slot pintu
Pekerja
Tukang kayu
Mandor
1.0000
0.0100
0.1000
0.0050
bh
hr
hr
hr
JUMLAH
DIBULATKAN
1 bh
1.0000
0.0500
0.2500
0.0100
bh
hr
hr
hr
JUMLAH
NO.
URAIAN
KOEF.
SAT.
DIBULATKAN
NO.
URAIAN
1 m'
KOEF.
SAT.
1.0500
0.1570
1.0000
0.1775
0.2218
0.0226
1.0000
m'
m2
bh
hr
hr
hr
set
JUMLAH
DIBULATKAN
1 m'
1.0500
0.1570
1.0000
0.1775
0.2218
0.0226
1.0000
m'
m2
bh
hr
hr
hr
set
JUMLAH
DIBULATKAN
1 m1
Railing tangga stainless steel
Hand Railing,besi pipa 2 " stainless steel, t.1,2mm
Besi Hollow 2 x 4 cm stainless steel, t=1,8mm
Las besi
Baut Dyna bolt
Tukang besi
Kepala tukang besi
Mandor
Alat bantu
1 bh
0.4667
0.7500
1.0000
2.0000
0.8875
0.0100
0.0533
1.0000
btg
btg
ls
bh
hr
hr
hr
set
JUMLAH
DIBULATKAN
1.0000
0.0150
0.1500
0.0075
bh
hr
hr
hr
JUMLAH
Engsel 4"
Pekerja
Tukang kayu
Mandor
DIBULATKAN
1 bh
NO.
URAIAN
Engsel 3"
Pekerja
Tukang kayu
Mandor
KOEF.
1.0000
0.0100
0.1000
0.0050
SAT.
bh
hr
hr
hr
JUMLAH
DIBULATKAN
HARGA
SATUAN
17,250.00
64,667.00
76,833.00
105,000.00
JUMLAH
17,250.00
970.01
11,524.95
787.50
JUMLAH
30,532.46
DIBULATKAN
30,532.00
12,083.50
64,667.00
76,833.00
105,000.00
12,083.50
646.67
7,683.30
525.00
JUMLAH
20,938.47
DIBULATKAN
20,938.00
7,500.00
64,667.00
76,833.00
105,000.00
7,500.00
646.67
7,683.30
525.00
JUMLAH
16,354.97
DIBULATKAN
16,354.00
17,500.00
64,667.00
76,833.00
105,000.00
17,500.00
646.67
7,683.30
525.00
JUMLAH
26,354.97
DIBULATKAN
26,354.00
154,500.00
64,667.00
76,833.00
105,000.00
JUMLAH
154,500.00
3,233.35
19,208.25
1,050.00
177,991.60
HARGA
SATUAN
DIBULATKAN
JUMLAH
177,991.00
HARGA
SATUAN
81,783.33
55,833.00
5,500.00
64,667.00
76,833.00
105,000.00
1,000.00
JUMLAH
85,872.50
8,765.78
5,500.00
11,478.39
17,041.56
2,373.00
1,000.00
JUMLAH
132,031.23
DIBULATKAN
132,031.00
81,783.33
55,833.00
5,500.00
64,667.00
76,833.00
105,000.00
1,000.00
85,872.50
8,765.78
5,500.00
11,478.39
17,041.56
2,373.00
1,000.00
JUMLAH
132,031.23
DIBULATKAN
132,031.00
551,200.00
121,600.00
50,000.00
5,500.00
74,500.00
85,167.00
105,000.00
1,000.00
257,226.67
91,200.00
50,000.00
11,000.00
66,118.75
851.67
5,596.50
1,000.00
482,993.59
482,993.59
45,000.00
JUMLAH
45,000.00
970.01
11,524.95
787.50
58,282.46
DIBULATKAN
58,282.00
JUMLAH
DIBULATKAN
64,667.00
76,833.00
105,000.00
HARGA
SATUAN
37,500.00
64,667.00
76,833.00
105,000.00
JUMLAH
37,500.00
646.67
7,683.30
525.00
JUMLAH
46,354.97
DIBULATKAN
46,354.00
NO.
URAIAN
KOEF.
SAT.
1.0250
0.1200
0.0540
0.0270
0.0750
0.0500
0.0125
m'
m3
m3
zak
hr
hr
hr
JUMLAH
DIBULATKAN
1 m2
- Paving block t = 6 cm
1.0250
0.0250
0.1500
0.0500
0.0030
m2
m3
hr
hr
hr
JUMLAH
DIBULATKAN
1 m2
- Paving block t = 8 cm
1.0250
0.0250
0.1500
0.0500
0.0030
m2
m3
hr
hr
hr
JUMLAH
DIBULATKAN
1 m2
- Grass block t = 6 cm
9.0000
0.0250
0.1500
0.0500
0.0030
bh
m3
hr
hr
hr
NO.
URAIAN
KOEF.
SAT.
JUMLAH
DIBULATKAN
1 m'
- Kanstin 10.20.40-K.175
1.0000
0.0100
0.0500
0.0175
0.00875
m2
m3
hr
hr
hr
JUMLAH
DIBULATKAN
NO.
URAIAN
1 m'
KOEF.
SAT.
0.1200
0.0150
0.0290
0.2250
1.0000
0.6000
0.3500
0.0350
m3
m3
m3
zak
m
hr
hr
hr
JUMLAH
DIBULATKAN
1 m'
0.1200
0.0150
0.0290
0.2250
1.0000
0.6000
0.3500
0.0350
m3
m3
m3
zak
m
hr
hr
hr
JUMLAH
DIBULATKAN
1 m'
- Pas.Pagar Hollow
0.1000
0.0250
0.1875
0.0300
0.0354
0.0167
0.5000
1.5200
1.0000
1.5200
1.0000
4.8333
7.0000
1.0000
1.0000
m3
m3
m3
m3
m3
m3
m2
m2
m2
m2
btg
kg
bh
ls
ls
JUMLAH
DIBULATKAN
NO.
URAIAN
1 m'
KOEF.
SAT.
Besi Hollow
Pengelasan & Pengecetan
Roda Pagar
Kunci Pagar
Rel Besi
Ongkos pasang Pagar Besi
1.0000
1.0000
0.7500
0.2500
1.3000
1.0000
btg
ls
bh
bh
kg
ls
JUMLAH
DIBULATKAN
1 m'
4.0000
1.1000
0.2000
6.0000
0.3550
0.8875
0.0533
1.0000
bh
m'
m2
bh
hr
hr
hr
set
JUMLAH
DIBULATKAN
1 m2
- Partisi double gysum 9 mm + rangka besi hollow 4x4 + List kayu papan diprofil + finish cat
Kayu meranti
Gypsum 9 mm
Paku
List papan diprofil 1.6x 9 cm(atas partisi 3muka bwh 2muka )
Cat dinding partisi (cat tembok)
Cat kayu
Pekerja
Tukang kayu
Mandor
Alat bantu
1.0000
0.7656
0.3500
3.5714
2.0000
0.3571
0.2200
0.3500
0.0460
1.0000
m3
lbr
kg
m'
m2
m2
hr
hr
hr
set
JUMLAH
DIBULATKAN
1 m1
0.4667
0.7500
1.0000
2.0000
0.8875
btg
btg
ls
bh
hr
NO.
URAIAN
Kepala tukang besi
Mandor
Alat bantu
1 m1
hr
hr
set
JUMLAH
DIBULATKAN
0.4667
0.6000
1.0000
0.8875
0.0100
0.0533
1.0000
btg
btg
ls
hr
hr
hr
set
JUMLAH
DIBULATKAN
1.0500
0.0200
0.0020
m2
hr
hr
JUMLAH
DIBULATKAN
0.5925
2.3700
7.8000
10.6350
1.0000
m3
m2
m2
m2
set
JUMLAH
DIBULATKAN
0.5600
75.0000
3.2000
0.0867
1.5328
0.0749
0.0249
m3
bh
zak
m3
hr
hr
hr
JUMLAH
DIBULATKAN
- Bak Bunga
Galian tanah
Pas.Rollag bata ad. 1:2
Pas.bata merah ad. 1:5
Plester + aci ad. 1:5
Alat bantu
1 bh
0.0100
0.0533
1.0000
1 unit
SAT.
1 m2
KOEF.
Pasir pasang
Bata merah
Semen PC ( 50 kg )
Beton K-175
Pekerja / kenek
Tukang batu
Mandor
HARGA
SATUAN
74,500.00
170,000.00
244,333.00
63,333.00
64,667.00
74,500.00
105,000.00
JUMLAH
76,362.50
20,400.00
13,193.98
1,709.99
4,850.03
3,725.00
1,312.50
JUMLAH
121,554.00
DIBULATKAN
121,553.00
55,300.00
244,333.00
64,667.00
74,500.00
105,000.00
56,682.50
6,108.33
9,700.05
3,725.00
315.00
JUMLAH
76,530.88
DIBULATKAN
76,530.00
81,000.00
249,167.00
64,667.00
74,500.00
105,000.00
83,025.00
6,229.18
9,700.05
3,725.00
315.00
JUMLAH
102,994.23
DIBULATKAN
102,994.00
21,000.00
249,167.00
64,667.00
74,500.00
105,000.00
189,000.00
6,229.18
9,700.05
3,725.00
315.00
HARGA
SATUAN
JUMLAH
JUMLAH
208,969.23
DIBULATKAN
208,969.00
32,500.00
777,649.00
64,667.00
74,500.00
105,000.00
32,500.00
7,776.49
3,233.35
1,303.75
918.75
JUMLAH
45,732.34
DIBULATKAN
45,732.00
HARGA
SATUAN
51,725.00
249,167.00
210,000.00
63,333.00
221,000.00
64,667.00
74,500.00
105,000.00
JUMLAH
6,207.00
3,737.51
6,090.00
14,249.93
221,000.00
38,800.20
26,075.00
3,675.00
JUMLAH
319,834.63
DIBULATKAN
319,834.00
51,725.00
249,167.00
210,000.00
63,333.00
260,000.00
64,667.00
74,500.00
105,000.00
6,207.00
3,737.51
6,090.00
14,249.93
260,000.00
38,800.20
26,075.00
3,675.00
JUMLAH
358,834.63
DIBULATKAN
358,834.00
51,725.00
21,050.00
671,133.00
4,152,068.00
4,857,785.00
4,857,785.00
122,304.00
48,058.00
182,359.00
39,597.00
121,600.00
14,500.00
7,500.00
55,000.00
10,000.00
5,172.50
526.25
125,837.44
124,562.04
172,046.55
80,963.08
61,152.00
73,048.16
182,359.00
60,187.44
121,600.00
70,083.33
52,500.00
55,000.00
10,000.00
JUMLAH
1,195,037.80
DIBULATKAN
1,195,037.00
HARGA
SATUAN
121,600.00
55,000.00
15,000.00
50,000.00
10,000.00
25,000.00
JUMLAH
121,600.00
55,000.00
11,250.00
12,500.00
13,000.00
25,000.00
JUMLAH
238,350.00
DIBULATKAN
238,350.00
50,050.00
30,250.00
80,600.00
1,500.00
64,667.00
76,833.00
105,000.00
10,000.00
200,200.00
33,275.00
16,120.00
9,000.00
22,956.79
68,189.29
5,591.25
10,000.00
JUMLAH
365,332.32
DIBULATKAN
365,332.00
ngka besi hollow 4x4 + List kayu papan diprofil + finish cat
121,600.00
61,167.00
12,250.00
51,743.00
36,004.00
91,635.00
64,667.00
76,833.00
105,000.00
1,000.00
121,600.00
46,830.98
4,287.50
184,796.43
72,008.00
32,726.79
14,226.74
26,891.55
4,830.00
1,000.00
JUMLAH
509,197.99
DIBULATKAN
509,197.00
551,200.00
49,400.00
50,000.00
1,500.00
74,500.00
257,226.67
37,050.00
50,000.00
3,000.00
66,118.75
HARGA
SATUAN
JUMLAH
85,167.00
105,000.00
1,000.00
851.67
5,596.50
1,000.00
420,843.59
420,843.00
551,200.00
121,600.00
55,000.00
74,500.00
85,167.00
105,000.00
1,000.00
257,226.67
72,960.00
55,000.00
66,118.75
851.67
5,596.50
1,000.00
458,753.59
458,753.00
25,000.00
64,667.00
105,000.00
26,250.00
1,293.34
210.00
27,753.34
27,753.00
51,725.00
134,427.00
122,304.00
48,058.00
1,000.00
30,647.06
318,591.99
953,971.20
511,096.83
1,000.00
1,815,307.08
1,815,307.00
242,200.00
500.00
63,333.00
1,029,161.00
60,000.00
74,500.00
105,000.00
135,632.00
37,500.00
202,665.60
89,228.26
91,968.00
5,580.05
2,614.50
565,188.41
565,188.00
JUMLAH
DIBULATKAN
JUMLAH
DIBULATKAN
JUMLAH
DIBULATKAN
JUMLAH
DIBULATKAN
JUMLAH
DIBULATKAN
NO.
URAIAN
KOEF.
SAT.
5.0000
1.0000
2.0000
0.3715
0.1050
0.0050
m
dus
m
hr
hr
hr
JUMLAH
DIBULATKAN
1 Titik
5.0000
1.0000
2.0000
0.3715
0.1050
0.0050
m
dus
m
hr
hr
hr
JUMLAH
DIBULATKAN
1 Titik
Saklar tunggal
Pembantu Instalator
Instalator
Mandor
1.0000
0.2500
0.1500
0.0050
bh
hr
hr
hr
JUMLAH
DIBULATKAN
1 Titik
Saklar ganda
Pembantu Instalator
Instalator
Mandor
1.0000
0.2500
0.1500
0.0050
bh
hr
hr
hr
JUMLAH
DIBULATKAN
1 titik
1.0000
bh
NO.
URAIAN
Pembantu instalator
Instalator
Mandor
Alat bantu
KOEF.
0.3132
0.1045
0.0050
0.3000
SAT.
hr
hr
hr
set
JUMLAH
DIBULATKAN
NO.
URAIAN
1 titik
KOEF.
SAT.
1.0000
1.0000
0.3132
0.1045
0.0050
0.3000
bh
bh
hr
hr
hr
set
JUMLAH
DIBULATKAN
1 Bh
Stop Kontak
Pembantu Instalator
Instalator
Mandor
1 unit
1.0000
5.0000
5.0000
10.0000
0.8122
0.3112
0.0050
unit
m1
m1
m1
hr
hr
hr
JUMLAH
DIBULATKAN
10.0000
10.0000
0.8210
0.1910
0.0050
m1
m1
hr
hr
hr
JUMLAH
DIBULATKAN
1.0000
1.0000
1.2621
unit
bh
hr
JUMLAH
DIBULATKAN
1 unit
bh
hr
hr
hr
JUMLAH
DIBULATKAN
1 unit
1.0000
0.2500
0.1500
0.0050
NO.
URAIAN
1 Bh
SAT.
- Lampu Pagar
1 Titik
KOEF.
1.0000
0.3132
0.1045
0.0050
0.3000
bh
hr
hr
hr
set
JUMLAH
DIBULATKAN
1.0000
1.0000
0.2500
0.1500
0.0050
bh
bh
hr
hr
hr
JUMLAH
DIBULATKAN
HARGA SATUAN
25,000.00
3,500.00
5,250.00
67,500.00
85,167.00
105,000.00
JUMLAH
125,000.00
3,500.00
10,500.00
25,076.25
8,942.54
525.00
JUMLAH
173,543.79
DIBULATKAN
173,543.00
25,000.00
3,500.00
5,250.00
67,500.00
85,167.00
105,000.00
125,000.00
3,500.00
10,500.00
25,076.25
8,942.54
525.00
JUMLAH
173,543.79
DIBULATKAN
173,543.00
27,000.00
67,500.00
85,167.00
105,000.00
27,000.00
16,875.00
12,775.05
525.00
JUMLAH
57,175.05
DIBULATKAN
57,175.00
27,000.00
67,500.00
85,167.00
105,000.00
27,000.00
16,875.00
12,775.05
525.00
JUMLAH
57,175.05
DIBULATKAN
57,175.00
180,000.00
180,000.00
HARGA SATUAN
67,500.00
85,167.00
105,000.00
1,000.00
JUMLAH
21,141.00
8,899.95
525.00
300.00
JUMLAH
210,865.95
DIBULATKAN
210,865.00
HARGA SATUAN
43,750.00
27,500.00
67,500.00
85,167.00
105,000.00
1,000.00
JUMLAH
43,750.00
27,500.00
21,141.00
8,899.95
525.00
300.00
JUMLAH
102,115.95
DIBULATKAN
102,115.00
13,910.00
67,500.00
85,167.00
105,000.00
13,910.00
16,875.00
12,775.05
525.00
44,085.05
44,085.00
28,000.00
91,866.67
109,366.67
13,250.00
67,500.00
85,167.00
105,000.00
28,000.00
459,333.35
546,833.35
132,500.00
54,823.50
26,503.97
525.00
1,248,519.17
1,248,519.00
30,000.00
14,500.00
67,500.00
85,167.00
105,000.00
300,000.00
145,000.00
55,417.50
16,266.90
525.00
517,209.40
517,209.00
1,248,519.00
517,209.00
125,000.00
1,248,519.00
517,209.00
157,762.50
1,923,490.50
1,923,490.00
JUMLAH
DIBULATKAN
JUMLAH
DIBULATKAN
JUMLAH
DIBULATKAN
JUMLAH
DIBULATKAN
HARGA SATUAN
JUMLAH
79,529.00
60,000.00
85,167.00
105,000.00
1,000.00
79,529.00
18,792.00
8,899.95
525.00
300.00
108,045.95
108,045.00
120,000.00
55,000.00
67,500.00
85,167.00
105,000.00
120,000.00
55,000.00
16,875.00
12,775.05
525.00
JUMLAH
DIBULATKAN
JUMLAH
205,175.05
DIBULATKAN
205,175.00
NO.
URAIAN
KOEF.
SAT.
PEKERJAAN BONGKARAN
1 m2
Pekerja
Mandor
2.3520
0.0388
hr
hr
JUMLAH
DIBULATKAN
1 m3
Pekerja
Mandor
Kompresor kap.400 - 6500 ltr/menit
Jack Hammer
1.9600
0.0323
0.1000
0.1000
hr
hr
jam
set
JUMLAH
DIBULATKAN
1 m2
Pekerja
Mandor
0.1000
0.0250
hr
hr
JUMLAH
DIBULATKAN
1 m2
Pekerja
Mandor
0.0800
0.0250
hr
hr
JUMLAH
DIBULATKAN
1 m2
- Bongkar genteng
Pekerja
Mandor
Alat bantu
0.0400
0.0100
1.0000
hr
hr
set
JUMLAH
DIBULATKAN
1 m2
Pekerja
Tukang kayu
Mandor
0.2000
0.0550
0.0102
hr
hr
hr
Alat bantu
1.0000
set
JUMLAH
DIBULATKAN
1 m2
- Bongkar plafond
Pekerja
Mandor
Alat bantu
0.1250
0.0500
1.0000
hr
hr
set
JUMLAH
DIBULATKAN
1 m2
Pekerja
Mandor
Alat bantu
0.0500
0.0250
1.0000
hr
hr
set
JUMLAH
DIBULATKAN
1 m2
Pekerja
Mandor
Alat bantu
0.3300
0.0330
2.0000
hr
hr
set
JUMLAH
DIBULATKAN
1 m2
Pekerja
Mandor
Alat bantu
0.3300
0.0330
2.0000
hr
hr
set
JUMLAH
DIBULATKAN
1 m'
Pekerja
Mandor
Alat bantu
0.0500
0.0225
1.0000
hr
hr
set
JUMLAH
DIBULATKAN
1 m'
Pekerja
Tukang kayu
Mandor
0.0840
0.1680
0.0216
hr
hr
hr
JUMLAH
DIBULATKAN
1 kg
Pekerja
Tukang besi
Mandor
Erection
0.0600
0.0045
0.0025
1.0000
hr
hr
hr
kg
JUMLAH
DIBULATKAN
HARGA
SATUAN
64,667.00
105,000.00
JUMLAH
152,096.78
4,074.00
JUMLAH
156,170.78
DIBULATKAN
156,170.00
64,667.00
105,000.00
58,467.00
19,417.00
126,747.32
3,391.50
5,846.70
1,941.70
JUMLAH
137,927.22
DIBULATKAN
137,927.00
64,667.00
105,000.00
6,466.70
2,625.00
JUMLAH
9,091.70
DIBULATKAN
9,091.00
64,667.00
105,000.00
5,173.36
2,625.00
JUMLAH
7,798.36
DIBULATKAN
7,798.00
64,667.00
105,000.00
1,000.00
2,586.68
1,050.00
1,000.00
JUMLAH
4,636.68
DIBULATKAN
4,636.00
64,667.00
105,000.00
105,000.00
12,933.40
5,775.00
1,071.00
1,000.00
1,000.00
JUMLAH
20,779.40
DIBULATKAN
20,779.00
64,667.00
105,000.00
1,000.00
8,083.38
5,250.00
1,000.00
JUMLAH
14,333.38
DIBULATKAN
14,333.00
64,667.00
105,000.00
1,000.00
3,233.35
2,625.00
1,000.00
JUMLAH
6,858.35
DIBULATKAN
6,858.00
64,667.00
105,000.00
1,000.00
21,340.11
3,465.00
2,000.00
JUMLAH
26,805.11
DIBULATKAN
26,805.00
64,667.00
105,000.00
1,000.00
21,340.11
3,465.00
2,000.00
JUMLAH
26,805.11
DIBULATKAN
26,805.00
64,667.00
105,000.00
1,000.00
3,233.35
2,362.50
1,000.00
JUMLAH
6,595.85
DIBULATKAN
6,595.00
64,667.00
76,833.00
105,000.00
5,432.03
12,907.94
2,268.00
JUMLAH
20,607.97
DIBULATKAN
20,607.00
64,667.00
74,500.00
105,000.00
10,000.00
3,880.02
335.25
262.50
10,000.00
JUMLAH
14,477.77
DIBULATKAN
14,477.00