PERENCANAAN REHABILITASI GEDUNG DI WILAYAH KECAMATAN CIPUTAT TIMUR

No.

I
II
II

Uraian Pekerjaan

PEKERJAAN POS JAGA DAN TEMPAT SERBAGUNA CIREADEUP


GEDUNG PERTEMUAN JALAN GUNUNG GALUNGGUNG
GEDUNG PERTEMUAN JALAN LEGOSO RAYA
JUMLAH
TERBILANG = SERATUS TUJUH PULUH TUJUH JUTA ENAM RATUS EMPAT PULUH SEMBILAN RIBU RUPIAH

Jumlah Harga

Rp.
Rp.
Rp.

39,312,000.00
86,281,000.00
52,056,000.00

Rp.

177,649,000.00

PERENCANA
CIR

No

Uraian pekerjaan

PEKERJAAN PERSIAPAN
1 Papan nama proyek

II

PEKERJAAN BANGUNAN
1 PEKERJAAN TANAH
- Pas. Bouwplank
- Galian tanah pondasi dan Sloof
- Urugan pasir bawah pondasi t = 5 cm
- Urugan tanah kembali
1 PEKERJAAN PONDASI
- Pasangan Batu Kosong
- Pondasi Batu Kali 1 : 5
- Sloof beton
a. Sloof beton 20/30 - K.125

III PEKERJAAN LANTAI I DAN 2


1 PEKERJAAN STRUKTUR
- Kolom beton struktur
a. Kolom beton 20/20 - K.125
- Balok beton struktur
a. Balok beton 20/20 - K.125
- Plat lantai kayu -Papan Kayu Meranti (oven) - 400 cm
- Tangga kayu - Papan dan balok Kayu Meranti (oven) - 400 cm

2 PEKERJAAN ARSITEKTUR
- Pekerjaan pasangan dinding dan Railing
a. Pas.Batu bata, t = 1 / 2 bata ad. 1 : 2
b. Plesteran dinding ad 1 : 5
c. Plesteran Beton, Kolom dan Balok ad 1 : 5
d. Acian Dinding, kolom dan balok
e. Railing Kayu - Balok Kayu Meranti (oven) - 400 cm
f. Railing Tangga Kayu- -Balok Kayu Meranti (oven) - 400 cm

- Pekerjaan pasangan keramik


a. Lantai keramik 40x40 cm, Kw1 setara Roman, Ex. Mulia, M

No

Uraian pekerjaan

2
d. Plin Lantai 10x40 cm

- Pekerjaan finishing
a. Pengecatan dinding luar (Weathershield,3x) Dulux/Mowilex
c. Pengecatan dinding Interior Vinilex/Catylac/Properti
e. Pengecatan kayu F-Talit, Avian, Glotex

IV PEKERJAAN ATAP
a. Kuda-kuda rangka Baja Ringan Zinc Alume Profil Z ( Terma
b. Genteng Metal Berpasir tebal: 0,35 mm
d. Alumunium Foil
e. Listplank GRC t = 12 mm lebar 30 cm

RENCANA ANGGARAN BIAYA ( R A B )


PERENCANAAN POS JAGA DAN TEMPAT SERBA
CIREDEUP - KOTA TANGERANG SELATAN

Uraian pekerjaan

Satuan

RSIAPAN
a proyek

bh

NGUNAN

AN TANAH
Bouwplank
n tanah pondasi dan Sloof
an pasir bawah pondasi t = 5 cm
an tanah kembali

AN PONDASI
ngan Batu Kosong
asi Batu Kali 1 : 5
beton
Sloof beton 20/30 - K.125

NTAI I DAN 2
AN STRUKTUR
m beton struktur
Kolom beton 20/20 - K.125
k beton struktur
Balok beton 20/20 - K.125
antai kayu -Papan Kayu Meranti (oven) - 400 cm
ga kayu - Papan dan balok Kayu Meranti (oven) - 400 cm

m1
m3
m3
m3

m3
m3
m3

m3
m3
m3
m3

AN ARSITEKTUR
rjaan pasangan dinding dan Railing
Pas.Batu bata, t = 1 / 2 bata ad. 1 : 2
Plesteran dinding ad 1 : 5
Plesteran Beton, Kolom dan Balok ad 1 : 5
Acian Dinding, kolom dan balok
Railing Kayu - Balok Kayu Meranti (oven) - 400 cm
Railing Tangga Kayu- -Balok Kayu Meranti (oven) - 400 cm

m2
m2
m2
m2
m3
m3

rjaan pasangan keramik


Lantai keramik 40x40 cm, Kw1 setara Roman, Ex. Mulia, Masterina

m2

Uraian pekerjaan

Satuan

3
m1

Plin Lantai 10x40 cm

rjaan finishing
Pengecatan dinding luar (Weathershield,3x) Dulux/Mowilex/Jotun
Pengecatan dinding Interior Vinilex/Catylac/Properti
Pengecatan kayu F-Talit, Avian, Glotex

m2
m2
m2

Kuda-kuda rangka Baja Ringan Zinc Alume Profil Z ( Termasuk Rangka Atap )
Genteng Metal Berpasir tebal: 0,35 mm
Alumunium Foil
Listplank GRC t = 12 mm lebar 30 cm

m2
m2
m2
m1

BIAYA ( R A B )
N TEMPAT SERBAGUNA
ERANG SELATAN

Volume

Harga Satuan (Rp)

Jumlah Harga (Rp)

6=4x5

1.00

346,333.00

346,333.00
346,333.00

16.00
3.82
0.15
3.82

29,011.00
51,725.00
157,163.00
67,062.00

464,176.00
197,589.50
23,102.96
256,176.84
941,045.30

0.44
1.51

276,565.00
671,133.00

121,965.17
1,014,753.10

1.27

777,649.00

984,363.66
2,121,081.92

0.84

777,649.00

653,225.16

0.84
0.34
0.18

777,649.00
5,920,692.00
5,920,692.00

656,242.44
2,013,035.28
1,042,041.79
4,364,544.67

32.55
32.55
8.42
40.97
0.20
0.07

134,427.00
48,058.00
48,058.00
25,341.00
5,920,692.00
5,920,692.00

4,375,598.85
1,564,287.90
404,648.36
1,038,220.77
1,184,138.40
414,448.44
8,981,342.72

20.09

117,608.00

2,362,744.72

Volume

Harga Satuan (Rp)

Jumlah Harga (Rp)


6=4x5
152,130.00
2,514,874.72

3.00

50,710.00

32.55
32.55
0.27

68,543.56
52,057.00
99,882.15

2,231,092.88
1,694,455.35
26,968.18
3,952,516.41

30.23
30.23
30.23
27.42

140,000.00
129,999.00
54,966.00
98,231.00

4,232,200.00
3,929,869.77
1,661,622.18
2,693,494.02
12,517,185.97

JUMLAH
PPN 10 %
TOTAL
DIBULATKAN

35,738,924.71
3,573,892.47
39,312,817.18
39,312,000.00
336

106,365.85
19.20

PER
JALAN GUNUN

No

Uraian pekerjaan

II

PEKERJAAN PERSIAPAN
1 Papan nama proyek

PEKERJAAN ARSITEKTUR
- Pekerjaan Kusen pintu, jendela dan kaca
a. Kusen Pintu kayu meranti
b. Daun pintu panel kayu meranti
c. Kusen Jendela kayu meranti
d. Daun Jendela + kaca
- Pekerjaan kunci dan aksesoris pintu jendela
a. Engsel Pintu uk. 4 " Stainless Steel Solid/dekson/paloma
b. Kunci double slaag Solid/dekson/paloma
c. Pasang Engsel jendela

- Pekerjaan Plafond
a. Plafond GRC t =5 mm+ rangka Galvalum 0.35 mm Grid 60
- Pekerjaan pasangan keramik
a. Lantai keramik 40x40 cm, Kw1 setara Roman, Ex. Mulia, M
d. Plin Lantai 10x40 cm

- Pekerjaan finishing
a. Pengecatan dinding luar (Weathershield,3x) Dulux/Mowilex
c. Pengecatan dinding Interior Vinilex/Catylac/Properti
e. Pengecatan kayu F-Talit, Avian, Glotex

III PEKERJAAN ATAP


a. Kuda-kuda rangka Baja Ringan Zinc Alume Profil Z ( Terma
b. Genteng Metal Berpasir tebal: 0,35 mm
d. Alumunium Foil
e. Listplank GRC t = 12 mm lebar 30 cm

No

Uraian pekerjaan

RENCANA ANGGARAN BIAYA ( R A B )


PERENCANAAN GEDUNG PERTEMUAN
JALAN GUNUNG GALUNGGUNG - KOTA TANGERANG

Uraian pekerjaan

Satuan

RSIAPAN
a proyek

bh

AN ARSITEKTUR
jaan Kusen pintu, jendela dan kaca
Kusen Pintu kayu meranti
Daun pintu panel kayu meranti
Kusen Jendela kayu meranti
Daun Jendela + kaca

m3
m2
m3
unit

rjaan kunci dan aksesoris pintu jendela


Engsel Pintu uk. 4 " Stainless Steel Solid/dekson/paloma
Kunci double slaag Solid/dekson/paloma
Pasang Engsel jendela

bh
bh
bh

rjaan Plafond
Plafond GRC t =5 mm+ rangka Galvalum 0.35 mm Grid 60 x 120
rjaan pasangan keramik
Lantai keramik 40x40 cm, Kw1 setara Roman, Ex. Mulia, Masterina
Plin Lantai 10x40 cm

m2
m1

rjaan finishing
Pengecatan dinding luar (Weathershield,3x) Dulux/Mowilex/Jotun
Pengecatan dinding Interior Vinilex/Catylac/Properti
Pengecatan kayu F-Talit, Avian, Glotex

m2
m2
m2

Kuda-kuda rangka Baja Ringan Zinc Alume Profil Z ( Termasuk Rangka Atap )
Genteng Metal Berpasir tebal: 0,35 mm
Alumunium Foil
Listplank GRC t = 12 mm lebar 30 cm

m2
m2
m2
m1

m2

Uraian pekerjaan

Satuan

BIAYA ( R A B )
NG PERTEMUAN
OTA TANGERANG SELATAN

Volume

Harga Satuan (Rp)

Jumlah Harga (Rp)

6=4x5

1.00

346,333.00

346,333.00
346,333.00

0.02
2.00
0.30
20.00

6,647,938.00
610,736.00
6,647,938.00
194,168.00

152,902.57
1,221,472.00
2,026,291.50
3,883,360.00
7,284,026.08

2.00
1.00
40.00

58,282.00
177,991.00
20,938.00

116,564.00
177,991.00
837,520.00
1,132,075.00

69.96

184,399.00

12,900,554.04

69.96
4.06

117,608.00
50,710.00

8,227,855.68
205,882.60
8,433,738.28

141.99
144.99
0.27

68,543.56
52,057.00
99,882.15

9,732,500.08
7,547,744.43
26,968.18
17,307,212.69

82.50
82.50
82.50
43.00

140,000.00
129,999.00
54,966.00
98,231.00

11,550,000.00
10,724,917.50
4,534,695.00
4,223,933.00
31,033,545.50

JUMLAH
PPN 10 %

78,437,484.59
7,843,748.46

Volume

Harga Satuan (Rp)

5
TOTAL
DIBULATKAN

Jumlah Harga (Rp)


6=4x5
86,281,233.05
86,281,000.00

PER
JALA

No

Uraian pekerjaan

PEKERJAAN PERSIAPAN
1 Papan nama proyek

II

PEKERJAAN BANGUNAN
1 PEKERJAAN TANAH
- Pas. Bouwplank
- Galian tanah pondasi dan Sloof
- Urugan pasir bawah pondasi t = 5 cm
- Urugan tanah kembali
- Urugan tanah peninggian lantai

1 PEKERJAAN PONDASI
- Pasangan Batu Kosong
- Pondasi Batu Kali 1 : 5
- Sloof beton
a. Sloof beton 15/30 - K.125
III PEKERJAAN LANTAI I DAN 2
1 PEKERJAAN STRUKTUR
- Kolom beton struktur
a. Kolom beton 15/15 - K.125
- Balok beton struktur
a. Ring balok beton 15/15 - K.125
2 PEKERJAAN ARSITEKTUR
- Pekerjaan pasangan dinding dan Railing
a. Pas.Batu bata, t = 1 / 2 bata ad. 1 : 2
b. Plesteran dinding ad 1 : 5
c. Plesteran Beton, Kolom dan Balok ad 1 : 5
d. Acian Dinding, kolom dan balok
e. Kisi-kisi kayu - Balok Kayu Meranti (oven) - 400 cm
- Pekerjaan Kusen
a. Kusen Pintu kayu meranti
b. Daun pintu panel kayu meranti

No

Uraian pekerjaan

- Pekerjaan Plafond
a. Plafond GRC t =5 mm+ rangka Galvalum 0.35 mm Grid 60

- Pekerjaan pasangan keramik


a. Lantai keramik 40x40 cm, Kw1 setara Roman, Ex. Mulia, M
d. Plin Lantai 10x40 cm

- Pekerjaan finishing
a. Pengecatan dinding luar (Weathershield,3x) Dulux/Mowilex
c. Pengecatan dinding Interior Vinilex/Catylac/Properti
e. Pengecatan kayu F-Talit, Avian, Glotex

IV PEKERJAAN ATAP
a. Kuda-kuda rangka Baja Ringan Zinc Alume Profil Z ( Terma
b. Atap genteng beton (polos)
d. Alumunium Foil
e. Listplank GRC t = 12 mm lebar 30 cm

RENCANA ANGGARAN BIAYA ( R A B )


PERENCANAAN GEDUNG PERTEMUAN
JALAN LEGOSO RAYA - KOTA TANGERANG

Uraian pekerjaan

Satuan

RSIAPAN
a proyek

bh

NGUNAN
AN TANAH
Bouwplank
n tanah pondasi dan Sloof
an pasir bawah pondasi t = 5 cm
an tanah kembali
an tanah peninggian lantai

m1
m3
m3
m3
m3

AN PONDASI
ngan Batu Kosong
asi Batu Kali 1 : 5
beton
Sloof beton 15/30 - K.125

NTAI I DAN 2
AN STRUKTUR
m beton struktur
Kolom beton 15/15 - K.125
k beton struktur
Ring balok beton 15/15 - K.125

m3
m3
m3

m3
m3

AN ARSITEKTUR
rjaan pasangan dinding dan Railing
Pas.Batu bata, t = 1 / 2 bata ad. 1 : 2
Plesteran dinding ad 1 : 5
Plesteran Beton, Kolom dan Balok ad 1 : 5
Acian Dinding, kolom dan balok
Kisi-kisi kayu - Balok Kayu Meranti (oven) - 400 cm

m2
m2
m2
m2
m3

rjaan Kusen
Kusen Pintu kayu meranti
Daun pintu panel kayu meranti

m3
m2

Uraian pekerjaan

Satuan

rjaan Plafond
Plafond GRC t =5 mm+ rangka Galvalum 0.35 mm Grid 60 x 120

m2

rjaan pasangan keramik


Lantai keramik 40x40 cm, Kw1 setara Roman, Ex. Mulia, Masterina
Plin Lantai 10x40 cm

m2
m1

rjaan finishing
Pengecatan dinding luar (Weathershield,3x) Dulux/Mowilex/Jotun
Pengecatan dinding Interior Vinilex/Catylac/Properti
Pengecatan kayu F-Talit, Avian, Glotex

m2
m2
m2

Kuda-kuda rangka Baja Ringan Zinc Alume Profil Z ( Termasuk Rangka Atap )
Atap genteng beton (polos)
Alumunium Foil
Listplank GRC t = 12 mm lebar 30 cm

m2
m2
m2
m

BIAYA ( R A B )
NG PERTEMUAN
OTA TANGERANG

Volume

Harga Satuan (Rp)

Jumlah Harga (Rp)

6=4x5

1.00

346,333.00

346,333.00
346,333.00

10.00
1.50
0.10
1.52
2.85

29,011.00
51,725.00
157,163.00
67,062.00
83,450.00

290,110.00
77,587.50
15,401.97
101,934.24
237,832.50
722,866.21

0.29
1.01

276,565.00
671,133.00

81,310.11
676,502.06

0.60

777,649.00

464,256.45
1,222,068.63

0.32

777,649.00

244,959.44

0.26

777,649.00

200,633.44
445,592.88

26.88
53.76
14.00
67.76
0.02

134,427.00
48,058.00
48,058.00
25,341.00
5,920,692.00

3,613,397.76
2,583,598.08
672,812.00
1,717,106.16
132,327.47
8,719,241.47

0.02
2.00

6,647,938.00
632,715.00

152,902.57
1,265,430.00
1,418,332.57

Volume

Harga Satuan (Rp)

Jumlah Harga (Rp)

6=4x5

13.95

184,399.00

2,572,181.65

50.28
12.97

117,608.00
50,710.00

5,913,330.24
657,455.15
6,570,785.39

29.35
16.20
1.79

68,543.56
52,057.00
99,882.15

2,011,753.49
843,323.40
178,789.05
3,033,865.93

53.49
58.74
58.74
42.88

140,000.00
125,029.00
54,966.00
98,231.00

7,487,942.00
7,343,615.82
3,228,702.84
4,212,145.28
22,272,405.94

JUMLAH
PPN 10 %
TOTAL
DIBULATKAN

47,323,673.68
4,732,367.37
52,056,041.05
52,056,000.00
336

140,844.27
19.20

RESUME ANALISA TEKNIS

HARGA SATUAN PEKERJAAN


BIDANG BANGUNAN GEDUNG KOTA TANGERANG SELATAN

NO.

BAGIAN PEKERJAAN

PEKERJAAN PERSIAPAN
Pembersihan Lokasi
Pengukuran & pemasangan bouwplank
Pagar Pengaman Proyek
Pagar BRC tinggi 90 cm
Papan nama proyek
Direksekeet ( Lantai diplester )

PEKERJAAN TANAH
Perataan Tanah
Galian Tanah Biasa Kedalaman 1 m
Galian Tanah Biasa Kedalaman 1 m - 2 m
Galian Tanah Biasa Kedalaman 2 m - 3 m
Galian Tanah Biasa Kedalaman 3 m - 4 m
Galian tanah kedalaman 1 - 5 m dengan alat besar
Galian Tanah Keras
Galian Tanah Berbatu
Galian Tanah Lumpur
Galian Tanah Sumuran Kedalaman Max. 10 m
Angkutan Galian Jarak Max. 30 m
Urugan Kembali Galian Tanah
Urugan Tanah bahan dari luar dipadatkan dg stamper tiap 20 cm (tanah biasa)
Urugan Tanah bahan dari luar pakai alat besar ( tiap 20 cm ) tanah biasa
Urugan tanah bahan dari luar pakai alat besar ( tiap 20 cm) tanah berbatu
Urugan pasir bawah lantai & pondasi
Urugan Sirtu
Pemadatan Tanah ( tiap 20 cm ) dengan stamper
Galian tanah borfile dengan mesin bor

PEKERJAAN PONDASI
Lantai kerja, mutu fc = 7.4 MPa (K.100)
Pas.Pondasi batu kali 1 : 2
Pas.Pondasi batu kali 1 : 3
Pas.Pondasi batu kali 1 : 4
Pas.Pondasi batu kali 1 : 5
Pas.Batu kosong

NO.

BAGIAN PEKERJAAN

Pas. Cerucuk Dolken sedalam 3 m jarak tiap 50 cm

NO.

BAGIAN PEKERJAAN

PEKERJAAN BETON
Cor beton K.125 ( manual )
Cor beton K.175 ( manual )
Cor beton K.225 ( manual )
Cor beton K.250 ( manual )
Cor beton K.125 dengan readymix
Cor beton K.225 dengan readymix
Cor beton K.250 dengan readymix
Cor beton K.300 dengan readymix
Cor beton K.350 dengan readymix
Cor beton K.400 dengan readymix
Pembesian ( besi polos )
Pembesian ( besi ulir )
Bekisting dengan papan + bongkaran dan penyiraman
Bekisting dengan triplex 9 mm + bongkaran dan penyiraman
Bekisting kolom beton struktur
Bekisting balok beton struktur
Bekisting lantai beton
Perancah kayu / stoot werk - tinggi s/d 2 m
Perancah kayu / stoot werk - tinggi s/d 3 m
Perancah kayu / stoot werk - tinggi s/d 4 m
Perancah kayu / stoot werk - tinggi s/d 5 m
Balok beton praktis K.175
Kolom beton praktis K.175
Pondasi beton setapak K.225
Pondasi beton bored pile 40 cm K.225
Sloof beton 20/40 K-225
Sloof beton 25/40 K.225
Sloof beton 20/30 K-225
Sloof beton 20/25 K.225
Sloof beton 15/20 K.175
Kolom beton 40/40 K-225
Kolom beton 30/40 K.225
Kolom beton 30/30 K.225
Kolom beton 15/30 K.225
Balok beton 30/50 K-225
Balok beton 25/60 K.225
Balok beton 25/50 K-225
Balok beton 25/35 K.225
Balok beton 20/40 K-225
( untuk dak selasar penghubung antar bangunan )
Balok beton 25/25 K-225
Balok beton 20/25 K-225
Balok beton 15/20 K.225

NO.

BAGIAN PEKERJAAN

Balok beton 12/60 K.225


Balok beton praktis K.175

NO.

BAGIAN PEKERJAAN

Ring balok beton 20/40 K-225


Ring balok beton 20/30 K-225
Plat lantai & tangga beton K.225
Plat listplank beton K.225
Beton Plat Canopy atas jendela t = 10 cm - K.225
Ring balok beton 15/20 - K. 225
Ring balok beton 15/25 K-175
Pondasi beton setapak K.225
Pondasi beton bored pile 60 cm K.225
Pondasi beton bored pile 40 cm K.225
Pile cup beton K.225
Kolom beton 20/35 K.225
Kolom beton 50/50 K.225
Balok beton 12/60 K.225
Ring balok beton 15/25 K-175
balok beton 15/30 ( B4 ) K-225 (ready mix)
Plat Sambung SQ 30x 30 Type A
Tiang Pancang Persegi SQ 30x 30 Type A
Tie beam beton 30/60 K-225
Pile cup beton K.225
Kolom beton 25/25 K.225
Plat lantai beton Basement K.225
Plat beton wiremash K.225 t= 7 cm
Plat beton wiremash K.225 t= 10 cm
Plat lantai beton wiremash K.225 t=12 cm
Pondasi Setapak K.225, Type P1
Pondasi Setapak K.225, Type P2
Pondasi Setapak K225, Type P3

NO.

BAGIAN PEKERJAAN

PEKERJAAN DINDING
Pas.Batu bata, t = 1 / 2 bata ad. 1 : 2
Pas.Batu bata, t = 1 / 2 bata ad. 1 : 3
Pas.Batu bata, t = 1 / 2 bata ad. 1 : 4
Pas.Batu bata, t = 1 / 2 bata ad. 1 : 5
Pas.Batako beton ad. 1 : 2
Pas. Hebel 10.20.60 ad. 1 : 3
Pas.Batako beton ad. 1 : 4
Pas.Batako beton ad. 1 : 5
Plesteran & acian tebal 1,5 cm ad. 1 : 2
Plesteran & acian tebal 1,5 cm ad. 1 : 3
Plesteran & acian tebal 1,5 cm ad. 1 : 4
Plesteran & acian tebal 1,5 cm ad. 1 : 5
Pek.Acian
Rabat beton 7 cm + plester dan acian
Pasang Dinding Rooster / Terawang, Natural, uk. 12x11x24 cm, Ad. 1Pc : 4Ps
Pasang Dinding Batu Tempel Palimanan Kuning, 20 x 20 cm Texture Kasar
Pas. Hebel 10.20.60 ad. 1 : 5
Hand Ralling Tangga

PEKERJAAN ATAP
Kuda - kuda kayu kamper kruing
Kuda - kuda kayu kamper banjar
Kuda - kuda kayu meranti
Rangka atap ( kaso 5/7 dan reng 3/4 ) kayu meranti
Listplank 3 / 30 + 3 / 15 kayu kamper banjar
Listplank 3 / 30 kayu kamper banjar
Atap genteng morando glasuur
Karpusan genteng morando glasuur
Atap genteng beton (polos)
Karpusan genteng beton
Atap genteng metal berpasir
Bubungan genteng metal berpasir
Pasang atap asbes gelombang 5 mm
Pasang bubungan/nok stel 1.05 m
Konstruksi baja H - beam / WF ( termasuk plat simpul,las & zinkchromate )
Konstruksi besi siku ( termasuk plat simpul,las & zinkchromate )
Konstruksi gording besi ( termasuk plat simpul,las & zinkchromate )
Talang datar / jurai seng tebal 0.3 mm
Pas. Kembali listplank 3 / 30 + 3 / 15 kayu kamper banjar

NO.

BAGIAN PEKERJAAN

PEKERJAAN KAYU
Kusen kayu kamper samarinda
Kusen kayu kamper banjar
Kusen kayu kamper kruing
Kusen kayu meranti
Daun pintu double teakwood
Daun pintu double teakwood lapis formika ( untuk KM/WC )
Daun pintu kaca polos
Daun pintu kaca rayben
Daun pintu kaca es
Daun pintu panel kayu samarinda + Kaca
Daun pintu panel kayu banjar
Daun pintu panel kayu meranti
Daun pintu double triplek
Daun pintu / jendela krepyak ( jalusi ) kamper samarinda
Daun pintu / jendela krepyak ( jalusi ) kamper banjar
Kusen Jendela Alumunium (J1)
Kusen Jendela Alumunium (J2)
Kusen Bouvenligh Alumunium (BV)
Kusen Bouvenligh Alumunium (BV1)
Kusen Bouvenligh Alumunium (BV2)

PEKERJAAN LANTAI
Rabat beton 7 cm + plester dan acian
Lantai keramik 20 x 20 ad.1 : 3
Lantai keramik 40 x 40 ad.1 : 3 KW 1 ( Setara Roman )
Keramik dinding 20 x 20 KW1
Keramik dinding 20x25 KW1
Plint keramik standar
Plint kayu standar
Plint keramik 10x20 dinding Kamar mandi
Border 7x20 / Plint keramik dinding Kamar mandi

PEKERJAAN PLAFOND
Rangka plafond gird 50 x 100 cm ( kayu meranti )
Rangka plafond gird 50 x 100 cm ( kayu kamper banjar )
Plafond asbes 5 mm + rangka kayu meranti
Plafond gysum 9 mm + rangka kayu meranti
Plafond triplek 4 mm + rangka kayu meranti
Plafond asbes 5 mm + rangka kayu meranti
List Plafond Kayu Kamper Samarinda 5 cm
List Plafond Gypsum

NO.

10

BAGIAN PEKERJAAN

PEKERJAAN CAT
Cat dinding dalam interior
Cat dinding dalam interior
Cat dinding luar exterior
Cat dinding interior
Cat dinding interior
Cat plafond interior
Cat plafond interior
Cat besi memakai kuas
Cat kayu memakai kuas
Cat plafond setara Vinilex
Water proofing memakai kuas

11

PEKERJAAN SANITER
Closet jongkok standar
Bak air fiber glass kap. 200 ltr
Floor drain
Kran air 1/2"
Pompa air jet pump + Instalasi dan pengeboran
Water tower rangka besi siku
Tangki air kapasitas 1 m3
Septictank & Rembesan + Instalasi
Instalasi air bersih, dari water tower ke - kran air
Instalasi air kotor, dari closet & Floor Drain ke Septictank

12

PEKERJAAN ASESORIS
Pasang Engsel pintu nilon 4"
Pasang Engsel jendela
Pasang hak angin
Pasang slot / grendel pintu
Pasang kunci double slaag
Hand Ralling Tangga
Hand Ralling Tangga Stainelss Steel

NO.

13

BAGIAN PEKERJAAN

PEKERJAAN SARANA LUAR


Saluran buis beton 1/2 dia. 20 cm
Paving block t = 6 cm
Paving block t = 8 cm
Pagar beton precat t = 2.00 m
Pagar beton precat t = 2.40 m
Pas.Pagar Hollow
Pas.Pintu Pagar Tralis Besi
Ralling Tangga Kayu
Partisi double gysum 9 mm + rangka besi hollow 4x4 + List kayu papan diprofil + finish cat

14

PEKERJAAN BONGKARAN
Bongkar bangunan total (manual)
Bongkar struktur Bangunan ( dengan alat berat )
Bongkar dinding bata merah
Bongkar lantai keramik
Bongkar genteng
Bongkar rangka atap
Bongkar plafond
Pekerjaan kupasan dinding
Bongkar dinding bata
Bongkar pintu besi
Bongkaran karpusan genteng morando glasuur
Bongkaran listplank 3 / 30 + 3 / 15 kayu kamper banjar
Bongkar konstruksi gording besi

AN

NG SELATAN

SAT

NILAI

1 m2
1 m1
1 m1
1 m1
1 bh
1 m2

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,283.00
29,011.00
224,006.00
79,579.00
346,333.00
373,828.00

1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,606.00
51,725.00
62,212.00
68,728.00
71,256.00
33,676.00
66,678.00
130,738.00
67,062.00
83,450.00
17,477.00
21,050.00
157,163.00
145,605.00
158,525.00
225,050.00
208,033.00
54,349.00
345,666.00

1 m3
1 m3
1 m3
1 m3
1 m3
1 m3

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

773,636.00
787,316.00
717,669.00
704,273.00
671,133.00
276,565.00

SAT

1 m2

NILAI

Rp.

371,336.00

SAT

1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 kg
1 kg
1 m2
1 m2
1 m3
1 m3
1 m3
1 m2
1 m2
1 m2
1 m2
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3

NILAI

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

777,649.00
1,029,161.00
1,173,189.00
1,206,650.00
716,757.00
753,494.00
767,661.00
818,328.00
876,494.00
916,494.00
13,299.00
13,667.00
159,406.00
152,414.00
1,351,580.00
1,004,754.00
1,245,890.00
209,088.00
292,681.00
376,274.00
480,818.00
3,426,271.00
4,234,158.00
4,996,427.00
2,883,119.00
3,886,318.00
4,518,653.00
3,534,958.00
4,354,970.00
4,152,068.00
4,701,804.00
5,019,110.00
4,857,785.00
4,595,710.00
4,615,514.00
5,422,072.00
4,916,966.00
5,094,280.00
4,885,653.00
4,716,600.00
4,900,806.00
5,313,394.00

SAT

1 m3
1 m3

NILAI

Rp.
Rp.

3,981,188.00
3,426,271.00

SAT

1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
1 m3
set
m1
1 m3
1 m3
1 m3
1 m3
1 m2
1 m2
1 m3
1 m3
1 m3
1 m3

NILAI

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,803,651.00
5,115,958.00
6,026,228.00
3,464,422.00
3,373,083.00
3,395,779.00
5,146,620.00
4,996,427.00
2,735,449.00
2,883,119.00
3,286,215.00
3,966,934.00
4,155,124.00
3,981,188.00
5,146,620.00
3,474,463.00
911,000.00
259,000.00
4,019,078.00
3,286,215.00
4,018,454.00
2,539,379.00
418,429.00
453,349.00
4,359,929.00
2,977,769.00
3,003,190.00
3,167,194.00

SAT

NILAI

1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m'

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

134,427.00
128,682.00
124,982.00
122,304.00
98,027.00
143,201.00
94,905.00
93,883.00
52,229.00
51,632.00
49,904.00
48,058.00
25,341.00
49,046.00
303,053.00
182,359.00
138,134.00
132,031.00

1 m3
1 m3
1 m3
1 m2
1 m'
1 m'
1 m2
1 m'
1 m2
1 m'
1 m2
1 m'
1 m2
1 m1
1 kg
1 kg
1 kg
1 m'
1 m'

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

8,971,871.00
8,971,871.00
5,836,871.00
82,962.00
184,743.00
106,370.00
80,029.00
76,248.00
125,029.00
97,248.00
129,999.00
90,666.00
64,006.00
123,033.00
29,547.00
29,722.00
29,287.00
72,693.00
35,625.00

SAT

NILAI

1 m3
1 m3
1 m3
1 m3
1 bh
1 bh
1 bh
1 bh
1 bh
1 Unit
1 m2
1 m2
1 bh
1 m2
1 m2
1 bh
1 bh
1 bh
1 bh
1 bh

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,920,692.00
6,647,938.00
9,782,938.00
6,647,938.00
558,736.00
621,986.00
547,959.00
563,109.00
571,959.00
1,159,184.00
610,736.00
610,736.00
558,736.00
720,915.00
632,715.00
2,902,735.00
2,251,943.00
560,581.00
634,593.00
620,971.00

1 m2
1 m2
1 m2
1 m2
1 m2
1 m1
1 m1
1 m'
1 m'

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

49,046.00
86,458.00
117,608.00
98,522.00
114,623.00
50,710.00
51,743.00
46,131.00
48,881.00

1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m1
1m'

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

59,373.00
90,573.00
86,329.00
105,235.00
91,946.00
97,008.00
24,347.00
21,950.00

SAT

NILAI

1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

52,057.00
36,004.00
62,884.00
35,257.00
39,597.00
52,752.00
35,552.00
46,520.00
91,635.00
34,752.00
58,740.00

1 unit
1 unit
1 buah
1 buah
1 unit
1 unit
1 buah
1 unit
1m'
1m'

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

389,408.00
389,908.00
38,621.00
35,129.00
5,389,600.00
5,370,594.00
1,357,216.00
4,374,711.00
37,409.00
85,539.00

1 bh
1 bh
1 bh
1 bh
1 bh
1 m'
1m'

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

30,532.00
20,938.00
16,354.00
26,354.00
177,991.00
132,031.00
482,993.59

SAT

NILAI

1 m'
1 m2
1 m2
1 m'
1 m'
1 m'
1 m'
1 m'
1 m2

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

121,553.00
76,530.00
102,994.00
45,732.00
319,834.00
358,834.00
1,195,037.00
238,350.00
365,332.00
509,197.00

1 m2
1 m3
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m2
1 m'
1 m'
1 kg

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

156,170.00
137,927.00
9,091.00
7,798.00
4,636.00
20,779.00
14,333.00
6,858.00
26,805.00
26,805.00
6,595.00
20,607.00
14,477.00

HARGA SATUAN DASAR

BAHAN / MATERIAL DAN UPAH KERJA

NO.

NAMA BAHAN/MATERIAL

PASIR DAN BATU


Abu Batu/Screening 5 mm
Batu Palimanan uk. 10x20 cm
Batu Belah Pondasi
Batu Pecah/Split ukr. 1 - 2 cm
Batu Pecah/Split ukr. 2 - 3 cm
Batu Pecah/Split ukr. 3 - 4 cm
Macadam/Steel Slag ukr. 5 - 7 cm
Batu Tempel Hitam
Koral Beton
Pasir Beton
Pasir pasang
Pasir urug darat
Sirtu
Tanah Merah

II

PAVING BLOCK
Kastin Abu-abu ukr. 10.20.40 K250
Kastin Abu-abu ukr. 10.20.40 K 300
Paving Block K 250 Tebal 6 Abu-abu
Paving Block K 250 Tebal 8 Abu-abu
Paving Block K 350 Tebal 6 Abu-abu
Paving Block K 350 Tebal 8 Abu-abu
Grass Block K 350 Tebal 6 cm
Grass Block K 350 Tebal 8 cm
Grass Block K 350 Tebal 10 cm

III

SEMEN DAN KAPUR


Bata merah
Batako putih / Hebel
Bataco (bhn Semen + Pasir + Abu Batu)
Rooster Beton 20 x 20 x 7 cm
Semen Cibinong (Holcim) 50 kg
Semen Tiga Roda 50 kg
Semen Putih Tiga Roda 40 kg
Semen Warna

NO.

NAMA BAHAN/MATERIAL

IV

KAYU
Kaso kayu Meranti Jambi/Palembang - 400 cm
Balok Kayu Kamper Kruing/ Medan / Banjar - 400 cm ( bukan Oven )
Balok Kayu Meranti Jambi/palembang - 400 cm
Papan Kayu Kamper Kruing/ Medan/Banjar (oven) - 400 cm
Papan Kayu Kamper Singkil (oven) - 400 cm
Papan Kayu Meranti (oven) - 400 cm
Papan Kayu Terentang - 400 cm
Dolken 5 - 7 cm ukr. 300 - 400 cm
Dolken 8 - 10 cm ukr. 350 - 400 cm
List Gypsum 7 cm
List Gypsum 10 cm
List profil kamper 5 Cm
List Profil Kamper 2 cm
Balok Kayu Kamper Samarinda Oven : 6x15x400 cm
Papan Kayu Kamper Samarinda Oven : 3x30x400 cm
Daun Pintu Kayu Kamper Samarinda (Bukan Oven)
Daun Pintu Kayu Kamper Samarinda Kualitas Export (Oven)
Bahan plafond hardplex 5 mm 120x240
Bahan plafond asbes semen 5 mm
Block teak 122 x 244 tebal 18 mm 1 muka
Formika ukr. 90 x 210 x 3 mm
Formika ukr. 122 x 244 x 3 mm
Gypsum 9 mm 120 x 240 ex. DN
Gypsum 12 mm 120 x 240 ex. DN
Kusen dan Daun Pintu PVC ukuran standar
Melamin ukr. 90 x 210 x 3 mm
Melamin 122 x 244 x 3 mm
Multiplek ukr. 122 x 244 x 9 mm
Multiplek ukr. 122 x 244 x 12 mm
Multiplek ukr. 122 x 244 x 15 mm
Multiplek ukr. 122 x 244 x 18 mm
Teak Wood ukr. 90 x 210 x 3 mm
Teak Wood ukr. 122 x 244 x 3 mm
Teakwood ukr. 90 x 210 x 4 mm
Teakwood ukr. 122 x 244 x 4 mm
Triplek ukr. 122 x 244 x 3 mm
Triplek ukr. 122 x 244 x 4 mm
Triplek ukr. 122 x 244 x 6 mm

NO.

NAMA BAHAN/MATERIAL

READYMIX
Readymix beton K-125 tanpa pompa
Readymix beton K-175 tanpa pompa
Readymix beton K-225 tanpa pompa
Readymix beton K-250 tanpa pompa
Readymix beton K-300 tanpa pompa
Readymix beton K-350 tanpa pompa
Readymix beton K-400 tanpa pompa
Readymix beton B-0 tanpa pompa
Dengan pompa ditambah sewa pompa standar

VI

BETON
Buis Beton
Buis Beton Ukuran . 20 cm tanpa tulangan panjang 1,00 m Lokal
Buis Beton Ukuran . 30 cm tanpa tulangan panjang 1,00 m lokal
Buis Beton Ukuran . 40 cm tanpa tulangan panjang 1,00 m Lokal
Buis Beton Ukuran . 50 cm tanpa tulangan panjang 1,00 m Lokal
Buis Beton Ukuran . 60 cm tanpa tulangan panjang 1,00 m Lokal
Buis Beton Ukuran . 80 cm tanpa tulangan panjang 1,00 m Lokal
Buis Beton Ukuran . 100 cm tanpa tulangan panjang 1,00 m Lokal
Buis beton bertulang panjang 2,50 m .uk. 60 cm
Buis beton bertulang panjang 2,50 m .uk. 70 cm
Buis beton bertulang panjang 2,50 m .uk. 80 cm
Buis beton bertulang panjang 2,50 m .uk. 90 cm
Buis beton bertulang panjang 2,50 m .uk. 100 cm
Buis beton bertulang panjang 2,50 m .uk. 110 cm
Buis beton bertulang panjang 2,50 m .uk. 120 cm
Buis beton bertulang panjang 2,50 m .uk. 130 cm
Buis beton bertulang panjang 2,50 m .uk. 140 cm
Buis beton bertulang panjang 2,50 m .uk. 150 cm
Buis Beton Ukuran .1/2 100 cm tanpa tulangan panjang 1,00 m lokal
Buis Beton Ukuran .1/2 80 cm tanpa tulangan panjang 1,00 m lokal
Buis Beton Ukuran .1/2 20 cm tanpa tulangan panjang 1,00 m lokal
Buis Beton Ukuran .1/2 30 cm tanpa tulangan panjang 1,00 m lokal
Buis Beton Ukuran .1/2 40 cm tanpa tulangan panjang 1,00 m lokal
Buis Beton Ukuran .1/2 50 cm tanpa tulangan panjang 1,00 m lokal
Buis Beton Ukuran .1/2 60 cm tanpa tulangan panjang 1,00 m lokal

NO.

NAMA BAHAN/MATERIAL

VII

CAT
Amplas Kayu, Besar
Ampelas Besi, halus
Bahan pelitur Kripik ( sirlak india)
Cat besi setara F Talit
Cat Besi setara Glotek
Cat besi setara seiv
Cat tembok setara Jotun Interior
Cat tembok setara Jotun Exterior
Cat tembok Dulux/ICI interior
Cat tembok Dulux/ICI exterior
Cat tembok setara Vinilex
Cat tembok setara Metrolith
Cat dasar setara Dulux/ICI
Dempul halus/Infra
Dempul plitur
Ijuk
Kwas 3"
Melamik
Meni Besi setara Nippon
Meni Kayu setara Nippon
Minyak Cat/Tinner
Minyak Solar
Minyak Tanah
Minyak Tanah Industri
Oker
Pelamir Tembok
Pelitur
Pelumas
Plamur Tembok setara Matek/Metrolite
Plamur Kayu/Dempul Kayu
Residu
Rool cat tembok
Sapu Lidi
Soda Api
Spirtus
Thiner A
Thiner B
Vernis Bee Brand 66 (kayu/besi)

NO.

NAMA BAHAN/MATERIAL

VIII

IX

LANTAI
Ubin Keramik Ukr. 10x40 Standar KW 1
Ubin Keramik Ukr. 20x20 Standar KW 1
Ubin Keramik Ukr. 40x40 Standar KW 1 ( SETARA ROMAN )
Ubin Keramik 10x20 dan 20x20 KW1 DN Standar
Ubin Keramik 20 x 25 Standar KW 1
ALAT PENGUNCI
Engsel Pintu Nilon ukuran 3"
Engsel Pintu Nilon ukuran 4"
Engsel Piano (RRC)
Engsel Stainless Stell setara YANK 3"
Engsel Stainless Stell setara YANK 4"
Engsel Stainless stell setara Dekon/Poloma uk. 3"
Engsel Stainless stell setara Dekon/Poloma uk. 4"
Kunci Double Slaag setara Solid
Gembok 60 mm merk AXEL
Grendel Ukuran 4" setara Solid
Grendel Ukuran 6" setara Solid
Grendel Ukuran 4" setara Dekon
Grendel Ukuran 6" setara Dekon

NO.

NAMA BAHAN/MATERIAL

SANITASI AIR
Bak mandi Alco Fiber uk. 65x65 cm
Closet Duduk CW 660 J/ SW 660 J Rough - in : 230 m
Colset Jongkok Merk Toto Tipe Standar
Tower Tank Merk Excel Cap. 1000 liter
Pipa PVC dia.1/2" AW. P=4 m
Pipa PVC dia.1/2" AW
Pipa PVC dia.3/4" AW. P=4 m
Pipa PVC dia.3/4" AW
Pipa PVC dia.1" AW. P=4 m
Pipa PVC dia.1" AW
Pipa PVC dia.2" AW. P=4 m
Pipa PVC dia.2" AW
Pipa PVC dia.3" AW. P=4 m
Pipa PVC dia.3" AW
Pipa PVC dia.4" AW. P=4 m
Pipa PVC dia.4" AW
Pipa PVC dia.6" AW. P=4 m
Pipa PVC dia.6" AW
Knee PVC 3/4"
Knee PVC 1/2"
Knee PVC 4"
Pipa Parous 6"
Seal Tape pipa
Lem pipa

NO.

NAMA BAHAN/MATERIAL

XI

ATAP
Rangka atap baja ringan profil
Atap genteng metal
Bubungan genteng metal
Alumunium Foil 1 muka, medium weight (HF 404)
Bubungan genteng beton
Bubungan Genteng ex. Jatiwangi
Bubungan Genteng Kanmuri
Bubungan Genteng Kodok Plentong Natural
Bubungan Genteng Marundo
Bubungan Genteng Marundo Glasur
Bubungan Genteng Glasur Pelita
Fiber / Asbes semen gelombang 150x105x0,4 cm
Fiber / Asbes semen gelombang 240x105x0,4 cm
Fiber / Asbes semen gelombang 270x105x0,4 cm
Fiber / Asbes semen gelombang 300x105x0,4 cm
Fiber / Asbes semen gelombang 180x108x0,5 cm
Fiber / Asbes semen gelombang 250x92x0,5 cm
Fiber / Asbes semen gelombang 210x108x0,5 cm
Fiber / Asbes semen gelombang 240x108x0,5 cm
Fiber / Asbes semen gelombang 270x108x0,5 cm
Fiber / Asbes semen gelombang 300x108x0,5 cm
Genteng Beton Polos
Genteng beton warna
Genteng Glasur setara Pelita
Genteng Kanmuri Espanila Natural
Genteng Kodok, Plentong Natural
Genteng Morando
Genteng Morando Glasur
Genteng List plang Marundo Glasur setara Pelita
Genteng plentong ex. Jatiwangi
Genteng metal
Bubungan genteng metal

NO.

NAMA BAHAN/MATERIAL

2
Kusen
Kusen Alumunium Natural Ukuran 3" x 1 1/2"
Kusen Alumunium Natural Ukuran 4" x 1 3/4"
Kusen Alumunium Warna Ukuran 4" x 1 3/4"
Nok stil rata 92 cm
Nok stil rata 105 cm
Nok stil rata 108 cm
Pintu P.V.C. ex. Moradon Typ 105 E Polos lengkap kunci + Engsel
Pintu P.V.C. ex. Moradon Typ 104 D Polos lengkap kunci + Engsel
Plat Asbes 100 x 100 tebal 5 mm
Plat Asbes 100 x 100 tebal 6 mm
Plat Fiber Semen Harflek 100x100 cm tbl. 5 mm
Plat seng tebal 0,020 cm lebar 0,90
Plat seng tebal 0,030 cm lebar 0,90
Sealent
Seng gelombang 180 x 90 x 0,20
Plat Bondex

NO.

NAMA BAHAN/MATERIAL

XII

BAJA TULANGAN / PROFIL


Besi beton polos
Besi beton ulir
Baja IWF ex.DN SII
Baja Canal C

XIII

KAWAT
Kawat beton
Kawat las harmonika
Kawat las listrik
Paku segala ukuran (rata-rata)
Wiremesh M8 uk 5.4 x 2.1 m
Pipa Galv Medium dia 2 inch
Pagar BRC t = 0.9 m 6

XIV

KACA
Kaca bening 2 mm
Kaca bening 3 mm
Kaca bening 5 mm
Kaca bening 8 mm
Kaca bening 10 mm
Kaca Es 3 mm
Kaca Es 5 mm
Kaca Rayben 5 mm
Kaca Rayben 8 mm
Kaca Rayben 10 mm
Kaca Rayben 12 mm

XV

LISTRIK
Kabel NYM 3x2.5 mm
Klem kabel
Pipa AW 1/2"
Saklar tunggal
Saklar double
Box Panel
Saklar double
Stop Kontak
Lampu TL 2 x 18 watt, armatur, komplit philips
Lampu SL 18 watt, komplit philips
Fitting Keramik
Rumah lampu bared
Lampu SL 40 watt, komplit philips

NO.

NAMA BAHAN/MATERIAL

XV

SEWA ALAT
Buldozer 100 - 150 HP
Compressor 4000-6500 liter/menit
Concrete Vibrator
Excavator 80 - 120 HP
Generator Set 125 KVA
Jack Hammer
Stamper

XVI

UPAH
Pekerja / knek
Tukang gali
Tukang Batu
Tukang Kayu
Tukang Besi
Tukang Cat
Kepala Tukang Batu
Kepala Tukang Kayu
Kepala Tukang Besi
Kepala Tukang Cat
Pembantu Instalator
Instalator
Mandor / pengawas

NO.

NAMA BAHAN/MATERIAL

XVII

TAMBAHAN
Tiang pancang 30x30
Karet List
Plint Keramik Standart 10 x 20 cm
Border Keramik Dinding 7 x 20
Cat Kayu setara F Talit
Lem Putih
Penangkal Petir
Tinggi pagar 5 panel/ 2 m, panjang kolom 3 m, mutu beton K225
Tinggi pagar 6 panel/ 2.4 m, panjang kolom 3.5 m, mutu beton K225
Tinggi pagar 7 panel/ 2.8 m, panjang kolom 4 m, mutu beton K225
Tinggi pagar 8 panel/ 3.2 m, panjang kolom 4.5 m, mutu beton K225
Besi Hollow 4 X 4 Cm
Catur kayu kamper
Hand Ralling
Melamin
Dyna Bolt
Kunci KM / WC
Kait Angin
Slot Tanam pada pintu double, 2 bh perpintu
Urinoir
Pipa Galv Medium dia 2 inch
Alat Bantu
Alat Bantu Railling Tangga
Besi pengikat kuda-kuda
Zinchromate
Erection
Jalusi Alumunium
Holo Galvanis 0,35 (4 x 4 x 400)
GRC Board uk. 5 mm x1220 mm x 2440 mm berat 20 kg/lembar

ARGA SATUAN DASAR

ATERIAL DAN UPAH KERJA


HARGA
SATUAN

SATUAN

151,667.00
82,500.00
163,333.00
201,667.00
210,000.00
210,000.00
190,000.00
125,000.00
209,167.00
249,167.00
244,333.00
170,000.00
144,167.00
95,500.00

m2
m2
m3
m3
m3
m3
m3
m2
m3
m3
m3
m3
m3
m3

32,500.00
34,667.00
55,300.00
81,000.00
71,167.00
81,167.00
21,000.00
27,667.00
29,333.00

m1
ml
m2
m2
m2
m2
bh
bh
bh

700.00
11,167.00
3,833.00
6,917.00
60,333.00
63,333.00
80,333.00
15,500.00

bh
bh
bh
bh
zak
zak
zak
kg

HARGA
SATUAN

SATUAN

2,583,333.00
6,483,333.00
3,633,333.00
7,083,333.00
7,083,333.00
4,050,000.00
2,116,667.00
18,167.00
23,167.00
15,000.00
17,833.00
14,917.00
7,717.00
8,550,000.00
9,183,333.00
1,716,667.00
2,258,333.00
70,833.00
65,000.00
242,000.00
110,000.00
61,167.00
178,167.00
95,333.00
125,167.00
165,000.00
209,000.00
231,500.00
71,500.00
107,333.00
92,500.00
110,667.00
50,467.00
59,167.00
75,667.00

m3
m3
m3
m3
m3
m3
m3
btg
btg
m1
m1
m1
m1
m3
m3
Unit
Unit
lbr
lbr
lbr
lbr
lbr
lbr
lbr
Unit
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr

HARGA
SATUAN

SATUAN

652,000.00
658,333.00
679,833.00
694,000.00
744,667.00
802,833.00
842,833.00
575,667.00
2,757,333.00

m3
m3
m3
m3
m3
m3
m3
m3
8 jam

128,333.00
128,500.00
193,833.00
281,333.00
289,333.00
329,000.00
523,500.00

m1
m1
m1
m1
m1
m1
m1

587,400.00
782,540.00
957,990.00
1,155,000.00
1,483,900.00
1,813,680.00
2,246,090.00
2,615,910.00
3,052,500.00
3,331,900.00

btg
btg
btg
btg
btg
btg
btg
btg
btg
btg

266,166.00
219,000.00
74,500.00
82,500.00
114,166.00
146,333.00
206,500.00

btg
btg
btg
btg
btg
btg
btg

HARGA
SATUAN

SATUAN

4,500.00
9,750.00
123,000.00
55,833.00
45,500.00
97,800.00
23,500.00
48,500.00

lbr
lbr
kg
kg
kg
kg
kg
kg

80,833.00
119,500.00
20,833.00
36,333.00

kg
kg
kg
kg

59,167.00
25,333.00
35,167.00
7,667.00
30,167.00
43,667.00
20,167.00
20,333.00
23,333.00

kg
kg
kg
ikat
bh
kg
kg
kg
ltr
ltr
ltr
ltr
kg
kg
kg
ltr
kg
kg
kg
bh
ikat
kg
ltr
ltr
ltr
ltr

13,667.00
15,033.00
44,833.00
47,500.00
15,033.00
22,700.00
10,050.00
16,667.00
11,875.00
13,000.00
10,333.00
17,167.00
25,583.00
47,333.00

HARGA
SATUAN

SATUAN

73,500.00
43,833.00
73,500.00
47,833.00
59,167.00

m2
m2
m2
m2
m2

24,167.00
34,500.00
37,500.00
23,125.00
42,200.00
37,500.00
45,000.00
154,500.00
66,500.00
25,333.00
37,167.00
45,200.00
59,400.00

ps
ps
ps
ps
ps
ps
ps
bh
bh
bh
bh
bh
bh

HARGA
SATUAN

SATUAN

290,000.00
2,324,000.00
289,500.00
1,329,500.00
11,333.00
2,833.25
18,500.00
4,625.00
23,000.00
5,750.00
53,000.00
13,250.00
76,000.00
19,000.00
172,667.00
43,166.75
403,000.00
100,750.00
2,880.00
1,920.00
12,280.00
60,000.00
14,300.00
10,200.00

bh
bh
bh
bh
btg
m'
btg
m'
btg
m'
btg
m'
btg
m'
btg
m'
btg
m'
bh
bh
bh
m'
roll
tube

HARGA
SATUAN

SATUAN

128,000.00
111,500.00
55,700.00
20,000.00
12,000.00
6,833.00
13,917.00
4,000.00
4,000.00
6,000.00
6,750.00

m2
m2
m'
m2
bh
bh
bh
bh
bh
bh
bh

35,083.00
50,167.00
57,000.00
67,333.00

lbr
lbr
lbr
lbr

51,333.00
72,667.00
58,500.00
68,500.00
77,000.00
86,333.00

lbr
lbr
lbr
lbr
lbr
lbr

6,000.00
10,150.00
2,667.00
6,500.00
2,000.00
2,333.00
3,500.00
7,000.00
1,500.00
111,500.00
55,700.00

bh
bh
Bh
bh
bh
bh
Bh
bh
bh
m2
m'

HARGA
SATUAN

SATUAN

95,000.00
95,000.00
120,700.00

m'
m'
m'

60,000.00
50,000.00
60,200.00

lbr
lbr
lbr

203,667.00
383,333.00

bh
bh

16,167.00
19,667.00
23,500.00
26,833.00
39,833.00
12,333.00
47,667.00

lb
lb
lb
m1
m1
tube
lbr

HARGA
SATUAN

SATUAN

7,833.00
8,167.00
14,333.00
14,500.00

kg
kg
kg
kg

15,800.00
28,000.00
25,200.00
12,250.00
484,000.00
490,700.00
168,400.00

kg
m
kg
kg
lbr
btg
m1

93,000.00
75,000.00
108,333.00
163,000.00
220,000.00
137,583.00
148,833.00
125,167.00
250,000.00
321,667.00
531,667.00

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

25,000.00
9,200.00
9,062.00
27,000.00
27,000.00
950,500.00
57,175.00
44,085.00
210,865.00
43,750.00

m
dus
m
bh
bh
bh

HARGA
SATUAN

SATUAN

222,667.00
58,467.00
19,000.00
202,333.00
156,333.00
19,417.00
37,583.00

Jam
Jam
Jam
Jam
Jam
Jam
Jam

64,667.00
75,833.00
74,500.00
76,833.00
74,500.00
74,500.00
85,167.00
85,167.00
85,167.00
90,167.00
67,500.00
85,167.00
105,000.00

hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari

HARGA
SATUAN

SATUAN

259,000.00
3,500.00
7,700.00
41,250.00
55,833.00
15,166.00
1,893,000.00
221,000.00
260,000.00
305,000.00
360,000.00
121,600.00
50,050.00
30,250.00
80,600.00
1,500.00
35,000.00
29,250.00
38,125.00
1,250,000.00

m'
m'
bh
m'
kg
Kg
titik
m
m
m
m
btg
bh
m'
m2
bh
bh
bh
bh
bh

1,000.00
10,000.00
11,000.00
500.00
10,000.00
28,000.00
27,583
99,000.00

lbr

ANALISA TEKNIS

HARGA SATUAN PEKERJAAN


BIDANG BANGUNAN GEDUNG KOTA TANGERANG SELATAN

NO.

URAIAN

KOEF.

SAT.

PEKERJAAN PERSIAPAN
1 m2

- Pembersihan Lokasi

Pekerja
Mandor

0.0500
0.0100

hr
hr
JUMLAH
DIBULATKAN

1 m1

- Pengukuran & pemasangan bouwplank

Kayu Kaso terentang 5/7-400 cm


Kayu Papan terentang 2/20- 400 cm
Paku segala ukuran
Pekerja
Tukang Kayu
Mandor

0.0040
0.0060
0.0200
0.0500
0.0500
0.0050

m3
m3
kg
hr
hr
hr
JUMLAH
DIBULATKAN

1 m1

- Pagar Pengaman Proyek

Pasir Beton
Batu kali
Semen PC ( 50 kg )
Kaso Meranti Jambi Basah uk. 5 x 10 x 400 cm
Seng Gelombang BJLS 28 (80x180) cm
Paku Kayu Segala uk.
Pekerja
Tukang Batu
Tukang Kayu
Mandor

0.0012
0.0048
0.0170
0.0360
1.4300
0.0200
0.3000
0.3750
0.1500
0.0150

m
m
zak
m
lbr
kg
hr
hr
hr
hr
JUMLAH
DIBULATKAN

1 m1

- Pagar BRC tinggi 90 cm

BRC t = 0.9 m 6
Pekerja
Tukang Kayu
Kepala Tukang Kayu

0.4340
0.0420
0.0420
0.0040

lbr
hr
hr
hr

NO.

URAIAN
Mandor

KOEF.
0.0020

SAT.
hr
JUMLAH
DIBULATKAN

NO.

URAIAN
1 bh

KOEF.

SAT.

- Papan nama proyek

Multipleks 120 x 240, 9 mm


Cat kayu/besi
Kaso kayu meranti
Penulisan
Ongkos pasang

0.5000
1.1000
0.0280
1.0000
1.0000

lbr
kg
m3
ls
ls
JUMLAH
DIBULATKAN

1 m2

- Direksikeet (lantai plesteran)

Pair pasang
Pasir beton
Batu bata merah
Semen PC 50 kg
Kayu kaso meranti
Triplek 122 x 244 x 4 mm
Engsel pintu uk 3 "
Asbes semen gelombang 250x92 x 0. 5 cm
Kaca polos 5 mm
Rangka teralis nako
Paku segala ukuran ( rata-rata)
Kunci gembok kecil
Pekerja
Tukang batu
Tukang kayu
Mandor

0.2500
0.0517
25.0000
0.2500
0.0300
1.0000
0.1667
0.5000
0.2917
0.2917
0.5000
0.0834
0.4000
0.0834
0.3340
0.0200

m3
m3
bh
zak
m3
lbr
bh
lbr
m2
bh
kg
bh
hr
hr
hr
hr
JUMLAH
DIBULATKAN

ANALISA TEKNIS

GA SATUAN PEKERJAAN

UNAN GEDUNG KOTA TANGERANG SELATAN

HARGA SATUAN

64,667.00
105,000.00

JUMLAH

3,233.35
1,050.00

JUMLAH

4,283.35

DIBULATKAN

4,283.00

2,116,667.00
2,116,667.00
12,250.00
64,667.00
76,833.00
105,000.00

8,466.67
12,700.00
245.00
3,233.35
3,841.65
525.00

JUMLAH

29,011.67

DIBULATKAN

29,011.00

249,167.00
163,333.00
63,333.00
2,583,333.00
47,667.00
12,250.00
64,667.00
74,500.00
76,833.00
105,000.00

299.00
784.00
1,076.66
92,999.99
68,163.81
245.00
19,400.10
27,937.50
11,524.95
1,575.00

JUMLAH

224,006.01

DIBULATKAN

224,006.00

168,400.00
64,667.00
76,833.00
85,167.00

73,085.60
2,716.01
3,226.99
340.67

HARGA SATUAN
105,000.00

JUMLAH
210.00

JUMLAH

79,579.27

DIBULATKAN

79,579.00

HARGA SATUAN

125,167.00
55,833.00
2,583,333.00
100,000.00
50,000.00

JUMLAH

62,583.50
61,416.30
72,333.32
100,000.00
50,000.00

JUMLAH

346,333.12

DIBULATKAN

346,333.00

244,333.00
249,167.00
700.00
63,333.00
2,583,333.00
59,167.00
60,000.00
35,083.00
108,333.00
12,000.00
12,250.00
15,000.00
64,667.00
74,500.00
76,833.00
105,000.00

61,083.25
12,881.93
17,500.00
15,833.25
77,499.99
59,167.00
10,002.00
17,541.50
31,600.74
3,500.40
6,125.00
1,251.00
25,866.80
6,213.30
25,662.22
2,100.00

JUMLAH

373,828.38

DIBULATKAN

373,828.00

NO.

URAIAN

KOEF.

SAT.

PEKERJAAN TANAH
1

1 m3

- Perataan Tanah

Pekerja
Mandor
Alat bantu

0.0400
0.0040
0.6000

hr
hr
set
JUMLAH
DIBULATKAN

1 m3

- Galian Tanah Biasa Kedalaman 1 m

Pekerja
Mandor
Alat bantu

0.7500
0.0250
0.6000

hr
hr
set
JUMLAH
DIBULATKAN

1 m3

- Galian Tanah Biasa Kedalaman 1 m - 2 m

Pekerja
Mandor
Alat bantu

0.9000
0.0325
0.6000

m3
hr
set
JUMLAH
DIBULATKAN

1 m3

- Galian Tanah Biasa Kedalaman 2 m - 3 m

Pekerja
Mandor
Alat bantu

0.9350
0.0730
0.6000

hr
hr
set
JUMLAH
DIBULATKAN

1 m3

- Galian Tanah Biasa Kedalaman 3 m - 4 m

Pekerja
Mandor
Alat bantu

0.9400
0.0940
0.6000

hr
hr
set
JUMLAH
DIBULATKAN

1 m3
Pekerja

- Galian tanah kedalaman 1 - 5 m dengan alat besar


0.2000

hr

NO.

URAIAN
Mandor
Excavator kap. 80 - 120 HP
Alat bantu

KOEF.
0.0020
0.1000
0.3000

SAT.
hr
jam
hr
JUMLAH
DIBULATKAN

NO.
7

URAIAN
1 m3

KOEF.

SAT.

- Galian Tanah Keras

Pekerja
Mandor
Alat bantu

0.9650
0.0350
0.6000

hr
hr
set
JUMLAH
DIBULATKAN

1 m3

- Galian Tanah Berbatu

Pekerja
Mandor
Alat bantu

1.9600
0.0323
0.6000

hr
hr
set
JUMLAH
DIBULATKAN

1 m3

- Galian Tanah Lumpur

Pekerja
Mandor
Alat bantu

0.9750
0.0325
0.6000

hr
hr
set
JUMLAH
DIBULATKAN

10

1 m3

- Galian Tanah Sumuran Kedalaman Max. 10 m

Pekerja
Mandor
Alat bantu

1.2000
0.0500
0.6000

hr
hr
set
JUMLAH
DIBULATKAN

11

1 m3

- Angkutan Galian Jarak Max. 30 m

Pekerja
Mandor
Alat bantu

0.2480
0.0080
0.6000

hr
hr
set
JUMLAH
DIBULATKAN

12

1 m3
Pekerja
Mandor
Alat bantu

- Urugan Kembali Galian Tanah


0.3000
0.0100
0.6000

hr
hr
set

NO.

URAIAN

KOEF.

SAT.
JUMLAH
DIBULATKAN

NO.
13

URAIAN
1 m3

KOEF.

SAT.

- Urugan Tanah bahan dari luar dipadatkan dg stamper tiap 20 cm (tanah biasa)

Tanah Urug
Pekerja
Mandor
Stamper, 5 HP, Kap. 0.17 ton
Alat bantu

1.2000
0.1240
0.0040
0.9000
0.3000

m3
hr
hr
jam
set
JUMLAH
DIBULATKAN

14

1 m3

- Urugan Tanah bahan dari luar pakai alat besar ( tiap 20 cm ) tanah biasa

Tanah Urug
Pekerja
Mandor
Buldozer kap. 100 - 150 HP
Alat bantu

1.2000
0.1240
0.0040
0.1000
0.3000

m3
hr
hr
jam
set
JUMLAH
DIBULATKAN

15

1 m3

- Urugan tanah bahan dari luar pakai alat besar ( tiap 20 cm) tanah berbatu

Tanah Urug
Pekerja
Mandor
Buldozer kap. 100 - 150 HP
Alat bantu

1.2000
0.1500
0.0050
0.1500
0.3000

m3
hr
hr
jam
set
JUMLAH
DIBULATKAN

16

1 m3

- Urugan pasir bawah lantai & pondasi

Pasir Urug
Pekerja
Mandor
Alat bantu

1.2000
0.3000
0.0100
0.6000

m3
hr
hr
set
JUMLAH
DIBULATKAN

17

1 m3
Sirtu
Pekerja
Mandor
Alat bantu

- Urugan Sirtu
1.2000
0.5000
0.0200
0.6000

m3
hr
hr
set

NO.

URAIAN

KOEF.

SAT.
JUMLAH
DIBULATKAN

NO.
18

URAIAN
1 m3

KOEF.

SAT.

- Pemadatan Tanah ( tiap 20 cm ) dengan stamper

Pekerja
Mandor
Stamper
Alat bantu

0.3000
0.0050
0.9000
0.6000

hr
hr
jam
set
JUMLAH
DIBULATKAN

19

1 m3

- Galian Tanah bore pile dengan mesin bor

Pekerja
Mandor
Mesin bor
Alat bantu

0.4000
0.0400
3.0000
0.6000

hr
hr
jam
set
JUMLAH
DIBULATKAN

1 m3

- Urugan Abu batu t = 5 cm

Abu Batu/Screening 5 mm
Pekerja
Mandor
Alat bantu

1.2000
0.3000
0.0100
0.6000

m3
hr
hr
set
JUMLAH
DIBULATKAN

HARGA
SATUAN

64,667.00
105,000.00
1,000.00

JUMLAH

2,586.68
420.00
600.00

JUMLAH

3,606.68

DIBULATKAN

3,606.00

64,667.00
105,000.00
1,000.00

48,500.25
2,625.00
600.00

JUMLAH

51,725.25

DIBULATKAN

51,725.00

64,667.00
105,000.00
1,000.00

58,200.30
3,412.50
600.00

JUMLAH

62,212.80

DIBULATKAN

62,212.00

64,667.00
105,000.00
1,000.00

60,463.65
7,665.00
600.00

JUMLAH

68,728.65

DIBULATKAN

68,728.00

64,667.00
105,000.00
1,000.00

60,786.98
9,870.00
600.00

JUMLAH

71,256.98

DIBULATKAN

71,256.00

64,667.00

12,933.40

HARGA
SATUAN
105,000.00
202,333.00
1,000.00

JUMLAH
210.00
20,233.30
300.00

JUMLAH

33,676.70

DIBULATKAN

33,676.00

HARGA
SATUAN

64,667.00
105,000.00
1,000.00

JUMLAH

62,403.66
3,675.00
600.00

JUMLAH

66,678.66

DIBULATKAN

66,678.00

64,667.00
105,000.00
1,000.00

126,747.32
3,391.50
600.00

JUMLAH

130,738.82

DIBULATKAN

130,738.00

64,667.00
105,000.00
1,000.00

63,050.33
3,412.50
600.00

JUMLAH

67,062.83

DIBULATKAN

67,062.00

64,667.00
105,000.00
1,000.00

77,600.40
5,250.00
600.00

JUMLAH

83,450.40

DIBULATKAN

83,450.00

64,667.00
105,000.00
1,000.00

16,037.42
840.00
600.00

JUMLAH

17,477.42

DIBULATKAN

17,477.00

64,667.00
105,000.00
1,000.00

19,400.10
1,050.00
600.00

HARGA
SATUAN

JUMLAH

JUMLAH

21,050.10

DIBULATKAN

21,050.00

HARGA
SATUAN

95,500.00
64,667.00
105,000.00
37,583.00
1,000.00

JUMLAH

114,600.00
8,018.71
420.00
33,824.70
300.00

JUMLAH

157,163.41

DIBULATKAN

157,163.00

95,500.00
64,667.00
105,000.00
222,667.00
1,000.00

114,600.00
8,018.71
420.00
22,266.70
300.00

JUMLAH

145,605.41

DIBULATKAN

145,605.00

95,500.00
64,667.00
105,000.00
222,667.00
1,000.00

114,600.00
9,700.05
525.00
33,400.05
300.00

JUMLAH

158,525.10

DIBULATKAN

158,525.00

170,000.00
64,667.00
105,000.00
1,000.00

204,000.00
19,400.10
1,050.00
600.00

JUMLAH

225,050.10

DIBULATKAN

225,050.00

144,167.00
64,667.00
105,000.00
1,000.00

173,000.40
32,333.50
2,100.00
600.00

HARGA
SATUAN

JUMLAH

JUMLAH

208,033.90

DIBULATKAN

208,033.00

HARGA
SATUAN

64,667.00
105,000.00
37,583.00
1,000.00

JUMLAH

19,400.10
525.00
33,824.70
600.00

JUMLAH

54,349.80

DIBULATKAN

54,349.00

64,667.00
105,000.00
105,000.00
1,000.00

25,866.80
4,200.00
315,000.00
600.00

JUMLAH

345,666.80

DIBULATKAN

345,666.00
152,000.00
64,667.00
105,000.00
1,000.00

JUMLAH
DIBULATKAN

182,400.00
19,400.10
1,050.00
600.00
203,450.10
203,450.00

NO.

URAIAN

KOEF.

SAT.

PEKERJAAN PONDASI
1

1 m3

- Lantai kerja, mutu fc = 7.4 MPa (K.100)

Pasir beton
Split pecah mesin 2/3
Semen PC ( 50 kg )
Pekerja
Tukang batu
Kepala Tukang
Mandor
Sewa molen

0.6200
0.7400
4.9400
1.6500
0.2500
0.0250
0.0800
0.4000

m3
m3
zak
hr
hr
hr
hr
jam
JUMLAH
DIBULATKAN

1 m3

- Pas.Pondasi batu kali 1 : 2

Pasir Pasang
Batu Kali
Semen PC ( 50 kg )
Pekerja
Tukang Batu
Mandor
Alat Bantu

0.4300
1.2000
5.2000
1.6500
0.5775
0.0495
2.0000

m3
m3
zak
hr
hr
hr
set
JUMLAH
DIBULATKAN

1 m3

- Pas.Pondasi batu kali 1 : 3

Pasir Pasang
Batu Kali
Semen PC ( 50 kg )
Pekerja
Tukang Batu
Mandor
Alat Bantu

0.4560
1.2000
4.0000
1.6500
0.5775
0.0495
2.0000

m3
m3
zak
hr
hr
hr
set
JUMLAH
DIBULATKAN

1 m3

- Pas.Pondasi batu kali 1 : 4

Pasir Pasang
Batu Kali
Semen PC ( 50 kg )
Pekerja
Tukang Batu
Mandor
Alat Bantu

0.3910
1.2000
3.5280
1.6500
0.8000
0.2000
2.0000

m3
m3
zak
hr
hr
hr
set

NO.

URAIAN

KOEF.

SAT.
JUMLAH
DIBULATKAN

NO.
5

URAIAN
1 m3

KOEF.

SAT.

- Pas.Pondasi batu kali 1 : 5

Pasir Pasang
Batu Kali
Semen PC ( 50 kg )
Pekerja
Tukang Batu
Mandor
Alat Bantu

0.5600
1.2000
2.8640
1.6500
0.5775
0.0495
2.0000

m3
m3
zak
hr
hr
hr
set
JUMLAH
DIBULATKAN

1 m3

- Pas.Batu kosong

Batu Kali
Pekerja
Mandor
Alat Bantu

1.2000
1.1240
0.0560
2.0000

m3
hr
hr
set
JUMLAH
DIBULATKAN

1 m2

- Pas. Cerucuk Dolken sedalam 3 m jarak tiap 50 cm

Dolken 8-10 x 350-400 cm


Pekerja
Tukang Kayu
Mandor

4.0000
0.7500
0.2625
2.0000

btg
hr
hr
hr
JUMLAH
DIBULATKAN

HARGA
SATUAN

249,167.00
210,000.00
63,333.00
64,667.00
74,500.00
85,167.00
105,000.00
37,583.00

JUMLAH

154,483.54
155,400.00
312,865.02
106,700.55
18,625.00
2,129.18
8,400.00
15,033.20

JUMLAH

773,636.49

DIBULATKAN

773,636.00

244,333.00
163,333.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00

105,063.19
195,999.60
329,331.60
106,700.55
43,023.75
5,197.50
2,000.00

JUMLAH

787,316.19

DIBULATKAN

787,316.00

244,333.00
163,333.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00

111,415.85
195,999.60
253,332.00
106,700.55
43,023.75
5,197.50
2,000.00

JUMLAH

717,669.25

DIBULATKAN

717,669.00

244,333.00
163,333.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00

95,534.20
195,999.60
223,438.82
106,700.55
59,600.00
21,000.00
2,000.00

HARGA
SATUAN

JUMLAH

JUMLAH

704,273.18

DIBULATKAN

704,273.00

HARGA
SATUAN

244,333.00
163,333.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00

JUMLAH

136,826.48
195,999.60
181,385.71
106,700.55
43,023.75
5,197.50
2,000.00

JUMLAH

671,133.59

DIBULATKAN

671,133.00

163,333.00
64,667.00
105,000.00
1,000.00

195,999.60
72,685.71
5,880.00
2,000.00

JUMLAH

276,565.31

DIBULATKAN

276,565.00

23,167.00
64,667.00
76,833.00
105,000.00

92,668.00
48,500.25
20,168.66
210,000.00

JUMLAH

371,336.91

DIBULATKAN

371,336.00

NO.

URAIAN

KOEF.

SAT.

PEKERJAAN BETON
1

1 m3

- Cor beton K.125 ( manual )

Pasir beton
Split pecah mesin 2/3
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu

0.5070
0.7160
5.0000
1.8000
0.4750
0.2858
2.5000

m3
m3
zak
hr
hr
hr
set
JUMLAH
DIBULATKAN

1 m3

- Cor beton K.175 ( manual )

Pasir beton
Split pecah mesin 2/3
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu

0.5070
0.7160
9.0000
1.8000
0.4858
0.2608
2.5000

m3
m3
zak
hr
hr
hr
set
JUMLAH
DIBULATKAN

1 m3

- Cor beton K.225 ( manual )

Pasir beton
Split pecah mesin 2/3
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu

0.5070
0.7160
11.0000
1.8000
0.2608
0.5858
2.5000

m3
m3
zak
hr
hr
hr
set
JUMLAH
DIBULATKAN

1 m3

- Cor beton K.250 ( manual )

Pasir beton
Split pecah mesin 2/3
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu

0.4000
0.7400
11.8000
1.8000
0.2620
0.6270
2.5000

m3
m3
zak
hr
hr
hr
set
JUMLAH

NO.

URAIAN

KOEF.

SAT.
DIBULATKAN

NO.
5

URAIAN
1 m3

KOEF.

SAT.

- Cor beton K.125 dengan readymix

Beton readymix K.125


Pekerja
Tukang batu
Mandor
Concrete vibrator
Alat bantu

1.0000
0.5508
0.1377
0.0688
0.4819
2.5000

m3
hr
hr
hr
jam
set
JUMLAH
DIBULATKAN

1 m3

- Cor beton K.225 dengan readymix

Beton readymix K.225


Pekerja
Tukang batu
Mandor
Concrete vibrator
Alat bantu

1.0000
0.6885
0.1377
0.0688
0.4819
2.5000

m3
hr
hr
hr
jam
set
JUMLAH
DIBULATKAN

1 m3

- Cor beton K.250 dengan readymix

Beton readymix K.250


Pekerja
Tukang batu
Mandor
Concrete vibrator
Alat bantu

1.0000
0.6885
0.1377
0.0688
0.4819
2.5000

m3
hr
hr
hr
jam
set
JUMLAH
DIBULATKAN

1 m3

- Cor beton K.300 dengan readymix

Beton readymix K.300


Pekerja
Tukang batu
Mandor
Concrete vibrator
Alat bantu

1.0000
0.6885
0.1377
0.0688
0.4819
2.5000

m3
hr
hr
hr
jam
set
JUMLAH
DIBULATKAN

NO.
9

URAIAN
1 m3

KOEF.

SAT.

- Cor beton K.350 dengan readymix

Beton readymix K.350


Pekerja
Tukang batu
Mandor
Concrete vibrator
Alat bantu

1.0000
0.6885
0.1377
0.0688
0.4819
2.5000

m3
hr
hr
hr
jam
set
JUMLAH
DIBULATKAN

10

1 m3

- Cor beton K.400 dengan readymix

Beton readymix K.400


Pekerja
Tukang batu
Mandor
Concrete vibrator
Alat bantu

1.0000
0.6885
0.1377
0.0688
0.4819
2.5000

m3
hr
hr
hr
jam
set
JUMLAH
DIBULATKAN

11

1 kg

- Pembesian ( besi polos )

Kawat beton
Besi beton polos
Pekerja
Tukang besi
Mandor
Alat bantu

0.0200
1.1000
0.0150
0.0050
0.0050
2.5000

kg
kg
hr
hr
hr
set
JUMLAH
DIBULATKAN

12

1 kg

- Pembesian ( besi ulir )

Kawat beton
Besi beton ulir
Pekerja
Tukang besi
Mandor
Alat bantu

0.0200
1.1000
0.0150
0.0050
0.0050
2.5000

kg
kg
hr
hr
hr
set
JUMLAH
DIBULATKAN

13

1 m2

- Bekisting dengan papan + bongkaran dan penyiraman

Kayu Papan terentang 2/20-400 cm


Kayu Kaso terentang 5/7-400 cm
Paku

0.0240
0.0280
0.2500

m3
m3
kg

NO.

URAIAN
Pekerja
Tukang kayu
Mandor
Alat bantu

KOEF.
0.1650
0.3940
0.0270
2.5000

SAT.
hr
hr
hr
set

NO.

URAIAN

KOEF.

SAT.
JUMLAH
DIBULATKAN

14

1 m2

- Bekisting dengan triplex 9 mm + bongkaran dan penyiraman

Kayu Kaso terentang 5/7-400 cm


Triplex 9 mm
Paku
Pekerja
Tukang kayu
Mandor
Alat bantu

0.0280
0.3500
0.2500
0.1650
0.3940
0.0270
2.5000

m3
lbr
kg
bh
hr
hr
set
JUMLAH
DIBULATKAN

15

1 m3

- Bekisting kolom beton struktur

Kayu Kaso terentang 5/7-400 cm


Triplex 9 mm
Paku
Pekerja
Tukang kayu
Mandor
Alat bantu

0.2520
3.1500
2.2500
1.4850
3.5440
0.2430
2.5000

m3
lbr
kg
hr
hr
hr
set
JUMLAH
DIBULATKAN

16

1 m3

- Bekisting balok beton struktur

Kayu Kaso terentang 5/7-400 cm


Triplex 9 mm
Paku
Pekerja
Tukang kayu
Mandor
Alat bantu

0.1870
2.3500
1.6680
1.1010
2.6260
0.1800
2.5000

m3
lbr
kg
hr
hr
hr
set
JUMLAH
DIBULATKAN

17

1 m3

- Bekisting lantai beton

Kayu Kaso terentang 5/7-400 cm


Triplex 9 mm
Paku
Pekerja
Tukang kayu
Mandor
Alat bantu

0.2320
2.9050
2.0750
1.3700
3.2685
0.2245
2.5000

m3
lbr
kg
hr
hr
hr
set

NO.

URAIAN

KOEF.

SAT.
JUMLAH
DIBULATKAN

NO.
18

URAIAN
1 m2

KOEF.

SAT.

- Perancah kayu / stoot werk - tinggi s/d 2 m

Kayu Kaso terentang 5/7-400 cm


Paku
Pekerja
Tukang kayu
Mandor
Alat bantu

0.0608
0.3000
0.6000
0.4200
0.0300
2.5000

m3
kg
hr
hr
hr
set
JUMLAH
DIBULATKAN

19

1 m2

- Perancah kayu / stoot werk - tinggi s/d 3 m

Kayu Kaso terentang 5/7-400 cm


Paku
Pekerja
Tukang kayu
Mandor
Alat bantu

0.0851
0.4200
0.8400
0.5880
0.0420
3.5000

m3
kg
hr
hr
hr
set
JUMLAH
DIBULATKAN

20

1 m2

- Perancah kayu / stoot werk - tinggi s/d 4 m

Kayu Kaso terentang 5/7-400 cm


Paku
Pekerja
Tukang kayu
Mandor
Alat bantu

0.1094
0.5400
1.0800
0.7560
0.0540
4.5000

m3
kg
hr
hr
hr
set
JUMLAH
DIBULATKAN

21

1 m2

- Perancah kayu / stoot werk - tinggi s/d 5 m

Kayu Kaso terentang 5/7-400 cm


Paku
Pekerja
Tukang kayu
Mandor
Alat bantu

0.1398
0.6900
1.3800
0.9660
0.0690
5.7500

m3
kg
hr
hr
hr
set
JUMLAH
DIBULATKAN

22

1 m3

- Balok beton praktis K.175

Adukan beton K.175 ( konvensional )


Pembesian besi polos
Bekisting dengan papan

1.0000
120.0000
5.0000

m3
kg
m2

NO.

URAIAN
Alat bantu

KOEF.
4.2000

SAT.
set
JUMLAH
DIBULATKAN

NO.
23

URAIAN
1 m3

KOEF.

SAT.

- Kolom beton praktis K.175

Adukan beton K.175 ( konvensional )


Pembesian besi polos
Bekisting dengan papan
Alat bantu

1.0000
180.7480
5.0000
4.2000

m3
kg
m2
set
JUMLAH
DIBULATKAN

24

1 m3

- Pondasi beton setapak K.225

Adukan beton K.225 ( konvensional )


Pembesian besi ulir
Bekisting triplek 9 mm

1.0000
250.0000
2.6670

m3
kg
m2
JUMLAH
DIBULATKAN

25

1 m3

- Sloof beton 20/40 K-225

Adukan beton K-225 (Konvensional)


Pembesian besi ulir
Bekisting balok struktur

1.0000
125.0000
1.0000

m3
kg
m3
JUMLAH
DIBULATKAN

26

1 m3

- Sloof beton 25/40 K.225

Adukan beton K.225 ready-mix


Pembesian besi ulir
Bekisting balok struktur

1.0000
201.9760
1.0000

m3
kg
m3
JUMLAH
DIBULATKAN

27

1 m3

- Sloof beton 20/30 K-225

Adukan beton K-225 Ready mix


Pembesian besi ulir
Bekisting triplex 9 mm

1.0000
130.0000
1.0000

m3
kg
m3
JUMLAH
DIBULATKAN

28

1 m3

- Sloof beton 20/25 K.225

Adukan beton K-225 Ready mix


Pembesian besi ulir
Bekisting balok struktur

1.0000
190.0000
1.0000

m3
kg
m3
JUMLAH
DIBULATKAN

NO.

URAIAN

KOEF.

SAT.

NO.
29

URAIAN
1 m3

KOEF.

SAT.

- Sloof beton 15/20 K.175

Adukan beton K-225 Ready mix


Pembesian
Bekisting balok struktur

1.0000
180.0000
1.0000

m3
kg
m3
JUMLAH
DIBULATKAN

30

1 m3

- Kolom beton 40/40 K-225

Adukan beton K-225 (ready-mixl)


Pembesian besi ulir
Bekisting Kolom

1.0000
190.0000
1.0000

m3
kg
m3
JUMLAH
DIBULATKAN

31

1 m3

- Kolom beton 30/40 K.225

Adukan beton K.225 ( ready - mix )


Pembesian besi ulir
Bekisting kolom

1.0000
213.2170
1.0000

m3
kg
m3
JUMLAH
DIBULATKAN

32

1 m3

- Kolom beton 30/30 K.225

Adukan beton K.225 ( ready - mix )


Pembesian besi ulir
Bekisting kolom

1.0000
201.4130
1.0000

m3
kg
m2
JUMLAH
DIBULATKAN

33

1 m3

- Kolom beton 15/30 K.225

Adukan beton K.225 ( ready - mix )


Pembesian besi polos
Bekisting kolom

1.0000
187.2800
1.0000

m3
kg
m3
JUMLAH
DIBULATKAN

34

1 m3

- Balok beton 30/50 K-225

Adukan beton K-225 (ready-mixl)


Pembesian besi ulir
Perancah kayu / stoot werk - tinggi s/d 4 m
Bekisting Balok

1.0000
154.0000
2.0000
1.0000

m3
kg
m2
m3
JUMLAH
DIBULATKAN

NO.

URAIAN

KOEF.

SAT.

NO.
35

URAIAN
1 m3

KOEF.

SAT.

- Balok beton 25/60 K.225

Adukan beton K.225 ( ready - mix )


Pembesian besi Ulir
Perancah kayu / stoot werk - tinggi s / d 4 m
Bekisting balok

1.0000
228.3170
1.6675
1.0000

m3
kg
m2
m3
JUMLAH
DIBULATKAN

36

1 m3

- Balok beton 25/50 K-225

Adukan beton K-225 (ready-mixl)


Pembesian besi ulir
Perancah kayu / stoot werk - tinggi s/d 4 m
Bekisting Balok

1.0000
170.0000
2.2200
1.0000

m3
kg
m2
m3
JUMLAH
DIBULATKAN

37

1 m3

- Balok beton 25/35 K.225

Adukan beton K.225 ( ready - mix )


Pembesian besi polos
Perancah kayu / stoot werk - tinggi s / d 4 m
Bekisting balok

1.0000
170.0000
2.8575
1.0000

m3
kg
m2
m3
JUMLAH
DIBULATKAN

38

1 m3

- Balok beton 20/40 K-225

Adukan beton K-225 (ready-mixl)


Pembesian besi ulir
Perancah kayu / stoot werk - tinggi s/d 4 m
Bekisting balok

( untuk dak selasar penghubung antar bangunan )


1.0000
160.0000
2.5000
1.0000

m3
kg
m2
m3
JUMLAH
DIBULATKAN

39

1 m3

- Balok beton 20/25 K-225

Adukan beton K-225 (ready-mixl)


Pembesian besi ulir
Perancah kayu / stoot werk - tinggi s/d 4 m
Bekisting Balok

1.0000
138.1750
3.3330
1.0000

m3
kg
m2
m3
JUMLAH
DIBULATKAN

40

1 m3

- Balok beton 15/20 K.225

Adukan beton K.225 ( ready - mix )


Pembesian besi ulir

1.0000
150.0000

m3
kg

NO.

URAIAN
Perancah kayu / stoot werk - tinggi s / d 4 m
Bekisting balok

KOEF.
4.0000
1.0000

SAT.
m2
m3
JUMLAH
DIBULATKAN

NO.

41

URAIAN

1 m3

KOEF.

SAT.

- Balok beton 12/60 K.225

Adukan beton K.225 ( ready - mix )


Pembesian besi polos
Perancah kayu / stoot werk - tinggi s / d 4 m
Bekisting balok

1.0000
120.0000
1.6665
1.0000

m3
kg
m2
m3
JUMLAH
DIBULATKAN

42

1 m3

- Ring balok beton 20/40 K-225

Adukan beton K-225 (ready-mixl)


Pembesian besi ulir
Perancah kayu / stoot werk - tinggi s/d 4 m
Bekisting Balok

1.0000
154.0000
2.5000
1.0000

m3
kg
m2
m3
JUMLAH
DIBULATKAN

43

1 m3

- Ring balok beton 20/30 K-225

Adukan beton K-225 (ready-mixl)


Pembesian besi ulir
Perancah kayu / stoot werk - tinggi s/d 4 m
Bekisting Balok

1.0000
154.0000
3.3300
1.0000

m3
kg
m2
m3
JUMLAH
DIBULATKAN

44

1 m3

- Plat lantai & tangga beton K.225

Adukan beton K.225 ( ready - mix )


Pembesian besi polos
Perancah kayu / stoot werk - tinggi s / d 4 m
Bekisting plat lantai

1.0000
126.0300
6.2475
1.0000

m3
kg
m2
m3
JUMLAH
DIBULATKAN

45

1 m3

- Plat listplank beton K.225

Adukan beton K.225 ( ready - mix )


Pembesian besi polos
Perancah kayu / stoot werk - tinggi s / d 4 m
Bekisting balok

1.0000
100.0000
1.0000
1.0000

m3
kg
m2
m3
JUMLAH
DIBULATKAN

46

1 m3

- Beton Plat Canopy atas jendela t = 10 cm - K.225

Adukan beton K-225 (ready-mixl)

1.0000

m3

NO.

URAIAN
Pembesian
Perancah kayu / stoot werk - tinggi s/d 4 m
Bekisting pelat lantai

KOEF.
75.0000
1.0000
1.0000

SAT.
kg
m2
m3
JUMLAH
DIBULATKAN

NO.
47

URAIAN
1 m3

KOEF.

SAT.

- Ring balok beton 15/20 - K. 225

Adukan beton K-225 (ready-mixl)


Pembesian
Bekisting Balok

1.0000
105.0000
1.0000

m3
kg
m3
JUMLAH
DIBULATKAN

48

1 m3

- Ring balok beton 15/25 K-175

Adukan beton K-225 (ready-mixl)


Pembesian besi ulir
Bekisting Balok

1.0000
230.2800
1.0000

m3
kg
m3
JUMLAH
DIBULATKAN

49

1 m3

- Pondasi beton bored pile 60 cm K.225

Adukan beton K.225 ( konvensional )


Pembesian besi ulir
Erection besi
Pengecoran dengan tremie

1.0000
100.0000
100.0000
1.0000

m3
kg
kg
m3
JUMLAH
DIBULATKAN

50

1 m3

- Pondasi beton bored pile 40 cm K.225

Adukan beton K.225 ( konvensional )


Pembesian besi ulir
Erection besi
Pengecoran dengan tremie

1.0000
110.0000
110.0000
1.0000

m3
kg
kg
m3
JUMLAH
DIBULATKAN

51

1 m3

- Kolom beton 20/35 K.225

Adukan beton K.225 ( ready - mix )


Pembesian besi polos
Bekisting kolom

1.0000
140.0000
1.0000

m3
kg
m3
JUMLAH
DIBULATKAN

52

1 m3

- Kolom beton 50/50 K.225

Adukan beton K.225 ( ready - mix )


Pembesian besi ulir
Bekisting kolom

1.0000
150.0000
1.0000

m3
kg
m3
JUMLAH
DIBULATKAN

NO.
53

URAIAN
1 m3

KOEF.

SAT.

- Tie beam beton 30/60 K-225

Adukan beton K-225 (readymix)


Pembesian
Bekisting triplek 9 mm

1.0000
170.0000
1.0000

m3
kg
m3
JUMLAH
DIBULATKAN

54

1 m3

- Pile cup beton K.225

Adukan beton K.225 ( konvensional )


Pembesian besi ulir
Bekisting triplek 9 mm

1.0000
110.0000
4.0000

m3
kg
m2
JUMLAH
DIBULATKAN

55

1 m3

- Kolom beton 25/25 K.225

Adukan beton K.225 ( ready - mix )


Pembesian besi ulir
Bekisting kolom

1.0000
140.0000
1.0000

m3
kg
m3
JUMLAH
DIBULATKAN

56

1 m3

- Plat lantai beton Basement K.225

Adukan beton K.225 ( ready - mix )


Pembesian besi polos
Bekisting dengan triplex 9 mm + bongkaran dan penyiraman

1.0000
110.0000
2.1192

m3
kg
m2
JUMLAH
DIBULATKAN

57

1 m2

- Plat beton wiremash K.225 t= 7 cm

Adukan beton K.225 ( ready - mix )


Wiremesh M8 uk 5.4 x 2.1 m
Bekisting dengan triplex 9 mm + bongkaran dan penyiraman

0.0700
0.0882
2.1192

m3
lbr
m2
JUMLAH
DIBULATKAN

NO.

58

URAIAN

1 m2

KOEF.

SAT.

- Plat beton wiremash K.225 t= 10 cm

Adukan beton K.225 ( ready - mix )


Wiremesh M8 uk 5.4 x 2.1 m
Bekisting dengan triplex 9 mm + bongkaran dan penyiraman

0.1000
0.0882
2.2000

m3
lbr
m2
JUMLAH
DIBULATKAN

59

1 m3

- Plat lantai beton wiremash K.225 t=12 cm

Adukan beton K.225 ( ready - mix )


Pembesian besi wiremash M-8
Perancah kayu / stoot werk - tinggi s / d 4 m
Bekisting plat lantai

1.0000
0.7349
6.2475
1.0000

m3
lbr
m2
m3
JUMLAH
DIBULATKAN

60

1 m3

- Kolom beton komposit 25/30 K-225

Adukan beton K-225 (ready-mixl)


Pembesian besi ulir
Bekisting Kolom

1.0000
100.0000
1.0000

m3
kg
m3
JUMLAH
DIBULATKAN

61

1 m3

- Kolom beton pedestral 25/35 K.225

Adukan beton K.225 ( ready - mix )


Pembesian besi polos
Bekisting kolom

1.0000
175.0000
1.0000

m3
kg
m3
JUMLAH
DIBULATKAN

62

1 m3

- Kolom beton pedestral 40/40 K.225

Adukan beton K.225 ( ready - mix )


Pembesian besi ulir
Bekisting kolom

1.0000
165.0000
1.0000

m3
kg
m3
JUMLAH
DIBULATKAN

55

1 m3

- Kolom beton pedestral 25/25 K.225

Adukan beton K.225 ( ready - mix )


Pembesian besi ulir
Bekisting kolom

1.0000
160.0000
1.0000

m3
kg
m3
JUMLAH
DIBULATKAN

NO.

30

URAIAN

1 m3

KOEF.

SAT.

- Kolom beton 25/40 K-225

Adukan beton K-225 (ready-mixl)


Pembesian besi ulir

1.0000
215.0000

m3
kg

NO.

URAIAN
Bekisting Kolom

KOEF.
1.0000

SAT.
m3
JUMLAH

DIBULATKAN
54

1 m3

- Pondasi Setapak K.225, Type P1

Adukan beton K.225 ( ready mix )


Pembesian besi ulir
Bekisting triplek 9 mm

1.0000
118.1400
4.0000

m3
kg
m2
JUMLAH

DIBULATKAN
54

1 m3

- Pondasi Setapak K.225, Type P2

Adukan beton K.225 ( ready mix )


Pembesian besi ulir
Bekisting triplek 9 mm

1.0000
120.0000
4.0000

m3
kg
m2
JUMLAH

DIBULATKAN
54

1 m3

- Pondasi Setapak K225, Type P3

Adukan beton K.225 ( ready mix )


Pembesian besi ulir
Bekisting triplek 9 mm

1.0000
132.0000
4.0000

m3
kg
m2
JUMLAH

DIBULATKAN
48

1 m3

- balok beton 15/30 ( B4 ) K-225 (ready mix)

Adukan beton K-175 (site-mix)


Pembesian besi ulir
Bekisting Balok

1.0000
107.9300
1.0000

m3
kg
m3
JUMLAH

DIBULATKAN

NO.

38

URAIAN

1 m3

KOEF.

SAT.

- Balok beton 25/25 K-225

Adukan beton K-225 (ready-mixl)


Pembesian besi ulir
Perancah kayu / stoot werk - tinggi s/d 4 m
Bekisting balok

1.0000
170.0000
1.6875
1.0000

m3
kg
m2
m3
JUMLAH

DIBULATKAN

HARGA
SATUAN

249,167.00
210,000.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00

JUMLAH

126,327.67
150,360.00
316,665.00
116,400.60
35,387.50
30,009.00
2,500.00

JUMLAH

777,649.77

DIBULATKAN

777,649.00

249,167.00
210,000.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00

126,327.67
150,360.00
569,997.00
116,400.60
36,192.10
27,384.00
2,500.00

JUMLAH

1,029,161.37

DIBULATKAN

1,029,161.00

249,167.00
210,000.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00

126,327.67
150,360.00
696,663.00
116,400.60
19,429.60
61,509.00
2,500.00

JUMLAH

1,173,189.87

DIBULATKAN

1,173,189.00

249,167.00
210,000.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00
JUMLAH

99,666.80
155,400.00
747,329.40
116,400.60
19,519.00
65,835.00
2,500.00
1,206,650.80

HARGA
SATUAN
DIBULATKAN

JUMLAH
1,206,650.00

HARGA
SATUAN

652,000.00
64,667.00
74,500.00
105,000.00
19,000.00
1,000.00

JUMLAH

652,000.00
35,618.58
10,258.65
7,224.00
9,156.10
2,500.00

JUMLAH

716,757.33

DIBULATKAN

716,757.00

679,833.00
64,667.00
74,500.00
105,000.00
19,000.00
1,000.00

679,833.00
44,523.23
10,258.65
7,224.00
9,156.10
2,500.00

JUMLAH

753,494.98

DIBULATKAN

753,494.00

694,000.00
64,667.00
74,500.00
105,000.00
19,000.00
1,000.00

694,000.00
44,523.23
10,258.65
7,224.00
9,156.10
2,500.00

JUMLAH

767,661.98

DIBULATKAN

767,661.00

744,667.00
64,667.00
74,500.00
105,000.00
19,000.00
1,000.00

744,667.00
44,523.23
10,258.65
7,224.00
9,156.10
2,500.00

JUMLAH

818,328.98

DIBULATKAN

818,328.00

HARGA
SATUAN

802,833.00
64,667.00
74,500.00
105,000.00
19,000.00
1,000.00

JUMLAH

802,833.00
44,523.23
10,258.65
7,224.00
9,156.10
2,500.00

JUMLAH

876,494.98

DIBULATKAN

876,494.00

842,833.00
64,667.00
74,500.00
105,000.00
19,000.00
1,000.00

842,833.00
44,523.23
10,258.65
7,224.00
9,156.10
2,500.00

JUMLAH

916,494.98

DIBULATKAN

916,494.00

15,800.00
7,833.00
64,667.00
74,500.00
105,000.00
1,000.00

316.00
8,616.30
970.01
372.50
525.00
2,500.00

JUMLAH

13,299.81

DIBULATKAN

13,299.00

15,800.00
8,167.00
64,667.00
74,500.00
105,000.00
1,000.00

316.00
8,983.70
970.01
372.50
525.00
2,500.00

JUMLAH

13,667.21

DIBULATKAN

13,667.00

2,116,667.00
2,116,667.00
12,250.00

50,800.01
59,266.68
3,062.50

HARGA
SATUAN
64,667.00
76,833.00
105,000.00
1,000.00

JUMLAH
10,670.06
30,272.20
2,835.00
2,500.00

HARGA
SATUAN

JUMLAH

JUMLAH

159,406.44

DIBULATKAN

159,406.00

2,116,667.00
125,167.00
12,250.00
64,667.00
76,833.00
105,000.00
1,000.00

59,266.68
43,808.45
3,062.50
10,670.06
30,272.20
2,835.00
2,500.00

JUMLAH

152,414.88

DIBULATKAN

152,414.00

2,116,667.00
125,167.00
12,250.00
64,667.00
76,833.00
105,000.00
1,000.00

533,400.08
394,276.05
27,562.50
96,030.50
272,296.15
25,515.00
2,500.00

JUMLAH

1,351,580.28

DIBULATKAN

1,351,580.00

2,116,667.00
125,167.00
12,250.00
64,667.00
76,833.00
105,000.00
1,000.00

395,816.73
294,142.45
20,433.00
71,198.37
201,763.46
18,900.00
2,500.00

JUMLAH

1,004,754.00

DIBULATKAN

1,004,754.00

2,116,667.00
125,167.00
12,250.00
64,667.00
76,833.00
105,000.00
1,000.00

491,066.74
363,610.14
25,418.75
88,593.79
251,128.66
23,572.50
2,500.00

HARGA
SATUAN

JUMLAH

JUMLAH

1,245,890.58

DIBULATKAN

1,245,890.00

HARGA
SATUAN

2,116,667.00
12,250.00
64,667.00
76,833.00
105,000.00
1,000.00

JUMLAH

128,693.35
3,675.00
38,800.20
32,269.86
3,150.00
2,500.00

JUMLAH

209,088.41

DIBULATKAN

209,088.00

2,116,667.00
12,250.00
64,667.00
76,833.00
105,000.00
1,000.00

180,128.36
5,145.00
54,320.28
45,177.80
4,410.00
3,500.00

JUMLAH

292,681.45

DIBULATKAN

292,681.00

2,116,667.00
12,250.00
64,667.00
76,833.00
105,000.00
1,000.00

231,563.37
6,615.00
69,840.36
58,085.75
5,670.00
4,500.00

JUMLAH

376,274.48

DIBULATKAN

376,274.00

2,116,667.00
12,250.00
64,667.00
76,833.00
105,000.00
1,000.00

295,910.05
8,452.50
89,240.46
74,220.68
7,245.00
5,750.00

JUMLAH

480,818.68

DIBULATKAN

480,818.00

1,029,161.00
13,299.00
159,406.00

1,029,161.00
1,595,880.00
797,030.00

HARGA
SATUAN
1,000.00

JUMLAH
4,200.00

JUMLAH

3,426,271.00

DIBULATKAN

3,426,271.00

HARGA
SATUAN

1,029,161.00
13,299.00
159,406.00
1,000.00

JUMLAH

1,029,161.00
2,403,767.65
797,030.00
4,200.00

JUMLAH

4,234,158.65

DIBULATKAN

4,234,158.00

1,173,189.00
13,667.00
152,414.00

1,173,189.00
3,416,750.00
406,488.14

JUMLAH

4,996,427.14

DIBULATKAN

4,996,427.00

1,173,189.00
13,667.00
1,004,754.00

1,173,189.00
1,708,375.00
1,004,754.00

JUMLAH

3,886,318.00

DIBULATKAN

3,886,318.00

753,494.00
13,667.00
1,004,754.00

753,494.00
2,760,405.99
1,004,754.00

JUMLAH

4,518,653.99

DIBULATKAN

4,518,653.00

753,494.00
13,667.00
1,004,754.00

753,494.00
1,776,710.00
1,004,754.00

JUMLAH

3,534,958.00

DIBULATKAN

3,534,958.00

753,494.00
13,667.00
1,004,754.00

753,494.00
2,596,730.00
1,004,754.00

JUMLAH

4,354,978.00

DIBULATKAN

4,354,970.00

HARGA
SATUAN

JUMLAH

HARGA
SATUAN

753,494.00
13,299.00
1,004,754.00

JUMLAH

753,494.00
2,393,820.00
1,004,754.00

JUMLAH

4,152,068.00

DIBULATKAN

4,152,068.00

753,494.00
13,667.00
1,351,580.00

753,494.00
2,596,730.00
1,351,580.00

JUMLAH

4,701,804.00

DIBULATKAN

4,701,804.00

753,494.00
13,667.00
1,351,580.00

753,494.00
2,914,036.74
1,351,580.00

JUMLAH

5,019,110.74

DIBULATKAN

5,019,110.00

753,494.00
13,667.00
1,351,580.00

753,494.00
2,752,711.47
1,351,580.00

JUMLAH

4,857,785.47

DIBULATKAN

4,857,785.00

753,494.00
13,299.00
1,351,580.00

753,494.00
2,490,636.72
1,351,580.00

JUMLAH

4,595,710.72

DIBULATKAN

4,595,710.00

753,494.00
13,667.00
376,274.00
1,004,754.00

753,494.00
2,104,718.00
752,548.00
1,004,754.00

JUMLAH

4,615,514.00

DIBULATKAN

4,615,514.00

HARGA
SATUAN

JUMLAH

HARGA
SATUAN

753,494.00
13,299.00
376,274.00
1,004,754.00

JUMLAH

753,494.00
3,036,387.78
627,436.90
1,004,754.00

JUMLAH

5,422,072.68

DIBULATKAN

5,422,072.00

753,494.00
13,667.00
376,274.00
1,004,754.00

753,494.00
2,323,390.00
835,328.28
1,004,754.00

JUMLAH

4,916,966.28

DIBULATKAN

4,916,966.00

753,494.00
13,299.00
376,274.00
1,004,754.00

753,494.00
2,260,830.00
1,075,202.96
1,004,754.00

JUMLAH

5,094,280.96

DIBULATKAN

5,094,280.00

753,494.00
13,667.00
376,274.00
1,004,754.00

753,494.00
2,186,720.00
940,685.00
1,004,754.00

JUMLAH

4,885,653.00

DIBULATKAN

4,885,653.00

753,494.00
13,667.00
376,274.00
1,004,754.00

753,494.00
1,888,437.73
1,254,121.24
1,004,754.00

JUMLAH

4,900,806.97

DIBULATKAN

4,900,806.00

753,494.00
13,667.00

753,494.00
2,050,050.00

HARGA
SATUAN
376,274.00
1,004,754.00

JUMLAH
1,505,096.00
1,004,754.00

JUMLAH

5,313,394.00

DIBULATKAN

5,313,394.00

HARGA
SATUAN

753,494.00
13,299.00
376,274.00
1,004,754.00

JUMLAH

753,494.00
1,595,880.00
627,060.62
1,004,754.00

JUMLAH

3,981,188.62

DIBULATKAN

3,981,188.00

753,494.00
13,667.00
376,274.00
1,004,754.00

753,494.00
2,104,718.00
940,685.00
1,004,754.00

JUMLAH

4,803,651.00

DIBULATKAN

4,803,651.00

753,494.00
13,667.00
376,274.00
1,004,754.00

753,494.00
2,104,718.00
1,252,992.42
1,004,754.00

JUMLAH

5,115,958.42

DIBULATKAN

5,115,958.00

753,494.00
13,299.00
376,274.00
1,245,890.00

753,494.00
1,676,072.97
2,350,771.82
1,245,890.00

JUMLAH

6,026,228.79

DIBULATKAN

6,026,228.00

753,494.00
13,299.00
376,274.00
1,004,754.00

753,494.00
1,329,900.00
376,274.00
1,004,754.00

JUMLAH

3,464,422.00

DIBULATKAN

3,464,422.00

753,494.00

753,494.00

HARGA
SATUAN
13,299.00
376,274.00
1,245,890.00

JUMLAH
997,425.00
376,274.00
1,245,890.00

JUMLAH

3,373,083.00

DIBULATKAN

3,373,083.00

HARGA
SATUAN

753,494.00
13,299.00
1,245,890.00

JUMLAH

753,494.00
1,396,395.00
1,245,890.00

JUMLAH

3,395,779.00

DIBULATKAN

3,395,779.00

753,494.00
13,667.00
1,245,890.00

753,494.00
3,147,236.76
1,245,890.00

JUMLAH

5,146,620.76

DIBULATKAN

5,146,620.00

1,173,189.00
13,667.00
1,100.00
85,560.00

1,173,189.00
1,366,700.00
110,000.00
85,560.00

JUMLAH

2,735,449.00

DIBULATKAN

2,735,449.00

1,173,189.00
13,667.00
1,100.00
85,560.00

1,173,189.00
1,503,370.00
121,000.00
85,560.00

JUMLAH

2,883,119.00

DIBULATKAN

2,883,119.00

753,494.00
13,299.00
1,351,580.00

753,494.00
1,861,860.00
1,351,580.00

JUMLAH

3,966,934.00

DIBULATKAN

3,966,934.00

753,494.00
13,667.00
1,351,580.00

753,494.00
2,050,050.00
1,351,580.00

JUMLAH

4,155,124.00

DIBULATKAN

4,155,124.00

HARGA
SATUAN

753,494.00
13,299.00
1,004,754.00

JUMLAH

753,494.00
2,260,830.00
1,004,754.00

JUMLAH

4,019,078.00

DIBULATKAN

4,019,078.00

1,173,189.00
13,667.00
152,414.00

1,173,189.00
1,503,370.00
609,656.00

JUMLAH

3,286,215.00

DIBULATKAN

3,286,215.00

753,494.00
13,667.00
1,351,580.00

753,494.00
1,913,380.00
1,351,580.00

JUMLAH

4,018,454.00

DIBULATKAN

4,018,454.00

753,494.00
13,299.00
152,414.00

753,494.00
1,462,890.00
322,995.75

JUMLAH

2,539,379.75

DIBULATKAN

2,539,379.00

753,494.00
484,000.00
152,414.00

52,744.58
42,688.80
322,995.75

JUMLAH

418,429.13

DIBULATKAN

418,429.00

HARGA
SATUAN

753,494.00
484,000.00
152,414.00

JUMLAH

75,349.40
42,688.80
335,310.80

JUMLAH

453,349.00

DIBULATKAN

453,349.00

753,494.00
13,299.00
376,274.00
1,245,890.00

753,494.00
9,773.44
2,350,771.82
1,245,890.00

JUMLAH

4,359,929.25

DIBULATKAN

4,359,929.00

753,494.00
13,667.00
1,351,580.00

753,494.00
1,366,700.00
1,351,580.00

JUMLAH

3,471,774.00

DIBULATKAN

3,471,774.00

753,494.00
13,299.00
1,351,580.00

753,494.00
2,327,325.00
1,351,580.00

JUMLAH

4,432,399.00

DIBULATKAN

4,432,399.00

753,494.00
13,667.00
1,351,580.00

753,494.00
2,255,055.00
1,351,580.00

JUMLAH

4,360,129.00

DIBULATKAN

4,360,129.00

753,494.00
13,667.00
1,351,580.00

753,494.00
2,186,720.00
1,351,580.00

JUMLAH

4,291,794.00

DIBULATKAN

4,291,794.00

HARGA
SATUAN

753,494.00
13,667.00

JUMLAH

753,494.00
2,938,405.00

HARGA
SATUAN
1,351,580.00

JUMLAH
1,351,580.00

JUMLAH

5,043,479.00

DIBULATKAN

5,043,479.00

753,494.00
13,667.00
152,414.00

753,494.00
1,614,619.38
609,656.00

JUMLAH

2,977,769.38

DIBULATKAN

2,977,769.00

753,494.00
13,667.00
152,414.00

753,494.00
1,640,040.00
609,656.00

JUMLAH

3,003,190.00

DIBULATKAN

3,003,190.00

753,494.00
13,667.00
152,414.00

753,494.00
1,804,044.00
609,656.00

JUMLAH

3,167,194.00

DIBULATKAN

3,167,194.00

753,494.00
13,667.00
1,245,890.00

753,494.00
1,475,079.31
1,245,890.00

JUMLAH

3,474,463.31

DIBULATKAN

3,474,463.00

HARGA
SATUAN

753,494.00
13,667.00
376,274.00
1,004,754.00

JUMLAH

753,494.00
2,323,390.00
634,962.38
1,004,754.00

JUMLAH

4,716,600.38

DIBULATKAN

4,716,600.00

NO.

URAIAN

KOEF.

SAT.

PEKERJAAN DINDING
1 m2

- Pas.Batu bata, t = 1 / 2 bata ad. 1 : 2

Pasir pasang
Bata merah
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu

0.0380
75.0000
0.4700
0.3600
0.1875
0.0155
4.0000

m3
bh
zak
hr
hr
hr
set
JUMLAH
DIBULATKAN

1 m2

- Pas.Batu bata, t = 1 / 2 bata ad. 1 : 3

Pasir pasang
Bata merah
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu

0.0430
75.0000
0.3600
0.3600
0.1875
0.0155
4.0000

m3
bh
zak
hr
hr
hr
set
JUMLAH
DIBULATKAN

1 m2

- Pas.Batu bata, t = 1 / 2 bata ad. 1 : 4

Pasir pasang
Bata merah
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu

0.0460
75.0000
0.2900
0.3600
0.1875
0.0155
4.0000

m3
bh
zak
hr
hr
hr
set
JUMLAH
DIBULATKAN

1 m2

- Pas.Batu bata, t = 1 / 2 bata ad. 1 : 5

Pasir pasang
Bata merah
Semen PC ( 50 kg )
Pekerja
Tukang batu

0.0480
75.0000
0.2400
0.3600
0.1875

m3
bh
zak
hr
hr

NO.

URAIAN
Mandor
Alat bantu

KOEF.
0.0155
4.0000

SAT.
hr
set
JUMLAH
DIBULATKAN

NO.

URAIAN
1 m2

KOEF.

SAT.

- Pas.Batako beton ad. 1 : 2

Pasir pasang
Batako beton 20 / 40
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu

0.0130
13.0000
0.1570
0.2900
0.1500
0.0300
2.0000

m3
bh
zak
hr
hr
hr
set
JUMLAH
DIBULATKAN

1 m2

- Pas. Hebel 10.20.60 ad. 1 : 3

Pasir pasang
Hebel 10.20.60
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu

0.0150
8.3333
0.1800
0.2900
0.1500
0.0300
2.0000

m3
bh
zak
hr
hr
hr
set
JUMLAH
DIBULATKAN

1 m2

- Pas.Batako beton ad. 1 : 4

Pasir pasang
Batako beton 20 / 40
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu

0.0150
13.0000
0.1000
0.2900
0.1500
0.0300
2.0000

m3
bh
zak
hr
hr
hr
set
JUMLAH
DIBULATKAN

1 m2

- Pas.Batako beton ad. 1 : 5

Pasir pasang
Batako beton 20 / 40
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu

0.0160
13.0000
0.0800
0.2900
0.1500
0.0300
2.0000

m3
bh
zak
hr
hr
hr
set

NO.

URAIAN

KOEF.

SAT.
JUMLAH
DIBULATKAN

NO.

URAIAN
1 m2

KOEF.

SAT.

- Plesteran & acian tebal 1,5 cm ad. 1 : 2

Pasir pasang
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu

0.0180
0.2130
0.3000
0.1575
0.0115
2.0000

m3
zak
hr
hr
hr
set
JUMLAH
DIBULATKAN

1 m2

- Plesteran & acian tebal 1,5 cm ad. 1 : 3

Pasir pasang
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu

0.0210
0.1920
0.3000
0.1575
0.0115
2.0000

m3
zak
hr
hr
hr
set
JUMLAH
DIBULATKAN

1 m2

- Plesteran & acian tebal 1,5 cm ad. 1 : 4

Pasir pasang
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu

0.0230
0.1570
0.3000
0.1575
0.0115
2.0000

m3
zak
hr
hr
hr
set
JUMLAH
DIBULATKAN

1 m2

- Plesteran & acian tebal 1,5 cm ad. 1 : 5

Pasir pasang
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu

0.0240
0.1240
0.3000
0.1575
0.0115
2.0000

m3
zak
hr
hr
hr
set
JUMLAH
DIBULATKAN

NO.

URAIAN
1 m2

KOEF.

SAT.

- Pek.Acian

Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu

0.0800
0.1430
0.1123
0.0063
2.0000

zak
hr
hr
hr
set
JUMLAH
DIBULATKAN

NO.

URAIAN
1 m2

KOEF.

SAT.

- Pasang Dinding Rooster / Terawang, Natural, uk. 12x11x24 cm, Ad. 1Pc : 4Ps

Rooster
Pasir pasang
Semen PC ( 50 kg )
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

36.0000
0.0350
0.2560
0.3000
0.1000
0.0100
0.0150

bh
m3
zak
hr
hr
hr
hr
JUMLAH
DIBULATKAN

1 m2

- Pasang Dinding Batu Tempel Palimanan Kuning, 20 x 20 cm Texture Kasar

Batu Tempel Palimanan


Pasir pasang
Semen PC ( 50 kg )
Pekerja
Tukang batu
Kepala Tukang Batu
Mandor

1.0500
0.0350
0.2350
0.6200
0.3500
0.0350
0.0300

m2
m3
zak
hr
hr
hr
hr
JUMLAH
DIBULATKAN

1 m2

- Pas. Hebel 10.20.60 ad. 1 : 5

Pasir pasang
Batako beton 20 / 40
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor
Alat bantu

0.0150
8.3333
0.1000
0.2900
0.1500
0.0300
2.0000

m3
bh
zak
hr
hr
hr
set
JUMLAH
DIBULATKAN

1 m2

- Pas. Hebel 10.20.60 ad. 1 : 5

Pasir pasang
Tukang batu
Mandor
Alat bantu

0.1500
0.2500
0.0250
2.0000

Zak
hr
hr
set
JUMLAH

NO.

URAIAN

KOEF.

SAT.

DIBULATKAN

HARGA
SATUAN

244,333.00
700.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00

JUMLAH

9,284.65
52,500.00
29,766.51
23,280.12
13,968.75
1,627.50
4,000.00

JUMLAH

134,427.53

DIBULATKAN

134,427.00

244,333.00
700.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00

10,506.32
52,500.00
22,799.88
23,280.12
13,968.75
1,627.50
4,000.00

JUMLAH

128,682.57

DIBULATKAN

128,682.00

244,333.00
700.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00

11,239.32
52,500.00
18,366.57
23,280.12
13,968.75
1,627.50
4,000.00

JUMLAH

124,982.26

DIBULATKAN

124,982.00

244,333.00
700.00
63,333.00
64,667.00
74,500.00

11,727.98
52,500.00
15,199.92
23,280.12
13,968.75

HARGA
SATUAN
105,000.00
1,000.00

JUMLAH
1,627.50
4,000.00

JUMLAH

122,304.27

DIBULATKAN

122,304.00

HARGA
SATUAN

244,333.00
3,833.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00

JUMLAH

3,176.33
49,829.00
9,943.28
18,753.43
11,175.00
3,150.00
2,000.00

JUMLAH

98,027.04

DIBULATKAN

98,027.00

244,333.00
11,167.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00

3,665.00
93,057.96
11,399.94
18,753.43
11,175.00
3,150.00
2,000.00

JUMLAH

143,201.33

DIBULATKAN

143,201.00

244,333.00
3,833.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00

3,665.00
49,829.00
6,333.30
18,753.43
11,175.00
3,150.00
2,000.00

JUMLAH

94,905.73

DIBULATKAN

94,905.00

244,333.00
3,833.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00

3,909.33
49,829.00
5,066.64
18,753.43
11,175.00
3,150.00
2,000.00

HARGA
SATUAN

JUMLAH

JUMLAH

93,883.40

DIBULATKAN

93,883.00

HARGA
SATUAN

244,333.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00

JUMLAH

4,397.99
13,489.93
19,400.10
11,733.75
1,207.50
2,000.00

JUMLAH

52,229.27

DIBULATKAN

52,229.00

244,333.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00

5,130.99
12,159.94
19,400.10
11,733.75
1,207.50
2,000.00

JUMLAH

51,632.28

DIBULATKAN

51,632.00

244,333.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00

5,619.66
9,943.28
19,400.10
11,733.75
1,207.50
2,000.00

JUMLAH

49,904.29

DIBULATKAN

49,904.00

244,333.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00

5,863.99
7,853.29
19,400.10
11,733.75
1,207.50
2,000.00

JUMLAH

48,058.63

DIBULATKAN

48,058.00

HARGA
SATUAN

63,333.00
64,667.00
74,500.00
105,000.00
1,000.00

JUMLAH

5,066.64
9,247.38
8,366.35
661.50
2,000.00

JUMLAH

25,341.87

DIBULATKAN

25,341.00

HARGA
SATUAN

6,917.00
244,333.00
63,333.00
64,667.00
74,500.00
85,167.00
105,000.00

JUMLAH

249,012.00
8,551.66
16,213.25
19,400.10
7,450.00
851.67
1,575.00

JUMLAH

303,053.67

DIBULATKAN

303,053.00

82,500.00
244,333.00
63,333.00
64,667.00
74,500.00
85,167.00
105,000.00

86,625.00
8,551.66
14,883.26
40,093.54
26,075.00
2,980.85
3,150.00

JUMLAH

182,359.30

DIBULATKAN

182,359.00

244,333.00
11,167.00
63,333.00
64,667.00
74,500.00
105,000.00
1,000.00

3,665.00
93,057.96
6,333.30
18,753.43
11,175.00
3,150.00
2,000.00

JUMLAH

138,134.69

DIBULATKAN

138,134.00

63,333.00
74,500.00
105,000.00
1,000.00
JUMLAH

9,499.95
18,625.00
2,625.00
2,000.00
32,749.95

HARGA
SATUAN

DIBULATKAN

JUMLAH

32,749.00

NO.

URAIAN

KOEF.

SAT.

PEKERJAAN ATAP
1 m3

- Kuda - kuda kayu kamper kruing

Kayu balok kamper kruing


Paku 8 - 12
Besi pengikat kuda - kuda
Pekerja
Tukang kayu
Mandor

1.1000
3.0000
15.0000
5.0000
15.7500
1.0000

m3
kg
kg
hr
hr
hr
JUMLAH
DIBULATKAN

1 m3

- Kuda - kuda kayu kamper banjar

Kayu balok kamper banjar


Paku 8 - 12
Besi pengikat kuda - kuda
Pekerja
Tukang kayu
Mandor

1.1000
3.0000
15.0000
5.0000
15.7500
1.0000

m3
kg
kg
hr
hr
hr
JUMLAH
DIBULATKAN

1 m3

- Kuda - kuda kayu meranti

Kayu meranti
Paku 8 - 12
Besi pengikat kuda - kuda
Pekerja
Tukang kayu
Mandor

1.1000
3.0000
15.0000
5.0000
15.7500
1.0000

m3
kg
kg
hr
hr
hr
JUMLAH
DIBULATKAN

1 m2

- Rangka atap ( kaso 5/7 dan reng 3/4 ) kayu meranti

Kayu meranti
Paku 8 - 12
Pekerja
Tukang kayu
Mandor

0.0180
0.1500
0.1000
0.1000
0.0150

m3
kg
hr
hr
hr
JUMLAH
DIBULATKAN

NO.

URAIAN
1 m'

KOEF.

SAT.

- Listplank 3 / 30 + 3 / 15 kayu kamper banjar

Papan kayu kamper banjar


Paku 8 - 12
Pekerja
Tukang kayu
Mandor

0.0150
0.8000
0.2800
0.5600
0.0720

m3
kg
hr
hr
hr
JUMLAH
DIBULATKAN

1 m'

- Listplank 3 / 30 kayu kamper banjar

Papan kayu kamper banjar


Paku 8 - 12
Pekerja
Tukang kayu
Mandor

0.0100
0.0500
0.1430
0.2850
0.0360

m3
kg
hr
hr
hr
JUMLAH
DIBULATKAN

1 m2

- Atap genteng morando glasuur

Genteng morando Glazur


Pekerja
Tukang kayu
Mandor

18.0000
0.1500
0.0790
0.0120

bh
hr
hr
hr
JUMLAH
DIBULATKAN

1 m'

- Karpusan genteng morando glasuur

Pasir pasang
Semen PC ( 50 kg )
Genteng bubungan / nok
Pekerja
Tukang batu
Mandor

0.0320
0.2200
3.5000
0.3000
0.1575
0.0225

m3
zak
bh
hr
hr
hr
JUMLAH
DIBULATKAN

1 m2

- Atap genteng beton (polos)

Genteng beton polos


Pekerja
Tukang kayu

18.0000
0.1500
0.0790

bh
hr
hr

NO.

URAIAN
Mandor

KOEF.
0.0120

SAT.
hr
JUMLAH
DIBULATKAN

NO.

URAIAN
1 m'

KOEF.

SAT.

- Karpusan genteng beton

Pasir pasang
Semen PC ( 50 kg )
Genteng bubungan / nok
Pekerja
Tukang batu
Mandor

0.0320
0.2200
3.5000
0.3000
0.1575
0.0225

m3
zak
bh
hr
hr
hr
JUMLAH
DIBULATKAN

1 m2

- Pasang atap asbes gelombang 5 mm

Asbes Gelombang 5 mm (180x108)cm


Paku asbes / kg
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

0.9000
0.1200
0.1400
0.0750
0.0080
0.0080

lbr
kg
hr
hr
hr
hr
JUMLAH
DIBULATKAN

1 m1

- Pasang bubungan/nok stel 1.05 m

Asbes Nok Stel


Paku Kayu Segala uk.
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

2.1000
0.1200
0.0840
0.1250
0.0130
0.0040

lbr
kg
hr
hr
hr
hr
JUMLAH
DIBULATKAN

1 kg

- Konstruksi baja H - beam / WF ( termasuk plat simpul,las & zinkchromate )

Zinkcchromate
Besi WF ex. DN SII
Pekerja
Tukang besi
Mandor
Erection

0.0400
1.0500
0.0600
0.0045
0.0025
1.0000

m2
kg
hr
hr
hr
kg
JUMLAH
DIBULATKAN

NO.

URAIAN
1 kg

KOEF.

SAT.

- Konstruksi besi siku ( termasuk plat simpul,las & zinkchromate )

Zinkcchromate
Besi siku ex. DN SII
Pekerja
Tukang besi
Mandor
Erection

0.0400
1.0500
0.0600
0.0045
0.0025
1.0000

m2
kg
hr
hr
hr
kg
JUMLAH
DIBULATKAN

1 kg

- Konstruksi gording besi ( termasuk plat simpul,las & zinkchromate )

Zinkcchromate
Gording besi
Pekerja
Tukang besi
Mandor
Erection

0.0400
1.0200
0.0600
0.0045
0.0025
1.0000

m2
kg
hr
hr
hr
kg
JUMLAH
DIBULATKAN

1 m'

- Talang datar / jurai seng tebal 0.3 mm

Papan kayu meranti 2 / 30


Plat seng lebar 90 cm, tebal 0.30 mm
Paku
Pekerja
Tukang kayu
Mandor

0.0096
0.5000
0.0150
0.0500
0.1200
0.0120

m3
m'
kg
hr
hr
hr
JUMLAH
DIBULATKAN

1 m'

- Pas. Kembali listplank 3 / 30 + 3 / 15 kayu kamper banjar

Paku 8 - 12
Pekerja
Tukang kayu
Mandor

0.4000
0.0840
0.2800
0.0360

kg
hr
hr
hr
JUMLAH
DIBULATKAN

NO.

URAIAN
1 m2

KOEF.

SAT.

- Atap genteng metal berpasir

Genteng metal berpasir


Paku
Pekerja
Tukang
Mandor

1.0000
0.1200
0.1500
0.0790
0.0120

m2
kg
hr
hr
hr
JUMLAH
DIBULATKAN

1 m'

- Bubungan genteng metal berpasir

Bubungan genteng metal berpasir


Paku
Pekerja
Tukang
Mandor

1.0000
0.1200
0.3000
0.1575
0.0225

m'
kg
hr
hr
hr
JUMLAH
DIBULATKAN

1 m2

- Alumunium Foil 1 muka, medium weight (HF 404)

Alumunium Foil
Paku
Pekerja
Tukang
Mandor

1.0000
0.1200
0.3000
0.1575
0.0225

m2
kg
hr
hr
hr
JUMLAH

DIBULATKAN
1 m'

- Listplank GRC t = 12 mm lebar 30 cm

GRC uk. 30 x 240 tebal = 12 mm


Paku
Pekerja
Tukang kayu
Mandor

1.0000
0.1200
0.2800
0.5600
0.0720

m1
kg
hr
hr
hr
JUMLAH
DIBULATKAN

HARGA
SATUAN

6,483,333.00
12,250.00
11,000.00
64,667.00
76,833.00
105,000.00

JUMLAH

7,131,666.30
36,750.00
165,000.00
323,335.00
1,210,119.75
105,000.00

JUMLAH

8,971,871.05

DIBULATKAN

8,971,871.00

6,483,333.00
12,250.00
11,000.00
64,667.00
76,833.00
105,000.00

7,131,666.30
36,750.00
165,000.00
323,335.00
1,210,119.75
105,000.00

JUMLAH

8,971,871.05

DIBULATKAN

8,971,871.00

3,633,333.00
12,250.00
11,000.00
64,667.00
76,833.00
105,000.00

3,996,666.30
36,750.00
165,000.00
323,335.00
1,210,119.75
105,000.00

JUMLAH

5,836,871.05

DIBULATKAN

5,836,871.00

3,633,333.00
12,250.00
64,667.00
76,833.00
105,000.00

65,399.99
1,837.50
6,466.70
7,683.30
1,575.00

JUMLAH

82,962.49

DIBULATKAN

82,962.00

HARGA
SATUAN

7,083,333.00
12,250.00
64,667.00
76,833.00
105,000.00

JUMLAH

106,250.00
9,800.00
18,106.76
43,026.48
7,560.00

JUMLAH

184,743.24

DIBULATKAN

184,743.00

7,083,333.00
12,250.00
64,667.00
76,833.00
105,000.00

70,833.33
612.50
9,247.38
21,897.41
3,780.00

JUMLAH

106,370.62

DIBULATKAN

106,370.00

3,500.00
64,667.00
76,833.00
105,000.00

63,000.00
9,700.05
6,069.81
1,260.00

JUMLAH

80,029.86

DIBULATKAN

80,029.00

244,333.00
63,333.00
6,000.00
64,667.00
74,500.00
105,000.00

7,818.66
13,933.26
21,000.00
19,400.10
11,733.75
2,362.50

JUMLAH

76,248.27

DIBULATKAN

76,248.00

6,000.00
64,667.00
76,833.00

108,000.00
9,700.05
6,069.81

HARGA
SATUAN
105,000.00

JUMLAH
1,260.00

JUMLAH

125,029.86

DIBULATKAN

125,029.00

HARGA
SATUAN

244,333.00
63,333.00
12,000.00
64,667.00
74,500.00
105,000.00

JUMLAH

7,818.66
13,933.26
42,000.00
19,400.10
11,733.75
2,362.50

JUMLAH

97,248.27

DIBULATKAN

97,248.00

51,333.00
12,250.00
64,667.00
76,833.00
85,167.00
105,000.00

46,199.70
1,470.00
9,053.38
5,762.48
681.34
840.00

JUMLAH

64,006.89

DIBULATKAN

64,006.00

50,000.00
12,250.00
64,667.00
76,833.00
85,167.00
105,000.00

105,000.00
1,470.00
5,432.03
9,604.13
1,107.17
420.00

JUMLAH

123,033.32

DIBULATKAN

123,033.00

500.00
14,333.00
64,667.00
74,500.00
105,000.00
10,000.00

20.00
15,049.65
3,880.02
335.25
262.50
10,000.00

JUMLAH

29,547.42

DIBULATKAN

29,547.00

HARGA
SATUAN

500.00
14,500.00
64,667.00
74,500.00
105,000.00
10,000.00

JUMLAH

20.00
15,225.00
3,880.02
335.25
262.50
10,000.00

JUMLAH

29,722.77

DIBULATKAN

29,722.00

500.00
14,500.00
64,667.00
74,500.00
105,000.00
10,000.00

20.00
14,790.00
3,880.02
335.25
262.50
10,000.00

JUMLAH

29,287.77

DIBULATKAN

29,287.00

4,050,000.00
39,833.00
12,250.00
64,667.00
76,833.00
105,000.00

38,880.00
19,916.50
183.75
3,233.35
9,219.96
1,260.00

JUMLAH

72,693.56

DIBULATKAN

72,693.00

12,250.00
64,667.00
76,833.00
105,000.00

4,900.00
5,432.03
21,513.24
3,780.00

JUMLAH

35,625.27

DIBULATKAN

35,625.00

HARGA
SATUAN

111,500.00
12,250.00
64,667.00
76,833.00
105,000.00

JUMLAH

111,500.00
1,470.00
9,700.05
6,069.81
1,260.00

JUMLAH

129,999.86

DIBULATKAN

129,999.00

55,700.00
12,250.00
64,667.00
74,500.00
105,000.00

55,700.00
1,470.00
19,400.10
11,733.75
2,362.50

JUMLAH

90,666.35

DIBULATKAN

90,666.00

20,000.00
12,250.00
64,667.00
74,500.00
105,000.00

20,000.00
1,470.00
19,400.10
11,733.75
2,362.50

JUMLAH

54,966.35

DIBULATKAN

54,966.00
29,375.00
12,250.00
64,667.00
74,500.00
105,000.00

JUMLAH
DIBULATKAN

29,375.00
1,470.00
18,106.76
41,720.00
7,560.00
98,231.76
98,231.00

NO.

URAIAN

KOEF.

SAT.

PEKERJAAN KAYU
1 m3

- Kusen kayu kamper samarinda

Kayu balok kamper samarinda


Paku
Angkur
Pekerja
Tukang kayu
Mandor

1.0000
2.0000
5.5600
7.2000
15.2000
1.5600

m2
kg
kg
hr
hr
hr
JUMLAH
DIBULATKAN

1 m3

- Kusen kayu kamper banjar

Kayu balok kamper banjar


Paku
Angkur
Pekerja
Tukang kayu
Mandor

1.1000
3.0000
5.5600
7.2000
25.2000
1.5600

m3
kg
kg
hr
hr
hr
JUMLAH
DIBULATKAN

1 m3

- Kusen kayu kamper kruing

Kayu balok kamper kruing


Paku
Angkur
Pekerja
Tukang kayu
Mandor

1.1000
3.0000
5.5600
7.2000
25.2000
1.5600

m3
kg
kg
hr
hr
hr
JUMLAH
DIBULATKAN

1 m3

- Kusen kayu meranti

Kayu balok meranti


Paku
Angkur
Pekerja
Tukang kayu
Mandor

1.1000
3.0000
5.5600
7.2000
25.2000
1.5600

m3
kg
kg
hr
hr
hr
JUMLAH
DIBULATKAN

NO.

URAIAN
1 bh

KOEF.

SAT.

- Daun pintu double teakwood

Rangka papan kamper banjar


Teakwood ukr. 122 x 244 x 3 mm
Lem putih
Paku triplek
Pekerja
Tukang kayu
Mandor

0.0400
1.0000
0.3000
0.0300
0.4800
1.6000
0.1840

m3
lbr
kg
kg
hr
hr
hr
JUMLAH
DIBULATKAN

1 bh

- Daun pintu double triplek

Rangka papan kamper banjar


Triplek ukr. 122 x 244 x 3 mm
Lem putih
Paku triplek
Pekerja
Tukang kayu
Mandor

0.0400
1.0000
0.3000
0.0300
0.4800
1.6000
0.1840

m3
lbr
kg
kg
hr
hr
hr
JUMLAH
DIBULATKAN

1 bh

- Daun pintu double teakwood lapis formika ( untuk KM/WC )

Rangka papan kamper banjar


Teakwood ukr. 122 x 244 x 3 mm
Formika
Lem putih
Paku triplek
Pekerja
Tukang kayu
Mandor

0.0400
1.0000
0.5000
0.8000
0.0300
0.4800
1.6000
0.1840

m3
lbr
lbr
kg
kg
hr
hr
hr
JUMLAH
DIBULATKAN

1 bh

- Daun pintu kaca polos

Rangka papan kamper banjar


Lem putih
Paku
Kaca polos 5 mm
Pekerja
Tukang kayu
Mandor

0.0300
0.4000
0.0300
0.9000
0.8000
2.0000
0.2400

m3
kg
kg
m2
hr
hr
hr
JUMLAH
DIBULATKAN

NO.

URAIAN
1 bh

KOEF.

SAT.

- Daun pintu kaca rayben

Rangka papan kamper banjar


Lem putih
Paku
Kaca rayben 5 mm
Pekerja
Tukang kayu
Mandor

0.0300
0.4000
0.0300
0.9000
0.8000
2.0000
0.2400

m3
kg
kg
m2
hr
hr
hr
JUMLAH
DIBULATKAN

1 bh

- Daun pintu kaca es

Rangka papan kamper banjar


Lem putih
Paku
Kaca es 5 mm
Pekerja
Tukang kayu
Mandor

0.0300
0.4000
0.0300
0.9000
0.8000
2.0000
0.2400

m3
kg
kg
m2
hr
hr
hr
JUMLAH
DIBULATKAN

1 Unit

- Daun pintu panel kayu samarinda + Kaca

Rangka papan kamper samarinda


Lem putih
Kaca Polos 5 mm
Dempul Halus Impra
Pekerja
Tukang kayu
Mandor

0.0850
1.1600
0.5000
0.4500
1.2150
2.4300
0.2590

m3
kg
m2
kg
hr
hr
hr
JUMLAH
DIBULATKAN

1 m2

- Daun pintu panel kayu banjar

Rangka papan kamper banjar


Lem putih
Pekerja
Tukang kayu
Mandor

0.0440
0.4000
1.2150
2.4300
0.2590

m3
kg
hr
hr
hr
JUMLAH
DIBULATKAN

NO.

URAIAN
1 m2

KOEF.

SAT.

- Daun pintu panel kayu meranti

Rangka papan kamper meranti


Lem putih
Pekerja
Tukang kayu
Mandor

0.0440
0.4000
1.2150
2.4300
0.2590

m3
kg
hr
hr
hr
JUMLAH
DIBULATKAN

1 m2

- Daun pintu / jendela krepyak ( jalusi ) kamper samarinda

Rangka papan kamper samarinda


Lem putih
Pekerja
Tukang kayu
Mandor

0.0420
0.2000
1.0000
3.0000
0.3500

m3
kg
hr
hr
hr
JUMLAH
DIBULATKAN

1 m2

- Daun pintu / jendela krepyak ( jalusi ) kamper banjar

Rangka papan kamper banjar


Lem putih
Pekerja
Tukang kayu
Mandor

0.0420
0.2000
1.0000
3.0000
0.3500

m3
kg
hr
hr
hr
JUMLAH
DIBULATKAN

1 bh

- Kusen Jendela Alumunium (J1)

Kusen Alumunium warna ukuran 4" x 1 3/4"


Jalusi Alumunium
Frame Daun Jendela Alumunium
Kaca Polos 5 mm
Sealent ( 300 ml )
Karet List
Pekerja

9.0000
12.0000
5.8000
0.4350
1.7307
13.5000
0.2028

m'
m'
m'
m2
tube
m'
hr

NO.

URAIAN
Tukang
Mandor

KOEF.
0.7453
0.0426

SAT.
hr
hr
JUMLAH
DIBULATKAN

1 bh

- Kusen Bouvenligh Alumunium (BV1)

Kusen Alumunium warna ukuran 4" x 1 3/4"


Kaca Polos 5 mm
Sealent ( 300 ml )
Karet List
Pekerja
Tukang
Mandor

3.9000
0.6604
0.3200
3.8000
0.0800
0.5856
0.0335

m'
m2
tube
m'
hr
hr
hr
JUMLAH
DIBULATKAN

1 bh

- Kusen Bouvenligh Alumunium (BV2)

Kusen Alumunium warna ukuran 4" x 1 3/4"


Kaca Polos 5 mm
Sealent ( 300 ml )
Karet List
Pekerja
Tukang
Mandor

3.4000
0.5564
0.9650
9.6000
0.1304
0.4791
0.0274

m'
m2
tube
m'
hr
hr
hr
JUMLAH
DIBULATKAN

1 bh

- Kusen Jendela Alumunium (J2)

Kusen Alumunium warna ukuran 4" x 1 3/4"


Jalusi Alumunium
Kaca Polos 5 mm
Sealent ( 300 ml )
Karet List
Pekerja
Tukang
Mandor

9.0000
12.0000
1.6900
1.7307
10.0000
0.2028
0.7453
0.0426

m'
m'
m2
tube
m'
hr
hr
hr
JUMLAH
DIBULATKAN

1 bh

- Kusen Jendela Alumunium (J3)

Kusen Alumunium warna ukuran 4" x 1 3/4"


Jalusi Alumunium
Kaca Polos 5 mm
Sealent ( 300 ml )
Karet List

12.0000
21.0000
1.6900
1.7307
5.0000

m'
m'
m2
tube
m'

NO.

URAIAN
Pekerja
Tukang
Mandor

KOEF.
0.1250
0.4360
0.0426

SAT.
hr
hr
hr
JUMLAH
DIBULATKAN

1 bh

- Kusen Jendela Alumunium J4

Kusen Alumunium warna ukuran 4" x 1 3/4"


Frame daun Jendela Alumunium
Kaca Polos 5 mm
Sealent ( 300 ml )
Karet List
Pekerja
Tukang
Mandor

9.0000
1.5200
1.5000
9.0000
0.1028
0.3453
0.0426

m'
m'
m2
tube
m'
hr
hr
hr
JUMLAH

1 m3

- Kusen pintu PVC komplit

Kusen dan Daun Pintu PVC ukuran standar


Pekerja
Tukang kayu
Mandor

1 bh

1.0000
0.2028
0.7453
0.0426

unit
hr
hr
hr
JUMLAH
DIBULATKAN

- Kusen Bouvenligh Alumunium (BV)

Kusen Alumunium warna ukuran 4" x 1 3/4"


Kaca Es 5 mm
Sealent ( 300 ml )
Karet List
Pekerja
Tukang
Mandor

2.8000
1.0192
0.3200
3.8000
0.0800
0.5856
0.0335

m'
m2
tube
m'
hr
hr
hr
JUMLAH

DIBULATKAN
1 bh

- Kusen Bouvenligh Alumunium (PJ)

Kusen Alumunium warna ukuran 4" x 1 3/4"


Kaca Polos 5 mm
Sealent ( 300 ml )
Karet List
Pekerja
Tukang
Mandor

21.2000
6.6600
0.3200
12.0000
0.0800
0.5856
0.0335

m'
m2
tube
m'
hr
hr
hr

NO.

URAIAN

KOEF.

SAT.

JUMLAH

DIBULATKAN
1 m2

- Daun jendela atas pintu

Rangka papan kamper samarinda oven


Kaca polos 5 mm
Lem putih
Pekerja
Tukang kayu
Mandor

0.0055
0.3025
0.2000
0.6500
1.0000
0.0350

m3
m2
kg
hr
hr
hr
JUMLAH

DIBULATKAN

HARGA
SATUAN

4,050,000.00
12,250.00
8,800.00
64,667.00
76,833.00
105,000.00

JUMLAH

4,050,000.00
24,500.00
48,928.00
465,602.40
1,167,861.60
163,800.00

JUMLAH

5,920,692.00

DIBULATKAN

5,920,692.00

3,633,333.00
12,250.00
8,800.00
64,667.00
76,833.00
105,000.00

3,996,666.30
36,750.00
48,928.00
465,602.40
1,936,191.60
163,800.00

JUMLAH

6,647,938.30

DIBULATKAN

6,647,938.00

6,483,333.00
12,250.00
8,800.00
64,667.00
76,833.00
105,000.00

7,131,666.30
36,750.00
48,928.00
465,602.40
1,936,191.60
163,800.00

JUMLAH

9,782,938.30

DIBULATKAN

9,782,938.00

3,633,333.00
12,250.00
8,800.00
64,667.00
76,833.00
105,000.00

3,996,666.30
36,750.00
48,928.00
465,602.40
1,936,191.60
163,800.00

JUMLAH

6,647,938.30

DIBULATKAN

6,647,938.00

HARGA
SATUAN

7,083,333.00
96,400.00
16,500.00
25,333.33
64,667.00
76,833.00
105,000.00

JUMLAH

283,333.32
96,400.00
4,950.00
760.00
31,040.16
122,932.80
19,320.00

JUMLAH

558,736.28

DIBULATKAN

558,736.00

7,083,333.00
96,400.00
16,500.00
25,333.33
64,667.00
76,833.00
105,000.00

283,333.32
96,400.00
4,950.00
760.00
31,040.16
122,932.80
19,320.00

JUMLAH

558,736.28

DIBULATKAN

558,736.00

7,083,333.00
96,400.00
110,000.00
16,500.00
25,333.33
64,667.00
76,833.00
105,000.00

283,333.32
96,400.00
55,000.00
13,200.00
760.00
31,040.16
122,932.80
19,320.00

JUMLAH

621,986.28

DIBULATKAN

621,986.00

7,083,333.00
16,500.00
25,333.33
108,333.00
64,667.00
76,833.00
105,000.00

212,499.99
6,600.00
760.00
97,499.70
51,733.60
153,666.00
25,200.00

JUMLAH

547,959.29

DIBULATKAN

547,959.00

HARGA
SATUAN

7,083,333.00
16,500.00
25,333.33
125,167.00
64,667.00
76,833.00
105,000.00

JUMLAH

212,499.99
6,600.00
760.00
112,650.30
51,733.60
153,666.00
25,200.00

JUMLAH

563,109.89

DIBULATKAN

563,109.00

7,083,333.00
16,500.00
25,333.33
135,000.00
64,667.00
76,833.00
105,000.00

212,499.99
6,600.00
760.00
121,500.00
51,733.60
153,666.00
25,200.00

JUMLAH

571,959.59

DIBULATKAN

571,959.00

9,183,333.00
16,500.00
108,333.00
28,500.00
64,667.00
76,833.00
105,000.00

780,583.31
19,140.00
54,166.50
12,825.00
78,570.41
186,704.19
27,195.00

JUMLAH

1,159,184.40

DIBULATKAN

1,159,184.00

7,083,333.00
16,500.00
64,667.00
76,833.00
105,000.00

311,666.65
6,600.00
78,570.41
186,704.19
27,195.00

JUMLAH

610,736.25

DIBULATKAN

610,736.00

HARGA
SATUAN

7,083,333.00
16,500.00
64,667.00
76,833.00
105,000.00

JUMLAH

311,666.65
6,600.00
78,570.41
186,704.19
27,195.00

JUMLAH

610,736.25

DIBULATKAN

610,736.00

9,183,333.00
16,500.00
64,667.00
76,833.00
105,000.00

385,699.99
3,300.00
64,667.00
230,499.00
36,750.00

JUMLAH

720,915.99

DIBULATKAN

720,915.00

7,083,333.00
16,500.00
64,667.00
76,833.00
105,000.00

297,499.99
3,300.00
64,667.00
230,499.00
36,750.00

JUMLAH

632,715.99

DIBULATKAN

632,715.00

120,700.00
65,000.00
131,000.00
108,333.00
29,300.00
7,700.00
64,667.00

1,086,300.00
780,000.00
759,800.00
47,124.86
50,709.51
103,950.00
13,114.47

HARGA
SATUAN
76,833.00
105,000.00

JUMLAH
57,263.63
4,473.00

JUMLAH

2,902,735.47

DIBULATKAN

2,902,735.00

120,700.00
108,333.00
29,300.00
7,700.00
64,667.00
76,833.00
105,000.00

470,730.00
71,543.11
9,376.00
29,260.00
5,173.36
44,993.40
3,517.50

JUMLAH

634,593.38

DIBULATKAN

634,593.00

120,700.00
108,333.00
29,300.00
7,700.00
64,667.00
76,833.00
105,000.00

410,380.00
60,276.48
28,274.50
73,920.00
8,432.58
36,810.69
2,877.00

JUMLAH

620,971.25

DIBULATKAN

620,971.00

120,700.00
65,000.00
108,333.00
29,300.00
7,700.00
64,667.00
76,833.00
105,000.00

1,086,300.00
780,000.00
183,082.77
50,709.51
77,000.00
13,114.47
57,263.63
4,473.00

JUMLAH

2,251,943.38

DIBULATKAN

2,251,943.00
120,700.00
65,000.00
108,333.00
29,300.00
7,700.00

1,448,400.00
1,365,000.00
183,082.77
50,709.51
38,500.00

HARGA
SATUAN
64,667.00
76,833.00
105,000.00

JUMLAH
8,083.38
33,499.19
4,473.00

JUMLAH

3,131,747.84

DIBULATKAN

3,131,747.00
120,700.00
131,000.00
108,333.00
29,300.00
7,700.00
64,667.00
76,833.00
105,000.00

JUMLAH

1,086,300.00
164,666.16
43,950.00
69,300.00
6,647.77
26,530.43
4,473.00
1,401,867.36

160,000.00
64,667.00
76,833.00
105,000.00

160,000.00
13,114.47
57,263.63
4,473.00
234,851.10
234,851.00

120,700.00

337,960.00
151,690.59
3,946.56
13,300.00
5,173.36
44,993.40
3,517.50

JUMLAH
DIBULATKAN

148,833.00
12,333.00
3,500.00
64,667.00
76,833.00
105,000.00
JUMLAH

560,581.42

DIBULATKAN

560,581.00

120,700.00
108,333.00
29,300.00
7,700.00
64,667.00
76,833.00
105,000.00

2,558,840.00
721,497.78
9,376.00
92,400.00
5,173.36
44,993.40
3,517.50

HARGA
SATUAN

JUMLAH

JUMLAH

3,435,798.04

DIBULATKAN

3,435,798.00

7,200,000.00
108,333.00
15,166.00
64,667.00
73,400.00
103,400.00

39,312.00
32,770.73
3,033.20
42,033.55
73,400.00
3,619.00

JUMLAH

194,168.48

DIBULATKAN

194,168.00

NO.

URAIAN

KOEF.

SAT.

PEKERJAAN LANTAI
1 m2

- Rabat beton 7 cm + plester dan acian

Pasir pasang
Pasir beton
Kerikil / split
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor

0.0030
0.0330
0.0650
0.2760
0.1150
0.0120
0.0060

m3
m3
m3
zak
hr
hr
hr
JUMLAH
DIBULATKAN

1 m2

- Lantai keramik 20 x 20 ad.1 : 3

Pasir pasang
Semen PC ( 50 kg )
Semen warna ( cor nat )
Keramik 20 x 20 standar
Pekerja
Tukang batu
Mandor
Alat bantu

0.0300
0.0337
0.0125
1.0500
0.2816
0.1320
0.0203
0.6000

m3
zak
kg
m2
hr
hr
hr
set
JUMLAH
DIBULATKAN

1 m2

- Lantai keramik 40 x 40 ad.1 : 3 KW 1 ( Setara Roman )

Pasir pasang
Semen PC ( 50 kg )
Semen warna ( cor nat )
Keramik 40 x 40
Pekerja
Tukang batu
Mandor
Alat bantu

0.0300
0.0337
0.0125
1.0500
0.2816
0.1320
0.0203
0.6000

m3
zak
kg
m2
hr
hr
hr
set
JUMLAH
DIBULATKAN

NO.

URAIAN
1 m2

KOEF.

SAT.

- Keramik dinding 20 x 20 KW1

Pasir pasang
Semen PC ( 50 kg )
Semen warna ( cor nat )
Keramik 20 x 20 standar
Pekerja
Tukang batu
Mandor
Alat bantu

0.0380
0.0340
0.0125
1.0500
0.2620
0.2760
0.0263
0.6000

m3
zak
kg
m2
hr
hr
hr
set
JUMLAH
DIBULATKAN

1 m2

- Keramik dinding 20x25 KW1

Pasir pasang
Semen PC ( 50 kg )
Semen warna ( cor nat )
Keramik 20/25
Pekerja
Tukang batu
Mandor
Alat bantu

0.0380
0.0340
0.0125
1.0500
0.2620
0.2760
0.0263
0.6000

m3
zak
kg
m2
hr
hr
hr
set
JUMLAH
DIBULATKAN

1 m1

- Plint keramik standar

Pasir pasang
Semen PC ( 50 kg )
Plint keramik standar
Semen warna ( cor nat )
Pekerja
Tukang batu
Mandor
Alat bantu

0.0030
0.0353
0.1100
0.0500
0.4000
0.1300
0.0260
0.6000

m3
zak
m2
kg
hr
hr
hr
set
JUMLAH
DIBULATKAN

1 m1

- Plint kayu standar

Rangka papan kamper banjar


Paku segala ukuran
Pekerja
Tukang kayu

0.0016
0.1000
0.4000
0.1300

m3
kg
hr
hr

NO.

URAIAN
Mandor
Alat bantu

KOEF.
0.0260
0.6000

SAT.
hr
set
JUMLAH
DIBULATKAN

NO.

URAIAN
1 m'

KOEF.

SAT.

- Plint keramik 10x20 dinding Kamar mandi

Pasir pasang
Semen PC ( 50 kg )
Plint keramik standar
Semen warna ( cor nat )
Pekerja
Tukang batu
Mandor
Alat bantu

0.0030
0.0353
5.0000
0.0500
0.0400
0.0130
0.0026
0.0600

m3
zak
bh
kg
hr
hr
hr
set
JUMLAH
DIBULATKAN

1 m'

- Border 7x20 / Plint keramik dinding Kamar mandi

Pasir pasang
Semen PC ( 50 kg )
Border Keramik Dinding 7/20
Semen warna ( cor nat )
Pekerja
Tukang batu
Mandor
Alat bantu

0.0030
0.0353
1.0000
0.0500
0.0400
0.0130
0.0026
0.0600

m3
zak
m'
kg
hr
hr
hr
set
JUMLAH
DIBULATKAN

1 m1

- Stepnosing

Stepnosing
Pekerja
Tukang batu
Mandor
Alat bantu

1.0000
0.1200
0.2300
0.0260
0.6000

m1
hr
hr
hr
set
JUMLAH

DIBULATKAN

HARGA
SATUAN

244,333.00
249,167.00
210,000.00
63,333.00
64,667.00
74,500.00
105,000.00

JUMLAH

733.00
8,222.51
13,650.00
17,479.91
7,436.71
894.00
630.00

JUMLAH

49,046.12

DIBULATKAN

49,046.00

244,333.00
63,333.00
15,500.00
43,833.00
64,667.00
74,500.00
105,000.00
1,000.00

7,329.99
2,134.32
193.75
46,024.65
18,210.23
9,834.00
2,131.50
600.00

JUMLAH

86,458.44

DIBULATKAN

86,458.00

244,333.00
63,333.00
15,500.00
73,500.00
64,667.00
74,500.00
105,000.00
1,000.00

7,329.99
2,134.32
193.75
77,175.00
18,210.23
9,834.00
2,131.50
600.00

JUMLAH

117,608.79

DIBULATKAN

117,608.00

HARGA
SATUAN

244,333.00
63,333.00
15,500.00
43,833.00
64,667.00
74,500.00
105,000.00
1,000.00

JUMLAH

9,284.65
2,153.32
193.75
46,024.65
16,942.75
20,562.00
2,761.50
600.00

JUMLAH

98,522.63

DIBULATKAN

98,522.00

244,333.00
63,333.00
15,500.00
59,167.00
64,667.00
74,500.00
105,000.00
1,000.00

9,284.65
2,153.32
193.75
62,125.35
16,942.75
20,562.00
2,761.50
600.00

JUMLAH

114,623.33

DIBULATKAN

114,623.00

244,333.00
63,333.00
73,500.00
15,500.00
64,667.00
74,500.00
105,000.00
1,000.00

733.00
2,235.65
8,085.00
775.00
25,866.80
9,685.00
2,730.00
600.00

JUMLAH

50,710.45

DIBULATKAN

50,710.00

7,083,333.00
12,250.00
64,667.00
76,833.00

11,333.33
1,225.00
25,866.80
9,988.29

HARGA
SATUAN
105,000.00
1,000.00

JUMLAH
2,730.00
600.00

JUMLAH

51,743.42

DIBULATKAN

51,743.00

HARGA
SATUAN

244,333.00
63,333.00
7,700.00
15,500.00
64,667.00
74,500.00
105,000.00
1,000.00

JUMLAH

733.00
2,235.65
38,500.00
775.00
2,586.68
968.50
273.00
60.00

JUMLAH

46,131.83

DIBULATKAN

46,131.00

244,333.00
63,333.00
41,250.00
15,500.00
64,667.00
74,500.00
105,000.00
1,000.00

733.00
2,235.65
41,250.00
775.00
2,586.68
968.50
273.00
60.00

JUMLAH

48,881.83

DIBULATKAN

48,881.00

30,000.00
64,667.00
74,500.00
105,000.00
1,000.00

30,000.00
7,760.04
17,135.00
2,730.00
600.00

JUMLAH

58,225.04

DIBULATKAN

58,225.00

NO.

URAIAN

KOEF.

SAT.

PEKERJAAN PLAFOND
1 m2

- Rangka plafond gird 50 x 100 cm ( kayu meranti )

Kayu meranti
Paku
Pekerja
Tukang kayu
Mandor
Alat bantu

0.0080
0.1400
0.1700
0.2800
0.0370
0.6000

m3
kg
hr
hr
hr
set
JUMLAH
DIBULATKAN

1 m2

- Rangka plafond gird 50 x 100 cm ( kayu kamper banjar )

Kayu kamper banjar


Paku
Pekerja
Tukang kayu
Mandor
Alat bantu

0.0080
0.1400
0.1700
0.2800
0.0370
0.6000

m3
kg
hr
hr
hr
set
JUMLAH
DIBULATKAN

1 m2

- Plafond asbes 5 mm + rangka kayu meranti

Kayu meranti
Plat asbes semen 100 x 100 cm, t = 5 mm
Paku
Pekerja
Tukang kayu
Mandor
Alat bantu

0.0080
1.0250
0.1750
0.2200
0.3500
0.0460
1.0000

m3
lbr
kg
hr
hr
hr
set
JUMLAH
DIBULATKAN

1 m2

- Plafond gysum 9 mm + rangka kayu meranti

Kayu meranti
Gypsum 9 mm
Paku
Pekerja
Tukang kayu
Mandor
Alat bantu

0.0080
0.5800
0.1750
0.2200
0.3500
0.0460
1.0000

m3
lbr
kg
hr
hr
hr
set

NO.

URAIAN

KOEF.

SAT.
JUMLAH
DIBULATKAN

NO.

URAIAN
1 m2

KOEF.

SAT.

- Plafond triplek 4 mm + rangka kayu meranti

Kayu meranti
Triplek 4 mm
Paku
Pekerja
Tukang kayu
Mandor
Alat bantu

0.0080
0.3750
0.1750
0.2200
0.3500
0.0460
1.0000

m3
lbr
kg
hr
hr
hr
set
JUMLAH
DIBULATKAN

1 m2

- Plafond asbes 5 mm + rangka kayu meranti

Kayu meranti
Asbes 5 mm
Paku
Pekerja
Tukang kayu
Mandor
Alat bantu

0.0080
0.3750
0.1750
0.2200
0.3500
0.0460
1.0000

m3
lbr
kg
hr
hr
hr
set
JUMLAH
DIBULATKAN

1 m1

- List Plafond Kayu Kamper Samarinda 5 cm

List Profil Kamper 5 cm


Paku
Pekerja
Tukang kayu
Kepala Tukang Kayu
Mandor

1.1000
0.0100
0.0500
0.0500
0.0050
0.0030

m1
kg
hr
hr
hr
hr
JUMLAH
DIBULATKAN

1 m1
- List Plafond gypsum 7 cm
List Profil gypsum 7 cm
Paku
Pekerja
Tukang kayu
Kepala Tukang Kayu
Mandor

1.1000
0.0100
0.0500
0.0500
0.0050
0.0030

m1
kg
hr
hr
hr
hr
JUMLAH
DIBULATKAN

NO.

URAIAN

1 m2

KOEF.

SAT.

- Plafond GRC t =5 mm+ rangka besi Hollow galvanis

Besi Hollow 4 x 4
GRC Board t = 5 mm
Paku
Pekerja
Tukang kayu
Mandor
Alat bantu

0.9375
0.3472
0.1750
0.2200
0.3500
0.0460
1.0000

btg
lbr
kg
hr
hr
hr
set
JUMLAH
DIBULATKAN

HARGA
SATUAN

2,583,333.00
12,250.00
64,667.00
76,833.00
105,000.00
1,000.00

JUMLAH

20,666.66
1,715.00
10,993.39
21,513.24
3,885.00
600.00

JUMLAH

59,373.29

DIBULATKAN

59,373.00

6,483,333.00
12,250.00
64,667.00
76,833.00
105,000.00
1,000.00

51,866.66
1,715.00
10,993.39
21,513.24
3,885.00
600.00

JUMLAH

90,573.29

DIBULATKAN

90,573.00

2,583,333.00
16,167.00
12,250.00
64,667.00
76,833.00
105,000.00
1,000.00

20,666.66
16,571.18
2,143.75
14,226.74
26,891.55
4,830.00
1,000.00

JUMLAH

86,329.88

DIBULATKAN

86,329.00

2,583,333.00
61,167.00
12,250.00
64,667.00
76,833.00
105,000.00
1,000.00

20,666.66
35,476.86
2,143.75
14,226.74
26,891.55
4,830.00
1,000.00

HARGA
SATUAN

JUMLAH

JUMLAH

105,235.56

DIBULATKAN

105,235.00

HARGA
SATUAN

2,583,333.00
59,167.00
12,250.00
64,667.00
76,833.00
105,000.00
1,000.00

JUMLAH

20,666.66
22,187.63
2,143.75
14,226.74
26,891.55
4,830.00
1,000.00

JUMLAH

91,946.33

DIBULATKAN

91,946.00

2,583,333.00
72,667.00
12,250.00
64,667.00
76,833.00
105,000.00
1,000.00

20,666.66
27,250.13
2,143.75
14,226.74
26,891.55
4,830.00
1,000.00

JUMLAH

97,008.83

DIBULATKAN

97,008.00

14,917.00
12,250.00
64,667.00
76,833.00
85,167.00
105,000.00

16,408.70
122.50
3,233.35
3,841.65
425.84
315.00

JUMLAH

24,347.04

DIBULATKAN

24,347.00

16,500.00
12,250.00
64,667.00
76,833.00
85,167.00
105,000.00
DIBULATKAN

14,300.00
253.33
3,000.00
3,670.00
417.00
310.20
21,950.53
21,950.00

HARGA
SATUAN

27,583.33
99,000.00
12,250.00
64,667.00
76,833.00
105,000.00
1,000.00
JUMLAH
DIBULATKAN

JUMLAH

25,859.38
34,372.80
2,143.75
14,226.74
26,891.55
4,830.00
1,000.00
109,324.22
109,324.00

NO.

URAIAN

KOEF.

SAT.

PEKERJAAN CAT
1 m2

- Cat dinding dalam interior

Cat setara interior


Roll cat + bak
Plamur / dempul tembok
Ampelas
Tukang cat
Mandor

0.2800
0.0100
0.1600
0.5000
0.2950
0.0250

kg
bh
kg
lbr
hr
hr
JUMLAH
DIBULATKAN

1 m2

- Cat dinding dalam interior

Cat tembok
Roll cat + bak
Plamur / dempul tembok
Ampelas
Tukang cat
Mandor

0.2800
0.0100
0.1600
0.5000
0.2950
0.0250

kg
bh
kg
lbr
hr
hr
JUMLAH
DIBULATKAN

1 m2

- Cat dinding luar exterior

Cat tembok exterior


Roll cat + bak
Plamur / dempul tembok
Ampelas
Tukang cat
Mandor

0.2800
0.0100
0.1600
0.5000
0.2950
0.0250

kg
bh
kg
lbr
hr
hr
JUMLAH
DIBULATKAN

1 m2

- Cat dinding interior

Cat tembok interior


Roll cat + bak
Plamur / dempul tembok
Ampelas
Tukang cat
Mandor

0.2800
0.0100
0.1600
0.5000
0.2950
0.0250

kg
bh
kg
lbr
hr
hr
JUMLAH

NO.

URAIAN

KOEF.

SAT.
DIBULATKAN

NO.

URAIAN
1 m2

KOEF.

SAT.

- Cat dinding interior

Cat tembok interior


Roll cat + bak
Plamur / dempul tembok
Ampelas
Tukang cat
Mandor

0.2800
0.0100
0.1600
0.5000
0.2950
0.0250

kg
bh
kg
lbr
hr
hr
JUMLAH
DIBULATKAN

1 m2

- Cat plafond interior

Cat plafond interior


Roll cat + bak
Plamur / dempul tembok
Ampelas
Tukang cat
Mandor

0.3000
0.0500
0.0450
0.2000
0.3150
0.0250

kg
bh
kg
lbr
hr
hr
JUMLAH
DIBULATKAN

1 m2

- Cat plafond interior

Cat plafond interior


Roll cat + bak
Plamur / dempul tembok
Ampelas
Tukang cat
Mandor

0.3000
0.0500
0.0450
0.2000
0.3150
0.0250

kg
bh
kg
lbr
hr
hr
JUMLAH
DIBULATKAN

1 m2

- Cat besi memakai kuas

Cat besi / kayu


Kuas 3"
Minyak cat / thiner
Meni besi
Ampelas
Tukang cat
Mandor

0.2000
0.0500
0.1500
0.1675
0.4000
0.3150
0.0250

kg
bh
lt
kg
lbr
hr
hr
JUMLAH
DIBULATKAN

NO.

URAIAN
1 m2

KOEF.

SAT.

- Cat kayu memakai kuas

Cat besi / kayu


Kuas 3"
Plamir kayu
Melamik Pintu
Meni kayu
Ampelas
Minyak cat / thiner
Tukang cat
Mandor

0.2000
0.0500
0.0630
1.0000
0.1670
0.4000
0.1500
0.3150
0.0250

kg
bh
kg
m2
kg
lbr
lt
hr
hr
JUMLAH
DIBULATKAN

1 m2

- Cat plafond setara Vinilex

Cat plafond interior


Roll cat + bak
Plamur / dempul tembok
Ampelas
Tukang cat
Mandor

0.3000
0.0500
0.0450
0.2000
0.3150
0.0250

kg
bh
kg
lbr
hr
hr
JUMLAH
DIBULATKAN

1 m2

- Water proofing memakai kuas

Water proofing
Kuas 3"
Ampelas
Tukang cat
Mandor

0.3000
0.0500
0.4000
0.3150
0.0250

kg
bh
lbr
hr
hr
JUMLAH
DIBULATKAN

1 m2

Pengecatan kayu/besi/dinding (lama) memakai kuas


(termasuk pembersihan permukaan cat lama)
Cat Kayu/besi
Kuas 3"
Minyak cat/thinner A
Plamir kayu
Ampelas Kayu
Tukang Cat
Mandor

0.07 kg
0.05 bh
0.05 lt
0.021 kg
0.28 lbr
0.21 hr
0.0166666667 hr

NO.

URAIAN

KOEF.

SAT.
Jumlah
Dibulatkan

HARGA
SATUAN

80,833.00
16,667.00
15,033.00
4,500.00
74,500.00
105,000.00

JUMLAH

22,633.24
166.67
2,405.28
2,250.00
21,977.50
2,625.00

JUMLAH

52,057.69

DIBULATKAN

52,057.00

23,500.00
16,667.00
15,033.00
4,500.00
74,500.00
105,000.00

6,580.00
166.67
2,405.28
2,250.00
21,977.50
2,625.00

JUMLAH

36,004.45

DIBULATKAN

36,004.00

119,500.00
16,667.00
15,033.00
4,500.00
74,500.00
105,000.00

33,460.00
166.67
2,405.28
2,250.00
21,977.50
2,625.00

JUMLAH

62,884.45

DIBULATKAN

62,884.00

20,833.00
16,667.00
15,033.00
4,500.00
74,500.00
105,000.00
JUMLAH

5,833.24
166.67
2,405.28
2,250.00
21,977.50
2,625.00
35,257.69

HARGA
SATUAN
DIBULATKAN

JUMLAH
35,257.00

HARGA
SATUAN

36,333.00
16,667.00
15,033.00
4,500.00
74,500.00
105,000.00

JUMLAH

10,173.24
166.67
2,405.28
2,250.00
21,977.50
2,625.00

JUMLAH

39,597.69

DIBULATKAN

39,597.00

80,833.00
16,667.00
15,033.00
4,500.00
74,500.00
105,000.00

24,249.90
833.35
676.49
900.00
23,467.50
2,625.00

JUMLAH

52,752.24

DIBULATKAN

52,752.00

23,500.00
16,667.00
15,033.00
4,500.00
74,500.00
105,000.00

7,050.00
833.35
676.49
900.00
23,467.50
2,625.00

JUMLAH

35,552.34

DIBULATKAN

35,552.00

55,833.00
30,167.00
17,167.00
20,167.00
4,500.00
74,500.00
105,000.00

11,166.60
1,508.35
2,575.05
3,377.97
1,800.00
23,467.50
2,625.00

JUMLAH

46,520.47

DIBULATKAN

46,520.00

HARGA
SATUAN

55,833.00
30,167.00
22,700.00
43,667.00
20,333.00
4,500.00
17,167.00
74,500.00
105,000.00

JUMLAH

11,166.60
1,508.35
1,430.10
43,667.00
3,395.61
1,800.00
2,575.05
23,467.50
2,625.00

JUMLAH

91,635.21

DIBULATKAN

91,635.00

20,833.00
16,667.00
15,033.00
4,500.00
74,500.00
105,000.00

6,249.90
833.35
676.49
900.00
23,467.50
2,625.00

JUMLAH

34,752.24

DIBULATKAN

34,752.00

97,800.00
30,167.00
4,500.00
74,500.00
105,000.00

29,340.00
1,508.35
1,800.00
23,467.50
2,625.00

JUMLAH

58,740.85

DIBULATKAN

58,740.00

55,833.00
16,065.00
15,120.00
19,372.50
4,725.00
61,425.00
99,225.00

3,908.31
803.25
756.00
406.82
1,323.00
12,899.25
1,653.75

HARGA
SATUAN

Dibulatkan

JUMLAH
21,750.38
21,750.00

NO.

URAIAN

KOEF.

SAT.

PEKERJAAN SANITER
1 unit

- Closet jongkok standar

Pasir pasang
Semen PC ( 50 kg )
Closet jongkok standar
Pekerja
Tukang batu
Mandor

0.1500
0.1000
1.0000
0.3000
0.2500
0.1800

m3
zak
bh
hr
hr
hr
JUMLAH
DIBULATKAN

1 unit

- Bak air fiber glass kap. 200 ltr

Pasir pasang
Semen PC ( 50 kg )
Bak air fiber glass kap. 200 ltr
Pekerja
Tukang batu
Mandor

0.1500
0.1000
1.0000
0.3000
0.2500
0.1800

m3
zak
bh
hr
hr
hr
JUMLAH
DIBULATKAN

1 buah

- Floor drain

Floor drain kuningan


Pekerja
Tukang batu
Mandor

1.0000
0.0100
0.1000
0.0050

bh
hr
hr
hr
JUMLAH
DIBULATKAN

1 buah

- Kran air 1/2"

Kran air 1/2 ex lokal


Seal tape
Lem pipa PVC
Pekerja
Tukang batu
Mandor

1.0000
0.0250
0.1250
0.0100
0.1000
0.0050

bh
roll
tube
hr
hr
hr
JUMLAH
DIBULATKAN

NO.

URAIAN
1 unit

KOEF.

SAT.

- Pompa air jet pump + Instalasi dan pengeboran

Pompa air jet pump


Pipa PVC 1 "
Pipa PVC 4 "
Bocht LL-D 1" (lokal)
Water moer
Ongkos pengeboran

1.0000
40.0000
16.0000
6.0000
2.0000
1.0000

bh
m'
m'
bh
bh
ls
JUMLAH
DIBULATKAN

1 unit

- Water tower rangka besi siku

Konstruksi besi siku


Pondasi beton tapak K. 175
Pekerja
Tukang besi
Tukang batu
Mandor

275.0000
0.7665
2.5000
3.0000
3.0000
0.3000

kg
m3
hr
hr
hr
hr
JUMLAH
DIBULATKAN

1 buah

- Tangki air kapasitas 1 m3

Tangki air kapasitas 1 m3


Pekerja
Tukang batu
Mandor

1.0000
0.1000
0.2500
0.0250

bh
hr
hr
hr
JUMLAH
DIBULATKAN

1 unit

- Septictank & Rembesan + Instalasi

Pas batu bata, t = 1/2 bata ad 1 : 2


Pasir urug unt rembesan
Koral beton unt. rembesan
Plesteran dan acian trasraam ad. 1 : 3
Plat beton penutup t = 12 cm (beton site mix K. 175)
Besi beton polos
Pipa PVC 1 "
Pipa porous 4 "
Ijuk
Pekerja
Tukang batu
Mandor

12.5000
0.3000
1.5080
11.3400
0.3600
47.4000
0.5000
3.0000
30.0000
2.5000
3.0000
0.0500

m2
m3
m3
m2
m3
kg
m'
m'
ikt
hr
hr
hr
JUMLAH

NO.

URAIAN

KOEF.

SAT.
DIBULATKAN

NO.

URAIAN
1m'

KOEF.

SAT.

- Instalasi air bersih, dari water tower ke - kran air

Pipa PVC 3/4"


Knee PVC
Lem Pipa PVC
Pekerja
Tukang Pipa / Plumbing
Mandor

1.2000
0.2000
0.2500
0.0500
0.3000
0.0300

m'
bh
tube
hr
hr
hr
JUMLAH
DIBULATKAN

1m'

- Instalasi air kotor, dari closet & Floor Drain ke Septictank

Pipa PVC 4"


Knee PVC
Lem Pipa PVC
Pekerja
Tukang Pipa / Plumbing
Mandor

1.2000
0.2000
0.2500
0.0500
0.3000
0.0300

m'
bh
tube
hr
hr
hr
JUMLAH
DIBULATKAN

1 unit

- Closet duduk standar

Pasir pasang
Semen PC ( 50 kg )
Closet duduk standar
Pekerja
Tukang batu
Mandor

0.1500
0.1000
1.0000
0.3000
0.2500
0.1800

m3
zak
bh
hr
hr
hr
JUMLAH

DIBULATKAN

1 unit

- Sumur Resapan

Pas batu bata, t = 1/2 bata ad 1 : 2


Pasir urug unt rembesan
Koral beton unt. rembesan
Plesteran dan acian trasraam ad. 1 : 3

12.5000
0.3000
1.5080
11.3400

m2
m3
m3
m2

NO.

URAIAN
Pipa PVC 1 "
Pipa porous 4 "
Ijuk
Pekerja
Tukang batu
Mandor

KOEF.
0.5000
3.0000
30.0000
2.5000
3.0000
0.0500

SAT.
m'
m'
ikt
hr
hr
hr
JUMLAH

DIBULATKAN

1 bh
- Kitchenzink + Accessories
Kitchen zink lengkap + Accessories
Kran Kitchen zink
Pekerja
Tukang ledeng
Mandor

1 unit

1.0000
1.0000
0.2975
0.2715
0.4121

bh
bh
hr
hr
hr
JUMLAH
DIBULATKAN

- washtafel + Accessories

Washtafel
Kran Wastafel SAN-EI Tipe Y50JSX
Flexibel
Pekerja
Tukang batu
Mandor

1.0000
1.0000
1.0000
0.1500
0.1750
0.0800

set
bh
bh
hr
hr
hr
JUMLAH
DIBULATKAN

HARGA
SATUAN

244,333.00
63,333.00
289,500.00
64,667.00
74,500.00
105,000.00

JUMLAH

36,649.95
6,333.30
289,500.00
19,400.10
18,625.00
18,900.00

JUMLAH

389,408.35

DIBULATKAN

389,408.00

244,333.00
63,333.00
290,000.00
64,667.00
74,500.00
105,000.00

36,649.95
6,333.30
290,000.00
19,400.10
18,625.00
18,900.00

JUMLAH

389,908.35

DIBULATKAN

389,908.00

30,000.00
64,667.00
74,500.00
105,000.00

30,000.00
646.67
7,450.00
525.00

JUMLAH

38,621.67

DIBULATKAN

38,621.00

25,000.00
9,300.00
10,200.00
64,667.00
74,500.00
105,000.00

25,000.00
232.50
1,275.00
646.67
7,450.00
525.00

JUMLAH

35,129.17

DIBULATKAN

35,129.00

HARGA
SATUAN

2,950,000.00
5,200.00
41,250.00
25,100.00
60,500.00
1,300,000.00

JUMLAH

2,950,000.00
208,000.00
660,000.00
150,600.00
121,000.00
1,300,000.00

JUMLAH

5,389,600.00

DIBULATKAN

5,389,600.00

14,333.00
1,029,161.00
64,667.00
74,500.00
74,500.00
105,000.00

3,941,575.00
788,851.91
161,667.50
223,500.00
223,500.00
31,500.00

JUMLAH

5,370,594.41

DIBULATKAN

5,370,594.00

1,329,500.00
64,667.00
74,500.00
105,000.00

1,329,500.00
6,466.70
18,625.00
2,625.00

JUMLAH

1,357,216.70

DIBULATKAN

1,357,216.00

134,427.00
225,050.00
208,033.00
51,632.00
1,029,161.00
13,299.00
5,200.00
41,250.00
7,000.00
64,667.00
74,500.00
105,000.00
JUMLAH

1,680,337.50
67,515.00
313,713.76
585,506.88
370,497.96
630,372.60
2,600.00
123,750.00
210,000.00
161,667.50
223,500.00
5,250.00
4,374,711.20

HARGA
SATUAN
DIBULATKAN

JUMLAH
4,374,711.00

HARGA
SATUAN

4,625.00
2,880.00
10,200.00
64,667.00
74,500.00
105,000.00

JUMLAH

5,550.00
576.00
2,550.00
3,233.35
22,350.00
3,150.00

JUMLAH

37,409.35

DIBULATKAN

37,409.00

43,166.75
12,280.00
10,200.00
64,667.00
74,500.00
105,000.00

51,800.10
2,456.00
2,550.00
3,233.35
22,350.00
3,150.00

JUMLAH

85,539.45

DIBULATKAN

85,539.00

244,333.00
63,333.00
2,324,000.00
64,667.00
74,500.00
105,000.00

36,649.95
6,333.30
2,324,000.00
19,400.10
18,625.00
18,900.00

JUMLAH

2,423,908.35

DIBULATKAN

2,423,908.00

134,427.00
225,050.00
208,033.00
51,632.00

1,680,337.50
67,515.00
313,713.76
585,506.88

HARGA
SATUAN
5,200.00
41,250.00
7,000.00
64,667.00
74,500.00
105,000.00

JUMLAH
2,600.00
123,750.00
210,000.00
161,667.50
223,500.00
5,250.00

JUMLAH

3,373,840.64

DIBULATKAN

3,373,840.00

200,000.00
135,000.00
64,667.00
74,500.00
105,000.00

200,000.00
135,000.00
19,238.43
20,226.75
43,270.50
417,735.68
417,735.00

810,000.00
210,000.00
35,000.00
64,667.00
74,500.00
105,000.00

810,000.00
210,000.00
35,000.00
9,700.05
13,037.50
8,400.00

JUMLAH
DIBULATKAN

JUMLAH

1,086,137.55

DIBULATKAN

1,086,137.00

NO.

URAIAN

KOEF.

SAT.

PEKERJAAN ASESORIS
1 bh

- Pasang Engsel pintu nilon 4"

Engsel nilon 4"


Pekerja
Tukang kayu
Mandor

1.0000
0.0150
0.1500
0.0075

bh
hr
hr
hr
JUMLAH
DIBULATKAN

1 bh

- Pasang Engsel jendela

Engsel nilon 3"


Pekerja
Tukang kayu
Mandor

1.0000
0.0100
0.1000
0.0050

bh
hr
hr
hr
JUMLAH
DIBULATKAN

1 bh

- Pasang hak angin

Hak angin
Pekerja
Tukang kayu
Mandor

1.0000
0.0100
0.1000
0.0050

bh
hr
hr
hr
JUMLAH
DIBULATKAN

1 bh

- Pasang slot / grendel pintu

Slot pintu
Pekerja
Tukang kayu
Mandor

1.0000
0.0100
0.1000
0.0050

bh
hr
hr
hr
JUMLAH
DIBULATKAN

1 bh

- Pasang kunci double slaag

Kunci double slaag


Pekerja
Tukang kayu
Mandor

1.0000
0.0500
0.2500
0.0100

bh
hr
hr
hr
JUMLAH

NO.

URAIAN

KOEF.

SAT.
DIBULATKAN

NO.

URAIAN
1 m'

KOEF.

SAT.

- Hand Ralling Tangga

Pipa Galv Medium dia 2 inch


Cat besi
Dynabolt
Pekerja
Tukang
Mandor
Alat bantu

1.0500
0.1570
1.0000
0.1775
0.2218
0.0226
1.0000

m'
m2
bh
hr
hr
hr
set
JUMLAH
DIBULATKAN

1 m'

- Hand Ralling Tangga

Pipa Galv Medium dia 2 inch


Cat besi
Dynabolt
Pekerja
Tukang
Mandor
Alat bantu

1.0500
0.1570
1.0000
0.1775
0.2218
0.0226
1.0000

m'
m2
bh
hr
hr
hr
set
JUMLAH
DIBULATKAN

1 m1
Railing tangga stainless steel
Hand Railing,besi pipa 2 " stainless steel, t.1,2mm
Besi Hollow 2 x 4 cm stainless steel, t=1,8mm
Las besi
Baut Dyna bolt
Tukang besi
Kepala tukang besi
Mandor
Alat bantu

1 bh

0.4667
0.7500
1.0000
2.0000
0.8875
0.0100
0.0533
1.0000

btg
btg
ls
bh
hr
hr
hr
set
JUMLAH
DIBULATKAN

1.0000
0.0150
0.1500
0.0075

bh
hr
hr
hr
JUMLAH

- Pasang Engsel pintu stenlis steel 4"

Engsel 4"
Pekerja
Tukang kayu
Mandor

DIBULATKAN
1 bh

- Pasang Engsel jendela stenlis steel 3"

NO.

URAIAN
Engsel 3"
Pekerja
Tukang kayu
Mandor

KOEF.
1.0000
0.0100
0.1000
0.0050

SAT.
bh
hr
hr
hr
JUMLAH
DIBULATKAN

HARGA
SATUAN

17,250.00
64,667.00
76,833.00
105,000.00

JUMLAH

17,250.00
970.01
11,524.95
787.50

JUMLAH

30,532.46

DIBULATKAN

30,532.00

12,083.50
64,667.00
76,833.00
105,000.00

12,083.50
646.67
7,683.30
525.00

JUMLAH

20,938.47

DIBULATKAN

20,938.00

7,500.00
64,667.00
76,833.00
105,000.00

7,500.00
646.67
7,683.30
525.00

JUMLAH

16,354.97

DIBULATKAN

16,354.00

17,500.00
64,667.00
76,833.00
105,000.00

17,500.00
646.67
7,683.30
525.00

JUMLAH

26,354.97

DIBULATKAN

26,354.00

154,500.00
64,667.00
76,833.00
105,000.00
JUMLAH

154,500.00
3,233.35
19,208.25
1,050.00
177,991.60

HARGA
SATUAN
DIBULATKAN

JUMLAH
177,991.00

HARGA
SATUAN

81,783.33
55,833.00
5,500.00
64,667.00
76,833.00
105,000.00
1,000.00

JUMLAH

85,872.50
8,765.78
5,500.00
11,478.39
17,041.56
2,373.00
1,000.00

JUMLAH

132,031.23

DIBULATKAN

132,031.00

81,783.33
55,833.00
5,500.00
64,667.00
76,833.00
105,000.00
1,000.00

85,872.50
8,765.78
5,500.00
11,478.39
17,041.56
2,373.00
1,000.00

JUMLAH

132,031.23

DIBULATKAN

132,031.00
551,200.00
121,600.00
50,000.00
5,500.00
74,500.00
85,167.00
105,000.00
1,000.00

257,226.67
91,200.00
50,000.00
11,000.00
66,118.75
851.67
5,596.50
1,000.00
482,993.59
482,993.59

45,000.00

JUMLAH

45,000.00
970.01
11,524.95
787.50
58,282.46

DIBULATKAN

58,282.00

JUMLAH
DIBULATKAN

64,667.00
76,833.00
105,000.00

HARGA
SATUAN

37,500.00
64,667.00
76,833.00
105,000.00

JUMLAH
37,500.00
646.67
7,683.30
525.00

JUMLAH

46,354.97

DIBULATKAN

46,354.00

NO.

URAIAN

KOEF.

SAT.

PEKERJAAN SARANA LUAR


1 m'

- Saluran buis beton 1/2 dia. 20 cm

Buis beton 1/2 dia. 20 cm


Pasir urug
Pasir pasang
Semen PC ( 50 kg )
Pekerja
Tukang batu
Mandor

1.0250
0.1200
0.0540
0.0270
0.0750
0.0500
0.0125

m'
m3
m3
zak
hr
hr
hr
JUMLAH
DIBULATKAN

1 m2

- Paving block t = 6 cm

Paving block t = 6 cm K.250


Pasir pasang
Pekerja
Tukang batu
Mandor

1.0250
0.0250
0.1500
0.0500
0.0030

m2
m3
hr
hr
hr
JUMLAH
DIBULATKAN

1 m2

- Paving block t = 8 cm

Paving block t = 8 cm K.250


Pasir beton
Pekerja
Tukang batu
Mandor

1.0250
0.0250
0.1500
0.0500
0.0030

m2
m3
hr
hr
hr
JUMLAH
DIBULATKAN

1 m2

- Grass block t = 6 cm

Grass block t = 6 cm K.250


Pasir beton
Pekerja
Tukang batu
Mandor

9.0000
0.0250
0.1500
0.0500
0.0030

bh
m3
hr
hr
hr

NO.

URAIAN

KOEF.

SAT.
JUMLAH
DIBULATKAN

1 m'

- Kanstin 10.20.40-K.175

Kanstin abu - abu 10.20.40 - K.175


Adukan
Pekerja
Tukang batu
Mandor

1.0000
0.0100
0.0500
0.0175
0.00875

m2
m3
hr
hr
hr
JUMLAH
DIBULATKAN

NO.

URAIAN
1 m'

KOEF.

SAT.

- Pagar beton precat t = 2.00 m

Galian tanah pondasi


Pasir beton
Batu pecah 3/4
Semen
Tinggi pagar 5 panel/ 2 m, panjang kolom 3 m, mutu beton K225
Pekerja
Tukang batu
Mandor

0.1200
0.0150
0.0290
0.2250
1.0000
0.6000
0.3500
0.0350

m3
m3
m3
zak
m
hr
hr
hr
JUMLAH
DIBULATKAN

1 m'

- Pagar beton precat t = 2.40 m

Galian tanah pondasi


Pasir beton
Batu pecah 3/4
Semen
Tinggi pagar 6 panel/ 2.4 m, pjang kolom 3.5 m, mutu beton K225
Pekerja
Tukang batu
Mandor

0.1200
0.0150
0.0290
0.2250
1.0000
0.6000
0.3500
0.0350

m3
m3
m3
zak
m
hr
hr
hr
JUMLAH
DIBULATKAN

1 m'

- Pas.Pagar Hollow

Galian Tanah Pondasi


Urugan Tanah Kembali
Pas. Batu Kali 1 : 5
Sloof beton 15/20 K.175
Kolom beton 25/25 K.225
Kepala pagar dengan beton K.225
Pas.Batu bata 1 : 5
Plester + Acian
Pas. Batu Tempel
Pengecetan Kolom
Besi Hollow
Besi siku L.40.40.4
Tombak Beton
Pengelasan & Pengecetan
Ongkos pasang Pagar Besi

0.1000
0.0250
0.1875
0.0300
0.0354
0.0167
0.5000
1.5200
1.0000
1.5200
1.0000
4.8333
7.0000
1.0000
1.0000

m3
m3
m3
m3
m3
m3
m2
m2
m2
m2
btg
kg
bh
ls
ls
JUMLAH
DIBULATKAN

NO.

URAIAN
1 m'

KOEF.

SAT.

- Pas.Pintu Pagar Tralis Besi

Besi Hollow
Pengelasan & Pengecetan
Roda Pagar
Kunci Pagar
Rel Besi
Ongkos pasang Pagar Besi

1.0000
1.0000
0.7500
0.2500
1.3000
1.0000

btg
ls
bh
bh
kg
ls
JUMLAH
DIBULATKAN

1 m'

- Ralling Tangga Kayu

Catur kayu kamper


Hand Ralling
Melamin
Dyna Bolt
Pekerja
Tukang
Mandor
Alat bantu

4.0000
1.1000
0.2000
6.0000
0.3550
0.8875
0.0533
1.0000

bh
m'
m2
bh
hr
hr
hr
set
JUMLAH
DIBULATKAN

1 m2

- Partisi double gysum 9 mm + rangka besi hollow 4x4 + List kayu papan diprofil + finish cat

Kayu meranti
Gypsum 9 mm
Paku
List papan diprofil 1.6x 9 cm(atas partisi 3muka bwh 2muka )
Cat dinding partisi (cat tembok)
Cat kayu
Pekerja
Tukang kayu
Mandor
Alat bantu

1.0000
0.7656
0.3500
3.5714
2.0000
0.3571
0.2200
0.3500
0.0460
1.0000

m3
lbr
kg
m'
m2
m2
hr
hr
hr
set
JUMLAH
DIBULATKAN

1 m1

Railing tangga stainless steel

Hand Railing,besi pipa 2 " stainless steel, t.1,2mm


Besi Hollow 2 x 4 cm stainless steel, t=1,8mm
Las besi
Baut Dyna bolt
Tukang besi

0.4667
0.7500
1.0000
2.0000
0.8875

btg
btg
ls
bh
hr

NO.

URAIAN
Kepala tukang besi
Mandor
Alat bantu

1 m1

hr
hr
set
JUMLAH
DIBULATKAN

0.4667
0.6000
1.0000
0.8875
0.0100
0.0533
1.0000

btg
btg
ls
hr
hr
hr
set
JUMLAH
DIBULATKAN

1.0500
0.0200
0.0020

m2
hr
hr
JUMLAH
DIBULATKAN

0.5925
2.3700
7.8000
10.6350
1.0000

m3
m2
m2
m2
set
JUMLAH
DIBULATKAN

0.5600
75.0000
3.2000
0.0867
1.5328
0.0749
0.0249

m3
bh
zak
m3
hr
hr
hr
JUMLAH
DIBULATKAN

- Bak Bunga

Galian tanah
Pas.Rollag bata ad. 1:2
Pas.bata merah ad. 1:5
Plester + aci ad. 1:5
Alat bantu

1 bh

0.0100
0.0533
1.0000

- Pasangan Lempengan Rumput

Rumput gajah mini


Pekerja
Mandor

1 unit

SAT.

Railing Selasar Stainless Steel 2" + plat strip + cat

Hand Railing,besi pipa 2 " stainless steel, t.1,2mm


Besi Hollow 4 x 4 cm, t=1.8 mm
Pengelasan & Pengecetan
Tukang besi
Kepala tukang besi
Mandor
Alat bantu

1 m2

KOEF.

- Bak Kontrol 40x40

Pasir pasang
Bata merah
Semen PC ( 50 kg )
Beton K-175
Pekerja / kenek
Tukang batu
Mandor

HARGA
SATUAN

74,500.00
170,000.00
244,333.00
63,333.00
64,667.00
74,500.00
105,000.00

JUMLAH

76,362.50
20,400.00
13,193.98
1,709.99
4,850.03
3,725.00
1,312.50

JUMLAH

121,554.00

DIBULATKAN

121,553.00

55,300.00
244,333.00
64,667.00
74,500.00
105,000.00

56,682.50
6,108.33
9,700.05
3,725.00
315.00

JUMLAH

76,530.88

DIBULATKAN

76,530.00

81,000.00
249,167.00
64,667.00
74,500.00
105,000.00

83,025.00
6,229.18
9,700.05
3,725.00
315.00

JUMLAH

102,994.23

DIBULATKAN

102,994.00

21,000.00
249,167.00
64,667.00
74,500.00
105,000.00

189,000.00
6,229.18
9,700.05
3,725.00
315.00

HARGA
SATUAN

JUMLAH

JUMLAH

208,969.23

DIBULATKAN

208,969.00

32,500.00
777,649.00
64,667.00
74,500.00
105,000.00

32,500.00
7,776.49
3,233.35
1,303.75
918.75

JUMLAH

45,732.34

DIBULATKAN

45,732.00

HARGA
SATUAN

51,725.00
249,167.00
210,000.00
63,333.00
221,000.00
64,667.00
74,500.00
105,000.00

JUMLAH

6,207.00
3,737.51
6,090.00
14,249.93
221,000.00
38,800.20
26,075.00
3,675.00

JUMLAH

319,834.63

DIBULATKAN

319,834.00

51,725.00
249,167.00
210,000.00
63,333.00
260,000.00
64,667.00
74,500.00
105,000.00

6,207.00
3,737.51
6,090.00
14,249.93
260,000.00
38,800.20
26,075.00
3,675.00

JUMLAH

358,834.63

DIBULATKAN

358,834.00

51,725.00
21,050.00
671,133.00
4,152,068.00
4,857,785.00
4,857,785.00
122,304.00
48,058.00
182,359.00
39,597.00
121,600.00
14,500.00
7,500.00
55,000.00
10,000.00

5,172.50
526.25
125,837.44
124,562.04
172,046.55
80,963.08
61,152.00
73,048.16
182,359.00
60,187.44
121,600.00
70,083.33
52,500.00
55,000.00
10,000.00

JUMLAH

1,195,037.80

DIBULATKAN

1,195,037.00

HARGA
SATUAN

121,600.00
55,000.00
15,000.00
50,000.00
10,000.00
25,000.00

JUMLAH

121,600.00
55,000.00
11,250.00
12,500.00
13,000.00
25,000.00

JUMLAH

238,350.00

DIBULATKAN

238,350.00

50,050.00
30,250.00
80,600.00
1,500.00
64,667.00
76,833.00
105,000.00
10,000.00

200,200.00
33,275.00
16,120.00
9,000.00
22,956.79
68,189.29
5,591.25
10,000.00

JUMLAH

365,332.32

DIBULATKAN

365,332.00

ngka besi hollow 4x4 + List kayu papan diprofil + finish cat
121,600.00
61,167.00
12,250.00
51,743.00
36,004.00
91,635.00
64,667.00
76,833.00
105,000.00
1,000.00

121,600.00
46,830.98
4,287.50
184,796.43
72,008.00
32,726.79
14,226.74
26,891.55
4,830.00
1,000.00

JUMLAH

509,197.99

DIBULATKAN

509,197.00
551,200.00
49,400.00
50,000.00
1,500.00
74,500.00

257,226.67
37,050.00
50,000.00
3,000.00
66,118.75

HARGA
SATUAN

JUMLAH

85,167.00
105,000.00
1,000.00

851.67
5,596.50
1,000.00
420,843.59
420,843.00

551,200.00
121,600.00
55,000.00
74,500.00
85,167.00
105,000.00
1,000.00

257,226.67
72,960.00
55,000.00
66,118.75
851.67
5,596.50
1,000.00
458,753.59
458,753.00

25,000.00
64,667.00
105,000.00

26,250.00
1,293.34
210.00
27,753.34
27,753.00

51,725.00
134,427.00
122,304.00
48,058.00
1,000.00

30,647.06
318,591.99
953,971.20
511,096.83
1,000.00
1,815,307.08
1,815,307.00

242,200.00
500.00
63,333.00
1,029,161.00
60,000.00
74,500.00
105,000.00

135,632.00
37,500.00
202,665.60
89,228.26
91,968.00
5,580.05
2,614.50
565,188.41
565,188.00

JUMLAH
DIBULATKAN

JUMLAH
DIBULATKAN

JUMLAH
DIBULATKAN

JUMLAH
DIBULATKAN

JUMLAH
DIBULATKAN

NO.

URAIAN

KOEF.

SAT.

PEKERJAAN MEKANIKAL ELEKTRIKAL


1 Titik

- Instalasi Lampu (kabel NYM 3x2,5 mm)

Kabel NYM 3x2.5 mm


Klem kabel
Pipa PVC AW 1/2"
Pembantu Instalator
Instalator
Mandor

5.0000
1.0000
2.0000
0.3715
0.1050
0.0050

m
dus
m
hr
hr
hr
JUMLAH
DIBULATKAN

1 Titik

- Instalasi Saklar/Stop Kontak (kabel NYM 3x2,5 mm)

Kabel NYM 3x2.5 mm


Klem kabel
Pipa PVC AW 1/2"
Pembantu Instalator
Instalator
Mandor

5.0000
1.0000
2.0000
0.3715
0.1050
0.0050

m
dus
m
hr
hr
hr
JUMLAH
DIBULATKAN

1 Titik

- Pasang Saklar Tunggal

Saklar tunggal
Pembantu Instalator
Instalator
Mandor

1.0000
0.2500
0.1500
0.0050

bh
hr
hr
hr
JUMLAH
DIBULATKAN

1 Titik

- Pasang Saklar Ganda

Saklar ganda
Pembantu Instalator
Instalator
Mandor

1.0000
0.2500
0.1500
0.0050

bh
hr
hr
hr
JUMLAH
DIBULATKAN

1 titik

- Lampu TL 2 x 18 watt (inbouw) termasuk bahan komplit

Lampu TL 2 x 18 watt, armatur, komplit

1.0000

bh

NO.

URAIAN
Pembantu instalator
Instalator
Mandor
Alat bantu

KOEF.
0.3132
0.1045
0.0050
0.3000

SAT.
hr
hr
hr
set
JUMLAH
DIBULATKAN

NO.

URAIAN
1 titik

KOEF.

SAT.

- Lampu SL 18 watt (inbouw) termasuk bahan komplit

Lampu SL 18 watt, armatur, komplit


Fitting keramik
Pembantu instalator
Instalator
Mandor
Alat bantu

1.0000
1.0000
0.3132
0.1045
0.0050
0.3000

bh
bh
hr
hr
hr
set
JUMLAH
DIBULATKAN

1 Bh

- Pasang Stop Kontak

Stop Kontak
Pembantu Instalator
Instalator
Mandor

1 unit

1.0000
5.0000
5.0000
10.0000
0.8122
0.3112
0.0050

unit
m1
m1
m1
hr
hr
hr
JUMLAH
DIBULATKAN

10.0000
10.0000
0.8210
0.1910
0.0050

m1
m1
hr
hr
hr
JUMLAH
DIBULATKAN

1.0000
1.0000
1.2621

unit
bh
hr
JUMLAH
DIBULATKAN

- Pemasangan Kabel Coaxial

Coaxial cable dia. 35 m


NYM 3 x 2.5 mm
Pembantu Instalator
Tukang listrik
Mandor

1 unit

bh
hr
hr
hr
JUMLAH
DIBULATKAN

- Pemasangan pipa dan Air terminal EF

Air terminal EF system R.150


Pipa GIP dia. 2"
Pipa GIP dia. 3"
Pipa PVC class AW dia. 2"
Pembantu Instalator
Tukang listrik
Mandor

1 unit

1.0000
0.2500
0.1500
0.0050

- Pas. Penangkal Petir

Pemasangan pipa dan Air terminal EF


Pemasangan Kabel Coaxial dan Lampu
Bak kontrol 40 x 40 x 30 cm

NO.

URAIAN
1 Bh

SAT.

- Lampu Pagar

Lampu pagar minimalis 18 watt


Pekerja
Tukang listrik
Mandor
Alat bantu

1 Titik

KOEF.

1.0000
0.3132
0.1045
0.0050
0.3000

bh
hr
hr
hr
set
JUMLAH
DIBULATKAN

- Pasang Lampu Bared kotak

Rumah lampu bared


Lampu SL 40 watt
Pembantu Instalator
Instalator
Mandor

1.0000
1.0000
0.2500
0.1500
0.0050

bh
bh
hr
hr
hr
JUMLAH
DIBULATKAN

HARGA SATUAN

25,000.00
3,500.00
5,250.00
67,500.00
85,167.00
105,000.00

JUMLAH

125,000.00
3,500.00
10,500.00
25,076.25
8,942.54
525.00

JUMLAH

173,543.79

DIBULATKAN

173,543.00

25,000.00
3,500.00
5,250.00
67,500.00
85,167.00
105,000.00

125,000.00
3,500.00
10,500.00
25,076.25
8,942.54
525.00

JUMLAH

173,543.79

DIBULATKAN

173,543.00

27,000.00
67,500.00
85,167.00
105,000.00

27,000.00
16,875.00
12,775.05
525.00

JUMLAH

57,175.05

DIBULATKAN

57,175.00

27,000.00
67,500.00
85,167.00
105,000.00

27,000.00
16,875.00
12,775.05
525.00

JUMLAH

57,175.05

DIBULATKAN

57,175.00

180,000.00

180,000.00

HARGA SATUAN
67,500.00
85,167.00
105,000.00
1,000.00

JUMLAH
21,141.00
8,899.95
525.00
300.00

JUMLAH

210,865.95

DIBULATKAN

210,865.00

HARGA SATUAN

43,750.00
27,500.00
67,500.00
85,167.00
105,000.00
1,000.00

JUMLAH

43,750.00
27,500.00
21,141.00
8,899.95
525.00
300.00

JUMLAH

102,115.95

DIBULATKAN

102,115.00
13,910.00
67,500.00
85,167.00
105,000.00

13,910.00
16,875.00
12,775.05
525.00
44,085.05
44,085.00

28,000.00
91,866.67
109,366.67
13,250.00
67,500.00
85,167.00
105,000.00

28,000.00
459,333.35
546,833.35
132,500.00
54,823.50
26,503.97
525.00
1,248,519.17
1,248,519.00

30,000.00
14,500.00
67,500.00
85,167.00
105,000.00

300,000.00
145,000.00
55,417.50
16,266.90
525.00
517,209.40
517,209.00

1,248,519.00
517,209.00
125,000.00

1,248,519.00
517,209.00
157,762.50
1,923,490.50
1,923,490.00

JUMLAH
DIBULATKAN

JUMLAH
DIBULATKAN

JUMLAH
DIBULATKAN

JUMLAH
DIBULATKAN

HARGA SATUAN

JUMLAH

79,529.00
60,000.00
85,167.00
105,000.00
1,000.00

79,529.00
18,792.00
8,899.95
525.00
300.00
108,045.95
108,045.00

120,000.00
55,000.00
67,500.00
85,167.00
105,000.00

120,000.00
55,000.00
16,875.00
12,775.05
525.00

JUMLAH
DIBULATKAN

JUMLAH

205,175.05

DIBULATKAN

205,175.00

NO.

URAIAN

KOEF.

SAT.

PEKERJAAN BONGKARAN
1 m2

- Bongkar bangunan total (manual)

Pekerja
Mandor

2.3520
0.0388

hr
hr
JUMLAH
DIBULATKAN

1 m3

- Bongkar struktur Bangunan ( dengan alat berat )

Pekerja
Mandor
Kompresor kap.400 - 6500 ltr/menit
Jack Hammer

1.9600
0.0323
0.1000
0.1000

hr
hr
jam
set
JUMLAH
DIBULATKAN

1 m2

- Bongkar dinding bata merah

Pekerja
Mandor

0.1000
0.0250

hr
hr
JUMLAH
DIBULATKAN

1 m2

- Bongkar lantai keramik

Pekerja
Mandor

0.0800
0.0250

hr
hr
JUMLAH
DIBULATKAN

1 m2

- Bongkar genteng

Pekerja
Mandor
Alat bantu

0.0400
0.0100
1.0000

hr
hr
set
JUMLAH
DIBULATKAN

1 m2

- Bongkar rangka atap

Pekerja
Tukang kayu
Mandor

0.2000
0.0550
0.0102

hr
hr
hr

Alat bantu

1.0000

set
JUMLAH
DIBULATKAN

1 m2

- Bongkar plafond

Pekerja
Mandor
Alat bantu

0.1250
0.0500
1.0000

hr
hr
set
JUMLAH
DIBULATKAN

1 m2

- Pekerjaan kupasan dinding

Pekerja
Mandor
Alat bantu

0.0500
0.0250
1.0000

hr
hr
set
JUMLAH
DIBULATKAN

1 m2

- Bongkar dinding bata

Pekerja
Mandor
Alat bantu

0.3300
0.0330
2.0000

hr
hr
set
JUMLAH
DIBULATKAN

1 m2

- Bongkar pintu besi

Pekerja
Mandor
Alat bantu

0.3300
0.0330
2.0000

hr
hr
set
JUMLAH
DIBULATKAN

1 m'

- Bongkaran karpusan genteng morando glasuur

Pekerja
Mandor
Alat bantu

0.0500
0.0225
1.0000

hr
hr
set
JUMLAH
DIBULATKAN

1 m'

- Bongkaran listplank 3 / 30 + 3 / 15 kayu kamper banjar

Pekerja
Tukang kayu
Mandor

0.0840
0.1680
0.0216

hr
hr
hr
JUMLAH
DIBULATKAN

1 kg

- Bongkar konstruksi gording besi

Pekerja
Tukang besi
Mandor
Erection

0.0600
0.0045
0.0025
1.0000

hr
hr
hr
kg
JUMLAH
DIBULATKAN

HARGA
SATUAN

64,667.00
105,000.00

JUMLAH

152,096.78
4,074.00

JUMLAH

156,170.78

DIBULATKAN

156,170.00

64,667.00
105,000.00
58,467.00
19,417.00

126,747.32
3,391.50
5,846.70
1,941.70

JUMLAH

137,927.22

DIBULATKAN

137,927.00

64,667.00
105,000.00

6,466.70
2,625.00

JUMLAH

9,091.70

DIBULATKAN

9,091.00

64,667.00
105,000.00

5,173.36
2,625.00

JUMLAH

7,798.36

DIBULATKAN

7,798.00

64,667.00
105,000.00
1,000.00

2,586.68
1,050.00
1,000.00

JUMLAH

4,636.68

DIBULATKAN

4,636.00

64,667.00
105,000.00
105,000.00

12,933.40
5,775.00
1,071.00

1,000.00

1,000.00

JUMLAH

20,779.40

DIBULATKAN

20,779.00

64,667.00
105,000.00
1,000.00

8,083.38
5,250.00
1,000.00

JUMLAH

14,333.38

DIBULATKAN

14,333.00

64,667.00
105,000.00
1,000.00

3,233.35
2,625.00
1,000.00

JUMLAH

6,858.35

DIBULATKAN

6,858.00

64,667.00
105,000.00
1,000.00

21,340.11
3,465.00
2,000.00

JUMLAH

26,805.11

DIBULATKAN

26,805.00

64,667.00
105,000.00
1,000.00

21,340.11
3,465.00
2,000.00

JUMLAH

26,805.11

DIBULATKAN

26,805.00

64,667.00
105,000.00
1,000.00

3,233.35
2,362.50
1,000.00

JUMLAH

6,595.85

DIBULATKAN

6,595.00

64,667.00
76,833.00
105,000.00

5,432.03
12,907.94
2,268.00

JUMLAH

20,607.97

DIBULATKAN

20,607.00

64,667.00
74,500.00
105,000.00
10,000.00

3,880.02
335.25
262.50
10,000.00

JUMLAH

14,477.77

DIBULATKAN

14,477.00

Anda mungkin juga menyukai