II
PEKERJAAN
2
PEKEKERJAAN PEMBONGKARAN
1 Bongkar atap seng,+ nok
2 Bongkar penutup plapon
3 Bongkar kaso/ reng
PEKERJAAN KAYU
1 Lisplank kalsiplank 9 mm
2 Rangka atap reng 3/5
3 Rangka atap kaso 5/7
KODE
VOLUME
SAT
HARGA
BIAYA
B6
B7
B9
H 16
H.13
H.13
G.2
G.3
I.4
I.1
I.10
N.2
N.3
N.4
N.7
J.2
J.4
J.5
J4
J1
O.13
J1
203.52
192.72
203.52
36.00
203.52
203.52
203.52
30.00
0.15
6.00
9.00
3.00
192.72
192.72
294.00
15.00
6.00
21.00
3.00
145.50
12.00
31.80
7.68
40.00
45.00
18.00
M2
M2
M2
Sub total
M1
M2
M2
Sub total
M2
M1
Sub total
M3
Bh
Bh
Bh
Sub total
M2
M2
M1
Sub total
Bh
Bh
Psg
Bh
Sub total
M2
M2
M2
M2
M2
M1
M1
Sub total
2
1
2
VIII PEKERJAAN SANITASI
1
Penggantian klosed jongkok
2
Floor drain
3
Perbaikan septictank+resapan
3
K2
K18
-
PEKERJAAN PENGECATAN
1
Cat dinding dinding
2
Cat plafon
3
Cat kayu/ kilap
L.2
L.2
L.5
4
3.00
3.00
2.00
3.00
3.00
760.50
192.72
122.82
Bh
Bh
Unit
Sub total
Unit
Unit
Sub total
M2
M2
M2
Sub total
Total
Dibulatkan
Terbilang:
Lokasi , Tanggal
PERUSAHAAN ( PT/CV )
CAP/TANDA TANGAN
Nama Direktur
Jabatan