PROJECT
MANAGEMENT
Taufik A. Taudjidi / M.
Haris
COURSE CONTENT
PERKENALAN
@ Umum
@ ENGINEERING
@ Procurement
@ construction
URAIAN PROYEK
AtURAN MANAJEMEN PROYEK
organiSASI
administraSI PROYEK
schedule ,engineering,procurement
,construction.
Taufik A. Taudjidi / M.
Haris
PRE ENGINEERING
SITE SURVEY
PENYELIDIKAN TANAH
ENVIROMENTAL & KONDISI
DATA
PEMILIHAN LOKASI
KONSTRUKSI
Taufik A. Taudjidi / M.
Haris
PEMBELIAN
@ LOKAL
@ LUAR NEGERI
PROCUREMENT
LOGISTIK
@ Transportasi
@ material handling
@ tempat penyimpanan
Taufik A. Taudjidi / M.
Haris
ENGINEERING
CONCEPTUAL DESIGN
BASIC DESIGN
DETAIL DESIGN
AS BUILD DRAWING
Taufik A. Taudjidi / M.
Haris
DETAIL DESIGN
Taufik A. Taudjidi / M.
Haris
CONSTRUCTION
CALCULATIONS
cONSTRUCTION
PROCEDURES
MATERIALS TAKE
OFF
DETAIL DRAWINGS
PEMBERI KERJA :
# MEMBUKA RAPAT DAN
MEMPERKENALKAN DI
RI.
# MENERANGKAN LING
KUP PROYEK
# MENERANGAKAN PIM
PINAN PROYEK
# MENERANGKAN CARA
BERKOMUNIKASI
# MENANYAKAN PIMPI
NAN PROYEK KONTRAK
TOR
# MENANYAKAN KESIAPAN
KONTRAKTOR
# MEMBERITAHU PERTE
MUAN BERIKUTNYA
Taufik A. Taudjidi / M.
Haris
KONTRAKTOR :
# MEMPERKENALKAN
DIRI
# MENERANGKAN
PIMPINAN
PROYEK
# MEMBERI GAMBARAN
SINGKAT MENGENAI
KESI
APAN PELAKSANAAN
PRO
YEK
# MENANYAKAN
CARBERKO
MUNIKASI
# MENANYAKAN
PERTEMU
AN BERIKUTNYA
PROJECT ENGINEERING
MENENTUKAN OBJEKTIVE ,
KRITERIA DAN KEBUTUHAN
MENENTUKANKAN SELURUH
PEKERJAAN PERENCANAAN
FORMALISASIKAN PEKERJAAN
PERENCANAAN
Taufik A. Taudjidi / M.
Haris
PROJECT PLAN
Taufik A. Taudjidi / M.
Haris
Taufik A. Taudjidi / M.
Haris
10
CONTROLABLE ITEMS
BUDGET CONTROL
MATERIAL CONTROL
LABOR CONTROL
SUBCONTRACT CONTROL
TIME CONTROL
Taufik A. Taudjidi / M.
Haris
11
DEVELOPING PROJECT
PARAMETERS
Taufik A. Taudjidi / M.
Haris
12
DIFFERENCE BETWEEN
FORECASTS & ESTIMATES
BASIS FOR
ESTIMATES
@ CONCEPTUAL SCO
PE INFORMATION
@ FIRM MAJOR EQUIP
MENT P.O.S
@ BROAD EST.PARA
METER
@ HISTORICAL
EXPERIENCE
Taufik A. Taudjidi / M.
Haris
BASIS FOR
FORECASTS
@ FIRM DESIGN
INFORMATION
@ FIRM EQUIPMENT P.O.S
@ ACTUAL FIELD LABOUR
EXPERIENCES
13
QA
DWGS.& SPECS.
FOR PROCURMENT
PROCURMENT
VENDORS
DWGS.& SPECS
FOR CONSTRUCTION
CONSTRUCTION
SUBCONTRACTOR
OPERATIONAL
REQUIRMENTS
Taufik A. Taudjidi / M.
Haris
OPERATIONS
14
18 QUALITY STANDARD
QUALITY ASSURANCE
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
Taufik A. Taudjidi / M.
Haris
15
QUALITY ASSURANCE
QA ORGANIZATION IS RES
PONSIBLE FOR DEFINING
& COORDINATING THE
QUALITY ASSURANCE
PROGRAM & FOR MONIO
RING & AUDITING PROG
RAM ACTIVITIES TO VERI
FY COMPLIANCE WITH ES
TABLISHED REQUIRMENTS
& TO MEASURE PROGRAM
EFEVTIVENESS.
Taufik A. Taudjidi / M.
Haris
CONSTRUCTION QUA
LITY CONTROL
CONSTRUCTION QUALI
TY CONTROL IS RESPON
SIBLE FOR QUALITY VERI
FICATION INSPECTION &
SUBCONTRACTOR SURVEI
LLANCE INSPECTION ACTI
VITIES DURING THE CONS
TRUCTION PHASE.
16
CONSTRUCTION QUALITY
CONTROL MANUAL
Taufik A. Taudjidi / M.
Haris
17
Type oF training
@ orientation and
indoctrination
@ procedures and
methods
@ supplementary qa/qc
technical
training
Taufik A. Taudjidi / M.
Haris
18
Inspection report
@
TIPE PENYELIDIKAN
HASIL INSPEKSI
Taufik A. Taudjidi / M.
Haris
19
Project administration
Taufik A. Taudjidi / M.
Haris
20
RECORDS MANAGEMENT
Taufik A. Taudjidi / M.
Haris
21
RELATIONSHIP OF QA ASSESSMENT TO
DESIGN AND QA.
FLOW CHART
DESIGN
Taufik A. Taudjidi / M.
Haris
QA
ASSESSMENT
QA
22
QUALITY ASSURANCE
Taufik A. Taudjidi / M.
Haris
23
PURCHASING PLANNING
MERIVIEW KONTRAK
POLESI PEMILIK PEKERJAAN
LOKASI PROYEK
JADWAL PENGADAAN/PEMBELIAN BARANG/MATERIAL
DAFTAR REKANAN
SIAPKAN DOKUMEN PEMBELIAN SESUAI KEBUTUHAN
BUAT LAPORAN PENGADAAN/PEMBELIAN DENGAN BAIK DAN BENAR
Taufik A. Taudjidi / M.
Haris
24
BIDDING PROCESS
MATERIAL REQUISITION
HECKLE SHEET
SOURCE SELECTION
BID REQUEST
LATE BIDS
Taufik A. Taudjidi / M.
Haris
25
BID EVALUATION
PROCUREMENT COMMERCIAL
ENGINEERING TECHNICAL
OTHERS
Taufik A. Taudjidi / M.
Haris
26
APPROVAL/cOMMITMENT
METHODS OF
COMMITMENT
CLIENT DIRECTED
COMMITMENTS
COMMITMENT
REGISTER
NOTICE TO
UNSUCCESSFUL
BIDDERS
Taufik A. Taudjidi / M.
Haris
27
PURCHASING DOCUMENTS
Purchase contrack
Taufik A. Taudjidi / M.
Haris
28
Unit price
Taufik A. Taudjidi / M.
Haris
29
Purchasing schedule
Mr
Sources
Rfq
Evaluate
Recommend
Approve
award
Taufik A. Taudjidi / M.
Haris
30
Taufik A. Taudjidi / M.
Haris
31
Procurement method
Fabrication method
Installation procedure
Test procedure
Construction method
Structure organization & MAN POWER
Schedule
appendices
Taufik A. Taudjidi / M.
Haris
32
QA & QC
QA
QA ORGANIZATION IS
RESPONSIBLE FOR DE
FINING AND COORDINA
TING THE QUALITY AS
SURANCE PROGRAM &
FOR MONITORING & AU
DITING PROGRAM ACTI
VITIES TO VERIFY COM
PLIANCE WITH ESTAB
LISHED REQUIRE
MENTS & TO MEASURE
PROGRAM EFECTIVENESS
Taufik A. Taudjidi / M.
Haris
QC
CONSTRUCTION
QUALITY CONTROL
IS RESPONSIBLE
FOR QUALITY VERI
FICATION INSPEC
TION AND SUB
CONTRACTOR SUR
VEILLANCE INS
PECTION ACTIVITI
ES DURING THE CONS
TRUCTION PHASE
33
CONSTRUCTION
MANAGEMENT
SITE ENGINERING
SITE
PROCUREMENT
SITE
CONSTRUCTION
Taufik A. Taudjidi / M.
Haris
34
SITE ENGINEERING
CONSTRUCTION
DRAWINGS
INSTALLATION
PROCEDURES
TEST
PROCEDURES
AS BUILD DWGS
Taufik A. Taudjidi / M.
Haris
35
CONSTRUCTION PROCUREMENT ON
SITE
LOCAL PURCHASE
Taufik A. Taudjidi / M.
Haris
36
SAFETY PLAN
Taufik A. Taudjidi / M.
Haris
37
WAREHOUSES
WAREHOUSE/STORAGE :
GUDANG TERBUKA
GUDANG TERTUTUP
DAERAH LAPANGAN TERBUKA
Taufik A. Taudjidi / M.
Haris
38
CONSTRUCTION
PERSIAPAN LOKASI
PEMBERSIHAN LOKASI
BUAT KANTOR DILOKASI BILA
PERLU
SIAPKAN TATA LETAK ATAU LAY
OUT PROYEK
BUAT PONDASI
BUAT STRUKTUR
BANGUNAN/PABRIK
SELESAIKAN PEKERJAAN
KONSTRUKSI
PRECOMMISSIONING/COMMISSI
ONING(HANYA BAGI PABRIK)
COMMISSIONING (HANYA BAGI
PABRIK)
START UP (HANYA BAGI PABRIK)
Taufik A. Taudjidi / M.
Haris
39
CM.ORGANIZATION
SITE MANAGERS
SITE ENGINEERS
SITE/FIELD INSPECTORS
SITE/FIELD SUPERVISORS
SITE ADMINISTRATION HEAD
SITE PROCUREMENT ,LOGISTIC & WAREHOUSE HEAD
SITE FINANCIAL & ACCOUNTING HEAD
BASE CAMP HEAD
SECURITY HEAD
LIAISON OFFICER
Taufik A. Taudjidi / M.
Haris
40
CREATE A SYSTEM OF WORK THAT HAS A HIGH STANDARD OF HEALTH ,ENVIRONMENTAL &
SAFETY ,FOR ITS EMPLOYEES AND ASSOCIATED WORKING PARTNER(S) AT ANY PLACE
INCOPERATE THAT SAME STANDARD INTO THE DESIGN ,CONSTRUCTION AND OPERATION OF
ANY EQUIPMENT OF WORK SYSTEMS IN WHICH THE COMPANY IS INVOLVED
ACKNOWLEDGE THE PRINCIPLE THAT ALL ACCIDENTS CAN BE PREVENTED AND ACTIVELY
PROMOTE ,AMONG ALL THOSE ASSOCIATED WITH ITS ACTIVITIES ,THE HIGHES STANDARDS
OF HEALTH ,ENVIRONMENTAL & SAFETY AWARENESS AND PERFORMANCE.
Taufik A. Taudjidi / M.
Haris
41
PO
SO
SC
LOI
LC
RIB
RFQ
MASTER LIST
CARGO MANIFEST
MILLSERT.
TAG NO.
QA/QC
STOCKIST
STOCK CODE
BUFFER STOCK
EXPEDITING
PINALTY
PACAGING
CARGO
DELIVERY ORDER (DO)
VENDOR MANUAL
TOR
SPEC.
DATA SHEET
Taufik A. Taudjidi / M.
Haris
VARIATION ORDER
CHANGE ORDER
ADDENDUM CONTRACT
AMANDEMENT CONTRACT
ORIGINATOR
MATERIAL HANDLING
LAYDOWN AREA
WAREHOUSE/STORAGE
LONGLEAD ITEMS
GUARANTY/WARRANTY
MR
MRR
BULK MATERIAL
PALLET
ACCESSORIES EQUIPMENT
BAYERS
CUSTOM CLEARENCE
LOT ,UNIT ,PEACE, KG,PACK,
BOX,DRUM,GALLON ,L,KG,M,KM
DOWN PAYMENT
MTO/BOM
BLUCKET ORDER
USAGE PLAN
CONTRACT AWARD
42