Anda di halaman 1dari 12

Company

opito

adc eng

simplysafety
thinkplus

arberdeen inter.

spe

actual progress
0
1
2
3

0
1
4
9.88

4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

15.76
21.64
30
37
40.87
49.98
59.388
68.796
70.56
72.324
80.556
91.14
93.08
96.5
100
100

88
Course Detail
oil and gas well technology(3modules)
each modules(40-60hours)
introduction to oil and gas
understanding rig inspection
understanding drilling equipment
iwcf lvl 2
understanding dropped objects
iadc rig pass
iwcf lvl 2

iwcf lvl 2
1day basic drilling awareness
1day interoduction to well services and well integrity

Advanced Completion Technology: Intelligent Wells, ICD's and AICD's

planned progress
0
5.88
11.76
17.64

23.52
29.4
35.28
41.16
47.04
52.92
58.8
64.68
70.56
76.44
82.32
88.2
94.08
99.96
100
100

pound=5.6
us=3.56

sg=2.7
mode of study

Fee
200 pound
50 pound
3225 pound
2445 pound
890 pound
225 pound
450 sg

5.6
5.6
5.6
5.6
5.6
5.6

RM
1120
280
18060
13692
4984
1260

2.7

1215

287.35

1260

5399
3799
1800
1900

2.7
2.7
3.56
3.56

5500
2500
2500
14577.3
10257.3
6408
6764

internet
internet
internet
internet
internet
internet

1215

tutor
tutor
tutor

5500

tutor

2500

tutor

6408

tutor
tutor

5500

days

2
3

17170.35

5.88

5.88
S-CURVE PROGRESS FOR TOPSIDE RISER MAINTENANCE AND HOT BOLTING SERVICES AT LEDANG PLATF
11.76
17.64
100
80
60

S-CURVE PROGRESS FOR TOPSIDE RISER MAINTENANCE AND HOT BOLTING SERVICES AT LEDANG PLATF
23.52
29.4
35.28
41.16
47.04
52.92
58.8
64.68
70.56
76.44
82.32
88.2
94.08
99.96
100
100

100
80
60
Percentage of Progress (%)

40
20
0
0

12

16

Day(s)
Overall Actual Progress(%)

Overall Planned Progress(%)

20

date

1st wed of month

5-6sept
5-6sept

SERVICES AT LEDANG PLATFORM (LDP-A)

Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Monday
Tuesday
Wednesday

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

SERVICES AT LEDANG PLATFORM (LDP-A)

12

16

nned Progress(%)

20

june

iwcf well control.OGA 2015

july
well control
well control
rig pass

iwcf well intervention

well control

august

september

spe advance well completion penang


before 6 july usd1800

Anda mungkin juga menyukai