actual progress
0
1
2
3
0
1
4
9.88
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
15.76
21.64
30
37
40.87
49.98
59.388
68.796
70.56
72.324
80.556
91.14
93.08
96.5
100
100
88
Course Detail
oil and gas well technology(3modules)
each modules(40-60hours)
introduction to oil and gas
understanding rig inspection
understanding drilling equipment
iwcf lvl 2
understanding dropped objects
iadc rig pass
iwcf lvl 2
iwcf lvl 2
1day basic drilling awareness
1day interoduction to well services and well integrity
planned progress
0
5.88
11.76
17.64
23.52
29.4
35.28
41.16
47.04
52.92
58.8
64.68
70.56
76.44
82.32
88.2
94.08
99.96
100
100
pound=5.6
us=3.56
sg=2.7
mode of study
Fee
200 pound
50 pound
3225 pound
2445 pound
890 pound
225 pound
450 sg
5.6
5.6
5.6
5.6
5.6
5.6
RM
1120
280
18060
13692
4984
1260
2.7
1215
287.35
1260
5399
3799
1800
1900
2.7
2.7
3.56
3.56
5500
2500
2500
14577.3
10257.3
6408
6764
internet
internet
internet
internet
internet
internet
1215
tutor
tutor
tutor
5500
tutor
2500
tutor
6408
tutor
tutor
5500
days
2
3
17170.35
5.88
5.88
S-CURVE PROGRESS FOR TOPSIDE RISER MAINTENANCE AND HOT BOLTING SERVICES AT LEDANG PLATF
11.76
17.64
100
80
60
S-CURVE PROGRESS FOR TOPSIDE RISER MAINTENANCE AND HOT BOLTING SERVICES AT LEDANG PLATF
23.52
29.4
35.28
41.16
47.04
52.92
58.8
64.68
70.56
76.44
82.32
88.2
94.08
99.96
100
100
100
80
60
Percentage of Progress (%)
40
20
0
0
12
16
Day(s)
Overall Actual Progress(%)
20
date
5-6sept
5-6sept
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Monday
Tuesday
Wednesday
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
12
16
nned Progress(%)
20
june
july
well control
well control
rig pass
well control
august
september