RENCANA INDUK JARINGAN TRANSMISI


DAN DISTRIBUSI GAS BUMI NASIONAL

Information:

Existing transmission pipe


(Open Access)
Plan of transmission pipe
(Open Access)
Existing transmission pipe
(Upstream Dedicated)
Plan of transmission pipe
(Upstream Dedicated)

Existing Distribution pipe


(Downstream Dedicated)
Plan of Distribution pipe
(Downstream Dedicated)
LPG refineries (Production)
LPG refineries
(not running)

LNG Floating Storage


Receiving Terminal
LNG Refineries
LNG Refineries
(Planned)

Copyright BPH Migas 2013, All Rights Reserved

PIPA GAS BUMI EKSISTING


PIPA PENGANGKUTAN
(OPEN ACCESS)

PIPA NIAGA
DEDICATED HILIR

Panjang total 3773,82 km


Diameter antara 8 32 inchi

Panjang total 4213,54 km


Diameter antara 20 mm 32 inchi

Pengangkutan
Badan Usaha Panjang (km) Prosentase

PGN
Pertagas
TGI
BU Lain

1,038.40
1,589.29
1,006.00
140.13

27.52%
42.11%
26.66%
3.71%

Dedicated Hilir
Badan Usaha

PGN
BU Lain

Panjang (km)

3,877.41
336.13

Prosentase

92%
8%

Copyright BPH Migas 2013, All Rights Reserved

PIPA GAS BUMI EKSISTING


PIPA PENGANGKUTAN
(OPEN ACCESS)

PIPA NIAGA
DEDICATED HILIR

Panjang total 3773,82 km


Diameter antara 8 32 inchi

Panjang total 4213,54 km


Diameter antara 20 32 inchi

Pipa Transmisi Diameter 32


& 36 inchi, Panjang 627,90
Km

Copyright BPH Migas 2013, All Rights Reserved

PEMBANGUNAN RUAS TRANSMISI GAS BUMI


OLEH PEMENANG LELANG HAK KHUSUS
KALIJA (Bontang-Semarang), 1115 km,

kapasitas 700 -1000 MMSCFD oleh PT Bakrie


& Brothers Tbk, dengan membangun ruas
pipa Kepodang Tambak Lorok sebagai
pembangunan Kalija Tahap I on stream Mei
2015
GRESEM (Gresik-Semarang), 258 km,

kapasitas 350-500 MMSCFD oleh PT


Pertamina, yang direncanakan on stream
pada 2015.
CISEM (Cirebon-Semarang), 255 km,

kapasitas 350-500 MMSCFD oleh PT


Rekayasa Industri, masih menunggu
ketersediaan gas

Copyright BPH Migas 2013, All Rights Reserved

PEMBANGUNAN RUAS TRANSMISI GAS BUMI


KALIMANTAN JAWA (KALIJA)

Kalija

Kalija Tahap I (Kepodang Semarang), saat ini status


sedang dalam persiapan konstruksi, penyiapan
Dokumen Lelang EPC
Kalija Tahap II (Bontang Semarang), saat ini status
dibentuk konsorsium Offtaker Gas Bumi

Copyright BPH Migas 2013, All Rights Reserved

PEMBANGUNAN RUAS TRANSMISI GAS BUMI


GRESIK SEMARANG (GRESEM)

Gresem
Pasokan Gas :
a. Sesuai dengan surat Menteri ESDM kepada Kepala SKK Migas Nomor : 1365/12/MEM.M/2013 bahwa pasokan gas
untuk PKC sebesar 85 MMSCFD berasal dari Lapangan Gas Bumi Jambaran, Cendan dan Tiung Biru yang
dioperasikan oleh PT Pertamina Cepu

b. Sesuai dengan surat Menteri ESDM kepada Kepala SKK Migas Nomor : 0890/15/MEM.M/2013 bahwa untuk
kebutuhan pasokan gas FSRU awa Tengah pada tahun 2014 dipasok sebesar 16 kargo yang akan diselesaikan
pembangunannya pada tahun 2016
c. Pertamina mengharapkan agar sisa alokasi gas dari PEPCI sekitar 100 MMSCFD dapat dialokasikan untuk
Pertamina Gas Niaga untuk mendukung pelaksanaan pembangunan pipa
Final Investment Decisions diharapkan sudah diterbitkan pada Desember 2013
Saat ini telah dikoordinasikan dengan Pemerintah Daerah Pemda Jawa Tengah dan Jawa Timur untuk
menginventarisasi potensi kebutuhan gas daerah sesuai jalur rencana pembangunan pipa.
PT Pertamina mengusulkan kepada BPH Migas bahwa Pembangunan pipa Gresik Semarang agar menggunakan
sistem Strategic Partnership dengan Sumber Petrindo Perkasa yang saat ini sudah selesai membangun pipa dari
Semarang ke Cepu dan akan dilanjutkan oleh PT Pertamina dari Cepu ke Gresik sepanjang sekitar 130 Km yang
diharapkan dapat diselesaikan pada tahun 2014.

Copyright BPH Migas 2013, All Rights Reserved

PROYEK PEMBANGUNAN PIPA


GUNDIH-SEMARANG OLEH PT SPP
Keterangan:
saat ini perkembangan
pembangunan pipanya sudah
mencapai 97,08% dan tinggal
menunggu commisioning test

Gas Delivery Point


Gas Compressor
Station

Gas Receiving Station

Proposed 20
+140km Gas
Pipeline

GAS LOCATION

Copyright BPH Migas 2013, All Rights Reserved

PEMBANGUNAN RUAS TRANSMISI GAS BUMI


CIREBON SEMARANG (CISEM)

Cisem

Untuk pembangunan pipa ini terkendala pada pasokan


gas (dapat memanfaatkan surplus gas dari FSRU
Jawa Tengah) dan kepastian kebutuhan Gas Bumi
oleh PT. PLN sebagai anchor buyer

Copyright BPH Migas 2013, All Rights Reserved

PROYEK PEMBANGUNAN PIPA TRANSMISI GAS ARUN BELAWAN


Paid , on payment process
or no acquisition needed

Re-route

Segmen 2 : 139
KM

Segmen 1 : 124.58
KM

PT.
Arun/
DJKN
35 Km

POINT
A

Medco
11 Km

Segmen 3 : 71
KM

Aceh Timur :
Bupati akan mendata
penduduk Aceh Timur dan
akan diserahkan pada tim
Legal

PTPN I 18 KM
Bumi Flora 12.6 Km

Villagers
1.9 Km

Bumi Flora 6 Km

Rantau Panjang
Exxon Mobil 38 Km

Reroute dari ROW Medco:


32.5 KM
1. PTPN I: 18 KM
2. Bumi Flora: 12.6 KM
3. Villagers: 1.9 KM

Aceh Tamiang :
Selesai pembahasan
Komersial

PTPN I 4 Km
Villagers 3 Km

SLS A
Villagers 6 Km
Wahyu Rizki 6
Km
Minamas 8 Km
Damar Siput 3 Km
PTPN I, 11 Km

Timbang Langsa 4 Km

Patria Kamau 5
Km
Villagers, 1 Km

Keterangan:
Saat ini sedang dalam tahap
konstruksi dan pembangunan pipa
sudah mencapai sekitar 45 km

Pekerjaan construction
EPC mencapai 48KM

PTPN I 10 Km
PTPN I 4 Km

Tg.Seumeunt

ok
Arco 3 Km
Mainly villagers
12Km
Dapat
Construction Plan1
melakukan
From
To
Segmen
konstruksi
PEP
P. Brandan
Segmen 3
Belawan
Rantau
Segmen 2
P. Brandan
Rantau Panjang
and PEP P.
Susu
Segmen 1
Rantau Panjang Point B
59 Km

10

Land Clearing di segmen 2


mencapai 29 KM (Ref.
Laporan KCS 04.11.2013)

Bukit
Krud
POINT
B

No approach, approach or survey

Negotiation or legal

Hamparan Perak :
Sedang dilakukan
pembayaran dengan
villagers
Terdapat 1 PT yang
tidak mengizinkan
penggunaan lahannya
untuk jalur pipa

Ranta
u

Pangkalan
Batu
Pangkalan
Brandan

Villagers Sicanang
9 Km
Belawan

Pertagas
existing ROW
49 Km

Staba
t

PTPN II
16 Km

PLN Belawan 1
Km
Dapat
melakukan
konstruksi

Copyright BPH Migas 2013, All Rights Reserved

RENCANA PEMBANGUNAN INFRASTRUKTUR PIPA GAS


MUARA KARANG MUARA TAWAR TEGALGEDE

Pondok Tengah

PLTG M. Tawar

PLTG M. Karang

Infrastruktur yang akan dibangun dan infrastruktur eksisting akan


digunakan untuk melaksanakan pengangkutan gas dari Muara
Karang Muara Tawar Pondok Tengah Tegalgede untuk
memenuhi kebutuhan gas PLN dan konsumen industri di sepanjang
ruas transmisi eksisting Pertagas.

11

Tegalgede

Copyright BPH Migas 2013, All Rights Reserved

RENCANA PEMBANGUNAN INFRASTRUKTUR PIPA


(LANJUTAN).
1. Berdasarkan analisa gas balance di Jawa Barat, terdapat kekurangan pasokan gas (unmeet
demand) yang sangat signifikan (> 1000 MMSCFD)

2. Karena upsite potential penemuan cadangan baru di sekitar Jawa Barat sangat terbatas perlu
supply gas dari luar daerah termasuk dari sumber LNG
3. Adanya pasokan LNG melalui FSRU NR untuk PLN Muara Karang memiliki kelebihan supply
dalam jumlah signifikan (> 200 MMSCFD dan masih dapat ditingkatkan) sulit diserap konsumen
karena belum adanya infrastruktur pipa yang menghubungkan ORF Muara Karang ke Jalur pipa
transmisi gas Pertagas ruas Tegal gede Cilegon.
4. Untuk mengatasi kekurangan pasokan gas ke industri-industri di Jawa Barat, sangat mendesak
dibangunnya pipa Open Akses dari ORF Muara Karang ke Tegal Gede.

12

Copyright BPH Migas 2013, All Rights Reserved

PEMBANGUNAN RUAS TRANSMISI :


1. DURI DUMAI OLEH PT PGN (PERSERO) TBK
2. P. PEMPING - TANJUNG UNCANG, BATAM OLEH PT PLN BATAM PT UBE

13

Copyright BPH Migas 2013, All Rights Reserved

RENCANA LELANG 5 WILAYAH JARINGAN DISTRIBUSI


(WJD)

JAMBI

PRABUMULIH
LAMPUNG

SEMARANG
PASURUAN

14

Copyright BPH Migas 2013, All Rights Reserved

WWW. BPHMIGAS.GO.ID
Copyright BPH Migas 2013, All Rights Reserved

RENCANA LELANG HAK KHUSUS


WILAYAH JARINGAN DISTRIBUSI GAS BUMI

Copyright BPH Migas 2013, All Rights Reserved

WJD JAMBI
PASOKAN/ POTENSI PASOKAN GAS:
1) COPHI - Corridor Block
2) PETROCHINA INT. JABUNG
3) JOB PTM-TALISMAN Jambi Merang
4) TAC Pertamina-EMP Gelam
PERMINTAAN/ POTENSI
PERMINTAAN GAS:
1) Existing Power Plant
a)
b)
c)
d)

PLTG/ GU Batang Hari


PLTD/ G Payo Selincah
PLTMG/ G S. Gelam (CNG peaking)
PLTMG/ G Jambi Peaker

PT Transportasi Gas Indonesia (TGI)

PT Energasindo Heksa Karya (EHK)


PT PDPDE

2) Industri: (eksisting LPPPI melalui pipa dedicated hilir PDPDE)


3) Jargas (dibangun tahun 2012 utk 4.000 SR, rencana sumber gas JOB Pertamina Talisman Jambi Merang
sebesar 0,5 MMSCFD)

4) SPBG (rencana dibangun tahun 2015) dll


Copyright BPH Migas 2013, All Rights Reserved

WJD PRABUMULIH
PASOKAN/ POTENSI PASOKAN
GAS:
Pertamina EP Region SumBagSel
COPHI - Corridor Block
(Pengembangan:
Letang, Tengah, Rawa
Optimization/LTRO,
Sumpal Expansion-Phase II)

INFRASTRUKTUR PIPA EKSISTING:

Ruas Transmisi PT. PGN (PERSERO)


Tbk (Grissik-Pagardewa)
Ruas Pipa Transmisi PT. Pertagas
(Betung-Prabumulih)
Ruas Pipa Transmisi PT. Pertagas
(Limau Timur - Sunyaragi
Prabumulih)

Copyright BPH Migas 2013, All Rights Reserved

WJD LAMPUNG
FSRU PGN Rencana pasokan gas berasal dari domestik,
(2 MTPA) dengan rencana distribusi gas ke Jawa Barat
(pelanggan PGN) dan potensi konsumen di
Lampung

Rencana pipa DH
distribusi oleh PGN
SSWJ II: Grissik-Muara
Bekasi

SSWJ I: PagardewaBojanegara
Copyright BPH Migas 2013, All Rights Reserved

WJD SEMARANG
PASOKAN/ POTENSI PASOKAN GAS:
1) Petronas Carigali Muriah Limited (PCML) Kepodang
2) Pertamina EP - Gundih Randublatung
3) Pertamina EP - North Central Java (NCJ-A) - Mangkang
4) Petronas Carigali Bukit Tua - Ketapang
5) Kalija Tahap 2
PERMINTAAN/ POTENSI
PERMINTAAN GAS:
1) PLTGU Blok 1-2 yang disuplai
oleh Sumber Petrindo Perkasa
(SPP) dari blok Gundih
2) Industri: Tossa Shakti
(eksisting), dll
3) SPBG (rencana dibangun
pemerintah tahun 2014)
4) Jargas

Rencana pipa KALIJA I (Kepodang


Tambak Lorok)

Lapangan Kepodang
(Blok Muriah)
120 MMSCFD

North Central Java


Mangkang Kulon, Kendal
2,5 MMSCFD

Rencana Cirebon - Semarang


Rencana Gresik - Semarang

Rencana Pipa (DH)


Gundih PLTG Tambak Lorok
PT Sumber Petrindo Perkasa

Blok Gundih
Blora Grobogan
50 MMSCFD