PERUM JASA TIRTA II

Unit Kerja : Divisi Bendungan

Lampiran :
Formulir No :
OPERASI WADUK Ir DJUANDA
PERIODE TANGGAL : 1 S.D 15 OKTOBER 2012

1. VOLUME EFEKTIF WADUK


Tanggal
: 15-Oct-2012
RENCANA
REALISASI
VOLUME
TMA
VOLUME EFEKTIF
TMA
EFEKTIF
( +m )
( +m ) ( Juta m3 )
(%)
( Juta m3 )
(%)
628.57
101.42
3.76
631.24
175.57
6.16
207.69
1,250.57
46.37
209.82 1,358.82
47.67
91.27
1,345.20
49.87
90.88 1,315.86
46.17

WADUK

SAGULING
CIRATA
IR.H.DJUANDA

Catatan : Berdasarkan Pola Operasi Tahun Kering


2. TMA,AIR MASUK,DAN AIR KELUAR WADUK IR.H.DJUANDA :

URAIAN

POLA OPERASI

RENCANA BULANAN

91.27
89.10
130.5

91.42
89.10
131.94

TMA ( +...m )
AM (m/dt)
AK (m/dt)

REALISASI
91.00
57.24
137.41

DEVIASI REALISASI TE
POLA OPERASI
-0.27
-31.86
6.91

3. PRAKIRAAN TMA,AIR MASUK DAN AIR KELUAR WADUK IR.DJUANDA


TMA AWAL
( +m)
92.23
90.86

AIR MASUK
(m/dt)
89.1
80.78

AIR KELUAR
( +m)
130.5
132.46

TMA AKHIR
( +m)
91.27
89.68

POL

REN

*) AK bedasarkan kemampuan 3 unit pembangkit, Head rata-rata 63,29 m, Daya masing-masing Unit 24,75 M
4.

PARAMETER
KECEPATAN ANGIN (km/jam)
PENGUAPAN ( mm/hari)
CURAH HUJAN ( mm )

MAKSIMUM

MINIM

NILAI

KETERANGAN

NILAI

7.94
4.93
21.7

14-Oct-2012
11-Oct-2012
8-Oct-2012

4.26
2.72
21.7

Jatiluhur, 16 Okt
Ka.Subdiv Bendungan

Andrijan
NIK. 0432

23
F-Pros.13-23

DEVIASI
( Juta m3 )
74.15
108.24
-29.34

(%)
2.40
1.31
-3.71

SI TERHADAP
RENCANA BULANAN
-0.42
-31.86
5.47

KETERANGAN
POLA OPERASI WADUK
RENCANA

,75 MW

MINIMUM
KETERANGAN
2-Oct-2012
2-Oct-2012
8-Oct-2012

16 Oktober 2012
ungan & Citarum Hulu

ndrijanto
. 04329 0168

PERUM JASA TIRTA II


Unit Kerja : Divisi Bendungan

Lampiran :
Formulir No :
OPERASI WADUK Ir DJUANDA
PERIODE TANGGAL : 16 OKTOBER S.D 31 NOVEMBER 2012

1. VOLUME EFEKTIF WADUK


Tanggal
: 27-Oct-2012
RENCANA
REALISASI
VOLUME
TMA
VOLUME EFEKTIF
TMA
EFEKTIF
( +m )
( +m ) ( Juta m3 )
(%)
( Juta m3 )
(%)
628.57
101.42
3.76
631.24
175.57
6.16
207.69
1,250.57
46.37
209.82 1,358.82
47.67
91.27
1,345.20
49.87
90.88 1,315.86
46.17

WADUK

SAGULING
CIRATA
IR.H.DJUANDA

Catatan : Berdasarkan Pola Operasi Tahun Kering


2. TMA,AIR MASUK,DAN AIR KELUAR WADUK IR.H.DJUANDA :

URAIAN

POLA OPERASI

RENCANA BULANAN

92.23
89.10
130.5

90.86
80.78
132.46

TMA ( +...m )
AM (m/dt)
AK (m/dt)

REALISASI
90.49
150.58
134.82

DEVIASI REALISASI TE
POLA OPERASI
-1.74
61.48
4.32

3. PRAKIRAAN TMA,AIR MASUK DAN AIR KELUAR WADUK IR.DJUANDA


TMA AWAL
( +m)
91.21
91.15

AIR MASUK
(m/dt)
133.50
133.50

AIR KELUAR
( +m)
147.50
147.50

TMA AKHIR
( +m)
96.72
96.75

POL

REN

*) AK bedasarkan kemampuan 3 unit pembangkit, Head rata-rata 63,29 m, Daya masing-masing Unit 24,75 M
4.

PARAMETER
KECEPATAN ANGIN (km/jam)
PENGUAPAN ( mm/hari)
CURAH HUJAN ( mm )

MAKSIMUM
NILAI
8.84
#DIV/0!
8.90

MINIM
KETERANGAN

NILAI
-7329.03
#DIV/0!
0.00

Jatiluhur, 1 Novem
Ka.Subdiv Bendungan

Andrijan
NIK. 0432

23
F-Pros.13-23

DEVIASI
( Juta m3 )
74.15
108.24
-29.34

(%)
2.40
1.31
-3.71

SI TERHADAP
RENCANA BULANAN
-0.37
69.80
2.36

KETERANGAN
POLA OPERASI WADUK
RENCANA

,75 MW

MINIMUM
KETERANGAN

Novemberber 2012
ungan & Citarum Hulu

ndrijanto
. 04329 0168