Anda di halaman 1dari 14

PERUM JASA TIRTA II

Unit Kerja : Divisi Bendungan

Lampiran :
Formulir No :
OPERASI WADUK Ir DJUANDA
PERIODE TANGGAL : 16 OKTOBER S.D 1 NOVEMBER 2012

1. VOLUME EFEKTIF WADUK


Tanggal
: 31-Oct-2012
RENCANA
REALISASI
VOLUME
TMA
VOLUME EFEKTIF
TMA
EFEKTIF
( +m )
( +m ) ( Juta m3 )
(%)
( Juta m3 )
(%)
628.49
101.83
3.78
631.24
175.57
6.16
207.64
1,248.31
46.38
209.82 1,358.82
47.67
91.21
1,341.60
49.84
90.88 1,315.86
46.17

WADUK

SAGULING
CIRATA
IR.H.DJUANDA

Catatan : Berdasarkan Pola Operasi Tahun Kering


2. TMA,AIR MASUK,DAN AIR KELUAR WADUK IR.H.DJUANDA :

URAIAN

POLA OPERASI

RENCANA BULANAN

92.23
89.10
130.5

90.86
89.10
131.94

TMA ( +...m )
AM (m/dt)
AK (m/dt)

REALISASI
91.15
304.33
118.35

DEVIASI REALISASI TE
POLA OPERASI
-1.08
215.23
-12.15

3. PRAKIRAAN TMA,AIR MASUK DAN AIR KELUAR WADUK IR.DJUANDA


TMA AWAL
( +m)
91.21
91.13

AIR MASUK
(m/dt)
133.5
229.9

AIR KELUAR
( +m)
147.5
136.6

TMA AKHIR
( +m)
96.72
93.19

POL

REN

*) AK bedasarkan kemampuan 3 unit pembangkit, Head rata-rata 64,2 m, Daya masing-masing Unit 26,15 MW
4.

PARAMETER
KECEPATAN ANGIN (km/jam)
PENGUAPAN ( mm/hari)
CURAH HUJAN ( mm )

MAKSIMUM

MINIM

NILAI

KETERANGAN

NILAI

8.84
5.15
8.90

18 Oktober 2012
16 Oktober 2012
21 Oktober 2012

3.63
2.52
1.00

Jatiluhur, 1 Nove
Ka.Subdiv Bendungan

Andrijan
NIK. 0432

23
F-Pros.13-23

DEVIASI
( Juta m3 )
73.75
110.51
-25.74

(%)
2.38
1.30
-3.67

SI TERHADAP
RENCANA BULANAN
0.29
215.23
-13.59

KETERANGAN
POLA OPERASI WADUK
RENCANA

15 MW

MINIMUM
KETERANGAN
28 Oktober 2012
27 Oktober 2012
20 Oktober 2012

1 November 2012
ungan & Citarum Hulu

ndrijanto
. 04329 0168

GRAFIK REALISASI OPERASI W


645.00

Bulan Oktober 20

SAGULING

643.00
641.00
639.00
T M A (m dpl)
637.00
635.00
633.00
631.00
629.00
627.00
625.00

25
67

18
93

22
22

19
9

21
39

26
67

43
66

59
58

39
33

46
0

29
32

26
23

21
21

22
24

19

23

AK rata2

23

AM rata2

30

623.00

CIRATA
222.00
220.00
218.00
T M A (m dpl)

216.00
214.00
212.00
210.00
208.00
206.00
204.00

200.00
AM rata2

43

77

37

33

15

71

72

105

78

215

122

55

19

19

100

25

AK rata2

66

48

60

57

27

72

105

142

122

151

113

82

76

54

115

202.00

109.00
107.00
105.00

DJUANDA

2
117
141

10

11

12

13

14

15

16

Air Masuk

TMA Rencana

Air Keluar

TMA Realisasi

0
141

3
57
140

0
140

3
80
142

0
142

3
86
140

0
140

3
116
144

0
144

3
154
140
140

138

2
124
138

0
139

Tanggal

0
108

3
144
139

0
139

3
108
108

0
139

2
74
139

0
141

2
3
139

0
139

1
28
141

0
145

2
58
139

AK rata2

112

2
62
145

2
50
112

AK L

146

AK HJV

AK T

68

AM rata2

146

AML

DJUANDA

109.00
107.00
105.00
103.00
101.00
99.00
97.00
T M A (m dpl)
95.00
93.00
91.00
89.00
87.00
85.00
83.00
81.00
79.00
77.00
75.00

Lampiran : 26
Formulir : F-Pros.13-26

PERASI WADUK SERI CITARUM

Oktober 2012
200
180
160
140

Debit (m3/detik)

120
100
80
60
40
20

22

34

65

33

23

20

19

17

15

15

15

72

46

42

50

80

58

47

43

37

43

59

70

56

56

58

96

77

100

400
350
300

Debit (m3/detik)
250
200
150
100
50

97

104

82

76

67

106

76

74

87

70

146

80

123

118

249

62

103

111

105

96

141

133

171

94

150

185

148

265

231

299

500
450

132
135
134
133
137
134
135
135
136
135
134
135
135
133
118

118

133

135

135

134

135

136

135

135

134

137

133

134

135

132

304

234

269

151

191

154

99

175

139

144

100

111

117

138

65

35

500

450

400

350

Debit (m3/detik)

300

250

200

150

100

50

17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

Lampiran : 10

PERUM JASA TIRTA II


Unit Kerja : Divisi Bendungan

Formulir No : F-Pros.13-10
OPERASI WADUK SERI CITARUM (SAGULING, CIRATA, DAN Ir. H. DJUANDA)
BULAN : OKTOBER 2012

12

SAGULING
TGL.

TMA +M

10

11

12

13

14

15

CIRATA
AM

AK

TMA +M

(m3/dt.)

(m3/dt.)

16

17

18

19

20

21

22

Ir. H. Djuanda

AM

AML.

AK

TMA +M

AM

AML

23

24

Aliran Citarum

Air Keluar (m3/det)

Produksi Listrik

Debit

Vol.

Akum Vol

(m3/dt.)

(m3/dt.)

(m3/dt.)

Renc

(m3/dt.)

(m3/dt.)

AK Turb

HJV

Lim

Total

kWh

MW

(m3/dt.)

( juta m3)

( juta m3)

1-Oct-12

630.96

633.47

22.96

30.1

209.11

211.37

42.73

12.63

65.92

93.19

92.28

92.35

67.55

1.63

146.30

0.00

0.00

146.30

2,048,000

85.33

37

3.2

3.22

2-Oct-12

630.88

633.42

19.00

23.41

209.06

211.28

30.62

7.21

48.00

93.13

92.18

92.20

49.73

1.73

111.86

6.66

0.00

118.52

1,573,000

65.54

28

2.4

3-Oct-12

630.80

633.38

21.58

24.03

209.02

211.26

37.11

13.08

60.27

93.06

92.08

92.10

61.95

1.68

145.12

0.00

0.00

145.12

2,033,000

84.71

36

3.1

8.77

4-Oct-12

630.72

633.34

21.13

21.08

208.97

211.21

33.38

12.30

56.52

93.00

91.98

91.99

58.33

1.81

139.28

0.00

0.00

139.28

1,935,000

80.63

35

3.0

11.81

5-Oct-12

630.64

633.32

26.25

23.03

208.92

211.17

15.00

(8.03)

26.56

92.93

91.86

91.89

28.05

1.49

141.44

0.00

0.00

141.44

1,948,000

81.17

20

1.7

13.52

6-Oct-12

630.56

633.31

28.63

32.47

208.87

211.22

71.02

38.55

1.56

92.87

91.67

91.72

3.26

1.70

138.74

0.00

0.00

138.74

1,920,000

80.00

69

6.0

19.47

7-Oct-12

630.48

633.31

46.46

0.00

208.83

211.31

72.27

72.27

72.27

92.81

91.48

91.49

74.04

1.77

139.16

0.00

0.00

139.16

1,921,000

80.04

121

10.4

29.88

8-Oct-12

630.40

633.47

39.29

33.23

208.78

211.35

104.61

71.38

104.61

92.74

91.38

91.40

108.09

3.48

108.09

0.00

0.00

108.09

1,936,000

80.67

114

9.9

39.74

9-Oct-12

630.32

633.48

59.04

57.63

208.73

211.31

78.00

20.37

141.67

92.68

91.34

91.37

144.32

2.65

139.46

0.00

0.00

139.46

1,923,000

80.13

82

7.1

46.83

10-Oct-12

630.24

633.48

42.88

65.57

208.68

211.33

214.53

148.96

121.87

92.62

91.33

91.35

124.06

2.19

137.54

0.00

0.00

137.54

1,912,000

79.67

194

16.8

63.60

11-Oct-12

630.16

633.37

26.38

66.74

208.64

211.36

121.77

55.03

150.75

92.55

91.30

91.31

154.01

3.26

140.09

0.00

0.00

140.09

1,935,000

80.63

85

7.3

70.91

12-Oct-12

630.08

633.22

21.08

38.68

208.59

211.29

54.98

16.30

112.87

92.49

91.29

91.31

115.97

3.10

144.43

0.00

0.00

144.43

2,006,000

83.58

40

3.5

74.41

13-Oct-12

630.00

633.14

19.17

8.85

208.54

211.18

18.80

9.95

82.35

92.42

91.22

91.25

85.61

3.26

140.45

0.00

0.00

140.45

1,933,000

80.54

32

2.8

77.21

14-Oct-12

629.92

633.15

21.63

21.53

208.49

211.07

18.72

(2.81)

76.38

92.36

91.12

91.15

79.55

3.17

142.19

0.00

0.00

142.19

1,963,000

81.79

22

1.9

79.11

15-Oct-12

629.84

633.09

17.88

92.53

208.45

211.00

100.34

7.81

54.21

92.30

91.00

91.04

57.24

3.03

140.38

0.00

0.00

140.38

1,927,000

80.29

29

2.5

81.59

16-Oct-12

629.76

633.82

24.83

66.86

208.40

211.10

24.56

(42.30)

114.93

92.23

90.86

90.92

117.19

90.86

141.02

0.00

0.00

141.02

1,936,000

80.67

73

6.3

87.93

17-Oct-12

629.69

632.66

21.50

79.55

208.35

211.04

96.69

17.14

62.09

92.17

90.80

90.82

64.53

90.74

131.59

0.00

0.00

131.59

1,806,000

75.25

129

11.2

18-Oct-12

629.61

632.50

34.00

57.69

208.30

211.07

104.27

46.58

103.10

92.10

90.71

90.73

138.41

90.74

134.69

0.00

0.00

134.69

1,830,000

76.25

171

14.8

113.91

19-Oct-12

629.53

632.50

64.83

46.66

208.26

211.03

82.16

35.50

110.92

92.04

90.71

90.71

117.33

90.71

134.14

0.00

0.00

134.14

1,817,000

75.71

191

16.5

130.42

20-Oct-12

629.45

632.48

32.88

42.79

208.21

210.97

76.25

33.46

105.03

91.98

90.67

90.69

110.95

90.65

133.02

0.00

0.00

133.02

1,805,000

75.21

157

13.6

143.98

21-Oct-12

629.37

632.39

23.04

37.07

208.16

210.91

66.81

29.74

95.59

91.91

90.63

90.64

99.98

90.55

136.94

0.00

0.00

136.94

1,902,000

79.25

143

12.4

156.36

22-Oct-12

629.29

632.34

19.83

43.19

208.11

210.91

106.21

63.02

140.67

91.85

90.55

90.57

143.81

90.55

134.40

0.00

0.00

134.40

1,817,000

75.71

173

15.0

171.35

23-Oct-12

629.21

632.22

18.63

59.17

208.07

210.80

75.58

16.41

132.93

91.78

90.54

90.55

138.69

90.56

134.91

0.00

0.00

134.91

1,845,000

76.88

126

10.9

182.20

24-Oct-12

629.13

632.06

16.71

69.99

208.02

210.69

74.08

4.09

171.32

91.72

90.53

90.54

175.04

90.59

134.69

0.00

0.00

134.69

1,820,000

75.83

111

9.6

191.82

25-Oct-12

629.05

631.81

14.92

55.65

207.97

210.56

87.47

31.82

93.84

91.66

90.56

90.55

98.95

90.51

135.86

0.00

0.00

135.86

1,849,000

77.04

137

11.9

203.68

26-Oct-12

628.97

631.64

14.92

5.65

207.92

210.50

70.39

64.74

150.22

91.59

90.52

90.53

154.15

90.51

134.80

0.00

0.00

134.80

1,822,000

75.92

170

14.7

218.38

27-Oct-12

628.89

631.48

14.92

55.65

207.88

210.42

145.63

89.98

184.86

91.53

90.49

90.50

191.02

90.58

134.32

0.00

0.00

134.32

1,815,000

75.63

195

16.9

235.27

28-Oct-12

628.81

631.61

71.78

57.99

207.83

210.33

79.59

21.60

147.75

91.47

90.55

90.51

150.58

90.59

134.82

0.00

0.00

134.82

1,824,000

76.00

184

15.9

251.17

29-Oct-12

628.73

631.59

46.08

96.27

207.78

210.21

123.08

26.81

264.58

91.40

90.57

90.54

269.07

90.78

135.08

0.00

0.00

135.08

1,837,000

76.54

164

14.1

265.31

30-Oct-12

628.65

631.35

41.63

77.48

207.73

209.96

117.86

40.38

230.56

91.34

90.75

90.71

233.52

2.96

133.45

0.00

0.00

133.45

1,812,000

75.50

85

7.3

272.65

31-Oct-12

628.57

631.24

49.50

100.37

207.69

209.82

248.83

148.46

299.41

91.27

90.88

90.89

304.33

4.92

118.35

0.00

0.00

118.35

1,661,000

69.21

203

17.5

290.18

1-Nov-12

628.49

631.04

207.64

209.69

91.21

91.15

91.16
135.37

0.21

0.00

135.59

Renc

Keny

Rata-2
Renc

30.43
18.40

Renc

Keny

48.09
36.20

= Air Masuk

Lim

= Limpasan (m3/det)

AML

= Air Masuk Lokal


= Air Keluar
= Tinggi Muka Air

Ak Tb
HJV

= Air Keluar Turbin (m3/det)


= AK Hollow Jet Valve (m3/det)

AK
TMA

OP

Sifat Aliran Citarum :Kering

00.00

83.66

35.56

115.60

119.98

42.35

64.90

28.70

85.30

89.10

3.80

Prod listrik s.d bulan September tahun 2012


Prod listrik bulan Oktober tahun 2012 s.d hari ini
Total Produksi listrik s.d hari ini
Rencana Produksi Listrik RKAP bulan .

Keterangan :
AM

07.00

= Beroperasi

SO
= Siap
R
= Rusak
P
= Pemeliharaan
KONDISI UNIT PLTA IR. H. DJUANDA PUKUL 07.00
II
III
IV
V

5.63

99.11

117.40

130.50

=
=
=
=

549,389,100
58,111,000
607,500,100
.

kWh
kWh
kWh
kWh

Kadiv Bendungan

= ...%
Jatiluhur, 1 November 2012
Ka. Sub Divisi Bendungan & Citarum Hulu

H. Djoni Panusunan, BE
NIK. 03706 8262

Andrijanto
NIK. 04329 0168

Mengetahui
VI

PERUM JASA TIRTA II


Unit Kerja : Divisi Bendungan
DATA KLIMATOLOGI WADUK IR. H. DJUANDA
Bulan :
Oct-2012
KECEPATAN

LAMANYA

HILIR

TMA

STI

STII

ANGIN

PENYINARAN

( +..m dpl )

(mm)

(mm)

( km/jam)

Jam

16-Oct-12

27.30

#N/A

17-Oct-12

27.30

#N/A

18-Oct-12

27.30

19-Oct-12

27.25

20-Oct-12

27.25

21-Oct-12
22-Oct-12

TANGGAL

CURAH HUJAN

TEMPERATUR

KELEMBABAN

Maks

Min

menit

( 0C )

( 0C )

(%)

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

8.7

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

27.10

8.6

8.9

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

27.25

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

23-Oct-12

27.25

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

24-Oct-12

27.25

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

25-Oct-12

27.25

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

26-Oct-12

27.25

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

27-Oct-12

27.25

5.9

5.7

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

28-Oct-12

27.25

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

29-Oct-12

27.25

4.8

4.6

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

30-Oct-12

27.25

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

31-Oct-12

27.25

5.4

5.5

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

1-Nov-12

27.25
#N/A

RATA2
MAKSIMUM
TGL.MAKS
MINIMUM
TGL.MIN

6.68

5.14

#N/A

#N/A

#N/A

#N/A

#N/A

27.30

8.70

8.90

#N/A

#N/A

35.00

#N/A

#N/A

#N/A

16-Oct-12

20-Oct-12

21-Oct-12

18-Oct-12

16-Oct-12

16-Oct-12

16-Oct-12

27.10

4.80

1.00

#N/A

21-Oct-12

29-Oct-12

20-Oct-12

28-Oct-12

VOLUME EVAPORASI WADUK BERDASARKAN METODE :


PANCI

PENMAN

0.38
0.27

JUTA M3

16-Oct-12
#N/A

0.00

27-Oct-12

#N/A

#N/A

#N/A

20-Oct-12

20-Oct-12

29-Oct-12

Jatiluhur, 01 Novem
Kasubdiv Bendungan &

JUTA M3

Andrijant
NIK : 04329 0

Lampiran

24

Formulir No : F-Pros.13-24

PENGUAPAN
PENMAN

PANCI

(mm/hari)

(mm/hari)

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

16-Oct-12

16-Oct-12

#N/A

#N/A

27-Oct-12

29-Oct-12

Jatiluhur, 01 November 2012


Kasubdiv Bendungan & Citarum Hulu

Andrijanto
NIK : 04329 0168

PERUM JASA TIRTA II

Lampiran :

UNIT KERJA : DIVISI BENDUNGAN

No.Formulir : F-10.12-25

4.7

25

EVALUASI TAMPUNGAN WADUK SERI CITARUM


ASUMSI TAHUN KERING 2012
Tanggal

NAMA
No
WADUK

MINIMUM POLA 2010

31-Oct-12

MAKSIMUM POLA 2010

VOLUME

TMA

VOLUME

TMA

VOLUME

EFEKTIF

(+m. DPL)

(Juta m3)

(+m. DPL)

(Juta m3)

Volume
( Juta m3 )
7=6-4

RENCANA

REALISASI

TMA

Volume

TMA

Volume

(+m. DPL)

(Juta m3)

(+m. DPL)

(Juta m3)

10

11

12

Deviasi
Volume

Volume
Efektif

Real-Renc

Deviasi
Volume

(Juta m3)

(Juta m3)

13=12-4

14

15=12-10

16=14-8

SAGULING

625.00

40.87

642.50

579.95

539.08

21.12%

628.490

101.828

631.24

175.57

134.71

26.81%

73.746

5.69%

CIRATA

206.00

1184.53

219.50

1895.93

711.41

28.94%

207.640

1248.309

209.82

1358.82

174.29

34.69%

110.507

5.75%

IR.H.DJUANDA

87.50

1122.50

106.50

2407.00

1284.50

49.94%

91.210

1341.600

90.88

1315.86

193.36

38.49%

-25.740

-11.45%

4882.88

2534.98

100.00%

502.35

99.99%

TOTAL

2347.90

Jatiluhur,01,November,2012
Catatan : Volume effektif yang ada :

19.82%

Ka. Sub. Divisi Bendungan & Citarum Hulu

Andrijanto
NIK : 04329 0168

Gambar - 1
POLA PENGUSAHAAN WADUK SERI CITARUM
TAHUN 2012
Saguling
644
640
TM A ( m dpl. )
636
632
628
624
620
AMN Rata-2
AKN Rata-2
AMK Rata-2
AKK Rata-2

124.6
85.0
93.1
70.6

131.1
105.2
102.8
78.1

154.8
130.5
112.2
84.7

154.1
138.2
116.5
94.1

92.9
91.2
70.5
75.4

55.0
76.9
34.8
63.8

30.7
62.0
19.4
54.1

18.0
50.2
11.2
33.9

17.9
40.1
10.6
21.0

36.9
53.0
19.2
40.1

95.6
100.0
53.1
62.5

115.2
115.0
84.9
80.1

102.4
110.0
69.1
93.9

184.8
171.0
117.4
126.8

212.3
195.0
151.5
141.0

Cirata
222.00
218.00
TM A ( m dpl. )
214.00
210.00
207,
70

206.00
202.00
AMN Rata-2
AKN Rata-2
AMK Rata-2
AKK Rata-2

198.5
160.8
156.2
142.0

224.6
185.5
173.4
136.0

255.7
218.8
176.9
135.7

247.3
221.7
179.6
145.2

172.4
166.4
135.9
139.0

117.8
144.3
89.7
125.8

88.2
127.4
69.3
113.2

68.7
108.8
43.6
70.9

61.6
80.0
32.1
42.3

Ir. H. Djuanda

Jan

Peb

Mar

Apr

Mei

Jun

Jul

Ags

Sep

Okt

Nop

Des

T M A ( m d pl. )

M ak .

AMN Rata-2
AKN Rata-2
AMK Rata-2
AKK Rata-2
KP Basah
KP Normal
KP Kering

172.5
137.6
119.7
100.9
90.0
96.4
112.1

181.6
94.3
141.6
78.4
85.2
89.0
87.2

196.5
100.3
152.8
96.3
93.0
100.3
107.0

194.6
108.9
162.1
109.4
103.5
108.9
121.6

171.0
151.7
141.6
141.0
132.0
151.7
156.7

150.9
197.9
125.0
185.5
178.5
197.9
206.1

124.0
188.1
102.5
170.1
167.3
177.8
189.0

117.7
200.0
63.0
107.0
110.2
113.3
118.9

118.9
200.0
40.0
60.7
55.8
62.8
67.4

Min .

143.9
200.0
89.1
130.5
115.7
133.6
145.0

No rm al

177.4
154.0
133.5
147.5
132.3
154
163.9

Ker in g

Bas ah

204.0
177.7
147.6
127.6
116.1
141.5
141.8

Re alis as i

Gambar - 1
GUSAHAAN WADUK SERI CITARUM
TAHUN 2012

M3/det
M3/det
M3/det
M3/det

207,
70

M3/det
M3/det
M3/det
M3/det

Des
T MA ( m d pl. )

M ak .

Min .

No rm al

Ke r in g

Bas ah

Re alis asi

M3/det
M3/det
M3/det
M3/det
M3/det
M3/det
M3/det

Anda mungkin juga menyukai