Anda di halaman 1dari 8

6

ASSEMBLY

Checked by

Approved by

SAIFAL

Hadi Soewito

Hadi Soewito

POLITEKNIK TEDC BANDUNG


6

Date

Designed by

Date

Assembly DRAWINGS
2

6/27/2015

Edition

Sheet

1/8
1

ASSEMBLY

260,00

360,00

Checked by

Approved by

SAIFAL

Hadi Soewito

Hadi Soewito

POLITEKNIK TEDC BANDUNG


6

Date

Designed by

Date

Assembly DRAWINGS
2

6/27/2015

Edition

Sheet

2/8
1

HOUSING

20
00
0,

10,00

30,00
R3
3

177,94

252,05

260,00

177,94

252,05

R8
9,
50

,75

Checked by

Approved by

SAIFAL

Hadi Soewito

Hadi Soewito

POLITEKNIK TEDC BANDUNG


6

Date

Designed by

Date

Assembly DRAWINGS
2

6/27/2015

Edition

Sheet

3/8
1

BLADE

106,00

100,00

10,00

200,00

R1
5,0
0

Checked by

Approved by

SAIFAL

Hadi Soewito

Hadi Soewito

POLITEKNIK TEDC BANDUNG


6

Date

Designed by

Date

Assembly DRAWINGS
2

6/27/2015

Edition

Sheet

4/8
1

SHAFT

40,00

C
0
,0
0
3

4,70

10,00

150,00
B

Checked by

Approved by

SAIFAL

Hadi Soewito

Hadi Soewito

POLITEKNIK TEDC BANDUNG


6

Date

Designed by

Date

Assembly DRAWINGS
2

6/27/2015

Edition

Sheet

5/8
1

KEYWAY
D

40,00

8,00

10,00

Checked by

Approved by

SAIFAL

Hadi Soewito

Hadi Soewito

POLITEKNIK TEDC BANDUNG


6

Date

Designed by

Date

Assembly DRAWINGS
2

6/27/2015

Edition

Sheet

6/8
1

150,00

COVER 2

69,00

20,00

30,
00

10,00

80,00

70,00

Checked by

Approved by

SAIFAL

Hadi Soewito

Hadi Soewito

POLITEKNIK TEDC BANDUNG


6

Date

Designed by

Date

Assembly DRAWINGS
2

6/27/2015

Edition

Sheet

7/8
1

COVER 1

C
10,00
22

0,0
0

50
,00

207,50

220,00

30,0
0

Checked by

Approved by

SAIFAL

Hadi Soewito

Hadi Soewito

POLITEKNIK TEDC BANDUNG


6

Date

Designed by

Date

Assembly DRAWINGS
2

6/27/2015

Edition

Sheet

8/8
1

Anda mungkin juga menyukai