DAYS
S. No. Activities Time
10 20 30 40 50 60
PLANNING
1 Mobilization and Data Collection
2 Reconnaissance Survey.
3 Inception Report
SURVEYS
1 Detailed Topographic Survey
2 Soil Survey
3 Material Investigation
4 Condition Survey
5 Hydrological Survey
8 Report
PRELIMINARY ENGINEERING
DESIGN
1 Road Geomateric Design
2 Pavement Design
3 Road Drainage
4 Structures
6 Preliminary Design
DETAILED ENGINEERING
1 Drawing Preparation
2 Engineer's Estimate
3 Tender Documents
PERSONNEL SCHEDULE
Sr. Name Designation DAYS
KEY STAFF 10 20 30 40 50 60
1 Mushtaq Ahamd Team Leader
SUPPORT STAFF
13 Babar Khan Admin Manager