Microwave Checklist ( Configuration)

Site A

Site B

Site Name

Commisioning Check

Planned

Actual

Planned

Actual

Result Ok/Not OK

IP Address
Active SW version
Tx Frequency
Rx Frequency
Tx Power
ATPC
Modulation
Capacity
Adaptive Modulation
XPIC enabled
NTP server defined
No MMU in slot 10
RSL

RAU 1 :
RAU 2 :

RAU 1 :
RAU 2 :

External Interference

RAU 1 :
RAU 2 :

RAU 1 :
RAU 2 :

RAU 1 :
RAU 2 :

RAU 1 :
RAU 2 :

Radio Status
XPD value

Other Parameters
Visibility in SO-EM
Visibility in IPTNMS
Alarms check
Perfomance check 48hrs
Password Change in Node
Password Change in SOEM
Radio Terminal ID
Port Naming LAN
Port Naming WAN

Site A
RAU1
RAU2
ON
OFF
OFF
ON
OFF
OFF
OFF
OFF

Site A

Site B
RAU1
RAU2
OFF
OFF
OFF
OFF
ON
OFF
OFF
ON

RSL Value
Site A
RAU1
RAU2

Site B
RAU1
RAU2

=>
=>
=>
=>

Site B

Result Ok/Not OK

Microwave Checklist (Physical)


Site A

Site B

Site Name

Installation Check
Antenna Size
Height of Antenna
Antenna Installation (Ok/Not OK)
Antenna Strurt for size >=0.9m ( check
tightness also)
Installation Check of ODU (Ok / Not OK )
Tightness of alignment unit and antenna
screws
ODU grounding
Grounding of TN
Flexible wavegide/low loss cable has no
damage
Wheather proofing tape to seal
connectors
cable tied at regular intervals of 1.5m
Labelling on ODU
Printed labelling on Power cables, IF
cables, cicuit breaker, all traffic
cables,MMU
Proper routing of IF cable in Rack
Dual Power of TN is working or not
Dummy Pannels are installed

Other Parameters
Availability of Access to site
Availability of Battery Bank
Rating of Circuit Breaker
All entry hole are sealed

Planned

Actual

Planned

Actual

Remarks (if any)