PEKERJAAN
LOKASI
1
2
3
4
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PERSIAPAN
PEMASANAGAN PAVING BLOCK DAN CASTIN JALAN
CANOPY RANGKA GALVANIZ 2"
LAIN-LAIN
JUMLAH
PPN 10 %
JUMLAH
TOTAL
PITULASI
ASTIN JALAN
JUMLAH
PPN 10 %
JUMLAH
TOTAL
Rp.
Rp.
Rp.
Rp.
1,500,000.00
16,328,308.50
72,187,500.00
900,000.00
Rp.
Rp.
Rp.
Rp.
90,915,808.50
9,091,580.85
100,007,389.35
100,000,000.00
No.
Item Pekerjaan
Volume
Satuan
Analisa
1.00
Ls
Ls
A. PEKERJAAN PERSIAPAN
1
Pembersihan Lapangan
12.38
m3
ANL. A18
12.38
m3
ANL. A18a
82.50
m2
SK-SNI-P-03-01
Canstin Beton 25 Cm
15.00
Anl. G63
Plesteran 1 : 2
7.50
m2
SNI-T-03-3A
82.50
m2
D. PEKERJAAN LAIN-LAIN
1
Administrasi
1.00
Ls
Pembersihan Akhir
1.00
Ls
B)
Harga
Jumlah
(
Rp. )
1,500,000.00
( Rp. )
1,500,000.00
Total
1,500,000.00
109,792.50
1,358,682.19
81,592.50
1,009,707.19
123,020.00
10,149,150.00
239,975.45
3,599,631.75
28,151.65
211,137.38
Total
16,328,308.50
875,000.00
72,187,500.00
600,000.00
600,000.00
300,000.00
300,000.00
Total
900,000.00
:
:
ANL. A18
Upah :
1 M3 Urungan Pasir
0.300 OH Pekerja
0.010 OH Mandor
@Rp.
@Rp.
Jumlah Upah
50,000.00
65,250.00
Rp.
Rp.
Rp.
@Rp.
78,450.00
Jumlah Bahan
Jumlah Upah + Bahan
Rp.
Rp.
Rp.
0.300 OH Pekerja
0.010 OH Mandor
@Rp.
@Rp.
Jumlah Upah
50,000.00
65,250.00
Rp.
Rp.
Rp.
@Rp.
54,950.00
Jumlah Bahan
Jumlah Upah + Bahan
Rp.
Rp.
Rp.
Bahan :
ANL. A18a
Upah :
1 M3 Urungan Tanah
Bahan :
SNI-T-03-3A
Upah :
Bahan :
1 M2 Plesteran Bata 1 : 2
0.040 OH
0.002 OH
0.004 OH
0.200 OH
0.017 M3
0.213 Zak
Anl. G63
Upah :
Pekerja
Kepala tukang
Mandor
Tukang
Pasir pasangan
Semen
@
@
@
@
@
@
Rp 50,000.00
Rp 78,000.00
Rp 65,250.00
Rp 68,500.00
Rp124,050.00
Rp 46,600.00
1 M Canstin (25x25x50)
2.000 OH Pekerja
1.000 OH Tukang
@Rp.
@ Rp.
Jumlah Upah
50,000.00
68,500.00
Rp.
Rp.
Rp.
2.000 M Canstin
0.030 M3 Kerikil
0.029 M3 Pasir pasang
0.030 Zak Semen
@Rp.
30,000.00
@Rp.
216,000.00
@Rp.
124,050.00
@Rp.
46,600.00
Jumlah Bahan
Jumlah Upah + Bahan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Bahan :
SK-SNI-P-03-01
0.320
0.010
0.015
0.100
1.000
0.043
0.430
OH
OH
OH
OH
m2
M3
Zak
50,000.00
78,000.00
65,250.00
68,500.00
75,000.00
78,450.00
46,600.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Dibulatkan
Rp
15,000.00
652.50
15,652.50
94,140.00
94,140.00
109,792.50
15,000.00
652.50
15,652.50
65,940.00
65,940.00
81,592.50
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
2,000.00
156.00
261.00
13,700.00
2,108.85
9,925.80
28,151.65
28,151.65
100,000.00
68,500.00
168,500.00
60,000.00
6,480.00
3,597.45
1,398.00
71,475.45
239,975.45
16,000.00
780.00
978.75
6,850.00
75,000.00
3,373.35
20,038.00
123,020.10
123,020.00
: PEMBANGUNAN RESERVOIR
LOKASI
No.
Item Pekerjaan
Volume
Satuan
Analisa
1.00
Ls
#REF!
I. PEKERJAAN PERSIAPAN
1
Pembersihan Lapangan
Kolom 20/20
0.41
m3
Sloof 18/20
0.63
m3
0.70
m3
4.92
m3
Err:509
1.28
m3
Err:509
1.88
m3
Err:509
26.25
m3
Err:509
Administrasi
1.00
Ls
Pembersihan Akhir
1.00
Ls
LOKASI
PEMBANGUNAN RESERVOIR
0
I. PEKERJAAN PERSIAPAN
II. PEKERJAAN TALUD
III. PEKERJAAN LAIN-LAIN
JUMLAH
DIBULATKAN
AB )
Jumlah
Harga
( Rp. )
( Rp. )
750,000.00
750,000.00
Total
750,000.00
#REF!
#REF!
#VALUE!
#VALUE!
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Total
#REF!
500,000.00
500,000.00
350,000.00
350,000.00
Total
850,000.00
0
-
N BIAYA
Rp.
Rp.
Rp.
750,000.00
#REF!
850,000.00
Rp.
#REF!
Rp.
#REF!
0
-
:
:
NO
0
0
URAIAN
SATUAN
HARGA
SATUAN
Rp.
HARGA UPAH
1 Mandor
2 Kepala Tukang
3 Tukang
4 Pekerja Batu / Besi
Orang/Hari
Orang/Hari
Orang/Hari
Orang/Hari
65,250.00
78,000.00
68,500.00
50,000.00
HARGA BAHAN
1 Batu bata
2 Bataco
3 Batu Kali/Batu Belah/(Sungai/Gunung)
4 Besi beton polos
5 Besi beton ulir
6 Triplek Tebal 4 mm (Plywood)
7 Kawat beton
8 Kayu Klas I
9 Kayu Klas II
10 Kayu Klas III
11 Paku Kayu
12 Paku
13 Paku Asbes/Plywood
14 Paku Seng
15 Pasir urug
16 Pasir pasang
17 Pasir beton / Kerikil (Lokal)
18 Pasir beton / Kerikil (Daratan)
19 Papan Bekisting
20 Papan Kayu Bowplank
21 Papan Kayu Klas I
22 Papan Kayu Klas II
23 Papan Kayu Klas III
24 Semen PC@ 40 kg
25 Semen Putih
26 Tanah Timbun
27 Kayu Lat Plafond / List Profil
28 Cat Minyak Mengkilat
29 Minyak Cat
30 Dempul
31 Cat Tembok
32 Kertas Pasir
33 Keramik 40x40 Cm
34 Keramik 20x20 Cm (Kulit Jeruk)
35 Keramik Dinding 20x25 Cm
36 Bubungan Seng Genteng 0,35
37 Seng Genteng 0,30
38 Glodokan Pagar
39 Palem Ekor Tupai (Besar)
40 Bougenvile
41 Palem Botol
42 Krokot
43 Kelapa Sawit
44 Rumput Jepang
45 Paving Block
46 Batu Kerikil Putih
47 Tanah Humus
Buah
Buah
m3
Kg
Kg
m2
Kg
m3
m3
m3
Kg
Kg
Kg
Bh
m3
m3
m3
m3
m3
m3
m3
m3
m3
Zak
Zak
m3
m'
Kg
Ltr
Kg
Kg
Lbr
m2
m2
m2
m'
m2
Batang
Batang
Batang
Batang
Batang
Batang
m2
m2
m2
m3
725.00
6,750.00
108,300.00
6,825.00
10,000.00
26,085.07
16,400.00
4,700,000.00
4,075,000.00
3,410,000.00
11,000.00
11,000.00
16,000.00
250.00
78,450.00
124,050.00
216,000.00
480,000.00
3,255,000.00
3,100,000.00
4,500,000.00
3,950,000.00
3,350,000.00
46,600.00
117,000.00
54,950.00
12,500.00
44,400.00
15,100.00
36,500.00
30,480.00
2,800.00
50,000.00
49,450.00
50,000.00
35,000.00
83,333.33
35,000.00
185,000.00
185,000.00
100,000.00
2,500.00
85,000.00
25,000.00
75,000.00
75,000.00
80,000.00
KETERANGAN
No.
Item Pekerjaan
Volume
Satuan
Analisa
1
I. PEKERJAAN PERSIAPAN
1
Pembersihan Lapangan
24.40
m2
Err:509
22.00
m'
Err:509
12.68
m3
Err:509
2.34
m3
ANL. A18
4.50
m3
Err:509
Aanstamping
2.70
m3
Err:509
3.17
m3
Err:509
0.78
m3
Err:509
Kolom 13/13
0.67
m3
Err:509
0.04
m3
Err:509
0.51
m3
Err:509
57.99
m2
Err:509
7.40
m2
Err:509
115.98
m2
Err:509
14.80
m2
SNI-T-03-3A
V. PEKERJAAN ATAP
1
0.97
m3
Err:509
Kayu Gording
1.05
m3
Err:509
Kayu Bubungan
0.06
m3
Pekerjaan Lisplank
50.00
Buah
Ls
6.60
m2
Err:509
12.00
m'
Err:509
71.40
m2
Err:509
34.76
m'
Ls
1.22
m3
ANL. A18
Tanah Timbun T = 30 Cm
7.32
m3
ANL. A18a
2.50
m2
Err:509
Dinding Keramik 20 x 25 Cm KM / WC
Lantai Keramik 40 x 40 Cm
7.27
m2
Err:509
24.15
m2
Err:509
Pintu PJ1
1.00
Buah
Ls
Pintu KM/WC
1.00
Buah
Ls
Ventilasi V1
1.00
Buah
Ls
Ventilasi V2
6.00
Buah
Ls
46.40
m2
Err:509
18.00
m'
Err:509
130.78
m2
Err:509
1
IX. PEKERJAAN PENGECATAN
Pengecatan Dinding
9.04
m2
Err:509
Pengecatan Lisplank
6.60
m2
Err:509
27.01
m2
Ls
46.40
m2
Err:509
- Lampu TL 20 Watt
1.00
Set
Ls
7.00
Set
Ls
8.00
Titik
Ls
2.00
Titik
Ls
1.00
Unit
Ls
2.00
Unit
Ls
2.00
Unit
Ls
1.00
Buah
Ls
X. PEKERJAAN LISTRIK
1
Armatur
Saklar
mencapai 2 ohm
1.00
Unit
Ls
1.00
Set
Ls
2.00
Buah
Ls
4.00
Buah
Ls
Engsel jendela
4.00
Buah
Ls
4.00
Buah
Ls
tarikan jendela
2.00
Buah
Ls
4.00
Buah
Ls
grendel/pacok pintu
4.00
Buah
Ls
1.00
Buah
Ls
1.00
Buah
Ls
Floor Drain
1.00
Buah
Ls
Clin Out
1.00
Buah
Ls
1.00
Buah
Ls
1.00
Buah
Ls
Kran air
1.00
Buah
Ls
4.00
m'
Ls
1.00
Unit
Ls
Administrasi
1.00
Set
Ls
Pembersihan Akhir
1.00
Set
Ls
:
:
I. PEKERJAAN PERSIAPAN
II. PEKERJAAN PONDASI
JUMLAH
DIBULATKAN
Harga
Jumlah
(
Rp.
6)
Err:509
7 ( Rp. )
Err:509
Err:509
Total
Err:509
Err:509
Err:509
109,792.50
256,914.45
Err:509
Err:509
Err:509
Total
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Total
Err:509
Err:509
Err:509
Err:509
Err:509
28,151.65
Total
Err:509
416,644.42
Err:509
Err:509
Err:509
Err:509
#VALUE!
5,000.00
250,000.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
83,000.00
Total
2,885,080.00
Err:509
109,792.50
133,946.85
81,592.50
597,257.10
Err:509
Err:509
Err:509
Total
731,203.95
1,400,000.00
1,400,000.00
650,000.00
650,000.00
450,000.00
450,000.00
125,000.00
750,000.00
Total
3,250,000.00
Err:509
Err:509
Err:509
Total
6
Err:509
Err:509
7
Err:509
Err:509
Err:509
6,500.00
175,582.42
Err:509
Total
Err:509
125,000.00
125,000.00
75,000.00
525,000.00
135,000.00
1,080,000.00
135,000.00
270,000.00
25,000.00
25,000.00
30,000.00
60,000.00
25,000.00
50,000.00
250,000.00
250,000.00
150,000.00
150,000.00
2,500,000.00
2,500,000.00
Total
5,035,000.00
150,000.00
300,000.00
30,000.00
120,000.00
30,000.00
120,000.00
27,500.00
110,000.00
27,500.00
55,000.00
22,500.00
90,000.00
22,500.00
90,000.00
Total
885,000.00
300,000.00
300,000.00
450,000.00
450,000.00
55,000.00
55,000.00
20,000.00
20,000.00
500,000.00
500,000.00
750,000.00
750,000.00
25,000.00
25,000.00
150,000.00
600,000.00
Total
2,700,000.00
5,500,000.00
5,500,000.00
550,000.00
550,000.00
750,000.00
750,000.00
Total
6,800,000.00
0
-
Rp.
Rp.
Err:509
Err:509
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Err:509
Err:509
Err:509
731,203.95
3,250,000.00
Err:509
Err:509
5,035,000.00
885,000.00
2,700,000.00
6,800,000.00
Rp.
Rp.
Err:509
Err:509
0
-