FORMATO N 16

PROGRAMA DE VALORIZACIN MENSUAL.


PROY ECTO: "MEJORAMIENTO DE PISTAS Y VEREDAS DEL PASAJE PILLCOMOZO, DISTRITO DE PILLCO MARCA - HUANUCO - HUANUCO"

MES - 01

MES - 02

MES - 03

Montos Valorizacin Desagregada (S/.)

Montos Valorizacin Desagregada (S/.)

Montos Valorizacin Desagregada (S/.)

Costo Unitario Desagregado (S/.)

tem

Partidas

Und.

Metrado

Costo Unitario
(S/.)

Aportes del Programa

Costo Parcial (S/.)

Cofinanciamiento
M.O.N.C.

01
01.01

01.01.02

CARTEL DE OBRA IMPRESION DE BANNER DE 3.60 M X 2.40 M (SOPORTE DE MADERA)

und

1.00

01.01.03

SEALIZACION EN OBRA DURANTE EJECUCION

226.64

SEALIZACION DE DESVIO DE TRANSITO EN PERIODO DE CONSTRUCCION

est

2.00

3.00

0.00

0.00

900.00

M.O.N.C.

OTROS

900.00

0.00

0.00

0.00

Metrado

Aportes del Programa


Cofinanciamiento

Monto de
Valorizacin
Total

M.O.N.C.

OTROS

0.00

0.00

0.00

0.00

0.00

683.50

783.5010

783.50

1.00

100.00

0.00

683.50

783.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.25

0.50

0.7500

169.98

226.64

56.66

0.00

113.32

169.98

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

25.00

816.00

841.0000

900.00

1,682.00

2.00

50.00

0.00

1,632.00

1,682.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

396.62

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

5,943.38
m2

793.24

0.50

01.02.02

LIMPIEZA GENERAL DE OBRA

m2

793.24

01.02.03

TRAZO Y REPLANTEO EN TERRENO NORMAL CON EQUIPO- OBRAS LONGITUDINALES

m2

793.24

01.02.04

TRAZO Y REPLANTEO FINAL DE LA OBRA

m2

793.24

MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA

glb

1.00

0.5000

396.62

793.24

396.62

0.00

0.25

0.2500

198.31

793.24

198.31

0.00

0.00

198.31

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.08

0.72

0.7984

633.32

793.24

66.16

0.00

567.17

633.32

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.07

0.20

0.2712

215.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

52.83

0.00

162.30

215.13

4,500.00

4,500.0000

4,500.00

0.00

0.00

0.00

0.00

1.00

0.00

0.00

4,500.00

4,500.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

123.37

308.43

0.00

0.00

308.43

0.00

0.00

0.00

0.00

3,365.69

0.00

0.00

0.00

0.00

356.96

2,549.68

0.00

816.01

3,365.69

0.00

0.00

0.00

0.00
0.00

DEMOLICIONES
DEMOLICION DE VEREDAS DE 0.15 M.

3.00

Cofinanciamiento

Monto de
Valorizacin
Total

100.00

LIMPIEZA MANUAL DE TERRENO NORMAL

01.04

OTROS

Aportes del Programa

300.0000

01.02.01

01.03.01

M.O.N.C.

Metrado

300.00

TRABAJOS PRELIMINARES

01.02.05

Cofinanciamiento

Monto de
Valorizacin
Total

3,535.48
mes

01.01.04

Aportes del Programa

127,521.52

OBRAS PROVISIONALES
ALQUILER DE LOCAL PARA LA OBRA

01.03

OTROS

PAVIMENTACION DE VIAS

01.01.01

01.02

Metrado

793.24

308.43
m2

123.37

2.50

2.5000

308.43

MOVIMIENTO DE TIERRAS

19,736.98

01.04.01

CORTE EN TERRENO NORMAL

m3

356.96

7.14

01.04.02

PERFILADO DE CALZADA DE VAS TERRENO NORMAL

m2

339.96

0.83

0.8334

283.32

0.00

0.00

0.00

0.00

339.96

283.32

0.00

0.00

283.32

0.00

0.00

0.00

01.04.03

RELLENO CON AFIRMADO Y/O MATERIAL GRANULAR E=6" INC. COMPACTACIN EQUIPO LIVIANO

m2

339.96

1.25

10.32

11.5730

3,934.36

0.00

0.00

0.00

0.00

339.96

424.95

0.00

3,509.41

3,934.36

0.00

0.00

0.00

0.00

01.04.04

SUBRASANTE MEJORADA E=0.05M(INCORPORANDO 0.065M3/M2 )

m2

339.96

0.10

7.85

7.9450

2,700.98

0.00

0.00

0.00

0.00

339.96

34.00

0.00

2,666.99

2,700.98

0.00

0.00

0.00

0.00

01.04.05

SUB-BASE GRANULAR E=0.20M. (AGREGADO PRODUCIDO)C/EQUIPO

m2

339.96

0.14

18.54

18.6828

6,351.40

0.00

0.00

0.00

0.00

339.96

48.55

0.00

6,302.86

6,351.40

0.00

0.00

0.00

0.00

01.04.06

AFIRMADO DE 4" PARA VEREDAS, COMPACTADO

m2

330.20

1.25

8.14

9.3920

3,101.22

0.00

0.00

0.00

0.00

330.20

412.75

0.00

2,688.48

3,101.22

0.00

0.00

0.00

0.00

116.51

1,941.83

0.00

0.00

1,941.83

165.93

2,765.56

0.00

0.00

2,765.56

0.00

0.00

0.00

0.00

1,344.05

1,680.07

0.00

0.00

1,680.07

01.05

2.29

9.4288

TRANSPORTE DE MATERIALES Y AGREGADOS

33,874.30

01.05.01

ACARREO DE AGREGADOS EN PENDIENTE PRONUNCIADA 50<D<100M

m3

282.44

16.67

16.6666

4,707.38

0.00

0.00

0.00

0.00

01.05.02

ACARREO DE CEMENTO EN PENDIENTE PRONUNCIADAD > 100M

und

1,344.05

1.25

1.2500

1,680.07

0.00

0.00

0.00

0.00

01.05.03

ACARREO DE AGUA PARA LA OBRA DMX<=50M

m3

113.13

8.33

8.3334

942.78

0.00

0.00

0.00

0.00

341.59

0.00

0.00

341.59

72.14

601.20

0.00

0.00

601.20

01.05.04

CARGUIO Y TRANSP.MATERIALES Y/O AGREGADOS A OBRA (D>1KM) INC.VOLQUETE 6 M3

m3

171.96

5.21

12.00

17.2054

2,958.59

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

171.96

895.62

0.00

2,062.97

2,958.59

01.05.05

ACARREO Y ACOPIO MANUAL DE MATERIAL EXEDENTE D>100M

m3

484.51

25.00

25.0000

12,112.79

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

484.51

12,112.79

0.00

0.00

12,112.79

01.05.06

ELIMINACIN DE MAT.EXCED.C/VOLQUETE DE 6 M3 CARGUIO MANUAL D<= 5KM

m3

484.51170

5.21

10.66

15.8724

7,690.36

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

484.51

2,523.53

0.00

5,166.83

7,690.36

01.05.07

EXTRACCIN DE HORMIGN EN CANTERA

m3

1.64

10.00

10.0000

16.40

0.00

0.00

0.00

0.00

1.64

16.40

0.00

0.00

16.40

0.00

0.00

0.00

0.00

01.05.08

EXTRACCIN Y ZARANDEO DE ARENA

m3

73.06

16.67

16.6666

1,217.64

0.00

0.00

0.00

0.00

73.06

1,217.64

0.00

0.00

1,217.64

0.00

0.00

0.00

0.00

01.05.09

EXTRACCIN Y ZARANDEO DE PIEDRA CHANCADA DPROM= 1/2", 3/4" Y 1"

m3

97.26

12.50

12.5000

1,215.73

0.00

0.00

0.00

0.00

47.41

592.63

0.00

0.00

592.63

49.85

623.10

0.00

0.00

623.10

01.05.10

EXTRACCIN Y ACOPIO DE AFIRMADO EN CANTERA (SELECCIONADO)

m3

186.56

7.14

7.1428

1,332.55

0.00

0.00

0.00

0.00

90.95

649.64

0.00

0.00

649.64

95.61

682.92

0.00

0.00

682.92

14.79

16.4595

746.08

0.00

0.00

0.00

0.00

33.29

55.48

0.00

492.46

547.94

12.04

20.06

0.00

178.08

198.14

27.94

58.1880

19,213.58

0.00

0.00

0.00

0.00

127.95

799.69

3,070.80

3,574.67

7,445.15

202.25

1,264.05

4,853.96

5,650.42

11,768.43

11.81

13.9494

1,834.35

0.00

0.00

0.00

0.00

131.50

281.78

0.00

1,552.57

1,834.35

0.00

0.00

0.00

0.00

234.16

324.5870

2,560.99

0.00

0.00

0.00

0.00

6.10

122.00

429.59

1,428.39

1,979.98

1.79

35.80

126.06

419.15

581.01

0.00

0.00

0.00

0.00

5.00

26.79

0.00

86.75

113.53

68.99

369.60

0.00

1,196.96

1,566.57

01.06

VEREDAS

19,959.66

01.06.01

VEREDAS - ENCOFRADO Y DESENCOFRADO

m2

45.33

1.67

01.06.02

VEREDAS - CONCRETO F'C= 175 KG/CM2 E=0.15M INCLUYE ACABADO Y BRUADO CON MEZCLA INC CURADO

m2

330.20

6.25

SARDINELES - ENCOFRADO Y DESENCOFRADO (H=0.20M)

131.50

2.14

SARDINELES - CONCRETO F'C = 175 KG/CM2 C/MEZCLADORA INC CURADO

m3

7.89

20.00

01.07

01.07.02
01.08

4,395.34

70.42

PAVIMENTACION RIGIDO

31,558.06

01.08.01

ENCOFRADO Y DESENCOFRADO PAVIMENTO RIGIDO

01.08.02

PAVIMENTACIN DE CONCRETO F'C=210 KG/CM2 E=0.20M C/MEZCLADORA INC CURADO

m2

339.96

6.88

01.08.03

CONEXION ENTRE LOSAS RIGIDAS (PAVIMENTOS) SEGN DISEO

und

120.00

1.28

01.09

24.00

SARDINELES

01.07.01

40.99

m2

73.99

5.36

17.35
41.84

22.7065

1,680.10

34.31

83.0240

28,224.84

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

339.96

2,337.23

14,223.59

11,664.03

28,224.84

12.49

13.7760

1,653.12

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

120.00

153.86

0.00

1,499.26

1,653.12

CUNETAS

3,812.32

01.09.01

CUNETAS - CONCRETO F'C= 175 KG/CM2 , MANUAL, INC CURADO

m3

8.50

25.00

293.23

318.2280

2,704.62

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8.50

212.48

0.00

2,492.14

2,704.62

01.09.02

CUNETAS - ENCOFRADO Y DESENCOFRADO , 1MX0.50M, E=0.10M

m2

56.66

6.25

13.30

19.5500

1,107.70

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

56.66

354.13

0.00

753.58

1,107.70

370.84

0.71

3.87

4.5812

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

370.84

264.93

0.00

1,433.96

1,698.89

01.10

JUNTAS

01.10.01
01.11

JUNTA CON ASFALTO E= 1"

1,698.89
1,698.89

SEALIZACION

1,502.48

01.11.01

PINTURA DE PAVIMENTO LINEA CONTINUA

226.64

1.11

1.44

2.5533

578.68

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

226.64

251.87

0.00

326.81

578.68

01.11.02

PINTADO DE PAVIMENTO LETRAS Y SIMBOLOS

m2

27.56

3.33

8.85

12.1804

335.69

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

27.56

91.87

0.00

243.82

335.69

01.11.03

PINTADO DE SARDINELES

131.50

1.11

3.36

4.4723

588.11

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

131.50

146.14

0.00

441.97

588.11

m2

60.45

0.83

10.50

11.3334

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

60.45

50.38

0.00

634.73

685.10

01.12

VARIOS

1,196.21

01.12.01

SEMBRADO DE GRASS

01.12.02

EXCAVACIN DE HOYOS PARA PLANTACIN DE RBOLES

m3

18.00

12.50

12.5000

225.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

18.00

225.00

0.00

0.00

225.00

01.12.03

SEMBRADO DE PLANTA Y TAPADO DE HOYO DE 0.40X0.40 X 0.40

und

18.00

0.69

15.00

15.6944

282.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

18.00

12.50

0.00

270.00

282.50

01.12.04

RIEGO DE GRASS CON MANGUERA

m2

60.45

0.05

0.01

0.0596

3.60

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

60.45

3.02

0.00

0.58

3.60

130.35

10.87

0.00

93.20

104.07

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

130.35

2,172.49

0.00

1,390.44

3,562.93

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

02
02.01

MEJORAMIENTO Y REHABILITACION DE REDES DE AGUA POTABLE

35,230.14

TRABAJOS PRELIMINARES

02.01.01
02.02

685.10

TRAZO Y REPLANTEO EN TERRENO NORMAL CON EQUIPO- OBRAS LONGITUDINALES

104.07
m2

130.35

0.08

0.72

0.7984

104.07

10.67

27.3336

3,562.93

MOVIMIENTO DE TIERRAS

15,139.38

02.02.01

EXCAVACIN DE ZANJA PARA TUBERAS APROM=0.80 HMX<= 2.00M EN TERRENO NORMAL MANUAL

130.35

16.67

02.02.02

EXCAVACIN DE ZANJA PARA TUBERAS APROM=0.60 HMX<= 2.00M EN TERRENO NORMAL (CONEXIONES DOMICILIARIAS) MANUAL

119.00

10.00

10.0000

1,190.00

119.00

1,190.00

0.00

0.00

1,190.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

02.02.03

REFINE Y NIVELACIN DE FONDO DE ZANJA

249.95

1.43

1.4284

357.03

249.95

357.03

0.00

0.00

357.03

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

02.02.04

CAMA DE APOYO PARA TUBO HASTA 10" CON MATERIAL PROPIO INCLUYE ZARANDEO

249.95

0.83

0.8334

208.31

249.95

208.31

0.00

0.00

208.31

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

RELLENO COMPACTADO ZANJAS CAPAS E 0.15M C/MAT. PROPIO INC. PLANCHA COMP. ANCHO = 0.80M,2.50< H<5.50M INC ZARANDEO

249.95

25.00

14.29

39.2923

0.00

0.00

0.00

0.00

249.95

6,248.75

0.00

3,572.36

9,821.11

0.00

0.00

0.00

0.00

43.91

0.00

2,739.06

2,782.97

29.33

12.75

0.00

795.25

808.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

130.35

65.18

0.00

2,404.38

2,469.56

0.00

0.00

0.00

0.00

02.02.05
02.03
02.03.01
02.04

SUMINISTRO E INSTALACIN DE TUBERA DE PVC-U UF ISO 4422 C-10 DN 110MM PARA AGUA INC. ANILLO

3,590.97
m

130.35

0.43

27.11

27.5487

130.35

0.50

18.45

18.9456

3,590.97

PRUEBA HIDRAULICA

02.04.01
02.05

9,821.11

RED DE AGUA POTABLE

PRUEBA HIDRULICA Y DESINFECCIN

101.02

2,469.56
2,469.56

CONEXIONES DOMICILIARIAS

12,919.10

02.05.01

RETIRO Y REPOSICION DE CAJA DE REGISTRO

und

23.00

3.13

106.75

109.8750

2,527.13

20.41

63.78

0.00

2,178.77

2,242.55

2.59

8.09

0.00

276.48

284.58

0.00

0.00

0.00

0.00

02.05.02

INSTALACIN DE CONEXIN DOMICILIARIA DE AGUA INCLUYE ACCESORIOS PVC 15 MM DESDE MATRIZ DE 90-110MM

und

23.00

50.00

401.83

451.8250

10,391.98

14.85

742.50

0.00

5,967.10

6,709.60

8.15

407.50

0.00

3,274.87

3,682.37

0.00

0.00

0.00

0.00

02.06

SUMINISTRO E INSTALACION DE ACCESORIOS

1,007.06

02.06.01

SUMINISTRO E INSTALACIN DE TAPON PVC C-10 110 MM UF

und

1.00

2.08

43.42

45.5022

45.50

1.00

2.08

0.00

43.42

45.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

02.06.02

SUMINISTRO E INSTALACIN DE TEE DOBLE CON REDUCCIN PVC C-10 200 X 110 MM UF ISO 4422

und

1.00

2.50

234.39

236.8900

236.89

1.00

2.50

0.00

234.39

236.89

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

VLVULA DE COMPUERTA DE BRONCE DE 110 MM INCLUYE SUMINISTRO E INSTALACIN

und

1.00

8.33

716.33

724.6664

724.67

1.00

8.33

0.00

716.33

724.67

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

130.61

10.89

0.00

93.39

104.28

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

02.06.03
03
03.01

MEJORAMIENTO Y REHABILITACION DE REDES DE ALCANTARILLADO


TRABAJOS PRELIMINARES

03.01.01
03.02

38,711.04

TRAZO Y REPLANTEO EN TERRENO NORMAL CON EQUIPO- OBRAS LONGITUDINALES

104.28
m2

130.61

0.08

0.72

0.7984

104.28

MOVIMIENTO DE TIERRAS

17,264.57

03.02.01

EXCAVACIN DE ZANJA PARA TUBERAS APROM=0.80 HMX<= 2.00M EN TERRENO NORMAL MANUAL

250.21

16.67

10.67

27.3336

6,839.14

250.21

4,170.15

0.00

2,668.99

6,839.14

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

03.02.02

EXCAVACIN PARA BUZONES EN TERRENO NORMAL HPROM=2.0M

m3

2.65

10.00

3.20

13.2000

34.99

2.65

26.51

0.00

8.48

34.99

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

03.02.03

REFINE Y NIVELACIN DE ZANJA TN P/TUB 8" - 10" HASTA 2.5 0M DE PROFUNDIDAD

130.61

1.67

1.6666

217.67

130.61

217.67

0.00

0.00

217.67

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

03.02.04

REFINE Y NIVELACIN DE ZANJA TN P/TUB AGUA HASTA 6"

119.60

1.11

1.1113

132.91

119.60

132.91

0.00

0.00

132.91

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

03.02.05

CAMA DE APOYO PARA TUBO HASTA 10" CON MATERIAL PROPIO INCLUYE ZARANDEO

250.21

0.83

0.8334

208.53

250.21

208.53

0.00

0.00

208.53

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

RELLENO COMPACTADO ZANJAS CAPAS E 0.15M C/MAT. PROPIO INC. PLANCHA COMP. ANCHO = 0.80M,2.50< H<5.50M INC ZARANDEO

250.21

25.00

14.29

39.2923

0.00

0.00

0.00

0.00

6,255.25

0.00

3,576.08

9,831.33

0.00

0.00

0.00

0.00

3,376.96

3,576.96

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

03.02.06
03.03

BUZN DE CONCRETO D=1.20M, H=1.50M, E=0.20M

und

1.00

200.00

03.03.02

ENCIMADO DE BUZN DE CONCRETO EXISTENTE MAX=1.50M PARA ADECUACION A PAVIMENTACION POSTERIOR H MAX= 40 CM

und

2.00

100.00

310.00

03.03.03

FABRICACION DE TAPAS PARA BUZN DE CONCRETOFC= 245 KG/M2 D=1.50M, E=0.20M

und

3.00

15.00

709.98

03.05

3,376.96

3,576.9643

3,576.96

1.00

200.00

0.00

409.9950

819.99

2.00

200.00

0.00

619.99

819.99

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

724.9780

2,174.93

3.00

45.00

0.00

2,129.93

2,174.93

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

126.52

158.15

0.00

4,303.83

4,461.98

5.11

0.00

139.13

144.24

0.00

0.00

0.00

0.00

SUMINISTRO E INSTALACION DE TUBERIAS

03.04.01

SUMINISTRO E INSTALACIN DE TUBERA DE PVC- U UF ISO 4435 DN 200MM INCLUYE ANILLO

250.21

6,571.89

03.03.01

03.04

9,831.33

BUZON DE CONCRETO

4,606.22
m

130.61

1.25

34.02

35.2670

4,606.22

CONEXIONES DOMICILIARIAS

4.09

10,010.75

03.05.01

RETIRO Y REPOSICION DE CAJA DE REGISTRO

und

23.00

3.13

106.75

109.8750

2,527.13

23.00

71.88

0.00

2,455.25

2,527.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

03.05.02

CONEXIONES DOMICILIARIAS SIMPLE DE DESAGE L=6.0M 160/200 MM (NO INCLUYE CAJA Y TAPA HASTA)

und

23.00

9.38

316.00

325.3750

7,483.63

23.00

215.63

0.00

7,268.00

7,483.63

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

130.61

48.98

0.00

104.36

153.34

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.00

0.00

0.00

1,325.00

1,325.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5,613.00

1.00

0.00

5,613.00

0.00

5,613.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5,206.50

1.00

0.00

5,206.50

0.00

5,206.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

850.00

1.00

0.00

0.00

850.00

850.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,200.00

1.00

0.00

0.00

1,200.00

1,200.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.00

4.17

0.00

91.67

95.83

1.00

4.17

0.00

91.67

95.83

2.00

03.06

PRUEBA HIDRAULICA

03.06.01
04
04.01
05
05.01
05.02
06
06.01
06.02
07

PRUEBA A ZANJA ABIERTA P/TUBERIA DESAGUE 8"

153.34
m

130.61

0.38

IMPLEMENTACION DE TALLERES DE CAPACITACION PARA OBRAS DE SANEAMIENTO

glb

1.00

KIT DE HERRAMIENTAS

und

1.00

KIT DE IMPLEMENTOS DE SEGURIDAD

und

1.00

5,613.00

5,613.0000

5,206.50

5,206.5000

1,325.00

2,050.00

MEDIDAS DE REDUCCION DE RIESGO POR EVENTOS NATURALES

glb

1.00

850.00

850.0000

MITIGACION POR IMPACTO NEGATIVO EN EL AIRE (RUIDO, POLVOS, OLORES Y GASES)

glb

1.00

1,200.00

1,200.0000

ENSAYOS

2,134.17

PRUEBA DE DISEO DE MEZCLAS DE CONCRETO

und

2.00

07.03

PRUEBA DE RESISTENCIA A LA COMPRESIN DEL CONCRETO

und

15.00

1.00

ENSAYO PRCTOR (COMPACTACIN DEL SUELO)

und

4.00

3.13

09.01

1,325.0000

MITIGACION DE IMPACTO AMBIENTAL

07.02

09

1,325.00

10,819.50

und

08.01

153.34

KIT

ENSAYO DENSIDAD DE CAMPO

08

1.1740

1,325.00

07.01

07.04

0.80

CAPACITACIONES

2.00

4.17

91.67

95.8336

191.67

350.00

350.0000

700.00

0.00

0.00

0.00

0.00

25.00

26.0000

390.00

0.00

0.00

0.00

0.00

210.00

213.1250

852.50

0.00

0.00

0.00

0.00

0.00

0.00

1,850.00

541.25

0.00

0.00

11,375.85

10,819.50

FLETE
FLETE TERRESTRE

0.00

700.00

700.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

15.00

15.00

0.00

375.00

390.00

3.13

0.00

210.00

213.13

3.00

9.38

0.00

630.00

639.38

1,850.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.25

0.00

535.00

541.25

45,512.88

67,708.23

23,117.04

3,500.39

42,658.79

69,276.22

27,765.31

19,203.61

36,229.26

83,198.18

1.00

1,850.00
glb

1.00

glb

1.00

1,850.00

1,850.0000

535.00

541.2500

1,850.00

PLACA RECORDATORIA
SUMINISTRO E INSTACION DE PLACA RERCORDATORIA DE METAL Y VIDRIO (SEGN DISEO DE 30 CM X 42 CM)

0.00
0.00

1.00

541.25
6.25

0.22

1.00

COSTO DIRECTO (CD)

S/.

220,182.6268

COSTO INDIRECTO (CI)

S/.

47,518.44

14,612.37

14,950.76

17,955.31

COSTO TOTAL

S/.

267,701.0652

82,320.60

84,226.98

101,153.49

% AVANCE MENSUAL

30.75%

31.46%

37.79%

% AVANCE FSICO ACUMULADO

30.75%

62.21%

100.00%