REKAPITULASI

PEKERJAAN PENGADAAN / PEMASANGAN INSTALASI PENGOLAHAN AIR (IPA)


LENGKAP KAPASITAS : 50 L/dt

NO.

URAIAN KEGIATAN

TOTAL HARGA
Rp.

I.

FABRIKASI INSTALASI PENGOLAHAN AIR (IPA)

II.

RUMAH POMPA

126,661,893

III.

RUMAH OPERASIONAL

437,867,944

IV

RUMAH GENSET

92,833,221

RUMAH GARDU INDUK PLN

92,833,221

VI

PEMBUATAN RESERVOIR KAPASITAS 500 M3

VII

PEMBANGUNAN JALAN DALAM LOKASI

4,626,902,202

1,529,381,915

Jalan

725

445,403,750

Kansteen

210

26,546,310

VIII PENGADAAN DAN PEMASANGAN PERPIPAAN DISTRIBUSI

147,225,361

IX

PEMBUATAN BANGUNAN SLUDGE DRYING BED KAP. 80 M

152,786,540

DRAINASE

300 m

213,240,600

XI

PAGAR

260 m

438,230,000

XII

UJI COBA

22,224,700

Jumlah Rp.

8,352,137,656

PPn 10%

835,213,766

Total Rp.

9,187,351,422

Pembulatan

9,187,351,000
9,268,202,000
Bekasi
Juli 2015
Pejabat Pembuat Komitmen
(Arief Subagyo ST MT)
19610409200711004

Page 1 of 59

PEKERJAAN

: PEKERJAAN PENGADAAN / PEMASANGAN INSTALASI PENGOLAHAN AIR (IPA) LENGKAP KAPASITAS : 50 L/dt

TAHUN ANGGARAN.
BAGIAN PEKERJAAN

: 2015
: (I) FABRIKASI INSTALASI PENGOLAHAN AIR (IPA)
JENIS PEKERJAAN

I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi dan Perataan Tanah
2 Pengukuran Pematokan Dan Papan Nama Proyek
3 Kantor Sementara

SATUAN

VOLUME

Ls
Ls
m2

2468
1
10

Acuan Harga Satuan

A
A
A

HARGA SATUAN

TOTAL HARGA

Rp.

Rp.

1.10
1.40
1.70

7,245
634,300
1,443,400

17,880,660
634,300
14,434,000
32,948,960

Diuraiakan sesuai
usulan kontraktor

2,850,000,000

2,850,000,000

Diuraiakan sesuai
usulan kontraktor

125,000,000

125,000,000

Diuraiakan sesuai
usulan kontraktor

35,500,000

106,500,000

Diuraiakan sesuai
usulan kontraktor

3,000,000

9,000,000

3,000,000

9,000,000

Sub Total 1

II. PEKERJAAN BANGUNAN PRODUKSI TERMASUK M & E


1 Pengadaan Dan Pemasangan Paket IPA Lengkap Dengan Accessories
Unit
1
Kapasitas :
50
Liter/detik
2 Pengadaan Dan Pemasangan Bangunan Atap IPA Terbuat Dari Rangka Baja,
Unit
1
Atap Dari Spandek, Tiang Atap Menggunakan Pipa Diameter 4 inch
Class Medium (Tidak Bersatu Dengan Konstruksi IPA)
3 Pengadaan Dan Pemasangan Pompa Dosing Lengkap Dengan Accessories
Unit
3
(Alum sulfat, Soda ash dan Kaporit)
4 Pengadaan Dan Pemasangan Tangki Pembubuh Bahan Kimia Lengkap
Unit
3
Dengan Accessories
Kapasitas :
1000
Liter
5 Pengadaan Dan Pemasangan Tangki Mixer Bahan Kimia
Unit
3
Kapasitas :
1000
Liter
6 Pengadaan Dan Pemasangan Mixer alum, Soda ash dan Kaporit (900 ~ Unit
1000 rpm)3
7 Pengadaan Dan Pemasangan Panel Pompa Kimia Dan Mixer Lengkap
Unit
1
Dengan MCCB, Contactor, Thermis, Push Button, Lampu Control Dan Lain-lain
8 Pengadaan Dan Pemasangan Genset Unit Produksi Lengkap Dengan Panel dan
Accessories (Pipa knalpot, Silencer, Kampas Radiator, Isolasi Asbes, Filter Oil 5 buah,
Unit
1
Filter Solar 3 buah, Filter Udara 2 buah)
Kapasitas :
150
kVA
9 Pengadaan Dan Pemasangan Panel MDP Dan Change Over Switch ( kap. 150 KVA)
10 Pembuatan Tangki Bahan Bakar Produksi Termasuk Accessories (Lihat Specifikasi)
Kapasitas :
5
m3
Spesifikasi :
Unit
1
Bahan :
Plat Baja
Tebal :
5 mm
Pondasi :
Beton Bertulang
Tangga Monyet :
Pipa Steel Class Medium dia. 2 Inch
11 Pengadaan Dan Pemasangan Pompa Air Minum (Centrifugal) Putaran : 1500 rpm
Lengkap dengan Accessories (Perpipaan, Valve, Check valve, Manometer,
Unit
2
Mekanikal Joint Dan Header Pipe Class "Schedule 40".
Kapasitas :
50
Lt/dt,
Total Head : 50
m
16 Pengadaan Dan Pemasangan Panel Pompa Air Minum Lengkap Dengan MCCB,
Unit
1
Contactor, Thermis, Lampu Control, Amper Meter, Level Control,
Push Button, Inverter dan Pressure gauge
17 Pengadaan Dan Pemasangan Kabel-kabel Untuk Kebutuhan Kabel Kabel Pompa
Rak Kabel, Tray Kabel Dan Lain-lain
m
50
Jenis :
NYY 4 x 70
mm2
18 Pengadaan Dan Pemasangan Kabel-kabel Untuk Kebutuhan Kabel Power Genset,
Kabel Penerangan, Rak Kabel, Tray Kabel Dan Lain-lain
m
50
Jenis :
NYFGBY 4 x 70mm2
23 Pengadaan Dan Pemasangan Water Meter Air Minum
Lengkap dengan Pipa Bypass, 3 Buah Valve, 2 buah Mechanical Joint
Unit
1
Dan Box Valve terbuat dari Pasangan Batu Bata, Atap dari plat baja
Diameter :
300
mm
29 Pengadaan Dan Pemasangan Lampu Penerangan Jalan (Termasuk Saklar)
a. Mercury 100 Watt
Unit
6
b. Tiang lampu 6 m
Unit
6
30 Pengadaan Dan Pemasangan Penangkal Petir Lengkap dgn Kabel B.C standar
Unit
PLN
2
31 Pondasi :
Lantai kerja 1 : 3 : 5 (mutu beton K-125)
m3
3.93
Tiang Pancang 30x30 ( 40 titik )
m
19.64
Beton bertulang 1 : 1.5 : 2.5 (mutu K-225)
m3
19.64
Pasangan Batu Kali 1:4
m3
78.57

Diuraiakan sesuai
usulan kontraktor
Perkiraan
Diuraiakan sesuai
usulan kontraktor

4,500,000

13,500,000

20,000,000

20,000,000

225,000,000

225,000,000

Diuraiakan sesuai
usulan kontraktor

45,000,000

45,000,000

Diuraiakan sesuai
usulan kontraktor

25,592,658

25,592,658

350,000,000

700,000,000

Diuraiakan sesuai
usulan kontraktor

140,000,000

140,000,000

8.8

151,200

7,560,000

8.1

644,000

32,200,000

109,668,691

109,668,691

Diuraiakan sesuai
usulan kontraktor

Diuraiakan sesuai
usulan kontraktor

C
C
C

8.17
8.22
8.23

175,000
3,750,000
14,500,000

1,050,000
22,500,000
29,000,000

A
A
A

5.2
3.8
7.11
3.2

355,300
404,600
3,444,400
590,300

1,395,821
7,947,500
67,657,857
46,380,714

Sub Total 2
Total

Page 2 of 59

4,593,953,242
4,626,902,202

PEKERJAAN

PEKERJAAN PENGADAAN / PEMASANGAN INSTALASI PENGOLAHAN AIR (IPA) LENGKAP KAPASITAS : 50 L/dt

TAHUN ANGGARAN.
BAGIAN PEKERJAAN

:
:

2015
(II) RUMAH POMPA

No

I
1.1
1.2
1.3

JENIS PEKERJAAN

PEKERJAAN TANAH
Pekerjaan galian tanah pondasi
Pekerjaan timbunan bekas galian
Pekerjaan Urugan pasir

SATUAN

VOLUME

Acuan Harga Satuan

HARGA SATUAN
(Rp)

JUMLAH HARGA
(Rp)

M3
M3
M3

5.12
3.16
1.28

A
A
A

2.1
2.11
2.13

19,800.00
65,300.00
206,000.00

101,376.00
206,348.00
263,680.00

II
2.1
2.3
2.4
2.6
2.8
2.9
2.10
2.11
2.12

PEKERJAAN COR BETON BERTULANG K 225


Beton bertulang (sloof 30/15) K 225
M3
Beton bertulang (kolom Praktis 20/20) K 225
M3
Beton bertulang (ring balk 30/15) K 225
M3
Beton bertulang (Pondasi Telapak 80/80) K 225
M3
Beton bertulang (plat atap & listplank tebal 12.5 cm) K 225
M3
Lantai Kerja
M3
Pekerjaan coran beton tumbuk lantai 175
M3
Balok Crane
M3
Pondasi Pompa
M3

1.31
1.15
1.31
1.96
5.50
1.93
3.85
1.54
3.00

A
A
A
A
A
A
A
A
A

7.12
7.18
7.19
7.11
7.15
3.7
5.22
7.14
7.11

2,242,400.00
3,850,800.00
3,850,800.00
3,444,400.00
5,658,700.00
674,909.57
746,100.00
6,347,700.00
3,444,400.00

2,926,332.00
4,436,121.60
5,025,294.00
6,751,024.00
31,122,850.00
1,299,200.93
2,872,485.00
9,775,458.00
10,333,200.00

III
3.1
3.2
3.4

PEKERJAAN BATU BATA & PLESTERAN


Pekerjaan dinding bata 1/2 batu 1 : 4
Pekerjaan plesteran dinding 1 : 4
Pekerjaan Keramik 30 x 30 Lantai

M2
M2
M2

104.40
208.80
38.50

A
A
A

4.2
5.4
9.8

144,700.00
30,600.00
404,300.00

15,106,680.00
6,389,280.00
15,565,550.00

IV
PEKERJAAN KAYU DAN KACA
4.1 Rolling Door
4.2 Rosster Dinding

M2
M2

1.50
19.32

A
A

15.80
5.10

706,510.20
206,400.00

1,059,765.30
3,987,648.00

V
FINISHING
5.1 Pekerjaan cat dinding luar dalam

M2

208.80

10.90

37,600.00

7,850,880.00

VI
PEKERJAAN KUNCI
6.1 Pekerjaan pasangan kunci tanam
6.2 Pekerjaan pasangan ensel pintu

Unit
Unit

1.00
1.00

C
C

4.30
4.40

185,000.00
15,680.00

185,000.00
15,680.00

VII
6.1
6.2
6.3
6.4
6.5

Unit
Unit
Unit
Unit
Unit

2.00
1.00
2.00
2.00
1.00

A
A
A
A
C

14.1
14.3
14.4
14.5
8.2

549,780.00
52,800.00
52,800.00
40,040.00
50,000.00

1,099,560.00
52,800.00
105,600.00
80,080.00
50,000.00

PEKERJAAN LISTRIK

Pemasangan Instalasi Titik Cahaya


Pemasangan Armatur Stop Kontak
Pemasangan Armatur Saklar Doble
Unit Lampu Sl 18 W
MCB 10 A

TOTAL HARGA

126,661,892.83

Page 3 of 59

PEKERJAAN

: PEKERJAAN PENGADAAN / PEMASANGAN INSTALASI PENGOLAHAN AIR (IPA) LENGKAP KAPASITAS : 50L/dt

TAHUN ANGGARAN.
BAGIAN PEKERJAAN

: 2015
: (III) RUMAH OPERASIONAL

NO
I

URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN
1 Pengukuran Site
2 Bouwplank

II

Acuan Harga Satuan

HARGA SATUAN
(Rp)

JUMLAH HARGA
(Rp)

m2
m1

84.00
60.00

A
A

1.11
1.10

2,300.00
60,200.00

193,200.00
3,612,000.00
3,805,200.00

1
2
3
4
5

PEKERJAAN TANAH DAN PONDASI


Galian Tanah
Urugan Tanah Kembali
Urugan Pasir
Pekerjaan Pasangan Pondasi Batu Belah 1: 5
Pembuangan Sisa Tanah

m3
m3
m3
m3
m3

62.70
17.56
7.52
45.14
45.14

A
A
A
A
A

2.10
2.90
2.13
3.30
2.70

19,800.00
11,300.00
206,000.00
561,300.00
25,500.00

1,241,460.00
198,382.80
1,549,944.00
25,339,327.20
1,151,172.00
29,480,286.00

1
2
3
4
5
6

PEKERJAAN BETON
Pekerjaan Pondasi Telapak 80/80 K 225
Pekerjaan kolom Praktis 15/15
Pekerjaan Sloof 25/15
Pekerjaan Ringbalok 25/15
Pekerjaan Meja laboratorium
Pekerjaan Pelat lantai beton tebal 12 cm K 225 ( Rg. Genset )

m3
m3
m3
m3
m3
m3

2.72
1.70
3.92
3.92
0.51
2.70

A
A
A
A
A
A

7.11
7.18
7.12
7.12
7.15
7.15

3,444,400.00
3,850,800.00
2,242,400.00
2,242,400.00
5,658,700.00
5,658,700.00

9,368,768.00
6,550,210.80
8,787,405.00
8,787,405.00
2,885,937.00
15,278,490.00
51,658,215.80

1
2
3
4
5
6

PEKERJAAN DINDING
Pasangan Bata merah 1 : 5
Plesteran 1 : 5 + Acian
Pasangan Keramik Dinding Kamar mandi
Pasang kran dinding kamar Mandi
Pasang keramik meja dapur
Pasang Zink meja laboratorium

m2
m2
m2
bh
m2
bh

346.75
693.50
9.45
2.00
5.10
1.00

A
A
A
D
C

4.30
5.50
10.70
31.10
31.10
3.30

140,500.00
30,900.00
57,400.00
102,000.00
102,000.00
65,000.00

48,718,375.00
21,429,150.00
542,430.00
204,000.00
520,200.00
65,000.00
71,479,155.00

PEKERJAAN KUSEN
Pekerjaan kusen Pintu ex Kamper banjar
Pekerjaan kusen Jendela ex. Kamper Banjar
Pekerjaan Daun Jendela ex. Kamper Banjar
Pekerjaan Daun Pintu double takwood
Pekerjaan kusen dan daun Pintu Aluminum
Pekerjaan Pasang kaca polos 5mm
Pekerjaan Pas. Pegangan pintu
Kunci Tanam Cilinder Merk Logo Type 1103 ( Silver/Brown )
Engsel Pintu
Pekerjaan hak angin Jendela antik
Pekerjaan Engsel jendela
Pekerjaan Slot jendela

m3
m3
m2
m2
Unit
m2
bh
bh
bh
bh
bh
bh

0.33
0.76
17.28
9.45
1.00
17.28
4.00
4.00
8.00
4.00
4.00
4.00

A
A
A
A
C
C
C
C
C
C
C
C

6.10
6.10
6.50
6.19
4.10
2.63
4.11
4.30
4.40
4.70
4.50
2.62

4,816,500.00
4,816,500.00
317,400.00
521,300.00
1,500,000.00
97,100.00
126,500.00
185,000.00
15,680.00
30,000.00
12,550.00
29,250.00

1,574,995.50
3,637,661.63
5,484,672.00
4,926,285.00
1,500,000.00
1,677,888.00
506,000.00
740,000.00
125,440.00
120,000.00
50,200.00
117,000.00
20,460,142.13

PEKERJAAN LANTAI
Pasangan keramik lantai 30 x 30 standard keramik Mulia
Pasangan keramik lantai 20 x 20 standard keramik Mulia ( Km. Mandi )
Pekerjaan closed jongkok
Pekerjaan pasang Ploordrain

m2
m2
bh
bh

61.30
3.00
1.00
1.00

A
A
A
A

10.50
10.70
9.20
9.21

77,600.00
57,400.00
720,400.00
87,900.00

4,756,880.00
172,200.00
720,400.00
87,900.00
5,737,380.00

m2
m2

61.30
61.30

A
A

6.32
6.46

107,700.00
41,600.00

6,602,010.00
2,550,080.00
9,152,090.00

III

IV

V
1
2
3
4
5
6
7
8
9
10
11
12
VI
1
2
3
4
VII

SATUAN VOLUME

PEKERJAAN PLAFOND
1 Pekerjaan Pasang rangka plafond ( borneo 5/7 cm )
2 Pekerjaan pasang penutup plafond ( triplek 4 mm )

VIII

1
2
3
4
5

PEKERJAAN ATAP
Pekerjaan Kuda-kuda 8/12 ex. Kamper
Pekerjaan Godeng 6/12 ex. Kamper
Pekerjjaan rangka atap Zingkalum
Pekerjaan Penutup atap ( Genteng )
Pekerjaan Lisplang 30/3 ex.Kamper

m3
m3
m2
m2
m1

0.73
0.85
367.50
367.50
61.00

A
A
A
A
A

6.21
6.21
11.15
8.20
8.10

3,928,100.00
3,928,100.00
309,000.00
292,200.00
39,700.00

2,857,692.75
3,340,849.05
113,557,500.00
107,383,500.00
2,421,700.00
229,561,241.80

1
2
3
4

PEKERJAAN FINISHING
Pengecatan dinding
Pengecatan Plafond
Pengecatan kusen
Pengecatan Lisplang

m2
m2
m2
m2

693.50
61.30
50.35
18.30

A
A
A
A

10.90
10.80
10.80
10.80

37,600.00
54,500.00
54,500.00
54,500.00

26,075,600.00
3,340,850.00
2,744,075.00
997,350.00
33,157,875.00

1
2
3
4
6
7

PEKERJAAN PLUMBING
Pekerjaan pasang Pipa Pvc 3" Instalasi air Kotor
Pekerjaan pasang Pipa Pvc 2 " Instalasi air Kotor
Pekerjaan pasang instalasi air bersih Pvc 3/4
Pekerjaan pasang instalasi air bersih Pvc 1/2
Stop Kran
Bak Fiber

m1
m1
m1
m1
bh
bh

15.00
16.00
21.00
24.00
1.00
1.00

A
A
A
A
C
C

9.18
9.17
9.15
9.14
6.20
6.10

111,100.00
58,900.00
20,800.00
18,700.00
25,000.00
200,000.00

1,666,500.00
942,400.00
436,800.00
448,800.00
25,000.00
200,000.00
3,719,500.00

1
2
3
4
6
7
8

PEKERJAAN LISTRIK
Pemasangan Instalasi Titik Cahaya
Pemasangan Instalasi Titik Daya Stop Kontak
Pemasangan Armatur Stop Kontak
Pemasangan Armatur Saklar Doble
Unit Lampu Sl 18 W
Pemasangan Lampu Taman
MCB 10 A

unit
unit
unit
unit
unit
unit
unit

16.00
2.00
10.00
6.00
20.00
4.00
1.00

A
A
A
A
A
A

14.10
14.20
14.30
14.40
14.50
14.60
8.20

549,780.00
71,280.00
52,800.00
52,800.00
40,040.00
137,280.00
50,000.00

8,796,480.00
142,560.00
528,000.00
316,800.00
800,800.00
549,120.00
50,000.00
11,183,760.00

IX

XI

JUMLAH HARGA

Page 4 of 59

437,867,943.60

PEKERJAAN
TAHUN ANGGARAN.
BAGIAN PEKERJAAN
No

I
1.1
1.2
1.3

: PEKERJAAN PENGADAAN / PEMASANGAN INSTALASI PENGOLAHAN AIR (IPA) LENGKAP KAPASITAS : 50 L/dt
: 2015
: (IV) RUMAH GENSET
JENIS PEKERJAAN

SATUAN

VOLUME

Acuan Harga Satuan

HARGA SATUAN
(Rp)

JUMLAH HARGA
(Rp)

PEKERJAAN TANAH
Pekerjaan galian tanah pondasi
Pekerjaan timbunan bekas galian
Pekerjaan Urugan pasir

M3
M3
M3

8.78
7.74
4.09

A
A
A

2.1
2.11
2.13

19,800.00
65,300.00
206,000.00

173,764.80
505,291.40
842,540.00

II
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10

PEKERJAAN COR BETON BERTULANG K 225


Beton bertulang (sloof 30/15) K 225
Beton bertulang (kolom 20/20) K 225
Beton bertulang (kolom Praktis 20/15) K 225
Beton bertulang (ring balk 30/15) K 225
Beton bertulang (Balok 30/20) K 225
Beton bertulang (Pondasi Telapak 80/80) K 225
Beton bertulang (Pondasi Genset 80/80) K 225
Beton bertulang (plat atap & listplank tebal 12.5 cm) K 225
Lantai Kerja
Pekerjaan coran beton tumbuk lantai 225

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

0.72
1.10
0.41
1.08
0.36
1.04
2.00
6.30
4.09
2.20

A
A
A
A
A
A
A
A
A
A

7.12
7.13
7.18
7.19
7.14
7.11
7.11
7.15
3.7
5.22

2,242,400.00
8,226,000.00
3,850,800.00
3,850,800.00
6,347,700.00
3,444,400.00
3,444,400.00
5,658,700.00
674,909.57
746,100.00

1,614,528.00
9,032,148.00
1,585,566.90
4,158,864.00
2,285,172.00
3,575,287.20
6,888,800.00
35,649,810.00
2,760,380.15
1,641,420.00

III
3.1
3.2
3.4

PEKERJAAN BATU BATA & PLESTERAN


Pekerjaan dinding bata 1/2 batu 1 : 4
Pekerjaan plesteran dinding 1 : 4
Pekerjaan Keramik 30 x 30 Lantai

M2
M2
M2

55.80
111.60
29.00

A
A
A

4.2
5.4
9.8

144,700.00
30,600.00
404,300.00

8,074,260.00
3,414,960.00
11,724,700.00

IV
4.1
4.2
4.3
4.4

PEKERJAAN KAYU DAN KACA


Rolling Door
Ventilasi Genset VG Besi
Bouvenlight Jalusi JLS.2 Kayu
Rosster Dinding

m2
M2
M2
M2

5.25
1.21
20.80
4.32

C
C
A
A

4.12
4.13
6.7
5.1

480,000.00
2,500,000.00
533,500.00
206,400.00

2,520,000.00
3,018,750.00
11,096,800.00
891,648.00

V
FINISHING
5.1 Pekerjaan cat dinding luar dalam

M2

147.60

10.90

37,600.00

5,549,760.00

VI
PEKERJAAN KUNCI
6.1 Pekerjaan pasangan kunci tanam
6.2 Pekerjaan pasangan ensel pintu

Unit
buah

1.00
4.00

C
C

4.30
4.40

185,000.00
15,680.00

185,000.00
62,720.00

Unit
Unit
Unit
Unit
Unit

2.00
1.00
2.00
2.00
1.00

A
A
A
A
C

14.10
14.30
14.40
14.50
8.20

549,780.00
52,800.00
52,800.00
40,040.00
50,000.00

1,099,560.00
52,800.00
105,600.00
80,080.00
50,000.00

VIII
6.1
6.2
6.3
6.4
6.5

PEKERJAAN LISTRIK
Pemasangan Instalasi Titik Cahaya
Pemasangan Armatur Stop Kontak
Pemasangan Armatur Saklar Doble
Unit Lampu Sl 18 W
MCB 10 A

TOTAL HARGA

Page 5 of 59

118,640,210.45

PEKERJAAN

: PEKERJAAN PENGADAAN / PEMASANGAN INSTALASI PENGOLAHAN AIR (IPA) LENGKAP KAPASITAS : 50 L/dt

TAHUN ANGGARAN.
BAGIAN PEKERJAAN

: 2015
: (V) RUMAH GARDU INDUK PLN

No

I
1.1
1.2
1.3

JENIS PEKERJAAN

SATUAN

VOLUME

Acuan Harga Satuan

HARGA SATUAN
(Rp)

JUMLAH HARGA
(Rp)

PEKERJAAN TANAH
Pekerjaan galian tanah pondasi
Pekerjaan timbunan bekas galian
Pekerjaan Urugan pasir

M3
M3
M3

3.84
2.80
1.28

A
A
A

2.1
2.11
2.13

19,800.00
65,300.00
206,000.00

76,032.00
182,970.60
263,680.00

II
2.1
2.3
2.4
2.6
2.8
2.9
2.10

PEKERJAAN COR BETON BERTULANG K 225


Beton bertulang (sloof 30/15) K 225
Beton bertulang (kolom Praktis 20/20) K 225
Beton bertulang (ring balk 30/15) K 225
Beton bertulang (Pondasi Telapak 80/80) K 225
Beton bertulang (plat atap & listplank tebal 12.5 cm) K 225
Lantai Kerja
Pekerjaan coran beton tumbuk lantai 175

M3
M3
M3
M3
M3
M3
M3

0.72
0.90
0.72
1.04
5.75
1.28
2.20

A
A
A
A
A
A
A

7.12
7.18
7.19
7.11
7.15
3.7
5.22

2,242,400.00
3,850,800.00
3,850,800.00
3,444,400.00
5,658,700.00
674,909.57
746,100.00

1,614,528.00
3,465,720.00
2,772,576.00
3,575,287.20
32,537,525.00
863,884.25
1,641,420.00

III
3.1
3.2
3.4

PEKERJAAN BATU BATA & PLESTERAN


Pekerjaan dinding bata 1/2 batu 1 : 4
Pekerjaan plesteran dinding 1 : 4
Pekerjaan Keramik 30 x 30 Lantai

M2
M2
M2

55.80
111.60
29.00

A
A
A

4.2
5.4
9.8

144,700.00
30,600.00
404,300.00

8,074,260.00
3,414,960.00
11,724,700.00

IV
4.1
4.2
4.3
4.4

PEKERJAAN KAYU DAN KACA


Pintu Besi
Ventilasi Genset VG Besi
Bouvenlight Jalusi JLS.2 Kayu
Rosster Dinding

Unit
M2
M2
M2

1.00
1.21
20.80
4.32

C
C
A
A

4.12
4.13
6.7
5.1

480,000.00
2,500,000.00
533,500.00
206,400.00

480,000.00
3,018,750.00
11,096,800.00
891,648.00

V
FINISHING
5.1 Pekerjaan cat dinding luar dalam

M2

147.60

10.9

37,600.00

5,549,760.00

VI
PEKERJAAN KUNCI
6.1 Pekerjaan pasangan kunci tanam
6.2 Pekerjaan pasangan ensel pintu

Unit
Unit

1.00
1.00

C
C

4.3
4.4

185,000.00
15,680.00

185,000.00
15,680.00

Unit
Unit
Unit
Unit
Unit

2.00
1.00
2.00
2.00
1.00

A
A
A
A
C

14.1
14.3
14.4
14.5
8.2

549,780.00
52,800.00
52,800.00
40,040.00
50,000.00

1,099,560.00
52,800.00
105,600.00
80,080.00
50,000.00

VIII
6.1
6.2
6.3
6.4
6.5

PEKERJAAN LISTRIK
Pemasangan Instalasi Titik Cahaya
Pemasangan Armatur Stop Kontak
Pemasangan Armatur Saklar Doble
Unit Lampu Sl 18 W
MCB 10 A

TOTAL HARGA

Page 6 of 59

92,833,221.05

PEKERJAAN

: PEKERJAAN PENGADAAN / PEMASANGAN INSTALASI PENGOLAHAN AIR (IPA) LENGKAP KAPASITAS : 50 L/dt

TAHUN ANGGARAN.
BAGIAN PEKERJAAN

: 2015
: (VI) PEMBUATAN RESERVOIR KAPASITAS 500 M3

No.

URAIAN PEKERJAAN

SATUAN

VOLUME Acuan Harga Satuan

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

PEMBUATAN RESERVOIR KAPASITAS 500 M3


I.
1
2
3
4

PEKERJAAN TANAH
Galian Tanah biasa
Urugan dan pemadatan Tanah bekas galian
Urugan dan pemadatan pasir bawah lantai
Buangan tanah bekas galian tanah

m
m
m
m

265.18
53.04
53.04
132.59

A
A
A
A

2.1
2.12
2.12
2.7

19,800
132,500
132,500
25,500

22,686,027

Jumlah Sub Total I.


II.
1
2
3

PEKERJAAN PASANGAN DAN BETON


Lantai kerja 1 : 3 : 5 (mutu beton K-125)
Tiang Pancang 15 m ( 56 titik )
Beton bertulang 1 : 1.5 : 2.5 (mutu K-200)

m
m'
m3

8.84
1,125
44.20

A
A
A

5.2
3.8
7.11

355,300
404,600
3,444,400

III.3

III.4

3,140,598
455,175,000
152,230,179
610,545,777

Jumlah Sub Total II.


III.
III.1
III.2

5,250,536
7,027,232
7,027,232
3,381,027

PEKERJAAN PERPIPAAN
Plat Reservoir
PIPA INLET :
a. Pengadaan Material
- Tee 200/200 mm degree
- Bend GIP 200 / 90 degree
- Gate valve 200 mm
- Flange ring 200 mm
- Packing 200 mm
- Baut 3/4" x 3"
- Pengelasan acc. Pipa

Unit
Unit
Unit
Unit
m2
Unit
m

1.00
6.00
2.00
4.00
4.00
140.00
27.95

D
D
D
D
C
C
A

PIPA OUTLET
a. Pengadaan Material
- Flange ring 200 mm

Unit

3.00

PIPA DRAIN & OVER FLOW


a. Pengadaan Material
- Tee 200/150 mm
- Tee 200/200 mm
- Bend 150 / 90 degree
- Gate valve 200 mm
- Flange ring 200 mm
- Flange ring 150 mm
- Blank Flange 200 mm
- Packing 200 mm
- Packing 150 mm
- Baut 3/4" x 3"
- Wall pipe single flange Dn 200 mm , L = 100 cm
- Wall pipe single flange Dn 150 mm , L = 60 cm
- Pengelasan acc. Pipa

Unit
Unit
Unit
Unit
Unit
Unit
Unit
m
m
Unit
Unit
Unit
m

2.00
1.00
2.00
1.00
3.00
4.00
1.00
5.00
4.00
52.00
1.00
2.00
12.25

ls

1.00

850,000,000

850,000,000

42.1
41.2
33.5
39.5
2
3
11.1

1,290,680
982,974
2,100,000
558,531
80,000
12,500
348,900

1,290,680
5,897,846
4,200,000
2,234,125
320,000
1,750,000
9,750,359
-

39.5

558,531

1,675,593

D
D
D
D
D
D
D

42.12
42.12
41.21
33.5
39.5
39.4
29.5
2.13
2.13
2.74
28.5
28.4
11.1

1,290,680
1,290,680
655,316
2,100,000
558,531
451,652
792,000
80,000
80,000
12,500
952,000
440,000
348,900

2,581,360
1,290,680
1,310,632
2,100,000
1,675,593
1,806,607
792,000
400,000
320,000
650,000
952,000
880,000
4,272,629

harga pasar

C
C
C

D
D
A

896,150,111

Jumlah Sub Total III.


JUMLAH TOTAL ( I + II + III )

1,529,381,915

Page 7 of 59

PEKERJAAN

: PEKERJAAN PENGADAAN / PEMASANGAN INSTALASI PENGOLAHAN AIR (IPA) LENGKAP KAPASITAS : 50 L/dt

TAHUN ANGGARAN.
BAGIAN PEKERJAAN

: 2012-2013
: (VII) PEMBANGUNAN JALAN DALAM LOKASI (lebar 3 m tebal 30 cm dengan beton tumbuk)

NO

URAIAN PEKERJAAN

SATUAN

VOLUME

HARGA
SATUAN
(Rp)

Acuan Harga Satuan

JUMLAH
HARGA
(Rp)

PEMBUATAN 1 M JALAN BETON BERTULANG


PEMBUATAN LEBAR 3 M' JALAN BETON BERTULANG tebal 30 cm

A.
I.
1
2
3

PEKERJAAN TANAH
Galian Tanah biasa
Buangan tanah
Urugan Pasir Dipadatkan

m
m
m

1.500
1.500
0.300

A
A
A

2.1
2.7
2.13

19,800
25,500
206,000

Jumlah Sub Total II.


II.
1
2
3

129,750

PEKERJAAN BETON
Urugan Sirtu
Pekerjaan Jalan Macadam / Penetrasi m2
Beton tumbuk K.-175

m
m2
M3

Jumlah Sub Total II.


JUMLAH A. (I + II)
JUMLAH untuk

B.

29,700
38,250
61,800

0.450
1.000
0.200

A
A
A

2.14
12.2
5.22

725 m2

208,400
241,600
746,100

93,780
241,600
149,220
484,600
614,350
445,403,750

KANSTIN (PENGUNCI JALAN) DI pinggir JALAN panjang 1 m

I.
1
2

PEKERJAAN TANAH
Galian Tanah biasa
Buangan tanah

m
m

0.160
0.160

A
A

2.1
2.7

19,800
25,500

Jumlah Sub Total II.


II.
1

3,168
4,080
7,248

PEKERJAAN KONSTRUKSI
Beton K-175

Jumlah Sub Total B

0.150

5.2

746,100

111,915
119,163

JUMLAH KANSTEEN PER M B. (I + II )


PANJANG TOLAL KANSTEEN

210 M

TOTAL

126,411
26,546,310
471,950,060

Page 8 of 59

PEKERJAAN

: PEKERJAAN PENGADAAN / PEMASANGAN INSTALASI PENGOLAHAN AIR (IPA) LENGKAP KAPASITAS : 50 L/dt

TAHUN ANGGARAN.
BAGIAN PEKERJAAN

: 2015
: (VIII) PENGADAAN DAN PEMASANGAN PERPIPAAN DISTRIBUSI

No.

URAIAN PEKERJAAN

III.
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
3.11
3.12
3.13
3.14
3.15
3.16
3.17
3.18
3.19
3.20

PEKERJAAN PERPIPAAN
Pipa Header 400mm
Dop 400mm
Bend 45 400 mm
Reducer 400x300 mm
Pipa GIP 300mm
Flange 300 mm
Mur dan Baut 3/4" x 3"
Gate Valve 300mm
Pipa Discharge 150mm
Pipa Hisap Pompa 150mm
Reducer 150x100 mm
Fleksible Joint 150mm
Check Valve 150mm
Gate Valve 150mm
Foot Valve 150mm
Stainer 150mm
Manometer
Air Valve 2"
Pemotongan
Pengelasan

SATUAN

M
bh
bh
bh
M
bh
set
bh
M
M
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
kg
m

VOLUME

18.00
1.00
4.00
1.00
12.00
2.00
24.00
1.00
12.00
12.00
2.00
2.00
4.00
2.00
2.00
2.00
2.00
1.00
1,627.78
43.96

Acuan Harga Satuan

D
D
D
D
D
D
C

1.15
47.13
1.15
1.15
1.13
39.7
2.74
33.7
1.1
1.1
50.7
37.4
32.4
33.4
35.4
27.4

D
D
D
D
D
D
D
D
D
harga pasar
D
36.3
A
11.1
A
11.11

HARGA
SATUAN
(Rp)

1,358,000
1,709,520
1,358,000
1,358,000
1,018,500
1,248,000
12,500
5,400,000
479,000
479,000
564,000
2,241,020
2,377,500
1,800,000
2,850,000
702,000
1,750,000
1,375,000
3,100
348,900

Jumlah Sub Total III.


II
1
2

PEKERJAAN LAIN-LAIN
Pondasi Penyangga pipa
Pengecatan bagian besi yang terbuka dengan cat besi

JUMLAH
HARGA
(Rp)

24,444,000
1,709,520
5,432,000
1,358,000
12,222,000
2,496,000
300,000
5,400,000
5,748,000
5,748,000
1,128,000
4,482,040
9,510,000
3,600,000
5,700,000
1,404,000
3,500,000
1,375,000
5,046,106
15,337,644
115,940,310

m3
m

Jumlah Sub Total IV.

2.70 A
203.47 A

7.13
10.13

8,226,000
44,600

22,210,200
9,074,851
31,285,051

JUMLAH TOTAL ( I + II)

147,225,361

Page 9 of 59

PEKERJAAN

: PEKERJAAN PENGADAAN / PEMASANGAN INSTALASI PENGOLAHAN AIR (IPA) LENGKAP KAPASITAS : 50 L/dt

TAHUN ANGGARAN.
BAGIAN PEKERJAAN

: 2015
: (IX( PEMBUATAN BANGUNAN SLUDGE DRYING BED KAP. 80 M

No.

URAIAN PEKERJAAN

I.

PEKERJAAN TANAH
Galian tanah biasa, kedalaman 1 m
Urugan Pasir
Urugan kembali bekas galian
Buangan Tanah bekas galian

1
2
3
4

SATUAN KUANTITAS

m
m
m
m

104.23
6.56
42.73
61.50

Acuan Harga Satuan

A
A
A

2.1
2.13
2.9
2.7

HARGA
SATUAN
(Rp.)

19,800
206,000
11,300
25,500

Jumlah Sub Total I.


II.
1
2
3
4
5
6
7
8
9
10

PEKERJAAN PASANGAN
Lantai kerja K-125
Aanstampang (pasangan batu kosong)
Pondasi Pasangan batu kali 1 : 4
Sloof 15/20
Kolom praktis 11/11
Ring Balok 11/11
Pasang bata 1/2 bata 1 : 2
Plesteran 1 : 2 tebal 20 mm
Acian
Media Filtrasi
:
- Lapisan kerikil 4/5 tebal 10 cm
- Lapisan kerikil 2/3 tebal 20 cm
- Lapisan Pasir tebal 20 cm

m
m
m
m
m
m
m
m
m

6.50
7.35
10.93
1.10
0.56
1.10
95.55
80.85
80.85

A
A
A
A
A
A
A
A
A

3.7
3.4
3.2
7.12
7.18
7.14
4.2
5.6
5.15

674,910
385,600
590,300
2,242,400
3,850,800
6,347,700
144,700
39,300
39,400

4,386,912
2,834,160
6,451,979
2,466,640
2,156,448
6,982,470
13,826,085
3,177,405
3,185,490

m
m
m

2.40
4.80
4.80

2.11
2.11
2.15

137,100
137,100
150,000

329,040
658,080
720,000

47,174,709

PEKERJAAN PERPIPAAN
Pipa Outlet
Wall pipe all flange GI DN 200 mm, 0,60 m'
Pipa GI DN 200 mm
Tee DN 200 x 200 mm
Bend DN 200 mm x 90
Gate Valve CI DN 200 mm
Flange ring (las) GI DN 200 mm
Packing DN 200 mm
Mur Baut DN 3/4"
Pengelasan acc. Pipa

Unit
meter
Unit
Unit
Unit
Unit
m2
Unit
meter

6.00
4.00
4.00
2.00
2.00
10.00
6.00
120.00
24.49

D
D
D
D
D
D

Pipa Over flow


Wall pipe all flange GI DN 200 mm, 0,60 m'
Bend DN 200 mm x 90
Flange ring (las) GI DN 200 mm
Packing DN 200 mm
Mur baut DN 3/4"
Pengelasan acc. Pipa

Unit
Unit
Unit
Unit
Unit
cm

1.00
1.00
1.00
1.00
12.00
125.60

Pipa Porous
Pipa PVC DN 200 mm S-12.5
Flange Spigot 200 mm
End Cap (RRJ)
Mur baut DN 3/4"
Packing DN 150 mm

meter
bh
bh
Unit
Unit

36.00
6.00
6.00
72.00
6.00

D
D
D
C

C
C

D
C
C
A

28.5
1.11
1.8
41.23
33.5
39.5
2.13
2.74
11.11

952,000
679,000
203,000
982,974
2,100,000
558,531
80,000
12,500
348,900

5,712,000
2,716,000
812,000
1,965,949
4,200,000
5,585,311
480,000
1,500,000
8,545,259

28.5
41.23
39.5
2.13
2.74
11.11

952,000
982,974
558,531
80,000
12,500
348,900

952,000
982,974
558,531
80,000
150,000
43,821,840

4.5
11.5
10.5
2.74
2.13

317,998
905,573
854,760
12,500
80,000

11,447,915
5,433,438
5,128,561
900,000
480,000

Jumlah Sub Total II.


IV.
1
2

PEKERJAAN FINISHING
Pengecatan bagian besi yang terbuka dengan cat besi
Pintu Air uk. 60 x 100 cm lengkap dengan rel (penstock)
Jumlah Sub Total IV.
PEMBUATAN BANGUNAN SLUDGE DRYING BED KAP. 80 M

2,063,754
1,351,360
482,849
1,568,250
5,466,213

Jumlah Sub Total II.


III.

HARGA
PEKERJAAN
(Rp.)

101,451,778

m
Unit

3.77 A
2.00 perkiraan

10.13

44,600
1,996,000

168,053
3,992,000
4,160,053
152,786,540

PEKERJAAN

: PEKERJAAN PENGADAAN / PEMASANGAN INSTALASI PENGOLAHAN AIR (IPA) LENGKAP KAPASITAS : 50 L/dt

TAHUN ANGGARAN.
BAGIAN PEKERJAAN

: 2015
: (X) Drainase m' dan (XI) Pagar m'
70x90 cm

No.

URAIAN PEKERJAAN

1
2
3

SATUAN KUANTITAS

PEKERJAAN DRAINASE PER M


Galian Tanah
Pasangan bata 1/2 batu 1 : 4
Plesteran 1 : 4 tebal 15 mm
Buangan tanah
Jumlah Drainase per m

m
m
m
m

1.00
3.84
3.84
0.70

Panjang Drainase

300

Pagar BRC

260

Acuan Harga Satuan

A
A
A

2.1
4.2
5.4
2.7

11.13

HARGA
SATUAN
(Rp.)

HARGA
PEKERJAAN
(Rp.)

19,800
144,700
30,600
25,500

19,800
555,648
117,504
17,850
710,802

710,802

213,240,600

1,685,500

438,230,000

PEKERJAAN

PEKERJAAN PENGADAAN / PEMASANGAN INSTALASI PENGOLAHAN AIR (IPA) LENGKAP KAPASITAS : 50 L/dt

TAHUN ANGGARAN.
BAGIAN PEKERJAAN

:
:

2015
(XII) UJI COBA

NO.

URAIAN KEGIATAN
PEKERJAAN LAIN-LAIN
1 Pengadaan Bahan Kimia dan Energi 72 jam
12960 m3
- Alum sulfat
- Soda Ash
- Kaporit
- Solar
2 Pembuatan Dokumentasi Dan Pelaporan

SATUANVOLUME

50 ppm
25 ppm
5 ppm

Kg
Kg
Kg
Ltr
Ls

12

648
324
65
300
1

Acuan Harga Satuan HARGA SATUAN


TOTAL HARGA
Rp.
Rp.
harga pasar
harga pasar
harga pasar
harga pasar
A
11.17

11,250
11,700
26,250
9,750
6,517,900

7,290,000
3,790,800
1,701,000
2,925,000
6,517,900
22,224,700

ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN


KABUPATEN B E K A S I

2015
NO
a
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
1.11
1.12
1.13

URAIAN PEKERJAAN
b
Pekerjaan Persiapan
1 M' Pek.Pemas. Bouwplank
1 M' Pengukuran Jalur Pipa
1 M2 Bedeng Buruh
1 Bh Papan Nama Proyek
1 M2 Los Kerja/Gudang
1 M' Pagar Sementara Seng Gelombang Tinggi 2 M
1 M2 Kantor Sementara
1 M3 Pek. Bongkaran Dinding / Tembok Bata Merah
1 M3 Pek. Bongkaran Beton Bertulang
1 M2 Pek. Perataan Tanah
1 M2 Pengukuran Site
1 M' Pasang Pagar Beton Pracetak (5x50x213) Cm
1 M3 Pek. Bongkaran Pasangan Batu Kali
2 Pekerjaan Tanah

2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
2.11
2.12
2.13
2.14
2.15
2.16
3
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
4
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
5

1.M3 Galian Tanah Biasa Sedalam 1 M


1.M3 Galian Tanah Biasa Sedalam 2 M
1.M3 Galian Tanah Biasa Sedalam 3 M
1 M3 Galian Tanah Keras Sedalam 1 M
1 M3 Pek. Galian Cadas / Tanah Berbatu
1 M3 Galian Tanah Lumpur Sedalam 1 M
1 M3 Pembuangan Tanah Sejauh 150 M
1 M3 Pek. Pemadatan Tanah
1 M3 Mengurug Kembali
1 M3 Pemasangan Lapisan Ijuk (5cm)
1 M3 Timbunan Tanah Setempat
1 M3 Timbunan Tanah Merah Dipadatkan
1 M3 Urugan Pasir
1 M3 Urugan Sirtu
1 M3 Pek.Galian Aspal/ Rabat Beton ( 1 Pc : 2.5 Pc : 5 Krl )
1 M2 Pek. Stripping Setinggi 1 M
Pekerjaan Pondasi
1 M3 Pas. Batu Kali 1 : 3
1 M3 Pas. Batu Kali 1 : 4
1 M3 Pas. Batu Kali 1 : 5
1 M3 Pasangan Anstamping / Batu Kosong
1 M3 Pasangan Pondasi Sumuran Dia. 100 Cm
1 M3 Saluran Gravel Btn 1/2 Dia 30 Cm
1 M3 Lantai Kerja 1 Pc : 3 Pc : 5 Krl
1 M' Pembuatan Tiang Pancang (35 X 35) Cm, Beton Bertulang
Pekerjaan Dinding
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2

Pas Bata Merah Tebal 1 Bata, 1 ; 3


Pas Bata Merah Tebal 1 Bata, 1 ; 4
Pas Bata Merah Tebal 1 Bata, 1 ; 5
Pas Bata Merah Tebal 1/2 Bata, 1 ; 3
Pas Bata Merah Tebal 1/2 Bata, 1 ; 4
Pas Bata Merah Tebal 1/2 Bata, 1 ; 5
Pas Batako 1 ; 4
Pas Batako 1 ; 5

Pekerjaan Plesteran

Rp
60,200
534,600
964,500
634,300
1,043,200
615,000
1,443,400
85,400
7,900
7,245
2,300
120,700
475,000
19,800
25,800
36,300
30,800
64,100
162,800
25,500
24,300
11,300
12,600
65,300
132,500
206,000
208,400
670,600
3,700
638,700
590,300
561,300
385,600
808,100
90,700
674,910
404,600
152,900
144,700
140,500
76,400
72,300
70,200
24,800
22,300
-

5.1
5.2
5.3
5.4
5.5
5.6
5.7
5.8
5.9
5.10
5.11
5.12
5.13
5.14
5.15
5.16
5.17
5.18
5.19
5.20
5.21
5.22
5.23
5.24
6
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
6.10
6.11
6.12
6.13
6.14
6.15
6.16
6.17
6.18
6.19
6.20
6.21
6.22
6.23
6.24
6.25
6.26
6.27
6.28
6.29
6.30
6.31
6.32
6.33
6.34
6.35
6.36
6.37
6.38
6.39

1 M2 Pasang Dinding Roster/Terawang (20 X 20) Cm


1 M2 Plesteran Dinding 1 : 2 Tebal 1,5 Cm
1 M2 Plesteran Dinding 1 : 3 Tebal 1,5 Cm
1 M2 Plesteran Dinding 1 : 4 Tebal 1,5 Cm
1 M2 Plesteran Dinding 1 : 5 Tebal 1,5 Cm
1 M2 Plesteran Dinding 1 : 2 Tebal 2,0 Cm
1 M2 Plesteran Dinding 1 : 3 Tebal 2,0 Cm
1 M2 Plesteran Dinding 1 : 4 Tebal 2,0 Cm
1 M2 Plesteran Dinding 1 : 5 Tebal 2,0 Cm
1 M2 Plesteran Dinding 1 : 2 Tebal 2,5 Cm
1 M2 Plesteran Dinding 1 : 3 Tebal 2,5 Cm
1 M2 Plesteran Dinding 1 : 4 Tebal 2,5 Cm
1 M2 Plesteran Dinding 1 : 5 Tebal 2,5 Cm
1 M2 Plesteran Beton 1 : 2 Tebal 1,5 Cm
1 M2 Plesteran Beton 1 : 3 Tebal 1,5 Cm
1 M2 Plesteran Skoning 1 : 2
1 M2 Plesteran Siar 1 : 2
1 M3 Beton Tumbuk 1 : 3 : 5
1 M3 Beton Tumbuk 1 : 4 : 6
1 M3 Lantai Kerja Beton Tumbuk 1 : 3 : 5 Tebal 5 Cm
1 M3 Beton Bertulang 1 : 2 : 3 (K 125)
1 M3 Beton Mutu K 225
1 M3 Beton Mutu K 275
1 M2 Pasang Jembatan Cor
Pekrjaan Kayu Dan Kuzen
1 M3 Pasang Kusen Pintu Dan Jendela Kayu Kamper
1 M3 Pasang Kusen Pintu Dan Jendela Kayu Borneo
1 M2 Pasang Pintu Panil Kayu Kamper
1 M2 Pasang Pintu Panil Kayu Borneo
1 M2 Pasang Pintu Dan Jendela Kaca Kayu Kamper
1 M2 Pasang Pintu Dan Jendela Kaca Kayu Borneo
1 M2 Pasang Pintu Dan Jendela Jalusi Kayu Kamper
1 M2 Pasang Pintu Dan Jendela Jalusi Kayu Borneo
1 M2 Pasang Pintu Plywood Rangkap Kayu Kamper
1 M2 Pasang Pintu Plywood Rangkap Kayu Borneo
1 M2 Pasang Jalusi Mati Kayu Kamper
1 M2 Pasang Jalusi Mati Kayu Borneo
1 M2 Pasang Pintu Teakwood Rangkap Rangka Kayu Kamper
1 M2 Pasang Pintu Teakwood Rangkap Rangka Kayu Borneo
1 M2 Pasang Pintu Plywood & Formika Rangka Kayu Kamper
1 M2 Pasang Pintu Plywood & Formika Rangka Kayu Borneo
1 M2 Pasang Pintu Teakwood & Formika Rangka Kayu Kamper (Divernis)
1 M2 Pasang Pintu Teakwood & Formika Rangka Kayu Borneo (Divernis)
1 M2 Pasang Pintu Formika Double Rangka Kayu Kamper
1 M2 Pasang Pintu Formika Double Rangka Kayu Borneo
1 M3 Pasang Konstruksi Kuda-Kuda Kayu Kamper
1 M3 Pasang Konstruksi Kuda-Kuda Kayu Borneo
1 M3 Pasang Konstruksi Kuda-Kuda Kayu Kruing
1 M2 Pasang Kaso + Reng Genteng Kodok Kayu Kamper
1 M2 Pasang Kaso + Reng Genteng Kodok Kayu Borneo
1 M2 Pasang Kaso + Reng Genteng Monier Kayu Kamper
1 M2 Pasang Kaso + Reng Genteng Beton & Monier Kayu Borneo
1 M2 Pasang Kaso + Reng Atap Sirap Kayu Kamper
1 M2 Pasang Kaso + Reng Atap Sirap Kayu Borneo
1 M2 Pasang Rangka Langit-Langit ( 1 X 1 ) M Kayu Kamper
1 M2 Pasang Rangka Langit-Langit ( 1 X 1 ) M Kayu Borneo
1 M2 Pasang Rangka Langit-Langit ( 30 X 30 ) Cm Kayu Kamper
1 M2 Pasang Rangka Langit-Langit ( 30 X 30 ) Cm Kayu Borneo
1 M' Pasang Lisplang Ukuran ( 3 X 20 ) Cm Kayu Kamper
1 M' Pasang Lisplang Ukuran ( 3 X 20 ) Cm Kayu Borneo
1 M' Pasang Lisplang Ukuran ( 3 X 30 ) Cm Kayu Kamper
1 M' Pasang Lisplang Ukuran ( 3 X 30 ) Cm Kayu Borneo
1 M' Pasang Lisplang Ukuran 2 X ( 3 X 20 ) Cm Kayu Kamper
1 M' Pasang Lisplang Ukuran 2 X ( 3 X 20 ) Cm Kayu Borneo

206,400
30,200
30,500
30,600
30,900
39,300
39,700
39,900
39,900
41,000
44,500
44,900
45,000
39,000
39,400
11,200
19,400
361,100
367,900
355,300
508,900
746,100
737,400
560,700
4,816,500
7,131,700
387,800
463,600
317,400
383,600
533,500
654,700
350,400
387,500
359,500
473,200
350,400
387,500
411,700
452,700
398,800
435,900
521,300
558,500
3,928,100
6,197,600
6,228,800
42,200
67,000
46,600
75,400
378,700
719,100
65,600
90,400
107,700
163,400
42,000
55,600
53,400
74,200
73,900
101,300

6.40
6.41
6.42
6.43
6.44
6.45
6.46
7
7.2
7.3
7.4
7.5
7.6
7.7
7.8
7.9
7.10
7.11
7.12
7.13
7.14
7.15
7.16
7.17
7.18
7.19
8

1 M' Pasang Lisplang Ukuran 2 X ( 2 X 20 ) Cm Kayu Kamper


1 M' Pasang Lisplang Ukuran 2 X ( 2 X 20 ) Cm Kayu Borneo
1 M2 Pasang Rangka Dinding Pemisah Kayu Kamper
1 M2 Pasang Rangka Dinding Pemisah Kayu Borneo
1 M2 Pasang Rangka Dinding Pemisah Teakwood Rangkap, Rangka Kayu Kamper
1 M2 Pasang Rangka Dinding Pemisah Plywood Rangkap, Rangka Kayu Kamper
1 M2 Pasang Rangka Plywood 4 Mm Untuk Dinding
Pekerjaan Beton
1 M' Pasang Pvc Water Stop Lebar 25 Cm
1 Kg Pembesian Dengan Besi Polos Atau Besi Ulir
1 M2 Bekisting Untuk Pondasi
1 M2 Bekisting Untuk Sloof
1 M2 Bekisting Untuk Kolom
1 M2 Bekisting Untuk Balok
1 M2 Bekisting Untuk Lantai
1 M2 Bekisting Untuk Dinding
1 M2 Bekisting Untuk Tangga
1 M3 Pondasi Beton Bertulang (150 Kg Besi + Bekisting)
1 M3 Sloof Beton Bertulang (200 Kg Besi + Bekisting)
1 M3 Kolom Beton Bertulang (300 Kg Besi + Bekisting)
1 M3 Balok Beton Bertulang (200 Kg Besi + Bekisting)
1 M3 Lantai Beton Bertulang (150 Kg Besi + Bekisting)
1 M3 Dinding Beton Bertulang (150 Kg Besi + Bekisting)
1 M3 Tangga Beton Bertulang (200 Kg Besi + Bekisting)
1 M' Kolom Praktis Beton Bertulang (11 X 11) Cm
1 M' Ring Balok Beton Bertulang (10 X 15) Cm
Pekerjaan Atap

8.1
8.2
8.3
8.4
8.5
8.6
8.7
9

1 M' Pasang List Plafond Kayu Profil


1 M2 Pasang Atap Genteng Plentong Kecil
1 M2 Pasang Atap Genteng Kodok / Glazzur
1 M2 Pasang Atap Genteng Plentong Super / Besar
1 M' Pasang Bubungan Genteng Plentong
1 M' Pasang Bubungan Genteng Kodok Glazzur
1 M' Pasang Bubungan Genteng Plentong Besar
Pekerjaan Sanitair

9.1
9.2
9.3
9.4
9.5
9.6
9.7
9.8
9.9
9.1
9.11
9.12
9.13
9.14
9.15
9.16
9.17
9.18
9.19
9.20
9.21

Pasang 1 Buah Kloset Duduk


Pasang 1 Buah Kloset Jongkok Porselen
Pasang 1 Buah Urinoir
Pasang 1 Buah Wastafel
Pasang 1 Buah Bak Mandi Fiberglass Vol O,30 M3
1 M' Pemasangan Buis Beton Dia. 20-100 Cm
1 M' Pemasangan Buis Beton Dia. 30 - 100 Cm
1 Buah Bak Kontrol Pas. Bata ( 30 X 30 ) Cm, Tinggi 35 Cm
1 Buah Bak Kontrol Pas. Bata ( 60 X 60 ) Cm, Tinggi 65 Cm
1 M' Pasang Pipa Galvanis Dia. 1/2"
1 M' Pasang Pipa Galvanis Dia. 3/4"
1 M' Pasang Pipa Galvanis Dia. 1"
1 M' Pasang Pipa Galvanis Dia. 3"
1 M' Pasang Pipa Pvc Type Aw Dia. 1/2"
1 M' Pasang Pipa Pvc Type Aw Dia. 3/4"
1 M' Pasang Pipa Pvc Type Aw Dia. 1"
1 M' Pasang Pipa Pvc Type Aw Dia. 2"
1 M' Pasang Pipa Pvc Type Aw Dia. 3"
1 Buah Bak Cuci Piring Stainless Steel
1 Bh Kran Dia. 3/4" Atau 1/2"
1 Bh Floor Drain

10
10.1
10.2
10.3

40,800
57,100
170,500
152,100
153,600
163,800
41,600
38,700
12,700
172,600
188,600
372,200
436,300
572,200
450,000
391,000
3,444,400
2,242,400
8,226,000
6,347,700
5,658,700
5,842,700
5,781,900
3,850,800
3,850,800
39,700
292,200
339,000
279,800
169,800
705,900
649,200

317,000
720,400
172,200
2,627,800
649,100
286,400
742,300
404,300
491,500
116,300
126,600
64,700
419,600
18,700
20,800
26,200
58,900
111,100
106,500
9,900
87,900

Finishing Dan Accessories


1 Bh Pasang Kunci Silinder
1 Bh Pasang Engsel Pintu
1 Bh Pasang Grendel Jendela

243,800
31,500
24,600

10.4
10.5
10.6
10.7
10.8
10.9
10.10
10.11
10.12
10.13

1 M2 Pasang Pintu Aluminium


1 M2 Pasang Lantai Keramik 30 X 30 Cm
1 M2 Pasang Dinding Keramik 10 X 20 Cm
1 M2 Pasang Dinding Keramik 20 X 20 Cm
1 M2 Pengecatan Bidang Kayu Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
1 M2 Pengecatan Bidang Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
1 M2 Pengecatan Bidang Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
1 M2 Pengecatan Baja Dengan Meni Besi
1 M2 Pengecatan Baja Dengan Meni Besi Dengan Perancah
1 M2 Pengecatan Besi

11

Pekerjaan Baja

11.1
11.2
11.3
11.4
11.5
11.6
11.7

1 Kg Besi Iwf/Unp
1 Kg Besi Plat
1 Kg Besi Siku
1 Unit Septictenk 1,5 X 1 X 1,5 M
1 M2 Pas. Paving Blok Natural 8 Cm
1 Bh Strauss Pile Kedalaman 16 M & Expose 1,5 M, Total Tinggi 7,5 M, 30 Cm
Strauss Pile Per M

11.8
11.9
11.10
11.11
11.12
11.13
11.14
11.15
11.16
11.17
11.18
11.19

1 Kg Pekerjaan Pengelasan Baja Galvanise Wtp


1 Kg Pekerjaan Cleaning
1 Kg Pekerjaan Pemotongan Dan Pabrikasi
1 M1 Pekerjaan Pengelasan Pipa 2x per meter
1 M1 Pemasangan Pondasi Cerucuk Dolken 10 Cm
Pasang Pagar PER M Brc Tinggi 1.5
1 M2 Pengadaan /Pemasangan Tube Settler
1 M2 Rangka Atap Zingalum
1 M2 Pekerjaan Grille
Dokumentasi, Pelaporan,Ast Build Drawing
1 M1 Pekerjaan Railing
Pembuatan Tutup Manhole 80 X 80 Cm

12

Pekerjaan Jalan

12.1
12.1
12.2
12.3
12.4
12.5
12.6
12.7
12.8

Pemadatan Dengan Walls Per M2


Sub Base Telford (Tebal 25 Cm)
Lapis Pondasi Bawah m2 (Lpb / Tebal 25 Cm)
Lapis Pondasi Atas m2 (Lpa / Tebal 20 Cm)
Prime Coat (400 Lt)
Prime Coat (400 Lt)Per M2
Lapis Penetrasi Tebal 5 Cm
Pekerjaan Jalan Macadam / Penetrasi m2
Pekerjaan Jalan Hotmix Tebal 3 Cm

14

ANALISA BIAYA PEKERJAAN INSTALASI LISTRIK

14.1
14.2
14.3
14.4
14.5
14.6

1 TTK PEMASANGAN INSTALASI TITIK CAHAYA


1 TTK PEMASANGAN INSTALASI TITIK DAYA STOP KONTAK
1 BH PEMASANGAN ARMATUR STOP KONTAK
1 BH PEMASANGAN ARMATUR SAKLAR DOBLE
1 UNIT LAMPU SL 18 W
1 BH PEMASANGAN LAMPU TAMAN

15
15.7
15.8

Perpipaan dan Meter Air

PENGGALIAN DAN PEMASANGAN PIPA


Pekerjaan Rolling Door

1,810,900
77,600
85,100
57,400
54,500
37,600
27,000
26,500
30,600
44,600

18,500
19,800
18,600
3,119,000
100
7,494,000
7,494,000
44,900
700
3,100
348,900
37,100
1,685,500
18,852,600
309,000
1,488,300
6,517,900
409,300
78,700

8,000
463,700
241,600
385,600
1,668,100
1,000
58,500
366,100
775,800
549,780.00
71,280.00
52,800.00
52,800.00
40,040.00
137,280.00
118,530,480.93
706,510.20

(B)
ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN
KABUPATEN B E K A S I
2015
HARGA
SUB-TOTAL
SAT
VOLUME
SATUAN
UPAH
RP
RP
c
d
e
f

NO

URAIAN PEKERJAAN

a
1

b
PEKERJAAN PERSIAPAN

1.1

1 M' PEK.PEMAS. BOUWPLANK


Tukang kayu
Pekerja
Kepala tukang
Mandor
Kayu 5/7
Paku biasa 2"-5"
Kayu papan 3/20
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

1.2

1.3

1.4

1.5

1 M' PENGUKURAN JALUR PIPA


Mandor
Pekerja
Patok
Alat bantu
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

1 M2 BEDENG BURUH
Tukang kayu
Pekerja
Kepala tukang
Mandor
Dolken kayu 8-10/400 cm
Kayu
Paku biasa
Semen portland
Pasir Beton
Koral beton
Seng gelombang bjls 32
Plywood 4 mm
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 BH PAPAN NAMA PROYEK
Kayu Borneo
Triplex 4 mm
Paku
Cat
Kuas
Penulisan
Ongkos Pasang
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 LOS KERJA/GUDANG
Tukang kayu
Pekerja
Kepala tukang
Mandor
Dolken kayu 8-10/400 cm
Kayu
Paku biasa
Semen portland
Pasir Beton
Koral beton
Seng gelombang bjls 32
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

OH
OH
OH
OH
M3
KG
M3

OH
OH
Bh
Ls

OH
OH
OH
OH
Btg
M3
Kg
sak
M3
M3
Lbr
Lbr

M3
lbr
KG
KG
bh
LS
LS

OH
OH
OH
OH
Btg
M3
Kg
sak
M3
M3
Lbr

0.100
0.100
0.010
0.005
0.006
0.020
0.004

1.000
4.000
20.000
1.000

2.000
1.000
0.200
0.050
1.250
0.186
0.300
0.360
0.030
0.050
0.250
0.060

0.110
0.250
0.250
1.000
1.000
1.000
1.000

2.000
1.000
0.200
0.050
1.700
0.210
0.300
0.210
0.030
0.050
0.250

73,000
59,000
81,000
89,000
3,881,400
22,500
4,140,200
Rp

14,455

89,000
292,000

73,000
73,000
81,000
89,000
33,800
2,911,100
22,500
60,000
269,300
137,100
22,910
75,300
Rp

146,000
73,000
16,200
4,450

73,000
73,000
81,000
89,000
33,800
2,911,100
22,500
60,000
269,300
137,100
22,910
Rp

TOTAL
HARGA
RP
h

7,300
5,900
810
445

89,000
73,000
3,500
35,000
Rp

3,881,400
75,300
22,500
79,400
10,900
15,000
20,000
Rp

SUB-TOTAL
BAHAN
RP
g

381,000

239,650

23,288
450
16,561
40,299

70,000
35,000
105,000

42,250
541,465
6,750
21,600
8,079
6,855
5,728
4,518
637,244

54,754
5,475
60,230
60,200

486,000
48,600
534,600
534,600

876,894
87,689
964,584
964,500

426,954
18,825
5,625
79,400
10,900
15,000
20,000
35,000

541,704

576,704
57,670
634,374
634,300

146,000
73,000
16,200
4,450

239,650

57,460
611,331
6,750
12,600
8,079
6,855
5,728
708,803

948,453
94,845
1,043,298
1,043,200

NO
a
1.6

1.7

1.8

1.9

1.10

1.11

ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN


KABUPATEN B E K A S I
2015
HARGA
SUB-TOTAL
URAIAN PEKERJAAN
SAT
VOLUME
SATUAN
UPAH
RP
RP
b
c
d
e
f
1 M' PAGAR SEMENTARA SENG GELOMBANG TINGGI 2 M
Tukang kayu
OH
2.000
55,000
110,000
Pekerja
OH
1.000
73,000
73,000
Kepala tukang
OH
0.200
81,000
16,200
Mandor
OH
0.050
89,000
4,450
Dolken kayu 8-10/400 cm
Btg
1.250
33,800
Kayu 5/7
M3
0.072
3,881,400
Paku biasa 2"-5"
Kg
0.060
22,500
Semen portland
sak
0.050
60,000
Pasir Beton
M3
0.005
269,300
Koral beton
M3
0.009
137,100
Seng gelombang bjls 32
Lbr
1.200
22,910
Meni besi
Kg
0.450
59,300
Total Harga
Rp
203,650
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 KANTOR SEMENTARA
Tukang kayu
Tukang batu
Pekerja
Kepala tukang
Mandor
Dolken kayu 8-10/400 cm
Kayu
Paku biasa
Besi strip
Semen portland
Pasir pasang
Pasir Beton
Koral beton
Bata merah
Seng gelombang
Kaca polos
Kunci tanam
Plywood 4 mm
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

OH
OH
OH
OH
OH
Btg
M3
Kg
Kg
sak
M3
M3
M3
BH
Lbr
M2
BH
Lbr

2.000
1.000
2.000
0.300
0.050
1.250
0.180
0.850
1.100
0.700
0.150
0.100
0.150
30.000
0.250
0.080
0.150
0.060

1 M3 PEK. BONGKARAN DINDING / TEMBOK BATA MERAH


Pekerja
OH
1.267
Mandor
OH
0.033
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M3 PEK. BONGKARAN BETON BERTULANG
Pekerja
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PEK. PERATAAN TANAH
Pekerja
Mandor
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PENGUKURAN SITE
Tukang kayu
Pekerja
Peralatan
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

OH
OH

OH
OH
LS

4.000
0.333

0.070
0.035

0.010
0.020
1.000

SUB-TOTAL
BAHAN
RP
g

42,250
279,461
1,350
3,000
1,347
1,234
27,492
26,685
356,133

TOTAL
HARGA
RP
h

559,783
55,978
615,762
615,000

73,000
72,000
73,000
81,000
89,000
33,800
3,881,400
22,500
11,000
60,000
150,000
269,300
137,100
500
22,910
97,100
15,680
75,300
Rp

146,000
72,000
146,000
24,300
4,450

59,000
89,000
Rp

74,735
2,937
77,672

77,672
7,767
85,440
85,400

59,000
89,000
Rp

236,000
29,637
265,637

265,637
26,564
292,201
292,200

59,000
89,000
Rp

4,130
3,115
7,245

7,245
725
7,970
7,900

73,000
59,000
1,000
Rp

730
1,180

392,750

1,180

42,250
698,652
19,125
12,100
42,000
22,500
26,930
20,565
15,000
5,728
7,768
2,352
4,518
919,488

1,000
1,000

1,312,238
131,224
1,443,461
1,443,400

2,180
218
2,398
2,300

NO
a
1.12

1.13

ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN


KABUPATEN B E K A S I
2015
HARGA
SUB-TOTAL
URAIAN PEKERJAAN
SAT
VOLUME
SATUAN
UPAH
RP
RP
b
c
d
e
f
1 M' PASANG PAGAR BETON PRACETAK (5X50X213) CM
Tukang batu
OH
0.125
72,000
9,000
Pekerja
OH
0.375
59,000
22,125
Kepala tukang
OH
0.012
81,000
972
Mandor
OH
0.019
89,000
1,691
Panel beton pracetak
Lbr
0.986
Kolom beton pracetak
Btg
0.525
Pasir beton
M3
0.074
269,300
Koral beton
M3
0.146
137,100
Semen portland
Kg
45.000
800
Total Harga
Rp
33,788
Keuntungan 10%
Jumlah
Dibulatkan
1 M3 PEK. BONGKARAN PASANGAN BATU KALI
Pekerja
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

6.667
0.433

SUB-TOTAL
BAHAN
RP
g

19,928
20,017
36,000
75,945

TOTAL
HARGA
RP
h

109,733
10,973
120,706
120,700

59,000
89,000
Rp

393,353
38,537
431,890

431,890
43,189
475,079
475,000

59,000
89,000
Rp

14,455
3,560
18,015

18,015
1,802
19,817
19,800

59,000
89,000
Rp

18,880
4,628
23,508

23,508
2,351
25,859
25,800

59,000
89,000
Rp

26,550
6,497
33,047

33,047
3,305
36,352
36,300

59,000
89,000
Rp

23,600
4,450
28,050

28,050
2,805
30,855
30,800

59,000
89,000
Rp

47,200
11,125
58,325

58,325
5,833
64,158
64,100

59,000
89,000
Rp

59,000
89,000
148,000

148,000
14,800
162,800
162,800

2 PEKERJAAN TANAH
2.1

2.2

2.3

2.4

2.5

2.6

1.M3 GALIAN TANAH BIASA SEDALAM 1 M


Pekerja
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1.M3 GALIAN TANAH BIASA SEDALAM 2 M
Pekerja
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1.M3 GALIAN TANAH BIASA SEDALAM 3 M
Pekerja
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M3 GALIAN TANAH KERAS SEDALAM 1 M
Pekerja
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M3 PEK. GALIAN CADAS / TANAH BERBATU
Pekerja
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M3 GALIAN TANAH LUMPUR SEDALAM 1 M
Pekerja
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

0.245
0.040

0.320
0.052

0.450
0.073

0.400
0.050

0.800
0.125

0.500
0.082

NO
a
2.7

2.8

2.9

2.1

2.11

2.12

2.13

2.14

ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN


KABUPATEN B E K A S I
2015
HARGA
SUB-TOTAL
URAIAN PEKERJAAN
SAT
VOLUME
SATUAN
UPAH
RP
RP
b
c
d
e
f
1 M3 PEMBUANGAN TANAH SEJAUH 150 M
Pekerja
OH
0.270
59,000
15,930
Mandor
OH
0.082
89,000
7,298
Total Harga
Rp
23,228
Keuntungan 10%
Jumlah
Dibulatkan
1 M3 PEK. PEMADATAN TANAH
Pekerja
Mandor
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M3 MENGURUG KEMBALI
Pekerja
Mandor
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

OH
OH

OH
OH

1 M3 PEMASANGAN LAPISAN IJUK (5CM)


Pekerja
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M3 TIMBUNAN TANAH SETEMPAT
Pekerja
OH
Mandor
OH
Sewa excavator
jam
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M3 TIMBUNAN TANAH MERAH DIPADATKAN
Pekerja
OH
Mandor
OH
Sewa excavator
jam
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M3 URUGAN PASIR
Pasir urug
Pekerja
Mandor
Sewa excavator
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M3 URUGAN SIRTU
Sirtu
Pekerja
Mandor
Sewa excavator
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

M3
OH
OH
jam

M3
OH
OH
jam

0.300
0.050

0.100
0.050

0.120
0.050

0.550
0.050
0.300

0.650
0.050
1.000

1.100
0.300
0.010
0.350

1.100
0.250
0.025
0.200

SUB-TOTAL
BAHAN
RP
g

TOTAL
HARGA
RP
h

23,228
2,323
25,551
25,500

59,000
89,000
Rp

17,700
4,450
22,150

22,150
2,215
24,365
24,300

59,000
89,000
Rp

5,900
4,450
10,350

10,350
1,035
11,385
11,300

59,000
89,000
Rp

7,080
4,450
11,530

11,530
1,153
12,683
12,600

59,000
89,000
75,000
Rp

32,450
4,450

59,000
143,200
75,000
Rp

38,350
7,160

129,500
59,000
89,000
75,000
Rp

143,200
59,000
89,000
75,000
Rp

36,900

45,510

22,500
22,500

75,000
75,000

59,400
5,940
65,340
65,300

120,510
12,051
132,561
132,500

142,450
17,700
890
18,590

26,250
168,700

187,290
18,729
206,019
206,000

157,520
14,750
2,225
16,975

15,000
172,520

189,495
18,950
208,445
208,400

NO
a
2.15

2.16

3
3.1

3.2

3.3

3.4

ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN


KABUPATEN B E K A S I
2015
HARGA
SUB-TOTAL
URAIAN PEKERJAAN
SAT
VOLUME
SATUAN
UPAH
RP
RP
b
c
d
e
f
1 M3 PEK.RABAT BETON ( 1 Pc : 2.5 pc : 5 KRL )
Semen
Kg
196
1,200
Pasir beton
m3
0.350
269,300
Split
m3
0.701
221,750
Pekerja
OH
1.650
59,000
97,350
Tukang batu
OH
0.250
72,000
18,000
Kepala tukang
OH
0.025
81,000
2,025
Mandor
OH
0.080
89,000
7,120
Total Harga
Rp
124,495
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PEK. STRIPPING SETINGGI 1 M
Pekerja
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

0.050
0.005

59,000
89,000
Rp

2,950
445
3,395

SUB-TOTAL
BAHAN
RP
g

TOTAL
HARGA
RP
h

235,440
94,351
155,383

485,175

609,670
60,967
670,637
670,600

3,395
340
3,735
3,700

PEKERJAAN PONDASI
1 M3 PAS. BATU KALI 1 : 3
Batu kali
Semen portland
Pasir pasang
Pekerja
Tukang batu
Kep. Tukang batu
Mandor
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M3 PAS. BATU KALI 1 : 4
Batu kali
Semen portland
Pasir pasang
Pekerja
Tukang batu
Kep. Tukang batu
Mandor
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M3 PAS. BATU KALI 1 : 5
Batu kali
Semen portland
Pasir pasang
Pekerja
Tukang batu
Kep. Tukang batu
Mandor
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

M3
sak
M3
OH
OH
OH
OH

M3
sak
M3
OH
OH
OH
OH

M3
Kg
M3
OH
OH
OH
OH

1 M3 PASANGAN ANSTAMPING / BATU KOSONG


Batu belah
M3
Pasir urug
M3
Pekerja
OH
Tukang batu
OH
Kep. Tukang batu
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

1.100
2.931
0.314
1.500
0.600
0.060
0.075

1.100
2.198
0.314
1.500
0.600
0.060
0.075

1.100
1.758
0.314
1.500
0.600
0.060
0.075

1.100
0.200
0.780
0.390
0.039
0.039

195,000
60,000
150,000
59,000
72,000
81,000
89,000
Rp

195,000
60,000
150,000
59,000
72,000
81,000
89,000
Rp

195,000
60,000
150,000
59,000
72,000
81,000
89,000
Rp

221,750
129,500
59,000
72,000
81,000
89,000
Rp

214,500
175,840
47,100
88,500
43,200
4,860
6,675
143,235

437,440

580,675
58,068
638,743
638,700

214,500
131,880
47,100
88,500
43,200
4,860
6,675
143,235

393,480

536,715
53,672
590,387
590,300

214,500
105,504
47,100
88,500
43,200
4,860
6,675
143,235

367,104

510,339
51,034
561,373
561,300

243,925
25,900
46,020
28,080
3,159
3,471
80,730

269,825

350,555
35,056
385,611
385,600

NO
a
3.5

3.6

3.7

3.8

4
4.1

ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN


KABUPATEN B E K A S I
2015
HARGA
SUB-TOTAL
URAIAN PEKERJAAN
SAT
VOLUME
SATUAN
UPAH
RP
RP
b
c
d
e
f
1 M3 PASANGAN PONDASI SUMURAN DIA. 100 CM
Batu belah
M3
0.450
221,750
Semen portland
sak
4.200
60,000
Pasir beton
M3
0.450
150,000
Koral beton
M3
0.670
1,200
Pekerja
OH
1.300
221,750
288,275
Tukang batu
OH
0.300
59,000
17,700
Kep. Tukang batu
OH
0.030
72,000
2,160
Mandor
OH
0.080
81,000
6,480
Mandor
Rp
314,615
Keuntungan 10%
Jumlah
Dibulatkan
1 M3 SALURAN GRAVEL BTN 1/2 DIA 30 Cm
Batu belah
M3
Pasir urug
M3
Pekerja
OH
Tukang batu
OH
Kep. Tukang batu
OH
Mandor
OH
Mandor
Keuntungan 10%
Jumlah
Dibulatkan
1 M3 LANTAI KERJA 1 PC : 3 PC : 5 KRL
Semen
Kg
Pasir beton
m3
Split
m3
Pekerja
OH
Tukang batu
OH
Kepala tukang
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

0.200
0.050
0.130
0.065
0.007
0.007

196
0.350
0.718
1.650
0.250
0.025
0.080

221,750
89,000
221,750
59,000
72,000
81,000
Rp

1,200
269,300
221,750
59,000
72,000
81,000
89,000
Rp

1 M' PEMASANGAN TIANG PANCANG (35 X 35) CM, BETON BERTULANG


Bahan Tiang pancang
m
1.01
308,000
Pekerja
OH
0.035
59,000
Mandor
OH
0.035
89,000
Operator Crane
OH
0.035
84,000
Tukang las
OH
0.035
70,000
Peralatan Crane besar
Hari
0.035
600,000
Alat pancang mesin tenaga diesel Hari
0.035
720,000
Jumlah
Rp
Keuntungan 10%
Jumlah
Dibulatkan

SUB-TOTAL
BAHAN
RP
g

TOTAL
HARGA
RP
h

99,788
252,000
67,500
804

420,092

734,707
73,471
808,177
808,100

44,350
4,450
28,828
3,835
468
527
33,657

48,800

82,457
8,246
90,703
90,700

235,440
94,351
159,268
97,350
18,000
2,025
7,120
124,495

489,059

613,554
61,355
674,910
674,900

311,080
2,065
3,115
2,940
2,450

10,570

21,000
25,200
357,280

367,850
36,785
404,635
404,600

PEKERJAAN DINDING
1 M2 PAS BATA MERAH TEBAL 1 BATA, 1 ; 3
Bata merah 5 x 11 x 22 Cm
BH
Semen portland
sak
Pasir pasang
M3
Pekerja
OH
Tukang Batu
OH
Kep. Tukang Batu
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

140.000
32.950
0.091
0.163
0.067
0.007
0.010

500
1,200
150,000
59,000
72,000
81,000
89,000
Rp

70,000
39,540
13,650
9,588
4,800
540
890
15,818

123,190

139,008
13,901
152,908
152,900

NO
a
4.2

4.3

4.4

4.5

4.6

4.7

ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN


KABUPATEN B E K A S I
2015
HARGA
SUB-TOTAL
URAIAN PEKERJAAN
SAT
VOLUME
SATUAN
UPAH
RP
RP
b
c
d
e
f
1 M2 PAS BATA MERAH TEBAL 1 BATA, 1 ; 4
Bata merah 5 x 11 x 22 Cm
BH
140.000
500
Semen portland
Kg
26.550
1,200
Pasir pasang
M3
0.093
150,000
Pekerja
OH
0.163
59,000
9,588
Tukang Batu
OH
0.067
72,000
4,800
Kep. Tukang Batu
OH
0.007
81,000
540
Mandor
OH
0.010
89,000
890
Total Harga
Rp
15,818
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PAS BATA MERAH TEBAL 1 BATA, 1 ; 5
Bata merah 5 x 11 x 22 Cm
BH
Semen portland
Kg
Pasir pasang
M3
Pekerja
OH
Tukang Batu
OH
Kep. Tukang Batu
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PAS BATA MERAH TEBAL 1/2 BATA, 1 ; 3
Bata merah 5 x 11 x 22 Cm
BH
Semen portland
Kg
Pasir pasang
M3
Pekerja
OH
Tukang Batu
OH
Kep. Tukang Batu
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PAS BATA MERAH TEBAL 1/2 BATA, 1 ; 4
Bata merah 5 x 11 x 22 Cm
BH
Semen portland
Kg
Pasir pasang
M3
Pekerja
OH
Tukang Batu
OH
Kep. Tukang Batu
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PAS BATA MERAH TEBAL 1/2 BATA, 1 ; 5
Bata merah 5 x 11 x 22 Cm
BH
Semen portland
Kg
Pasir pasang
M3
Pekerja
OH
Tukang Batu
OH
Kep. Tukang Batu
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PAS BATAKO 1 ; 4
Batako 8x20x30
Semen portland
Pasir pasang
Pekerja
Tukang Batu
Kep. Tukang Batu
Mandor
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

BH
Kg
M3
OH
OH
OH
OH

140.000
22.200
0.102
0.163
0.067
0.007
0.010

70.000
16.475
0.046
0.081
0.033
0.003
0.005

70.000
13.275
0.047
0.081
0.033
0.003
0.005

70.000
11.100
0.051
0.081
0.033
0.003
0.005

15.000
7.500
0.038
0.081
0.033
0.003
0.005

500
1,200
150,000
59,000
72,000
81,000
89,000
Rp

500
1,200
150,000
59,000
72,000
81,000
89,000
Rp

500
1,200
150,000
59,000
72,000
81,000
89,000
Rp

500
1,200
150,000
59,000
72,000
81,000
89,000
Rp

1,200
150,000
59,000
72,000
81,000
89,000
Rp

SUB-TOTAL
BAHAN
RP
g

TOTAL
HARGA
RP
h

70,000
31,860
13,950

115,810

131,628
13,163
144,790
144,700

70,000
26,640
15,300
9,588
4,800
540
890
15,818

111,940

127,758
12,776
140,533
140,500

35,000
19,770
6,825
4,794
2,400
270
445
7,909

61,595

69,504
6,950
76,454
76,400

35,000
15,930
6,975
4,794
2,400
270
445
7,909

57,905

65,814
6,581
72,395
72,300

35,000
13,320
7,650
4,794
2,400
270
445
7,909

55,970

63,879
6,388
70,267
70,200

9,000
5,700
4,794
2,400
270
445
7,909

14,700

22,609
2,261
24,870
24,800

NO

URAIAN PEKERJAAN

4.8

5
5.1

5.2

5.3

5.4

5.5

1 M2 PAS BATAKO 1 ; 5
Batako 8x20x30
Semen portland
Pasir pasang
Pekerja
Tukang Batu
Kep. Tukang Batu
Mandor
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN


KABUPATEN B E K A S I
2015
HARGA
SUB-TOTAL
SAT
VOLUME
SATUAN
UPAH
RP
RP
c
d
e
f

BH
Kg
M3
OH
OH
OH
OH

15.000
6.000
0.035
0.081
0.033
0.003
0.005

1,200
150,000
59,000
72,000
81,000
89,000
Rp

SUB-TOTAL
BAHAN
RP
g

TOTAL
HARGA
RP
h

7,200
5,250
4,794
2,400
270
445
7,909

12,450

20,359
2,036
22,395
22,300

PEKERJAAN PLESTERAN
1 M2 PASANG DINDING ROSTER/TERAWANG (20 x 20) CM
Roster/terawang
BH
25.000
Semen portland
sak
0.320
Pasir pasang
M3
0.035
Pekerja
OH
0.300
Tukang Batu
OH
0.100
Kep. Tukang Batu
OH
0.010
Mandor
OH
0.015
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PLESTERAN DINDING 1 : 2 TEBAL 1,5 CM
Semen portland
Kg
Pasir pasang
M3
Pekerja
OH
Tukang Batu
OH
Kep. Tukang Batu
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PLESTERAN DINDING 1 : 3 TEBAL 1,5 CM
Semen portland
Kg
Pasir pasang
M3
Pekerja
OH
Tukang Batu
OH
Kep. Tukang Batu
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PLESTERAN DINDING 1 : 4 TEBAL 1,5 CM
Semen portland
Kg
Pasir pasang
M3
Pekerja
OH
Tukang Batu
OH
Kep. Tukang Batu
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PLESTERAN DINDING 1 : 5 TEBAL 1,5 CM
Semen portland
Kg
Pasir pasang
M3
Pekerja
OH
Tukang Batu
OH
Kep. Tukang Batu
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

0.213
0.017
0.200
0.150
0.015
0.010

0.162
0.019
0.200
0.150
0.015
0.010

0.130
0.020
0.200
0.150
0.015
0.010

0.108
0.022
0.200
0.150
0.015
0.010

6,200
1,200
150,000
59,000
72,000
81,000
89,000
Rp

155,000
384
5,250
17,700
7,200
810
1,335
27,045

1,200
150,000
59,000
72,000
81,000
89,000
Rp

11,800
10,800
1,215
890
24,705

1,200
150,000
59,000
72,000
81,000
89,000
Rp

11,800
10,800
1,215
890
24,705

1,200
150,000
59,000
72,000
81,000
89,000
Rp

11,800
10,800
1,215
890
24,705

1,200
150,000
59,000
72,000
81,000
89,000
Rp

11,800
10,800
1,215
890
24,705

160,634

187,679
18,768
206,447
206,400

256
2,550

2,806

27,511
2,751
30,262
30,200

194
2,850

3,044

27,749
2,775
30,524
30,500

156
3,000

3,156

27,861
2,786
30,647
30,600

130
3,300

3,430

28,135
2,813
30,948
30,900

NO
a
5.6

5.7

5.8

5.9

5.11

5.12

ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN


KABUPATEN B E K A S I
2015
HARGA
SUB-TOTAL
URAIAN PEKERJAAN
SAT
VOLUME
SATUAN
UPAH
RP
RP
b
c
d
e
f
1 M2 PLESTERAN DINDING 1 : 2 TEBAL 2,0 CM
Semen portland
Kg
0.357
1,200
Pasir pasang
M3
0.023
150,000
Pekerja
OH
0.250
59,000
14,750
Tukang Batu
OH
0.200
72,000
14,400
Kep. Tukang Batu
OH
0.020
81,000
1,620
Mandor
OH
0.013
89,000
1,113
Total Harga
Rp
31,883
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PLESTERAN DINDING 1 : 3 TEBAL 2,0 CM
Semen portland
Kg
Pasir pasang
M3
Pekerja
OH
Tukang Batu
OH
Kep. Tukang Batu
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PLESTERAN DINDING 1 : 4 TEBAL 2,0 CM
Semen portland
Kg
Pasir pasang
M3
Pekerja
OH
Tukang Batu
OH
Kep. Tukang Batu
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PLESTERAN DINDING 1 : 5 TEBAL 2,0 CM
Semen portland
Kg
Pasir pasang
M3
Pekerja
OH
Tukang Batu
OH
Kep. Tukang Batu
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PLESTERAN DINDING 1 : 2 TEBAL 2,5 CM
Semen portland
Kg
Pasir pasang
M3
Pekerja
OH
Tukang Batu
OH
Kep. Tukang Batu
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PLESTERAN DINDING 1 : 3 TEBAL 2,5 CM
Semen portland
Kg
Pasir pasang
M3
Pekerja
OH
Tukang Batu
OH
Kep. Tukang Batu
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

0.270
0.026
0.250
0.200
0.020
0.013

0.217
0.028
0.250
0.200
0.020
0.013

0.182
0.028
0.250
0.200
0.020
0.013

0.388
0.013
0.300
0.200
0.020
0.013

0.294
0.035
0.300
0.200
0.020
0.013

1,200
150,000
59,000
72,000
81,000
89,000
Rp

1,200
150,000
59,000
72,000
81,000
89,000
Rp

1,200
150,000
59,000
72,000
81,000
89,000
Rp

1,200
150,000
59,000
72,000
81,000
89,000
Rp

1,200
150,000
59,000
72,000
81,000
89,000
Rp

SUB-TOTAL
BAHAN
RP
g

TOTAL
HARGA
RP
h

428
3,450

3,878

35,761
3,576
39,337
39,300

324
3,900
14,750
14,400
1,620
1,113
31,883

4,224

36,107
3,611
39,717
39,700

260
4,200
14,750
14,400
1,620
1,113
31,883

4,460

36,343
3,634
39,977
39,900

219
4,200
14,750
14,400
1,620
1,113
31,883

4,419

36,301
3,630
39,931
39,900

465
1,950
17,700
14,400
1,620
1,157
34,877

2,415

37,292
3,729
41,021
41,000

353
5,250
17,700
14,400
1,620
1,157
34,877

5,603

40,480
4,048
44,527
44,500

NO
a
5.13

5.14

5.15

5.16

5.17

5.18

ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN


KABUPATEN B E K A S I
2015
HARGA
SUB-TOTAL
URAIAN PEKERJAAN
SAT
VOLUME
SATUAN
UPAH
RP
RP
b
c
d
e
f
1 M2 PLESTERAN DINDING 1 : 4 TEBAL 2,5 CM
Semen portland
Kg
0.237
1,200
Pasir pasang
M3
0.038
150,000
Pekerja
OH
0.300
59,000
17,700
Tukang Batu
OH
0.200
72,000
14,400
Kep. Tukang Batu
OH
0.020
81,000
1,620
Mandor
OH
0.013
89,000
1,157
Total Harga
Rp
34,877
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PLESTERAN DINDING 1 : 5 TEBAL 2,5 CM
Semen portland
Kg
Pasir pasang
M3
Pekerja
OH
Tukang Batu
OH
Kep. Tukang Batu
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PLESTERAN BETON 1 : 2 TEBAL 1,5 CM
Semen portland
Kg
Pasir pasang
M3
Pekerja
OH
Tukang Batu
OH
Kep. Tukang Batu
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PLESTERAN BETON 1 : 3 TEBAL 1,5 CM
Semen portland
Kg
Pasir pasang
M3
Pekerja
OH
Tukang Batu
OH
Kep. Tukang Batu
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PLESTERAN SKONING 1 : 2
Semen portland
Pasir pasang
Pekerja
Tukang Batu
Kep. Tukang Batu
Mandor
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PLESTERAN SIAR 1 : 2
Semen portland
Pasir pasang
Pekerja
Tukang Batu
Kep. Tukang Batu
Mandor
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

Kg
M3
OH
OH
OH
OH

Kg
M3
OH
OH
OH
OH

0.199
0.039
0.300
0.200
0.020
0.013

0.233
0.018
0.260
0.200
0.020
0.013

0.177
0.021
0.260
0.200
0.020
0.013

0.500
0.002
0.057
0.038
0.038
0.002

0.108
0.016
0.150
0.070
0.007
0.008

1,200
150,000
59,000
72,000
81,000
89,000
Rp

1,200
150,000
59,000
72,000
81,000
89,000
Rp

1,200
150,000
59,000
72,000
81,000
89,000
Rp

1,200
150,000
59,000
72,000
81,000
89,000
Rp

1,200
150,000
59,000
72,000
81,000
89,000
Rp

SUB-TOTAL
BAHAN
RP
g

TOTAL
HARGA
RP
h

284
5,700

5,984

40,861
4,086
44,948
44,900

238
5,850
17,700
14,400
1,620
1,157
34,877

6,088

40,965
4,097
45,062
45,000

279
2,700
15,340
14,400
1,620
1,157
32,517

2,979

35,496
3,550
39,046
39,000

212
3,150
15,340
14,400
1,620
1,157
32,517

3,362

35,879
3,588
39,467
39,400

600
300
3,363
2,736
3,078
178
9,355

900

10,255
1,026
11,281
11,200

130
2,400
8,850
5,040
567
712
15,169

2,530

17,699
1,770
19,468
19,400

NO
a
5.19

5.20

5.21

5.22

5.23

5.24

URAIAN PEKERJAAN
b
1 M3 BETON TUMBUK 1 : 3 : 5
Semen portland
Pasir beton
Koral beton
Pekerja
Tukang Batu
Kep. Tukang Batu
Mandor
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M3 BETON TUMBUK 1 : 4 : 6
Semen portland
Pasir beton
Koral beton
Pekerja
Tukang Batu
Kep. Tukang Batu
Mandor
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN


KABUPATEN B E K A S I
2015
HARGA
SUB-TOTAL
SAT
VOLUME
SATUAN
UPAH
RP
RP
c
d
e
f
Kg
M3
M3
OH
OH
OH
OH

Kg
M3
M3
OH
OH
OH
OH

5.450
0.520
0.870
1.650
0.250
0.025
0.080

4.325
0.570
0.870
1.650
0.250
0.025
0.080

1 M3 LANTAI KERJA BETON TUMBUK 1 : 3 : 5 TEBAL 5 CM


Semen portland
Kg
4.500
Pasir beton
M3
0.570
Koral beton
M3
0.870
Pekerja
OH
1.650
Tukang Batu
OH
0.250
Kep. Tukang Batu
OH
0.025
Mandor
OH
0.080
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M3 BETON BERTULANG 1 : 2 : 3 (K 125)
Semen portland
Kg
Pasir beton
M3
Koral beton
M3
Pekerja
OH
Tukang Batu
OH
Kep. Tukang Batu
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M3 BETON MUTU K 225
Semen portland
Pasir beton
Koral beton
Pekerja
Tukang Batu
Kep. Tukang Batu
Mandor
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M3 BETON MUTU K 275
Semen portland
Pasir beton
Koral beton
Pekerja
Tukang Batu
Kep. Tukang Batu
Mandor
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

Kg
M3
M3
OH
OH
OH
OH

Kg
M3
M3
OH
OH
OH
OH

8.400
0.540
0.810
2.000
0.350
0.035
1.000

9.700
0.650
0.650
6.000
1.000
0.100
0.300

10.000
0.400
0.820
6.000
1.000
0.100
0.300

1,200
150,000
137,100
59,000
72,000
81,000
89,000
Rp

1,200
150,000
137,100
59,000
72,000
81,000
89,000
Rp

800
150,000
172,730
38,500
55,000
60,500
60,500
Rp

800
150,000
172,730
59,000
72,000
81,000
89,000
Rp

800
150,000
172,730
59,000
72,000
81,000
89,000
Rp

800
150,000
172,730
59,000
72,000
81,000
89,000
Rp

SUB-TOTAL
BAHAN
RP
g

TOTAL
HARGA
RP
h

6,540
78,000
119,277
97,350
18,000
2,025
7,120
124,495

203,817

328,312
32,831
361,143
361,100

5,190
85,500
119,277
97,350
18,000
2,025
7,120
124,495

209,967

334,462
33,446
367,908
367,900

3,600
85,500
150,275
63,525
13,750
1,513
4,840
83,628

239,375

323,003
32,300
355,303
355,300

6,720
81,000
139,911
118,000
25,200
2,835
89,000
235,035

227,631

462,666
46,267
508,933
508,900

7,760
97,500
112,275
354,000
72,000
8,100
26,700
460,800

217,535

678,335
67,833
746,168
746,100

8,000
60,000
141,639
354,000
72,000
8,100
26,700
460,800

209,639

670,439
67,044
737,482
737,400

NO
a
5.25

6
6.1

6.2

6.3

6.4

6.5

URAIAN PEKERJAAN
b
1 M2 PASANG JEMBATAN COR
Kayu terentang
Paku biasa 2"-5"
Dolken kayu 8-10/400 cm
Pekerja
Tukang kayu
Kepala tukang
Mandor
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN


KABUPATEN B E K A S I
2015
HARGA
SUB-TOTAL
SAT
VOLUME
SATUAN
UPAH
RP
RP
c
d
e
f
M3
Kg
M3
OH
OH
OH
OH

0.062
0.600
0.500
0.150
0.050
0.005
0.007

870,000
10,910
872,640
59,000
55,000
81,000
89,000
Rp

8,850
2,750
405
623
12,628

1,980,000
59,000
73,000
81,000
89,000
Rp

354,000
1,460,000
162,000
26,700
2,002,700

3,855,600
59,000
73,000
81,000
89,000
Rp

354,000
1,314,000
162,000
26,700
1,856,700

SUB-TOTAL
BAHAN
RP
g

TOTAL
HARGA
RP
h

54,288
6,546
436,320

497,154

509,782
50,978
560,760
560,700

PEKRJAAN KAYU DAN KUZEN


1 M3 PASANG KUSEN PINTU DAN JENDELA KAYU KAMPER
Kayu kamper, balok
M3
1.200
Pekerja
OH
6.000
Tukang kayu
OH
20.000
Kepala tukang
OH
2.000
Mandor
OH
0.300
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M3 PASANG KUSEN PINTU DAN JENDELA KAYU BORNEO
Kayu borneo, balok
M3
1.200
Pekerja
OH
6.000
Tukang kayu
OH
18.000
Kepala tukang
OH
2.000
Mandor
OH
0.300
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PASANG PINTU PANIL KAYU KAMPER
Kayu kamper, papan
M3
Pekerja
OH
Tukang kayu
OH
Kepala tukang
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PASANG PINTU PANIL KAYU BORNEO
Kayu borneo, papan
M3
Pekerja
OH
Tukang kayu
OH
Kepala tukang
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

0.040
1.000
2.500
0.250
0.050

0.040
1.000
2.500
0.250
0.050

1 M2 PASANG PINTU DAN JENDELA KACA KAYU KAMPER


Kayu kamper, papan
M3
0.035
Pekerja
OH
0.800
Tukang kayu
OH
2.000
Kepala tukang
OH
0.200
Mandor
OH
0.040
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

2,160,000
59,000
73,000
81,000
89,000

2,376,000

2,376,000

4,378,700
437,870
4,816,570
4,816,500

4,626,720

4,626,720

6,483,420
648,342
7,131,762
7,131,700

86,400
59,000
182,500
20,250
4,450
266,200

3,881,400
59,000
73,000
81,000
89,000
Rp

59,000
182,500
20,250
4,450
266,200

2,160,000
59,000
73,000
81,000
89,000
Rp

47,200
146,000
16,200
3,560
212,960

86,400

352,600
35,260
387,860
387,800

155,256

155,256

421,456
42,146
463,602
463,600

75,600

75,600

288,560
28,856
317,416
317,400

NO
a
6.6

6.7

6.8

6.9

6.10

6.11

ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN


KABUPATEN B E K A S I
2015
HARGA
SUB-TOTAL
URAIAN PEKERJAAN
SAT
VOLUME
SATUAN
UPAH
RP
RP
b
c
d
e
f
1 M2 PASANG PINTU DAN JENDELA KACA KAYU BORNEO
Kayu borneo, papan
M3
0.035
3,881,400
Pekerja
OH
0.800
59,000
47,200
Tukang kayu
OH
2.000
73,000
146,000
Kepala tukang
OH
0.200
81,000
16,200
Mandor
OH
0.040
89,000
3,560
Total Harga
Rp
212,960
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PASANG PINTU DAN JENDELA JALUSI KAYU KAMPER
Kayu kamper, papan
M3
0.064
Pekerja
OH
1.000
Tukang kayu
OH
3.000
Kepala tukang
OH
0.300
Mandor
OH
0.500
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PASANG PINTU DAN JENDELA JALUSI KAYU BORNEO
Kayu borneo, papan
M3
0.064
Pekerja
OH
1.000
Tukang kayu
OH
3.000
Kepala tukang
OH
0.300
Mandor
OH
0.500
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PASANG PINTU PLYWOOD RANGKAP KAYU KAMPER
Kayu kamper, papan
M3
0.0196
Paku biasa 1/2"-1"
Kg
0.030
Lem kayu
Kg
0.300
Plywood 4' x 8' x 4 mm
Lbr
1.000
Pekerja
OH
0.600
Tukang kayu
OH
2.000
Kepala tukang
OH
0.200
Mandor
OH
0.030
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PASANG PINTU PLYWOOD RANGKAP KAYU BORNEO
Kayu borneo, papan
M3
0.0196
Paku biasa 1/2"-1"
Kg
0.030
Lem kayu
Kg
0.300
Plywood 4' x 8' x 4 mm
Lbr
1.000
Pekerja
OH
0.600
Tukang kayu
OH
2.000
Kepala tukang
OH
0.200
Mandor
OH
0.030
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PASANG JALUSI MATI KAYU KAMPER
Kayu kamper, papan
M3
Paku biasa 1/2"-1"
Kg
Pekerja
OH
Tukang kayu
OH
Kepala tukang
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

0.060
0.150
0.500
2.000
0.200
0.025

2,160,000
59,000
73,000
81,000
89,000
Rp

59,000
219,000
24,300
44,500
346,800

3,881,400
59,000
73,000
81,000
89,000
Rp

59,000
219,000
24,300
44,500
346,800

2,160,000
22,500
75,300
59,000
73,000
81,000
89,000
Rp

3,881,400
22,500
75,300
59,000
73,000
81,000
89,000
Rp

2,160,000
22,500
59,000
73,000
81,000
89,000
Rp

SUB-TOTAL
BAHAN
RP
g

TOTAL
HARGA
RP
h

135,849

135,849

348,809
34,881
383,690
383,600

138,240

138,240

485,040
48,504
533,544
533,500

248,410

248,410

595,210
59,521
654,731
654,700

42,336
675
75,300
35,400
146,000
16,200
2,670
200,270

118,311

318,581
31,858
350,439
350,400

76,075
675
75,300
35,400
146,000
16,200
2,670
200,270

152,050

352,320
35,232
387,552
387,500

129,600
3,375
29,500
146,000
16,200
2,225
193,925

132,975

326,900
32,690
359,590
359,500

NO
a
6.12

6.13

6.14

6.15

6.16

ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN


KABUPATEN B E K A S I
2015
HARGA
SUB-TOTAL
URAIAN PEKERJAAN
SAT
VOLUME
SATUAN
UPAH
RP
RP
b
c
d
e
f
1 M2 PASANG JALUSI MATI KAYU BORNEO
Kayu borneo, papan
M3
0.060
3,881,400
Paku biasa 1/2"-1"
Kg
0.150
22,500
Pekerja
OH
0.500
59,000
29,500
Tukang kayu
OH
2.000
73,000
146,000
Kepala tukang
OH
0.200
81,000
16,200
Mandor
OH
0.025
89,000
2,225
Total Harga
Rp
193,925
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PASANG PINTU TEAKWOOD RANGKAP RANGKA KAYU KAMPER
Kayu kamper, papan
M3
0.0196
2,160,000
Paku biasa 1/2"-1"
Kg
0.030
22,500
Lem kayu
Kg
0.300
Teakwood 4' x 8' x 4 mm
Lbr
1.000
75,300
Pekerja
OH
0.600
59,000
Tukang kayu
OH
2.000
73,000
Kepala tukang
OH
0.200
81,000
Mandor
OH
0.030
89,000
Total Harga
Rp
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PASANG PINTU TEAKWOOD RANGKAP RANGKA KAYU BORNEO
Kayu borneo, papan
M3
0.0196
3,881,400
Paku biasa 1/2"-1"
Kg
0.030
22,500
Lem kayu
Kg
0.300
Teakwood 4' x 8' x 4 mm
Lbr
1.000
75,300
Pekerja
OH
0.600
59,000
Tukang kayu
OH
2.000
73,000
Kepala tukang
OH
0.200
81,000
Mandor
OH
0.030
89,000
Total Harga
Rp
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PASANG PINTU PLYWOOD & FORMIKA RANGKA KAYU KAMPER
Kayu kamper, papan
M3
0.0196
2,160,000
Paku biasa 1/2"-1"
Kg
0.300
22,500
Lem kayu
Kg
0.800
Plywood 4' x 8' x 4 mm
Lbr
1.000
75,300
Formika 4' x 8'
Lbr
0.500
Pekerja
OH
0.800
59,000
Tukang kayu
OH
2.500
73,000
Kepala tukang
OH
0.250
81,000
Mandor
OH
0.040
89,000
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PASANG PINTU PLYWOOD & FORMIKA RANGKA KAYU BORNEO
Kayu borneo, papan
M3
0.0196
3,881,400
Paku biasa 1/2"-1"
Kg
0.300
22,500
Lem kayu
Kg
0.800
Plywood 4' x 8' x 4 mm
Lbr
1.000
75,300
Formika 4' x 8'
Lbr
0.500
Pekerja
OH
0.800
59,000
Tukang kayu
OH
2.500
73,000
Kepala tukang
OH
0.250
81,000
Mandor
OH
0.040
89,000
Total Harga
Rp
Keuntungan 10%
Jumlah
Dibulatkan

SUB-TOTAL
BAHAN
RP
g

TOTAL
HARGA
RP
h

232,884
3,375

236,259

430,184
43,018
473,202
473,200

42,336
675
75,300
35,400
146,000
16,200
2,670
200,270

118,311

318,581
31,858
350,439
350,400

76,075
675
75,300
35,400
146,000
16,200
2,670
200,270

152,050

352,320
35,232
387,552
387,500

42,336
6,750
75,300
47,200
182,500
20,250
249,950

124,386

374,336
37,434
411,770
411,700

76,075
6,750
75,300
47,200
182,500
20,250
3,560
253,510

158,125

411,635
41,164
452,799
452,700

NO
a
6.17

6.18

6.19

6.20

6.21

ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN


KABUPATEN B E K A S I
2015
HARGA
SUB-TOTAL
URAIAN PEKERJAAN
SAT
VOLUME
SATUAN
UPAH
RP
RP
b
c
d
e
f
1 M2 PASANG PINTU TEAKWOOD & FORMIKA RANGKA KAYU KAMPER (divernis)
Kayu kamper, papan
M3
0.0196
2,160,000
Paku biasa 1/2"-1"
Kg
0.300
22,500
Lem kayu
Kg
0.800
Teakwood 4' x 8' x 4 mm
Lbr
1.000
60,000
Formika 4' x 8'
Lbr
0.500
Vernis
Lt
0.500
Pekerja
OH
0.800
59,000
47,200
Tukang kayu
OH
2.500
73,000
182,500
Kepala tukang
OH
0.250
81,000
20,250
Mandor
OH
0.040
89,000
3,560
Total Harga
Rp
253,510
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PASANG PINTU TEAKWOOD & FORMIKA RANGKA KAYU BORNEO (divernis)
Kayu borneo, papan
M3
0.0196
3,881,400
Paku biasa 1/2"-1"
Kg
0.300
22,500
Lem kayu
Kg
0.800
Teakwood 4' x 8' x 4 mm
Lbr
1.000
60,000
Formika 4' x 8'
Lbr
0.500
Vernis
Lt
0.500
Pekerja
OH
0.800
59,000
Tukang kayu
OH
2.500
73,000
Kepala tukang
OH
0.250
81,000
Mandor
OH
0.040
89,000
Total Harga
Rp
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PASANG PINTU FORMIKA DOUBLE RANGKA KAYU KAMPER
Kayu kamper, papan
M3
0.0196
2,160,000
Paku biasa 1/2"-1"
Kg
0.300
22,500
Lem kayu
Kg
1.200
Plywood 4' x 8' x 4 mm
Lbr
1.000
75,300
Formika 4' x 8'
Lbr
1.000
75,300
Pekerja
OH
1.000
59,000
Tukang kayu
OH
2.600
73,000
Kepala tukang
OH
0.260
81,000
Mandor
OH
0.050
89,000
Total Harga
Rp
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PASANG PINTU FORMIKA DOUBLE RANGKA KAYU BORNEO
Kayu borneo, papan
M3
0.0196
3,881,400
Paku biasa 1/2"-1"
Kg
0.300
22,500
Lem kayu
Kg
1.200
Plywood 4' x 8' x 4 mm
Lbr
1.000
75,300
Formika 4' x 8'
Lbr
1.000
75,300
Pekerja
OH
1.000
59,000
Tukang kayu
OH
2.600
73,000
Kepala tukang
OH
0.260
81,000
Mandor
OH
0.050
89,000
Total Harga
Rp
Keuntungan 10%
Jumlah
Dibulatkan
1 M3 PASANG KONSTRUKSI KUDA-KUDA KAYU KAMPER
Kayu kamper, balok
M3
1.100
Besi strip
Kg
15.000
Paku biasa 2"-5"
Kg
0.800
Pekerja
OH
4.000
Tukang kayu
OH
12.000
Kepala tukang
OH
1.200
Mandor
OH
0.200
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

1,980,000
11,000
1,300
59,000
73,000
81,000
89,000
Rp

SUB-TOTAL
BAHAN
RP
g

TOTAL
HARGA
RP
h

42,336
6,750
60,000
-

109,086

362,596
36,260
398,856
398,800

76,075
6,750
60,000
47,200
182,500
20,250
3,560
253,510

142,825

396,335
39,634
435,969
435,900

42,336
6,750
75,300
75,300
59,000
189,800
21,060
4,450
274,310

199,686

473,996
47,400
521,396
521,300

76,075
6,750
75,300
75,300
59,000
189,800
21,060
4,450
274,310

233,425

507,735
50,774
558,509
558,500

2,178,000
165,000
1,040
236,000
876,000
97,200
17,800
1,227,000

2,344,040

3,571,040
357,104
3,928,144
3,928,100

NO
a
6.22

6.23

6.24

6.25

6.26

6.27

ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN


KABUPATEN B E K A S I
2015
HARGA
SUB-TOTAL
URAIAN PEKERJAAN
SAT
VOLUME
SATUAN
UPAH
RP
RP
b
c
d
e
f
1 M3 PASANG KONSTRUKSI KUDA-KUDA KAYU BORNEO
Kayu borneo, balok
M3
1.100
3,855,600
Besi strip
Kg
15.000
11,000
Paku biasa 2"-5"
Kg
0.800
1,300
Pekerja
OH
4.000
59,000
236,000
Tukang kayu
OH
12.000
73,000
876,000
Kepala tukang
OH
1.200
81,000
97,200
Mandor
OH
0.200
89,000
17,800
Total Harga
Rp
1,227,000
Keuntungan 10%
Jumlah
Dibulatkan
1 M3 PASANG KONSTRUKSI KUDA-KUDA KAYU KRUING
Kayu kruing, balok
M3
1.100
Besi strip
Kg
15.000
Paku biasa 2"-5"
Kg
0.800
Pekerja
OH
4.000
Tukang kayu
OH
12.000
Kepala tukang
OH
1.200
Mandor
OH
0.200
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PASANG KASO + RENG GENTENG KODOK KAYU KAMPER
Kayu kamper, balok
M3
0.012
Paku biasa 2"-5"
Kg
0.150
Pekerja
OH
0.100
Tukang kayu
OH
0.100
Kepala tukang
OH
0.010
Mandor
OH
0.005
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PASANG KASO + RENG GENTENG KODOK KAYU BORNEO
Kayu borneo, balok
M3
0.012
Paku biasa 2"-5"
Kg
0.150
Pekerja
OH
0.100
Tukang kayu
OH
0.100
Kepala tukang
OH
0.010
Mandor
OH
0.005
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PASANG KASO + RENG GENTENG MONIER KAYU KAMPER
Kayu kamper, balok
M3
0.014
Paku biasa 2"-5"
Kg
0.150
Pekerja
OH
0.100
Tukang kayu
OH
0.100
Kepala tukang
OH
0.010
Mandor
OH
0.005
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

3,881,400
11,000
1,300
59,000
73,000
81,000
89,000
Rp

1,980,000
1,300
59,000
73,000
81,000
89,000
Rp

3,855,600
1,300
59,000
73,000
81,000
89,000
Rp

1,980,000
1,300
59,000
73,000
81,000
89,000
Rp

1 M2 PASANG KASO + RENG GENTENG BETON & MONIER KAYU BORNEO


Kayu borneo, balok
M3
0.014
3,855,600
Paku biasa 2"-5"
Kg
0.150
1,300
Pekerja
OH
0.100
59,000
Tukang kayu
OH
0.100
73,000
Kepala tukang
OH
0.010
81,000
Mandor
OH
0.005
89,000
Total Harga
Rp
Keuntungan 10%
Jumlah
Dibulatkan

SUB-TOTAL
BAHAN
RP
g

TOTAL
HARGA
RP
h

4,241,160
165,000
1,040

4,407,200

5,634,200
563,420
6,197,620
6,197,600

4,269,540
165,000
1,040
236,000
876,000
97,200
17,800
1,227,000

4,435,580

5,662,580
566,258
6,228,838
6,228,800

23,760
195
5,900
7,300
810
445
14,455

23,955

38,410
3,841
42,251
42,200

46,267
195
5,900
7,300
810
445
14,455

46,462

60,917
6,092
67,009
67,000

27,720
195
5,900
7,300
810
445
14,455

27,915

42,370
4,237
46,607
46,600

53,978
195
5,900
7,300
810
445
14,455

54,173

68,628
6,863
75,491
75,400

NO
a
6.28

6.29

6.30

6.31

6.32

6.33

ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN


KABUPATEN B E K A S I
2015
HARGA
SUB-TOTAL
URAIAN PEKERJAAN
SAT
VOLUME
SATUAN
UPAH
RP
RP
b
c
d
e
f
1 M2 PASANG KASO + RENG ATAP SIRAP KAYU KAMPER
Kayu kamper, balok
M3
0.165
1,980,000
Paku biasa 2"-5"
Kg
0.200
1,300
Pekerja
OH
0.120
59,000
7,080
Tukang kayu
OH
0.120
73,000
8,760
Kepala tukang
OH
0.012
81,000
972
Mandor
OH
0.006
89,000
534
Total Harga
Rp
17,346
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PASANG KASO + RENG ATAP SIRAP KAYU BORNEO
Kayu borneo, balok
M3
0.165
Paku biasa 2"-5"
Kg
0.200
Pekerja
OH
0.120
Tukang kayu
OH
0.120
Kepala tukang
OH
0.012
Mandor
OH
0.006
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

3,855,600
1,300
59,000
73,000
81,000
89,000
Rp

1 M2 PASANG RANGKA LANGIT-LANGIT ( 1 X 1 ) M KAYU KAMPER


Kayu kamper, balok
M3
0.012
1,980,000
Paku biasa 2"-5"
Kg
0.100
1,300
Pekerja
OH
0.150
59,000
Tukang kayu
OH
0.250
73,000
Kepala tukang
OH
0.025
81,000
Mandor
OH
0.075
89,000
Total Harga
Rp
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PASANG RANGKA LANGIT-LANGIT ( 1 X 1 ) M KAYU BORNEO
Kayu borneo, balok
M3
0.012
3,855,600
Paku biasa 2"-5"
Kg
0.100
1,300
Pekerja
OH
0.150
59,000
Tukang kayu
OH
0.250
73,000
Kepala tukang
OH
0.025
81,000
Mandor
OH
0.075
89,000
Total Harga
Rp
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PASANG RANGKA LANGIT-LANGIT ( 30 X 30 ) CM KAYU KAMPER
Kayu kamper, balok
M3
0.027
1,980,000
Paku biasa 2"-5"
Kg
0.200
1,300
Pekerja
OH
0.250
59,000
Tukang kayu
OH
0.350
73,000
Kepala tukang
OH
0.035
81,000
Mandor
OH
0.0125
89,000
Total Harga
Rp
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PASANG RANGKA LANGIT-LANGIT ( 30 X 30 ) CM KAYU BORNEO
Kayu borneo, balok
M3
0.027
3,855,600
Paku biasa 2"-5"
Kg
0.200
1,300
Pekerja
OH
0.250
59,000
Tukang kayu
OH
0.350
73,000
Kepala tukang
OH
0.035
81,000
Mandor
OH
0.0125
89,000
Total Harga
Rp
Keuntungan 10%
Jumlah
Dibulatkan

SUB-TOTAL
BAHAN
RP
g

TOTAL
HARGA
RP
h

326,700
260

326,960

344,306
34,431
378,737
378,700

636,174
260
7,080
8,760
972
534
17,346

636,434

653,780
65,378
719,158
719,100

23,760
130
8,850
18,250
2,025
6,675
35,800

23,890

59,690
5,969
65,659
65,600

46,267
130
8,850
18,250
2,025
6,675
35,800

46,397

82,197
8,220
90,417
90,400

53,460
260
14,750
25,550
2,835
1,113
44,248

53,720

97,968
9,797
107,764
107,700

104,101
260
14,750
25,550
2,835
1,113
44,248

104,361

148,609
14,861
163,470
163,400

NO
a
6.34

6.35

6.36

6.37

6.38

6.39

ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN


KABUPATEN B E K A S I
2015
HARGA
SUB-TOTAL
URAIAN PEKERJAAN
SAT
VOLUME
SATUAN
UPAH
RP
RP
b
c
d
e
f
1 M' PASANG LISPLANG UKURAN ( 3 X 20 ) CM KAYU KAMPER
Kayu kamper, papan
M3
0.0072
2,160,000
Paku biasa 2"-5"
Kg
0.050
1,300
Pekerja
OH
0.100
59,000
5,900
Tukang kayu
OH
0.200
73,000
14,600
Kepala tukang
OH
0.020
81,000
1,620
Mandor
OH
0.005
89,000
445
Total Harga
Rp
22,565
Keuntungan 10%
Jumlah
Dibulatkan
1 M' PASANG LISPLANG UKURAN ( 3 X 20 ) CM KAYU BORNEO
Kayu borneo, papan
M3
0.0072
Paku biasa 2"-5"
Kg
0.050
Pekerja
OH
0.100
Tukang kayu
OH
0.200
Kepala tukang
OH
0.020
Mandor
OH
0.005
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M' PASANG LISPLANG UKURAN ( 3 X 30 ) CM KAYU KAMPER
Kayu kamper, papan
M3
0.011
Paku biasa 2"-5"
Kg
0.050
Pekerja
OH
0.110
Tukang kayu
OH
0.220
Kepala tukang
OH
0.022
Mandor
OH
0.005
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M' PASANG LISPLANG UKURAN ( 3 X 30 ) CM KAYU BORNEO
Kayu borneo, papan
M3
0.011
Paku biasa 2"-5"
Kg
0.050
Pekerja
OH
0.110
Tukang kayu
OH
0.220
Kepala tukang
OH
0.022
Mandor
OH
0.005
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

3,881,400
1,300
59,000
73,000
81,000
89,000
Rp

2,160,000
1,300
59,000
73,000
81,000
89,000
Rp

3,881,400
1,300
59,000
73,000
81,000
89,000
Rp

1 M' PASANG LISPLANG UKURAN 2 x ( 3 X 20 ) CM KAYU KAMPER


Kayu kamper, papan
M3
0.0145
2,160,000
Paku biasa 2"-5"
Kg
0.060
1,300
Pekerja
OH
0.150
59,000
Tukang kayu
OH
0.250
73,000
Kepala tukang
OH
0.025
81,000
Mandor
OH
0.075
89,000
Total Harga
Rp
Keuntungan 10%
Jumlah
Dibulatkan
1 M' PASANG LISPLANG UKURAN 2 x ( 3 X 20 ) CM KAYU BORNEO
Kayu borneo, papan
M3
0.0145
3,881,400
Paku biasa 2"-5"
Kg
0.060
1,300
Pekerja
OH
0.150
59,000
Tukang kayu
OH
0.250
73,000
Kepala tukang
OH
0.025
81,000
Mandor
OH
0.075
89,000
Total Harga
Rp
Keuntungan 10%
Jumlah
Dibulatkan

SUB-TOTAL
BAHAN
RP
g

TOTAL
HARGA
RP
h

15,552
65

15,617

38,182
3,818
42,000
42,000

27,946
65
5,900
14,600
1,620
445
22,565

28,011

50,576
5,058
55,634
55,600

23,760
65
6,490
16,060
1,782
445
24,777

23,825

48,602
4,860
53,462
53,400

42,695
65
6,490
16,060
1,782
445
24,777

42,760

67,537
6,754
74,291
74,200

31,320
78
8,850
18,250
2,025
6,675
35,800

31,398

67,198
6,720
73,918
73,900

56,280
78
8,850
18,250
2,025
6,675
35,800

56,358

92,158
9,216
101,374
101,300

NO
a
6.40

6.41

6.42

6.43

6.44

6.45

ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN


KABUPATEN B E K A S I
2015
HARGA
SUB-TOTAL
URAIAN PEKERJAAN
SAT
VOLUME
SATUAN
UPAH
RP
RP
b
c
d
e
f
1 M' PASANG LISPLANG UKURAN 2 x ( 2 X 20 ) CM KAYU KAMPER
Kayu kamper, papan
M3
0.0086
2,160,000
Paku biasa 2"-5"
Kg
0.060
1,300
Pekerja
OH
0.100
59,000
5,900
Tukang kayu
OH
0.100
73,000
7,300
Kepala tukang
OH
0.010
81,000
810
Mandor
OH
0.050
89,000
4,450
Total Harga
Rp
18,460
Keuntungan 10%
Jumlah
Dibulatkan
1 M' PASANG LISPLANG UKURAN 2 x ( 2 X 20 ) CM KAYU BORNEO
Kayu borneo, papan
M3
0.0086
3,881,400
Paku biasa 2"-5"
Kg
0.060
1,300
Pekerja
OH
0.100
59,000
Tukang kayu
OH
0.100
73,000
Kepala tukang
OH
0.010
81,000
Mandor
OH
0.050
89,000
Total Harga
Rp
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PASANG RANGKA DINDING PEMISAH KAYU KAMPER
Kayu kamper, balok
M3
0.0195
Kayu kamper, papan
M3
0.007
Paku biasa 2"-5"
Kg
0.100
Pekerja
OH
0.150
Tukang kayu
OH
0.450
Kepala tukang
OH
0.045
Mandor
OH
0.075
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PASANG RANGKA DINDING PEMISAH KAYU BORNEO
Kayu borneo, balok
M3
0.0195
Kayu borneo, papan
M3
0.007
Paku biasa 2"-5"
Kg
0.100
Pekerja
OH
0.150
Tukang kayu
OH
0.450
Kepala tukang
OH
0.045
Mandor
OH
0.075
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

3,881,400
3,881,400
1,300
59,000
73,000
81,000
89,000
Rp

3,881,400
1,500,000
1,300
59,000
73,000
81,000
89,000
Rp

SUB-TOTAL
BAHAN
RP
g

TOTAL
HARGA
RP
h

18,576
78

18,654

37,114
3,711
40,825
40,800

33,380
78
5,900
7,300
810
4,450
18,460

33,458

51,918
5,192
57,110
57,100

75,687
27,170
130
8,850
32,850
3,645
6,675
52,020

102,987

155,007
15,501
170,508
170,500

75,687
10,500
130
8,850
32,850
3,645
6,675
52,020

1 M2 PASANG RANGKA DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KAMPER


Kayu kamper, balok
M3
0.0195
1,980,000
Kayu kamper, papan
M3
0.007
2,160,000
Paku biasa 2"-5"
Kg
0.100
1,300
Lem kayu
Kg
0.560
21,820
Teakwood 4' x 8' x 4 mm
Lbr
1.000
75,300
Pekerja
OH
0.150
59,000
8,850
Tukang kayu
OH
0.450
73,000
32,850
Kepala tukang
OH
0.045
81,000
3,645
Mandor
OH
0.075
89,000
6,675
Total Harga
Rp
52,020
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PASANG RANGKA DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KAMPER
Kayu kamper, balok
M3
0.0195
1,980,000
Kayu kamper, papan
M3
0.007
2,160,000
Paku biasa 2"-5"
Kg
0.100
1,300
Lem kayu
Kg
0.560
21,820
Plywood 4' x 8' x 4 mm
Lbr
1.000
75,300
Pekerja
OH
0.200
59,000
11,800
Tukang kayu
OH
0.600
73,000
43,800
Kepala tukang
OH
0.060
81,000
4,860
Mandor
OH
0.010
89,000
890
Total Harga
Rp
61,350
Keuntungan 10%
Jumlah
Dibulatkan

86,317

138,337
13,834
152,171
152,100

38,610
15,120
130
12,219
75,300

87,649

139,669
13,967
153,636
153,600

38,610
15,120
130
12,219
75,300

87,649

148,999
14,900
163,899
163,800

NO
a
6.46

7
7.1

7.2

7.3

7.4

7.5

ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN


KABUPATEN B E K A S I
2015
HARGA
SUB-TOTAL
URAIAN PEKERJAAN
SAT
VOLUME
SATUAN
UPAH
RP
RP
b
c
d
e
f
1 M2 PASANG RANGKA PLYWOOD 4 MM UNTUK DINDING
Plywood 4' x 8' x 4 mm
Lbr
0.400
75,300
Paku biasa 1/2"-1"
Kg
0.050
1,300
Pekerja
OH
0.025
59,000
1,475
Tukang kayu
OH
0.075
73,000
5,475
Kepala tukang
OH
0.0075
81,000
608
Mandor
OH
0.0013
89,000
116
Total Harga
Rp
7,673
Keuntungan 10%
Jumlah
Dibulatkan

SUB-TOTAL
BAHAN
RP
g

TOTAL
HARGA
RP
h

30,120
65

30,185

37,858
3,786
41,644
41,600

PEKERJAAN BETON
1 M' PASANG PVC WATER STOP LEBAR 20 CM
Water stop lebar 20 cm
M'
Pekerja
OH
Tukang batu
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M' PASANG PVC WATER STOP LEBAR 25 CM
Water stop lebar 25 cm
M'
Pekerja
OH
Tukang batu
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

1.050
0.050
0.035
0.002

1.050
0.550
0.035
0.003

1 KG PEMBESIAN DENGAN BESI POLOS ATAU BESI ULIR


Besi beton polos/ulir
KG
1.050
Kawat beton
KG
0.015
Pekerja
OH
0.007
Tukang besi
OH
0.007
Kepala tukang
OH
0.0007
Mandor
OH
0.0003
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 BEKISTING UNTUK PONDASI
Kayu terentang
Paku biasa 2"-5"
Minyak bekisting
Pekerja
Tukang kayu
Kepala tukang
Mandor
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 BEKISTING UNTUK SLOOF
Kayu terentang
Paku biasa 2"-5"
Minyak bekisting
Pekerja
Tukang kayu
Kepala tukang
Mandor
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

M3
Kg
Lt
OH
OH
OH
OH

M3
Kg
Lt
OH
OH
OH
OH

0.040
0.300
0.100
0.300
0.260
0.026
0.005

0.045
0.300
0.100
0.300
0.260
0.026
0.005

#REF!
59,000
72,000
89,000

#REF!
2,950
2,520
178
5,648

59,000
72,000
89,000
Rp

32,450
2,520
267
35,237

9,980
12,280
59,000
57,000
81,000
89,000
Rp

413
399
57
27
895

2,911,100
1,300
9,000
59,000
73,000
81,000
89,000
Rp

2,911,100
1,300
9,000
59,000
73,000
81,000
89,000
Rp

#REF!

#REF!
#REF!
#REF!
#REF!

35,237
3,524
38,761
38,700

10,479
184

10,663

11,559
1,156
12,714
12,700

116,444
390
900
17,700
18,980
2,106
445
39,231

117,734

156,965
15,697
172,662
172,600

131,000
390
900
17,700
18,980
2,106
445
39,231

132,290

171,521
17,152
188,673
188,600

NO
a
7.6

7.7

7.8

7.8

7.9

ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN


KABUPATEN B E K A S I
2015
HARGA
SUB-TOTAL
URAIAN PEKERJAAN
SAT
VOLUME
SATUAN
UPAH
RP
RP
b
c
d
e
f
1 M2 BEKISTING UNTUK KOLOM
Kayu terentang
M3
0.040
2,911,100
Paku biasa 2"-5"
Kg
0.400
1,300
Minyak bekisting
Lt
0.200
9,000
Balok kayu borneo
M3
0.015
3,881,400
Plywood tebal 9 mm
Lbr
0.350
139,500
Dolken kayu 8-10/400 cm
Btg
2.000
33,800
Pekerja
OH
0.300
59,000
17,700
Tukang kayu
OH
0.330
73,000
24,090
Kepala tukang
OH
0.033
81,000
2,673
Mandor
OH
0.006
89,000
534
Total Harga
Rp
44,997
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 BEKISTING UNTUK BALOK
Kayu terentang
Paku biasa 2"-5"
Minyak bekisting
Balok kayu borneo
Plywood tebal 9 mm
Dolken kayu 8-10/400 cm
Pekerja
Tukang kayu
Kepala tukang
Mandor
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 BEKISTING UNTUK LANTAI
Kayu terentang
Paku biasa 2"-5"
Minyak bekisting
Balok kayu borneo
Plywood tebal 9 mm
Dolken kayu 8-10/400 cm
Pekerja
Tukang kayu
Kepala tukang
Mandor
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 BEKISTING UNTUK DINDING
Kayu terentang
Paku biasa 2"-5"
Minyak bekisting
Balok kayu borneo
Plywood tebal 9 mm
Dolken kayu 8-10/400 cm
Formtie/spacer/penjaga jarak bekisting
Pekerja
Tukang kayu
Kepala tukang
Mandor
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 BEKISTING UNTUK TANGGA
Kayu terentang
Paku biasa 2"-5"
Minyak bekisting
Balok kayu borneo
Plywood tebal 9 mm
Dolken kayu 8-10/400 cm
Pekerja
Tukang kayu
Kepala tukang
Mandor
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

M3
Kg
Lt
M3
Lbr
Btg
OH
OH
OH
OH

M3
Kg
Lt
M3
Lbr
Btg
OH
OH
OH
OH

M3
Kg
Lt
M3
Lbr
Btg
Btg
OH
OH
OH
OH

M3
Kg
Lt
M3
Lbr
Btg
OH
OH
OH
OH

0.040
0.400
0.200
0.018
0.350
2.000
0.320
0.330
0.033
0.006

0.040
0.400
0.200
0.015
0.350
6.000
0.320
0.330
0.033
0.006

0.030
0.400
0.200
0.020
0.350
3.000
4.000
0.320
0.330
0.033
0.006

0.030
0.400
0.150
0.015
0.350
2.000
0.320
0.330
0.033
0.006

2,911,100
1,300
9,000
3,881,400
269,300
33,800
59,000
73,000
81,000
89,000
Rp

2,911,100
1,300
9,000
3,881,400
269,300
33,800
59,000
73,000
81,000
89,000
Rp

2,911,100
1,300
9,000
3,881,400
269,300
33,800
59,000
73,000
81,000
89,000
Rp

2,911,100
1,300
9,000
3,881,400
269,300
33,800
59,000
73,000
81,000
89,000
Rp

SUB-TOTAL
BAHAN
RP
g

TOTAL
HARGA
RP
h

116,444
520
1,800
58,221
48,825
67,600

293,410

338,407
33,841
372,248
372,200

116,444
520
1,800
69,865
94,255
67,600
18,880
24,090
2,673
534
46,177

350,484

396,661
39,666
436,327
436,300

116,444
520
1,800
58,221
94,255
202,800
18,880
24,090
2,673
534
46,177

474,040

520,217
52,022
572,239
572,200

87,333
520
1,800
77,628
94,255
101,400
18,880
24,090
2,673
534
46,177

362,936

409,113
40,911
450,024
450,000

87,333
520
1,350
58,221
94,255
67,600
18,880
24,090
2,673
534
46,177

309,279

355,456
35,546
391,002
391,000

NO
a
7.10

7.11

7.12

ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN


KABUPATEN B E K A S I
2015
HARGA
SUB-TOTAL
URAIAN PEKERJAAN
SAT
VOLUME
SATUAN
UPAH
RP
RP
b
c
d
e
f
1 M3 PONDASI BETON BERTULANG (150 KG BESI + BEKISTING)
Kayu terentang
M3
0.200
2,911,100
Paku biasa 2"-5"
Kg
1.500
1,300
Minyak bekisting
Lt
0.400
9,000
Besi beton polos
Kg
150.000
10,000
Kawat beton
Kg
2.250
23,300
Semen portland
sak
6.460
60,000
Pasir beton
M3
0.520
150,000
Koral beton
M3
0.780
137,100
Pekerja
OH
3.900
59,000
230,100
Tukang batu
OH
0.350
73,000
25,550
Tukang kayu
OH
1.040
73,000
75,920
Tukang besi
OH
1.050
50,000
52,500
Kepala tukang
OH
0.245
81,000
19,845
Mandor
OH
0.165
89,000
14,685
Total Harga
Rp
418,600
Keuntungan 10%
Jumlah
Dibulatkan
1 M3 SLOOF BETON BERTULANG (200 KG BESI + BEKISTING)
Kayu terentang
M3
0.270
Paku biasa 2"-5"
Kg
2.000
Minyak bekisting
Lt
0.600
Besi beton polos
sak
6.460
Kawat beton
Kg
3.000
Semen portland
Kg
6.460
Pasir beton
M3
0.520
Koral beton
M3
0.780
Pekerja
OH
4.850
Tukang batu
OH
0.350
Tukang kayu
OH
1.560
Tukang besi
OH
1.400
Kepala tukang
OH
0.331
Mandor
OH
0.170
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M3 KOLOM BETON BERTULANG (300 KG BESI + BEKISTING)
Kayu terentang
M3
0.400
Paku biasa 2"-5"
Kg
4.000
Minyak bekisting
Lt
2.000
Besi beton polos
Kg
300.000
Kawat beton
Kg
4.500
Semen portland
sak
6.460
Pasir beton
M3
0.520
Koral beton
M3
0.780
Kayu borneo balok
M3
0.150
Plywood 9 mm
Lbr
3.500
Dolken kayu 8-10/400 cm
Btg
20.000
Pekerja
OH
7.300
Tukang batu
OH
0.350
Tukang kayu
OH
3.300
Tukang besi
OH
2.100
Kepala tukang
OH
0.570
Mandor
OH
0.250
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

2,911,100
1,300
9,000
10,000
23,300
60,000
150,000
137,100
59,000
73,000
73,000
50,000
81,000
89,000
Rp

2,911,100
1,300
9,000
10,000
23,300
60,000
150,000
137,100
3,855,600
139,500
33,800
59,000
73,000
73,000
50,000
81,000
89,000
Rp

SUB-TOTAL
BAHAN
RP
g

TOTAL
HARGA
RP
h

582,220
1,950
3,600
1,500,000
52,425
387,600
78,000
106,938

2,712,733

3,131,333
313,133
3,444,466
3,444,400

785,997
2,600
5,400
64,600
69,900
387,600
78,000
106,938
286,150
25,550
113,880
70,000
26,811
15,130
537,521

1,501,035

2,038,556
203,856
2,242,412
2,242,400

1,164,440
5,200
18,000
3,000,000
104,850
387,600
78,000
106,938
578,340
488,250
676,000
430,700
25,550
240,900
105,000
46,170
22,250
870,570

6,607,618

7,478,188
747,819
8,226,007
8,226,000

NO
a
7.13

7.14

7.15

ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN


KABUPATEN B E K A S I
2015
HARGA
SUB-TOTAL
URAIAN PEKERJAAN
SAT
VOLUME
SATUAN
UPAH
RP
RP
b
c
d
e
f
1 M3 BALOK BETON BERTULANG (200 KG BESI + BEKISTING)
Kayu terentang
M3
0.320
2,911,100
Paku biasa 2"-5"
Kg
3.200
1,300
Minyak bekisting
Lt
1.600
9,000
Besi beton polos
Kg
200.000
10,000
Kawat beton
Kg
3.000
23,300
Semen portland
sak
6.460
60,000
Pasir beton
M3
0.520
150,000
Koral beton
M3
0.780
137,100
Kayu borneo balok
M3
0.140
3,855,600
Plywood 9 mm
Lbr
2.800
139,500
Dolken kayu 8-10/400 cm
Btg
16.000
33,800
Pekerja
OH
5.960
59,000
351,640
Tukang batu
OH
0.350
73,000
25,550
Tukang kayu
OH
2.800
73,000
204,400
Tukang besi
OH
1.400
50,000
70,000
Kepala tukang
OH
0.455
81,000
36,855
Mandor
OH
0.208
89,000
18,512
Total Harga
Rp
706,957
Keuntungan 10%
Jumlah
Dibulatkan
1 M3 LANTAI BETON BERTULANG (150 KG BESI + BEKISTING)
Kayu terentang
M3
0.320
Paku biasa 2"-5"
Kg
3.200
Minyak bekisting
Lt
1.600
Besi beton polos
Kg
150.000
Kawat beton
Kg
2.250
Semen portland
sak
6.460
Pasir beton
M3
0.520
Koral beton
M3
0.780
Kayu borneo balok
M3
0.120
Plywood 9 mm
Lbr
2.800
Dolken kayu 8-10/400 cm
Btg
16.000
Pekerja
OH
5.800
Tukang batu
OH
0.350
Tukang kayu
OH
2.800
Tukang besi
OH
1.050
Kepala tukang
OH
0.420
Mandor
OH
0.185
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M3 DINDING BETON BERTULANG (150 KG BESI + BEKISTING)
Kayu terentang
M3
0.240
Paku biasa 2"-5"
Kg
3.200
Minyak bekisting
Lt
1.600
Besi beton polos
Kg
150.000
Kawat beton
Kg
2.250
Semen portland
sak
6.460
Pasir beton
M3
0.520
Koral beton
M3
0.780
Kayu borneo balok
M3
0.160
Plywood 9 mm
Lbr
2.800
Dolken kayu 8-10/400 cm
Btg
24.000
Pekerja
OH
5.600
Tukang batu
OH
0.350
Tukang kayu
OH
2.640
Tukang besi
OH
1.050
Kepala tukang
OH
0.400
Mandor
OH
0.193
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

2,911,100
1,300
9,000
10,000
23,300
60,000
150,000
137,100
3,855,600
139,500
33,800
59,000
73,000
73,000
50,000
81,000
89,000
Rp

2,911,100
1,300
9,000
10,000
23,300
60,000
150,000
137,100
3,855,600
139,500
33,800
59,000
73,000
73,000
50,000
81,000
89,000
Rp

SUB-TOTAL
BAHAN
RP
g

TOTAL
HARGA
RP
h

931,552
4,160
14,400
2,000,000
69,900
387,600
78,000
106,938
539,784
390,600
540,800

5,063,734

5,770,691
577,069
6,347,760
6,347,700

931,552
4,160
14,400
1,500,000
52,425
387,600
78,000
106,938
462,672
390,600
540,800
342,200
25,550
204,400
52,500
34,020
16,465
675,135

4,469,147

5,144,282
514,428
5,658,710
5,658,700

698,664
4,160
14,400
1,500,000
52,425
387,600
78,000
106,938
616,896
390,600
811,200
330,400
25,550
192,720
52,500
32,400
17,177
650,747

4,660,883

5,311,630
531,163
5,842,793
5,842,700

NO
a
7.16

7.17

7.18

8
8.1

ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN


KABUPATEN B E K A S I
2015
HARGA
SUB-TOTAL
URAIAN PEKERJAAN
SAT
VOLUME
SATUAN
UPAH
RP
RP
b
c
d
e
f
1 M3 TANGGA BETON BERTULANG (200 KG BESI + BEKISTING)
Kayu terentang
M3
0.250
2,911,100
Paku biasa 2"-5"
Kg
3.000
1,300
Minyak bekisting
Lt
1.200
9,000
Besi beton polos
Kg
200.000
10,000
Kawat beton
Kg
3.000
23,300
Semen portland
sak
6.460
60,000
Pasir beton
M3
0.520
150,000
Koral beton
M3
0.780
137,100
Kayu borneo balok
M3
0.105
3,855,600
Plywood 9 mm
Lbr
2.500
139,500
Dolken kayu 8-10/400 cm
Btg
14.000
33,800
Pekerja
OH
5.600
59,000
330,400
Tukang batu
OH
0.350
73,000
25,550
Tukang kayu
OH
2.300
73,000
167,900
Tukang besi
OH
1.400
50,000
70,000
Kepala tukang
OH
0.405
81,000
32,805
Mandor
OH
0.202
89,000
17,978
Total Harga
Rp
644,633
Keuntungan 10%
Jumlah
Dibulatkan
1 M' KOLOM PRAKTIS BETON BERTULANG (11 X 11) CM
Kayu terentang
M3
0.200
Paku biasa 2"-5"
Kg
1.000
Besi beton polos
Kg
200.000
Kawat beton
Kg
0.450
Semen portland
sak
6.460
Pasir beton
M3
0.520
Koral beton
M3
0.780
Pekerja
OH
0.060
Tukang batu
OH
0.350
Tukang kayu
OH
2.300
Tukang besi
OH
1.400
Kepala tukang
OH
0.500
Mandor
OH
0.300
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M' RING BALOK BETON BERTULANG (10 X 15) CM
Kayu albasiah
M3
0.200
Paku biasa 2"-5"
Kg
1.000
Besi beton polos
Kg
200.000
Kawat beton
Kg
0.450
Semen portland
sak
6.460
Pasir beton
M3
0.520
Koral beton
M3
0.780
Pekerja
OH
0.060
Tukang batu
OH
0.350
Tukang kayu
OH
2.300
Tukang besi
OH
1.400
Kepala tukang
OH
0.500
Mandor
OH
0.300
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

2,911,100
1,300
10,000
23,300
60,000
150,000
137,100
59,000
73,000
73,000
50,000
81,000
89,000
Rp

SUB-TOTAL
BAHAN
RP
g

TOTAL
HARGA
RP
h

727,775
3,900
10,800
2,000,000
69,900
387,600
78,000
106,938
404,838
348,750
473,200

4,611,701

5,256,334
525,633
5,781,967
5,781,900

582,220
1,300
2,000,000
10,485
387,600
78,000
106,938
3,540
25,550
167,900
70,000
40,500
26,700
334,190

2,911,100
1,300
10,000
23,300
60,000
150,000
137,100
59,000
73,000
73,000
50,000
81,000
89,000
Rp

3,540
25,550
167,900
70,000
40,500
26,700
334,190

31,500
59,000
73,000
81,000
89,000
Rp

1,239
1,533
162
89
3,023

3,166,543

3,500,733
350,073
3,850,806
3,850,800

582,220
1,300
2,000,000
10,485
387,600
78,000
106,938

3,166,543

3,500,733
350,073
3,850,806
3,850,800

PEKERJAAN ATAP
1 M' PASANG LIST PLAFOND KAYU PROFIL
Kayu profil
M'
Pekerja
OH
Tukang kayu
OH
Kepala tukang
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

1.050
0.021
0.021
0.002
0.001

33,075

33,075

36,098
3,610
39,708
39,700

NO
a
8.2

8.3

8.4

8.5

8.6

8.7

ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN


KABUPATEN B E K A S I
2015
HARGA
SUB-TOTAL
URAIAN PEKERJAAN
SAT
VOLUME
SATUAN
UPAH
RP
RP
b
c
d
e
f
1 M2 PASANG ATAP GENTENG PLENTONG KECIL
Genteng plentong
BH
25.000
10,000
Pekerja
OH
0.150
59,000
8,850
Tukang kayu
OH
0.075
73,000
5,475
Kepala tukang
OH
0.008
81,000
648
Mandor
OH
0.008
89,000
712
Total Harga
Rp
15,685
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PASANG ATAP GENTENG KODOK / GLAZZUR
Genteng kodok
BH
Pekerja
OH
Tukang kayu
OH
Kepala tukang
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

25.000
0.150
0.075
0.008
0.008

1 M2 PASANG ATAP GENTENG PLENTONG SUPER / BESAR


Genteng plentong super
BH
12.000
Pekerja
OH
0.150
Tukang kayu
OH
0.060
Kepala tukang
OH
0.006
Mandor
OH
0.008
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M' PASANG BUBUNGAN GENTENG
Genteng bubung plentong
Semen portland
Pasir pasang
Pekerja
Tukang kayu
Kepala tukang
Mandor
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

PLENTONG
BH
Kg
M3
OH
OH
OH
OH

1 M' PASANG BUBUNGAN GENTENG


Genteng bubung kodok
Semen portland
Pasir pasang
Pekerja
Tukang kayu
Kepala tukang
Mandor
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

KODOK GLAZZUR
BH
5.000
Kg
8.000
M3
0.032
OH
0.400
OH
0.200
OH
0.020
OH
0.002

5.000
0.160
0.032
0.400
0.200
0.020
0.002

1 M' PASANG BUBUNGAN GENTENG PLENTONG BESAR


Genteng plentong besar
BH
4.000
Semen portland
Kg
8.000
Pasir pasang
M3
0.032
Pekerja
OH
0.400
Tukang kayu
OH
0.200
Kepala tukang
OH
0.020
Mandor
OH
0.002
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

11,700
59,000
73,000
81,000
89,000
Rp

8,850
5,475
648
712
15,685

20,000
59,000
73,000
81,000
89,000
Rp

8,850
4,380
486
712
14,428

20,000
60,000
150,000
59,000
73,000
81,000
89,000
Rp

23,400
60,000
150,000
59,000
73,000
81,000
89,000
Rp

16,360
60,000
150,000
59,000
73,000
81,000
89,000
Rp

SUB-TOTAL
BAHAN
RP
g

TOTAL
HARGA
RP
h

250,000

250,000

265,685
26,569
292,254
292,200

292,500

292,500

308,185
30,819
339,004
339,000

240,000

240,000

254,428
25,443
279,871
279,800

100,000
9,600
4,800
23,600
14,600
1,620
178
39,998

114,400

154,398
15,440
169,838
169,800

117,000
480,000
4,800
23,600
14,600
1,620
178
39,998

601,800

641,798
64,180
705,978
705,900

65,440
480,000
4,800
23,600
14,600
1,620
178
39,998

550,240

590,238
59,024
649,262
649,200

NO
a
9
9.1

9.2

9.3

9.4

9.5

9.6

URAIAN PEKERJAAN
b
Pekerjaan Sanitair

ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN


KABUPATEN B E K A S I
2015
HARGA
SUB-TOTAL
SAT
VOLUME
SATUAN
UPAH
RP
RP
c
d
e
f

PASANG 1 BUAH KLOSET DUDUK


Kloset duduk
Perlengkapan
Pekerja
Tukang batu
Kepala tukang
Mandor
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

BH
LS
OH
OH
OH
OH

PASANG 1 BUAH KLOSET JONGKOK PORSELEN


Kloset jongkok porselen
BH
Semen portland
sak
Pasir pasang
M3
Pekerja
OH
Tukang batu
OH
Kepala tukang
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
PASANG 1 BUAH URINOIR
Kloset jongkok porselen
Perlengkapan
Semen portland
Pasir pasang
Pekerja
Tukang batu
Kepala tukang
Mandor
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
PASANG 1 BUAH WASTAFEL
Wastafel
Perlengkapan
Semen portland
Pasir pasang
Pekerja
Tukang batu
Kepala tukang
Mandor
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

BH
LS
Kg
M3
OH
OH
OH
OH

BH
LS
Kg
M3
OH
OH
OH
OH

1.000
1.000
3.300
1.100
0.001
0.160

1.000
0.120
0.010
1.000
1.500
1.500
0.160

1.000
1.000
0.120
0.010
1.000
1.000
0.100
0.100

1.000
1.000
6.000
0.010
1.200
1.450
0.150
0.100

PASANG 1 BUAH BAK MANDI FIBERGLASS VOL O,30 M3


Bak fiberglass
BH
1.000
Perlengkapan
LS
1.000
Pekerja
OH
1.800
Tukang batu
OH
2.700
Kepala tukang
OH
0.540
Mandor
OH
0.110
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M' PEMASANGAN BUIS BETON DIA. 20-100 CM
Pipa beton
BH
Batu bata
M3
Semen portland
Kg
Pasir pasang
M3
Pasir urug
M3
Pekerja
OH
Tukang batu
OH
Kepala tukang
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

1.100
0.027
3.920
0.056
0.024
0.140
0.070
0.007
0.007

59,000
72,000
81,000
89,000
Rp

343,640
60,000
136,360
59,000
72,000
81,000
89,000
Rp

60,000
136,360
59,000
72,000
81,000
89,000
Rp

1,636,360
196,363
60,000
136,360
59,000
72,000
81,000
89,000
Rp

200,000
36,000
59,000
72,000
81,000
89,000
Rp

500
60,000
136,360
129,500
59,000
72,000
81,000
89,000
Rp

SUB-TOTAL
BAHAN
RP
g

TOTAL
HARGA
RP
h

194,700
79,200
81
14,240
288,221

288,221
28,822
317,043
317,000

343,640
7,200
1,364
59,000
108,000
121,500
14,240
302,740

352,204

654,944
65,494
720,438
720,400

7,200
1,364
59,000
72,000
8,100
8,900
148,000

8,564

156,564
15,656
172,220
172,200

1,636,360
196,363
360,000
1,364
70,800
104,400
12,150
8,900
196,250

2,192,723

2,388,973
238,897
2,627,871
2,627,800

200,000
36,000
106,200
194,400
43,740
9,790
354,130

236,000

590,130
59,013
649,143
649,100

14
235,200
7,636
3,108
8,260
5,040
567
623
14,490

245,958

260,448
26,045
286,492
286,400

NO

URAIAN PEKERJAAN

9.7

9.8

9.9

9.10

9.11

ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN


KABUPATEN B E K A S I
2015
HARGA
SUB-TOTAL
SAT
VOLUME
SATUAN
UPAH
RP
RP
c
d
e
f

1 M' PEMASANGAN BUIS BETON DIA. 30 - 100 CM


Pipa beton
BH
Batu bata
M3
Semen portland
Kg
Pasir pasang
M3
Pasir urug
M3
Pekerja
OH
Tukang batu
OH
Kepala tukang
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

1.100
0.550
10.300
0.061
0.069
0.380
0.190
0.019
0.019

1 BUAH BAK KONTROL PAS. BATA ( 30 X 30 ) CM, TINGGI 35 CM


Batu bata
M3
0.145
Semen portland
Kg
0.880
Pasir pasang
M3
0.070
Batu koral
M3
0.070
Besi beton
Kg
1.600
Pasir beton
M3
0.060
Pekerja
OH
3.200
Tukang batu
OH
1.015
Kepala tukang
OH
0.0015
Mandor
OH
0.016
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 BUAH BAK KONTROL PAS. BATA ( 60 X 60 ) CM, TINGGI 65 CM
Batu bata
M3
0.371
Semen portland
Kg
2.280
Pasir pasang
M3
0.184
Batu koral
M3
0.033
Besi beton
Kg
4.850
Pasir beton
M3
0.120
Pekerja
OH
2.160
Tukang batu
OH
0.720
Kepala tukang
OH
0.072
Mandor
OH
0.108
Tukang gali
OH
0.100
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M' PASANG PIPA GALVANIS DIA. 1/2"
Pipa galvanis
M'
Perlengkapan
LS
Pekerja
OH
Tukang batu
OH
Kepala tukang
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M' PASANG PIPA GALVANIS DIA. 3/4"
Pipa galvanis
M'
Perlengkapan
LS
Pekerja
OH
Tukang batu
OH
Kepala tukang
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

1.200
1.000
0.054
0.090
0.009
0.027

1.200
1.000
0.054
0.090
0.009
0.027

500
60,000
136,360
129,500
59,000
72,000
81,000
89,000
Rp

500
60,000
136,360
137,100
10,000
269,300
59,000
72,000
81,000
89,000
Rp

500
60,000
136,360
137,100
10,000
269,300
59,000
72,000
81,000
89,000
47,500
Rp

60,000
21,000
59,000
72,000
81,000
89,000
Rp

66,000
23,100
59,000
72,000
81,000
89,000
Rp

SUB-TOTAL
BAHAN
RP
g

TOTAL
HARGA
RP
h

275
618,000
8,318
8,936
22,420
13,680
1,539
1,691
39,330

635,528

674,858
67,486
742,344
742,300

73
52,800
9,545
9,597
16,000
16,158
188,800
73,080
122
1,424
263,426

104,173

367,598
36,760
404,358
404,300

186
136,800
25,090
4,524
48,500
32,316
127,440
51,840
5,832
9,612
4,750
199,474

247,416

446,890
44,689
491,579
491,500

72,000
21,000
3,186
6,480
729
2,403
12,798

93,000

105,798
10,580
116,378
116,300

79,200
23,100
3,186
6,480
729
2,403
12,798

102,300

115,098
11,510
126,608
126,600

NO
a
9.12

9.13

9.14

9.15

9.16

9.17

ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN


KABUPATEN B E K A S I
2015
HARGA
SUB-TOTAL
URAIAN PEKERJAAN
SAT
VOLUME
SATUAN
UPAH
RP
RP
b
c
d
e
f
1 M' PASANG PIPA GALVANIS DIA. 1"
Pipa galvanis
M'
1.200
29,700
Perlengkapan
LS
1.000
10,395
Pekerja
OH
0.054
59,000
3,186
Tukang batu
OH
0.090
72,000
6,480
Kepala tukang
OH
0.009
81,000
729
Mandor
OH
0.027
89,000
2,403
Total Harga
Rp
12,798
Keuntungan 10%
Jumlah
Dibulatkan
1 M' PASANG PIPA GALVANIS DIA. 3"
Pipa galvanis
Perlengkapan
Pekerja
Tukang batu
Kepala tukang
Mandor
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

M'
LS
OH
OH
OH
OH

1 M' PASANG PIPA PVC TYPE AW DIA. 1/2"


Pipa PVC
M'
Perlengkapan
LS
Pekerja
OH
Tukang batu
OH
Kepala tukang
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M' PASANG PIPA PVC TYPE AW DIA. 3/4"
Pipa PVC
M'
Perlengkapan
LS
Pekerja
OH
Tukang batu
OH
Kepala tukang
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M' PASANG PIPA PVC TYPE AW DIA. 1"
Pipa PVC
M'
Perlengkapan
LS
Pekerja
OH
Tukang batu
OH
Kepala tukang
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M' PASANG PIPA PVC TYPE AW DIA. 2"
Pipa PVC
M'
Perlengkapan
LS
Pekerja
OH
Tukang batu
OH
Kepala tukang
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

1.200
1.000
0.108
0.180
0.018
0.0054

1.200
1.000
0.036
0.060
0.006
0.0018

1.200
1.000
0.036
0.060
0.006
0.0018

1.200
1.000
0.036
0.060
0.006
0.0018

1.200
1.000
0.054
0.090
0.009
0.0027

232,400
81,340
59,000
72,000
81,000
89,000
Rp

6,410
2,244
59,000
72,000
81,000
89,000
Rp

7,660
2,681
59,000
72,000
81,000
89,000
Rp

10,840
3,794
59,000
72,000
81,000
89,000
Rp

27,700
9,695
59,000
72,000
81,000
89,000
Rp

SUB-TOTAL
BAHAN
RP
g

TOTAL
HARGA
RP
h

35,640
10,395

46,035

58,833
5,883
64,716
64,700

278,880
81,340
6,372
12,960
1,458
481
21,271

360,220

381,491
38,149
419,640
419,600

7,692
2,244
2,124
4,320
486
160
7,090

9,936

17,026
1,703
18,728
18,700

9,192
2,681
2,124
4,320
486
160
7,090

11,873

18,963
1,896
20,860
20,800

13,008
3,794
2,124
4,320
486
160
7,090

16,802

23,892
2,389
26,281
26,200

33,240
9,695
3,186
6,480
729
240
10,635

42,935

53,570
5,357
58,927
58,900

NO
a
9.18

9.19

9.20

9.21

10
10.1

10.2

10.3

ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN


KABUPATEN B E K A S I
2015
HARGA
SUB-TOTAL
URAIAN PEKERJAAN
SAT
VOLUME
SATUAN
UPAH
RP
RP
b
c
d
e
f
1 M' PASANG PIPA PVC TYPE AW DIA. 3"
Pipa PVC
M'
1.200
54,890
Perlengkapan
LS
1.000
19,212
Pekerja
OH
0.081
59,000
4,779
Tukang batu
OH
0.135
72,000
9,720
Kepala tukang
OH
0.0135
81,000
1,094
Mandor
OH
0.0041
89,000
365
Total Harga
Rp
15,957
Keuntungan 10%
Jumlah
Dibulatkan
1 BUAH BAK CUCI PIRING STAINLESS STEEL
Bak cuci
BH
Water drain + acc.
SET
Pekerja
OH
Tukang batu
OH
Kepala tukang
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 BH KRAN DIA. 3/4" ATAU 1/2"
Kran air
Seal tape
Pekerja
Tukang batu
Kepala tukang
Mandor
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 BH FLOOR DRAIN
Floor drain
Pekerja
Tukang batu
Kepala tukang
Mandor
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

BH
BH
OH
OH
OH
OH

BH
OH
OH
OH
OH

1.000
1.000
0.030
0.300
0.030
0.0015

1.000
0.025
0.010
0.100
0.010
0.005

1.000
0.010
0.100
0.010
0.005

70,910
59,000
72,000
81,000
89,000
Rp

SUB-TOTAL
BAHAN
RP
g

TOTAL
HARGA
RP
h

65,868
19,212

85,080

101,037
10,104
111,141
111,100

70,910
1,770
21,600
2,430
134
25,934

1,500
59,000
72,000
81,000
89,000
Rp

590
7,200
810
445
9,045

70,910
59,000
72,000
81,000
89,000
Rp

590
7,200
810
445
9,045

185,000
59,000
72,000
81,000
89,000
Rp

295
36,000
405
22
36,722

15,680
59,000
72,000
81,000
89,000
Rp

885
10,800
1,215
67
12,967

9,410
59,000
72,000
81,000
89,000
Rp

885
10,800
1,215
67
12,967

70,910

96,844
9,684
106,528
106,500

38

38

9,083
908
9,991
9,900

70,910

70,910

79,955
7,996
87,951
87,900

Finishing Dan Accessories


1 BH PASANG KUNCI SILINDER
Kunci silinder
Pekerja
Tukang kayu
Kepala tukang
Mandor
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 BH PASANG ENGSEL PINTU
Engsel pintu
Pekerja
Tukang kayu
Kepala tukang
Mandor
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 BH PASANG GRENDEL JENDELA
Grendel jendela
Pekerja
Tukang kayu
Kepala tukang
Mandor
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

BH
OH
OH
OH
OH

BH
OH
OH
OH
OH

BH
OH
OH
OH
OH

1.000
0.005
0.500
0.005
0.00025

1.000
0.015
0.150
0.015
0.00075

1.000
0.015
0.150
0.015
0.00075

185,000

185,000

221,722
22,172
243,894
243,800

15,680

15,680

28,647
2,865
31,511
31,500

9,410

9,410

22,377
2,238
24,614
24,600

ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN


KABUPATEN B E K A S I
2015
HARGA
SUB-TOTAL
SAT
VOLUME
SATUAN
UPAH
RP
RP
c
d
e
f

NO

URAIAN PEKERJAAN

10.4

1 M2 PASANG PINTU ALUMINIUM


Pintu aluminium
Pekerja
Tukang kayu
Kepala tukang
Mandor
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

10.5

10.6

10.7

10.8

10.9

M2
OH
OH
OH
OH

1 M2 PASANG LANTAI KERAMIK 30 X 30 CM


Ubin keramik 30 x 30 cm
M2
Semen portland
Kg
Pasir pasang
M3
Semen warna
Kg
Pekerja
OH
Tukang batu
OH
Kepala tukang
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PASANG DINDING KERAMIK 10 X 20 CM
Ubin keramik 10 x 20 cm
bh
Semen portland
Kg
Pasir pasang
M3
Semen warna
Kg
Pekerja
OH
Tukang batu
OH
Kepala tukang
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PASANG DINDING KERAMIK 20 X 20 CM
Ubin keramik 20 x 20 cm
bh
Semen portland
Kg
Pasir pasang
M3
Semen warna
Kg
Pekerja
OH
Tukang batu
OH
Kepala tukang
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

1.000
1.050
1.050
0.105
0.0025

12.000
11.380
0.042
1.500
0.620
0.350
0.035
0.030

50.000
9.300
0.018
1.500
0.600
0.450
0.045
0.030

25.000
9.300
0.018
1.500
0.600
0.100
0.045
0.030

1,500,000
59,000
72,000
81,000
89,000
Rp

75,700
60,000
150,000
2,200
59,000
72,000
81,000
89,000
Rp

60,000
150,000
2,200
59,000
72,000
81,000
89,000
Rp

69,900
60,000
150,000
2,200
59,000
72,000
81,000
89,000
Rp

SUB-TOTAL
BAHAN
RP
g

TOTAL
HARGA
RP
h

1,500,000
61,950
75,600
8,505
223
146,278

1,500,000

1,646,278
164,628
1,810,905
1,810,900

908,400
682,800
6,300
3,300
36,580
25,200
2,835
2,670
67,285

3,300

70,585
7,059
77,644
77,600

558,000
2,700
3,300
35,400
32,400
3,645
2,670
74,115

3,300

77,415
7,742
85,157
85,100

1,747,500
558,000
2,700
3,300
35,400
7,200
3,645
2,670
48,915

1 M2 PENGECATAN BIDANG KAYU BARU (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
Cat meni
Kg
0.200
59,300
Plamir
Kg
0.150
29,200
Cat dasar
Kg
0.170
42,450
Cat penutup 2 kali
Kg
0.260
79,400
Pekerja
OH
0.070
59,000
4,130
Tukang cat
OH
0.009
72,000
648
Kepala tukang
OH
0.006
81,000
486
Mandor
OH
0.0025
89,000
223
Total Harga
Rp
5,487
Keuntungan 10%
Jumlah
Dibulatkan
1 M2 PENGECATAN BIDANG TEMBOK BARU (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
Plamir
Kg
0.100
29,200
Cat dasar
Kg
0.100
42,450
Cat penutup 2 kali
Kg
0.260
79,400
Pekerja
OH
0.020
59,000
1,180
Tukang cat
OH
0.063
72,000
4,536
Kepala tukang
OH
0.0063
81,000
510
Mandor
OH
0.0025
89,000
223
Total Harga
Rp
6,449
Keuntungan 10%
Jumlah
Dibulatkan

3,300

52,215
5,222
57,437
57,400

11,860
4,380
7,217
20,644

44,101

49,587
4,959
54,546
54,500

2,920
4,245
20,644

27,809

34,258
3,426
37,684
37,600

ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN


KABUPATEN B E K A S I
2015
HARGA
SUB-TOTAL
NO
URAIAN PEKERJAAN
SAT
VOLUME
SATUAN
UPAH
RP
RP
a
b
c
d
e
f
10.10 1 M2 PENGECATAN BIDANG TEMBOK LAMA (1 lapis cat dasar, 2 lapis cat penutup)
Cat dasar
Kg
0.120
42,450
Cat penutup 2 kali
Kg
0.180
79,400
Pekerja
OH
0.028
59,000
1,652
Tukang cat
OH
0.042
72,000
3,024
Kepala tukang
OH
0.0042
81,000
340
Mandor
OH
0.0025
89,000
223
Total Harga
Rp
5,239
Keuntungan 10%
Jumlah
Dibulatkan
10.11 1 M2 PENGECATAN BAJA DENGAN MENI BESI
Meni besi
Kg
Kuas
BH
Pekerja
OH
Tukang cat
OH
Kepala tukang
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

0.100
0.010
0.020
0.200
0.020
0.010

10.12 1 M2 PENGECATAN BAJA DENGAN MENI BESI DENGAN PERANCAH


Meni besi
Kg
0.100
Kuas
BH
0.010
Perancah kayu
M3
0.002
Pekerja
OH
0.025
Tukang cat
OH
0.225
Kepala tukang
OH
0.0225
Mandor
OH
0.0075
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
10.13 1 M2 PENGECATAN BESI
Cat dasar
Cat antara
Cat penutup
Pekerja
Tukang cat
Kepala tukang
Mandor
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
11
11.1

11.2

Kg
Kg
Kg
OH
OH
OH
OH

0.110
0.170
0.080
0.025
0.225
0.0225
0.0075

59,300
10,900
59,000
72,000
81,000
89,000
Rp

59,300
10,900
851,820
59,000
72,000
81,000
89,000
Rp

SUB-TOTAL
BAHAN
RP
g

TOTAL
HARGA
RP
h

5,094
14,292

19,386

24,625
2,462
27,087
27,000

5,930
109
1,180
14,400
1,620
890
18,090

6,039

24,129
2,413
26,542
26,500

5,930
109
1,704
1,475
16,200
1,823
668
21,869

42,450
63,200
63,200
59,000
72,000
81,000
89,000
Rp

1,475
16,200
1,823
668
20,165

10,000
1,000
59,000
57,000
81,000
Rp

2,065
1,995
810
4,870

6,039

27,908
2,791
30,698
30,600

4,670
10,744
5,056

20,470

40,635
4,063
44,698
44,600

Pekerjaan Baja
1 KG BESI IWF/UNP
Besi IWF rata-rata
Peralatan
Pekerja
Tukang . Besi
Kepala tukang
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
1 KG BESI PLAT
Besi Plat rata-rata
Peralatan
Pekerja
Tukang . Besi
Kepala tukang
Tenaga Ahli SKA Madya
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

KG
LS
OH
OH
OH

KG
LS
ORG
ORG
ORG
ORG

1.100
1.000
0.035
0.035
0.010

1.100
1.000
0.035
0.035
0.010
0.200

11,000
1,000

11,000
1,100
59,000
57,000
81,000

2,065
1,995
810

Rp

4,870

12,000

16,870
1,687
18,557
18,500

12,100
1,100

13,200

18,070
1,807
19,877
19,800

NO
a
11.3

11.4

11.5

11.6

11.7

11.8

URAIAN PEKERJAAN
b
1 KG BESI SIKU
Besi Siku rata-rata
Peralatan
Pekerja
Tukang . Besi
Kepala tukang
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN


KABUPATEN B E K A S I
2015
HARGA
SUB-TOTAL
SAT
VOLUME
SATUAN
UPAH
RP
RP
c
d
e
f

1 UNIT SEPTICTENK 1,5 X 1 X 1,5 M


Galian Tanah
Urugan Pasir
Lantai Kerja
Pas bata 1 : 5
Plesteran & Acian
Plat Beton penutup + balok
Pipa PVC 4" jenis AW
Mobilisasi Alat
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

KG
LS
ORG
ORG
ORG

M3
M3
m3
M2
M2
M3
M'
Ls

1 M2 PAS. PAVING BLOK NATURAL 8 CM


Paving blok natural 8 cm
M2
Pasir urug
M3
Pekerja
OH
Tukang batu
OH
Kepala tukang batu
OH
Mandor
OH
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

1.100
1.000
0.035
0.035
0.010

2.250
0.107
1.125
7.500
15.000
0.150
9.000
0.200

1.01
0.10
0.13
0.25
0.01
0.002

10,000
1,000
59,000
57,000
89,000
Rp

33,047
189,495
139,008
27,511
5,144,282
54,890
100,000
Rp

59,000
72,000
81,000
89,000
Rp

0.018
1.000
0.008
0.007
1.000

1 KG PEKERJAAN PENGELASAN BAJA GALVANISE WTP


Plat Baja
KG
1.1000
Galvanise
KG
1.1000
Mobilisasi
LS
1.0000
Pekerjaan Las
KG
1.0000
Pekerja
ORG
0.0350
Tukang . Besi
ORG
0.0350
Kepala tukang besi
ORG
0.0100
Total Harga
Keuntungan 10%
Jumlah
DIBULATKAN

450,000
2,500
70,000
59,000
1,500
Rp

11,000
8,000
4,180
12,974
59,000
2,500
70,000
Rp

TOTAL
HARGA
RP
h

11,000
1,000
2,065
1,995
890
4,950

12,000

16,950
1,695
18,645
18,600

74,356
20,295
1,042,556
412,659
771,642
494,010
20,000
20,000

2,815,518

2,835,518
283,552
3,119,070
3,119,000

7,375
18,000
1,013
178
178

1 BH STRAUSS PILE KEDALAMAN 16 M & EXPOSE 1,5 M, TOTAL TINGGI 7,5 M, 30 CM


a. Pembuatan Lubang Bor Pile/m'
Pekerja
OH
0.750
59,000
44,250
Mandor
OH
0.025
89,000
2,225
Alat Bantu (alat bor)
LS
1.000
35,000
Jumlah
Rp
46,475
Untuk kedalaman 16 m'
743,600
b. Pengecoran Beton Strauss Pile Tertanam
Beton K 225
M3
2.011
678,335
Besi Beton U 24 (110kg/m3)
KG
382.006
10,663
Jumlah
Rp
c. Pengecoran Beton Strauss Pile Expose
Beton K 225
M3
0.106
678,335
Jumlah
Rp
Jumlah Sub Total
per 6 m
Rp
743,600
Keuntungan 10%
Jumlah
Dibulatkan
1 KG PEKERJAAN PENGELASAN BAJA WTP
Mesin Las
JAM
Alat Bantu
LS
Tukang Las
OH
Pekerja
OH
Electroda
LS
Jumlah
Keuntungan 10%
Jumlah
Dibulatkan

SUB-TOTAL
BAHAN
RP
g

178
18
196
100

35,000
35,000
560,000

81,475
1,303,600

1,363,832
4,073,411
5,437,243

5,437,243

71,921
71,921
6,069,164

71,921
6,812,764
681,276
7,494,040
7,494,000

8,036
2,500
525
413
938

938
2,065
88
700
3,791

1,500
12,036

12,974
1,297
14,271
14,200

12,100.00
8,800.00
4,180
12,036

37,116

40,906
4,091
44,997
44,900

NO
a
11.9

URAIAN PEKERJAAN
b
1 KG PEKERJAAN CLEANING
Sikat Baja
Pekerja
Jumlah
Keuntungan 10%
Jumlah
Dibulatkan

ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN


KABUPATEN B E K A S I
2015
HARGA
SUB-TOTAL
SAT
VOLUME
SATUAN
UPAH
RP
RP
c
d
e
f
BH
OH

11.10 1 KG PEKERJAAN PEMOTONGAN DAN PABRIKASI


Oxigen
BTG
Accetelin
BTG
Peralatan
LS
Kepala Tukang Las
OH
Tukang Las
OH
Pekerja
OH
Jumlah
Keuntungan 10%
Jumlah
Dibulatkan
11.11 PEKERJAAN PENGELASAN PIPA PER METER 2X
Upah Tenaga Kerja
Tukang Las
OH
Pekerja
OH
Mandor
OH

0.015
0.007

20,000
59,000
Rp

0.004
0.004
1.000
0.003
0.006
0.008

SUB-TOTAL
BAHAN
RP
g

TOTAL
HARGA
RP
h

300
393
393

60,000
150,000
1,000
60,500
70,000
59,000
Rp

182
385
472
1,039

0.397
0.445
0.133

70,000.00
59,000.00
89,000.00

27,777.78
26,276.72
11,809.98

0.125
2.000
0.150
0.150

30,000.00
10,000.00
9,900.00
450,000.00

300

693
69
763
700

240
600
1,000

1,840

2,879
288
3,166
3,100

Biaya Pengelasan dan Bahan


Kawat Las
Batu Gurinda
Solar
Sewa Mesin Las

DUS
BH
LTR
jam

Total Harga
Untuk 2 x Pengelasan
Keuntungan 10%
Jumlah
Dibulatkan
11.12 1 M1 PEMASANGAN PONDASI CERUCUK DOLKEN 10 CM
Kayu Dolken
Btg
0.3
Pekerja
OH
0.08
Tukang batu
OH
0.19
Kepala tukang
OH
0.019
Mandor
OH
0.019
Alat bantu
Ls
1
Total Harga
Rp
Keuntungan 10%
Jumlah
Dibulatkan

11.13 PASANG PAGAR BRC PER M TINGGI 1.5


Galian Tanah
m3
Pondasi Batu Kali 1: 4
m3
Sloof beton K-125/U-24
m3
urugan Pasir
m3
Urugan Tanah
m3
Pagar BRC Tinggi 1.5
m2
Tiang BRC Pipa GIP dia 50mm
kg
Alat bantu dll
Ls

1.8
1.2
0.18
0.45
1.5
3
3
1

3,750
20,000
1,485
67,500

Rp

65,864.48

33,800
59,000
72,000
81,000
89,000
500

4,720.00
13,680.00
1,539.00
1,691.00

92,735.00

10,140

`
21,630.00

18,015
580,675
2,038,556
123,920
9,440
62,870
58,870
1,000

2,000
12,140.00

32,427
696,810
366,940
55,764
14,160
188,610
176,610
1,000
1,532,321.08

Keuntungan 10%
Jumlah
Dibulatkan
11.14 1 m2 PENGADAAN /PEMASANGAN TUBE SETTLER
Tube Settler dari Fiber Glass t=1mm T=80m2
cm L=1m
Lem fibre
kg
Alat Bantu
ls
Pekerja Trampil
ORG
Mandor
ORG
Kepala tukang
ORG
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

1.200
5.0000
1.0000
0.5000
0.2500
0.0500

14,000,000.00
55,000.00
1,500.00
72,000.00
89,000.00
81,000.00

158,599
317,199
31,720
348,919
348,900

33,770
3,377
37,147
37,100

1,532,321
153,232
1,685,553
1,685,500

16,800,000
275,000
1,500
36,000.00
22,250.00
4,050.00
62,300.00

17,076,500.00

17,138,800.00
1,713,880
18,852,680
18,852,600

ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN


KABUPATEN B E K A S I
2015
HARGA
SUB-TOTAL
NO
URAIAN PEKERJAAN
SAT
VOLUME
SATUAN
UPAH
RP
RP
a
b
c
d
e
f
11.15 1 M2 RANGKA ATAP ZINGALUM
Rangka Besi GIP dia. 50mm
kg
18.000
10,000
Penutup Atap Zingalum
m2
1.333
65,000
Peralatan
LS
1.000
7,500
Pekerja Trampil
OH
0.055
72,000
3,960.00
Tukang . Besi
OH
0.035
57,000
1,995.00
Kepala tukang
OH
0.010
81,000
810.00
Total Harga
Rp
6,765
Keuntungan 10%
Jumlah
Dibulatkan
11.16 1 M2 PEKERJAAN GRILLE
Besi Beton dia.12 mm
Besi Siku 5cm
Galvanise
Peralatan
Pekerja
Tukang . Besi
Kepala tukang Besi
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

Kg
Kg
Kg
LS
OH
OH
OH

11.17 DOKUMENTASI, PELAPORAN,AST BUILD DRAWING


Film Fhoto
Roll
Cuci Cetak
Roll
Tukang Tik
Org
Drafter
Org
Biaya Cetak + Jilid A3
Ls
Biaya Cetak + Jilid Kertas A4
Ls
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
11.18 1 M1 PEKERJAAN RAILING
Pipa Gip Dia 38 mm
Peralatan
Pekerja
Tukang . Besi
Kepala tukang Besi
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

m1
LS
OH
OH
OH

11.20 PEMBUATAN TUTUP MANHOLE 80 X 80 CM


Besi Siku L.50.50.5
Kg
Plat Hitam 4 mm
Kg
Engsel dan Gembok
Unit
Kepala Tukang
HOK
Tukang Las
HOK
Pekerja
HOK
Mandor
HOK
Alat Bantu
LS
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
12

12.000
40.000
52.000
1.000
2.000
2.000
1.000

2.00
2.00
6.00
6.00
3.00
3.00

2.200
1.000
0.750
0.750
0.100

15.08
37.99
1.00
0.100
1.000
1.000
0.050
1.000

10,000
10,000
8,000
104,000
59,000
57,000
81,000
Rp

30,000
35,000
332,948
332,948
300,000
300,000
Rp

104,950
46,178
59,000
57,000
81,000
Rp

8,680.00
10,910.00
#REF!
81,000.00
70,000.00
59,000.00
89,000.00
40,000.00
Rp

SUB-TOTAL
BAHAN
RP
g

TOTAL
HARGA
RP
h

180,000
86,667
7,500

274,167

280,932
28,093
309,025
309,000

120,000
400,000
416,000
104,000
118,000.00
114,000.00
81,000.00
313,000

1,040,000

1,353,000
135,300
1,488,300
1,488,300

60,000
70,000
1,997,687.86
1,997,687.86

3,995,376

900,000
900,000
1,930,000

5,925,376
592,538
6,517,913
6,517,900

230,890
46,178
44,250.00
42,750.00
8,100.00
95,100

277,068

372,168
37,217
409,385
409,300

130,894
414,515
#REF!
8,100
70,000.00
59,000.00
4,450.00
63,450

40,000
8,100

71,550
7,155
78,705
78,700

Pekerjaan Jalan

12.1 PEMADATAN DENGAN WALLS PER M2


Sewa Walls
JAM
Solar
LITER
Pekerja
HOK
Operator
HOK
Pembantu Operator
HOK
300 M2 Pemadatan Dengan Walls
1 M2 Pemadatan Dengan Walls
Keuntungan 10%
Jumlah
Dibulatkan

8.0000
60.0000
1.0000
8.0000
8.0000

50,000.00
9,900.00
59,000.00
84,000.00
59,000.00

400,000
594,000
59,000.00
672,000.00
472,000.00
1,203,000.00

994,000.00

2,197,000
7,323
732
8,056
8,000

ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN


KABUPATEN B E K A S I
2015
HARGA
SUB-TOTAL
NO
URAIAN PEKERJAAN
SAT
VOLUME
SATUAN
UPAH
RP
RP
a
b
c
d
e
f
12.2 SUB BASE TELFORD PER M2 (TEBAL 25 CM)
Batukali/Batubelah
M3
1.0140
221,750.00
Batu Pecah 5/7
M3
0.2030
221,750.00
Pekerja
HOK
2.0000
59,000.00
118,000.00
Mandor
HOK
0.0500
89,000.00
4,450.00
Pemadatan Dengan Walls (Analisa Ja.1) M2
4.0000
7,323.33
Total Harga
122,450.00
Keuntungan 10%
Jumlah
Dibulatkan
12.3 LAPIS PONDASI BAWAH PER M3 (LPB / TEBAL 25 CM)
Sirtu
M3
1.2000
Pekerja
HOK
0.3000
Mandor
HOK
0.0100
Pemadatan Dengan Walls (Analisa Ja.1) M2
4.0000
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
12.4 LAPIS PONDASI ATAS PER M3 (LPA / TEBAL 20 CM)
Batu Pecah 3/4
M3
Batu Pecah 1/2
M3
Abu Batu (Filler)
M3
Pasir Urug
M3
Pekerja
HOK
Mandor
HOK
Pemadatan Dengan Walls (Analisa Ja.1) M2
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
12.5 PRIME COAT (400 LT)
Asphalt
Minyak Tanah
Pekerja
Tukang
Mandor
Sewa Sprayer
1500 M2 Untuk Prime Coat 400 Liter
Keuntungan 10%
Jumlah
Dibulatkan
PRIME COAT (400 LT)PER M2
Dibulatkan

KG
LITER
HOK
HOK
HOK
JAM

12.6 LAPIS PENETRASI TEBAL 5 CM


Batu Pecah 3/4
M3
Batu Pecah 1/2
M3
Abu Batu (Filler)
M3
Pasir Urug
M3
Asphalt
KG
Minyak Tanah
LITER
Kayu Bakar
M3
Pekerja
HOK
Tukang
HOK
Mandor
HOK
Pemadatan Dengan Walls (Analisa Ja.1) M2
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan
12.7 PEKERJAAN JALAN MACADAM / PENETRASI m2
Sub Base / Telford (Tebal 25 cm) (AnalisaM3
Ja.2)
Lapis Pondasi Bawah (LPB) Tebal 25 cm M3
(Analisa Ja.3)
Lapis Pondasi Atas (LPA) Tebal 20 cm (Analisa
M3
Ja.4)
Prime Coat (Analisa Ja.5)
M2
Lapis Penetrasi (Tebal 5 cm) (Analisa Ja.6)
M2
Total Harga
Keuntungan 10%
Jumlah
Dibulatkan

0.5400
0.1200
0.0600
0.4800
1.4700
0.2100
5.0000

143,200.00
59,000.00
89,000.00
7,323.33

3000
59,000.00
55,000.00
89,000.00
80,000.00

221,750.00
221,750.00
129,500.00
3,622.50
3,000.00
125000
59,000.00
55,000.00
89,000.00
7,323.33

421,613
42,161
463,774
463,700

29,293
201,133.33

219,723
21,972
241,696
241,600

86,730.00
18,690.00
36,617
245,131.67

350,552
35,055
385,607
385,600

600,000
177,000.00
55,000.00
44,500.00
640,000
1,240,000.00

1,516,500
151,650
1,668,150
1,668,100
1,011
1,000

9,757
3,105
907
16,229
960
2,500
8,850.00
2,750.00
890.00
12,490.00

0.2500
0.2500
0.2000
1.0000
1.0000

29,293
299,163.08

119,745
26,610
62,160

276,500.00

0.0440
0.0140
0.0040
0.0070
4.4800
0.3200
0.0200
0.1500
0.0500
0.0100
1.0000

224,855
45,015

171,840

105,420.00

230.0000
200.0
3.0000
1.0000
0.5000
8.0000

TOTAL
HARGA
RP
h

17,700.00
890.00
18,590.00

221,750.00
221,750.00
129,500.00
59,000.00
89,000.00
7,323.33

SUB-TOTAL
BAHAN
RP
g

421,613.08
219,723.33
350,551.67
1,011.00
53,270.13
-

7,323
40,780.13

105,403
54,931
70,110
1,011
53,270
332,829.04

53,270
5,327
58,597
58,500

332,829
33,283
366,112
366,100

ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN


KABUPATEN B E K A S I
2015
HARGA
SUB-TOTAL
NO
URAIAN PEKERJAAN
SAT
VOLUME
SATUAN
UPAH
RP
RP
a
b
c
d
e
f
12.8 PEKERJAAN JALAN HOTMIX TEBAL 3 CM
Sub Base / Telford (Tebal 25 cm) (AnalisaM3
Ja.2)
0.2500
421,613.08
Lapis Pondasi Bawah (LPB) Tebal 25 cm M3
(Analisa Ja.3) 0.2500
219,723.33
Lapis Pondasi Atas (LPA) Tebal 20 cm (Analisa
M3
Ja.4)
0.2000
350,551.67
Prime Coat (Analisa Ja.5)
M2
1.0000
1,011.00
Lapis Penetrasi (Tebal 5 cm) (Analisa Ja.6)
M2
1.0000
53,270.13
Hotmix HRS (Tebal 3 cm)
M3
0.0300
3,500,000.00
Total Harga
-

14

ANALISA BIAYA PEKERJAAN INSTALASI LISTRIK

14.1

1 TTK PEMASANGAN INSTALASI TITIK CAHAYA


Bahan :
Kabel NYM 3 x 2,5
M1
Solatif Kabel
Roll
Pipa Kabel
Btg
Inbow-dus
Bh
Upah Kerja Instalasi Elektrikal
Ls
Jumlah
Keuntungan Maksimal 10%
Jumlah

14.2

14.3

14.4

14.5

14.6

1 TTK PEMASANGAN INSTALASI TITIK DAYA STOP KONTAK


Bahan :
Kabel NYM 3 x 2,5
M1
Solatif Kabel
Roll
Pipa Kabel
Btg
Inbow-dus
Bh
Upah Kerja Instalasi Elektrikal
Ls
Jumlah
Keuntungan Maksimal 10%
Jumlah
1 BH PEMASANGAN ARMATUR STOP KONTAK
Bahan :
Stop Kontak 250 Watt"BROCO"
Bh
Alat Bantu
Ls
Jumlah
Keuntungan Maksimal 10%
Jumlah
1 BH PEMASANGAN ARMATUR SAKLAR DOBLE
Bahan :
Stop Kontak 250 Watt"BROCO"
Bh
Alat Bantu
Ls
Jumlah
Keuntungan Maksimal 10%
Jumlah
1 UNIT LAMPU SL 18 W
Bahan :
Lampu 1 Buah
Alat Bantu
Jumlah
Keuntungan Maksimal 10%
Jumlah

Unit
Ls

1 BH PEMASANGAN LAMPU TAMAN


Bahan :
Lampu Mercury 80 W "Philip" lengkap dudukan
Bh + Trafo
Alat Bantu
Ls
Jumlah
Keuntungan Maksimal 10%
Jumlah

25.000
1.000
4.000
1.000
1.000

25.000
1.000
4.000
1.000
1.000

1.000
1.000

1.000
1.000

1.000
0.200

1.000
0.200

15,000.00
5,000.00
25,000.00
9,000.00
10,800.00

15,000.00
5,000.00
25,000.00
9,000.00
10,800.00

40,000.00
8,000.00

40,000.00
8,000.00

35,000.00
7,000.00

120,000.00
24,000.00

SUB-TOTAL
BAHAN
RP
g
105,403
54,931
70,110
1,011
53,270
105,000
775,824.74

TOTAL
HARGA
RP
h

775,825
775,800

375,000
5,000
100,000
9,000
10,800.00
10,800.00

489,000.00

499,800.00
49,980.00
549,780.00

15,000.00
5,000.00
25,000.00
9,000.00
10,800.00
10,800.00

54,000.00

64,800.00
6,480.00
71,280.00

40,000.00
8,000.00
8,000.00

40,000.00

48,000.00
4,800.00
52,800.00

40,000.00
8,000.00
8,000.00

40,000.00

48,000.00
4,800.00
52,800.00

35,000.00
1,400.00
1,400.00

35,000.00

36,400.00
3,640.00
40,040.00

120,000.00
4,800.00
4,800.00

120,000.00

124,800.00
12,480.00
137,280.00

NO
a
15
15.7
15.71
15.72
15.73
15.74
15.75
15.76
15.77
15.78
15.79
15.710
15.711

ANALISA HARGA SATUAN PEKERJAAN UMUM & BANGUNAN


KABUPATEN B E K A S I
2015
HARGA
SUB-TOTAL
URAIAN PEKERJAAN
SAT
VOLUME
SATUAN
UPAH
RP
RP
b
c
d
e
f
PEMASANGAN PENGETESAN DAN PENGGALIAN PIPA PVC
Perpipaan dan Meter Air
Pengadaan Pipa GIP 300 mm
M
6.00
1,018,500
Bend 300 mm x 90 degree
Unit
2.00
1,310,632
Giboult Join 300 mm
Unit
2.00
1,396,800
Tee 300 x 300 mm
Unit
2.00
989,036
Gate Valve 300 mm
Unit
3.00
5,400,000
Water meter 300 mm
Unit
1.00
30,450,000
Strainer 300 mm
Unit
1.00
2,140,000
Flange 300 mm
Unit
26.00
1,248,000
Mur dan Baut 3/4" x 3"
Unit
240.00
2,000
Pengelasan
m
32.66
348,900
11,393,678.40
Total
11,393,678.40
Pabrikasi dan Pemasangan
Ls
1.00
1,139,367.84
Jumlah
12,533,046.24

SUB-TOTAL
BAHAN
RP
g

TOTAL
HARGA
RP
h

6,111,000.00
2,621,264.70
2,793,600.00
1,978,071.72
16,200,000.00
30,450,000.00
2,140,000.00
32,448,000.00
480,000.00
95,221,936.43
95,221,936.43

Keuntungan Maksimal 10%


Jumlah

107,754,982.67
10,775,498.27
118,530,480.93

15.8 PEKERJAAN ROLLING DOOR m2

Pekerja
Tukang Las Biasa
Kepal tukang
Mandor
Pintu gulung besi
PERALATAN
Jumlah
Overhead & Profit 10%
Harga Satuan Pekerjaan (D+E)

OH
OH
OH
OH
m2
Ls

0.440
0.440
0.044
0.022
1.000
1.000

59,000.00
70,000.00
81,000.00
89,000.00
480,000.00
100,000.00

25,960.00
30,800.00
3,564.00
1,958.00

62,282.00

480,000.00
100,000.00
580,000.00

642,282.00
64,228.20
706,510.20

(C)
DAFTAR SATUAN UPAH DAN BAHAN
PEKERJAAN UMUM & BANGUNAN
KABUPATEN B E K A S I
2015

NO.

SATUAN

HARGA SATUAN
(Rp)

1
1.1
1.2
1.4
1.5
1.6
1.7
1.8
1.12
1.15
1.16
1.17
1.18
1.19
1.20
1.21
1.22
1.23
1.24
1.25
1.26
1.27
1.28
1.29
1.30
1.31
1.32
1.33
1.34
1.35

UPAH
Pekerja
Mandor
Tukang batu
Tukang kayu
Tukang besi
Tukang las
Tukang cat
Kepala tukang
Operator alat
Pekerja Trampil
Draftman
Draftman
Operator komputer
Operator komputer
Geologist
Geologist
Geologist
Assisten Geologist
Assisten Geologist
Assisten Geologist
Driller
Driller
Driller
Assisten Driller
Assisten Driller
Assisten Driller
Crew Bor
Crew Bor
Crew Bor

hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
Bulan
hari
Bulan
hari
Bulan
Hari
jam
Bulan
Hari
jam
Bulan
Hari
jam
Bulan
Hari
jam
Bulan
Hari
jam

59,000.00
89,000.00
72,000.00
73,000.00
57,000.00
70,000.00
72,000.00
81,000.00
84,000.00
72,000.00
7,200,000.00
332,947.98
7,200,000.00
332,947.98
15,000,000.00
714,285.71
86,705.20
7,500,000.00
357,142.86
43,352.60
7,200,000.00
342,857.14
41,618.50
4,500,000.00
214,285.71
26,011.56
4,500,000.00
214,285.71
26,011.56

2
2.1
2.3
2.4
2.5
2.11
2.13

BAHAN
Batu bata merah
Batu kali bulat utuh
Batu pecah tangan 15/20
Batu pecah mesin 1/2
Kerikil beton
Pasir beton

buah
m
m
m
m
m

500.00
195,000.00
221,750.00
221,750.00
137,100.00
269,300.00

NO.
2.14
2.15
2.16
2.18
2.20
2.21
2.22
2.25
2.26
2.33
2.34
2.35
2.36
2.37
2.38
2.39
2.40
2.41
2.42
2.43
2.44
2.45
2.46
2.47
2.48
2.49
2.62
2.63
2.65
2.66
2.70
2.72
2.73
2.74
2.75
2.76
2.77
2.78
2.79
2.80
2.81
2.82
2.83
2.84
2.85
2.91
2.92
2.93
2.94

SATUAN
Pasir beton (bobot isi 1400 kg/m)
Pasir pasang
Pasir urug
Timbunan sirtu
Pasir silika 0,8 mm
Gravel filter ( 1,2 - 35 mm)
Bentonite
Keramik 20 x 20
Keramik 30 x 30
Semen portland
Semen portland (50 kg/zak)
Semen warna
Cat besi
Cat minyak
Cat dasar
Cat kayu
Cat tembok
Cat water proffing
Dempul
Minyak bekisting
Meni besi
Meni kayu
Plamur kayu
Minyak cat
Amplas
Kuas
Kunci slot
Kaca polos tebal 5 mm
Paku biasa 1/2" - 1"
Paku biasa 2" - 5"
Paku sekrup 1 cm - 2,5 cm
Mur baut DN. 22 mm x 40 cm
Mur baut DN. 20 mm x 4"
Baut 3/4" x 3"
Angkur baut & mur DN. 16 mm panjang 30 cm
Angkur baut & mur DN. 12 mm panjang 20 cm
Besi beton
Baja profil
Besi plat
Besi plat bordes
Kawat ikat beton
Kawat bronjong (digalvano DN. 4 mm)
Kawat las
Kawat las
Batu Gerinda
Kayu bornio (papan) kelas I
Kayu barnio (balok) kelas I
Kayu marsawa (papan) kelas II
Kayu marsawa (balok) kelas II

kg
m
m
m
kg
kg
kg
buah
buah
zak
kg
kg
kg
kg
kg
kg
kg
kg
kg
liter
kg
kg
kg
liter
lembar
buah
unit
unit
kg
kg
kg
kg
kg
buah
unit
unit
kg
kg
kg
kg
kg
kg
kg
buah
buah
m
m
m
m

HARGA SATUAN
(Rp)
130.00
150,000.00
129,500.00
143,200.00
3,500.00
800.00
20,000.00
69,900.00
75,700.00
60,000.00
1,200.00
2,200.00
63,200.00
40,500.00
42,450.00
79,400.00
34,400.00
43,650.00
32,300.00
9,000.00
59,300.00
47,800.00
29,200.00
21,200.00
6,750.00
10,900.00
29,250.00
97,100.00
22,500.00
22,500.00
1,300.00
36,000.00
40,500.00
12,500.00
22,500.00
15,750.00
10,000.00
10,000.00
11,000.00
13,000.00
23,300.00
26,000.00
30,000.00
5,850.00
10,000.00
3,881,400.00
3,855,600.00
2,160,000.00
1,980,000.00

Kayu merantih (papan) kelas III


Kayu merantih (balok) kelas III
Kayu bekisting (papan) kelas IV
Kayu bekisting (balok) kelas IV
Kayu Albasiah
Kayu terenteng (bekisting)
Kayu dolken DN. 8-10 cm / 4 m (tiang pancang)
Kayu les 1/3
Kayu profil 1/3
Tripleks 4 mm
Tripleks 9 mm
Multipleks 18 mm, 120 x 240
Solar
Pelumas
Ijuk
Wastafel
Closet jongkok porselin
Floor drain
Sewa mesin las
Sewa bult fusion welding
Air (untuk pengetesan pipa)
Air (untuk pengecoran beton) 1000 kg/m
Packing Flange
Tiang pancang pratekan pracetak 300x300 mm
Tiang pancang pratekan pracetak 400x400 mm

m
m
m
m
m
m
batang
batang
batang
lembar
lembar
lembar
liter
liter
kg
unit
unit
unit
jam
jam
m
liter
m2
m'
m'

HARGA SATUAN
(Rp)
4,140,200.00
3,881,400.00
1,485,000.00
1,440,000.00
1,440,000.00
2,911,100.00
33,800.00
31,500.00
31,500.00
75,300.00
139,500.00
225,000.00
9,900.00
48,750.00
10,300.00
2,356,200.00
179,500.00
44,000.00
450,000.00
130,500.00
5,000.00
100.00
80,000.00
308,000.00
514,800.00

PENUTUP ATAP
Asbes plat datar (100x200x4mm)
Seng gelombang BJLS 28
Zingalum U 575 ( Lebar 750mm)
Asbes gelombang besar (90x180)
Asbes Gelombang kecil (90x180)
Nok stell
faber glass
Genteng beton
Nok genteng beton
Genteng kramik
Nok genteng kramik
Genteng Morando Press Jatiwangi (kecil)
Genteng Morando Press Jatiwangi (besar)
Genteng Morando Press Jatiwangi berglasur (kecil)
Genteng Morando Press Jatiwangi berglasur (besar)
Bubungan genteng Morando Jatiwangi
bubungan Morando Press Jatiwangi berglasur (besar)
Nok Morando Press Jatiwangi berglasur (besar)
Roster Terawang

lbr
lbr
m1
lbr
lbr
pasang
lbr
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

30,180.00
22,910.00
65,000.00
29,640.00
39,910.00
17,000.00
28,360.00
3,270.00
5,450.00
8,730.00
16,360.00
10,000.00
20,000.00
11,700.00
23,400.00
2,250.00
20,000.00
23,400.00
6,200.00

NO.
2.95
2.100
2.101
2.102
2.103
2.104
2.107
2.108
2.109
2.110
2.111
2.112
2.119
2.120
2.121
2.122
2.124
2.125
2.128
2.129
2.130
2.131
2.133
2.134
2.135

3
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
3.11
3.12
3.13
3.14
3.15
3.16
3.17
3.18
3.21

SATUAN

NO.

4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
4.10
4.11
4.12
4.13

SATUAN
4 PENGGANTUNG KUNCI
Kunci standar doble slaag
Kunci km/wc
Kunci Tanam cilinder setara Merk Logo type 1103
Engsel pintu
Engsel jendela
Grendel jendela/jendela
Hak angin
Slot Jendela
Angker pintu
Pintu Aluminium
Pegangan pintu

HARGA SATUAN
(Rp)

Ventilasi Genset VG Besi

unit
unit
unit
bh
bh
bh
bh
bh
bh
bh
bh
m2
unit

126,500.00
51,750.00
185,000.00
15,680.00
12,550.00
9,410.00
30,000.00
17,500.00
6,270.00
1,500,000.00
126,500.00
480,000.00
2,500,000.00

6
6.1
6.2
6.10
6.11
6.12
6.13
6.14
6.15
6.16

UTILITAS WC/KM
Bak fibre
Kran 1/2" kuningan
Floor Drain
Pipa PVC AW dia. 1/2"
Pipa PVC AW dia. 3/4"
Pipa PVC AW dia. 1"
Pipa PVC AW dia. 2"
Pipa PVC AW dia. 3"
Pipa PVC AW dia. 4"

bh
bh
bh
m'
m'
m'
m'
m'
m'

200,000.00
25,000.00
70,910.00
6,410.00
7,660.00
10,840.00
27,700.00
54,890.00
70,000.00

7
7.1
7.2
7.3
7.4
7.5
7.6
7.7
7.8
7.9
7.10

SEWA ALAT
Sewa alat pengetesan pipa
Sewa jack hammer
Sewa concrete mixer & vibrator
Sewa stamper
Sewa excavator
Sewa alat perpipaan (tracker&katrol)
Sewa walls
Sewa sprayer
Peralatan Crane besar
Alat pancang mesin tenaga diesel

hk
hk
hk
hk
jam
hk
jam
jam
hk
hk

8
8.8
8.14
8.17
8.18
8.19
8.20
8.21
8.22
8.23

Elektrikal
NYY 4 x 70 mm
NYFGBY 4 x 70 mm
Lampu merkuri 100 watt
Terminal kabel
MCB 2 A
MCB 10 A
Water meter 300 mm
Mercury 100 Watt
Tiang lampu 6 m

m'
m'
Unit
Unit
Unit
Unit
Unit
Unit
Unit

Rolling Door

75000
150000
100000
150000
75000
50000
50000
80000
600,000
720,000

151,200
644,000
175,000
40,000
50,000
50,000
33,600,000
3,750,000
14,500,000

(D)
DAFTAR SATUAN UPAH PIPA DAN ACCESSORIES
PEKERJAAN UMUM & BANGUNAN
KABUPATEN B E K A S I
2015
NO.

JENIS

1
1.8
1.10
1.11
1.13
1.14
1.15
2
2.11
3
3.3
4
4.5
4.6

Pipa Besi

Pipa Besi
Pipa PVC RR
Pipa PVC RR

10 Accesories Pipa PVC


10.5
11 Accesories Pipa PVC
11.5
19
19.7
27
27.4
27.5
27.7
28
28.4
28.5
29
29.5
31
31.1
32
32.4
33
33.4
33.5
33.7
35
35.4
36
36.3
37
37.4
39
39.4
39.5
39.7
40.9
41
41.21
41.23
41.25

NAMA BARANG

GALVANIS MEDIUM
Pipa Galv. Med. SII Dia
Pipa Galv. Med. SII Dia
Pipa Galv. Med. SII Dia
Pipa Galv. Med. SII Dia
Pipa Galv. Med. SII Dia
Pipa Galv. Med. SII Dia
PIPA STEEL ASTM 120
Pipa Steel Dia 12"
Pipa PVC RR S,10
S. 10 4"
Pipa PVC RR S. 12, 5
S. 12,5 8 "
S. 12,5 10 "
DOP PVC
ND. 8"

SATUAN

HARGA
2015

3"
6"
8"
12"
14"
16"

Meter
Meter
Meter
Meter
Meter
Meter

203,000
479,000
679,000
1,018,500
1,188,250
1,358,000

Meter

989,036
2

Meter

150,400

Meter
Meter

317,998
563,524

Buah

854,760

Buah

905,573

Buah

1,396,800.00
702,000.00
1,096,000.00
2,140,000.00
440,000.00
952,000.00

FLANGED SPYGOT

ND. 8"
Accesories Pipa Cast Iron GIBOULT JOINT
ND. 12"
Accesories Pipa Cast Iron STRAINER
ND. Ukuran 6"
ND. Ukuran 8"
ND. Ukuran 12"
Accesories Pipa Cast Iron WALL PIPE
ND. 6 x 60
ND. 8 x 75
Accesories Pipa Cast Iron BLIND FLANGE ( CI )
ND. 8"
Accessories
BALL VALVE
ND. Ukuran 1/2"
Accessories
CHECK VALVE
ND. 6"
Accessories
GATE VALVE
ND. 6"
ND. 8"
ND. 12"
Accessories
FOOT VALVE
ND. 6"
Accessories
AIR VALVE
ND. 2"
Accessories
FLEXIBLE JOINT
ND. 6"
Accessories
FlLANGE LAS PN 10
ND. 6"
ND. 8"
ND. 12"
ND. Dia. 12"
Accesories Pipa GIP
BEND GALVANIS
ND. 6 x 90
ND. 8 x 90
ND. 12 x 90

Buah
Buah
Buah
Buah
Buah

Buah
Buah
Buah

792,000.00
102,000.00
2,377,500.00
0.40
1,800,000
2,100,000
5,400,000

Buah

2,850,000

Buah

1,375,000

Buah

2,241,020
451,652
558,531
1,248,000
30,450,000

Buah
Buah
Buah

Buah
Buah
Buah
Buah
Buah
Buah
Buah

655,316
982,974
1,310,632
1,290,680
3,205,216

42 Accesories Pipa GIP


42.12
42.14
42.15
42.16

TEE GALVANIS
ND. 8
ND. 12
ND. 14
ND. 16

47 Accesories Pipa GIP


47.11
47.12
47.13

DOP GALVANIS
ND. 8
ND. 12
ND. 16

Buah
Buah
Buah

854,760
1,282,140
1,709,520
-

REDUCER
ND. 6 x 4

Buah

564,000.00

Buah
Buah
Buah
Buah

50 Accesories Pipa GIP


50.7

PEKERJAAN

: PEKERJAAN PENGADAAN / PEMASANGAN INSTALASI PENGOLAHAN AIR (IPA) LENGKAP KAPASITAS :


50 L/dt

TAHUN ANGGARAN.

: 2015

PEKERJAAN

: A PENGADAAN DAN PEMASANGAN WATER METER INDUK DIA. 300 MM

No.

URAIAN PEKERJAAN

SATUAN

VOLUME

I.
1.1
1.2
1.3
1.4

PEKERJAAN TANAH
Galian Tanah
Urugan Tanah Kembali
Urugan Pasir Dipadatkan
Buangan tanah bekas galian tanah

m
m
m
m

16.85
3.08
0.94
13.77

= 1 UNIT

HARGA
SATUAN
(Rp)
5

19,800
11,300
24,300
25,500

Jumlah Sub Total I.


II.
2.1
2.2
2.3
2.4

PEKERJAAN BETON
Lantai kerja 1 : 3 : 5 (mutu K-125)
lantai Beton Bertulang 1 : 1,5 : 1,5 (K-225 besi 150 kg)
Dinding Beton Bertulang1 : 1,5 : 1,5 (K-225 besi 150 kg)
Atap Beton Bertulang 1 : 1,5 : 1,5 (K-225 besi 150 kg)

3.1
3.2
4.2
5.2
6.2
7.2
8.2
9.2
10.2
11.2
12.2

PEKERJAAN PERPIPAAN
Pengadaan Pipa GIP 300 mm
Bend 300 mm x 90 degree
Giboult Join 300 mm
Tee 300 x 300 mm
Gate Valve 300 mm
Water meter 300 mm
Strainer 300 mm
Flange 300 mm
Mur dan Baut 3/4" x 3"
Pengelasan
Pabrikasi dan Pemasangan

m
m
m
m

0.47
1.87
3.30
0.70

674,910
5,658,700
5,842,700
5,658,700

4.1
4.2

PEKERJAAN LAIN-LAIN
Manhole ukuran 0,8 x 0,8 m lengkap gembok dan engsel
Pengecatan bagian besi yang terbuka dengan cat besi
Jumlah Sub Total IV.

JUMLAH TOTAL ( I + II + III + IV)

315,858
10,593,086
19,280,910
3,961,090
34,150,944

M
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Cm
Ls

6.00
2.00
2.00
2.00
3.00
1.00
1.00
4.00
240.00
5.02
1.00

1,018,500
1,310,632
1,396,800
989,036
5,400,000
30,450,000
2,140,000
1,248,000
12,580
348,900
1,139,368

Jumlah Sub Total III.


IV.

333,590
34,804
22,745
351,084
742,223

Jumlah Sub Total II.


III.

JUMLAH
HARGA
(Rp)
6

6,111,000
2,621,265
2,793,600
1,978,072
16,200,000
30,450,000
2,140,000
4,992,000
3,019,200
1,752,874
1,139,368
73,197,378

Unit
m

1.00
3.77

1,500,000
20,739

1,500,000
78,145
1,578,145

109,668,691