Anda di halaman 1dari 2

5.

22
5.23
5.24
5.25
5.26
5.27
5.28
5.29
5.30

Texturing of Surface
Finished Levels and Surface Regularity
Initial Curing
Time Allowed for Concreting
Final Curing
Contraction Grooves
Tests on Hardened Concrete
Sealing of Expansion Joints
Sealing of Construction Joints and Contraction Grooves

5.31
Traffic on Finished Concrete 29
5.32
Filling Core Holes 29
5.33
Cutting out and Replacing Concrete 29
5.34
Cracks in New Concrete 30
5.35
Grooving of Hardened Concrete 30
5.36
Treatment of Surface of Hangar Floors 30
6
Trials 34
6.1
Trial Mixtures 34
6.2
Trial Areas 34
7
Concrete for Surface Surrounds to Fittings 36

7.1
Mixture Specification 36
7.2
Designed Concrete in Accordance with BS EN 206-1 36
7.3
Preparation For Concreting 37
7.4
Placing and Compaction 37
7.5
Finishing 37
7.6
Curing 37
8
Summary of Tests 38
8.1
Test Results 38
8.2
Tests for Initial Approval of Materials 38
8.3
Routine Tests on Bulk Supplies Throughout Plant Mixing 38
8.4
Routine Tests on Plant Throughout Plant Mixing 39
8.5
Routine Tests on Concrete Throughout Plant Mixing 39
8.6
Routine Tests on Hardened Concrete 39

Anda mungkin juga menyukai