wit ests
&
ALLS,
Petroleum Development Oman
utes of Meeting - 010
On Plot Site Progress Review Meeting
Rabab Harweel Power Plant and HRSG Project ~ €311530
Date: 21” May 2015,
PDO
Mr. Said Al Abt, CSR On-Plot,UIESSH
Mr. Ganesan, Civil Engineer UIESS4H,
Mr. Nazar, Civil Engineer, UIESS4A,
‘AHEC
‘Mr. MLN Tamodaran, Construction Manager
MeV. Ramanjaneyuiu, Site-QA/Qc In Charge
Mr. Sayeed, Civil Engineer.
‘Me: Rohit Singh Yaav , Mechanical Engineer
Me Mirza Rasikh Al, Electrical Engineor
Me. Ashaknaz Bhatt, Ast. Manager ~Admin,
Me. Ahmed Nadim Jian, Area Planner,
Me. Rana Karmakar, Area Planner.
hallenges and proi Remarks
highlights
7 UES Conplted
Elevated Foor Sab Casting Balas
soMay15 |
Za) | HRSE_ Cantal Buiting Givated Foor [TARAS | ORMayss | Completed
Foundations ( Faotngs
Slab Casing Pat-t (Grid 5D) 17 May 18
2b) | HRSE Conel Bulling Elevated Foor Dues | Nan Avaisbaly of Sagng
‘Slab Casting Part-2 (rd 6-8 /4-D) Osan 15) | Matera
a WEB ¥2 Rost Sab Conereing OSApeIs [Tans
4 ‘GTP Buleing Roof Slab Coneaing | 2i-Agr.16 | To-iart5
5 HRSG FTF Foundation Concring | 37-May-15) S1Nay-6
@ EB 3 Roar Sins Coneratng Tae is | RNS
7 12 KV Swichyard Bay 1&2 Canty | TELUS POT ay TS
toldgic LESS,
Petroleum eS Oman
gasac
Salis of STO Response Recaied: — [AEC [WR
No.of STO Raed 73 Nos
FRosponse Recelve: 23 Nos
Response Pending: No
‘POO CSR Highlighted tt CONS hall| ARES [YE ROVE | Oa Cong
be the mandatory tool for earthing
omplason and informed that AHEC
Fesporsiie fr the COMS sysemation
‘nds having ined respurces for
Subsequent implementation cluding
CONS amiistrao: by HO.
HEC informed that ce Check Shoots
ae approved and dlvered fo ate, those
\wilbe completed fo upoad inthe COMS
em
POO sdvsed AREC 16 mcbiiza, OC | ance | COBWEDIS im progress
Inspectors for Mechania. Elect! and
‘a0. asctionl One Cl dscbinestt
Bosse) on urgent bass
EG eed at i Gi Kuna
al Inspec) already sve at
See Weak a de’ te be
‘eprint ares! Sis
Electrical inspector wil be reporting at
theend of ay 15.
Regarding Civil Inspector Ste wil inform
to HO and revert back on the
Sevelopments
POO inforried at TPIOGP and Wathod | AHEC | T0621
Statements rolled. to. mechanical
discipline skal be ‘submited for
approval. AS GE Packages stared 10
ave ast,
[AVEC informed that 4 Nos QCP wil be
submited by 10" dune 15.
to Sttemens for Sursce
Preparation and Panting Werks (PCS 4
4.3) has been apofoved wah Code 8,
POO asked forthe Approved MS rom — | GE
(OEM Versorfor Thermal insulation the
‘ab over insulation of GT Foundation.
‘AMEC replied that Response is Awates
tom GE epresenatve Me Gayroot.
Page 206— aS Oman
Construction Progress
‘Staus tobe updated wah te punch st.
[ANEC informed that Camp Port
‘2 compleled wih required metalation
‘Sturihing.
Chiy Adora punch points ike atets
1 POO Recreaton/camp Mosque
Sta ess, AC In oles oro, Glass
fing in coir, General Gy,
pan cute ca,
nce whch wl be compte
toute ive
Fabreaton fr Hondas are completed
nd wl erst tom Saturday
Onwards
ton | AEE
ating
Tass
Completed
‘CSR asked or PHASE-Zinspecana’ | AHEC
(car) Date
|AHEC ior thatthe inaction wi,
be ofered forthe Second phase on 26°
May 208,
2605-35
‘CSR fomed_10 develop Retoures | ARE
Losses" MicSchacule of ah
Bung Seucts,
[AHEG Pretonted Mroschedul ral
Bulargs with Rescuroe Loading nthe
Progress Review Nesting.
(CSR Adve fr sare lcficaton on
‘he some and AHEC wil be stoma
tng
oon
peseary
220515,
POO. raised the oon WSlTar| AEC] PE
POWERTECH . Supervsng
‘Overlapping of Stal, whan existing
's gong for an anrual leav
hapening ats
PTE informed that this fave wil be
token care
‘tats
9 taf
weet
Wk
Page 3 0f 4Petroleum Development Oman
3 "AHEG requesiad POO CSR thal 160-200 [POO Wa
kg of fe fo bo allowed to be prepared
{he neuly ave Wain Cer Ut 2
‘One) nthe camp forthe ay toy
Minor Coneeing usege at On plo.
POO CSR agreed the AHEC request
considering ‘the icay of ho. lox
‘equvenent for Concrete temperature
ontling wihout contaminating the
‘Sill te wakincene,
[Senate
‘Wea Abe EES COR OTIS [MN Ternodaran = ATES Constratin W
feos ie oe Soe ae
Page dor& ®
"RABAS HARWEEL POWER PLANT &HRSG PROJECT: (8-209)
(Contract Number: 6-911520
Meoting Topic : Weekly Progress Review Mecting LOCATION: AHEG Cont. Room
Project: RHFP DATE: 21-08-2015
S.NO | COMPANY JOB POSITION | SIGNATURE
ES2 CS
r VE S24 & =
EDO
a c
Bie ENC. Cx