ITEM PEMBAYARAN NO.

JENIS PEKERJAAN

: 1.2
: MOBILISASI

% TERHADAP TOTAL BIAYA PROYEK =

No.

URAIAN

A.

Sewa Tanah

B.

PERALATAN
Periksa lembar 1.2-2

C.
1
2
3
4
5
6

FASILITAS KONTRAKTOR
Base Camp
Kantor
Barak
Bengkel
Gudang, dan lain-lain
......................

D.
1
2

FASILITAS LABORATORIUM
Ruang Laboratorium (sesuai Gambar)
Soil & Aggregate Testing
Compaction Test
CBR Test
Specific Gravity
Atterberg Limits
Grain Size Analysis
Field Density Test by Sand Cone Methode
Moisture Content
Abrasion of Aggregate by Los Angeles Machine
Bituminous Testing
Marshall Asphalt Test
Extraction Test, Centrifuge/Refflux Method
Specific Gravity for Coarse Aggregate
Specific Gravity for Fine Aggregate
Mix Air Viod Content (Accurate Method)
Core Drill
Metal Thermometer
Accessories and Tolls
Penetration Test
Softening Point
Refusal Density Compactor
Concrete Testing
Slump Cone
Cylinder/Cube Mould for Compressive Strength
Beam Mould for Flexural Strength (RIGID)
Crushing Machine
Pendukung
(Periksa Fasilitas Laboratorium)
Operasional
(Periksa Fasilitas Laboratorium)

5
6
E.
E.I.
1
2
3
E.II.
1
2
3
F.

MOBILISASI LAINNYA
PEKERJAAN DARURAT
Sewa Jembatan Bailly dan Pembuatan Jemb. Darurat

SATUAN

HARGA
SATUAN
(Rp.)

VOL.

M2

2.000

M2
M2
M2
M2
M2
....

120
60

Lembar 1.2-1
JUMLAH
HARGA
(Rp.)

50

M2
Set
Set
Set
Set
Set
Set
Set
Bln
Set
Set
Set
Set
Set
Set
Set
Set
Bln
Set
Set
Set
Set
Set
Set

LS

Pemeliharaan Jalan Kerja / Samping


Kantor Direksi

LS
M2

104

LAIN-LAIN
Komunikasi Lapangan Lengkap
As Built Drawing
Papan Nama Proyek

Set
Ls
bh

1
2

DEMOBILISASI

LS

Total Biaya Mobilisasi


Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.

ITEM PEMBAYARAN NO.


JENIS PEKERJAAN

No.

B.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51

: 1.2
: MOBILISASI

JENIS ALAT

KODE
ALAT

SATUAN

E01
E02
E03
E04
E05
E06
E07
E08
E09
E10
E11
E12
E13
E14
E15
E16
E17
E18
E19
E20
E21
E22
E23
E24
E25
E26
E27
E28
E29
E30
E31
E32
E33
E34
E35
E37
E36
E38
E39
E40
E41
E42
E43
E44
E45
E46
E47
E48
E49
E50
E51

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

HARGA
SATUAN
(Rp.)

VOL.

PERALATAN
ASPHALT MIXING PLANT
ASPHALT FINISHER
ASPHALT SPRAYER
BULLDOZER 100-150 HP
COMPRESSOR 4000-6500 L\M
CONCRETE MIXER 0.3-0.6 M3
CRANE 10-15 TON
DUMP TRUCK 10 TON
DUMP TRUCK 10 TON
EXCAVATOR 80-140 HP
FLAT BED TRUCK 3-4 M3
GENERATOR SET
MOTOR GRADER >100 HP
TRACK LOADER 75-100 HP
WHEEL LOADER 1.0-1.6 M3
THREE WHEEL ROLLER 6-8 T
TANDEM ROLLER 6-8 T.
TIRE ROLLER 8-10 T.
VIBRATORY ROLLER 5-8 T.
CONCRETE VIBRATOR
STONE CRUSHER
WATER PUMP 70-100 mm
WATER TANKER 3000-4500 L.
PEDESTRIAN ROLLER
TAMPER
JACK HAMMER
FULVI MIXER
CONCRETE PUMP
TRAILER 20 TON
PILE DRIVER + HAMMER
CRANE ON TRACK 35 TON
WELDING SET
BORE PILE MACHINE
ASPHALT LIQUID MIXER
TRONTON
COLD MILLING MACHINE
ROCK DRILL BREAKER
COLD RECYCLER
HOT RECYCLER
AGGREGAT (CHIP) SPREADER
ASPHALT DISTRIBUTOR
SLIP FORM PAVER
CONCRETE PAN MIXER
CONCRETE BREAKER
ASPAHLT TANKER
CEMENT TANKER
CONDRETE MIXER (350)
VIBRATING RAMMER
TRUK MIXER (AGITATOR)
BORE PILE MACHINE
CRANE ON TRACK 75-100 TON

Total untuk Item B pada Lembar 1

1
1
1
6

6
2
1
1

1
1
1
2
4
1
2

Lembar 1.2-2
JUMLAH
HARGA
(Rp.)

Anda mungkin juga menyukai