Datos:
Qmed=
Qmin=
Qmaxins=
Qmaxext=
diametro tubo=
Material:
34.2 lps
17.1 lps
122.39 lps
183.58 lps
45 cm
Concreto reforzado
Q= AV
Vrango=
proponiendo V=
.6 a .4
0.41
la seccin de construccin
A = Q/V =
0.4477560976 m2
0.0342 m3/seg
0.0171 m3/seg
0.12239 m3/seg
0.18358 m3/seg
0.45 m
0.013 rugosidad
m/seg
m/seg
0.5 m
0.8955122 m
0.78539816 rad
0.03 m
0.00635 m
14 espacios
13 barras
revisando el ancho del canal sin bastidor y sin holguras
0.3125 "
0.0079375 m
ancho=
0.518425 m
Si redondeamos el ancho a
la holgura resultante sera de :
0.525 m
0.0032875 m
3.2875
Q/A
0.5125 m/seg
revisando perdidas
=(/)^(4/3)
hf=
0.0018494349
0.1261449767
0.008567788
calculando la perdida con la rejilla obstruida al 50% se tiene
=(v^2^2)/2
(1/0.7)
hf=
0.0068848296
Calculo de la pendiente
^(1/2)=/^(2/3)
0.3428167436
s= 0.00024173
Qmaxext
0.525
0.853
0.0171 m3/seg
0.41 m/seg
0.0417073171 m2
0.525 m
0.0794425087 m
=1/
^(2/3) ^(1/2)
V a qmin =
0.1852996537
m/s
0.0609858617
0.0342
m3/seg
^(1/2)=/^(2/3
)
seccin a Qmed
A=
0.0834146341
Ancho =
0.525
tirante t =
0.1588850174
S=
0.0989767442
0.00062
Va qmaxext.
0.2007211044
0.6568866557
Va qmin =
0.0609858617
0.2968801703
m2
m
mm
1
0.079
0.525
1
0.159
0.525
INGENIERIA CIVIL.
(PRETRATAMIENTO)
INGENIERIA CIVIL.
17.1 lps
QMEDIO =
34.2 lps
QMAXIMO INSTANTANEO =
122.39 lps
QMAXIMO EXTRAORDINARIO =
183.58 lps
=
=
=
=
0.18358
0.41
2.
0.4478
0.4477561
0.5
3.
0.8955
=
2.42
=
45
ESPACIO ENTRE LAS BARRAS=
ESPESOR DE LA BARRA
=
30 mm
0.25 "
n=
n-1=
INGENIERIA CIVIL.
4.
REVISANDO EL CANAL SIN BASTIDOR Y SIN HOLGURAS
Ancho del canal = longitud (# de espacios) + long (# de barras)
Ancho de canal = (.03m)(13)+(.0127)(1
5.
0.3125
0.50255 m
0.0079375 m
0.50255
0.525 m
0.0032875 m
3.2875
0.8529
7.
REVISANDO LA VELOCIDAD DE LA REJA.
El rea hidrulica entre las barras ser
A = Espacio entre barras x nmero de espacios x tirante
A = (0.03) (14) (0.8668) 0.35820488 m2
Velocidad entre barras = Q/A
V = 0.20186 / 0.39387
8.
0.5125 m/s
=2.42(0.00635/.03)^(4/3)
((0.410.41)/(29.81))^ (45) =
0.001849435
INGENIERIA CIVIL.
9.
10.
0.41
9.81
0.00688483
S=
11.
0.853
Q Max. Ext.
0.525
12.
0.0417
0.0417
0.525
Q Min.
0.525
13.
INGENIERIA CIVIL.
0.0342
0.41
0.0834
0.525
0.0834
Q med.
0.525
s= 0.0006205025
14.
15.
1
GUTIRREZ MARTNEZ LUIS ALBERTO.
INGENIERIA CIVIL.
1m
16.
0.525
m
LONGITUD FINAL DEL CANAL
LONGITUD DE ENTRADA
10 ANCHO=
LONGITU DE LA REJILLA =
17.
1.41421
0.0342
INGENIERIA CIVIL.
10 m3
2954.88 m3
Por lo tant
=?
INGENIERIA CIVIL.
INGENIERIA CIVIL.
0.0171 m3/s
3
0.0342 m /s
3
0.12239 m /s
0.18358 m3/s
0.41
DE CANAL DE 0.50m
0.5
0.03 m
0.00635 m
(ESPESOR DE LA BARRA)
14 ESPACIOS
13 BARRAS
GUTIRREZ MARTNEZ LUIS ALBERTO.
INGENIERIA CIVIL.
0.518 m
mm
cumple
SI CUMPLE
0.78539816
INGENIERIA CIVIL.
###
0.079
0.079 m
INGENIERIA CIVIL.
0.159
0.159
CUMPLE
0.062
0.801
m
GUTIRREZ MARTNEZ LUIS ALBERTO.
INGENIERIA CIVIL.
0.801
0.137
5.25 m
4.2 m
1m
2954.88
m3/dia
INGENIERIA CIVIL.
Desarenador
Muestra
Tiempo de
sedimentacin (seg)
Superficie
libre (m)
Solidos
sedimentable
s (mg/l)
0
1
2
3
4
5
6
23.25
36.00
58.00
76.3636364
135.00
260.00
1.6
1.55
1.5
1.45
1.4
1.35
1.3
0.2
0.25
0.3
0.35
0.4
0.45
0.5
11.5700
10.9915
9.8345
7.5205
6.4792
5.3222
3.0082
50
40
30
20
10
0
0.00
0.01
0.02
0.03
0.04
0.05
30
20
10
0
0.00
0.01
0.02
0.03
0.04
0.05
=
remanentes
Xc >
Fijando Xc =
Vs =
dx
0.1
0.1
0.1
82.71%
17.29%
17.29%
0.30
0.0064 m/seg
v
0.001
0.003
0.005
dx(v)
0.0001
0.0003
0.0005
0
0
0
0
E. Global =
0.0009
UUU
7
6
5
UUU
4
3
2
1
0
0.001
0.002
0.003
0.004
0.005
0.006
ya que la Vs no cumple con los valores tipicos se diseara con valores tipicos
Conclusin: se usara una Vs =
0.0064 m/s
0.384 m/mn
84.06%
0.0171 m3/s
0.0342 m3/s
0.18358 m3/s
VH = de .25 a .40m/seg
0.57911672 m2
0.0342 m3/seg
0.013 m3/seg
^(1/2)=/^(2/3
)
seccin a Qmed
A=
0.1078864353 m2
Ancho =
0.525
tirante t =
0.2054979721 m
S=
0.11526379
0.000302748
0.18358 m3/seg
0.317 m/seg
A=
Ancho =
tirante t=
0.5791167192 m2
0.525 m
1.1030794652 m
=1/
^(2/3) ^(1/2)
V a qmaxext
0.4759303833 m/s
0.21204065
revisando la seccin resultante a gasto min
Qmin =
VH =
A=
Ancho =
tirante t=
0.0171 m3/seg
0.317 m/seg
0.0539432177 m2
0.525 m
0.102748986 m
=1/
^(2/3) ^(1/2)
V a qmin =
0.2355822507 m/s
0.07384445
5.098136646 m
3.8097537081 m
velocidad de
% de solidos
sedimentaci
remanentes
n m/s
100
95
85
65
56
46
26
0.0688
0.0431
0.0259
0.0190
0.0104
0.0052
0
IMENTACIN DISCRETA
0.02
0.03
0.04
0.05
0.06
0.07
0.08
0.02
0.03
0.04
0.05
84.06%
UUU
0.006
0.06
0.07
0.08
1
1.10
0.525
0.205
0.525
1.10
0.525
0.103
0.525
INGENIERIA CIVIL.
DISEO DE CANAL
DESARENADOR.
1.
SEDIMENTACION DISCRETA.
Muestra
0
1
2
3
4
5
6
7
Tiempo de
sedimentaci
n (seg)
0.2
0.22
0.24
0.26
0.28
0.3
0.32
0.34
Altura de
cada (m)
1.6
1.58
1.56
1.54
1.52
1.5
1.48
1.46
Solidos
velocidad de
Superficie libre
sedimentable sedimentaci
(m)
s (mg/l)
n m/s
0.2
10.0125
0.22
9.712125
7.2727
0.24
9.511875
6.5833
0.26
8.510625
6.0000
0.28
6.508125
5.5000
0.3
5.607
5.0667
0.32
4.60575
4.6875
0.34
2.60325
4.3529
50
40
30
20
10
0
0
Ya que debemos remover los slidos sedimentables para cumplir la norma se debe cumplir
INGENIERIA CIVIL.
= SOLIDOS SEDIMENTABLES =
11.57
2
11.57
*100 =
De acuerdo con lo anterior para remover el 82.71% de partculas, quedan como residuo o
remanente.
17.29 %
1 TANTEO.
FIJANDO Xc =
30%
Vs =
dx
0.1
0.1
0.1
0.3
0.0064 m/seg
v
0.001
0.003
0.005
dx(v)
0.0001
0.0003
0.0005
dx
0.1
0.1
0.1
0.05
84.0625
Elim. Global
81.6666667
0.0009
2 TANTEO.
FIJANDO Xc =
35%
Vs =
Elim. Global
0.35
0.0075 m/seg
v
0.001
0.003
0.005
0.007
dx(v)
0.0001
0.0003
0.0005
0.00035
INGENIERIA CIVIL.
0.00125
3 TANTEO.
FIJANDO Xc =
33%
Vs =
0.33
0.007 m/seg
dx
0.1
0.1
0.1
0.03
v
0.001
0.003
0.005
0.0065
dx(v)
0.0001
0.0003
0.0005
0.000195
Elim. Global
82.6428571
= 0.001095
Con el tercer tanteo se encuentra la Vs =
0.007 m/s
con la que la eliminacin global es la que se requiere para el diseo.
0.42
Revisando los valores tpicos de Vs se tiene que esta para un tamao de malla 65 (.21mm) el
es Vs = 1 1.3 m/min.
0.42 m/min << 1 m/min por lo que se concluye en desechar la prueba de sedimentacin discr
disear con valores tpicos. Cabe sealar que la prueba pudo haber sido desechada desde un
cipio ya que en la sexta y ltima muestra tomada presentaba un valor de solidos sedimentabl
yor que el permitido por la norma.
Diseo del canal desarenador para las condiciones:
QMINIMO =
17.1 lps
0.0171
QMEDIO =
34.2 lps
0.0342
QMAXIMO INSTANTANEO =
122.39 lps
0.12239
QMAXIMO EXTRAORDINARIO =
183.58 lps
0.18358
SECCION TRANSVERSAL.
0.18358
0.317
0.5791
0.525
INGENIERIA CIVIL.
0.57911672
=
0.525
REDONDEAMOS A
1.10 m
1.2 m
CORTE LONGITUDINAL.
4.
VH =
0.317 m/s
n=
0.013 (Concreto pulido)
QMEDIO =
0.0342 m3/s
Seccin a gasto medio
INGENIERIA CIVIL.
0.0342
0.317
0.10788644
0.525
0.1079
0.205 m
0.0003027481
5.
Seccin a gasto mn
0.0171
0.317
0.0539
0.525
0.0539
0.103 m
=1/
^(2/3) ^(1/2)
0.2355823
MENOR QUE 0.25 m/s P
TANTO CUMPLE
6.
0.5791
0.525
=
REDONDEAMOS A
0.5791
1.103 m
1.2 m
. .=1/ ^(2/3)
^(1/2)
0.4809211
INGENIERIA CIVIL.
7.
CALCULO DEL AREA SUPERFICIAL.
Vs = 1.15 m/seg (De valores tpicos de partculas de tamao de la malla #65 .21mm )
0.0342
=
1.7843
0.01916667
El largo terico del canal ser:
1.7843
0.525
8.
LARGO REAL.
3.40 m
3.40
3.40
9.
1.699
2.4
5.10
5.80
10.
m
m
0.262 m
30
=
0.4547 m
INGENIERIA CIVIL.
0.26 m
INGENIERIA CIVIL.
% de solidos
remanentes
100
97
95
85
65
56
46
26.804123711
dimentacion (m/s)
INGENIERIA CIVIL.
82.71
> 82.71
< 82.71
INGENIERIA CIVIL.
82.71
m/min
m3/s
m3/s
m3/s
m3/s
INGENIERIA CIVIL.
INGENIERIA CIVIL.
m/s
MENOR QUE 0.25 m/s POR
TANTO CUMPLE
XIMO EXTRAORDINARIO.
m/s
INGENIERIA CIVIL.
INGENIERIA CIVIL.
Observacin
Tiempo
(mn)
1
2
3
4
5
6
7
8
9
10
20
30
40
50
60
70
80
90
Observacin
Tiempo
(mn)
.60(m)
1
2
3
4
5
6
7
8
9
10
20
30
40
50
60
70
80
90
42.6938
74.0025
113.8500
150.8513
173.6213
187.8525
204.9300
210.6225
222.0075
Tiempo
(mn)
0
.60(m)
0
10
20
30
40
50
60
70
80
90
15
26
40
53
61
66
72
74
78
Observacin
1
2
3
4
5
6
7
8
9
.60(m)
241.93125 261.855
210.6225 233.3925
170.775 202.08375
133.77375 170.775
111.00375 156.54375
96.7725 133.77375
79.695 119.5425
74.0025 96.7725
62.6175 85.3875
267.5475
247.62375
213.46875
196.39125
170.775
156.54375
139.46625
109.5237
97.34175
17.0775
37.0013
71.1563
88.2338
113.8500
128.0813
145.1588
175.101300
187.28325
6
13
25
31
40
45
51
61.52
65.8
90
80
70
60
50
% de solidos suspendidos removidos
40
30
20
10
0
0
10
20
30
40
50
60
Tiempo (mn)
0.60m
Profundidad
0
0.6
1.2
1.8
2.4
3
10%
0
4.1
5.9
6.2
7.5
8.15
1.20m
20%
0
8.3
13.2
17.5
24
32.75
1.80m
3.00m
Tiempo (mn)
40%
0
25.25
34
42.5
64.75
84.75
30%
0
16.2
23.5
27.75
42
61.75
10
2.40m
20
30
40
50
0
0.5
1
Profundidad (m)
1.5
2
2.5
3
3.5
Tiempo (m
2.5
3
3.5
Tiempo (m
10%
20%
30%
40%
Column B
Datos de proyecto:
Qmin =
17.1 lps
Qmed =
34.2 lps
Qmax.ins =
122.39 lps
Qmax.ext =
183.58 lps
Diametro emisor =
0.0171 m3/s
0.0342 m3/s
0.12239 m3/s
0.18358 m3/s
45 cm
60.00%
% =%+(/)
% de remosin global =
68.05%
0.03836187 m/min
55.2410885 m3/m2-dia
Co
=()
Vol tanque:
160.471856 m3
A sup=/
A sup =
53.4906187 m2
=/
Tirante =
3m
4.12633095
Diametro =
8.25266191
Diametro final =
5459.175 mg/seg
471.67272 kg/dia
tirante de lodos =
0.1291994 m
Pendiente tolva
de tablas es
80 mm/m
desnivel =
740 mm
Dimensionamiento de canaletas
El Q por metro lineal de la canaleta sera:
Permetro = D
Permetro =
58.119415 m
Q/ml=
0.0005884436 m3/seg-ml
0.0013076525 m2
Proponiendo base de
tirante =
0.3 m
0.0043588418 m
Carga aplicada =
50.8415303 m3/m-dia
os remanenentes (mg/lt)
2.40(m)
3.00(m)
273.24
261.855
239.085
224.85375
210.6225
199.2375
179.31375
162.23625
145.15875
spendidos removidos
2.40(m)
0
278.9325
267.5475
256.1625
244.7775
233.3925
224.85375
207.77625
196.39125
182.16
3.00(m)
5.6925
17.0775
28.4625
39.8475
51.2325
59.7713
76.8488
88.2338
102.4650
3.00(m)
0
4
8
16
21
26
30
37
43
49
2
6
10
14
18
21
27
31
36
mg/lt
20
30
40
50
60
70
80
90
100
Tiempo (mn)
1.80m
2.40m
Tiempo (mn)
50%
0
33.5
49
58.5
82
30
40
3.00m
60%
0
43.75
65.75
72.2
50
Tiempo (mn)
70%
0
61.25
81.75
60
80%
0
90
70
80
90
100
Tiempo (mn)
40%
Column B
Column B
Column B
2954.88 m3/dia
seg
3m
80%
284.625 mg/lt
125 mg/lt
aumentan 3 tirantes
TRATAMIENTO PRIMARIO
INGENIERIA CIVIL.
328.9 mg/lt
125 mg/lt
= SOLIDOS SUSPENDIDOS =
328.9
125
328.9
*100 =
Observacin
Tiempo
(mn)
1
2
3
4
5
6
7
8
10
20
30
40
50
60
70
80
90
Observacin
Tiempo
(mn)
.60(m)
1
2
3
4
5
6
7
8
10
20
30
40
50
60
70
80
86.9688
118.2775
158.1250
195.1263
217.8963
232.1275
249.2050
254.8975
67.0450
95.5075
126.8163
158.1250
172.3563
195.1263
209.3575
232.1275
61.3525
81.2763
115.4313
132.5088
158.1250
172.3563
189.4338
219.376300
55.6600
67.0450
89.8150
104.0463
118.2775
129.6625
149.5863
166.6638
90
266.2825
243.5125
231.55825
183.7413
Observacin
Tiempo
(mn)
.60(m)
0
10
20
30
40
50
60
70
0
26.44
35.96
48.08
59.33
66.25
70.58
75.77
1
2
3
4
5
6
7
.60(m)
241.93125 261.855
210.6225 233.3925
170.775 202.08375
133.77375 170.775
111.00375 156.54375
96.7725 133.77375
79.695 119.5425
74.0025 96.7725
62.6175 85.3875
267.5475
247.62375
213.46875
196.39125
170.775
156.54375
139.46625
109.5237
97.34175
273.24
261.855
239.085
224.85375
210.6225
199.2375
179.31375
162.23625
145.15875
0
18.65
24.71
35.10
40.29
48.08
52.40
57.60
0
16.92
20.38
27.31
31.63
35.96
39.42
45.48
TRATAMIENTO PRIMARIO
INGENIERIA CIVIL.
80
77.50
70.58
66.70
50.67
90
80.96
74.04
70.40
55.87
40
30
20
10
0
0
10
20
30
40
50
60
70
80
90 100
Tiempo (mn)
0.60m
1.20m
10
20
1.80m
30
40
2.40m
50
60
3.00m
70
80
90
0
0.5
1
Profundidad (m)
1.5
2
2.5
3
3.5
Tiempo (mn)
10%
20%
Column B
Column B
30%
40%
Column B
80%
100
3.5
PLANTAS DE TRATAMIENTO DE AGUAS RESIDUALES
TRATAMIENTO PRIMARIO
Tiempo (mn)
INGENIERIA CIVIL.
2.
10%
20%
30%
40%
Column B
Column B
Column B
80%
1 TANTEO.
% INICIAL =
60%
Fijando una profundidad del tanque de:
Tiempo de retencin:
1.8 m
72 mn
67.31
2 TANTEO.
% INICIAL =
50%
Fijando una profundidad del tanque de:
Tiempo de retencin:
1.8 m
58.5 mn
60.92
3 TANTEO.
% INICIAL =
65%
Fijando una profundidad del tanque de:
Tiempo de retencin:
1.8 m
80 mn
71.14
4 TANTEO.
% INICIAL =
55%
Fijando una profundidad del tanque de:
Tiempo de retencin:
1.8 m
69 mn
66.31
TRATAMIENTO PRIMARIO
INGENIERIA CIVIL.
5 TANTEO.
% INICIAL =
30%
Fijando una profundidad del tanque de:
Tiempo de retencin:
TIEMPO REQUERIDO =
3.
62
3 m (TIPICOS DE 3-5 m)
62 mn
61.99
49.15
1.261
78.20
Cs =
1.261
0.0384
55.2410885 m3/m2-dia
0.0342
160.47 m3
TRATAMIENTO PRIMARIO
INGENIERIA CIVIL.
As =Qmed./Cs =
6.
2954.88
=
55.2411
CALCULO DEL TIRANTE.
53.491
m2
160.471856
=
3.000
53.4906
SE PROCEDE A DISEAR UN TANQUE RECTANGULAR:
7.
CALCULO DE LA SECCION.
TIRANTE= VOLUMEN/As =
92.045 m2
B
POR LO TANTO B=2A
AREA = A*B = 92.045 = A*2A =
POR LO TANTO A =
6.784
6.784 m
13.568 m
B=(2*A) =
8.
VOLUMEN DE LODOS.
9.7485
= 602.456034 Kg/dia
Gasto medio =
Sol. Susp. Totales
=
Eficiencia=
=
8.
0.0342 m3/s
328.9 mg/l
61.99 %
1000 kg/m3
1.05 tabla 8.9
0.06 metcalf.
TIRANTE DE LODOS.
4.874
53.491
4.874 m3/dia
=
0.091
TRATAMIENTO PRIMARIO
INGENIERIA CIVIL.
3.00
13.568
3.00 m
3.00
19.57
3.091
3.000
0.091
LODOS.
1.565 m
80 mm
1000
L=19.57*0.08 =
8.
1.565 m
2954880 lt/dia
2954.88 m3/dia
=
CARGA DE DERRAME
APLICADA
2954.88
6.784
435.5667759
m3/m-dia
2954.88
12.784
231.1391315
m3/m-dia
FINALMENTE LA GEOMETRIA.
19.57
3.091
3.000
m
LODOS.
0.091
TRATAMIENTO PRIMARIO
INGENIERIA CIVIL.
1.565 m
80 mm
1000
L=19.57*0.08 =
1.565 m
6.784
19.57
CABALLAJE PARA LAS RASTRAS:
RASTRAS
POR TANTO
1 Hp
93 m2 DE SUPERFICIE
X Hp
132.748931 m2 DE SUPERFICIE
X = 1.4274079 HP
= 2 HP
INGENIERIA CIVIL.
TRATAMIENTO PRIMARIO
PRUEBA DE TRATABILIDAD.
61.99
manenentes (mg/lt)
3.00(m)
278.9325
267.5475
256.1625
244.7775
233.3925
224.85375
207.77625
196.39125
182.16
emovidos (mg/lt)
3.00(m)
49.9675
61.3525
72.7375
84.1225
95.5075
104.0463
121.1238
132.5088
146.7400
didos removidos
3.00(m)
0
15.19
18.65
22.12
25.58
29.04
31.63
36.83
INGENIERIA CIVIL.
TRATAMIENTO PRIMARIO
40.29
44.62
dos (%)
50
60
70
80
90 100
mpo (mn)
60
3.00m
70
80
90
100
40%
80%
INGENIERIA CIVIL.
TRATAMIENTO PRIMARIO
40%
80%
61.99
% > 61.99%
% < 61.99%
% > 61.99%
% > 61.99%
INGENIERIA CIVIL.
TRATAMIENTO PRIMARIO
m (TIPICOS DE 3-5 m)
min.
m/min
nidas anteriormente:
seg.
4692.16
INGENIERIA CIVIL.
TRATAMIENTO PRIMARIO
m3/dia
INGENIERIA CIVIL.
TRATAMIENTO PRIMARIO
m
m
no cumple
con tipicos
CUMPLE.
m
m
INGENIERIA CIVIL.
TRATAMIENTO PRIMARIO
m2 DE SUPERFICIE
m2 DE SUPERFICIE