Biaya Bangun Rumah
Biaya Bangun Rumah
tukang
batu
pasir
split
semen
besi
kayu dll
12 hari
7 colt
7 colt
4 colt
10 sak
7 ljr
x
x
x
x
x
x
185,000 =
260,000 =
260,000 =
260,000 =
65,000 =
80,000 =
2,220,000
1,820,000
1,820,000
1,040,000
650,000
560,000
500,000
8,610,000
18 hari
8 colt
8 colt
5 colt
12 sak
7 ljr
x
x
x
x
x
x
185,000 =
260,000 =
260,000 =
260,000 =
65,000 =
80,000 =
7 titik x
125,000 =
3,330,000
2,080,000
2,080,000
1,300,000
780,000
560,000
500,000
875,000
11,505,000
Materil
Cakar Ayam
Besi Ulir
Kawat Bendraft
Batu Kali
Split
Semen @50kg
Semen @40kg
Pasir cor (5 colt)
Batu Belah
Kayu Kaso (4x6x4)
Paku (uk 7)
Benang
Batu Potong Besi
10.0
4.0
1.0
4.0
3.0
15.0
4.0
0.5
5.0
1.0
0.5
1.0
2.0
pcs
btg
pcs
colt
colt
sak
sak
truk
colt
ikat
kg
rol
pcs
x
x
x
x
x
x
x
x
x
x
x
x
x
120,000
67,000
13,000
260,000
260,000
67,000
55,000
2,600,000
260,000
210,000
16,000
5,000
5,000
=
=
=
=
=
=
=
=
=
=
=
=
=
Man
1,200,000
268,000
13,000
1,040,000
780,000
1,005,000
220,000
1,300,000
1,300,000
210,000
8,000
5,000
10,000
29-Mar-14
29-Mar-14
29-Mar-14
29-Mar-14
30-Mar-14
31-Mar-14
1-Apr-14
5-Apr-14
7,359,000
55
15,000
15,000
20,000
50,000
32,500
86,000
100,000
1,850,000
2,168,500
9,527,500
Materil
pcs
btg
truk
sak
truk
x
x
x
x
x
120,000
67,000
2,600,000
55,000
2,600,000
=
=
=
=
=
13.0
sak
Semen @40kg
0.5
truk
Pasir cor (5 colt)
Baru dibayar 1,400,000
Batu Kali
x
x
55,000
2,600,000
=
=
Cakar Ayam
Besi Ulir
Batu Kali
Semen @40kg
Pasir cor (5 colt)
6.0
3.0
1.0
20.0
0.5
Man
720,000
201,000
2,600,000
1,100,000
1,300,000
5,921,000
715,000
1,300,000
1,200,000
3,215,000
5-Apr-14
15,000
15,000
5,936,000