Anda di halaman 1dari 176

MUNICIPALIDAD PROVINCIAL DE

CANCHIS
GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
SUB GERENCIA DE INFRAESTRUCTURA URBANA

Informe Mensual de Obra N 02


April/2015

: OBRA

MEJORAMIENTO Y AMPLIACIN DEL SISTEMA


DE AGUA POTABLE Y DESAGUE EN LA
ASOCIACIN PRO
LA FLORIDA I
pegarVIVIENDA
foto aca
ETAPA DEL DISTRITO SICUANI, PROVINCIA DE
.CANCHIS CUSCO
CANCHIS-CUSCO

MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y DESAGUE EN LA ASOCIACIN PRO


VIVIENDA LA FLORIDA I ETAPA DEL DISTRITO SICUANI, PROVINCIA DE CANCHIS CUSCO.

META SIAF
Residente de Obra
Supervisor de Obra

:
:
:

012
ING. ALEDIO OSCAR NINA TTICA
ING. CHARLES ALFREDO CHIRINOS LLAMOCCA

SICUANI, ABRIL 2015

CIP N 113611
CIP N 113604

MUNICIPALIDAD PROVINCIAL DE CANCHIS


GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
SUB GERENCIA INFRAESTRUCTURA URBANA

INFORME TECNICO MENSUAL


April/2015
CONTENIDO
No
A.
1
2
3
4
5
6
7
8
9

10
11

B.
12

14

15
16

DESCRIPCION

FORMATO

INFORME
Caratula
Contenido
Ficha Tcnica para INFObras
Datos Generales de la Obra
Meta Anual
Resumen Ejecutivo
Recursos Utilizados
Control Costo - Tiempo - Avance
Memoria Valorizada
AVANCE FISICO - Valorizacin de Obra
Resumen de Valorizacin de Obras Programadas (por
9.1 componentes del Proyecto); Modificaciones de Obra (Mayores
metrados, partidas adicionales y deductivos)
9.2 Valorizacin de Avance de Obra Programada y Metrados Diarios
9.3 Valorizacin de Avance Mayores Metrados y Metrados Diarios
9.4 Valorizacin de Avance Partidas Adicionales y Metrados Diarios
Cronograma de Avance de Obra Valorizado
AVANCE FINANCIERO
11.1 Resumen General Ejecucin Financiera - Gasto Mensual por espec
11.2 Ejecucin Financiera de Gasto por por especfica - Costo Directo
11.3 Calendario de Compromiso Mensual - Costo Directo
11.4 Ejecucin Financiera de Gasto por por especfica - Gastos General
11.5 Calendario de Compromiso Mensual - Gastos Generales
11.6 Ejecucin Financiera de Gasto por por especfica - Gastos de Insp
11.7 Calendario de Compromiso Mensual - Gastos de Inspeccin
11.8 Ejecucin Financiera de Gasto por por especfica - Gastos de Liqu
11.9 Calendario de Compromiso Mensual - Gastos de Liquidacin
11.10 Ejecucin Financiera de Gasto por por especfica - Gastos de Exp.
11.11 Calendario de Compromiso Mensual - Gastos de Exp Tcnico
SUSTENTO DE VALORIZACION
Movimiento de Almacn
13.1 Resumen Mensual Valorizado del de Movimiento de Almacn
13.2 Movimiento Diario de Almacen de Obra
Movimiento de Equipo Mecnico
14.1 Valorizacion Acumulada de Equipo Mecanico
14.3 Control Diario de Equipo Mecnico
14.3 Partes Diarios de Equipo Mecnico
REGISTRO FOTOGRAFICO
15.1 Panel Fotografico Mensual
ANEXOS
16.1 Copia de los Certificados de Control de Calidad
16.2 Copia Original del Cuaderno de Obra
16.3 Tareo de Personal valorizado (Costo Directo e Indirecto)
16.4 Otros
P=Present
N=No present
X=No corresponde

F-1
F-2
F-3 A
F-3 B
F-4
F-5
F-6
F-7
F-8

F-9
F-10
F-11
F-12
F-13
F-14
F-15 A
F-15 B
F-16 A
F-16 B
F-17 A
F-17 B
F-18 A
F-18 B
F-19 A
F-19 B

F - 20
F - 21
F - 22
F - 23

INFORME TECNICO MENSUAL


April/2015
CONTENIDO
CONTROL
P
P
P
P
P
P

P
P
P
N
P
P
P
no
P
no
P
P
X
X
X
X

P
P
P
P
P
P
P
P
P
P

MUNICIPALIDAD PROVINCIAL DE CANCHIS

A0: 2015

GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL

April/2015

SUB GERENCIA DE INFRAESTRUCTURA URBANA


FICHA TECNICA DE PROYECTO (FORMATO 01)
DATOS GENERALES
NOMBRE DEL PROYECTO:

UBICACIN
DPTO CUSCO
PROV CANCHIS
DIST SICUANI
APV LA FLORIDA I ETAPA
LOC. FRENTE AL COLEGIO
AMAUTA
PERFIL
CODIGO
282682
SNIP
MONTO
S/. 266,356.13
FECHA
12/27/2013

MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y DESAGUE EN


LA ASOCIACIN PRO VIVIENDA LA FLORIDA I ETAPA DEL DISTRITO SICUANI,
PROVINCIA DE CANCHIS CUSCO.

RES. APROB.
MONTO
FECHA

EXPEDIENTE TECNICO
RGM N 027-2015 - GM
RES.
MPC
APROB./MODIFIC.
S/. 300,263.88
MONTO
2/26/2015
FECHA

UNIDAD EJECUTORA
GERENCIA DE DESARROLLO URBANO Y OBRAS
SUB GERENCIA DE OBRAS PUBLICAS
MODALIDAD

ADMINISTRACION PRESUPUESTARIA DIRECTA

VARIACIN VIABILIDAD

PLAZO EJECUCIN

12.73%

90 DIAS

AMPLIACION DE PLAZO

CADENA FUNCIONAL
PROGRA
PRODUCTO
GRUPO
ACT. Ai OBRA
META
FINALIDAD
DIVISION FUNC
MA
PROYECTO
FUNCIONAL
040
4000053
2199338
088
00001
0153639
040
INFORMACION DE AGENTES
ESPECIAL
COLEGIATU
N
AGENTE
CARGO
N DNI
RESOLUCIN
IDAD
RA
1
: Ing. ELVIS UISOCCO PEREZ Proyectista/ConsultING. CIVIL
45971862 CIP
113612
2
: ING. RONAL TORRES CALLA Evaluador
ING. CIVIL
43888043 CIP N 121439
3
ING. CHARLES ALFREDO CHIR Inspector/Supervis ING. CIVIL
25002454 CIP N 113604
4
ING. ALEDIO OSCAR NINA TTI Residente
ING. CIVIL
43231139 CIP N 113611
MEMORANDUM N 007-2015-MPC/
PLAZO EJECUCION
TIEMPO DE
FECHA DE
TIEMPO DE
FECHA DE TERMINO
FECHA DE INICIO:
3/3/2015
90 DIAS
6/1/2015
6/1/2015
EJECUCION
CONCLUSION:
AMPLIACION
REAL:
1. Sistema de Agua Potable; se proyecta una red de tubera PVC NTP ISO
METAS
PROGRAMADAS
EXPEDIENTE
EL423.57
MES
ESTRUCTURA DE PRESUPUESTO EXP. TEC.
4422
UF C/ANILLO
DE 63 DE
mmACUERDO
C-10, conAL
una
longitud deDURANTE
tuberas de
CONCEPTO
Monto asignado
2015
ANTERIOR
ACTUAL
Total Ejecutado SALDO
m con 35 acometidas domiciliarias.
206,005.15
206,005.15
34,444.98
19,009.13
53,454.13 152,550.98
2. Sistema de Desage: Se reemplazaran las tuberas de CSN por tuberas Costo Directo
54,134.94
54,134.94
9,984.31
5,510.04
15,494.35
44,218.82
de PVC. Se instalaran tuberas PVC NTP ISO 4435 UF C/ANILLO DE 200mm Gastos Generales
Gasto de inspeccion
24,142.93
24,142.93
6,039.61
3,333.08
9,372.69
26,748.42
x 6m, para una longitud de 466.28 m.
8,812.08
8,812.08
1,576.21
869.86
2,446.07
6,980.76
Adems se construirn 09 buzones de inspeccin de 1.20m de dimetro Gastos de liquidacion
7,168.78
7,168.78
2,855.94
1,576.11
4,432.05
12,648.49
interior y tapa de 0.60m de dimetro con losa de fondo de CA, paredes Expediente Tcnico
Aporte Patronal
###
laterales de CA y losa de techo tambin de CA.
SEC.
FUNC.
12

FUNCION
018

Las conexiones domiciliarias a realizarse son en su totalidad 35, las cuales


se realizaran mediante cachimbas de PVC; se instalarn 35 conexiones de
desage de 200 mm a 160 mm de dimetro de tubera, dichas conexiones
irn con sus cajas de registro.
3. CAPACITACION DE USUARIOS Y ASISTENCIA TECNICA.
CRONOGRAMA AVANCE
FISICO
MES

PROGRAMADO
VALOR.
%
VALOR. ACUM.

VALOR.

EJECUTADO
%
VALOR. ACUM.

TOTAL S/.

300,263.88

300,263.88

ESTADO

PROG.
ACUM.
%

EJEC ACUM.
%

54,901.06

30,298.22 85,199.30 ###

AVANCE FINANCIERO
AVANCE FINANCIERO
AVANCE FINANCIERO EJECUTADO
PROGRAMADO
MONTO
%
ACUMULADO MONTO
%
ACUMULADO
0.00%
0.00%

Mar-15

27,217.27

13.21%

27,217.27

34,444.98

16.72%

34,444.98

PROGRAMADO

13.21%

16.72%

Apr-15

115,142.11

55.89%

142,359.38

19,009.13

9.23%

53,454.11

PROGRAMADO

69.10%

25.95%

May-15

62,101.45

30.15%

204,460.83

0.00%

53,454.11

99.25%

25.95%

90,516.29

30.15%

99.25%

42.82% 128560.46

Jun-15

1,544.32

0.75%

206,005.15

0.00%

53,454.11

PROGRAMADO

100.00%

25.95%

2,250.93

0.75%

100.00%

42.82% 128560.46

Jul-15

0.00

0.00%

206,005.15

0.00%

53,454.11

PROGRAMADO

100.00%

25.95%

0.00%

100.00%

42.82% 128560.46

Aug-15

0.00

0.00%

0.00%

53,454.11

100.00%

25.95%

0.00%

100.00%

42.82% 128560.46

Sep-15

0.00

0.00%

0.00%

53,454.11

100.00%

25.95%

0.00%

100.00%

42.82% 128560.46

Oct-15
TOTAL

0.00
206,005.15

0.00%
###

53,454.11

100.00%

25.95%

0.00%
300,263.88

100.00%

42.82% 128560.46

0.00

0.00%
53,454.11 25.95%

39,670.67

TOTAL

13.21%

13.21%

79782.5

26.57%

167,825.98 55.89%

69.10%

48777.6

42.82% 128560.46

79782.86

CURVA AVANCE FISICO ACUMULADO PROGRAMADO VS AVANCE FISICO ACUMULADO EJECUTADO


120.00%
100.00%
80.00%

Column P

Column R

99.25%

100.00%

CURVA DE AVANCE FISICO VS AVANCE FINANCIERO


120.00%
100.00%

69.10%

80.00%

60.00%

60.00%

40.00%

40.00%

25.95%

25.95%

25.95%

16.72%
13.21%
20.00%
0.00%

M ar-1 5

Column X

20.00%

99.25%

100.00%

42.82%

42.82%

42.82%

Apr-15

May-15

Jun-15

Column V
69.10%

26.57%
13.21%

0.00%

A pr-1 5

M a y-1 5

Jun-1 5

METAS EJECUTADOS EN EL MES

Mar-15

EJECUCIN MENSUAL DE GASTO POR ESPECFICA


ESP. DE
GASTO
2.6.2.3.2.4
2.6.2.3.2.5
2.6.2.3.2.6

DENOMINACION

PIM

ACUMULADO HASTA

April-15

EL MES ANTERIOR
01.01.01CARTEL DE IDENTIFICACION DE OBRAS 3.60m x 2.40m, 01.01.02 ALQUILER DE ALMACEN DE
OBRA, 02.01.01.01 TRAZO, NIVELES Y REPLANTEO DE ZANJAS PRE EXCAVACION, 02.01.01.02 TRAZO,
PERSONAL
69,661.28
13478.86
17,162.16
NIVELES Y REPLANTEO DE ZANJAS POST EXCAVACION, 02.01.01.03 EXCAVACION DE ZANJAS EN
BIENES
112,105.36
40988.3
3,414.00
MATERIAL COMPACTO H<2.00 MT, ANCHO=0.50 mt. 02.01.03.01 CORTE DE CARPETA ASFALTICA E=3",
SERVICIOS
21,728.81
###
02.02.01TRAZO, NIVELES Y REPLANTEO DE ZANJAS PRE EXCAVACION, 02.02.03 EXCAVACION EN TIERRA
OTROS
2,509.70
COMPACTA, 02.02.04 DEMOLICION DE BUZONES EXISTENTES, 02.02.05 ACARREADO DE MATERIAL
TOTAL
206,005.15
54,467.16
20,576.16
EXCEDENTE (D=30m.), 02.02.07CONCRETO SOLADO e=0.05 m, f'c=100 kg/cm2, 02.02.08 ACERO DE
EJECUCION MENSUAL DE PRESUPLITICO ANALITICO
REFUERZO EN LOSA DE FONDO DE BUZON, 02.02.09 ACERO DE REFUERZO EN LOSA DE TECHO DE
BUZON, 02.02.10, ENCOFRADO Y DESENCOFRADO NORMAL PARA BUZONES, 02.02.11 ENCOFRADO Y
MONTO
ACUMULADO HASTA
CONCEPTO
April-15
DESENCOFRADO LOSA TECHO DE BUZON, 02.02.12 CONCRETO F'c=175 Kg/cm2 PARED BASE,
ASIGNADO
EL MES ANTERIOR
02.02.13 CONCRETO F'c=210 Kg/cm2 LOSA DE BUZON, 02.02.15 TAPA DE F F PARA BUZON (D=0.60
Costo Directo
206,005.15
54,467.16
21,478.30
mt.), 02.04.02 SUMINISTRO EQUIPO COMPLEMENTARIO, 02.05.01 EQUIPOS DE PROTECCIN INDIVIDUAL,
Gastos Generales
54,134.94
22,398.68
21,582.64
02.05.02 EQUIPOS DE PROTECCIN COLECTIVA, 02.05.03 EMERGENCIAS EN SEGURIDAD Y SALUD
Gasto de supervision
24,142.93
2,916.66
5,716.66
DURANTE EL TRABAJO
Expediente de Liquidacion
Expediente Tecnico
Aporte patronal
TOTAL S/.

La obra se realiza normalmente, con el inconveniete de desabastecimiento de


materiales que en su mayoria son de compra directa, otra ocurrencia presentada
es la peticion por parte de los beneficiarios de modificacion de trazo en la calle
OBSERVACIONES
Ninguna.
Jorge Basadre por un tramo que aparentemente pertenece a uno de los
beneficiarios.

7,168.78
8,812.08
300,263.88

79,782.50

###
###
48,777.60

TOTAL
EJECUTA.
30,641.02
44,402.30
75,043.32

39,020.26
67,703.06
21,728.81
2,509.70
###

TOTAL
EJECUTA.
75,945.46
43,981.32
8,633.32
###

130,059.69
10,153.62
15,509.61
7,168.78
8,812.08
###

SALDO

SALDO

MUNICIPALIDAD PROVINCIAL DE CANCHIS


GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
SUB GERENCIA DE INFRAESTRUCTURA URBANA

FICHA TECNICA
A.1Entidad Ejecutor: MUNICIPALIDAD PROVINCIAL DE CANCHIS
Unidad Ejecutor : GERENCIA DE INFRAESTRUCTURA URBANO Y RURAL
A.2DATOS DE LA OBRA
Nombre del Proyecto

Ubicacin

Provincia
Distrito
Lugar

Proy y/o Actividad

Codigo
Meta SIAF
Fuente de Financiamiento

MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POT


Y DESAGUE EN LA ASOCIACIN PRO VIVIENDA LA FLORIDA
ETAPA DEL DISTRITO SICUANI, PROVINCIA DE CANCHIS CU
: CANCHIS
: SICUANI
: APV LA FLORIDA I ETAPA FRENTE AL COLEGIO AMAUTA

MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POT


Y DESAGUE EN LA ASOCIACIN PRO VIVIENDA LA FLORIDA
ETAPA DEL DISTRITO SICUANI, PROVINCIA DE CANCHIS CU

012
: 018 RECURSOS DETERMINADOS RUBRO CANON Y SOBREC

A.3Modalidad de Ejecucin
: EJECUCION POR ADMINISTRACION PRESUPUESTARIA DIREC
Plazo de ejecucin inicial
:
90 dias
Fecha de Inicio
3/3/2015
Fecha de Trmino Programad
6/1/2015
Fecha de Paralizacin
:
Ampliacin de Plazo N 01 :
0
dias
Ampliacin de Plazo N 02 :
0
dias
Plazo de ejecucin modifica ###
dias
Fecha de Reinico de Activida:
Fecha de Trmino Real
###
Meta Fsica

una red
de tubera
PVC NTP
ISO 4422 UF C/ANILLO
:Se1.proyecta
Adecuada
sistema
de agua
potable:
mmC-10 , con una longitud de tuberas de 423.57 m. PJ
CRISTOBAL
:
94.88m. CALLE SAN FRANCISCO ASIS
: 17
CALLE TITTO QOSNIPA
:
149.28m.
Abastecidas a partir de las tomas en las A.V Repblica Pop
Hungra. Para el control del sistema se tienen 2 vlvulas de con
63mm tipo luflex, adems. La red de tuberas se instalara
profundidad de 1.2m siguiendo el perfil del terreno. Con
domiciliarias sern a partir de la tubera matriz hasta una d
mnima de 0.30m del lmite de propiedad en las cuales se
tuberas PVC SAP Clase 10 de , siendo un total de 35 conex
realizarse entre las que se incluyen las conexiones existentes
retirarn por su mal estado. Es importante mencionar y aclarar
se colocaran nuevos medidores.

: 2. Adecuado sistema de desage:

Se reemplazaran las tuberas de CSN por tuberas de PVC. Se ins


tuberas PVC NTP ISO 4435 UF C/ANILLO DE 200mm x 6m, pa
longitud de 466.28 m. Adems se construirn
09 buzo
inspeccin de 1.20m de dimetro interior y tapa de 0.60m de d
con losa de fondo de CA, paredes laterales de CA y losa d
tambin de CA.
Las conexiones domiciliarias a realizarse son en su totalidad
cuales se realizaran mediante cachimbas de PVC; se instala
conexiones de desage de 200 mm a 160 mm de dimetro de t

Se reemplazaran las tuberas de CSN por tuberas de PVC. Se ins


tuberas PVC NTP ISO 4435 UF C/ANILLO DE 200mm x 6m, pa
longitud de 466.28 m. Adems se construirn
09 buzo
inspeccin de 1.20m de dimetro interior y tapa de 0.60m de d
con losa de fondo de CA, paredes laterales de CA y losa d
tambin de CA.
INFRAESTRUCTURA
URBANA Y RURAL
Las conexiones domiciliarias a realizarse son en su totalidad
cuales se realizaran mediante cachimbas de PVC; se instala
conexiones de desage de 200 mm a 160 mm de dimetro de t
dichas conexiones irn con sus cajas de registro.

MUNICIPALIDAD PROVINCIAL DE CANCHIS


GERENCIA DE

: 3. Mejor nivel de conocimiento de educacin sanitaria:


Este componente hace referencia ala la implementacin del
programa de educacin sanitaria

MUNICIPALIDAD PROVINCIAL DE CANCHIS


GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
A.4Valores Referenciales de la Actividad
DESCRIPCION
COSTO DIRECTO
GASTOS GENERALES
GASTOS DE SUPERVISION
GASTOS DE LIQUIDACION
GASTOS DE EXP. TECNICO
Costo Total del Proyecto

Costo Expediente Tcnico


206,005.15
54,134.94
24,142.93
7,168.78
8,812.08
300,263.88

26.28%
11.72%
3.48%
4.28%

A.7 Ejecucin Fsica


AVANCE DEL PLAZO DE EJECUCION DE OBRA
PERIODO DE
EJECUCION

DESDE

MARZO
ABRIL
MAYO
JUNIO

3/3/2015
4/1/2015

HASTA

FECHAS
SIN AVANCE

N DIAS
PERDIDOS

3/31/2015
4/30/2015

TOTAL EJECUTADO
PLAZO DE
EJECUCION
90

TIEMPO DE EJECUCION
ANTERIOR ACTUAL
ACUMULADO
28
30
58

TOTAL
58

A.8 Ejecucin Fnanciera


AVANCE DEL PLAZO DE EJECUCION ANUAL
TIEMPO DE EJECUCION
PLAZO DE
EJECUCION ANTERIOR ACTUAL
ACUMULADO
90
28
30
58

TOTAL
58

A.9Documentacin Administrativa
DESCRIPCION
DOCUMENTO
Aprobacin Expediente
Resolucin
Asignacin Presupuestal
Acuerdo Reg
Ejec de Obra y Desig. ResideMemorandum
Modificaciones de Obra
Resolucin
Cuaderno de Obra Vol. I
Legalizacin
Cuaderno de Obra Vol. II
Legalizacin
Cuaderno de Obra Vol. III
Legalizacin
Cuaderno de Obra Vol. IV
Legalizacin
Entrega de Terreno

Acta

NUMERO
RGM N 027-2015 - GM MPC
MEMORANDUM N 007-2015-MPC/SGOP

NINGUNA

MUNICIPALIDAD PROVINCIAL DE CANCHIS


GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
Toma de Posecion
Inicio de Obra
Resolucion de Paralizacin
Resolucin de Reinicio
Ampliacin de Plazo N 01
Culminacin de Actividad
Verificacin y Recepcin

Acta
Acta
Resolucin
Resolucin
Resolucin
Acta
Acta

Toma de Posecion del Sitio de l


Acta de Inicio de Obras

MUNICIPALIDAD PROVINCIAL DE CANCHIS


GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
Responsables de la ejecucin de la obra
RESIDENTE DE OBRA
Nombre
: Aledio Oscar Nina Ttica DNI
: 43231139
Especialidad
: Ing. Civil
Colegiatura
: 113611
Direccin
: Urb. Tulquipata C-5 San Sebastian - Cusco
Telefonos
: 959- 190944
Email
: racso_oidela@hotmail.com

INSPECTOR DE OBRA
Nombre
: ING. CHARLES ALFREDODNI
25002454
Especialidad
: Ing. Civil
Colegiatura
: 113604
Direccin
CALLE FRANCISCVO BOLOGNESI Z-10 URB. ZARSUELA
Telefonos
: 956-774626
Email
charles.alfredo.chirinos@hotmail.co

LIDAD PROVINCIAL DE CANCHIS

INFRAESTRUCTURA URBANA Y RURAL

FICHA TECNICA

MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE


Y DESAGUE EN LA ASOCIACIN PRO VIVIENDA LA FLORIDA I
ETAPA DEL DISTRITO SICUANI, PROVINCIA DE CANCHIS CUSCO.

APV LA FLORIDA I ETAPA FRENTE AL COLEGIO AMAUTA

MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE


Y DESAGUE EN LA ASOCIACIN PRO VIVIENDA LA FLORIDA I
ETAPA DEL DISTRITO SICUANI, PROVINCIA DE CANCHIS CUSCO.

018 RECURSOS DETERMINADOS RUBRO CANON Y SOBRECANON


EJECUCION POR ADMINISTRACION PRESUPUESTARIA DIRECTA

Se proyecta una red de tubera PVC NTP ISO 4422 UF C/ANILLO DE 63


mmC-10 , con una longitud de tuberas de 423.57 m. PJ DIEGO
CRISTOBAL
:
94.88m. CALLE SAN FRANCISCO ASIS
: 179.40m.
CALLE TITTO QOSNIPA
:
149.28m.
Abastecidas a partir de las tomas en las A.V Repblica Popular de
Hungra. Para el control del sistema se tienen 2 vlvulas de control de
63mm tipo luflex, adems. La red de tuberas se instalara a una
profundidad de 1.2m siguiendo el perfil del terreno. Conexiones
domiciliarias sern a partir de la tubera matriz hasta una distancia
mnima de 0.30m del lmite de propiedad en las cuales se usaran
uberas PVC SAP Clase 10 de , siendo un total de 35 conexiones a
ealizarse entre las que se incluyen las conexiones existentes que se
etirarn por su mal estado. Es importante mencionar y aclarar que no
se colocaran nuevos medidores.

Se reemplazaran las tuberas de CSN por tuberas de PVC. Se instalaran


uberas PVC NTP ISO 4435 UF C/ANILLO DE 200mm x 6m, para una
ongitud de 466.28 m. Adems se construirn
09 buzones de
nspeccin de 1.20m de dimetro interior y tapa de 0.60m de dimetro
con losa de fondo de CA, paredes laterales de CA y losa de techo
ambin de CA.
Las conexiones domiciliarias a realizarse son en su totalidad 35, las
cuales se realizaran mediante cachimbas de PVC; se instalarn 35
conexiones de desage de 200 mm a 160 mm de dimetro de tubera,

LIDAD PROVINCIAL DE CANCHIS

INFRAESTRUCTURA URBANA Y RURAL

3. Mejor nivel de conocimiento de educacin sanitaria:

Este componente hace referencia ala la implementacin del


programa de educacin sanitaria

LIDAD PROVINCIAL DE CANCHIS

INFRAESTRUCTURA URBANA Y RURAL


VALORIZADO
ACTUAL
14,310.84
3,760.66
1,677.17
0.00
0.00
19,748.67

EJECUCION
EFECTIVA
28 DAS
30 DAS
0 DAS
0 DAS
58 DAS
SALDO
32

SALDO
32

FECHA
2/26/2015
1/15/2015
2/26/2015

LIDAD PROVINCIAL DE CANCHIS

INFRAESTRUCTURA URBANA Y RURAL


3/3/2015
3/3/2015

LIDAD PROVINCIAL DE CANCHIS

INFRAESTRUCTURA URBANA Y RURAL

: racso_oidela@hotmail.com

charles.alfredo.chirinos@hotmail.com

MUNICIPALIDAD PROVINCIAL DE CANCHIS


GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
SUB GERENCIA DE INFRAESTRUCTURA URBANA
META
INFORMACION FINANCIERA
PRESUPUESTO DE INVERSION
Costo Directo
Gastos Generales
Gastos de Supervisin
Gastos de Liquidacin
Gastos de Exp. Tcnico
TOTAL

206,005.15
54,134.94
24,142.93
7,168.78
8,812.08
300,263.88

PRESUPUESTO DE OBRA
Mano de Obra
Materiales
Equipo Mecnico
Herramientas
Sub contratos
TOTAL

69,661.28
112,105.36
21,728.81
709.70
1,800.00
206,005.15

B.2 DESCRIPCION DE LA META


1. Sistema de Agua Potable; se proyecta una red de tubera PVC NTP ISO 4422 UF C/ANILLO
DE 63 mmC-10 , con una longitud de tuberas de 423.57 m.
PJ DIEGO CRISTOBAL
:
94.88m.
CALLE SAN FRANCISCO ASIS
:
179.40m.
CALLE TITTO QOSNIPA
:
149.28m.
Abastecidas a partir de las tomas en las A.V Repblica Popular de Hungra. Para el control
del sistema se tienen 2 vlvulas de control de 63mm tipo luflex, adems. La red de
tuberas se instalara a una profundidad de 1.2m siguiendo el perfil del terreno. Conexiones
domiciliarias sern a partir de la tubera matriz hasta una distancia mnima de 0.30m del
lmite de propiedad en las cuales se usaran tuberas PVC SAP Clase 10 de , siendo un
total de 35 conexiones a realizarse entre las que se incluyen las conexiones existentes que
se retirarn por su mal estado. Es importante mencionar y aclarar que no se colocaran
nuevos medidores.
2. Sistema de Desage: Se reemplazaran las tuberas de CSN por tuberas de PVC. Se
instalaran tuberas PVC NTP ISO 4435 UF C/ANILLO DE 200mm x 6m, para una longitud de
466.28 m.
N Descripcin N veces Long (m)
1 Tubera nueva D=8" BZ1-BZ2 1.00 63.67
2 Tubera nueva D=8" BZ2-BZ3 1.00 39.98
3 Tubera nueva D=8" BZ3-BZ4 1.00 41.21
4 Tubera nueva D=8" BZ4-BZ5 1.00 46.57
5 Tubera nueva D=8" BZ5-BZ6 1.00 32.54
6 Tubera nueva D=8" BZ4-BZ7 1.00 79.63
7 Tubera nueva D=8" BZ7-BZ9 1.00 46.35
8 Tubera nueva D=8" BZ12-BZ9 1.00 24.01
9 Tubera nueva D=8" BZ8-BZ9 1.00 43.37
10 Tubera nueva D=8" BZ9-BZ10 1.00 48.95
Adems se construirn 09 buzones de inspeccin de 1.20m de dimetro interior y tapa de
0.60m de dimetro con losa de fondo de CA, paredes laterales de CA y losa de techo
tambin de CA.
Las conexiones domiciliarias a realizarse son en su totalidad 35, las cuales se realizaran
mediante cachimbas de PVC; se instalarn 35 conexiones de desage de 200 mm a 160
mm de dimetro de tubera, dichas conexiones irn con sus cajas de registro.

MUNICIPALIDAD PROVINCIAL DE CANCHIS


GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
SUB GERENCIA DE INFRAESTRUCTURA URBANA
C.1 EJECUCION FISICA
C.1.1 VALORIZACION DE OBRA
DESCRIPCION PROGRAMADO ANTERIOR
Prog. C.Directo 206,005.15
34,444.98
Gast. General
Total Prog.
206,005.15
34,444.98
Mayor Metrado
5,707.88
1,261.85
Part. Nuevas
0.00
0.00
Deductivos
0.00
0.00
TOTAL
211,713.03
35,706.83
AVANCE FISICO PORCENTUAL

17.33%

ACTUAL ACUMULADO
19,009.13
53,454.13

SALDO
152,551.02

19,009.13
4,446.03
0.00
0.00
23,455.17

53,454.13
5,707.88
0.00
0.00
59,162.01

152,551.02
0.00
0.00
0.00
152,551.02

11.39%

28.72%

74.05%

C.1.2 AVANCE DE OBRA MENSUAL VALORCOSTO DIRECTO


MES
Feb-2015
Mar-2015
Apr-2015
May-2015
Jun-2015

TOTAL

AVANCE
PROGRAMADO
0.00
0.00%
27,217.27
13.21%
115,142.11
55.89%
62,101.45
30.15%
1,544.32
0.75%
0.00
0.00%
0.00
0.00%
0.00
0.00%

AVANCE
ESTADO DEL AVANCE
EJECUTADO
ATRASADO ADELANTADO
0.00
0.00%
0.00%
0.00%
34,444.98
16.72%
0.00%
3.51%
19,009.13
9.23%
46.67%
0.00%
0.00
0.00%
30.15%
0.00%
0.00
0.00%
0.75%
0.00%
0.00
0.00%
0.00%
0.00%
0.00
0.00%
0.00%
0.00%
0.00
0.00%
0.00%
0.00%

206,005.15

53,454.11

100.00%

25.95%

74.05%

0.00%

C.1.3 AVANCE DEL PLAZO DE EJECUCION


INICIAL

MODIFICADO

PARALIZADO

AMPLIACION

EJECUTADO

SALDO

90

58

32

C.1.4 CRONOLOGIA DE EJECUCION


ENTREGA

INICIO DE

TERRENO

OBRA

PROGRAM

CONCLUSION DE OBRA
MODIFICADA

3/3/2015

3/3/2015

6/1/2015

6/1/2015

REAL

C.1.6 COMENTARIO DEL AVANCE FISICO


El avance fisico alcanzado el el mes de Abril -2015 es de 9.23% que esta con un retraso respecto al
programado, por el desabastecimiento oportuno de los materiales que hasta la fecha no son
abastecidos a los almacenes de obra, con el consiguiente avance de las partidas referentes a
instalacion de tuberias y accesorios.
Los materiales y herramientas empleadas son de tranferencia del almacen central de la
municipalidad provincial que fueros solicitados a inicio de obra
C.2 ASPECTO FINANCIERO
C.2.1 ESTADO FINANCIERO GENERAL DEL PROYECTO
DESCRIPC.
PRESUPUESTO
TOTAL

PROGRAM
339,630.14

EJECUT.
ACUMULAD
O AL 2015
128,560.10

SALDO
BALANCE

TOTAL

211,070.04

C.2.2 EJECUCION DE META FINANCIERA 2015


PROGRAM
DESCRIPC.
ANTERIOR
ACTUAL
PRESUPUESTO
339,630.14
TOTAL
79,782.50
48,777.60
TOTAL
339,630.14
79,782.50
48,777.60

ACUM.
128,560.10
128,560.10

SALDO
211,070.04
211,070.04

C.2.5 COMENTARIO DEL AVANCE FINANCIERO


EXISTE AFECTACIONES A LA META NO AUTORIZADAS POR EL RESIDENTE DE OBRA.

MUNICIPALIDAD PROVINCIAL DE CANCHIS


GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
SUB GERENCIA DE INFRAESTRUCTURA URBANA
D.1 RECURSOS UTILIZADOS
D.1.1 PERSONAL DE OBRA

1
1
1

1
2
1

1
10
17

3
12
23

Total Acumulado

0
S/. 0.00

1
-

S/. 0.00

S/. 0.00

1
1
1

S/. 0.00

1
1
-

S/. 0.00

1
1
-

S/. 0.00

1
1

S/. 0.00

S/. 0.00

S/. 45,363.60

S/. 27,217.20

COSTO

S/. 6,183.33

CATEGORIA
PROFESIONAL:
Ing. Residente
TECNICO:
Asistente Tcnico
Maestro de Obra
Tcnico de Suelos
Topografo
ADMINISTRATIVO:
Tcnico Administrativo
Almacenero de Obra
Controlador de Maquina
Guardin
OBRERO:
Capataz
Operario
Oficial
Pen
TOTAL

CANTIDAD
AO 2015
ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC

S/. 4,585.16

PERSONAL DE OBRA

S/. 83,349.29

D.1.2 EQUIPO MECANICO


HORAS/MAQUINA
AO 2015
DESCRIPCION
ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC
MAQUINARIA PESADA
Cargador Frontal
0.00 0.00
Motoniveladora
0.00 0.00
Rodillo Liso Vib. Autopor 0.00 0.00
Retroexcabadora
0.00 0.00
VEHICULOS
Cama Baja
0.00 0.00
Camin Volquete 15 M3 0.00 0.00
Camin Volquete 8 T
0.00 0.00
Camioneta Pick up
0.00 0.00
MAQUINARIA LIVIANA
Mezcladora
0.00 0.00 21:30 24:48
Vibradora
0.00 0.00 18:47 12.19
Plancha Compactadora 0.00 0.00
11.04
Canguro Compactador 0.00 0.00
6.40
Cierra Cortadora de Pav.
MARTILLO DEMOLEDOR 0.00 0.00 20:31
2.00
UNIDAD

MUNICIPALIDAD PROVINCIAL DE CANCHIS


GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL

Total Acumulado

S/. 2,454.52

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

196.00

S/. 1,247.88

S/. 1,206.64

S/. 0.00

COSTO

S/. 0.00

EQUIPO DE TOPOGRAFIA (DIAS)


Nivel Topogrfico
0.00 0.00 25:25
Estacin Total
0.00 0.00
Estadia
0.00 0.00
Jalones
0.00 0.00

CANTIDAD
AO 2015
TOTAL
4
4
3
0
2
0
3
3
0
2
0
0
4
0
22
47

HORAS/MAQUINA
AO 2015
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
46.18
31.06
11.04
6.40
2.85

221.25
0.00
0.00
0.00

EJECUCION FINANCIERA
C.3

EJECUCION FINANCIERA

C.3.1

AVANCE FINANCIERO
El gasto ejecutado correspondiente al mes de Octubre asciende a la cantidad de S/. 69,895.56 nuevo soles y
representa el 9.22 %, siendo el gasto acumulado a la fecha S/. 254,237.94 nuevos soles y representa el 33.54 % del
Presupuesto aprobado que figura en el Expediente Tcnico.
GASTO
PROGRAMADO

MES
ENERO
FEBRERO
MARZO
ABRIL
MAYO
JUNIO
JULIO
AGOSTO
SETIEMBRE
OCTUBRE
NOVIEMBRE
DICIEMBRE

165,235.51

TOTAL
C.3.2

165,235.51

Mano de Obra
Materiales
Equipo Mecanico
Herramientas
Costos Indirectos

PRESUPUESTO
APROBADO
172,482.53
592,783.77
168,521.69
5,174.48
64,694.51

TOTAL

APROBADO

7,256,812.20

C.5

27.86%

146,901.89

25.42%

146,901.89

25.42%

18,333.62

18,333.62

1,003,656.98

DEL MES
PROGRAM
EJECUTADO
#REF!

0.00
0.00%

ACUMULADO
PROGRAM
EJECUTADO

#REF!
#REF!
#REF!

0.00%

TOTAL

SALDO

0.00

AVANCE FINANCIERO
PRESUPUESTO

C.4

27.86%

SALDO

GASTOS CLASIFICADOS
ITEMS

C.3.3

GASTO
EJECUTADO

GASTO DEL MES

350,000.00

MAT. EN CANCHA
CANCHA

1,007,490.00

8,614,302.20

-8,614,302.20

AVANCE DEL PLAZO DE EJECUCION


INICIAL

MODIFICADO

PARALIZADO

AMPLIACION

EJECUTADO

300

365

40
13.33%

25
8.33%

340
113.33%

CRONOLOGIA DE EJECUCION
ENTREGA

INICIO DE

CONCLUSION DE OBRA

0.00
0.00%

EJECUCION FINANCIERA
TERRENO

OBRA

PROGRAM

ESTIMADA

REAL

5/2/2006

5/2/2006

2/15/2007

4/30/2007

4/30/2007

EJECUCION FINANCIERA
C.6

EVALUACIN TECNICA FINANCIERA

C.7

LIMITACIONES Y RECOMENDACIONES
Dentro de las limitaciones que se han tenido en el presente mes fueron la atencin oportuna de los requerimientos
solicitados.
En el presente mes se tramitaron un total de 25 requerimientos de insumos considerados en el cronograma de
adquisiciones, de los cuales han sido atendido un total de 17 requerimientos.
En el presente mes no se conto con la participacin de los beneficiarios

MUNICIPALIDAD PROVINCIAL DE CANCHIS


GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
SUB GERENCIA DE INFRAESTRUCTURA URBANA
RECURSOS UTILIZADOS

D.1.3 RECURSOS DE MAQUINARIA Y EQUIPO


MAQUINARIA
MP-CANCHIS
Mezcladora de Concreto
1.00
Vibradora de Concreto
1.00
Compactadora de Plancha Vibratoria
1.00
Camion de 8 T
Motoniveladora
Camin Volquete de 15 m3
Cargador Frontal
Tractor sobre orugas
Retroexcavadora
1.00
Rodillo Compactador Autopropulsado
Cisterna 4000 gln
Camioneta Pick UP
Sierra Circular de Banco
Cepilladora de Banco
Maquina Soldadora
MARTILLO DEMOLEDOR
1.00
Andamios
EQUIPO DE INGENIERIA
1
Nivel de Ingeniera
Teodolito
TOTAL

6.00

D.1.4 VALORIZACION DE MAQUINARIA Y EQUIPO


DESCRIPC. PROGRAM.
ANTERIOR
ACTUAL
MPC
17,244.43
1,206.64
1,247.88
TOTAL
17,244.43
1,206.64
1,247.88

CONVENIO
-

ACUM.
2,454.52
2,454.52

LIDAD PROVINCIAL DE CANCHIS

E INFRAESTRUCTURA URBANA Y RURAL

ALQUILADO
13.00
13.00
7.30
1
34.30

SALDO
14,789.91
14,789.91

MUNICIPALIDAD PROVINCIAL DE CANCHIS


GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
SUB GERENCIA DE INFRAESTRUCTURA URBANA

COSTO-TIEMPO-AVANCE
AVAN FINANCIERA

S/.220,000.00

S/.204,460.83

AVAN FISICO PROG


FISICO EJEC

S/.200,000.00

S /.206,005.15

AVAN FINC ACUM.


S/.180,000.00

ACUM
FIS. EJC. ACUM

S/.160,000.00
S /.142,359.38

S/.140,000.00

S /.128,560.10

S /.128,560.10

S /.128,560.10

S /.53,454.11

S /.53,454.11

S /.53,454.11

MAYO

JUNIO

S/.120,000.00
S/.100,000.00
S /.79,782.50

S/.80,000.00
S/.60,000.00

S /.34,444.98

S/.40,000.00

S /.27,217.27

S/.20,000.00
S/.-

S /.10,768.50
S /.3,683.02
S /.S /.-

ENERO

S /.S /.-

FEBRERO

MARZO

ABRIL

MUNICIPALIDAD PROVINCIAL DE CANCHIS


GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
SUB GERENCIA DE INFRAESTYRUCTURA URBANA

MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y DESAGUE EN LA


ASOCIACIN PRO VIVIENDA LA FLORIDA I ETAPA DEL DISTRITO SICUANI, PROVINCIA DE
CANCHIS CUSCO.

Proyecto:

Residente de Obra:

ING. ALEDIO OSCAR NINA TTICA

Monto Expediente Tcni S/. 300,263.88

Funcin

018

SANEAMIENTO

Monto Asignado PIA 201 S/. 254,856.00

Programa

040

SANEAMIENTO

Fecha de Inicio de Obra 3/3/2015

Sub- Programa

088

SANEAMIENTO URBANO

Plazo de Ejecucin:

Meta

010

90

Fecha de Termino de Ob 6/1/2015

Fuente Financiamiento : CANON Y SOBRECANON

08. MEMORIA DESCRIPTIVA


VALORIZADA DE PARTIDAS
EJECUTADAS

DIAS

MUNICIPALIDAD PROVINCIAL DE CANCHIS


GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
SUB GERENCIA DE INFRAESTRUCTURA URBANA

01

ADECUADA INFRAESTRUCTURA DE REDES DE AGUA

01.01OBRAS PROVISIONALES

Comprende la habilitacion todas las construcciones e instalaciones que con carcter temporal son
ejecutadas, para el servicio del personal administrativo y obrero, para almacenamiento y cuidado de los
materiales durante la ejecucin de las obras. Se utilizo materiales recuperables en parte ya que
estas construcciones e instalaciones deben ser demolidas y/o desarmadas al final de la obra dejando el
lugar empleado en iguales o mejores condiciones a como lo encontr. Tambin comprende la ejecucin
de todas aquellas labores previas y necesarias para iniciar la obra.

33.33%

600.00

1.00

0.00%

0.00

2.00

33.33%

600.00

1.00

33.33%

600.00

mes

1.00

DE OBRA

Valorizacin Anterior
Valorizacin Actual
Valorizacin Acumulada
Saldo por Valorizar
Parci
Cost
Cost
Cost
Cost
al Metr.
%
Metr.
%
Metr.
%
Metr.
%
o
o
o
o
1,800.00

01.01.0ALMACEN

Und Metr. P.U.


600.00

DESCRIPCION

3.00

Item

MODO DE EJECUCION
Para ejecutar esta partida que comprende todas las
construcciones, tales como oficinas, almacenes, casetas de
guardiana, comedores, vestuarios, servicios higinicos,
cercos, carteles, etc
Debido a la ubicacin urbana del proyecto se tomo los
servicios de alquiler, de una vivienda cercana al lugar del
proyecto, ubicada en la Av. San Felipe dicho espacio cuenta
con un almacn, 01 patio, 01 SS.HH. y 01 Oficina con un area
aproximado a 200 m2.
Los trabajos descritos en esta partida se pagarn luego de
haberse verificado la correcta prestacin del servicio, que
sern aprobados y tendrn la conformidad del Inspector de
Obra.
MUNICIPALIDAD
MUNICIPALIDAD PROVINCIAL
PROVINCIAL DE
DE CANCHIS
CANCHIS
GERENCIA
GERENCIADE
DEDESARROLLO
DESARROLLOURBANO
URBANOYYOBRAS
OBRAS
SUB
SUBGERENCIA
GERENCIADE
DEOBRAS
OBRASPUBLICAS
PUBLICAS

01.03RED DE AGUA POTABLE

82.39%

324.57

349.00

17.61%

69.35

74.57

17.61%

69.35

74.57

0.00%

0.00

0.00

393.92

TRAZO, NIVELES Y REPLANTEO


DE ZANJAS PRE - EXCAVACION

0.93

01.03.

MOVIMIENTO DE TIERRAS
423.57

01.03

82.39%

401.35

349.00

17.61%

85.76

74.57

17.60%

85.76

74.57

0.00%

0.00

0.00

487.11

TRAZO, NIVELES Y REPLANTEO


DE ZANJAS POST EXCAVACION

1.15

01.03.

423.57

Dentro trazo y replanteo se llevo al terreno los ejes y niveles establecidos en los planos. Para esta tarea
de determino la ubicacin y medidas de todos los elementos que se detallan en los planos y se
seguira trazando durante el proceso de ejecucin.
Los trabajos fueron realizados por el asistente tecnico con la direccion de Ing. Residente, materializando
en campo todos los trabajos topogrficos, planimtricos y altimtricos que son necesarios para hacer el
replanteo del proyecto, con eventuales ajustes del mismo y control de resultados al inicio de obra.

72.48%

2,913.25

216.76

27.52%

1,106.38

82.32

27.52%

1,106.38

82.32

0.00%

0.00

0.00

4,019.64

m3

13.44

EXCAVACION DE ZANJAS EN
01.03. MATERIAL COMPACTO H<2.00
MT, ANCHO=0.50 mt.

299.08

se viene realizando el replanteo durante la construccin general de las caractersticas geomtricas


descritas en los planos llevando los controles planimtricos (alineamientos) y altimtrico (niveles), as
como de las obras de arte diseadas para el presente sistema hasta la etapa final de la obra.

se biene realizando la excavacin de los materiales de la zona donde se va construir la respectiva obra
con el fin de eliminar todo el material acumulado en el permetro de dicha obra, Solo de manera manual
mediante la utilizacin de herramientas necesarias como picos y palas y si fuera necesario cinceles y
barretas de tal manera no se deforma la consistencia del lugar en el rea de construccin de la obra.
02.01SISTEMAS DE REDES DE DESAGUE

82.39%

401.35

349.00

17.61%

85.76

74.57

17.60%

85.76

74.57

0.00%

0.00

0.00

487.11

TRAZO, NIVELES Y REPLANTEO


DE ZANJAS POST EXCAVACION

1.15

MOVIMIENTO DE TIERRAS

423.57

01.03.01.02

02.01

se viene realizando el replanteo durante la construccin general de las caractersticas geomtricas

MUNICIPALIDAD PROVINCIAL DE CANCHIS


GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
SUB GERENCIA INFRAESTRUCTURA URBANA

Proyecto:
Residente de Obra:
Funcin
Programa
Sub- Programa
Meta
Fuente Financiamiento

MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y DESAGUE EN LA ASOCIACIN PRO


VIVIENDA LA FLORIDA I ETAPA DEL DISTRITO SICUANI, PROVINCIA DE CANCHIS CUSCO.
ING. ALEDIO OSCAR NINA TTICA
Monto Expediente Tcnico:
S/. 300,263.88
018
SANEAMIENTO
Monto Asignado PIA 2015:
S/. 156,923.00
040
SANEAMIENTO
Fecha de Inicio de Obra:
3/3/2015
088
SANEAMIENTO URBANO
Plazo de Ejecucin:
90 DIAS
010
Fecha de Termino de Obra:
7/1/2015
: CANON Y SOBRECANON

08. AVANCE FISICO


VALORIZADO
(Valorizacion de Obra)
correspondiente a :

April/2015

RESUMEN DESAGREGADO DE VALORIZACIONES


PRESUPUESTO
TEM

VALORIZACIN

ANTERIOR
Valorizado
S/.
%
S/.
S/. 206,005.15 S/. 34,444.98 16.72%

AVANCES
ACTUAL
Valorizado
%
S/.
S/. 19,009.13
9.23%

ACUMULADO
Valorizado
%
S/.
S/. 53,454.11 25.95%

SALDO
Valorizado
S/.
S/. 152,551.04

74.05%

PROGRAMADO

MAYOR METRADOS

S/. 5,707.88

S/. 1,261.85

0.61%

S/. 4,446.03

2.16%

S/. 5,707.88

2.77%

S/. 0.00

0.00%

PARTIDAS NUEVAS

S/. 0.00

S/. 0.00

0.00%

S/. 0.00

0.00%

S/. 0.00

0.00%

S/. 0.00

0.00%

DEDUCTIVOS

S/. 0.00

S/. 0.00

0.00%

S/. 0.00

0.00%

S/. 0.00

0.00%

S/. 0.00

0.00%

S/. 211,713.03

S/. 35,706.83 17.33%

S/. 23,455.17

11.39%

S/. 59,162.00 28.72%

S/. 152,551.04

74.05%

S/. 206,005.15

S/. 34,444.98 16.72%

S/. 19,009.13

9.23%

S/. 53,454.11 25.95%

S/. 152,551.04

74.05%

TOTAL COSTO DIRECTO

Costo Directo
GASTOS GENERALES (28.99%)

S/. 54,134.94

S/. 9,984.31

S/. 5,510.04

S/. 15,494.35

S/. 44,218.84

GASTOS DE SUPERVISION (17.53%)

S/. 26,748.43

S/. 24,142.93

S/. 6,039.61

S/. 3,333.08

S/. 9,372.69

GASTOS DE LIQUIDACION (4.58%)

S/. 7,168.78

S/. 1,576.21

S/. 869.86

S/. 2,446.07

S/. 6,980.77

GASTOS DE EXP. TECNICO (8.29%)

S/. 8,812.08

S/. 2,855.94

S/. 1,576.11

S/. 4,432.05

S/. 12,648.49

TOTAL

S/. 300,263.88

S/. 54,901.06 18.28%

S/. 30,298.22 10.09%

S/. 85,199.27 28.37%

S/. 243,147.56

80.98%

VALORIZACIN DE AVANCE DE OBRA PROGRAMADA


ABRIL 2015
Residente de Obra
Funcin
Programa

ING. ALEDIO OSCAR NINA TTICA


: 018
SANEAMIENTO
: 088
SANEAMIENTO

Monto Expediente Tcnico


###
Monto Asignado PIA 2015
###
Fecha de Inicio de Obra:
3/3/2015

Sub- Programa

088

Plazo de Ejecucin:

Obra

MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y


DESAGUE EN LA ASOCIACIN PRO VIVIENDA LA FLORIDA I ETAPA DEL Fecha de Termino de Obra 7/1/2015
DISTRITO SICUANI, PROVINCIA DE CANCHIS CUSCO.

SANEAMIENTO URBANO

90 dias

Meta
12
Fuente Financiamiento : CANON Y SOBRECANON
Item

DESCRIPCION

01

SISTEMA DE AGUA POTABLE:

01.01

OBRAS PROVISIONALES

01.01.01

CARTEL DE IDENTIFICACION DE
OBRAS 3.60m x 2.40m

Und

Precio
Metra
Unitari
do
o

Valorizacin Anterior
Parcial

Metra
do

Costo

Valorizacin Actual
Metrad
Costo
%
o

Valorizacin Acumulada
Metra
do

Costo

409.05

###

Saldo por Valorizar


Metrad
Costo
o

ASOCIACION PRO VIVIENDA LA FLORIDA

und

1.00 409.05

01.01.02

ALQUILER DE ALMACEN DE OBRA mes

01.02

OBRAS PRELIMINARES

01.02.01

LIMPIEZA DE TERRENO MANUAL

m2

468.46

01.02.02

LIMPIEZA DE TERRENO CON


MAQUINARIA

m3

78.07

01.02.03

TRANSPORTE DE MATERIAL
EXCEDENTE CON VOLQUETES

01.03

RED DE AGUA POTABLE

m3

3.00 600.00

409.05

1.00

409.05

1,800.00

1.00

0.23

107.75

0.00

0.00

2.15

167.85

0.00

0.00

###

600.00 33.33%

0.00

0.00

0.00%

1.00

2.00 1,200.00 66.67%

0.00
1.00

0.00

0.00%

600.00 33.33%

1.00

600.00

33.33%

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00% 468.46

107.75

###

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

78.07

167.85

###

0.00%

97.58 4,122.76

###

97.58

42.25

4,122.76

0.00

0.00

0.00%

423.57

0.93

393.92

0.00

0.00

0.00%

423.57

1.15

487.11

0.00

0.00

0.00%

m3

299.08

13.44

4,019.64

0.00

0.00

0.00%

198.90

0.61

121.33

0.00

0.00

423.57

0.81

343.09

0.00

0.00

423.57

8.70

3,685.06

0.00

423.57

6.62

2,804.03

423.57

6.11

2,588.01

0.00

0.00

0.00%

74.57

69.35

17.61%

0.00

0.00

01.03.01 MOVIMIENTO DE TIERRAS


TRAZO, NIVELES Y REPLANTEO
01.03.01.01
DE ZANJAS PRE - EXCAVACION
TRAZO, NIVELES Y REPLANTEO
01.03.01.02
DE ZANJAS POST - EXCAVACION
EXCAVACION DE ZANJAS EN
01.03.01.03MATERIAL COMPACTO H<2.00
MT, ANCHO=0.50 mt.
ELIMINACION DE TUBERIAS DE
01.03.01.04
AGUA (RED DE AGUA ANTIGUO)
REFINE Y NIVELACION DE
01.03.01.05FONDO DE ZANJAS (ANCHO =
0.50 MT)
CAMA DE APOYO DE ARENA DE
01.03.01.06
H=0.10 MT., ANCHO = 0.50 mt.
PREPARACION Y COLOCACION DE
01.03.01.072DA CAMA (CON MATERIAL
SELECCIONADO)
RELLENO Y COMPACTADO CON
01.03.01.08MATERIAL PROPIO EN CAPAS DE
0.20M

74.57

69.35 17.61% 349.00

324.57 82.39%

74.57

85.76 17.61% 349.00

401.35 82.39%

74.57

85.76

17.60%

82.32

1,106.38

27.52%

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00% 198.90

121.33

###

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00% 423.57

343.09

###

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00% 423.57 3,685.06

###

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00% 423.57 2,804.03

###

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00% 423.57 2,588.01

###

82.32 1,106.38 27.52% 216.76 2,913.25 72.48%

01.03.02 SUMINISTRO E INSTALAC. DE TUBERIA PVC NTP ISO 4422 UF C/ANILLO DE 63 mm


TUBERIA PVC NTP ISO 4422 UF
01.03.02.01
C/ANILLO DE 63 mm C-10

423.57

14.44

6,116.35

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00% 423.57 6,116.35

###

1.00 377.50

377.50

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

377.50

###

12.00

202.08

###

01.03.02.0COLOCACION DE ACCESORIOS
01.03.02.02SUMINISTRO DE ACCESORIOS

glb

01.03.02.02INSTALACION Y ACCESORIOS

und

PRUEBA HIDRAULICA Y
01.03.02.03
DESINFECCION

12.00

16.84

202.08

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

423.57

4.06

1,719.69

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00% 423.57 1,719.69

###

01.03.03 PAVIMENTOS
CORTE DE CARPETA ASFALTICA
01.03.03.01
E=3"

m2

5.00

9.03

45.15

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

5.00

45.15

###

REPOSICION CARPETA ASFALTICA


01.03.03.02
EN CALIENTE E=3"

m2

5.00

54.65

273.25

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

5.00

273.25

###

01.04
01.04.01

CONEXIONES DOMICILIARIAS - AGUA POTABLE


TRAZO, NIVELES Y REPLANTEO
DE ZANJAS PRE - EXCAVACION
EXCAVACION DE ZANJAS EN
MATERIAL COMPACTO H<2.00
MT, ANCHO=0.50
mt. DE
REFINE
Y NIVELACION

325.00

0.93

302.25

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00% 325.00

302.25

###

m3

193.01

13.44

2,594.05

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00% 193.01 2,594.05

###

325.00

0.81

263.25

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00% 325.00

263.25

###

325.00

8.70

2,827.50

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00% 325.00 2,827.50

###

325.00

6.62

2,151.50

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00% 325.00 2,151.50

###

01.04.06

MATERIAL PROPIO EN CAPAS DE


0.20M
CONEXIONES DOMICILIARIAS
01.04.07
DE AGUA

325.00

6.11

1,985.75

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00% 325.00 1,985.75

###

01.04.07.01SUMINISTRO DE ACCESORIOS

glb

35.00 187.50

6,562.50

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

35.00 6,562.50

###

01.04.07.02INSTALACION Y ACCESORIOS

und

8,064.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00% 420.00 8,064.00

###

0.00

0.00% 325.00 1,365.00

###

01.04.02
01.04.03
01.04.04
01.04.05

FONDO DE ZANJAS (ANCHO =


0.50 MT)
CAMA DE APOYO DE ARENA DE
H=0.10 MT., ANCHO = 0.50 mt.
PREPARACION Y COLOCACION DE
2DA CAMA (CON MATERIAL
SELECCIONADO)
RELLENO Y COMPACTADO CON

SUMINISTRO E INSTALAC. DE
01.04.07.03TUBERIA PVC SAP D=1/2"x5m
C-10

420.00
325.00

19.20
4.20

1,365.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

VALORIZACIN DE AVANCE DE OBRA PROGRAMADA


ABRIL 2015
Residente de Obra
Funcin
Programa

ING. ALEDIO OSCAR NINA TTICA


: 018
SANEAMIENTO
: 088
SANEAMIENTO

Monto Expediente Tcnico


###
Monto Asignado PIA 2015
###
Fecha de Inicio de Obra:
3/3/2015

Sub- Programa

088

Plazo de Ejecucin:

Obra

MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y


DESAGUE EN LA ASOCIACIN PRO VIVIENDA LA FLORIDA I ETAPA DEL Fecha de Termino de Obra 7/1/2015
DISTRITO SICUANI, PROVINCIA DE CANCHIS CUSCO.

SANEAMIENTO URBANO

90 dias

Meta
12
Fuente Financiamiento : CANON Y SOBRECANON
Item

DESCRIPCION

Und

Precio
Metra
Unitari
do
o

Valorizacin Anterior
Parcial

Metra
do

Costo

Valorizacin Actual
Metrad
Costo
%
o

Valorizacin Acumulada
Metra
do

Costo

Saldo por Valorizar


Metrad
Costo
o

01.05

VALVULAS DE CONTROL (02 Unid)

01.05.01

TRAZO, NIVELES Y REPLANTEO


DE VALVULA DE CONTROL

m2

1.80

1.20

2.16

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.80

2.16

###

01.05.02

EXCAVACION EN TIERRA
COMPACTA

m3

2.16

13.44

29.03

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

2.16

29.03

###

01.05.03

ACARREADO DE MATERIAL
EXCEDENTE (D=30m.)

m3

2.70

8.06

21.76

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

2.70

21.76

###

m3

2.70

42.25

114.08

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

2.70

114.08

###

m2

1.80 248.74

447.73

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.80

447.73

###

01.05.04
01.05.05
01.05.06

ELIMINACION DE MATERIAL
EXCEDENTE
CONCRETO SOLADO e=0.05 m,
f'c=100 kg/cm2 VACIADO
MANUALMENTE
ACERO CORRUGADO FY= 4200
kg/cm2 GRADO 60

kg

24.07

6.80

163.68

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

24.07

163.68

###

01.05.07

ENCOFRADO Y DESENCOFRADO
EN CAJA DE VALVULA

m2

2.36

31.16

73.54

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

2.36

73.54

###

01.05.08

CONCRETO F'c=175 Kg/cm2 EN


PARED

m3

1.23 390.67

480.52

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.23

480.52

###

01.05.09

CONCRETO F'c=210 Kg/cm2


LOSA
DE CAJA Y COLOCACION
SUMINISTRO

###

m3

0.36 416.17

149.82

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.36

149.82

DE ACCESORIOS PARA
VALVULAS DE CONTROL DE
63mm
01.05.10.01SUMINISTRO DE ACCESORIOS

glb

1.00 680.00

680.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

680.00

###

01.05.10.02INSTALACION Y ACCESORIOS

und

2.00

21.80

43.60

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

2.00

43.60

###

01.05.11

TAPAS DE FF

und

2.00

67.71

135.42

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

2.00

135.42

###

02

SISTEMA DE ALCANTARILLADO:

02.01

SISTEMAS DE REDES DE DESAGUE

###

0.00

0.00

0.00% 466.28

433.64

###

0.00

0.00

0.00%

466.28

536.22

###

0.00

0.00

0.00%

419.65 5,640.10

###

0.00

0.00

0.00%

01.05.10

ASOCIACION PRO VIVIENDA LA FLORIDA

02.01.01 MOVIMIENTO DE TIERRAS


TRAZO, NIVELES Y REPLANTEO
02.01.01.01
DE ZANJAS PRE - EXCAVACION
TRAZO, NIVELES Y REPLANTEO
02.01.01.02
DE ZANJAS POST - EXCAVACION
EXCAVACION DE ZANJAS EN
02.01.01.03MATERIAL COMPACTO H<2.00
MT, ANCHO=0.50 mt.
RETIRO DE RED DE DESAGUE
02.01.01.04
ANTIGUO
REFINE Y NIVELACION DE
02.01.01.05FONDO DE ZANJAS (ANCHO =
0.50 MT)
CAMA DE APOYO DE ARENA DE
02.01.01.06
H=0.10 MT., ANCHO = 0.50 mt.
PREPARACION Y COLOCACION DE
02.01.01.072DA CAMA (CON MATERIAL
SELECCIONADO)
RELLENO Y COMPACTADO CON
02.01.01.08MATERIAL PROPIO EN CAPAS DE
0.20M
ELIMINACION DE MATERIAL
02.01.01.09
EXCEDENTE

466.28

0.93

433.64 466.28

433.64

466.28

1.15

536.22 242.40

278.76 51.99%

m3

419.65

13.44

5,640.10 360.99

### 86.02%

200.29

3.02

604.88

0.00

0.00

0.00%

466.28

0.81

377.69

0.00

0.00

0.00%

466.28

8.70

4,056.64

0.00

0.00

0.00%

466.28

6.62

3,086.77

0.00

0.00

0.00%

466.28

6.11

2,848.97

0.00

0.00

0.00%

m3

145.71

42.25

6,156.25

0.00

0.00

0.00%

223.88

257.46

48.01%

58.66

788.39

13.98%

71.57

216.14

35.73%

303.70

246.00

65.13%

111.77

972.40

23.97%

234.71

1,553.78

50.34%

111.77

682.91

23.97%

10.00

422.50

6.86%

111.77

5,806.45

23.97%

111.77

761.15

23.97%

71.57

216.14 35.73% 128.72

388.73 64.27%

303.70

246.00 65.13% 162.58

131.69 34.87%

111.77

972.40 23.97% 354.51 3,084.24 76.03%

234.71 1,553.78 50.34% 231.57 1,532.99 49.66%


111.77
10.00

682.91 23.97% 354.51 2,166.06 76.03%


422.50

6.86% 135.71 5,733.75 93.14%

02.01.02 SUMINISTRO E INSTALAC. DE TUBERIA PVC NTP ISO 4435 UF C/ANILLO DE 200mm x 6m
TUBERIA PVC NTP ISO 4435 UF
02.01.02.01
C/ANILLO DE 200mm x 6m

466.28

PRUEBA HIDRAULICA EN
02.01.02.02
TUBERIAS DE DESAGUE

466.28

6.81

51.95 24,223.25

0.00

0.00

0.00%

3,175.37

0.00

0.00

0.00%

111.77 5,806.45 23.97% 354.51


111.77

### 76.03%

761.15 23.97% 354.51 2,414.21 76.03%

02.01.03 PAVIMENTOS
CORTE DE CARPETA ASFALTICA
02.01.03.01
E=3"

m2

20.00

9.03

180.60

20.00

180.60

###

0.00

0.00

0.00%

20.00

180.60

###

REPOSICION CARPETA ASFALTICA


02.01.03.02
EN CALIENTE E=3"

m2

20.00

54.65

1,093.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

14.79 99.98%

0.00

0.00

0.00%

15.90

14.79

###

0.00

0.00

0.00%

15.90

18.29

###

0.00

0.00

0.00%

30.04

403.74

###

0.00

0.00

0.00%

4.98

826.68

###

0.00

0.00

0.00%

145.08 48.15%

19.38

02.02

CAMARAS DE INSPECCION (BUZONES)

02.02.01

TRAZO, NIVELES Y REPLANTEO


DE ZANJAS PRE - EXCAVACION

15.90

0.93

14.79

15.90

02.02.02

TRAZO, NIVELES Y REPLANTEO


DE ZANJAS POST - EXCAVACION

15.90

1.15

18.29

0.00

02.02.03

EXCAVACION EN TIERRA
COMPACTA

m3

30.04

13.44

403.74

29.93

02.02.04

DEMOLICION DE BUZONES
EXISTENTES

m3

4.98 166.00

826.68

4.98

02.02.05

ACARREADO DE MATERIAL
EXCEDENTE (D=30m.)

m3

37.38

8.06

301.28

10.00

02.02.06

ELIMINACION DE MATERIAL
EXCEDENTE

m3

37.38

42.25

1,579.31

0.00

02.02.07

CONCRETO SOLADO e=0.05 m,


f'c=100 kg/cm2

m2

15.90 248.74

3,954.97

14.07

### 88.49%

02.02.08

ACERO DE REFUERZO EN LOSA


DE FONDO DE BUZON

kg

651.85

6.80

4,432.58 157.58

### 24.17%

02.02.09

ACERO DE REFUERZO EN LOSA


DE TECHO DE BUZON

kg

188.04

6.80

1,278.67 160.65

### 85.43%

02.02.10

ENCOFRADO Y DESENCOFRADO
NORMAL PARA BUZONES

m2

71.63

24.58

1,760.67

### 62.63%

44.86

0.00

0.00%

402.26 99.63%
826.68

###

80.60 26.75%
0.00

0.00%

15.90

18.29

99.97%

0.11

1.48

0.37%

0.00

0.00

0.00%

8.00

64.48

21.40%

0.00

0.00

0.00%

1.83

455.19

11.51%

494.27

3,361.04

75.83%

27.39

186.25

14.57%

12.06

296.48

16.84%

18.00
0.00

0.00

0.00

0.00%

20.00 1,093.00

###

156.20 51.85%

0.00

0.00%

15.90 3,954.97

###

37.38 1,579.31
0.00

0.00

0.00%

###

651.85 4,432.58

###

0.00

0.00

0.00%

188.04 1,278.67

###

0.00

0.00

0.00%

56.92 1,399.14 79.47%

14.71

361.53 20.53%

VALORIZACIN DE AVANCE DE OBRA PROGRAMADA


ABRIL 2015
Residente de Obra
Funcin
Programa

ING. ALEDIO OSCAR NINA TTICA


: 018
SANEAMIENTO
: 088
SANEAMIENTO

Monto Expediente Tcnico


###
Monto Asignado PIA 2015
###
Fecha de Inicio de Obra:
3/3/2015

Sub- Programa

088

Plazo de Ejecucin:

Obra

MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y


DESAGUE EN LA ASOCIACIN PRO VIVIENDA LA FLORIDA I ETAPA DEL Fecha de Termino de Obra 7/1/2015
DISTRITO SICUANI, PROVINCIA DE CANCHIS CUSCO.

SANEAMIENTO URBANO

90 dias

Meta
12
Fuente Financiamiento : CANON Y SOBRECANON
Item

DESCRIPCION

Und

Precio
Metra
Unitari
do
o

Valorizacin Anterior
Parcial

Metra
do

Costo

02.02.11

ENCOFRADO Y DESENCOFRADO
LOSA TECHO DE BUZON

m2

10.18

98.25

1,000.19

10.18

###

02.02.12

CONCRETO F'c=175 Kg/cm2


PARED - BASE

m3

13.93 390.67

5,442.03

13.28

### 95.33%

CONCRETO F'c=210 Kg/cm2


LOSA DE BUZON
ACABADO INTERIOR DE
BUZONES CON MEDIA CAA DE
FONDO
TAPA DE F F PARA BUZON
(D=0.60 mt.)

m3

3.69 416.17

1,535.67

2.66

### 72.09%

und

9.00 137.60

1,238.40

0.00

0.00

02.02.13
02.02.14
02.02.15

Valorizacin Actual
Metrad
Costo
%
o

###

0.00%

0.00

0.00

0.00%

0.65

253.94

4.67%

1.03

428.66

27.91%

0.00

0.00

0.00%

2.00

374.66

22.22%

Valorizacin Acumulada
Metra
do

Costo

Saldo por Valorizar


Metrad
Costo
o

10.18 1,000.19

###

0.00

0.00

0.00%

13.93 5,442.03

###

0.00

0.00

0.00%

###

0.00

0.00

0.00%

9.00 1,238.40

###

3.69 1,535.67
0.00

0.00

0.00%

9.00 1,685.97

###

und

9.00 187.33

1,685.97

7.00

### 77.78%

02.02.16

ESCALERA TIPO GATO EN


BUZONES H>=1.50 CON 3/4"

glb

1.00

###

1,492.80

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

02.02.17

INSTALACION DE ESCALERA TIPO


GATO

und

8.00

19.72

157.76

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

02.03

CONEXIONES DOMICILIARIAS - ALCANTARILLADO

0.00

0.00

0.00%

0.00%

1.00 1,492.80

###

0.00%

8.00

157.76

###

02.03.01 MOVIMIENTO DE TIERRAS


TRAZO, NIVELES Y REPLANTEO
02.03.01.01
DE ZANJAS PRE - EXCAVACION
EXCAVACION DE ZANJAS EN
02.03.01.02MATERIAL COMPACTO H<2.00
MT, ANCHO=0.50
mt. DE
REFINE
Y NIVELACION

420.00

0.93

390.60

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00% 420.00

390.60

###

m3

286.13

13.44

3,845.59

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00% 286.13 3,845.59

###

02.03.01.03FONDO DE ZANJAS (ANCHO =


0.50 MT)
CAMA DE APOYO DE ARENA DE
02.03.01.04
H=0.10 MT., ANCHO = 0.50 mt.
PREPARACION Y COLOCACION DE
02.03.01.052DA CAMA (CON MATERIAL
SELECCIONADO)
RELLENO Y COMPACTADO CON

420.00

0.81

340.20

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00% 420.00

340.20

###

420.00

8.70

3,654.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00% 420.00 3,654.00

###

420.00

6.62

2,780.40

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00% 420.00 2,780.40

###

02.03.01.06MATERIAL PROPIO EN CAPAS DE


0.20M

420.00

6.11

2,566.20

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00% 420.00 2,566.20

###

###

02.03.02 SUMINISTRO E INSTALAC. DE TUBERIA PVC NTP ISO 4435 UF C/ANILLO DE 160mm x 6m

CONEXION DOMICILIARIA DE
02.03.02.03DESAGUE DE 200 A 160mm (8" A
6")
02.04
VARIOS

420.00

32.82 13,784.40

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00% 420.00

und

35.00 147.34

5,156.90

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

35.00 5,156.90

###

und

35.00 136.73

4,785.55

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

35.00 4,785.55

###

539.96

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

539.96

###

4,807.90

1.00

###

###

0.00

0.00

0.00%

1.00 4,807.90

###

0.00

0.00

0.00%

0.00

02.04.01

PLACA RECORDATORIA DE
INAGURACION

und

1.00 539.96

02.04.02

SUMINISTRO EQUIPO
COMPLEMENTARIO

glb

1.00

02.05

RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE EL TRABAJO

02.05.01

EQUIPOS DE PROTECCIN
INDIVIDUAL

glb

1.00

###

5,000.00

1.00

02.05.02

EQUIPOS DE PROTECCIN
COLECTIVA

glb

1.00 936.00

936.00

1.00

02.05.03

EMERGENCIAS EN SEGURIDAD Y
SALUD DURANTE EL TRABAJO

glb

1.00 250.00

250.00

02.06

MITIGACION AMBIENTAL

02.06.01

LIMPIEZA FINAL DE OBRA

m2

###

03

CAPACITACION DE USUARIOS Y ASISTENCIA TECNICA

03.01

CAPACITACION DE USUARIOS Y
ASISTENCIA TECNICA

1.00

###

0.00

0.00

0.00%

1.00 5,000.00

###

0.00

0.00

0.00%

936.00

###

0.00

0.00

0.00%

1.00

936.00

###

0.00

0.00

0.00%

1.00

250.00

###

0.00

0.00

0.00%

1.00

250.00

###

0.00

0.00

0.00%

847.14

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

###

847.14

###

### 18,542.37

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

0.50

###

34,444.98

glb

###

206,005.15

COSTO DIRECTO

###

16.72%

19,009.13

9.23%

25.95%

###

###

152,550.98

02.03.02.02CAJA DE REGISTRO

53,454.13

TUBERIA PVC NTP ISO 4435 UF


02.03.02.01
C/ANILLO DE 160mm x 6m

74.05%

AVANCE MENSUAL
OBRA

: MEJORAMIENTO DE VIAS URBANAS

RESIDENTE : ING JUAN PEREZ


SUPERVISOR : ING JHON SMIT

INFORME TECNICO MENSUAL ENERO 2011

FECHA : 05 - FEB -2,011

PRESUPUESTO BASE
ITEMS
#REF!

DESCRIPCION PARTIDA

AVANCE MENSUAL
ENE

FEB

MAR

ABR

MAY

JUN

JUL

AVANCE
AGO

SET

OCT

NOV

DIC

ACUMUL

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
0.00%
0.00%

#REF!

#REF!
0.00%

#REF!

#REF!
0.00%

AVANCE MENSUAL
OBRA

: MEJORAMIENTO DE VIAS URBANAS

RESIDENTE : ING JUAN PEREZ


SUPERVISOR : ING JHON SMIT

INFORME TECNICO MENSUAL ENERO 2011

FECHA : 05 - FEB -2,011

PRESUPUESTO BASE
ITEMS

DESCRIPCION PARTIDA

AVANCE MENSUAL
ENE

FEB

MAR

ABR

MAY

JUN

JUL

#DIV/0!

#DIV/0!

AVANCE
AGO

SET

OCT

NOV

DIC

ACUMUL

#REF!

#REF!

PARTIDAS EJECUTADAS

Err:518

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

Err:518

VALORIZACIN DE AVANCE POR MAYORES METR


ABRIL 2015
Residente de Obra
Funcin
Programa
Sub- Programa
Obra
Meta
Fuente Financiamiento
Item
02

DESCRIPCION

ING. ALEDIO OSCAR NINA TTICA


: 018
SANEAMIENTO
: 088
SANEAMIENTO
088
SANEAMIENTO
URBANO
MEJORAMIENTO
Y AMPLIACIN
DEL SISTEMA DE AGUA POTABLE Y
DESAGUE EN LA ASOCIACIN PRO VIVIENDA LA FLORIDA I ETAPA DEL
DISTRITO
SICUANI, PROVINCIA DE CANCHIS CUSCO.
012
: CANON Y SOBRECANON
Und

SISTEMA DE ALCANTARILLADO:

Valorizacin Anterior
Valorizacin Actual
Precio
Metra
Unitari Parcial Metra
Metrad
do
Costo
%
Costo
o
do
o

ASOCIACION PRO VIVIENDA LA FLORIDA

02.01

SISTEMAS DE REDES DE DESAGUE


EXCAVACION DE ZANJAS EN
02.01.01.03MATERIAL COMPACTO H<2.00
m3 131.15
MT, ANCHO=0.50 mt.
02.01.03 PAVIMENTOS
CORTE DE CARPETA ASFALTICA
02.01.03.01
m2
1.20
E=3"
02.02
CAMARAS DE INSPECCION (BUZONES)
02.02.01

TRAZO, NIVELES Y REPLANTEO


DE ZANJAS PRE - EXCAVACION

02.02.03

13.44

###

0.00

9.03

10.84

1.20

0.00

0.00%

10.84 99.96%

2.05

2.20

2.05 99.80%

EXCAVACION EN TIERRA
COMPACTA

m3

8.02

13.44

107.81

0.00

0.00

02.02.04

DEMOLICION DE BUZONES
EXISTENTES

m3

5.74 166.00

952.84

3.15

522.90 54.88%

02.02.11

ENCOFRADO Y DESENCOFRADO
LOSA TECHO DE BUZON

m2

98.25

###

7.39

726.07 59.55%

m2

2.01 248.74

499.97

0.00

0.00

0.00%

m3

2.95 390.67

###

0.00

0.00

0.00%

02.02.07
02.02.12

COSTO DIRECTO

1,261.85

0.93

5,707.89

2.20

CONCRETO SOLADO e=0.05 m,


f'c=100 kg/cm2
CONCRETO F'c=175 Kg/cm2
PARED - BASE

1,762.63

0.00

0.00

0.00

0.00

8.02

107.81

2.59

429.94

5.02

493.22

2.01

499.97

2.95

1,152.48

0.00

12.41

131.15

0.00%

22.11%

4,446.03

AYORES METRADOS

Monto Expediente Tcnico


###
Monto Asignado PIA 2015
###
Fecha de Inicio de Obra:
3/3/2015
90 dias
AGUA POTABLE Y Plazo de Ejecucin:
RIDA I ETAPA DEL Fecha de Termino de Obra 7/1/2015
.

orizacin Actual
%

100.00%

Valorizacin Acumulada
Metra
do

Costo

131.15 1,762.63

Saldo por Valorizar


Metrad
Costo
o

###

0.00

0.00

0.00%

10.84

###

0.00

0.00

0.00%

0.00%

2.20

2.05

###

0.00

0.00

0.00%

8.02

107.81

###

0.00

0.00

0.00%

5.74

952.84

###

0.00

0.00

0.00%

12.41 1,219.28

###

0.00

0.00

0.00%

499.97

###

0.00

0.00

0.00%

2.95 1,152.48

###

0.00

0.00

0.00%

100.00%
45.12%
40.45%
100.00%
100.00%

77.89%

2.01

###

0.00

1.20

5,707.90

0.00%

0.00%

FORMATO No 09

VALORIZACIN DE APORTE COMUNAL E


FEBRERO 2015
Residente de Obra
Funcin
Programa
Sub- Programa
Obra

: ING.
018
SANEAMIENTO
040
SANEAMIENTO
088
MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y DESAGUE EN LA ASOCI
DEL DISTRITO SICUANI, PROVINCIA DE CANCHIS CUSCO.

Meta
Fuente Financiamiento

010
: CANON Y SOBRECANON

Item

DESCRIPCION

01

OBRAS PROVISIONALES, TRABAJOS PRELIMINARES

01.01

CONSTRUCCIONES PROVISIONALES Y TRABAJOS PRELIMINARES

Und

Metrado

Precio
Unitario

Parcial

Metrado

Valorizacin Anterior
Costo

12,662.03
8,022.33

01.01.01

CARTEL DE IDENTIFICACION DE OBRA

und

01.01.02

OFICINA DE RESIDENCIA Y ALMACEN

m2

21.00

57.73

1,212.33

0.00

0.00

0.00%

01.01.03

TRAZO NIVELES Y REPLANTEO

m2

47,000.00

0.13

6,110.00

0.00

0.00

0.00%

01.02

MOVILIZACION DE MAQUINARIA Y EQUIPO

0.00

0.00

0.00%

0.00

0.00

0.00%

01.02.01

MOVILIZACION Y DESMOVILIZACION DE EQUIPOS

01.03

SEGURIDAD Y SALUD

1.00

700.00

700.00

0.00

0.00

0.00%

2,669.70

glb

1.00

2669.70

2,669.70
1,970.00

glb

01.03.01

EQUIPOS DE PROTECCION INDIVIDUAL

02

CONSTRUCCION DE LA VIA

02.01

MOVIMIENTO DE TIERRAS (SUB RASANTE)

02.01.01

CORTE EN MATERIAL SUELTO

m3

16,320.00

0.62

10,118.40

16,320.00

10,118.40

100.00%

02.01.02

CORTE DE ROCA SUELTA

m3

120.00

0.29

34.80

120.00

34.80

100.00%

02.01.03

CORTE ROCA FIJA (VOLADURA DE ROCA)

m3

63.00

37.80

2,381.40

63.00

2,381.40

100.00%

02.01.04

ELIMINACION DE MATERIAL EXCEDENTE

m3

20,583.00

2.39

49,193.37

7,865.00

18,797.35

38.21%

1.00

1970.00

1,970.00
168,646.47
61,727.97

FORMATO No 09

VALORIZACIN DE APORTE COMUNAL E


FEBRERO 2015
Residente de Obra
Funcin
Programa
Sub- Programa
Obra

: ING.
018
SANEAMIENTO
040
SANEAMIENTO
088
MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y DESAGUE EN LA ASOCI
DEL DISTRITO SICUANI, PROVINCIA DE CANCHIS CUSCO.

Meta
Fuente Financiamiento

010
: CANON Y SOBRECANON

Item

DESCRIPCION

Und

Metrado

Precio
Unitario

Parcial

Metrado

Valorizacin Anterior
Costo

02.02

CONFORMACION DE BASE

02.02.01

CORTE, EXTRACCION Y ACUMULACION DE MATERIAL PARA BASE

m3

9,400.00

0.84

7,896.00

9,100.00

7,644.00

96.81%

02.02.02

CARGUIO DE MATERIAL PARA BASE

m3

11,750.00

0.51

5,992.50

11,375.00

5,801.25

96.81%

02.02.03

TRANSPORTE DE MATERIAL PARA BASE

m3

11,750.00

3.12

36,660.00

11,375.00

35,490.00

96.81%

02.02.04

CONFORMACION DE BASE GRANULAR

m2

47,000.00

0.96

45,120.00

45,255.00

43,444.80

96.29%

02.02.05

RIEGO EN BASE GRANULAR

m2

47,000.00

0.12

5,640.00

45,255.00

5,430.60

96.29%

02.03

CUNETAS

02.03.01

CUNETAS SIN REVESTIR

10,000.00

5,100.00

90.91%

03

CONSTRUCCION DE PONTON

03.01

TRABAJOS PRELIMINARES

102.00

106.08

72.03%

03.01.01

TRAZO Y REPLANTEO PRELIMINAR

03.02

MOVIMIENTO DE TIERRAS

101,308.50

5,610.00

11,000.00

0.51

5,610.00
73,481.32
147.26

m2

141.60

1.04

147.26
1,083.61

03.02.01

EXCAVACION MANUAL EN TERRENO SUELTO

m3

03.02.02

RELLENO Y COMPACTADO CON MATERIAL PROPIO

m3

3.84

16.24

62.36

1.40

22.74

36.46%

03.02.03

ELIMINACION DE MATERIAL EXCEDENTE

m3

69.89

2.39

167.04

48.00

114.72

68.68%

57.60

14.83

854.21

40.50

600.62

70.31%

FORMATO No 09

VALORIZACIN DE APORTE COMUNAL E


FEBRERO 2015
Residente de Obra
Funcin
Programa
Sub- Programa
Obra

: ING.
018
SANEAMIENTO
040
SANEAMIENTO
088
MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y DESAGUE EN LA ASOCI
DEL DISTRITO SICUANI, PROVINCIA DE CANCHIS CUSCO.

Meta
Fuente Financiamiento

010
: CANON Y SOBRECANON

Item

DESCRIPCION

Und

Metrado

Precio
Unitario

Parcial

Metrado

Valorizacin Anterior
Costo

03.03

CIMIENTOS

9,241.60

03.03.01

ENCOFRADO Y DESENCOFRADO DE CIMIENTOS

m2

14.40

23.25

334.80

10.00

232.50

69.44%

03.03.02

CONCRETO f'c = 175 KG/CM2, EN CIMIENTOS

m3

34.56

257.72

8,906.80

24.52

6,319.29

70.95%

03.04

ESTRIBOS

30,801.42

03.04.01

ENCOFRADO Y DESENCOFRADO DE ESTRIBOS

m2

03.04.02

CONCRETO f'c = 175 KG/CM2, EN ESTRIBOS

m3

03.05

ESTRUCTURA PRINCIPAL (LOSA)

118.02

23.25

2,743.97

84.00

1,953.00

71.17%

96.84

289.73

28,057.45

68.24

19,771.18

70.47%

32,207.43

FORMATO No 09

VALORIZACIN DE APORTE COMUNAL E


FEBRERO 2015
Residente de Obra
Funcin
Programa
Sub- Programa
Obra

: ING.
018
SANEAMIENTO
040
SANEAMIENTO
088
MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y DESAGUE EN LA ASOCI
DEL DISTRITO SICUANI, PROVINCIA DE CANCHIS CUSCO.

Meta
Fuente Financiamiento

010
: CANON Y SOBRECANON

Item

DESCRIPCION

Und

Metrado

Precio
Unitario

Parcial

Metrado

Valorizacin Anterior
Costo

03.05.01

CONCRETO ARMADO f'c = 210 KG/CM2 EN LOSA

m3

32.40

364.05

11,795.22

24.00

8,737.20

74.07%

03.05.02

ENCOFRADO Y DESENCOFRADO DE LOSA

m2

95.40

39.94

3,810.28

68.80

2,747.87

72.12%

03.05.03

ACERO CORRUGADO Fy = 4200 KG/CM2, EN LOSA

kg

3,388.15

4.90

16,601.94

2,440.00

11,956.00

72.02%

04

ALCANTARILLAS

19,982.08

04.01

ALCANTARILLAS SIMPLE CON TUBERIA

13,936.25

04.01.01

TRAZO Y REPLANTEO PRELIMINAR

m2

56.40

1.04

58.66

42.30

43.99

75.00%

04.01.02

EXCAVACION MANUAL EN TERRENO SUELTO

m3

61.20

14.83

907.60

45.90

680.70

75.00%

04.01.03

RELLENO Y COMPACTADO CON MATERIAL PROPIO

m3

27.54

16.24

447.25

20.70

336.17

75.16%

04.01.04

ELIMINACION DE MATERIAL EXCEDENTE

m3

43.76

2.39

104.59

32.85

78.51

75.07%

04.01.05

ENCOFRADO Y DESENCOFRADO DE CAMARA DE CAPTACION

m2

79.20

23.25

1,841.40

59.40

1,381.05

75.00%

04.01.06

CONCRETO ARMADO f'c = 210 KG/CM2 EN CAMARA DE CAPTACIO m3

19.68

364.05

7,164.50

14.76

5,373.38

75.00%

04.01.07

TENDIDO DE TUBERIAS D = 200 MM

54.00

63.19

3,412.26

40.50

2,559.20

75.00%

04.02

ALCANTARILLAS DE CONCRETO ARMADO

04.02.01

TRAZO Y REPLANTEO PRELIMINAR

m2

14.40

1.04

14.98

14.40

14.98

100.00%

04.02.02

EXCAVACION MANUAL EN TERRENO SUELTO

m3

10.80

14.83

160.16

10.80

160.16

100.00%

6,045.83

FORMATO No 09

VALORIZACIN DE APORTE COMUNAL E


FEBRERO 2015
Residente de Obra
Funcin
Programa
Sub- Programa
Obra

: ING.
018
SANEAMIENTO
040
SANEAMIENTO
088
MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y DESAGUE EN LA ASOCI
DEL DISTRITO SICUANI, PROVINCIA DE CANCHIS CUSCO.

Meta
Fuente Financiamiento

010
: CANON Y SOBRECANON

Item

DESCRIPCION

Und

Metrado

Precio
Unitario

Parcial

Metrado

Valorizacin Anterior
Costo

04.02.03

RELLENO Y COMPACTADO CON MATERIAL PROPIO

m3

2.16

16.24

35.08

2.16

35.08

100.00%

04.02.04

ELIMINACION DE MATERIAL EXCEDENTE

m3

11.23

2.39

26.84

11.23

26.84

100.00%

04.02.05

ENCOFRADO Y DESENCOFRADO DE CAMARA DE CAPTACION

m2

19.20

23.25

446.40

19.20

446.40

100.00%

04.02.06

CONCRETO ARMADO f'c = 210 KG/CM2 EN CAMARA DE CAPTACIO m3

4.74

364.05

1,725.60

4.74

1,725.60

100.00%

04.02.07

CONCRETO ARMADO f'c = 210 KG/CM2 EN ALCANTARILLA

m3

3.11

364.05

1,132.20

3.11

1,132.20

100.00%

04.02.08

ENCOFRADO Y DESENCOFRADO DE ALCANTARILLA

m2

17.10

23.25

397.58

17.10

397.58

100.00%

04.02.09

ACERO CORRUGADO Fy = 4200 KG/CM2, EN ALCANTARILLA

kg

430.00

4.90

2,107.00

430.00

2,107.00

100.00%

05

VARIOS

21,000.00

05.01

MANTENIMIENTO DE EQUIPOS Y MAQUINARIA

20,000.00

05.01.01

MANTENIMIENTO DE EQUIPOS Y MAQUINARIAS

1.00

20,000.00

100.00%

05.02

FLETE

05.02.01

FLETE TERRESTRE

0.00

0.00

0.00%

COSTO DIRECTO
GASTOS GENERALES
GASTOS DE SUPERVISION
GASTOS DE LIQUIDACION

glb

1.00

20000.00

20,000.00
1,000.00

glb

1.00

9.57%
1.72%
1.01%

1000.00

1,000.00

295,771.93
28,312.99
5,090.00
3,000.00

223,302.61
21,375.81
3,842.86
2,264.95

75.50%

FORMATO No 09

VALORIZACIN DE APORTE COMUNAL E


FEBRERO 2015

Item

Residente de Obra
Funcin
Programa
Sub- Programa
Obra

: ING.
018
SANEAMIENTO
040
SANEAMIENTO
088
MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y DESAGUE EN LA ASOCI
DEL DISTRITO SICUANI, PROVINCIA DE CANCHIS CUSCO.

Meta
Fuente Financiamiento

010
: CANON Y SOBRECANON

DESCRIPCION

GASTOS DE EXPEDIENTE TECNICO


PRESUPUESTO TOTAL

Und

Metrado

1.35%

Precio
Unitario

Parcial

4,000.00
336,174.92

Metrado

Valorizacin Anterior
Costo

3,019.93
253,806.16

ORMATO No 09

ORTE COMUNAL EN LA OBRA


BRERO 2015

OTABLE Y DESAGUE EN LA ASOCIACIN PRO VIVIENDA LA FLORIDA I ETAPA

Metrado

Valorizacin Actual
Costo

Monto Expediente Tcnico:


Monto Asignado PIA 2015:
Fecha de Inicio de Obra:
Plazo de Ejecucin:
Fecha de Termino de Obra:

Valorizacin Acumulada
Metrado
Costo

S/. 300,263.88
S/. 156,923.00
3/3/2015
90 DIAS
dias
7/1/2015

Metrado

Saldo por Valorizar


Costo

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

700.00

100.00%

7.00

404.11

33.33%

7.00

404.11

33.33%

14.00

808.22

66.67%

0.00

0.00

0.00%

0.00

0.00

0.00%

47,000.00

6,110.00

100.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

2,669.70

100.00%

1.00

1,970.00

100.00%

1.00

1,970.00

100.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

16,320.00

10,118.40

100.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

120.00

34.80

100.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

63.00

2,381.40

100.00%

0.00

0.00

0.00%

9,100.00

21,749.00

44.21%

16,965.00

40,546.35

82.42%

3,618.00

8,647.02

17.58%

ORMATO No 09

ORTE COMUNAL EN LA OBRA


BRERO 2015

OTABLE Y DESAGUE EN LA ASOCIACIN PRO VIVIENDA LA FLORIDA I ETAPA

Metrado

Valorizacin Actual
Costo

Monto Expediente Tcnico:


Monto Asignado PIA 2015:
Fecha de Inicio de Obra:
Plazo de Ejecucin:
Fecha de Termino de Obra:

Valorizacin Acumulada
Metrado
Costo

S/. 300,263.88
S/. 156,923.00
3/3/2015
90 DIAS
dias
7/1/2015

Metrado

Saldo por Valorizar


Costo

0.00

0.00

0.00%

9,100.00

7,644.00

96.81%

300.00

252.00

3.19%

0.00

0.00

0.00%

11,375.00

5,801.25

96.81%

375.00

191.25

3.19%

0.00

0.00

0.00%

11,375.00

35,490.00

96.81%

375.00

1,170.00

3.19%

0.00

0.00

0.00%

45,255.00

43,444.80

96.29%

1,745.00

1,675.20

3.71%

0.00

0.00

0.00%

45,255.00

5,430.60

96.29%

1,745.00

209.40

3.71%

0.00

0.00

0.00%

10,000.00

5,100.00

90.91%

1,000.00

510.00

9.09%

39.60

41.18

27.97%

141.60

147.26

100.00%

0.00

0.00

0.00%

15.00

222.45

26.04%

55.50

823.07

96.35%

2.10

31.14

3.65%

1.40

22.74

36.46%

2.80

45.47

72.92%

1.04

16.89

27.08%

21.89

52.32

31.32%

69.89

167.04

100.00%

0.00

0.00

0.00%

ORMATO No 09

ORTE COMUNAL EN LA OBRA


BRERO 2015

OTABLE Y DESAGUE EN LA ASOCIACIN PRO VIVIENDA LA FLORIDA I ETAPA

Metrado

Valorizacin Actual
Costo

Monto Expediente Tcnico:


Monto Asignado PIA 2015:
Fecha de Inicio de Obra:
Plazo de Ejecucin:
Fecha de Termino de Obra:

Valorizacin Acumulada
Metrado
Costo

S/. 300,263.88
S/. 156,923.00
3/3/2015
90 DIAS
dias
7/1/2015

Metrado

Saldo por Valorizar


Costo

4.40

102.30

30.56%

14.40

334.80

100.00%

0.00

0.00

0.00%

10.04

2,587.51

29.05%

34.56

8,906.80

100.00%

0.00

0.00

0.00%

17.00

395.25

14.40%

101.00

2,348.25

85.58%

17.02

395.72

14.42%

28.60

8,286.28

29.53%

96.84

28,057.45

100.00%

0.00

0.00

0.00%

ORMATO No 09

ORTE COMUNAL EN LA OBRA


BRERO 2015

OTABLE Y DESAGUE EN LA ASOCIACIN PRO VIVIENDA LA FLORIDA I ETAPA

Metrado

Valorizacin Actual
Costo

Monto Expediente Tcnico:


Monto Asignado PIA 2015:
Fecha de Inicio de Obra:
Plazo de Ejecucin:
Fecha de Termino de Obra:

Valorizacin Acumulada
Metrado
Costo

S/. 300,263.88
S/. 156,923.00
3/3/2015
90 DIAS
dias
7/1/2015

Metrado

Saldo por Valorizar


Costo

8.40

3,058.02

25.93%

32.40

11,795.22

100.00%

0.00

0.00

0.00%

26.60

1,062.40

27.88%

95.40

3,810.28

100.00%

0.00

0.00

0.00%

948.15

4,645.94

27.98%

3,388.15

16,601.94

100.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

42.30

43.99

75.00%

14.10

14.66

24.99%

0.00

0.00

0.00%

45.90

680.70

75.00%

15.30

226.90

25.00%

0.00

0.00

0.00%

20.70

336.17

75.16%

6.84

111.08

24.84%

0.00

0.00

0.00%

32.85

78.51

75.07%

10.91

26.07

24.93%

0.00

0.00

0.00%

59.40

1,381.05

75.00%

19.80

460.35

25.00%

0.00

0.00

0.00%

14.76

5,373.38

75.00%

4.92

1,791.13

25.00%

0.00

0.00

0.00%

40.50

2,559.20

75.00%

13.50

853.07

25.00%

0.00

0.00

0.00%

14.40

14.98

100.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

10.80

160.16

100.00%

0.00

0.00

0.00%

ORMATO No 09

ORTE COMUNAL EN LA OBRA


BRERO 2015

OTABLE Y DESAGUE EN LA ASOCIACIN PRO VIVIENDA LA FLORIDA I ETAPA

Metrado

Valorizacin Actual
Costo

Monto Expediente Tcnico:


Monto Asignado PIA 2015:
Fecha de Inicio de Obra:
Plazo de Ejecucin:
Fecha de Termino de Obra:

Valorizacin Acumulada
Metrado
Costo

S/. 300,263.88
S/. 156,923.00
3/3/2015
90 DIAS
dias
7/1/2015

Metrado

Saldo por Valorizar


Costo

0.00

0.00

0.00%

2.16

35.08

100.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

11.23

26.84

100.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

19.20

446.40

100.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

4.74

1,725.60

100.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

3.11

1,132.20

100.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

17.10

397.58

100.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

430.00

2,107.00

100.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

20,000.00

100.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

1,000.00

100.00%

44,599.49
4,269.32
767.52
452.37

15.08%

267,902.13
25,645.13
4,610.38
2,717.32

90.58%

27,869.80
2,667.86
479.62
282.68

9.42%

ORMATO No 09

ORTE COMUNAL EN LA OBRA


BRERO 2015

OTABLE Y DESAGUE EN LA ASOCIACIN PRO VIVIENDA LA FLORIDA I ETAPA

Metrado

Valorizacin Actual
Costo

603.16
50,691.87

Monto Expediente Tcnico:


Monto Asignado PIA 2015:
Fecha de Inicio de Obra:
Plazo de Ejecucin:
Fecha de Termino de Obra:

Valorizacin Acumulada
Metrado
Costo

3,623.09
304,498.06

S/. 300,263.88
S/. 156,923.00
3/3/2015
90 DIAS
dias
7/1/2015

Metrado

Saldo por Valorizar


Costo

376.91
31,676.87

METRADO DIARIO DEL APO


FEBR
Residente de Obra
Funcin
Programa
Sub- Programa
Proyecto

: ING.
: 15
TRANSPORTE
: 033
TRASNPORTE TERRESTRE
:MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y DESAGUE EN LA
CUSCO.

Meta
Fuente Financiamiento

010
: CANON Y SOBRECANON

Item

PARTIDA

PROGRAMADO
UNID

ANTERIOR

Metrado

01

OBRAS PROVISIONALES, TRABAJOS PRELIMINARES

01.01

CONSTRUCCIONES PROVISIONALES Y TRABAJOS PRELIMINARES

01.01.01

CARTEL DE IDENTIFICACION DE OBRA

und

1.00

0.00

01.01.02

OFICINA DE RESIDENCIA Y ALMACEN

m2

21.00

14.00

01.01.03

TRAZO NIVELES Y REPLANTEO

m2

01.02

MOVILIZACION DE MAQUINARIA Y EQUIPO

01.02.01

MOVILIZACION Y DESMOVILIZACION DE EQUIPOS

01.03

SEGURIDAD Y SALUD

01.03.01

EQUIPOS DE PROTECCION INDIVIDUAL

02

CONSTRUCCION DE LA VIA

02.01

MOVIMIENTO DE TIERRAS (SUB RASANTE)

02.01.01

CORTE EN MATERIAL SUELTO

m3

02.01.02

CORTE DE ROCA SUELTA

m3

120.00

120.00

02.01.03

CORTE ROCA FIJA (VOLADURA DE ROCA)

m3

63.00

63.00

02.01.04

ELIMINACION DE MATERIAL EXCEDENTE

m3

20,583.00

7,865.00

Cant

Cant

Cant

Cant

5
Cant

Cant

Cant

Cant

3.5

47,000.00 47,000.00

glb

1.00

1.00

glb

1.00

0.00

16,320.00 16,320.00

3.5

METRADO DIARIO DEL APO


FEBR
Residente de Obra
Funcin
Programa
Sub- Programa
Proyecto

: ING.
: 15
TRANSPORTE
: 033
TRASNPORTE TERRESTRE
:MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y DESAGUE EN LA
CUSCO.

Meta
Fuente Financiamiento

010
: CANON Y SOBRECANON

Item

PARTIDA

PROGRAMADO
UNID

ANTERIOR

Metrado

02.02

CONFORMACION DE BASE

02.02.01

CORTE, EXTRACCION Y ACUMULACION DE MATERIAL PARA BASE

m3

02.02.02

CARGUIO DE MATERIAL PARA BASE

m3

11,750.00 11,375.00

02.02.03

TRANSPORTE DE MATERIAL PARA BASE

m3

11,750.00 11,375.00

02.02.04

CONFORMACION DE BASE GRANULAR

m2

47,000.00 45,255.00

02.02.05

RIEGO EN BASE GRANULAR

m2

47,000.00 45,255.00

02.03

CUNETAS

02.03.01

CUNETAS SIN REVESTIR

11,000.00 10,000.00

03

CONSTRUCCION DE PONTON

03.01

TRABAJOS PRELIMINARES

03.01.01

TRAZO Y REPLANTEO PRELIMINAR

03.02

MOVIMIENTO DE TIERRAS

03.02.01

9,400.00

Cant

Cant

Cant

Cant

5
Cant

Cant

Cant

Cant

9,100.00

m2

141.60

102.00

EXCAVACION MANUAL EN TERRENO SUELTO

m3

57.60

40.50

03.02.02

RELLENO Y COMPACTADO CON MATERIAL PROPIO

m3

3.84

1.40

03.02.03

ELIMINACION DE MATERIAL EXCEDENTE

m3

69.89

48.00

20 19.6

METRADO DIARIO DEL APO


FEBR
Residente de Obra
Funcin
Programa
Sub- Programa
Proyecto

: ING.
: 15
TRANSPORTE
: 033
TRASNPORTE TERRESTRE
:MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y DESAGUE EN LA
CUSCO.

Meta
Fuente Financiamiento

010
: CANON Y SOBRECANON

Item

PARTIDA

PROGRAMADO
UNID

ANTERIOR

Metrado

03.03

CIMIENTOS

03.03.01

ENCOFRADO Y DESENCOFRADO DE CIMIENTOS

m2

14.40

10.00

03.03.02

CONCRETO f'c = 175 KG/CM2, EN CIMIENTOS

m3

34.56

24.52

03.04

ESTRIBOS

03.04.01

ENCOFRADO Y DESENCOFRADO DE ESTRIBOS

m2

118.02

84.00

03.04.02

CONCRETO f'c = 175 KG/CM2, EN ESTRIBOS

m3

96.84

68.24

03.05

ESTRUCTURA PRINCIPAL (LOSA)

Cant

Cant

Cant

Cant

5
Cant

Cant

Cant

Cant

METRADO DIARIO DEL APO


FEBR
Residente de Obra
Funcin
Programa
Sub- Programa
Proyecto

: ING.
: 15
TRANSPORTE
: 033
TRASNPORTE TERRESTRE
:MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y DESAGUE EN LA
CUSCO.

Meta
Fuente Financiamiento

010
: CANON Y SOBRECANON

Item

PARTIDA

PROGRAMADO
UNID

ANTERIOR

Metrado

03.05.01

CONCRETO ARMADO f'c = 210 KG/CM2 EN LOSA

m3

32.40

24.00

03.05.02

ENCOFRADO Y DESENCOFRADO DE LOSA

m2

95.40

68.80

03.05.03

ACERO CORRUGADO Fy = 4200 KG/CM2, EN LOSA

kg

3,388.15

2,440.00

04

ALCANTARILLAS

04.01

ALCANTARILLAS SIMPLE CON TUBERIA

04.01.01

TRAZO Y REPLANTEO PRELIMINAR

m2

56.40

42.30

04.01.02

EXCAVACION MANUAL EN TERRENO SUELTO

m3

61.20

45.90

04.01.03

RELLENO Y COMPACTADO CON MATERIAL PROPIO

m3

27.54

20.70

04.01.04

ELIMINACION DE MATERIAL EXCEDENTE

m3

43.76

32.85

04.01.05

ENCOFRADO Y DESENCOFRADO DE CAMARA DE CAPTACION

m2

79.20

59.40

04.01.06

CONCRETO ARMADO f'c = 210 KG/CM2 EN CAMARA DE CAPTACION

m3

19.68

14.76

04.01.07

TENDIDO DE TUBERIAS D = 200 MM

54.00

40.50

04.02

ALCANTARILLAS DE CONCRETO ARMADO

04.02.01

TRAZO Y REPLANTEO PRELIMINAR

m2

14.40

14.40

04.02.02

EXCAVACION MANUAL EN TERRENO SUELTO

m3

10.80

10.80

Cant

Cant

Cant

Cant

5
Cant

Cant

Cant

Cant

METRADO DIARIO DEL APO


FEBR
Residente de Obra
Funcin
Programa
Sub- Programa
Proyecto

: ING.
: 15
TRANSPORTE
: 033
TRASNPORTE TERRESTRE
:MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y DESAGUE EN LA
CUSCO.

Meta
Fuente Financiamiento

010
: CANON Y SOBRECANON

Item

PARTIDA

PROGRAMADO
UNID

ANTERIOR

Metrado

04.02.03

RELLENO Y COMPACTADO CON MATERIAL PROPIO

m3

2.16

2.16

04.02.04

ELIMINACION DE MATERIAL EXCEDENTE

m3

11.23

11.23

04.02.05

ENCOFRADO Y DESENCOFRADO DE CAMARA DE CAPTACION

m2

19.20

19.20

04.02.06

CONCRETO ARMADO f'c = 210 KG/CM2 EN CAMARA DE CAPTACION

m3

4.74

4.74

04.02.07

CONCRETO ARMADO f'c = 210 KG/CM2 EN ALCANTARILLA

m3

3.11

3.11

04.02.08

ENCOFRADO Y DESENCOFRADO DE ALCANTARILLA

m2

17.10

17.10

04.02.09

ACERO CORRUGADO Fy = 4200 KG/CM2, EN ALCANTARILLA

kg

430.00

430.00

05

VARIOS

05.01

MANTENIMIENTO DE EQUIPOS Y MAQUINARIA

05.01.01

MANTENIMIENTO DE EQUIPOS Y MAQUINARIAS

glb

1.00

1.00

05.02

FLETE

05.02.01

FLETE TERRESTRE

glb

1.00

0.00

Cant

Cant

Cant

Cant

5
Cant

Cant

Cant

Cant

METRADO DIARIO DEL APO


FEBR

Item

Residente de Obra
Funcin
Programa
Sub- Programa
Proyecto

: ING.
: 15
TRANSPORTE
: 033
TRASNPORTE TERRESTRE
:MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y DESAGUE EN LA
CUSCO.

Meta
Fuente Financiamiento

010
: CANON Y SOBRECANON
PARTIDA

PROGRAMADO
UNID

Metrado

ANTERIOR

Cant

Cant

Cant

Cant

5
Cant

Cant

Cant

Cant

FORMATO N 004

DEL APORTE COMUNAL EN LA OBRA N 01


FEBRERO 2015

DESAGUE EN LA ASOCIACIN PRO VIVIENDA LA FLORIDA I ETAPA DEL DISTRITO SICUANI, PROVINCIA DE CANCHIS

Monto Expediente Tcnico:


Monto Asignado PIA 2015:
Fecha de Inicio de Obra:
Plazo de Ejecucin:
Fecha de Termino de Obra:

FEBRERO 2015
9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

TOTAL MES

0.00
7.00
0.00

0.00

1.00

0.00
0.00
0.00

700 700 700 700 700

700 700 700 700 700

700 700 700

9,100.00

FORMATO N 004

DEL APORTE COMUNAL EN LA OBRA N 01


FEBRERO 2015

DESAGUE EN LA ASOCIACIN PRO VIVIENDA LA FLORIDA I ETAPA DEL DISTRITO SICUANI, PROVINCIA DE CANCHIS

Monto Expediente Tcnico:


Monto Asignado PIA 2015:
Fecha de Inicio de Obra:
Plazo de Ejecucin:
Fecha de Termino de Obra:

FEBRERO 2015
9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

TOTAL MES

0.00
0.00
0.00
0.00
0.00

0.00

39.60

15.00

1.4
11

11

1.40
21.89

FORMATO N 004

DEL APORTE COMUNAL EN LA OBRA N 01


FEBRERO 2015

DESAGUE EN LA ASOCIACIN PRO VIVIENDA LA FLORIDA I ETAPA DEL DISTRITO SICUANI, PROVINCIA DE CANCHIS

Monto Expediente Tcnico:


Monto Asignado PIA 2015:
Fecha de Inicio de Obra:
Plazo de Ejecucin:
Fecha de Termino de Obra:

FEBRERO 2015
9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

2.2

2.2

TOTAL MES

4.40

5.5 4.54

10.04

17

17.00

15

13.6

28.60

FORMATO N 004

DEL APORTE COMUNAL EN LA OBRA N 01


FEBRERO 2015
Monto Expediente Tcnico:
Monto Asignado PIA 2015:
Fecha de Inicio de Obra:
Plazo de Ejecucin:
Fecha de Termino de Obra:

DESAGUE EN LA ASOCIACIN PRO VIVIENDA LA FLORIDA I ETAPA DEL DISTRITO SICUANI, PROVINCIA DE CANCHIS

FEBRERO 2015
9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

8.4
9

10

TOTAL MES
8.40

7.6

26.60

474 474

948.15

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

FORMATO N 004

DEL APORTE COMUNAL EN LA OBRA N 01


FEBRERO 2015

DESAGUE EN LA ASOCIACIN PRO VIVIENDA LA FLORIDA I ETAPA DEL DISTRITO SICUANI, PROVINCIA DE CANCHIS

Monto Expediente Tcnico:


Monto Asignado PIA 2015:
Fecha de Inicio de Obra:
Plazo de Ejecucin:
Fecha de Termino de Obra:

FEBRERO 2015
9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

TOTAL MES
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

FORMATO N 004

DEL APORTE COMUNAL EN LA OBRA N 01


FEBRERO 2015

DESAGUE EN LA ASOCIACIN PRO VIVIENDA LA FLORIDA I ETAPA DEL DISTRITO SICUANI, PROVINCIA DE CANCHIS

Monto Expediente Tcnico:


Monto Asignado PIA 2015:
Fecha de Inicio de Obra:
Plazo de Ejecucin:
Fecha de Termino de Obra:

FEBRERO 2015
9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

Cant

TOTAL MES

S/. 300,263.88
S/. 156,923.00
3/3/2015
90 DIAS
7/1/2015

ACUMULADO

dias

SALDO

0.00

1.00

21.00

0.00

47,000.00

0.00

1.00

0.00

1.00

0.00

16,320.00

0.00

120.00

0.00

63.00

0.00

16,965.00

3,618.00

S/. 300,263.88
S/. 156,923.00
3/3/2015
90 DIAS
7/1/2015

ACUMULADO

dias

SALDO

9,100.00

300.00

11,375.00

375.00

11,375.00

375.00

45,255.00

1,745.00

45,255.00

1,745.00

10,000.00

1,000.00

141.60

0.00

55.50

2.10

2.80

1.04

69.89

0.00

S/. 300,263.88
S/. 156,923.00
3/3/2015
90 DIAS
7/1/2015

ACUMULADO

dias

SALDO

14.40

0.00

34.56

0.00

101.00

17.02

96.84

0.00

S/. 300,263.88
S/. 156,923.00
3/3/2015
90 DIAS
7/1/2015

ACUMULADO

dias

SALDO

32.40

0.00

95.40

0.00

3,388.15

0.00

42.30

14.10

45.90

15.30

20.70

6.84

32.85

10.91

59.40

19.80

14.76

4.92

40.50

13.50

14.40

0.00

10.80

0.00

S/. 300,263.88
S/. 156,923.00
3/3/2015
90 DIAS
7/1/2015

ACUMULADO

dias

SALDO

2.16

0.00

11.23

0.00

19.20

0.00

4.74

0.00

3.11

0.00

17.10

0.00

430.00

0.00

1.00

0.00

0.00

1.00

S/. 300,263.88
S/. 156,923.00
3/3/2015
90 DIAS
7/1/2015

ACUMULADO

dias

SALDO

MUNICIPALIDAD PROVINCIAL DE CANCHIS


GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
SUB GERENCIA DE INFRAESTRUCTURA URBANA

SUSTENTOS
VALORIZACION DE OBRA

PLANILLA DIARIA DE AVANCE DE PARTIDAS (METRADOS)


CORRESPONDIENTE A April/2015
Propietario
Elaborado por
Revisado por:
Fecha de Elaboracion

:
:
:
:

MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y


DESAGUE EN LA ASOCIACIN PRO VIVIENDA LA FLORIDA I ETAPA
DEL DISTRITO SICUANI, PROVINCIA DE CANCHIS CUSCO.
MUNICIPALIDAD PROVINCIAL DE CANCHIS
ING. ALEDIO OSCAR NINA TTICA
ING. CHARLES ALFREDO CHIRINOS LLAMOCCA
sbado, 16 de mayo de 2015

und

1.00

01.01.02

ALQUILER DE ALMACEN DE OBRA

mes

3.00

01.02

OBRAS PRELIMINARES

01.02.01

LIMPIEZA DE TERRENO MANUAL

m2

468.46

01.02.02

LIMPIEZA DE TERRENO CON MAQUINARIA

m3

78.07

01.02.03

TRANSPORTE DE MATERIAL EXCEDENTE


CON VOLQUETES

m3

97.58

01.03

RED DE AGUA POTABLE

1.00

0.00

0.00

0.00 468.46

0.00

0.00

0.00

78.07

0.00

0.00

0.00

97.58

0.00

0.00

0.00

0.00

74.57

0.00 74.57 349.00

74.57

0.00 74.57 349.00

30/Apr Thu

2.00

29/Apr Wed

1.00

28/Apr Tue

0.00

27/Apr Mon

1.00

26/Apr Sun

Fri

1.00

25/Apr Sat

24/Apr

23/Apr Thu

22/Apr Wed

21/Apr Tue

20/Apr Mon

19/Apr Sun

Fri

18/Apr Sat

17/Apr

16/Apr Thu

15/Apr Wed

14/Apr Tue

13/Apr Mon

12/Apr Sun

Fri

11/Apr Sat

10/Apr

09/Apr Thu

08/Apr Wed

07/Apr Tue

06/Apr Mon

Fri

ANTERIOR

CARTEL DE IDENTIFICACION DE OBRAS


3.60m x 2.40m

TOTAL MES

01.01.01

0.00

ASOCIACION PRO VIVIENDA LA FLORIDA

1.00

OBRAS PROVISIONALES

28

SISTEMA DE AGUA POTABLE:

01.01

31.36 28

01

05/Apr Sun

Met.
PROY.

04/Apr Sat

Und

03/Apr

DESCRIPCION

02/Apr Thu

Item

01/Apr Wed

April

SALDO

ACUMULADO

Obra

1.00

TRAZO, NIVELES Y REPLANTEO DE ZANJAS


PRE - EXCAVACION

423.57

01.03.01.0

TRAZO, NIVELES Y REPLANTEO DE ZANJAS


POST - EXCAVACION

423.57

82.32

0.00 82.32 216.76

198.90

0.00

0.00

0.00 198.90

423.57

0.00

0.00

0.00 423.57

423.57

0.00

0.00

0.00 423.57

423.57

0.00

0.00

0.00 423.57

423.57

0.00

0.00

0.00 423.57

423.57

0.00

0.00

0.00 423.57

299.08

6.72

EXCAVACION DE ZANJAS EN MATERIAL


01.03.01.0
m3
COMPACTO H<2.00 MT, ANCHO=0.50 mt.
ELIMINACION DE TUBERIAS DE AGUA (RED
01.03.01.0
m
DE AGUA ANTIGUO)
REFINE Y NIVELACION DE FONDO DE
01.03.01.0
m
ZANJAS (ANCHO = 0.50 MT)
CAMA DE APOYO DE ARENA DE H=0.10
01.03.01.0
m
MT., ANCHO = 0.50 mt.
PREPARACION Y COLOCACION DE 2DA
01.03.01.0
m
CAMA (CON MATERIAL SELECCIONADO)
RELLENO Y COMPACTADO CON MATERIAL
01.03.01.0
m
PROPIO EN CAPAS DE 0.20M

44.24 46.57

01.03.01.0

46.57

01.03.01 MOVIMIENTO DE TIERRAS

01.03.02 SUMINISTRO E INSTALAC. DE TUBERIA PVC NTP ISO 4422 UF C/ANILLO DE 63 mm


01.03.02.0

TUBERIA PVC NTP ISO 4422 UF C/ANILLO


DE 63 mm C-10

01.03.02. COLOCACION DE ACCESORIOS


01.03.02.0SUMINISTRO DE ACCESORIOS

glb

1.00

0.00

0.00

0.00

1.00

01.03.02.0INSTALACION Y ACCESORIOS

und

12.00

0.00

0.00

0.00

12.00

423.57

0.00

0.00

0.00 423.57

m2

5.00

0.00

0.00

0.00

5.00

m2

5.00

0.00

0.00

0.00

5.00

01.03.02.0PRUEBA HIDRAULICA Y DESINFECCION

01.03.03 PAVIMENTOS
01.03.03.0CORTE DE CARPETA ASFALTICA E=3"
01.03.03.0

REPOSICION CARPETA ASFALTICA EN


CALIENTE E=3"

01.04

CONEXIONES DOMICILIARIAS - AGUA POTABLE

01.04.01
01.04.02
01.04.03
01.04.04
01.04.05
01.04.06

TRAZO, NIVELES Y REPLANTEO DE ZANJAS


PRE - EXCAVACION
EXCAVACION DE ZANJAS EN MATERIAL
COMPACTO H<2.00 MT, ANCHO=0.50 mt.
REFINE Y NIVELACION DE FONDO DE
ZANJAS (ANCHO = 0.50 MT)
CAMA DE APOYO DE ARENA DE H=0.10
MT., ANCHO = 0.50 mt.
PREPARACION Y COLOCACION DE 2DA
CAMA (CON MATERIAL SELECCIONADO)
RELLENO Y COMPACTADO CON MATERIAL
PROPIO EN CAPAS DE 0.20M

325.00

0.00

0.00

0.00 325.00

m3

193.01

0.00

0.00

0.00 193.01

325.00

0.00

0.00

0.00 325.00

325.00

0.00

0.00

0.00 325.00

325.00

0.00

0.00

0.00 325.00

325.00

0.00

0.00

0.00 325.00

01.04.07 CONEXIONES DOMICILIARIAS DE AGUA


01.04.07.0SUMINISTRO DE ACCESORIOS

glb

35.00

0.00

0.00

0.00

01.04.07.0INSTALACION Y ACCESORIOS

und

420.00

0.00

0.00

0.00 420.00

35.00

325.00

0.00

0.00

0.00 325.00

01.04.07.0

SUMINISTRO E INSTALAC. DE TUBERIA


PVC SAP D=1/2"x5m C-10

01.05

VALVULAS DE CONTROL (02 Unid)

01.05.01

TRAZO, NIVELES Y REPLANTEO DE


VALVULA DE CONTROL

m2

1.80

0.00

0.00

0.00

1.80

01.05.02

EXCAVACION EN TIERRA COMPACTA

m3

2.16

0.00

0.00

0.00

2.16

01.05.03

ACARREADO DE MATERIAL EXCEDENTE


(D=30m.)

m3

2.70

0.00

0.00

0.00

2.70

01.05.04

ELIMINACION DE MATERIAL EXCEDENTE

m3

2.70

0.00

0.00

0.00

2.70

m2

1.80

0.00

0.00

0.00

1.80

kg

24.07

0.00

0.00

0.00

24.07

m2

01.05.05
01.05.06

CONCRETO SOLADO e=0.05 m, f'c=100


kg/cm2 VACIADO MANUALMENTE
ACERO CORRUGADO FY= 4200 kg/cm2
GRADO 60
ENCOFRADO Y DESENCOFRADO EN CAJA
DE VALVULA

2.36

0.00

0.00

0.00

2.36

01.05.08

CONCRETO F'c=175 Kg/cm2 EN PARED

m3

1.23

0.00

0.00

0.00

1.23

01.05.09

CONCRETO F'c=210 Kg/cm2 LOSA DE CAJA m3

0.36

0.00

0.00

0.00

0.36

01.05.07

01.05.10 SUMINISTRO Y COLOCACION DE ACCESORIOS PARA VALVULAS DE CONTROL DE 63mm


01.05.10.0SUMINISTRO DE ACCESORIOS

glb

1.00

0.00

0.00

0.00

1.00

01.05.10.0INSTALACION Y ACCESORIOS

und

2.00

0.00

0.00

0.00

2.00

01.05.11

und

2.00

0.00

0.00

0.00

2.00

TAPAS DE FF

PLANILLA DIARIA DE AVANCE DE PARTIDAS (METRADOS)


CORRESPONDIENTE A April/2015

02

SISTEMA DE ALCANTARILLADO:

02.01

SISTEMAS DE REDES DE DESAGUE

30/Apr Thu

29/Apr Wed

28/Apr Tue

27/Apr Mon

26/Apr Sun

Fri

25/Apr Sat

24/Apr

23/Apr Thu

22/Apr Wed

21/Apr Tue

20/Apr Mon

19/Apr Sun

Fri

18/Apr Sat

17/Apr

16/Apr Thu

15/Apr Wed

14/Apr Tue

13/Apr Mon

12/Apr Sun

Fri

11/Apr Sat

10/Apr

09/Apr Thu

08/Apr Wed

07/Apr Tue

06/Apr Mon

Fri

05/Apr Sun

Met.
PROY.

04/Apr Sat

Und

03/Apr

DESCRIPCION

02/Apr Thu

Item

01/Apr Wed

April

0.00

###

###

0.00

###

###

0.00

###

###

0.00

SALDO

:
:
:
:

ACUMULADO

Propietario
Elaborado por
Revisado por:
Fecha de Elaboracion

MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y


DESAGUE EN LA ASOCIACIN PRO VIVIENDA LA FLORIDA I ETAPA
DEL DISTRITO SICUANI, PROVINCIA DE CANCHIS CUSCO.
MUNICIPALIDAD PROVINCIAL DE CANCHIS
ING. ALEDIO OSCAR NINA TTICA
ING. CHARLES ALFREDO CHIRINOS LLAMOCCA
sbado, 16 de mayo de 2015
ANTERIOR

TOTAL MES

Obra

ASOCIACION PRO VIVIENDA LA FLORIDA

12.57

24.00

25.5

43.37

86.49

43.37

79.57

145.71

23.99

m3

02.01.01.0ELIMINACION DE MATERIAL EXCEDENTE

234.71
111.77

10.00

466.28

RELLENO Y COMPACTADO CON MATERIAL


PROPIO EN CAPAS DE 0.20M

23.99

02.01.01.0

41.21

466.28

23.99

303.70
111.77

23.99

466.28

46.57

PREPARACION Y COLOCACION DE 2DA


02.01.01.0
CAMA (CON MATERIAL SELECCIONADO)

41.21 41.21

466.28

32.45

CAMA DE APOYO DE ARENA DE H=0.10


02.01.01.0
MT., ANCHO = 0.50 mt.

71.57

41.21

200.29

46.57 46.57 46.57

REFINE Y NIVELACION DE FONDO DE


02.01.01.0
ZANJAS (ANCHO = 0.50 MT)

46.57

02.01.01.0RETIRO DE RED DE DESAGUE ANTIGUO

58.66
46.57

419.65

223.88

8.44

m3

41.21

466.28

7.84

EXCAVACION DE ZANJAS EN MATERIAL


02.01.01.0
COMPACTO H<2.00 MT, ANCHO=0.50 mt.

9.18

TRAZO, NIVELES Y REPLANTEO DE ZANJAS


POST - EXCAVACION

13.44

02.01.01.0

63.67

466.28

6.16

39.98

TRAZO, NIVELES Y REPLANTEO DE ZANJAS


PRE - EXCAVACION

5.60

02.01.01.0

25.00 8.00

02.01.01 MOVIMIENTO DE TIERRAS

10.00

0.00 71.57 128.72


0.00

### 162.58

0.00

### 354.51

0.00

### 231.57

0.00

### 354.51

0.00 10.00 135.71

PRUEBA HIDRAULICA EN TUBERIAS DE


DESAGUE

466.28

23.99

02.01.02.0

111.77

23.99

466.28

46.57

41.21

TUBERIA PVC NTP ISO 4435 UF C/ANILLO


DE 200mm x 6m

41.21

02.01.02.0

46.57

02.01.02 SUMINISTRO E INSTALAC. DE TUBERIA PVC NTP ISO 4435 UF C/ANILLO DE 200mm x 6m

111.77

0.00

### 354.51

0.00

### 354.51

02.01.03 PAVIMENTOS
02.01.03.0CORTE DE CARPETA ASFALTICA E=3"

m2

20.00

0.00

REPOSICION CARPETA ASFALTICA EN


02.01.03.0
CALIENTE E=3"

m2

20.00

0.00

20.00 20.00
0.00

0.00

0.00

20.00

CAMARAS DE INSPECCION (BUZONES)

02.02.01

TRAZO, NIVELES Y REPLANTEO DE ZANJAS


PRE - EXCAVACION

15.90

0.00

15.90 15.90

0.00

02.02.02

TRAZO, NIVELES Y REPLANTEO DE ZANJAS


POST - EXCAVACION

15.90

0.00

15.90 15.90

0.00

02.02.03

EXCAVACION EN TIERRA COMPACTA

m3

30.04

29.93 30.04

0.00

02.02.04

DEMOLICION DE BUZONES EXISTENTES

m3

4.98

02.02.05

ACARREADO DE MATERIAL EXCEDENTE


(D=30m.)

m3

37.38

02.02.06

ELIMINACION DE MATERIAL EXCEDENTE

m3

37.38

02.02.07

CONCRETO SOLADO e=0.05 m, f'c=100


kg/cm2

m2

15.90

02.02.08

ACERO DE REFUERZO EN LOSA DE FONDO


DE BUZON

kg

651.85

02.02.09

ACERO DE REFUERZO EN LOSA DE TECHO


DE BUZON

kg

188.04

02.02.10

ENCOFRADO Y DESENCOFRADO NORMAL


PARA BUZONES

m2

71.63

02.02.11

ENCOFRADO Y DESENCOFRADO LOSA


TECHO DE BUZON

m2

10.18

02.02.12

CONCRETO F'c=175 Kg/cm2 PARED - BASE m3

13.93

02.02.13

CONCRETO F'c=210 Kg/cm2 LOSA DE


BUZON

m3

3.69

02.02.14

ACABADO INTERIOR DE BUZONES CON


MEDIA CAA DE FONDO

und

9.00

02.02.15

TAPA DE F F PARA BUZON (D=0.60 mt.)

und

9.00

02.02.16

ESCALERA TIPO GATO EN BUZONES


H>=1.50 CON 3/4"

glb

1.00

02.02.17

INSTALACION DE ESCALERA TIPO GATO

und

8.00

0.11

02.02

0.11

8.00

0.00
8.00

44.91

494.27
27.39

6.03

6.03

27.39

79.86

60.70

60.70

44.9121.83

1.83

12.06
0.00

0.65

0.65

0.65

1.00

4.98

0.00

10.00 18.00

19.38

0.00

0.00

37.38

14.07 15.90

0.00

###

###

0.00

###

###

0.00

44.86 56.92

14.71

10.18 10.18

0.00

13.28 13.93

0.00

2.66

3.69

0.00

0.00

0.00

9.00

7.00

9.00

0.00

0.00

0.00

0.00

1.00

0.00

0.00

0.00

8.00

1.03
0.00

1.00

0.38

11.2

191.978

0.00

4.98

2.00

PLANILLA DIARIA DE AVANCE DE PARTIDAS (METRADOS)


CORRESPONDIENTE A April/2015

30/Apr Thu

29/Apr Wed

28/Apr Tue

27/Apr Mon

26/Apr Sun

Fri

25/Apr Sat

24/Apr

23/Apr Thu

22/Apr Wed

21/Apr Tue

20/Apr Mon

19/Apr Sun

Fri

18/Apr Sat

17/Apr

16/Apr Thu

15/Apr Wed

14/Apr Tue

13/Apr Mon

12/Apr Sun

Fri

11/Apr Sat

10/Apr

09/Apr Thu

08/Apr Wed

07/Apr Tue

06/Apr Mon

Fri

05/Apr Sun

Met.
PROY.

04/Apr Sat

Und

03/Apr

DESCRIPCION

02/Apr Thu

Item

01/Apr Wed

April

SALDO

:
:
:
:

ACUMULADO

Propietario
Elaborado por
Revisado por:
Fecha de Elaboracion

MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y


DESAGUE EN LA ASOCIACIN PRO VIVIENDA LA FLORIDA I ETAPA
DEL DISTRITO SICUANI, PROVINCIA DE CANCHIS CUSCO.
MUNICIPALIDAD PROVINCIAL DE CANCHIS
ING. ALEDIO OSCAR NINA TTICA
ING. CHARLES ALFREDO CHIRINOS LLAMOCCA
sbado, 16 de mayo de 2015
ANTERIOR

TOTAL MES

Obra

02.03
CONEXIONES DOMICILIARIAS - ALCANTARILLADO
02.03.01 MOVIMIENTO DE TIERRAS
02.03.01.0

TRAZO, NIVELES Y REPLANTEO DE ZANJAS


PRE - EXCAVACION

EXCAVACION DE ZANJAS EN MATERIAL


02.03.01.0
COMPACTO H<2.00 MT, ANCHO=0.50 mt.

420.00

0.00

0.00

0.00 420.00

m3

286.13

0.00

0.00

0.00 286.13

02.03.01.0

REFINE Y NIVELACION DE FONDO DE


ZANJAS (ANCHO = 0.50 MT)

420.00

0.00

0.00

0.00 420.00

02.03.01.0

CAMA DE APOYO DE ARENA DE H=0.10


MT., ANCHO = 0.50 mt.

420.00

0.00

0.00

0.00 420.00

02.03.01.0

PREPARACION Y COLOCACION DE 2DA


CAMA (CON MATERIAL SELECCIONADO)

420.00

0.00

0.00

0.00 420.00

420.00

0.00

0.00

0.00 420.00

RELLENO Y COMPACTADO CON MATERIAL


02.03.01.0
PROPIO EN CAPAS DE 0.20M

02.03.02 SUMINISTRO E INSTALAC. DE TUBERIA PVC NTP ISO 4435 UF C/ANILLO DE 160mm x 6m
TUBERIA PVC NTP ISO 4435 UF C/ANILLO
DE 160mm x 6m

420.00

0.00

0.00

0.00 420.00

und

35.00

0.00

0.00

0.00

35.00

02.03.02.0

CONEXION DOMICILIARIA DE DESAGUE DE


und
200 A 160mm (8" A 6")

35.00

0.00

0.00

0.00

35.00

02.04

VARIOS

02.04.01

PLACA RECORDATORIA DE INAGURACION

und

1.00

0.00

0.00

0.00

1.00

02.04.02

SUMINISTRO EQUIPO COMPLEMENTARIO

glb

1.00

0.00

1.00

1.00

0.00

02.05

RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE EL TRABAJO

02.05.01

EQUIPOS DE PROTECCIN INDIVIDUAL

glb

1.00

0.00

1.00

1.00

0.00

02.05.02

EQUIPOS DE PROTECCIN COLECTIVA

glb

1.00

0.00

1.00

1.00

0.00

02.05.03

EMERGENCIAS EN SEGURIDAD Y SALUD


DURANTE EL TRABAJO

glb

1.00

0.00

1.00

1.00

0.00

02.06

MITIGACION AMBIENTAL

02.06.01

LIMPIEZA FINAL DE OBRA

m2

###

0.00

0.00

0.00

###

03

CAPACITACION DE USUARIOS Y ASISTENCIA TECNICA

03.01

CAPACITACION DE USUARIOS Y
ASISTENCIA TECNICA

0.00

0.00

0.00

1.00

02.03.02.0

02.03.02.0CAJA DE REGISTRO

glb

1.00

PLANILLA DIARIA DE SOBRE AVANCE DE PARTIDAS


CORRESPONDIENTE A April/2015
Obra

Propietario
Elaborado por
Revisado por:
Fecha de Elaboracion

:
:
:
:

MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABL


DESAGUE EN LA ASOCIACIN PRO VIVIENDA LA FLORIDA I ETA
DEL DISTRITO SICUANI, PROVINCIA DE CANCHIS CUSCO.
MUNICIPALIDAD PROVINCIAL DE CANCHIS
ING. ALEDIO OSCAR NINA TTICA
ING. CHARLES ALFREDO CHIRINOS LLAMOCCA
ABRIL DEL 2015
14/Apr Tue

15/Apr Wed

2.51

2.51

13/Apr Mon

12/Apr Sun

11/Apr Sat

Fri

09/Apr Thu

08/Apr Wed

07/Apr Tue

06/Apr Mon

05/Apr Sun

04/Apr Sat

Fri

11.2

ASOCIACION PRO VIVIENDA LA FLORIDA

02.01.01.03EXCAVACION DE ZANJAS EN MATERIAL COMPm3

131.15

90.44

SISTEMAS DE REDES DE DESAGUE

10/Apr

SISTEMA DE ALCANTARILLADO:

02.01

9.2

02

Met.
PROY.

03/Apr

Un
d

DESCRIPCION

02/Apr Thu

Item

01/Apr Wed

April

2.20

02.02

CAMARAS DE INSPECCION (BUZONES)

02.02.01

TRAZO, NIVELES Y REPLANTEO DE ZANJAS


PRE - EXCAVACION

02.02.03

EXCAVACION EN TIERRA COMPACTA

m3

8.02

02.02.04

DEMOLICION DE BUZONES EXISTENTES

m3

5.74

02.02.07

CONCRETO SOLADO e=0.05 m, f'c=100


kg/cm2

m2

2.01

02.02.11

ENCOFRADO Y DESENCOFRADO LOSA


TECHO DE BUZON

m2

5.02

2.01

1.20

3.8106192983

m2

2.59

02.01.03.01CORTE DE CARPETA ASFALTICA E=3"

4.21

02.01.03 PAVIMENTOS

DE PARTIDAS (MAYORES METRADOS)


April/2015

SALDO

###

0.00

0.00 1.20

1.20

0.00

0.00 2.20

2.20

0.00

8.02 0.00

8.02

0.00

2.59 3.15

5.74

0.00

2.01 0.00

2.01

0.00

5.02 0.00

5.02

0.00

131.15

0.00

ACUMULADO

ANTERIOR

30/Apr Thu

29/Apr Wed

28/Apr Tue

27/Apr Mon
7.96

26/Apr Sun

Fri

25/Apr Sat

24/Apr

23/Apr Thu

22/Apr Wed

21/Apr Tue

20/Apr Mon

19/Apr Sun

18/Apr Sat

Fri
17/Apr
12.348

16/Apr Thu

April

TOTAL MES

EMA DE AGUA POTABLE Y


NDA LA FLORIDA I ETAPA
NCHIS CUSCO.

REGISTRO DE AVANCE DE PARTIDAS (METRADOS)


EN EL MES DE April/2015
Obra

MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y DESAGUE EN LA


ASOCIACIN PRO VIVIENDA LA FLORIDA I ETAPA DEL DISTRITO SICUANI, PROVINCIA DE
CANCHIS CUSCO.
MUNICIPALIDAD PROVINCIAL DE CANCHIS
ING. ALEDIO OSCAR NINA TTICA
ING. CHARLES ALFREDO CHIRINOS LLAMOCCA
sbado, 16 de mayo de 2015

Propieta:
Elaborad:
Revisado:
Fecha de:
Fecha

Rango de ComputoElem./ W.U.N Veces

Largo/
Radio

Perimetr
o/
Ancho/Pe
so

Alto

Area

Vol/
W. Parc.

Parc.

01.01.02 ALQUILER DE ALMACEN DE OBRA


31/04/2015

01.03

RED DE AGUA POTABLE

01.03.01

MOVIMIENTO DE TIERRAS

1.00

02.01.01.01TRAZO, NIVELES Y REPLANTEO DE ZANJAS PRE - EXCAVACION

Metrado

unidad

Ant.

Act.

Acum.

Proy.

Saldo

1.00

1.00

2.00

1.00

MES

1.00

0.00

74.57

74.57

423.57

349.00

ML

74.57

423.57

349.00

ML

82.32

419.65

337.33

M3

708.68

466.28

-242.40

ML

529.03

419.65

-109.38

M3

CALLE SAN FRANCISCO DE ASIS


4/25/2015

J-8

J-5

01

01

28.00

28.00

22/04/15

J-11

J-8

01

01

46.57

46.57

02.01.01.02TRAZO, NIVELES Y REPLANTEO DE ZANJAS POST - EXCAVACION

28.00
46.57

0.00

74.57

CALLE SAN FRANCISCO DE ASIS


4/25/2015

J-8

J-5

01

01

28.00

28.00

4/23/2015

J-11

J-8

01

01

46.57

46.57

01.03.01.03EXCAVACION DE ZANJAS EN MATERIAL COMPACTO H<2.00 MT, ANCHO=0.50 mt.

28.00
46.57

0.00

82.32

CALLE SAN FRANCISCO DE ASIS


4/24/2015

01

01

28.00

0.70

1.60

31.36

31.36

31.36

4/23/2015

01

01

39.500

0.70

1.60

44.24

44.24

44.24

4/24/2015

01

01

6.000

0.70

1.60

6.72

6.72

6.72

02

SISTEMA DE ALCANTARILLADO:

ASOCIACION PRO VIVIENDA LA FLORIDA

02.01

SISTEMAS DE REDES DE DESAGUE

02.01.01

MOVIMIENTO DE TIERRAS

02.01.01.02TRAZO, NIVELES Y REPLANTEO DE ZANJAS POST - EXCAVACION

242.40

466.28

4/6/2015

BZ-01

BZ-02

01

01

63.67

63.67

63.67

4/2/2015

BZ-02

BZ-03

01

01

39.98

39.98

39.98

4/9/2015

BZ-03

BZ-04

01

01

41.21

41.21

41.21

4/17/2015

BZ-04

BZ-05

01

01

46.57

46.57

46.57

4/16/2015

BZ-05

BZ-06

01

01

32.45

32.45

32.45

360.99

168.04

02.01.01.03EXCAVACION DE ZANJAS EN MATERIAL COMPACTO H<2.00 MT, ANCHO=0.50 mt.


CALLE SAN FRANCISCO DE ASIS
01

01

4/8/2015

BZ-01

01

01

8.200

0.70

1.60

9.18

9.18

9.18

4/7/2015

01

01

12.000

0.70

1.60

13.44

13.44

13.44

4/15/2015

01

01

36.700

0.70

2.20

56.52

56.52

56.52

4/27/2015

01

01

5.170

0.70

2.20

7.96

7.96

7.96

BZ-02

BZ-02

01

01

39.98

4/6/2015

01

01

5.50

0.70

1.60

6.16

6.16

6.16

4/2/2015

01

01

5.00

0.70

1.60

5.60

5.60

5.60

4/10/2015

01

01

5.79

0.70

1.60

6.48

6.48

6.48

4/10/2015

01

01

12.00

0.70

2.10

17.64

17.64

17.64

4/17/2015

01

01

8.40

0.70

2.10

12.35

12.35

12.35

41.21
8.06

BZ-03

BZ-03

63.67

01

01

4/1/2015

BZ-04

01

01

7.20

0.70

1.60

8.06

8.06

4/9/2015

01

01

16.00

0.70

0.70

7.84

7.84

7.84

4/11/2015

01

01

10.00

0.70

1.60

11.20

11.20

11.20

4/15/2015

01

01

5.00

0.70

1.60

5.60

5.60

5.60

02.01.01.04RETIRO DE RED DE DESAGUE ANTIGUO

0.00

15/04/15

BZ-04

BZ-05

01

01

46.57

46.57

02/04/15

BZ-11

BZ-09

01

01

25.00

25.00

02.01.01.05REFINE Y NIVELACION DE FONDO DE ZANJAS (ANCHO = 0.50 MT)


28/04/14

BZ-01

BZ-02

01

01

25.50

29/04/15

BZ-01

BZ-02

01

01

30/04/16

BZ-01

BZ-02

01

01

22/04/14

BZ-02

BZ-03

01

01

71.57

maqui

roca

71.57

200.29

128.72

ML

303.70

466.28

162.58

ML

46.57
25.00

0.00

303.70

25.5

25.50

24.00

24

24.00

12.57

12.57

12.57

39.98

39.98

39.98

REPROGRACION Y SEGUIMIENTO DE AVANCE DE OBRA

### 1
### 2
### 3
### 4
### 5
### 6
### 7
### 8
### 9
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
###
###
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
###
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######

Residente de Obra:
ING. ALEDIO OSCAR NINA TTICA
Monto Expediente Tcnico:
###
Funcin: 018
SANEAMIENTO
Monto Asignado PIA 2015:
###
Programa: 088
SANEAMIENTO
Fecha de Inicio de Obra: 3/3/2015
Sub- Programa: 088
SANEAMIENTO URBANO
Plazo de Ejecucin: 90 DIAS
Obra: MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y DESAGUE EN LA ASOCIACIN PRO VIVIENDA LA FLORIDA I ETAPA DEL DISTRITO SICUANI, PROVINCIAFecha
DE CANCHIS
de Termino
CUSCO.
de Obra: 7/1/2015
Meta 010
Fuente Financiamiento : CANON Y SOBRECANON

DESC
Precio
Metra
RIPCI Und
Unitari
Parcial
do
CART
ON
o
EL DE
IDENT
01
ADECUADA
INFRAESTRUCTURA DE REDES DE AGUA
IFICA
01.01 OBRAS
PROVISIONALES
CION
01.01.01
DE LA und
S/. 0.00
1.00 641.71
641.71
P
OBRA N Dias
2.00 s/./dia =
320.86
DE
Ren/D
0.50 T. Ejec.
0.00
E
S/. 0.00
300.00 N Cuad
0.00
3.60x Rend
0.00 M.E. Real
0.00
2.40M M.E. Teo
01.01.02 ALMACEN DE OBRA
mes
4.00
N Dias
3.00
Ren/D
1.33
Rend
0.25
M.E. Teo
0.00

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

Item

150.00
s/./dia =
T. Ejec.
N Cuad
M.E. Real

600.00
200.00
0.00
5.33
1.00

01.02 OBRAS PRELIMINARES


01.02.01 TRAZO Y REPLANTEO INICIAL
m
545.23
0.94
N Dias
3.00 s/./dia =
Ren/D 181.74 T. Ejec.
Rend
200.00 N Cuad
M.E. Teo
0.00 M.E. Real

512.52
170.84
0.00
0.91
74.57

01.02.02 TRAZO Y REPLANTEO PERMANENTE DE OBRA


EXCA
m
545.23
0.94
512.52
P
3.00 s/./dia =
170.84
VACIO N Dias
0.00
N DE Ren/D 181.74 T. Ejec.
E
200.00 N Cuad
0.91
ZANJA Rend
M.E. Teo
0.00 M.E. Real
0.00
S
01.03 PARA
MOVIMIENTO DE TIERRAS
01.03.01 RED
m
545.23
3.05
1,662.95
DE
P
29.00 s/./dia =
57.34
AGUA N Dias
Ren/D
18.80 T. Ejec.
0.00
E
HAST Rend
3.00 N Cuad
6.27
A
M.E. Teo
0.00 M.E. Real
0.00
CAMA
H=1.
DE
01.03.02 50M
REFINE
APOY Y NIVELACION DE ZANJA
m
545.23
0.81
441.64
P
O
N Dias
4.00 s/./dia =
110.41
PARA Ren/D 136.31 T. Ejec.
0.00
E
100.00 N Cuad
1.36
ZANJA Rend
0.00 M.E. Real
0.00
CON M.E. Teo
MATE
01.03.03 RELLE
RIAL
m
545.23
1.34
730.61
NO Y
P
PROPI
5.00 s/./dia =
146.12
COMP N Dias
O
Ren/D 109.05 T. Ejec.
0.00
ACTA
E
100.00 N Cuad
1.09
(E=0. Rend
DO
M.E.
Teo
0.00
M.E.
Real
0.00
05M,0
CON
.60M)
01.03.04 MATE
_x000 m3
658.37
12.19
8,025.53
RIAL
P
D_
5.00 s/./dia =
1,605.11
PROPI N Dias
Ren/D 131.67 T. Ejec.
0.00
E
O EN Rend
10.00 N Cuad
13.17
CAPA M.E. Teo
0.00 M.E. Real
0.00
S DE
01.03.05 0.20M
ACARREADO DE MATERIAL EXCEDENTE (D=30m.)
m3
65.84
8.06
530.67
P
N Dias
6.00 s/./dia =
88.45
Ren/D
10.97 T. Ejec.
0.00
E
Rend
10.00 N Cuad
1.10
M.E. Teo
0.00 M.E. Real
0.00
01.03.06 ELIMINACION DE MATERIAL EXCEDENTE
m3
65.84
25.62
1,686.82
N Dias
6.00 s/./dia =
281.14
Ren/D
10.97 T. Ejec.
0.00
Rend
10.00 N Cuad
1.10
M.E. Teo
0.00 M.E. Real
234.71

P
E

01.04 SUMINISTRO E INSTALACION DE TUBERIAS


01.04.01 TUBERIA PVC NTP ISO 1452:2011 UF D=75 mm C-10
m
545.23
30.25 16,493.21
P
N Dias
5.00 s/./dia =
3,298.64
Ren/D 109.05 T. Ejec.
0.00
E
Rend
100.00 N Cuad
1.09
M.E. Teo
0.00 M.E. Real
0.00
01.04.02 TEE DE PVC U/FLEXIBLE 110MMX110MM
und
4.00 218.41
873.64
N Dias
1.00 s/./dia =
873.64
Ren/D
4.00 T. Ejec.
0.00
Rend
10.00 N Cuad
0.40
M.E. Teo
0.00 M.E. Real
71.57
01.04.03 REDUCCIN DE 110MMX75 MM
und
4.00
78.41
N Dias
1.00 s/./dia =
Ren/D
4.00 T. Ejec.
Rend
10.00 N Cuad
M.E. Teo
0.00 M.E. Real

313.64
313.64
0.00
0.40
111.77

01.04.04 TEE DE PVC U/FLEXIBLE 75 MMX 75 MM


und
9.00 108.41
975.69
N Dias
1.00 s/./dia =
975.69
Ren/D
9.00 T. Ejec.
0.00
Rend
10.00 N Cuad
0.90
M.E. Teo
0.00 M.E. Real
0.00

P
E

P
E

P
E

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 200.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 344.06
57 57 57 57 57 57

S/. 344.06
57 57 57 57 57 57

S/. 344.06
57 57 57 57 57 57

S/. 286.72
57 57 57 57
57

S/. 344.06
57 57 57 57 57 57

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 441.64
############

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 146.12

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 641.71
######

###

###

###

###

S/. 512.52
#########
S/. 0.00

###

0
0

###
###

###
###

###
###

S/. 0.00

S/. 0.00

S/. 0.00
S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 1,605.11
###

S/. 0.00

S/. 584.49
############
S/. 0.00

S/. 0.00

S/. 0.00

S/. 6,420.42
############

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 530.67
88 88 88 88 88 88

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 1,686.82
##################

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00
S/. 0.00

###

S/. 3,298.64
###

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00
S/. 0.00

S/. 13,194.57
############

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 873.64

S/. 0.00

S/. 0.00

S/. 0.00

S/. 313.64

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 975.69
###

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

###

###

REPROGRACION Y SEGUIMIENTO DE AVANCE DE OBRA

DESC
RIPCI
ON

Und

Precio
Metra
Unitari
do
o

Parcial

01.04.05 CODO DE 90 PVC U/FLEXIBLE 110MM


und
1.00
57.84
57.84
N Dias
1.00 s/./dia =
57.84
Ren/D
1.00 T. Ejec.
0.00
Rend
10.00 N Cuad
0.10
M.E. Teo
0.00 M.E. Real
27.39
01.04.06 CODO DE 45 PVC U/FLEXIBLE 75MM
und
4.00
62.84
251.36
N Dias
1.00 s/./dia =
251.36
Ren/D
4.00 T. Ejec.
0.00
Rend
10.00 N Cuad
0.40
M.E. Teo
0.00 M.E. Real
0.00
01.04.07 TAPO
CRUZ DE PVC U/FLEXIBLE 75 MMX75 MM
und
1.00 128.41
128.41
N DE
1.00 s/./dia =
128.41
PVC N Dias
1.00 T. Ejec.
0.00
PARA Ren/D
Rend
10.00 N Cuad
0.10
RED M.E. Teo
0.00 M.E. Real
0.00
DE
01.04.08 AGUA
und
4.00
71.83
287.32
POTA
N Dias
1.00 s/./dia =
287.32
BLE
Ren/D
4.00 T. Ejec.
0.00
TUBE Rend
10.00 N Cuad
0.40
RIA
M.E. Teo
0.00 M.E. Real
0.00
DE 75
01.04.09 MM
PRUEBA HIDRAULICA Y DESINFECCION
m
545.23
3.25
1,772.00
N Dias
4.00 s/./dia =
443.00
Ren/D 136.31 T. Ejec.
0.00
Rend
10.00 N Cuad
13.63
M.E. Teo
0.00 M.E. Real
0.00

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

Item

### 1
### 2
### 3
### 4
### 5
### 6
### 7
### 8
### 9
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
###
###
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
###
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######

Residente de Obra:
ING. ALEDIO OSCAR NINA TTICA
Monto Expediente Tcnico:
###
Funcin: 018
SANEAMIENTO
Monto Asignado PIA 2015:
###
Programa: 088
SANEAMIENTO
Fecha de Inicio de Obra: 3/3/2015
Sub- Programa: 088
SANEAMIENTO URBANO
Plazo de Ejecucin: 90 DIAS
Obra: MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y DESAGUE EN LA ASOCIACIN PRO VIVIENDA LA FLORIDA I ETAPA DEL DISTRITO SICUANI, PROVINCIAFecha
DE CANCHIS
de Termino
CUSCO.
de Obra: 7/1/2015
Meta 010
Fuente Financiamiento : CANON Y SOBRECANON

P
E

P
E

P
E

P
E

P
E

01.05 VALVULAS DE CONTROL


01.05.01 CONCRETO Fc=175 Kg/cm2
m3
3.30 348.80
N Dias
1.00 s/./dia =
Ren/D
3.30 T. Ejec.
Rend
12.00 N Cuad
M.E. Teo
0.00 M.E. Real

1,151.04
1,151.04
0.00
0.28
0.00

01.05.02 CONCRETO F'C=210 KG/CM2


m3
0.90 381.23
N Dias
1.00 s/./dia =
Ren/D
0.90 T. Ejec.
Rend
12.00 N Cuad
M.E. Teo
0.00 M.E. Real

343.11
343.11
0.00
0.08
0.00

01.05.03 ENCOFRADO PARA MUROS DE CONCRETO


m2
29.30
26.28
770.00
N Dias
3.00 s/./dia =
256.67
Ren/D
9.77 T. Ejec.
0.00
SUMI Rend
10.00 N Cuad
0.98
0.00 M.E. Real
0.00
NISTR M.E. Teo
OY
01.05.04 COLO
TARRAJEO EN INTERIORES E=1.5cm, mezcla 1:5
m2
19.00
10.02
190.38
CACI N Dias
2.00 s/./dia =
95.19
ON
Ren/D
9.50 T. Ejec.
0.00
Rend
9.50 N Cuad
1.00
DE
0.00 M.E. Real
0.00
ACCE M.E. Teo
SORI
01.05.05
OS
und
5.00 354.65
1,773.25
PARA N Dias
1.00 s/./dia =
1,773.25
VALV Ren/D
5.00 T. Ejec.
0.00
5.00 N Cuad
1.00
ULAS Rend
M.E.
Teo
0.00
M.E.
Real
0.00
DE
CONT DE FF
01.05.06 TAPAS
ROL
und
5.00
26.41
132.05
DE
N Dias
1.00 s/./dia =
132.05
5.00 T. Ejec.
0.00
75MM Ren/D
Rend
5.00 N Cuad
1.00
M.E. Teo
0.00 M.E. Real
0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

C:A
P

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

P
E

P
E

01.06 GRIFOS CONTRA INCENDIOS


01.06.01 CONCRETO Fc=175 Kg/cm2
m3
0.66 348.80
N Dias
1.00 s/./dia =
Ren/D
0.66 T. Ejec.
Rend
1.00 N Cuad
M.E. Teo
0.00 M.E. Real

230.21
230.21
0.00
0.66
0.00

01.06.02 CONCRETO F'C=210 KG/CM2


m3
0.18 381.23
N Dias
1.00 s/./dia =
Ren/D
0.18 T. Ejec.
Rend
1.00 N Cuad
M.E. Teo
0.00 M.E. Real

68.62
68.62
0.00
0.18
0.00

01.06.03 ENCOFRADO PARA MUROS DE CONCRETO


m2
5.86
26.28
154.00
N Dias
1.00 s/./dia =
154.00
Ren/D
5.86 T. Ejec.
0.00
Rend
12.00 N Cuad
0.49
M.E. Teo
0.00 M.E. Real
0.00

S/. 0.00

P
E

01.06.04 TARRAJEO EN INTERIORES E=1.5cm, mezcla 1:5 C:A

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 57.84
58

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 251.36
###

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 128.41
###

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 287.32
###

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 1,151.04
###

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 343.11
###

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 770.00
#########

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 230.21
###

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 68.62
69

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 154.00
###

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 1,772.00
############

S/. 0.00

S/. 190.38
95 95
S/. 0.00

S/. 1,773.25
###

###

S/. 0.00
S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 132.05

S/. 0.00

S/. 0.00

S/. 0.00

REPROGRACION Y SEGUIMIENTO DE AVANCE DE OBRA

Und

Precio
Metra
Unitari
do
o

Parcial

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

DESC
RIPCI
SUMI
ON
NISTR
OY
COLO
CACI
ON
DE
ACCE
SORI
01.06.05
OS
PARA
GRIF
O
CONT
01.06.06 RA
TAPAS
INCE
NDIO
S
Item

### 1
### 2
### 3
### 4
### 5
### 6
### 7
### 8
### 9
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
###
###
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
###
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######

Residente de Obra:
ING. ALEDIO OSCAR NINA TTICA
Monto Expediente Tcnico:
###
Funcin: 018
SANEAMIENTO
Monto Asignado PIA 2015:
###
Programa: 088
SANEAMIENTO
Fecha de Inicio de Obra: 3/3/2015
Sub- Programa: 088
SANEAMIENTO URBANO
Plazo de Ejecucin: 90 DIAS
Obra: MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y DESAGUE EN LA ASOCIACIN PRO VIVIENDA LA FLORIDA I ETAPA DEL DISTRITO SICUANI, PROVINCIAFecha
DE CANCHIS
de Termino
CUSCO.
de Obra: 7/1/2015
Meta 010
Fuente Financiamiento : CANON Y SOBRECANON

m2
N Dias
Ren/D
Rend
M.E. Teo

3.80
1.00
3.80
12.00
0.00

10.02
s/./dia =
T. Ejec.
N Cuad
M.E. Real

38.08
38.08
0.00
0.32
0.00

und
N Dias
Ren/D
Rend
M.E. Teo

1.00
1.00
1.00
5.00
0.00

2416.39
s/./dia =
T. Ejec.
N Cuad
M.E. Real

2,416.39
2,416.39
0.00
0.20
0.00

DE FF
und
N Dias
Ren/D
Rend
M.E. Teo

1.00
26.41
1.00 s/./dia =
1.00 T. Ejec.
5.00 N Cuad
0.00 M.E. Real

26.41
26.41
0.00
0.20
0.00

P
E

01.07 CONEXIONES DOMICILIARIAS DE AGUA (LARGAS)


01.07.01 EXCAVACION MANUAL DE ZANJAS
m3
97.46
13.44
1,309.86
P
N Dias
24.00 s/./dia =
54.58
Ren/D
4.06 T. Ejec.
0.00
E
Rend
3.00 N Cuad
1.35
M.E. Teo
0.00 M.E. Real
0.00
CAMA
01.07.02 DE
REFINE Y NIVELACION DE ZANJA
m
107.10
0.81
86.75
P
APOY N Dias
6.00 s/./dia =
14.46
O
Ren/D
17.85 T. Ejec.
0.00
E
PARA Rend
50.00 N Cuad
0.36
0.00 M.E. Real
0.00
ZANJA M.E. Teo
CON
01.07.03 CONE
MATE
m
107.10
1.34
143.51
P
XION
RIAL N Dias
6.00 s/./dia =
23.92
ES
PROPI Ren/D
17.85 T. Ejec.
0.00
E
DOMI
Rend
50.00 N Cuad
0.36
O
0.00 M.E. Real
0.00
CILIA
(E=0. M.E. Teo
RIAS
05M,0
01.07.04 RELLE
DE
.60M)
und
21.00 251.27
5,276.67
NO Y
P
AGUA N Dias
6.00 s/./dia =
879.45
COMP
POTA Ren/D
3.50 T. Ejec.
0.00
ACTA
E
4.00 N Cuad
0.88
BLE(l Rend
DO
M.E. Teo
0.00 M.E. Real
0.00
argas
CON
01.07.05 )MATE
m3
112.08
5.63
631.01
RIAL
P
s/./dia
=
N
Dias
7.00
90.14
PROPI
Ren/D
16.01 T. Ejec.
0.00
E
O EN Rend
4.00 N Cuad
4.00
CAPA M.E. Teo
0.00 M.E. Real
0.00
S DE
01.07.06 0.20M
ACARREADO DE MATERIAL EXCEDENTE (D=30m.)
m3
4.98
8.06
40.14
P ###
N Dias
1.00 s/./dia =
40.14
Ren/D
4.98 T. Ejec.
0.00
E
###
Rend
5.00 N Cuad
1.00
M.E. Teo
0.00 M.E. Real
0.00
01.07.07 ELIMINACION DE
m3
N Dias
Ren/D
Rend
M.E. Teo

MATERIAL EXCEDENTE
4.98
25.62
127.59
1.00 s/./dia =
127.59
4.98 T. Ejec.
0.00
5.00 N Cuad
1.00
0.00 M.E. Real
0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

P ###
E

###

01.08 CONEXIONES DOMICILIARIAS DE AGUA (CORTAS)


01.08.01 EXCAVACION MANUAL DE ZANJAS
m3
57.33
13.44
770.52
P
N Dias
18.00 s/./dia =
42.81
Ren/D
3.19 T. Ejec.
0.00
E
Rend
3.00 N Cuad
1.06
0.00 M.E. Real
0.00
CAMA M.E. Teo
DE
01.08.02 APOY
REFINE Y NIVELACION DE ZANJA
m
63.00
0.81
51.03
P
O
N Dias
6.00 s/./dia =
8.51
PARA Ren/D
10.50 T. Ejec.
0.00
E
ZANJA Rend
50.00 N Cuad
0.21
0.00 M.E. Real
0.00
CON M.E. Teo
MATE
01.08.03
RIAL
m
63.00
1.34
84.42
CONE
P
PROPI
N
Dias
3.00
s/./dia
=
28.14
XION
O
Ren/D
21.00 T. Ejec.
0.00
ES
E
Rend
50.00 N Cuad
0.42
(E=0.
DOMI M.E. Teo
0.00
M.E.
Real
0.00
05M,0
CILIA
.60M)
RELLE
01.08.04 RIAS
_x000
und
30.00 243.71
7,311.30
NO
Y
DE
P
D_
N Dias
7.00 s/./dia =
1,044.47
COMP
AGUA
4.29 T. Ejec.
0.00
ACTA Ren/D
E
POTA
Rend
4.00 N Cuad
1.07
DO
BLE(c M.E. Teo
0.00 M.E. Real
0.00
CON
ortas)
01.08.05 MATE
m3
65.93
12.19
803.69
RIAL
P
3.00 s/./dia =
267.90
PROPI N Dias
O EN
CAPA
S DE
0.20M

###

###

###

###

###

###

###

###

###

###

###

###

###

S/. 0.00
###

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 38.08
38

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 26.41
26

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 327.47
55 55 55 55 55 55

S/. 327.47
55 55 55 55 55 55

S/. 327.47
55 55 55 55 55 55

S/. 327.47
55 55 55 55 55 55

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 86.75
14 14 14 14 14 14

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 5,276.67
##################

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 40.14
40

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 127.59
###

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 256.84
43 43 43 43 43 43

S/. 256.84
43 43 43 43 43 43

S/. 256.84
43 43 43 43 43 43

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 51.03
9 9 9 9 9 9

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 803.69
#########

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 2,416.39
###

S/. 95.67
24 24 24 24

S/. 0.00

S/. 47.84
24 24

S/. 360.58
90 90 90 90
S/. 0.00

S/. 270.43
90 90 90
S/. 0.00

S/. 0.00

S/. 0.00

S/. 84.42
28 28 28
S/. 0.00

S/. 2,088.94
######

S/. 0.00

S/. 0.00

S/. 5,222.36
###############

S/. 0.00

REPROGRACION Y SEGUIMIENTO DE AVANCE DE OBRA

DESC
RIPCI
ON

Und

Ren/D
Rend
M.E. Teo

Precio
Metra
Unitari
do
o
21.98 T. Ejec.
10.00 N Cuad
0.00 M.E. Real

Parcial

0.00
2.20
0.00

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

Item

### 1
### 2
### 3
### 4
### 5
### 6
### 7
### 8
### 9
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
###
###
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
###
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######

Residente de Obra:
ING. ALEDIO OSCAR NINA TTICA
Monto Expediente Tcnico:
###
Funcin: 018
SANEAMIENTO
Monto Asignado PIA 2015:
###
Programa: 088
SANEAMIENTO
Fecha de Inicio de Obra: 3/3/2015
Sub- Programa: 088
SANEAMIENTO URBANO
Plazo de Ejecucin: 90 DIAS
Obra: MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y DESAGUE EN LA ASOCIACIN PRO VIVIENDA LA FLORIDA I ETAPA DEL DISTRITO SICUANI, PROVINCIAFecha
DE CANCHIS
de Termino
CUSCO.
de Obra: 7/1/2015
Meta 010
Fuente Financiamiento : CANON Y SOBRECANON

01.08.06 ACARREADO DE MATERIAL EXCEDENTE (D=30m.)


m3
8.60
8.06
69.32
P
N Dias
2.00 s/./dia =
34.66
Ren/D
4.30 T. Ejec.
0.00
E
Rend
10.00 N Cuad
0.43
M.E. Teo
0.00 M.E. Real
0.00
01.08.07 ELIMINACION DE MATERIAL EXCEDENTE
m3
8.60
25.62
220.33
N Dias
2.00 s/./dia =
110.17
Ren/D
4.30 T. Ejec.
0.00
Rend
10.00 N Cuad
0.43
M.E. Teo
0.00 M.E. Real
0.00

P
E

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 22.92

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 133.72
###

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 1,370.63
##################
##################
S/. 1,370.63

S/. 1,370.63
##################

S/. 1,370.63
##################

S/. 1,370.63
##################

S/. 1,370.63
##################

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 2,533.89
##################

S/. 2,533.89
##################

S/. 2,533.89
##################

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 221.81
37 37 37 37 37 37

S/. 221.81
37 37 37 37 37 37

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 366.94
61 61 61 61 61 61

S/. 244.63
61 61 61
61

S/. 0.00

S/. 0.00

S/. 0.00

S/. 4,834.47
#########
###

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 13,574.91

S/. 6,787.46

02
ADECUADA INFRAESTRUCTURA DE REDES DE ALCANTARILLADO
02.01 TRABAJOS PRELIMINARES
02.01.01 TRAZO Y REPLANTEO INICIAL
m3
547.67 0.94
514.81
S/. 514.81
P
######
N Dias
2.00 s/./dia =
257.40
######
Ren/D 273.84 T. Ejec.
514.81
E
Rend
300.00 N Cuad
0.91
S/. 514.81
M.E. Teo 547.67 M.E. Real
223.88
02.01.02 TRAZO Y REPLANTEO PERMANENTE
m
547.67
0.94
N Dias
6.00 s/./dia =
Ren/D
91.28 T. Ejec.
Rend
100.00 N Cuad
M.E. Teo
0.00 M.E. Real

DE OBRA
514.81
85.80
0.00
0.91
10.00

P
E

02.02 ROTURA Y REPOSICION DE PAVIMENTO PARA RED DE DESAGUE


02.02.01 CORTE DE PAVIMENTO DE ASFALTO
S/. 0.00
m2
2.57
8.92
22.92
P
N Dias
1.00 s/./dia =
22.92
Ren/D
2.57 T. Ejec.
0.00
E
S/. 0.00
Rend
5.00 N Cuad
0.51
M.E. Teo
0.00 M.E. Real
0.00
02.02.02 CARPETA ASFALTICA EN FRIO DE 3"
m2
2.57
52.03
133.72
N Dias
1.00 s/./dia =
133.72
Ren/D
2.57 T. Ejec.
0.00
Rend
5.00 N Cuad
0.51
M.E. Teo
0.00 M.E. Real
494.27
02.03 MOVIMIENTO DE TIERRAS
02.03.01 EXCAVACION MANUAL DE ZANJAS
m3
594.89 13.44
N Dias
35.00 s/./dia =
Ren/D
17.00 T. Ejec.
Rend
3.00 N Cuad
M.E. Teo 152.97 M.E. Real

7,995.32
228.44
2,055.94
5.67
111.77

P
E

P
E

02.03.02 ENTIBADO Y DESENTIVADO


m
547.67
13.88
7,601.66
P
N Dias
18.00 s/./dia =
422.31
Ren/D
30.43 T. Ejec.
0.00
E
Rend
3.00 N Cuad
10.14
M.E. Teo
0.00 M.E. Real
0.00
CAMA
02.03.03 DE
REFINE Y NIVELACION DE ZANJA
m
547.67
0.81
443.61
P
APOY N Dias
12.00 s/./dia =
36.97
O
Ren/D
45.64 T. Ejec.
0.00
E
50.00 N Cuad
0.91
PARA Rend
M.E.
Teo
0.00
M.E.
Real
0.00
ZANJA
CON
02.03.04 RELLE
MATE
m
547.67
1.34
733.88
P
NO Y
RIAL N Dias
12.00 s/./dia =
61.16
COMP
PROPI
45.64 T. Ejec.
0.00
E
ACTA Ren/D
Rend
50.00 N Cuad
0.91
O
DO
M.E. Teo
0.00 M.E. Real
1.03
(E=0.
CON
05M,0
02.03.05 MATE
.60M)
m3
594.89
12.19
7,251.71
P
RIAL
6.00 s/./dia =
1,208.62
PROPI N Dias
Ren/D
99.15 T. Ejec.
0.00
E
O EN Rend
45.50 N Cuad
2.18
CAPA M.E. Teo
0.00 M.E. Real
0.00
S DE
02.03.06 0.20M
ACARREADO DE MATERIAL EXCEDENTE (D=30m.)
m3
89.23
8.06
719.19
P
N Dias
4.00 s/./dia =
179.80
Ren/D
22.31 T. Ejec.
0.00
E
Rend
10.00 N Cuad
2.23
M.E. Teo
0.00 M.E. Real
27.39
02.03.07 ELIMINACION DE MATERIAL EXCEDENTE
m3
89.23
25.62
2,286.07
N Dias
4.00 s/./dia =
571.52
Ren/D
22.31 T. Ejec.
0.00
Rend
10.00 N Cuad
2.23
M.E. Teo
0.00 M.E. Real
0.00

S/. 1,142.19
###############
#########
S/. 685.31

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

P ###

###

###

###

###

###

###

###

02.04 SUMINISTRO E INSTALACION DE TUBERIAS


02.04.01 TUBERIA PVC NTP ISO 4435 UF 200MM
m
547.67
37.18 20,362.37
P ###

###

###

###

###

S/. 0.00
###

S/. 0.00
###

S/. 0.00
###

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 257.41
86 86 86

S/. 0.00

S/. 0.00

S/. 257.41
86 86 86
S/. 0.00

23

S/. 122.31
61 61

S/. 2,417.24
######

S/. 359.60
######
S/. 0.00

S/. 1,143.04
######
S/. 0.00

S/. 359.60
######
S/. 0.00

S/. 1,143.04
######
S/. 0.00

S/. 0.00

S/. 69.32
35 35
S/. 0.00

S/. 220.33
######
S/. 0.00

S/. 0.00

S/. 0.00
S/. 0.00

S/. 0.00
S/. 0.00

REPROGRACION Y SEGUIMIENTO DE AVANCE DE OBRA

DESC
RIPCI
ON

Und

N Dias
Ren/D
Rend
M.E. Teo

Precio
Metra
Unitari
do
o
6.00
91.28
45.50
0.00

s/./dia =
T. Ejec.
N Cuad
M.E. Real

Parcial

3,393.73
0.00
2.01
0.00

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

Item

### 1
### 2
### 3
### 4
### 5
### 6
### 7
### 8
### 9
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
###
###
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
###
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######

Residente de Obra:
ING. ALEDIO OSCAR NINA TTICA
Monto Expediente Tcnico:
###
Funcin: 018
SANEAMIENTO
Monto Asignado PIA 2015:
###
Programa: 088
SANEAMIENTO
Fecha de Inicio de Obra: 3/3/2015
Sub- Programa: 088
SANEAMIENTO URBANO
Plazo de Ejecucin: 90 DIAS
Obra: MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y DESAGUE EN LA ASOCIACIN PRO VIVIENDA LA FLORIDA I ETAPA DEL DISTRITO SICUANI, PROVINCIAFecha
DE CANCHIS
de Termino
CUSCO.
de Obra: 7/1/2015
Meta 010
Fuente Financiamiento : CANON Y SOBRECANON

#########
E

###

02.04.02 PRUEBA HIDRAULICA EN TUBERIAS DE DESAGUE


m
547.67
6.78
3,713.20
P ###
N Dias
3.00 s/./dia =
1,237.73
Ren/D 182.56 T. Ejec.
0.00
E
###
Rend
200.00 N Cuad
0.91
M.E. Teo
0.00 M.E. Real
0.00
02.05 INSTALACIONES DOMICILIARIAS RED DESAGUE
02.05.01 EXCAVACION MANUAL DE ZANJAS
m3
259.90
13.44
3,493.06
P ###
N Dias
15.00 s/./dia =
232.87
Ren/D
17.33 T. Ejec.
0.00
E
###
Rend
3.00 N Cuad
5.78
M.E. Teo
0.00 M.E. Real
0.00
02.05.02 CAJA DE REGISTRO
und
51.00
N Dias
6.00
Ren/D
8.50
Rend
5.00
M.E. Teo
0.00

149.52
s/./dia =
T. Ejec.
N Cuad
M.E. Real

7,625.52
1,270.92
0.00
1.70
0.00

P ###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

P ###

###

###

###

###

###

###

###

02.06 BUZON DE INSPECCION TIPO H=2.5,D=1.20M(INCLUYE TAPA )


02.06.01 EXCAVACION PARA BUZON
m3
71.65
13.44
962.98
S/. 222.23
P
74 74 74
N Dias
13.00 s/./dia =
74.08
74 74
74
Ren/D
5.51 T. Ejec.
296.30
E
Rend
3.00 N Cuad
1.84
S/. 222.23
M.E. Teo 22.05 M.E. Real
12.06
02.06.02 CONC
CONCRETO SIMPLE FC=140 KG/CM2
m3
7.55 301.48
2,276.17
RETO N Dias
4.00 s/./dia =
569.04
F
Ren/D
1.89 T. Ejec.
0.00
C=1 Rend
5.00 N Cuad
0.38
M.E.
Teo
0.00
M.E.
Real
0.00
75
KG/C
02.06.03
M2
m3
29.91 353.84 10,583.35
PARA N Dias
4.00 s/./dia =
2,645.84
MURO Ren/D
7.48 T. Ejec.
0.00
5.00 N Cuad
1.50
S DE Rend
0.00 M.E. Real
0.00
BUZO M.E. Teo

###

###

02.05.03 RELLE
CONEXION DOMICILIARIA DE DESAGUE
und
51.00 254.57 12,983.07
P
NO Y
6.00 s/./dia =
2,163.85
COMP N Dias
8.50 T. Ejec.
0.00
E
ACTA Ren/D
Rend
10.00 N Cuad
0.85
DO
M.E. Teo
0.00 M.E. Real
0.00
CON
02.05.04 MATE
m3
259.90
12.19
3,168.18
P
RIAL
6.00 s/./dia =
528.03
PROPI N Dias
Ren/D
43.32 T. Ejec.
0.00
E
O EN Rend
10.00 N Cuad
4.33
CAPA M.E. Teo
0.00 M.E. Real
0.00
S DE
02.05.05 0.20M
ACARREADO DE MATERIAL EXCEDENTE (D=30m.)
m3
38.98
8.06
314.18
P
N Dias
2.00 s/./dia =
157.09
Ren/D
19.49 T. Ejec.
0.00
E
Rend
10.00 N Cuad
1.95
M.E. Teo
0.00 M.E. Real
0.00
02.05.06 ELIMINACION DE MATERIAL EXCEDENTE
m3
38.98
25.62
998.67
N Dias
2.00 s/./dia =
499.34
Ren/D
19.49 T. Ejec.
0.00
Rend
10.00 N Cuad
1.95
M.E. Teo
0.00 M.E. Real
0.00

###

P
E

P
E

02.06.04 N
CONCRETO FC=175 KG/CM2 PARA MEDIA CAA
m3
8.37 353.84
2,961.64
P
N Dias
2.00 s/./dia =
1,480.82
Ren/D
4.19 T. Ejec.
0.00
E
Rend
5.00 N Cuad
0.84
M.E. Teo
0.00 M.E. Real
0.00
02.06.05 CONCRETO FC=210 KG/CM2 PARA LOSAS TECHO
m3
7.75 386.27
2,993.59
ENCO
P
2.00 s/./dia =
1,496.80
FRAD N Dias
Ren/D
3.88 T. Ejec.
0.00
OY
E
Rend
5.00 N Cuad
0.78
DESE M.E. Teo
0.00 M.E. Real
0.00
NCOF
02.06.06 RADO
m2
274.44
23.58
6,471.30
NOR
P
6.00 s/./dia =
1,078.55
MAL N Dias
Ren/D
45.74 T. Ejec.
0.00
E
PARA Rend
25.00 N Cuad
1.83
BUZO M.E. Teo
0.00 M.E. Real
0.00
NES
02.06.07 ENCOFRADO Y DESENCOFRADO P/TECHO DE BUZON
m2
22.62 101.54
2,296.83
P
N Dias
2.00 s/./dia =
1,148.42
Ren/D
11.31 T. Ejec.
0.00
E

S/. 148.15
74 74
74
S/. 74.08

S/. 0.00
S/. 0.00

###

S/. 0.00
###

S/. 0.00
###

S/. 0.00
###

S/. 0.00
###

S/. 0.00
###

S/. 0.00
###

S/. 0.00
###

S/. 296.30
74 74 74 74
S/. 0.00

S/. 296.30
74 74 74 74
S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 5,291.68
######

S/. 5,291.68
######

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 2,961.64
######

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 1,138.09
######

S/. 1,138.09
######

S/. 3,235.65
#########

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 1,397.22
##################

S/. 1,397.22
##################

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 7,625.52
##################

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 3,168.18
##################

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00
S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 2,993.59
######
S/. 0.00

S/. 3,235.65
#########

S/. 2,296.83
######

######

S/. 0.00

S/. 0.00

S/. 0.00

###

S/. 0.00

S/. 0.00

S/. 3,713.20
#########
S/. 0.00

S/. 698.61
#########

S/. 8,655.38
############

S/. 4,327.69
######

S/. 314.18
######
S/. 0.00

S/. 998.67
######
S/. 0.00

REPROGRACION Y SEGUIMIENTO DE AVANCE DE OBRA

DESC
RIPCI
ON

Und

Rend
M.E. Teo

Precio
Metra
Unitari
do
o
12.00 N Cuad
0.00 M.E. Real

Parcial

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

Item

### 1
### 2
### 3
### 4
### 5
### 6
### 7
### 8
### 9
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
###
###
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
###
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######
######

Residente de Obra:
ING. ALEDIO OSCAR NINA TTICA
Monto Expediente Tcnico:
###
Funcin: 018
SANEAMIENTO
Monto Asignado PIA 2015:
###
Programa: 088
SANEAMIENTO
Fecha de Inicio de Obra: 3/3/2015
Sub- Programa: 088
SANEAMIENTO URBANO
Plazo de Ejecucin: 90 DIAS
Obra: MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y DESAGUE EN LA ASOCIACIN PRO VIVIENDA LA FLORIDA I ETAPA DEL DISTRITO SICUANI, PROVINCIAFecha
DE CANCHIS
de Termino
CUSCO.
de Obra: 7/1/2015
Meta 010
Fuente Financiamiento : CANON Y SOBRECANON

0.94
0.00

02.06.08 ACERO DE REFUERZO fy=4200 Kg/cm2.


kg
###
4.19
6,798.69
N Dias
6.00 s/./dia =
1,133.12
Ren/D 270.43 T. Ejec.
3,399.35
Rend
250.00 N Cuad
1.08
M.E. Teo 811.30 M.E. Real
0.00

P
E

02.06.09 TAPA DE CONCRETO ARMADO PARA BUZON


und
20.00 355.65
7,113.00
N Dias
4.00 s/./dia =
1,778.25
Ren/D
5.00 T. Ejec.
0.00
Rend
5.00 N Cuad
1.00
M.E. Teo
0.00 M.E. Real
0.00
02.06.10 TARRAJEO INTERIORES DE BUZON
m2
117.62
13.28
N Dias
11.00 s/./dia =
Ren/D
10.69 T. Ejec.
Rend
10.00 N Cuad
M.E. Teo
0.00 M.E. Real

1,561.99
142.00
0.00
1.07
0.00

02.07 VARIOS
02.07.01 PLACA RECORDATORIA
und
1.00 797.46
N Dias
1.00 s/./dia =
Ren/D
1.00 T. Ejec.
Rend
1.00 N Cuad
M.E. Teo
0.00 M.E. Real

797.46
797.46
0.00
1.00
0.00

P
E

P
E

P
E

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 6,798.69
##################

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

######
S/. 2,266.23

###
S/. 1,133.12

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 851.99
##################

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 797.46

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

02.08 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE EL TRABAJO
02.08.01 EQUIPOS DE PROTECCIN INDIVIDUAL
S/. 0.00
S/. 0.00
glb
1.00
### 19,093.00
S/. 9,546.50
P
###
N Dias
2.00 s/./dia =
9,546.50
###
Ren/D
0.50 T. Ejec.
9,546.50
E
S/. 0.00
S/. 0.00
Rend
0.50 N Cuad
1.00
S/. 9,546.50
M.E. Teo
0.50 M.E. Real
0.00
02.08.02 EQUIPOS DE PROTECCIN COLECTIVA
glb
1.00 1272.00
1,272.00
N Dias
1.00 s/./dia =
1,272.00
Ren/D
1.00 T. Ejec.
1,272.00
Rend
1.00 N Cuad
1.00
M.E. Teo
1.00 M.E. Real
0.00

P
E

NCIAS EN SEGURIDAD
02.08.03
Y SALUD DURANTE EL TRABAJO
glb
1.00 200.00
200.00
N Dias
1.00 s/./dia =
200.00
Ren/D
1.00 T. Ejec.
0.00
Rend
1.00 N Cuad
1.00
M.E. Teo
0.00 M.E. Real
0.00

P
E

02.09 MITIGACION AMBIENTAL


02.09.01 HUMEDECIMIENTO DEL MATERIAL EXCAVADO
m2
547.67
3.58
1,960.66
N Dias
2.00 s/./dia =
980.33
Ren/D 273.84 T. Ejec.
0.00
Rend
547.00 N Cuad
0.50
M.E. Teo 67.00 M.E. Real
0.00
02.09.02 LIMPIEZA FINAL DE OBRA
m2
547.67
0.67
N Dias
2.00 s/./dia =
Ren/D 273.84 T. Ejec.
Rend
275.00 N Cuad
M.E. Teo
0.00 M.E. Real

P
E

366.94
183.47
0.00
1.00
0.00

P
E

02.09.03 CAPACITACION DE USUARIOS Y ASISTENCIA TECNICA


glb
1.00 3781.00
3,781.00
P
N Dias
3.00 s/./dia =
1,260.33
Ren/D
0.33 T. Ejec.
0.00
E
Rend
0.50 N Cuad
0.67
M.E. Teo
0.00 M.E. Real
0.00
213,084.31

SEMANAL

COSTO DIRECTO

S/. 0.00

S/. 0.00

S/. 3,556.50
######

S/. 0.00

S/. 3,556.50
######
S/. 0.00

S/. 710.00
###############

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 9,546.50
###

###

S/. 1,272.00
###
###
S/. 1,272.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 200.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 980.33

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 12,697.72

S/. 1,518.78

S/. 9,307.40

S/. 14,507.93

S/. 34,604.07

S/. 12,210.75

S/. 18,810.65

S/. 14,595.40

S/. 3,259.02

S/. 10,396.66

S/. 12,439.93

S/. 11,657.55

S/. 28,002.33

S/. 4,732.46

S/. 5,343.29

S/. 8,664.62

S/. 10,335.75

5.96%

0.71%

4.37%

6.81%

16.24%

5.73%

8.83%

6.85%

1.53%

4.88%

5.84%

5.47%

13.14%

2.22%

2.51%

4.07%

4.85%

0.00%

S/. 14,507.08

S/. 2,577.82

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

6.81%

1.21%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

6.67%

###

###

S/. 1,260.33
###

33.15%

###

S/. 980.33

S/. 0.00

S/. 0.00

S/. 0.00

S/. 366.94
######
S/. 0.00

S/. 0.00

S/. 1,260.33
###

27.92%

S/. 0.00

S/. 1,260.33
###

S/. 0.00

S/. 0.00

23.34%

S/. 0.00

8.92%

S/. 0.00

RESUMEN GENERAL - EJECUCION FINANCIERA


DE GASTO POR ESPECIFICA
April/2015

"MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DESAGUE EN LA ASOCIACION PRO


VIVIENDA LA FLORIDA I ETAPA DEL DISTRITO DE SICUANI, PROVINCIA DE CANCHIS - CUSCO"
148

ACTIVIDAD / PROYECTO
META

FUENTE DE FINANCIAMIENTO: CANON Y SOBRE CANON

: MUNICIPALIDAD PROVINCIAL DE CANCHIS

UNIDAD EJECUTORA

GERENCIA DE GESTION AMBIENTAL


Arq. FLORA MAMANI LACUTA

RESIDENTE DE OBRA
ESPECIFICA

TOTAL
PRESUPUEST
O
(PROGRAMAD
O)

2.6.2.3.5.3

2.6.2.3.5.4

2.6.2.3.5.5

2.6.2.3.5.6

COSTO DE
CONSTRUCCION POR
ADMINISTRACION
DIRECTA - PERSONAL

COSTO DE
CONSTRUCCION POR
ADMINISTRACION
DIRECTA - BIENES

COSTO DE
CONSTRUCCION POR
ADMINISTRACION
DIRECTA - SERVICIOS

OTROS

CD
ENERO

FEBRERO

MARZO

ABRIL

S/.

S/.

###

###

MAYO

###

JUNIO

S/. 1,544.32

TOTAL
EJECUCIN

TOTAL
PRESUPUEST
O
(PROGRAMAD
O)
###

S/.

S/.

###

S/.

S/.

###

S/.

S/.

S/.

S/.

###

S/.

S/.

###

S/.

S/.

###

40,988.30

S/.

###

808.50

S/.

###

S/.

###

S/.

S/.

S/.

S/.

S/.

S/.

S/.

S/.

GG

S/.

GS

S/.

CD

S/.

GG

S/.

GS

S/.

CD

S/.

12,576.72

S/.

GG

S/.

11,723.82

S/.

GS

S/.

CD

S/.

18,064.30

S/.

GG

S/.

21,582.64

S/.

SS

S/.

5,716.66

S/.

S/.

79,530.50

S/.

###

###

CIP: 113611

3,683.02

6,183.34
-

AVANCE
FINANCIERO
ANTERIOR
S/.

S/.

3,414.00

45,210.80

AVANCE
FINANCIERO
ACTUAL

79,782.50 23.49% S/.

AVANCE
FINANCIERO
ACUMULADO

48,777.60 14.36% S/.

128,560.10

###

SALDO
FINANCIERO
S/.

211,070.04

TOTAL
EJECUTADO

PORCENTAJE
EJECUTADO

S/. 124,741.30

60.55%

62.15%

EJECUCION FINANCIERA DE GASTO POR


costo directo

CORRESPONDIENTE AL MES DE JULIO

"MANTENIMIENTO DEL BOTADERO CONTROLADO DE RESIDUOS SOLIDOS DEL DIST


- CUSCO

Obra

Propietario
MUNICIPALIDAD PROVINCIAL DE CANCHIS
Elaborado por
ARQ. FLORA MAMANI LACUTA
Revisado por:
S/I
Fecha de Elaboracion:JULIO DEL 2015
ESP/
GASTO
2.6.2.3.5.3
2.6.2.3.5.4
2.6.2.3.5.5
2.6.2.3.5.6

E.T.

RESUMEN
COSTO DE CONSTRUCCION POR
### ADMINISTRACION DIRECTA PERSONAL
COSTO DE CONSTRUCCION POR
###
ADMINISTRACION DIRECTA - BIENES
COSTO DE CONSTRUCCION POR
### ADMINISTRACION DIRECTA SERVICIOS
COSTO DE CONSTRUCCION POR
S/. 0.00
ADMINISTRACION DIRECTA - OTROS
###

ENERO

FEBRERO

MARZO

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

###

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

17,427.80

*SE ESTA ACUMULANDO EL PAGO DE TOPOGRAFO PARA ABRIL YA QUE SE NO SE AFECTO EL MES DE ENER

ESPECIFICA
GASTO

N Pnll

2 6.2 3.5 3

DETALLE O DESCRIPCION

UNID

CANT.

P.U.

COSTO DE CONSTRUCCION POR ADMINITRACION DIRECTA-PERSONAL


PERSONAL OBRERO - JUNIO

TOPOGRAFO JORGE CAMPANA QUILLE


PERSONAL OBRERO - JUNIO

S/. 742.07
_
S/. 0.00
_

2 6.2 3.5 4

O/C

COSTOS DE CONSTRUCCION POR ADM DIRECTA BIENES

16/072015

7/16/2015

3/9/2015

3/5/2015

3/5/2015

01074

01076

00123

00128

1094

GLADYS MARIBEL CONDORI


YUCRA
ALAMBRE GALVANIZADO N16

KG

ALAMBRE NEGRO RECOCIDO N8

KG

ALAMBRE NEGRO RECOCIDO N16

KG

CLAVOS C/C PARA MADERA DE 2"

KG

CLAVOS C/C PARA MADERA DE 3"

KG

CLAVOS C/C/ PARA MADERA DE 4"

KG

CLAVOS PARA CALAMINA DE 21/2

KG

3.00
20.00
10.00
3.00
18.00
22.00
12.00

7.50
5.50
5.50
5.50
5.50
5.50
7.50
16.00
14.00
12.00
8.00
7.00
13.00
16.00
4.00

ROSMERY SURCO HUAYMATALLA


AGUA OXIGENADA X 1000ML

UND

ALCOHOL MEDICINAL X 1000 ML

UND

ALCOHOL YODADO

UND

ALGODN DE 100 GR

PQT

CURITAS

CJA

DICLOFENACO EN GEL

TBO

FURACIN POMADA

UND

GASA ESTERILIZADA 10X10CM


GUANTES QUICURGICOS
DESCARTABLES (TALLA M,L)

PQT

1.00
1.00
1.00
3.00
1.00
5.00
3.00
5.00

CJA

1.00

75.00

JABON CARBOLICO EN BARRA X60G

UND

5.00

3.00

JABON DE TOCADOR ANTIBACTERIAL


EN BARRA

UND

5.00

4.00

JABON LIQUIDO

UND

1.00

7.00

ROLLO DE ESPARADRAPO
5.00CMX4.5MT
VENDA MEDIANA

UND
UND

1.00
5.00

14.00
4.00

YODO POVIDONA

FCO

1.00

16.00

PIEDRA CHANCADA DE 1/2

Mt3

3.00

PIEDRA MEDIANA DE 4"

Mt3

3.00

PIEDRA MEDIANA CANTO RODADO


DE 6"
PIEDRA GRANDE DE 8"

Mt3

PIEDRA DE CANTO RADADO DE 4"

MT3

ARENA FINA

MT3

ARENA GRUESA

MT3

HORMIGON

MT3

2.00
10.00
50.00
6.00
4.00
15.00

CEMENTO PORTLAND TIPO 42.50 KG

BLS

100.00

YANINA APAZA CHAMBI


PALA TIPO CUCHARA DE ACERO CON
MANGO DE BUENA CALIDAD
PICOS(ZAPAPICOS)INCLUIDO MANGO
DE BUENA CALIDAD

UND

6.00

UND

6.00

BUGUIES

UND

3.00

UND

1.00

UND

1.00

GUIDO HUAMANVILCA VERGARA

MT3

CARMEN ROSA QUISPE LEON

BARRETA OCTAGONAL DE ACERO DE


1"X1.5M
COMBA DE 12 LB

28.00

MTS

50.00

UND

2.00

MTS

100.00

UND

3.00

WINCHA DE 60 MTS

UND

1.00

HOJA DE SIERRA

UND

50.00

MANGUERA REFORZADA 5/8

MTS

100.00

CABLE UNIPOLAR N 14WG

MTS

100.00

FOCO 100 W

UND

2.00

SOCKET P/ COLGAR
INTERRUPTOR SIMPLE DE
SOBREPONER
EXTENSION TRIPLE CON CABLE
BIPOLAR N 14 20 MTS
EXTENSION TRIPLE C/ CABLE
BIPOLAR N 14 6MTS
LINTERNA GRANDE RECARGABLE
INCLUYE PILAS RECARGABLES
CORDEL DE NILON 0.80MMX100M

UND

2.00

UND

2.00

UND

1.00

UND

1.00

UND

1.00

RLL

1.00

BALDE DE PLASTICO DE 5 GALONES

UND

5.00

BALDE DE PLASTICO DE 1 GALON

UND

5.00

CANDADO X 60MM

UND

2.00

PARCHE P/ CAMARA DE LLANTAS

UND

6.00

PEGAMENTO JEBE LIQUIDO X 1/4


LLANTAS P/ BUGUIE INCLUYE
CAMARA
CINTA AISLANTE
ESCOBA DE NYLON CON MANGO
PLASTIFICADO
RECOGEDOR DE PLASTICO

UND

1.00

UND

2.00

RLL

2.00

UND

2.00

UND

2.00

REGLA DE ALUMINIO 2" X 4" X 6M

UND

2.00

RODILLO P/ PINTAR DE 12"

UND

4.00

BROCHA DE NYLON 4"

UND

2.00

SERRUCHO DE 20"

UND

1.00

PZA

28.00

PZA

24.00

PZA

7.00

PZA

6.00

MANGUERA DE NIVEL TRANSPARENTE


CILINDRO SE POLIMERO DE 55
( GALONES)
ARPILLERA DE 2.50M DE ANCHO X
3MTS DE ALTURA NACIONAL
WINCHA DE DE 5 MTS

3/9/2015

00156

CARMEN ROSA QUISPE LEON


LISTONES DE MADERA CORRIENTE
DE 2X4X3MTS
LISTONES DE MADERA CORRIENTE
DE 2X3X4.50MTS
LISTONES DE MADERA CORRIENTE
DE 2X6X5MTS
MADERA EUCALIPTO DE 8X8X2MTS

3/10/2015

00166

TABLAS DE MADERA CORRIENTE DE


11/2 X8 X3MTS
ROLLIZO DE EUCALIPTO DE 4X3MTS

PZA

15.00

UND

ROLLIZO DE EUCALIPTO DE 6X6 MTS

UND

PACA MONTAA D=4"


LISTONES DE MADERA DE
4"X4"X4.00MT
JUANA QUISPE QUISPE

UND

18.00
2.00
30.00
6.00

PZA

ACEITE MULTIGRADO 20W50

UND

GRASA EP2

LBS

4.00
2.00

23.00
15.00

3/10/2015

00173

CARMEN ROSA QUISPE LEON


ASFALTO RC - 250
CAJA DE REGISTRO DE CONCRETO
PREFABRICADO 12" X 24"
CANDADO N 40

GLN

5.00

23.00

UND

HOJA DE SIERRA PARA METAL

PQT

LIJA DE METAL N 40

UND

110.00
4.00
3.00
10.00

20.00
38.00
55.00
1.80

PINTURA ESMALTE SINTETICO C/ROJO


Y BLANCO

GLN

2.00

39.00

UND
UND

36.00
4.00

55.00
49.00

UND

9.00

530.00

UND

36.00

49.00

BLS

10.00

10.00

AGUA OXIGENADA 250ML

UND

ALCOHOL MEDICINAL DE 90

UND

ALCOHOL YODADO 1/2 LT

UND

ALGODN

RLL

DICLOXACILINA

CJA

ESPARADRAPO ROLLO GRANDE

RLL

GASA
GOTAS OPTALMICAS PARA
CONJUNTIVITIS
GUANTES QUIRURJICOS

RLL
UND

IBUPROFENO

CJA

PARACETAMOL

CJA

VENDA MEDIANA

UND

1.00
1.00
1.00
1.00
1.00
1.00
1.00
5.00
5.00
1.00
1.00
5.00

6.00
13.00
24.50
4.00
35.00
8.00
1.80
5.00
1.50
10.00
10.00
3.00

CALIXTO FORTUNATO
BUSTAMANTE
ARAGON
CAMARA FOTOGRAFICA
DIGITAL DE
18 MP
TONER LASER JET NET - CE285 - A

UND
UND

1.00
1.00

435.00
248.00

CECILIA
YOBANA
HAUMAN
YUCRA
CARTEL DE
OBRA SEGN
DISEO
DE
2.40 X 3.60, MATERIAL BANNER CON
MARCO DE FIERRO

UND

1.00

500.00

CARMEN ROSA QUISPE LEON


ACERO CORRUGADO FY=4200
KG/CM2
G-60 =1/2"FY=4200
ACERO CORRUGADO

VRL

KG/CM2
G-60 =3/8"FY=4200
ACERO CORRUGADO
KG/CM2 G-60 =5/8"
ALAMBRE GALVANIZADO N 18

VRL

30.00
60.00
6.00
10.00
50.00
20.00
15.00
30.00

37.00
21.00
56.00
8.00
5.00
5.00
5.20
5.20

TAPA C/MARCO FF DE REGISTRO DE


DESAGUE
12" XFF
24" NORMA NTP 350.
TAPA C/MARCO
106. 1998
TAPA PARA BUZON ESTANDAR FF
D=0.60MT INCL.MARCO FF
TAPA Y MARCO DE FG P/REGISTRO
DE AGUA 25 X 30 CM.
YESO DE 28 KG
3/11/2015

3/11/2015

3/11/2015

3/12/2015

00180

00186

00191

00199

UND

GLENIS ORCOTORIO QUISPE

PAR

VRL
KG

ALAMBRE NEGRO N 16

KG

ALAMBRE NEGRO N 8

KG

CLAVOS C/C PARA MADERA DE 3"

KG

CLAVOS C/C PARA MADERA DE 4"

KG

4/6/2015

4/15/2015

4/29/2015

0390

0464

0649

FEDERICO ANTONIO CARPIO


VARGAS
GASOHOL 84 PLUS

GLN

PETROLERO DIESEL B5

GLN

DENNIS PAUL QUISPE SURCO


LINTERNAS RECARGABLE DE 15 LED
DE LARGO ALCANCE
PLASTICO TRIPLE ANCHO 100M

UND

FERRETERIA MULTISERVICIOS EL
GIGA
ADITIVO ACELERANTE DE FRAGUA
BROCA DE CONCRETO DIAMANTADA
1/2 X 4"
GUANTES DE BADANA REFORZADO

GLN

PERNOS EXPANSIVOS DE 1/2" X 4"


WAYPE

RLL

UND
PAR
UND
KG

50.00
160.00

12.00
12.50

2.00
1.00

28.00
350.00

1.00
3.00
15.00
42.00
4.00

30.00
20.50
9.50
3.00
12.00

2 6.2 3.5 5

O/S

COSTOS DE CONSTRUCCION POR ADMINISTRACION DIRECTA - SERVICIOS

2 6.2 3.5 6

DOC.

OTROS (CAJA CHICA)

ERA DE GASTO POR ESPECIFICA


costo directo

DIENTE AL MES DE JULIO del 2015

LADO DE RESIDUOS SOLIDOS DEL DISTRITO DE SICUANI - CANCHIS

ABRIL

MAYO

TOTAL
EJEC.

SALDO

% EJEC.
E.T.

#REF!

#REF!

#REF!

#REF!

S/. 3,414.00

###

###

15.72%

S/. 0.00

S/. 0.00

###

0.00%

S/. 0.00

S/. 0.00

S/. 0.00

0.00%

#REF!

QUE SE NO SE AFECTO EL MES DE ENERO

PARCIAL

TOTAL O/C

ACUM.

ITRACION DIRECTA-PERSONAL
S/. 742.07 S/. 742.07

S/. 0.00

S/. 0.00

742.07

514.00

22.50
110.00
55.00
16.50
99.00
121.00
90.00
S/. 373.00

16.00
14.00
12.00
24.00
7.00
65.00
48.00
20.00
75.00
15.00
20.00
7.00
14.00
20.00
16.00
S/. 0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
S/. 0.00

0.00
S/. 168.00

168.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
S/. 0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
S/. 122.00

92.00
30.00

###

115.00
2,200.00
152.00
165.00
18.00
78.00
1,980.00
196.00
4,770.00
1,764.00
100.00
S/. 159.80

6.00
13.00
24.50
4.00
35.00
8.00
1.80
25.00
7.50
10.00
10.00
15.00
S/. 683.00

435.00
248.00
S/. 500.00

500.00
3,370.00

1,110.00
1,260.00
336.00
80.00
250.00
100.00
78.00
156.00

2,600.00

600.00
2,000.00
406.00

56.00
350.00
408.00

30.00
61.50
142.50
126.00
48.00

17,427.80

NISTRACION DIRECTA - SERVICIOS

0.00

0.00

EJECUCION FINANCIERA DE GASTO POR ESPECIFICA


GASTOS GENERALES
CORRESPONDIENTE AL MES DE JUNIO 2015
"MANTENIMIENTO DEL BOTADERO CONTROLADO DE RESIDUOS SOLIDOS DEL DISTRITO
DE SICUANI - CANCHIS CUSCO"
Propietario
MUNICIPALIDAD PROVINCIAL DE CANCHIS
Elaborado por
ARQ. FLORA MAMANI LACUTA
Revisado por:
S/I
Fecha de ElaboracionJUNIO
Obra

ESP/
GASTO
2 6.2 3.5 3

E.T.

RESUMEN
COSTO DE CONSTRUCCION
### POR ADMINISTRACION DIRECTA
-COSTO
PERSONAL
DE CONSTRUCCION
2 6.2 3.5 4 S/. 3,089.03 POR ADMINISTRACION DIRECTA
-COSTO
BIENESDE CONSTRUCCION

JUNIO

TOTAL
EJEC.
S/. 3,770.22

JULIO

### S/. 824.91

###

% EJEC.
PIM
S/. 0.08

SALDO

S/. 0.00

S/. 0.00

S/. 0.00

###

S/. 0.00

2 6.2 3.5 5 S/. 1,596.00 POR ADMINISTRACION DIRECTA


-COSTO
SERVICIOS
DE CONSTRUCCION

S/. 0.00

S/. 0.00

S/. 0.00

###

S/. 0.00

2 6.2 3.5 6

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

ESPECIFICA
GASTO

S/. 0.00 POR ADMINISTRACION DIRECTA


- OTROS
###

N Pnll

2 6.2 3.5 3

DETALLE O DESCRIPCION

### S/. 824.91

UNID

PERSONAL PROFESIONAL
TECNICO - JUNIO

P.U.

ARQ. RESIDEFLORA MAMANI LACUTA


ASISTENTE
JORGE CAMPANA QUILLE
TECNICO III
PERSONAL PROFESIONAL
TECNICO - JUNIO

ASIST. ADM.

CANT.

PARCIAL

TOTAL

ACUM.

COSTO DE CONSTRUCCION POR ADMINITRACION DIRECTA-PERSONAL

GREGORIA BELEN HUAMANI


ESPINOZA

###

S/. 742.07

S/. 824.91 S/. 824.91


S/. 824.91

PERSONAL PROFESIONAL
TECNICO - JULIO

ARQ. RESIDEFLORA MAMANI LACUTA


ASISTENTE
JORGE CAMPANA QUILLE
TECNICO III
MAESTRO
GUILERMO VARGAS ORE
DE OBRA

S/. 0.00

S/. 0.00

###

###

S/. 0.00
S/. 0.00
S/. 0.00

PERSONAL PROFESIONAL
TECNICO - ABRIL

ASESORA
PATY RUTH CAMPANA GAONA
LEGAL
COORD.OBR
RONALD TORRES CALLAAUPA
A
AUX.COORD WILBER HUAMAN PUMA
ASISTENTE
MARCIAL HUARCA MACEDO
TECNICO III
ASIST. ADM. KATHIA KENIA VELASQUEZ JARA
MAESTRO
CASIMIRO ROMERO
DE OBRA
COROPUNA
ALMACENERALEISEL MERCEDES DOLMOS APAZA
ALMACENERAESPERANZA MAMANI PORTILLA
ERNESTINA SOLORZANO DE
GUARDIAN
CCORRIMANYA

###

###

###
###
###
###
###
###
S/. 700.00
###
###

25,352.86

2 6.2 3.5 4

O/C

18/13/2015

00265

COSTOS DE CONSTRUCCION POR ADM DIRECTA BIENES


IMPRENTA LIBRERA LIWI
E.I.R.Ltda.
ARCHIVADORDE PALANCA
ANCHO TAMAO OFICIO
CINTA ADHESIVA DE EMBALAJE

S/. 808.50
UND

6.00

6.00

36.00

UND

2.00

5.00

10.00

CORRECTOR LIQUIDO TIPO LAPI


CUADERNOS DE OBRA
AUTOCOPIATIVO DE 1 X 3
COPIA DE 50 HOJAS
C/NUMERACION
- EMPASTADO
CUADERNO ESPIRAL
CUADRICULADO TAMAO A4 X
200 HOJAS
ENGRAMPADOR TIPO ALICATE

UND

3.00

3.50

10.50

UND

5.00

30.00

150.00

UND

2.00

9.50

19.00

UND

1.00

48.00

48.00

FOLDER MANILA DE A4 C/FASTE

UND

50.00

0.50

25.00

FOLIADOR DE 60 DIGITOS

UND

1.00

95.00

95.00

GOMA EN BARRA N 40

UND

2.00

8.50

17.00

GRAPAS 26/6

CJA

1.00

4.50

4.50

LAPICERO C/AZUL DE TINTA SE

CJA

1.00

18.00

18.00

TAL

2.00

18.00

36.00

TAL

4.00

18.00

72.00

MLL

0.50

85.00

42.50

MLL

0.50

16.00

8.00

MLL

4.00

24.50

98.00

NOTAS DE ENTRADA DE
ALMACEN AUTOCOPIATIVO 50
HOJAS 1/3 C/N 001 - 050
NOTAS DE SALIDA DE ALMACEN
AUTOCOPIATIVO 50 HOJAS 1/3
C/N 001 - 050
PAPEL BOND 80 GR TAMAO A2
PAPEL BOND 80 G TAMAO A-4
C/AMARILLO
PAPEL BOND 80 GR TAMAO A4 C/BLANCO
PARTES DIARIO DE EQUIPO
MECANICO AUTOCOPIATIVO 1/3
50 HOJAS C/N
PERFORADOR GRANDE
PLUMON INDELEBLE GRANDE
COLOR AZUL
RESALTADOR DE TEXTO
VINCARD

TAL

2.00

25.00

50.00

UND

1.00

16.00

16.00

UND

3.00

3.50

10.50

UND

3.00

2.50

7.50

CTO

1.00

35.00

35.00
808.50

2 6.2 3.5 5

O/S

COSTOS DE CONSTRUCCION POR ADMINISTRACION DIRECTA - SERVICIOS

0.00
2 6.2 3.5 6

DOC.

OTROS (CAJA CHICA)

0.00

EJECUCION FINANCIERA DE GASTO POR ESPECIFICA


GASTOS DE SUPERVISION

ADE
JUNIO
delSOLIDOS
2015 DEL DISTRITO
MANTENIMIENTOCORRESPONDIENTE
DEL BOTADERO CONTROLADO
RESIDUOS
Obra
DE SICUANI - CANCHIS - CUSCO
Propietario
MUNICIPALIDAD PROVINCIAL DE CANCHIS
Elaborado por
ARQ. FLORA MAMANI LACUTA
Revisado por:
S/I
Fecha de ElaboracionJUNIO DEL 2015
ESP/
GASTO

E.T.

RESUMEN

ENERO

COSTO DE CONSTRUCCION
### POR ADMINISTRACION DIRECTA
- PERSONAL
COSTO DE CONSTRUCCION
2 6.2 3.5 4 S/. 1,028.56 POR ADMINISTRACION DIRECTA
- BIENES
COSTO DE CONSTRUCCION
2 6.2 3.5 5 S/. 3,900.00 POR ADMINISTRACION DIRECTA
- SERVICIOS
COSTO DE CONSTRUCCION
2 6.2 3.5 6
S/. 0.00 POR ADMINISTRACION DIRECTA
- OTROS
###
2 6.2 3.5 3

ESPECIFICA
GASTO

N Pnll

2 6.2 3.5 3

DETALLE O DESCRIPCION

FEBRERO

MARZO

ABRIL

MAYO

JUNIO

###

S/. 0.00

S/. 4,795.00

###

S/. 0.25

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

###

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

###

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

4,795.00

0.00

UNID

CANT.

P.U.

PARCIAL

TOTAL

ACUM.

PERSONAL PROFESIONAL FEBRERO

_
-

###
###

0.00
2 6.2 3.5 4

O/C

COSTOS DE CONSTRUCCION POR ADM DIRECTA BIENES

0.00
2 6.2 3.5 5

O/S

COSTOS DE CONSTRUCCION POR ADMINISTRACION DIRECTA - SERVICIOS

0.00
2 6.2 3.5 6

DOC.

% EJEC.
PIM

S/. 0.00

PERSONAL PROFESIONAL ENERO

PERSONAL PROFESIONAL

SALDO

S/. 0.00

COSTO DE CONSTRUCCION POR ADMINITRACION DIRECTA-PERSONAL

ASISTENTE MARZO
TECNICO II
DE
ROLANDO HUAMANI ROCCA
SUPERVICIO
N

TOTAL
EJEC.

OTROS (CAJA CHICA)

0.00

HOJA

DE

TAREO

N
1
2
3
4
5

APELLIDO
PATERNO

GERENCIA DE DESARROLLO URBANO Y OBRAS


SUB GERENCIA DE OBRAS PUBLICAS

SEC FUNC:

TAREO DE PERSONAL

RESIDENTE:

APELLIDO
NOMBRES
MATERNO

DNI

FECHA
NACIM

CATEGORIA

TTICA
ALEDIO OSC 43231139 3/22/1980 RESIDENTE DE OBRA
43888043 7/22/1986 INSPECTOR DE OBRA
CALLAAUPRONALD

NINA
TORRES
HUAMAN
HUAMAN
ARIAS

PUMA
WILBER
GUTIERREZ MARIO
CHOQUE MIRIAN

40708836 1/1/1980 ASISTENTE


TECNICO/INPECTOR
24713862 3/3/1976 ASISTENTE TECNICO III

41879936 12/5/1982 ASISTENTE


DARIO DAVID 41013303 8/3/1981 ADMINISTRATIVO
MAESTRO DE OBRA

"MEJORAMIENTO DE LOS SE
ALCANTARILLADO DE LA ASOCIACI
DISTRITO DE SICUANI,PROV

OBRA:

MUNICIPALIDAD PROVINCIAL DE CANCHIS

META:

ING. ALEDIO OS

FECHA
SEX
INGRESO
O

M MI

M MI

10 11 12 13

2/1/2015

2/1/2015

2/1/2015

2/1/2015

2/2/2015

2/1/2015

HIHUALLANC MACEDO
A
TINTA
MEDINA

2/17/2015

TINTAYA

KELY
KODDALY
VICTOR

44650291 4/8/1986 ALMACENERA

CCUNO

24676832 3/6/1957 GUARDIAN

2/17/2015

ROQUE

HUARCA

HIGIDIO

40488241 7/17/1976 OPERARIO

2/17/2015

10

CABALLERO

QUISPE

JUAN NILO

24571075

PEON

2/17/2015

11

VILLENA

CCANCHI

ALEJANDRO

24680835 7/17/1962 PEON

2/17/2015

12

MAMANI

NINA

RICARDO

23837082 2/7/1959 PEON

2/17/2015

13

PAMPA

MAMANI

MAURO

24718413 11/8/1976 PEON

2/17/2015

14

CRUZ

SONCO

JOSE LUIS

24705533 4/22/1971 PEON

2/17/2015

VB ING RESIDENTE

###

VB SUPERVISOR DE OBRAS

VB SUB GERENCIA DE OBRAS PUBLICAS

AREO
"MEJORAMIENTO DE LOS SERVICIOS DE AGUA POTABLE Y
ALCANTARILLADO DE LA ASOCIACION PRO VIVIENDA 27 DE JUNIO DEL
DISTRITO DE SICUANI,PROVINCIA DE CANCHIS - CUSCO"
01 AL 28 DE FEBRERO
PERIODO:

X: 8 Horas Trabaj.

10

S: Suspensin

CLAVE
O: Inasist.Injust.

ING. ALEDIO OSCAR NINA TTICA

B SUB GERENCIA DE OBRAS PUBLICAS

M MI

P: Permisos

M MI

14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

TOTAL

DIAS

28

28

28

28

27

11

11

11

11

11

11

11

X O

X
X

X
X

X
X

X
X

X
X

X
X

X
X

X
X

11

X
X

X O
VB GERENCIA DE DESARROLLO URBANO Y OBRAS

11

MUNICIPALIDAD PROVINCIAL DE CANCHIS


GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
SUB GERENCIA DE INFRAESTRUCTURA URBANA

MOVIMIENTO DE ALMACEN

ALIDAD PROVINCIAL DE CANCHIS

E INFRAESTRUCTURA URBANA Y RURAL

ENCIA DE INFRAESTRUCTURA URBANA

MIENTO DE ALMACEN

RESUMEN VALORIZADO DEL MOVIMIENTO DE ALMACEN 2015


OBRA :
META:
SUPERVISOR DE OBRA:
RESIDENTE DE OBRA:
ALMACENERO:

"MANTENIMIENTO DEL BOTADERO CONTROLADO DE RESIDUOS SOLIDOS DEL DISTRITO


DE SICUANI - CANCHIS - CUSCO"
148
PERIODO REPORTADO:
ING. CHARLES ALFREDO CHIRINOS LLAMOCCA
ARQ. FLORA MAMANI LACUTA

July-15

SALIDAS A ALMACEN
N DESCRIPCION

SALDO

SALIDA
CANT.
Total
UND 1er P. U.
JULIO
MARZO
ABRIL
MAYO
JUNIO
JULIO
ENT.
Cant. Total Cant. Total Cant. Total Cant. Total Cant. Total Cant. Total Cant. Total

Saldo Final
Cant.

Total
S/.

BIENES EN TRANSFERENCIA DE ALMACEN CENTRAL


FERRETERIA
1
2
3

UND
UND
UND

2
1
3

38 0
2.5 0
6 0

0.00
0.00
0.00

UND

21.5 0

UND

16.3 0

ANILLOS INTERIORES PARA


TAPA DE BUZON D=0.60m

UND

40 0

0.00

ACERO CORRUGADO =1/2


Fy=4200 Kg./Cm2 G-60

VRLL

27 1

TUBERIA PVC SAP UF DE


110mm X6m

UND

CLAVOS DE CALAMINA

Kg

10

TUBERIA PVC SAL UF DE


D=200mm X6m

UND

4
5

LLANTAS DE BUGUIE
BALDE
BOTAS DE JEBE
TUBERIA PVC SAP SP DE
2X3m
TUBO PVC SAP DE 1/2

0
0
0

0
0
0

2
1
3

76.00
2.50
18.00

0.00

64.50

0.00

81.50

0.00

27.00

0.00

59.00

59 0

0.00

15

9 3

27.00

277 0

0.00

12 108.00
2

553.92

25.00

MADERAMEN
11
12
13

ESTACAS DE MADERA DE
2X3X0.40
TRIPLAY DE 0.04mm X
1.20X2.40M
MADERAS DE 1X8X10

PQTS

25 3

75.00

UND

21

24.9 0

0.00

UND

21 3

63.00

21 522.90
0

0.00

AGLUTINANTES Y AGREGADOS
14

PIEDRA DE 3/4

m3

2.8

70 1

70.00

15

YESO DE 28 Kg.

BLS

12 2

24.00

1.8 126.00
2

24.00

UND
UND
UND

1
1
3

1
1
0

0.00
0.00
0.00

1
1
0

0
0
3

0.00
0.00
0.00

PAR

0.00

0.00

PAR

0.00

0.00

UND

0.00

0.00

UND

0.00

0.00

UND

0.00

0.00

24

COMPACTADOR TIPO
CANGURO HONDA COD. 4271 UND
SERIE 673616620011

0.00

0.00

25

MARTILLO DEMOLEDOR
ELECTRICO MARCA BOSCK
SERIE 672275898882
INC/SINCEL ACERADO

0.00

0.00

MUEBLES Y EQUIPOS MENORES


16
17
18
19
20
21
22
23

ESCRITORIO DE MADERA
SILLA DE PLASTICO
BRIQUETERAS DE METAL
FORMAS DE BUZON DE
1.20mx1.20m, 1.60mx1.20m
y1.80mx1.20m
FORMAS DE TAPA PARA
BUZON
PESTAA PARA TAPA DE
BUZON (MOLDE) D=0.60m
MESCLADORA MARCA HONDA
COD.4550 SERIE
675080890001
VIBRADOR DE CONCRETO
MARCA HONDA COD. 5161
SERIE 675099500014

UND

RESUMEN VALORIZADO DEL MOVIMIENTO DE ALMACEN 2015


OBRA :
META:
SUPERVISOR DE OBRA:
RESIDENTE DE OBRA:
ALMACENERO:

"MANTENIMIENTO DEL BOTADERO CONTROLADO DE RESIDUOS SOLIDOS DEL DISTRITO


DE SICUANI - CANCHIS - CUSCO"
148
PERIODO REPORTADO:
ING. CHARLES ALFREDO CHIRINOS LLAMOCCA
ARQ. FLORA MAMANI LACUTA

July-15

SALIDAS A ALMACEN
N DESCRIPCION

SALDO

SALIDA
CANT.
Total
UND 1er P. U.
JULIO
MARZO
ABRIL
MAYO
JUNIO
JULIO
ENT.
Cant. Total Cant. Total Cant. Total Cant. Total Cant. Total Cant. Total Cant. Total

Saldo Final
Cant.

Total
S/.

HERRAMIENTAS MANUALES
26
27
28
29
30
31

COMBAS DE 10 LIBRAS
SAPAPICOS DE ARADO
INC/MANGO
PALAS TIPO CUCHARA
ZARANDAS DE 3/4
MANGUERA DE NIVEL DE
AGUA
MANGUERA DE 1

UND

60 0

0.00

120.00

UND
UND
UND

7
32 6
8 28.75 6
3
0

0.00
0.00
0.00

6
6
0

1
2
3

32.00
57.50
0.00
21.60
75.20

M
M

18
47

1.2 0
1.6 0

0.00
0.00

0
0

18
47

32

BARRETAS EXAGONAL DE
1X1.80M

UND

75 2

0.00

225.00

33

BUGUIS CON LLANTAS


NEUMATICAS

UND

195 0

0.00

975.00

34
35

MALLA DE NAYLON
CILINDRO PLASTICO

M
UND

2
2

1.5 0
110 0

0.00
0.00

0
0

2
2

3.00
220.00

36

CILINDRO METALICO

UND

70 0

0.00

210.00

37
38

BIENES PATRA SEGURIDAD PERSONAL Y COLECTIVA


CINTA DE SEALIZACION DE
RLL
3
48 1
0.00
OBRA
CONOS REFLEJANTES
RLL
6
58 6
0.00

1
6

2
0

96.00
0.00

UTILES DE ESCRITORIO

0.00

0.00

0.00

30.00

39

CUADERNO DE OBRA

UND

30 0

BIENES EN CUSTODIA

0.00

UTILES DE ESCRITORIO

0.00

40

KARDEX

UND

20

20 0

0.00

20 400.00

41

TALONARIO NOTA DE
ENTRADA DE ALMACEN

UND

25 0

0.00

25.00

42

TALONARIO NOTA DE SALIDA


DE ALMACEN

UND

25 0

0.00

25.00

VRLL

45

27 44

0.00

44

27.00

0.00

FERRETERIA
43

ACERO CORRUGADO =1/2


Fy=4200 Kg./Cm2 G-60

AGLUTINANTES Y AGREGADOS
44

CEMENTO PORTLAND TIPO I


42.5 Kg

BOLS

50

22.5 7

###

43 967.50
###

RESUMEN VALORIZADO DEL MOVIMIENTO DE ALMACEN 2015


OBRA :
META:
SUPERVISOR DE OBRA:
RESIDENTE DE OBRA:
ALMACENERO:

"MANTENIMIENTO DEL BOTADERO CONTROLADO DE RESIDUOS SOLIDOS DEL DISTRITO


DE SICUANI - CANCHIS - CUSCO"
148
PERIODO REPORTADO:
ING. CHARLES ALFREDO CHIRINOS LLAMOCCA
ARQ. FLORA MAMANI LACUTA

July-15

SALIDAS A ALMACEN
N DESCRIPCION

SALDO

SALIDA
CANT.
Total
UND 1er P. U.
JULIO
MARZO
ABRIL
MAYO
JUNIO
JULIO
ENT.
Cant. Total Cant. Total Cant. Total Cant. Total Cant. Total Cant. Total Cant. Total

Saldo Final
Cant.

Total
S/.

BIENES ADQUIRIDOS BAJO REQUERIMIENTO


FERRETERIA
1

03 SOQUETE, 03 INTERRUPTO, 03
TOMACORRIENTE

JGO

1.00

5.00

FOCO AHORRADOR 40 W

Und

INTERRUPTOR
TERMOMAGNETICO DE 60 A

Und

ESCALERA TIPOGATO DE
H=1.20MT

0.00

0.00

0.00

1.00

5.00

10

0.00

20.00

20.00

10.00

25

0.00

0.00

0.00

25.00

Und

200

0.00

200.00

200.00

200.00

ESCALERA TIPOGATO DE
H=1.30MT

Und

210

0.00

0.00

0.00

210.00

ESCALERA TIPOGATO DE
H=1.40MT

Und

215

0.00

0.00

0.00

215.00

ESCALERA TIPOGATO DE
H=1.75MT

Und

225

0.00

0.00

0.00

225.00

ASFALTO RC-250

Gln

25

0.00

0.00

0.00

125.00

CAJA DE REGISTRO DE
CONCRETO PREFABRICADO
12"X24"

Und

110

19

0.00

0.00

0.00

110

###

10 CANDADO N 50

Und

42

0.00

0.00

0.00

168.00

11 LIJA DE METAL N 40

Und

10

1.8

0.00

7.20

7.20

10.80

Gln

45

0.00

0.00

0.00

90.00

Und

36

48

0.00

0.00

0.00

36

###

Und

49

0.00

0.00

0.00

196.00

Und

490

0.00

###

###

###

Und

36

37.5

0.00

Vrl

30

37

Vrl

60

21

147.00 48

Vrl

56

224.00

Kg

10

21 ALAMBRE NEGRO N 16

Kg

50

22 ALAMBRE NEGRO N 8

Kg

20

23

CLAVOS C/C PARA MADERA DE


Kg
3"

24

CLAVOS C/C PARA MADERA DE


Kg
4"

25

CABLE AWG #14 (ROLLO DE


1000 M)

12
13
14
15
16
17
18
19
20

PINTURA ESMALTE SINTETICO


C/ROJO Y BLANCO
TAPA C/MARCO FF DE
REGISTRO DE DESAGUE
12"X24"
TAPA C/MARCO FF NORMA
NTP 350. 106. 1998
TAPA PARA BUZON ESTANDAR
FF D=0.60MT INCL. MARCO
FF
TAPA Y MARCO DE FG
P/REGISTRO DE AGUA
25X30CM.
ACERO CORRUGADO
FY=4200 KG/CM2 G-60 = "
ACERO CORRUGADO
FY=4200 KG/CM2 G-60
=3/8"
ACERO CORRUGADO
FY=4200 KG/CM2 G-60
=5/8"
ALAMBRE GALVANIZADO N
18

Rll

26 CABLE DE EXTENSION DE 10M Und

0.00

16 600.00

15 555.00 15 555.00

16 600.00

20 750.00

30

###

0.00

###

55

###

105.00

112.00

336.00

0.00

24.00

0.00

24.00

56.00

45.00

13

65.00

15.00

10.00

15

5.2

1.8

9.10

36.40

8.8 45.50

30

5.2

5.20

18

93.60

19

98.80

11

57.20

95

0.00

0.00

0.00

95.00

15

30.00

0.00

30.00

0.00

22 110.00
5

25.00

28 140.00
15

75.00

6.25 32.50

RESUMEN VALORIZADO DEL MOVIMIENTO DE ALMACEN 2015


OBRA :
META:
SUPERVISOR DE OBRA:
RESIDENTE DE OBRA:
ALMACENERO:

"MANTENIMIENTO DEL BOTADERO CONTROLADO DE RESIDUOS SOLIDOS DEL DISTRITO


DE SICUANI - CANCHIS - CUSCO"
148
PERIODO REPORTADO:
ING. CHARLES ALFREDO CHIRINOS LLAMOCCA
ARQ. FLORA MAMANI LACUTA

July-15

SALIDAS A ALMACEN
N DESCRIPCION

SALDO

SALIDA
CANT.
Total
UND 1er P. U.
JULIO
MARZO
ABRIL
MAYO
JUNIO
JULIO
ENT.
Cant. Total Cant. Total Cant. Total Cant. Total Cant. Total Cant. Total Cant. Total

Saldo Final
Cant.

Total
S/.

MADERAMEN
27

MADERA CORRIENTE DURA


DE 1 1/2" X 8" X 10"

Und

MADERA CORRIENTE DURA


Und
DE 2" X 3" X 10"
ROLLIZO DE MADERA
29 EUCALIPTO D MENOR = 4" X 3 Und
MT
ROLLIZO DE MADERA
30 EUCALIPTO D MENOR = 4" X Und
6.0 MT
28

30

29.9

18 538.20 12 358.80

30 897.00

0.00

50

14.9

31 461.90 13 193.70

44 655.60

89.40

10

18

10 180.00

10 180.00

0.00

39

0.00

156.00

0.00

156.00

0.00

MUEBLES Y EQUIPOS MENORES

CAMARA FOTOGRAFICA
DIGITAL DE 18 MP
CARTEL DE OBRA SEGN
DISEO DE 2.40 X 3.60,
32
MATERIAL BANNER CON
MARCO DE FIERRO
31

Und

435

435.00

0.00

435.00

0.00

Und

500

500.00

0.00

500.00

0.00

72.00

18.00

10

90.00

0.00

HERRAMIENTAS MANUALES

33 BALDE DE PLASTICO X 5 GLN

Und

10

34 CARRETILLA TIPO BUGUI

Und

180

720.00

180.00

900.00

0.00

35

CINCEL ACERADA PUNTA


PLANA DE 1"X0.30

Und

55

0.00

165.00

165.00

0.00

36

COMBA DE 12 LIBRAS INCL.


MANGO

Und

56

112.00

0.00

112.00

0.00

37 COMBA DE 20 LIBRAS

Und

0.00

0.00

0.00

0.00

38 COMBA DE 25 LIBRAS

Und

0.00

0.00

0.00

0.00

DISCO DE CORTE PARA


39 CONCRETO DIAMANTADO DE Und
7"
DISCO DE CORTE PARA METAL
40
Und
DE 7"

0.00

57

0.00

57.00

57.00

57.00

15

0.00

0.00

0.00

45.00

Und

16

0.00

32.00

32.00

0.00

Und

25

0.00

50.00

50.00

0.00

Rll

16

32.00

16.00

48.00

0.00

Und

25

0.00

25.00

25.00

0.00

Und

10

25

0.00

225.00

225.00

25.00

Und

30

29

0.00

14 406.00

14 406.00

0.5

0.00

0.5

3.50

0.5

3.50

0.00

Rll

45

0.00

0.00

0.00

45.00

Und

80

160.00

0.00

160.00

0.00

ZAPAPICO DE ARADO
ANGOSTO INCL. MANGO

Und

30

30

120.00 26 780.00

30 900.00

0.00

51 HOJA DE SIERRA PARA METAL

Pqt

55

0.00

0.00

0.00

165.00

52 HOJA DE SIERRA PARA METAL

UND

30

0.00

0.00

0.00

22

0.00

53 MANGUERA DE 1/2"

Mt3

25

25

0.00

0.00

25

0.00

0.00

41

ESCOFINA MEDIA CAA DE


12"

42 FLEXOMETRO DE 8 m
43 HILO DE NYLON DE 100M
44 INFLADOR PARA BUGUI
45

LLANTAS C/CAMARA PARA


BUGUI (REPUESTO)

46 PALA TIPO CUCHARA


47

PLASTICO POLIETILENO DE 2M
Rll
DOBLE ANCHO

48 RAFIA DE 1KG
49 WINCHA PVC DE 60M
50

16 464.00

RESUMEN VALORIZADO DEL MOVIMIENTO DE ALMACEN 2015


OBRA :
META:
SUPERVISOR DE OBRA:
RESIDENTE DE OBRA:
ALMACENERO:

"MANTENIMIENTO DEL BOTADERO CONTROLADO DE RESIDUOS SOLIDOS DEL DISTRITO


DE SICUANI - CANCHIS - CUSCO"
148
PERIODO REPORTADO:
ING. CHARLES ALFREDO CHIRINOS LLAMOCCA
ARQ. FLORA MAMANI LACUTA

July-15

SALIDAS A ALMACEN
N DESCRIPCION

SALDO

SALIDA
CANT.
Total
UND 1er P. U.
JULIO
MARZO
ABRIL
MAYO
JUNIO
JULIO
ENT.
Cant. Total Cant. Total Cant. Total Cant. Total Cant. Total Cant. Total Cant. Total

Saldo Final
Cant.

Total
S/.

AGLUTINANTES Y AGREGADOS
54

CEMENTO PORTLAND TIPO I


42.5 Kg

Bls

280

24.3

55 ARENA FINA LIMPIA DE RIO

Mt3

120

56 ARENA GRUESA

Mt3

15

70

57 PIEDRA CHANCADA DE 3/4"

Mt3

30

58 YESO DE 28 KG

Bls

10

25 607.50 116
0

0.00

139

###

360.00

240.00

11 778.40 3.9 271.60

15

###

0.00

80

13

###

26

###

15

10 150.00

0.00

10 150.00

51.00

17 144.50

14

360.00

141 ###
3

###

###

3.7 296.00
0

0.00

BIENES PARA SEGURIDAD PERSONAL Y COLECTIVA


59 ANTEOJOS DE SEGURIDAD UV Und

30

8.5

11

93.50

13 110.50

60

BOTAS DE JEBE PUNTA


ACERADO (10 #39 Y 10 #40)

Par

20

23

12 276.00

184.00

20 460.00

0.00

61

CASCO DE PROTECCION TIPO


KW C/ ANARANJADO

Und

30

12 108.00

63.00

19 171.00

11

99.00

Und

8.5

25.50

0.00

25.50

0.00

Und

39

0.00

78.00

78.00

0.00

Und

30

26

208.00

Und

120

480.00

120.00

600.00

0.00

Rll

48

144.00

48.00

192.00

48.00

Und

20

100.00

20.00

120.00

0.00

108.00

36.00

12 144.00

96.00

85.00

27 229.50

25.50

62
63
64
65
66
67

CASCO DE SEGURIDAD
C/AZUL (PERSONAL TECNICO)
CASCO DE SEGURIDAD
C/BLANCO (PERSONAL
PROFESIONAL)
CHALECO DE SEGURIDAD C/
ANARANJADO CON CINTA
REFLEXIVA
CHALECO DE SEGURIDAD
TERMICO C/AZUL (PERSONAL
PROFESIONAL-TECNICO)
CINTA DE SEGURIDAD DE C/
AMARILLO (2), ROJO(1),
VERDE(2)
CONOS DE SEGURIDAD
(MEDIANO)

12 312.00

20 520.00

10 260.00

68

GUANTES DE JEBE #9
PESADO

Par

20

12

69

GUANTES DE LONA PALMA DE


Par
GOMA REFORZADA

30

8.5

70

MALLA DE SEGURIDAD
C/NARANJA

59

59.00

59.00

118.00

236.00

71

MASCARILLA DE PROTECCION
Und
BUCAL

30

14

14.00

0.00

14

14.00

16

16.00

Und

20

19

0.00

Par

10

157

PONCHO PARA LLUVIA


REFORZADA
ZAPATOS DE CUERO DE
73 SEGURIDAD CAA ALTA (05
#39 Y 05 #40)
72

Rll

17 144.50 10

10 190.00 10 190.00
3

471.00

20 380.00

471.00

942.00

628.00

COMBUSTIBLES, CARBURANTES, LUBRICANTES Y OTROS

74 ACEITE MULTIGRADO 20W50

Und

23

69.00

0.00

69.00

23.00

75 GRASA EP2

Lbs

15

30.00

0.00

30.00

0.00

76 GASOLINA 84

Glns

12

84.00

24.00

108.00

0.00

77 PETROLEO

Glns

12.5

25.00

50.00

75.00

0.00

IMPLEMETOS DE PRIMEROS AUXILIOS


78 AGUA OXIGENADA 250ML

Und

0.00

6.00

6.00

0.00

79 ALCOHOL MEDICINAL DE 90

Und

13

0.00

13.00

13.00

0.00

80 ALCOHOL YODADO 1/2 LT

Und

24.5

0.00

24.50

24.50

0.00

81 ALGODON

Rll

0.00

4.00

4.00

0.00

82 DICLOXACILINA

Cja

35

0.00

35.00

35.00

0.00

RESUMEN VALORIZADO DEL MOVIMIENTO DE ALMACEN 2015


OBRA :
META:
SUPERVISOR DE OBRA:
RESIDENTE DE OBRA:
ALMACENERO:

"MANTENIMIENTO DEL BOTADERO CONTROLADO DE RESIDUOS SOLIDOS DEL DISTRITO


DE SICUANI - CANCHIS - CUSCO"
148
PERIODO REPORTADO:
ING. CHARLES ALFREDO CHIRINOS LLAMOCCA
ARQ. FLORA MAMANI LACUTA

July-15

SALIDAS A ALMACEN
N DESCRIPCION

SALDO

SALIDA
CANT.
Total
UND 1er P. U.
JULIO
MARZO
ABRIL
MAYO
JUNIO
JULIO
ENT.
Cant. Total Cant. Total Cant. Total Cant. Total Cant. Total Cant. Total Cant. Total

Saldo Final
Cant.

Total
S/.

ESPARADRAPO ROLLO
83
GRANDE

Rll

0.00

8.00

8.00

0.00

84 GASA

Rll

1.8

0.00

1.80

1.80

0.00

Und

0.00

25.00

25.00

0.00

86 GUANTES QUIRURGICOS

Par

1.5

0.00

7.50

7.50

0.00

87 IBUPROFENO

Cja

10

0.00

10.00

10.00

0.00

88 PARACETAMOL

Cja

10

0.00

10.00

10.00

0.00

89 VENDA MEDIANA

Und

0.00

15.00

15.00

0.00

Und

248

248.00

0.00

248.00

0.00

Und

0.00

6.00

6.00

30.00

Und

0.00

5.00

5.00

5.00

3.5

0.00

3.50

3.50

7.00

30

0.00

150.00

150.00

0.00

9.5

0.00

19.00

19.00

0.00

Und

48

0.00

0.00

0.00

48.00

Und

50

0.5

0.00

0.00

0.00

50

25.00

98 FOLIADOR DE 06 DIGITOS

Und

95

0.00

0.00

0.00

95.00

99 GOMA EN BARRA N 40

Und

8.5

0.00

8.50

8.50

8.50

Cja

4.5

0.00

0.00

0.00

4.50

Cja

18

18.00

0.00

18.00

0.00

Tal

18

0.00

36.00

36.00

0.00

Tal

18

0.00

54.00

54.00

18.00

Mll

0.5

85

0.5

42.50

0.00

0.5 42.50

0.00

Mll

0.5

16

0.00

0.00

0.5

8.00

Mll

24.5

0.5

12.25

24.50

2.5

61.25

Tal

25

0.00

25.00

25.00

25.00

Und

16

0.00

16.00

16.00

0.00

Und

3.5

3.50

0.00

3.50

7.00

110 RESALTADOR DE TEXTO

Und

2.5

0.00

2.50

2.50

5.00

111 VINCARD

Cto

35

0.00

35.00

35.00

0.00

85

GOTAS OPTALMICAS PARA


CONJUNTIVITIS

UTILES DE ESCRITORIO
TONER HP LASER JET NTCE285-A
ARCHIVADORES DE PALANCA
91 LOMO ANCHO TAMAO
OFICIO
CINTA ADHESIVA DE
92
EMBALAJE GRANDE
90

CORRECTOR LIQUIDO TIPO


Und
LAPICERO
CUADERNO DE OBRA
AUTOCOPIATIVO DE 1 X 3
94
Und
COPIAS DE 50 HOJAS
C/NUMERACIN
EMPASTADO
CUADERNO ESPIRAL
95 CUADRICULADO TAMAO A4 Und
X 200 HOJAS
93

96 ENGRAPADOR TIPO ALICATE


97

FOLDER MANILA A4
C/FASTENER

100 GRAPAS 26/6


101
102
103
104
105

LAPICEROS C/AZUL DE TINTA


SECA 0.4 MM DE ANCHO DE
TRAZO
NOTAS DE ENTRADA DE
ALMACEN AUTOCOPIATIVO 50
HOJAS 1/3 C/N 001 - 050
NOTAS DE SALIDA DE
ALMACEN AUTOCOPIATIVO 50
HOJAS 1/3 C/N 001 - 050
PAPEL BOND DE 80 GR
TAMAO A-2
PAPEL BOND DE 80 GR
TAMAO A-4 C/AMARILLO

PAPEL BOND DE 80 GR
TAMAO A-4 C/BLANCO
PARTES DIARIO DE EQUIPO
107 MECANICO AUTOCOPIATIVO
1/3 50 HOJAS C/N
106

108 PERFORADOR GRANDE


109

PLUMON INDELEBLE GRANDE


COLOR AZUL

0.00

1.5 36.75

RESUMEN VALORIZADO DEL MOVIMIENTO DE ALMACEN 2015


OBRA :
META:
SUPERVISOR DE OBRA:
RESIDENTE DE OBRA:
ALMACENERO:

"MANTENIMIENTO DEL BOTADERO CONTROLADO DE RESIDUOS SOLIDOS DEL DISTRITO


DE SICUANI - CANCHIS - CUSCO"
148
PERIODO REPORTADO:
ING. CHARLES ALFREDO CHIRINOS LLAMOCCA
ARQ. FLORA MAMANI LACUTA

July-15

SALIDAS A ALMACEN
N DESCRIPCION
111 VINCARD

SALIDA
CANT.
Total
UND 1er P. U.
JULIO
MARZO
ABRIL
MAYO
JUNIO
JULIO
ENT.
Cant. Total Cant. Total Cant. Total Cant. Total Cant. Total Cant. Total Cant. Total
Cto
1
35
0
0.00
1 35.00
1 35.00

SALDO
Saldo Final
Cant.
0

Total
S/.
0.00

MOVIMIENTO DIARIO DE MATERIALES


CORRESPONDIENTE AL MES DE JULIO DEL 2015

ITEM

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

OBRA :

"MANTENIMIENTO DEL BOTADERO CONTROLADO DE RESIDUOS SOLIDOS DEL DISTRITO DE SICUANI - CANCHIS - CUSCO

META:
INSPECTOR DE OBRA:
RESIDENTE DE OBRA:

148
ING. CHARLES ALFREDO CHIRINOS LLAMOCCA
ARQ. FLORA MAMANI LACUTA

MI
J
V
1
2
3
BIENES EN TRANSFERENCIA DE ALMACEN CENTRAL
FERRETERIA
ARPILLERA DE 2.50M DE
E
ANCHO X 3MTS DE ALTURA - UND
S
NACIONAL
E
BARRETA OCTAGONAL DE
Kg
S
ACERO DE 1"X1.5M
E
CILINDRO DE POLIMERO DE 55
UND
S
(GALONES)
E
PARCHE P/ CAMARA DE LLANTA UND
S
E
PEGAMENTO JEBE LIQUIDO X
UND
S
1/4
E
SOCKET P/ COLGAR EPEN
UND
S
E
CALAMINA GALVANIZADO DE
UND
S
ZINC 1.80M X 80 CM X 22MM
E
ALAMBRE GALVANIZADO DE
RLL
S
PUAS ROLLO DE 200 M
E
ALAMBRE NEGRO RECOCIDO
KG
S
N8
E
ALAMBRE NEGRO RECOCIDO
KG
S
N16
E
ALAMBRE GALVANIZADO N16 KG
S
E
CLAVOS C/C PARA MADERA DE
KG
S
2"
E
CLAVOS C/C PARA MADERA N3 KG
S
E
CLAVOS C/C PARA MADERA N4 KG
S
E
CLAVOS PARA CALAMINA DE
KG
S
21/2"
MADERAMEN
E
LISTONES DE MADERA
PZA
S
CORRIENTE DE 2"X4"X3"MTS
E
LISTONES DE MADERA
PZA
S
CORRIENTE DE 2"X3"X4.50MTS
E
LISTONES DE MADERA
PZA
S
CORRIENTE DE 2"X6"X5MTS
E
MADERA EUCALIPTO DE
PZA
S
8"X8"X2MTS
TABLAS DE MADERA
E
PZA
CORRIENTE DE
S
11/2"X8X3MTS
E
ROLLIZO DE EUCALIPTO DE
UND
S
4"X3MTS
E
ROLLIZO DE EUCALIPTO DE
UND
S
6"X6MTS
E
PACA MONTAA D=4"
UND
S
E
LISTONES DE MADERA DE
PZA
S
4"X4"X4.00MT
UTILES DE ESCRITORIO
E
ENGRAPADOR DE METAL TIPO
UND
S
ALICATE
E
FOLDER MANILA A4 C/
CTO
S
FASTENER
E
CUADERNO CON ESPIRAL 100
UND
S
HOJAS A4
E
POST IT
PQT
S
E
CORRECTOR LIQUIDO
UND
S
E
GRAPAS 26/6
CJA
S
E
CINTA MASKING TAPE 3/4"X 40
UND
S
YD
E
PLUMON INDELEBLE PUNTA
UND
S
DELGADA COLOR AZUL
E
PAPEL A4 75GM
MLL
S
E
CAJA DE LAPIZ 2B
CJA
S
PLUMON RESALTADOR PUNTA
E
GRUESA BISELADA COLOR
UND
S
AMARILLO
E
CINTA ADHESIVA DE EMBALAJE
UND
S
GRANDE
E
PEGAMENTO EN BARRA N40 UND
S
E
PERFORADOR BUENA CALIDAD UND
S
E
ARCHIVADORES TIPO PALANCA
UND
S
LOMO ANCHO A4
E
LAPICERO TINTA LIQUIDA
CJA
S
(AZUL, NEGRO, ROJO)
DESCRIPCION

Unid

S
4

D
5

L
6

MA MI
7
8

MES REPORTADO:

J
9

V
10

S
11

D
12

JULIO 2015
L MA MI
J
V
13 14 15 16 17

S
18

D
19

July/2015

L MA MI
20 21 22

100
25
1

J
23

V
24

S
25

D
26

L MA MI
27 28 29

J
30

V
31

5
1

2
2
6
1
2
50
1
20
5
10
3
3
2
18
2
22
2
12

28
24
2
7
5
6
15
4

18
2
30
6
1
1
1
3
1
1
1
3
1
1
1
2
1
3
1
5
2
0.5
0.5
2
1
2
1
1
1
1
3
3
1
1

TOTA TOTA
L
L SALDO
ENT. SAL
100

30

70

50

50

20

15

10

10

18

16

22

18

12

12

28

28

24

22

15

10

18

18

30

30

0.5

0.5

MOVIMIENTO DIARIO DE MATERIALES


CORRESPONDIENTE AL MES DE JULIO DEL 2015

ITEM
41
42
43
44

OBRA :

"MANTENIMIENTO DEL BOTADERO CONTROLADO DE RESIDUOS SOLIDOS DEL DISTRITO DE SICUANI - CANCHIS - CUSCO

META:
INSPECTOR DE OBRA:
RESIDENTE DE OBRA:

148
ING. CHARLES ALFREDO CHIRINOS LLAMOCCA
ARQ. FLORA MAMANI LACUTA

DESCRIPCION
HERRAMIENTAS MANUALES
LLANTAS P/ BUGUIE INCLUYE
CAMARA
PICOS (ZAPAPICOS ) INCLUIDO
MANGO DE BUENA CALIDAD
BALDE DE PLASTICO DE 1
GALONES
BALDE DE PLASTICO DE 5
GALONES

UND
UND
UND
UND

45 MANGUERA REFORZADA 5/8


MTS
BARRETAS OCTAGONAL DE
46 ACERO DE 1"X1.5M EXAGONAL UND
DE 1X1.80M
47 BUGUIES TRUPER
UND
48 BROCHA DE NYLON 4"
49

UND

CILINDRO DE POLIMERO DE 55
UND
(GALONES)

50 CABLE UNIPOLAR N14 AWG

MTS

51 CANDADO X 60 MM

UND

52 COMBA DE 12 1B

UND

53 CINTA AISLANTE 3M

RLL

CORDEL DE NYLON
0.80MMX100M
ESCOBA DE NYLON CON
55
MANGO PLASTIFICADO
EXTENSION TRIPLE C/ CABLE
56
BIPOLAR N14 6 MTS
EXTENSION TRIPLE C/ CABLE
57
BIPOLAR N14 20 MTS
54

RLL
UND
UND
UND

58 FOCO 100 W

UND

59 HOJA DE SIERRA

UND

60
61
62
63
64

INTERRUPTOR SIMPLE
DESOBREPONER TICINO
LINTERNA GRANDE
RECARGABLE INCLUIDO PILAS
RECARGABLES
MANGUERA DE NIVEL
TRANSPARENTE
PALA TIPO CUCHARAS DE
ACERO CON MANGO DE BUENA
CALIDAD
RECOGEDOR DE PLASTICO

UND
UND
MTS
UND
UND

65 REGLA DE ALUMINIO2"4"X6"M UND


66 RODILLO P/ PINTAR DE 12"

UND

67 SERRUCHO DE 20"

UND

68 WINCHA DE 5 MTS

UND

69 WINCHA DE 60 MTS

UND

70

EXTENSION TRIPLE C/ CABLE


BIPOLAR N14 6MTS

MI
1

Unid

UND

J
2

V
3

S
4

D
5

L
6

MA MI
7
8

MES REPORTADO:

J
9

V
10

S
11

D
12

JULIO 2015
L MA MI
J
V
13 14 15 16 17

E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

S
18

D
19

July/2015

L MA MI
20 21 22

J
23

V
24

S
25

D
26

L MA MI
27 28 29

J
30

V
31

2
2
6
4

5
3

5
1

100
50
1
1
3
2

2
2
2
100
2
1
1
1
2
1
1
2
1
1
1
2
50
2
1
50
10
6
3

2
1
2
1
4
1
3
3
1
1
1

TOTA TOTA
L
L SALDO
ENT. SAL
2

100

50

50

100

100

50

50

50

10

40

0
0

71 AGLUTINANTES Y AGREGADOS

E
S
E
S
E
PIEDRA MEDIANA CANTO
74
MT3
S
RADADO DE 6"
E
75 PIEDRA GRANDE DE 8"
MT3
S
E
PIEDRA DE CANTO RODADO DE
76
MT3
S
4"
E
77 ARENA FINA
MT3
S
E
78 ARENA GRUESA
MT3
S
E
79 HORMIGON
MT3
S
E
CEMENTO PORTLAND TIPO
80
BLS
S
42.50 KG
BIENES PARA SEGURIDAD PERSONAL Y COLECTIVA
CASCOS DE PROTECCION
E
81 BLANCO C/ PROTECCION UV Y UND 0
S
CORTAVIENTO
AZUL
CASCOS
C/ CORTAVIENTO(
01
E
82 VERDE, 10 AMARILLOS, 02
UND
S
AZUL)
E
GUANTES DE JEBE DE USO
83
PAR
S
INDUSTRIAL TALLA 9
E
GUANTES DE CUERO
84
PAR
S
REFORZADO TALLA 9
E
LENTES DE PROTECCION
85
UND
S
TRANSPARENTE
E
MASCARILLA DE PROTECCION
86
UND
S
PARA OBRA
E
87 MASCARILLA DE TELA
UND
S
E
GUANTES DE ALGODN
88
PAR
S
REFORZADO CON NITRILO
GUANTES DE CUERO PALMA
E
89 REFORZADO (30 PARES TALLA PAR
S
8 Y 30 PARES
TALLA
9)NOMBRE
CHALECO
DRILL
CON
E
90 DE LA OBRA BORDADA Y
UND
S
CINTAS
REFLECTIVAS
CHALECOS IMPERMEABLES
E
92 TIPO REPORTERO SEGN
UND
S
MODELO
IMPLEMENTO DE PRIMEROS AUXILIOS
E
92 AGUA OXIGENADA X 1000 ML UND
S
E
ALCOHOL MEDICINAL X1000
93
UND
S
ML
E
94 ALGODN DE 100 GR
PQT
S
E
95 ALCOHOL YODADO 1/2 LT
UND
S
72 PIEDRA CHANCADA DE 1/2"

MT3

73 PIEDRA MEDIANA DE 4"

MT3

3
3
3
3
2
2
10
3
50
25
6
4
15
12
100
7

1
1
13
5
20
5
20
5
12
5
12
5
60
20
60
20
60
20
12
5
3
1
1
1
1
3
1

10

50

25

25

15

12

100

17

83

13

20

15

20

15

12

12

60

20

40

60

20

40

60

20

40

12

MOVIMIENTO DIARIO DE MATERIALES


CORRESPONDIENTE AL MES DE JULIO DEL 2015

ITEM

OBRA :

"MANTENIMIENTO DEL BOTADERO CONTROLADO DE RESIDUOS SOLIDOS DEL DISTRITO DE SICUANI - CANCHIS - CUSCO

META:
INSPECTOR DE OBRA:
RESIDENTE DE OBRA:

148
ING. CHARLES ALFREDO CHIRINOS LLAMOCCA
ARQ. FLORA MAMANI LACUTA

DESCRIPCION

Unid

96 GASA ESTERILIZADA 10X10CM PQT


97 FURACIN POMADA

UND

E
S
E
S

MI
1

J
2

V
3

S
4

D
5

L
6

MA MI
7
8

MES REPORTADO:

J
9

V
10

S
11

D
12

JULIO 2015
L MA MI
J
V
13 14 15 16 17
5
3

S
18

D
19

July/2015

L MA MI
20 21 22

J
23

V
24

S
25

D
26

L MA MI
27 28 29

J
30

V
31

TOTA TOTA
L
L SALDO
ENT. SAL
5
0
5
3

MOVIMIENTO DIARIO DE MATERIALES


CORRESPONDIENTE AL MES DE JULIO DEL 2015
OBRA :

"MANTENIMIENTO DEL BOTADERO CONTROLADO DE RESIDUOS SOLIDOS DEL DISTRITO DE SICUANI - CANCHIS - CUSCO

META:
INSPECTOR DE OBRA:
RESIDENTE DE OBRA:

148
ING. CHARLES ALFREDO CHIRINOS LLAMOCCA
ARQ. FLORA MAMANI LACUTA

ITEM

DESCRIPCION

Unid

ROLLO DE ESPARADRAPO
98
5.00CMX4.5MT

UND

99 VENDA MEDIANA

UND

100 CURITAS

CJA

101 YODO POVIDONA

FCO

JABON CARBOLICO EN BARRA X


UND
60 G
JABON DE TOCADOR
103
UND
ANTIBACTERIAL EN BARRA
102

104 DICLOFENACO EN GEL

TBO

105 JABON LIQUIDO

GLN

106

GUANTES QUIRURGICOS
DESCARTABLES (TALLAM,L)

CJA

E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

MI
1

J
2

V
3

S
4

D
5

L
6

MA MI
7
8

MES REPORTADO:

J
9

V
10

S
11

D
12

JULIO 2015
L MA MI
J
V
13 14 15 16 17
1

S
18

D
19

July/2015

L MA MI
20 21 22

5
1
1
1
5
5
1
5
1
1
1

J
23

V
24

S
25

D
26

L MA MI
27 28 29

J
30

V
31

TOTA TOTA
L
L SALDO
ENT. SAL
1
0
1
5

107

OBRA :
META:
INSPECTOR DE OBRA:
RESIDENTE DE OBRA:
ALMACENERO:

ITEM

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

DESCRIPCION

MOVIMIENTO DIARIO DE MATERIALES TRA


MEJORAMIENTO Y AMPLIACIN
DEL SISTEMA DE AGUA POTABLE
Y DES
CORRESPONDIENTE
AL MES
SICUANI, PROVINCIA DE CANCHIS CUSCO.
12
ING. ALEDIO OSCAR NINA TTICA
ESPERANZA MAMANI PORTILLA

Unid SAL.ANT

MI
1

BIENES ADQUIRIDOS BAJO REQUERIMIENTO


FERRETERIA
E
03 SOQUETE, 3 INTERUPTOR, 3
JGO
0
TOMACORRIENTE
S
E
FOCO AHORRADOR 40W
UND
3
S
1
E
INTERRUPTOR
UND
1
TERMOMAGNETICO DE 60 A
S
E
ESCALERA TIPO GATO DE
UND
2
H=1,20M
S
E
ESCALERA TIPO GATO DE
UND
1
H=1,30M
S
E
ESCALERA TIPO GATO DE
UND
1
H=1,40M
S
E
ESCALERA TIPO GATO DE
UND
1
H=1,75M
S
E
ASFALTO RC-250
GLN
5
S
CAJA DE REGISTRO DE
E
CONCRETO PREFABRICADO
UND 70
S
12"X24"
E
CANDADO N 50
UND
4
S
E
LIJA DE METAL N 40
UND 10
S
E
PINTURA ESMALTE SINTETICO
GLN
2
C/ROJO Y BLANCO
S
TAPA C/MARCO FF DE
E
REGISTRO DE DESAGUE 12" X UND 36
S
24"
E
TAPA C/MARCO FF NORMA
UND
4
NTP 350.106.1998
S
TAPA PARA BUZON ESTANDAR
E
UND
9
FF D= 0.60 M INL. MARCO
S
FF
TAPA Y MARCO DE F G
E
P/REGISTRO DE AGUA 25 X 30 UND 36
S
CM
E
ACERO CORRUGADO Fy=4200
VRLL 15
Kg./Cm2 G-60 =1/2"
S
E
ACERO CORRUGADO Fy=4200
VRLL 53
Kg./Cm2 G-60 =3/8"
S 22
E
ACERO CORRUGADO Fy=4200
VRLL
2
Kg./Cm2 G-60 =5/8"
S
E
ALAMBRE GALVANIZADO N 18 KG
7
S
E
ALAMBRE NEGRO N 16
KG
41

J
2

V
3

S
4

D
5

L
6

MA
7

MI
8

J
9

V
10

4
3

3
2

S
11

D
12

21 ALAMBRE NEGRO N 16

KG

41

22 ALAMBRE NEGRO N 8

KG

20

KG

15.25

KG

29

RLL

UND

CLAVOS C/C PARA MADERA DE


23
3"
CLAVOS C/C PARA MADERA DE
24
4"
CABLE AWG #14 (ROLLO DE
25
100M)
26 CABLE DE EXTENSION DE 10M

27
28
29
30

31
32

MADERAMEN
MADERA CORRIENTE DURA DE
UND
1 1/2" X 8" X10"
MADERA CORRIENTE DURA DE
UND
2" X 3" X10"
ROLLIZO DE MADERA
EUCALIPTO DE MENOR = 4" X UND
3M
ROLLIZO DE MADERA
EUCALIPTO DE MENOR = 4" X UND
6,0M
MUEBLES Y EQUIPOS MENORES
CAMARA FOTOGRAFICA
UND
DIGITAL
DE OBRA
18 MPSEGN
CARTEL DE
DISEO DE 2.40 X 3.60
UND
MATERIAL BANNER CON
MARCO
DE FIERROMANUALES
HERRAMIENTAS

12
19
0
0

0
0

33 BALDE DE PLASTICO X 5 GLN

UND

34 CARRETILLA TIPO BUGUI

UND

UND

UND

37 COMBA DE 20 LIBRAS

UND

38 COMBA DE 25 LIBRAS
DISCO DE CORTE PARA
39 CONCRETO DIAMANTADO DE
7"
DISCO DE CORTE PARA METAL
40
DE 7"

UND

UND

UND

41 ESCOFINA MEDIA CAA DE 12" UND

42 FLEXOMETRO DE 8M

UND

43 HILO DE NAYLON

RLL

44 INFLADOR PARA BUGUI

UND

UND

10

CINCEL ACERADA PUNTA


35
PLANA DE 1" X0,30
COMBA DE 12 LIBRAS INCL
36
MANGO

45

LLANTAS C/CAMARA PARA


BUGUI (REPUESTO)

S
E
S
E
S
E
S
E
S
E
S

1
1

16

E
S
E
S
E
S
E
S

2
1

E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

2
1

1
1
1
1
9

46 PALA TIPO CUCHARA

UND

30

RLL

0.5

48 RAFIA DE 1KG

RLL

49 WINCHA PVC DE 60M

UND

ZAPAPICO DE ARADO
ANGOSTO INCL. MANGO

UND

26

52 HOJA DE SIERRA PARA METAL

UND

28

47

50

PLASTICO POLIETILENO DE 2M
DOBLE ANCHO

53 MANGUERA DE 1/2"

E
S
E
S
E
S
E
S
E
S
E
S
E
S

55
56
57
58

59
60
61
62
63
64
65
66
67
68
69
70
71
72
73

0.5

27

AGLUTINANTES Y AGREGADOS
CEMENTO PORTLAND TIPO I
54
BOLS 150
42.5 Kg

E
S
E
ARENA FINA LIMPIA DE RIO
M3
6.5
S
E
ARENA GRUESA
M3 18.88
S 7.4
E
PIEDRA CHANCADA DE 3/4"
M3 17.5
S
E
YESO DE 28 KG
BOLS 13
S
BIENES PARA SEGURIDAD PERSONAL Y COLECTIVA
E
ANTEOJOS DE SEGURIDAD UV UND 19
S
E
BOTAS DE JEBE PUNTA
PAR
12
ACERADO (10 #39 Y 10 # 40)
S
1
E
CASCO DE PROTECCION TIPO
UND 18
KW C/ANARANJADO
S
E
CASCO DE SEGURIDAD C/ AZUL
UND
0
(PERSONAL TECNICO)
S
CASCO DE SEGURIDAD
E
UND
2
C/BLANCO (PERSONAL
S
PROFESIONAL)
CHALECO DE SEGURIDAD
E
C/ANARANJADO CON CINTA
UND 18
S
REFLEXIVA
CHALECO DE SEGURIDAD
E
UND
1
TERMICO C/AZUL(PERSONAL
S
PROFESIONAL
- TECNICO)
CINTA
DE SEGURIDAD
DE
E
C/AMARILLO (2) ROJO (1)
RLL
2
S
VERDE (2)
E
CONOS DE SEGURIDAD
UND
1
(MEDIANO)
S
E
GUANTES DE JEBE # 9 PESADO PAR
11
S
E
GUANTES DE LONA PALMA DE
PAR
13
GOMA REFORZADA
S
E
MALLA DE SEGURIDAD
RLL
5
C/NARANJA
S
1
E
MASCARILLA DE PROTECCION
UND 26
BUCAL
S
E
PONCHO PARA LLUVIA
UND 10
REFORZADO
S 10
ZAPATOS DE CUERO DE
E
SEGURIDAD CAA ALTA (5# 39 PAR
7
Y 5# 40)

0.1
0.1

1
0.3

0.3

1
1
2

ZAPATOS DE CUERO DE
73 SEGURIDAD CAA ALTA (5# 39 PAR
7
S
Y 5# 40)
COMBUSTIBLES, CARBURANTES, LUBRICANTES Y OTROS
E
74 ACEITE MULTIGRADO 20W50
UND
4
S
E
75 GRASA EP2
LBS
1
S
E
76 GASOLINA 84
GLN
2
S
E
77 PETROLEO
GLN
4
S
IMPLEMETOS DE PRIMEROS AUXILIOS
E
78 AGUA OXIGENADA 250ML
UND
1
S
E
79 ALCOHOL MEDICINAL DE 90
UND
1
S
E
80 ALCOHOL YODADO 1/2 LT
UND
1
S
E
81 ALGODN
RLL
1
S
E
82 DICLOXACILINA
CJA
1
S
E
83 ESPARADRAPO ROLLO GRANDE RLL
1
S
E
84 GASA
RLL
1
S
E
GOTAS OPTALMICAS PARA
85
UND
5
CONJUNTIVITIS
S
E
86 GUANTES QUIRURGICOS
PAR
5
S
E
87 IBIPROFENO
CJA
1
S
E
88 PARACETAMOL
CJA
1
S
E
89 VENDA MEDIANA
UND
5
S
UTILES DE ESCRITORIO
E
TONER HP LASER JET NT- CE
90
UND
0
285-A
S
E
ARCHIVADORES DE PALANCA
91
UND
6
LOMO ANCHO TAMAO OFICIO
S
E
CINTA ADHESIVA DE EMBALAJE
92
UND
2
GRANDE
S
1
E
CORRECTOR LIQUIDO TIPO
93
UND
3
LAPICERO
S
CUADERNO DE OBRA
E
AUTOCOPIATIVO DE 1 X 3
94
UND
5
COPIAS DE 50 HOJAS
S
C/NUMERACION-EMPASTADO
E
CUADERNO CUADRICULADO
95
UND
0
TAMAO A4 X 100 HOJAS
S
CUADERNO ESPIRAL
E
96 CUADRICULADO TAMAO A4 X UND
2
S
200 HOJAS

10
1

97 ENGRAPADOR TIPO ALICATE

UND

FOLDER MANILA A4 C/
FASTENER

UND

50

99 FOLIADOR DE 06 DIGITOS

UND

100 GOMA EN BARRA N 40

UND

101 GRAPAS 26/6


LAPICEROS C/AZUL DE TINTA
102 SECA 0.4MM DE ANCHO DE
TRAZO
NOTAS DE ENTRADA DE
103 ALMACEN AUTOCOPIATIVO 50
HOJAS
001-050
NOTAS 1/3
DE C/N
SALIDA
DE
104 ALMACEN AUTOCOPIATIVO 50
HOJAS 1/3 C/N 001-050
PAPEL BOND DE 80GR TAMAO
105
A-2
PAPEL BOND DE 80GR TAMAO
106
A-4 C/AMARILLO
PAPEL BOND DE 80GR TAMAO
107
A-4 C/ BLANCO
PARTES DIARIO DE EQUIPO
108 MECANICO AUTOCOPIATIVO 1/3
50 HOJAS C/N
109 PERFORADOR GRANDE

CJA

CJA

TAL

TAL

MLL

MLL

0.5

MLL

3.5

TAL

UND

110 PLUMON INDELEBLE GRANDE

UND

111 RESALTADOR DE TEXTO

UND

112 VINCARD

CTO

98

E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

1
1

ES TRANFERIDOS DE ALMACEN CENTRAL


ABLEMES
Y DESAGUE
LA ASOCIACIN
PRO VIVIENDA
AL
DEENMARZO
DEL
2015 LA FLORIDA I ETAPA DEL DISTRITO
MES REPORTADO:

ABRIL 2015
L MA MI
J
V
13 14 15 16 17

S
18

D
19

April/2015

L
20

MA
21

MI
22

J
23

V
24

S
25

D
26

L
27

MA MI
28 29

40

1
6

2
4

3
1

4
3

4
2
1

J
30

TOTA TOTA
L
L SALDO
ENT. SAL

110

110

10

36

36

36

16

20

15

15

53

48

41

13

28

8
2

1
1

41

13

28

20

18

15.25

8.25

29

18

11

12

12

19

13

10

8
1
0.1

0.02

0.12

20

18

0.5

1.5 0.5

1
1

6
10

2
6

10

0.5

0.5

0.5 0.5

0.5

0.5

0.5

0.5

0.5

0.5

1
1

0.5

1.5

1.5 2.5 0.5

0.12

0.1

30

14

16

1.6

1.06

0.54

26

26

28

22

150

116

34

6.5

3.5

18.88 15.2

3.68

17.5 13.8

3.7

13

19

13

12

12

18

11

18

10

11

13

10

26

26

10

10

15
1
15
11

0.5

1
1
1
1
1
1
1
5
5
1
1
5

0.5 0.5

17

14

29

12.5

16.5

50

50

0.5

0.5

3.5

2.5

MOVIMIENTO DIARIO DE MATER


CORRESPONDIENT
OBRA :
META:
INSPECTOR DE OBRA:
RESIDENTE DE OBRA:
ALMACENERO:

ITEM

56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80

MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABL


PROVINCIA DE CANCHIS CUSCO.
12
ING. ALEDIO OSCAR NINA TTICA
KELY KODDALY TINTA MEDINA

MI
J
1
2
BIENES ADQUIRIDOS BAJO REQUERIMIENTO
FERRETERIA
E
03 SOQUETE, 3 INTERUPTOR,
JGO
S
3 TOMACORRIENTE
E
FOCO AHORRADOR 40W
UND
S
1
E
INTERRUPTOR
UND
S
TERMOMAGNETICO DE 60 A
E
ESCALERA TIPO GATO DE
UND
S
H=1,20M
E
ESCALERA TIPO GATO DE
UND
S
H=1,30M
E
ESCALERA TIPO GATO DE
UND
S
H=1,40M
E
ESCALERA TIPO GATO DE
UND
S
H=1,75M
E
ASFALTO RC-250
GLN
S
CAJA DE REGISTRO DE
E
CONCRETO PREFABRICADO
UND
S
12"X24"
E
CANDADO N 50
UND
S
E
LIJA DE METAL N 40
UND
S
E
PINTURA ESMALTE SINTETICO
GLN
S
C/ROJO Y BLANCO
TAPA C/MARCO FF DE
E
REGISTRO DE DESAGUE 12" X UND
S
24"
E
TAPA C/MARCO FF NORMA
UND
S
NTP 350.106.1998
TAPA PARA BUZON ESTANDAR
E
UND
FF D= 0.60 M INL. MARCO
S
FF
TAPA Y MARCO DE F G
E
P/REGISTRO DE AGUA 25 X 30 UND
S
CM
ACERO CORRUGADO
E
Fy=4200 Kg./Cm2 G-60
VRLL
S
=1/2"
ACERO CORRUGADO
E
Fy=4200 Kg./Cm2 G-60
VRLL
S
3
=3/8"
ACERO CORRUGADO
E
Fy=4200 Kg./Cm2 G-60
VRLL
S
=5/8"
E
ALAMBRE GALVANIZADO N
KG
S
18
E
ALAMBRE NEGRO N 16
KG
S
E
ALAMBRE NEGRO N 8
KG
S
E
CLAVOS C/C PARA MADERA DE
KG
S
3"
E
CLAVOS C/C PARA MADERA DE
KG
S
4"
E
CABLE AWG #14 (ROLLO DE
RLL
100M)
DESCRIPCION

Unid

V
3

S
4

D
5

L
6

MA
7

MI
8

80

CABLE AWG #14 (ROLLO DE


100M)

RLL

81 CABLE DE EXTENSION DE 10M UND


82
83
84
85
86
87

MADERAMEN
MADERA CORRIENTE DURA DE
UND
1 1/2" X 8" X10"
MADERA CORRIENTE DURA DE
UND
2" X 3" X10"
ROLLIZO DE MADERA
EUCALIPTO DE MENOR = 4" X UND
3M
ROLLIZO DE MADERA
EUCALIPTO DE MENOR = 4" X UND
6,0M
MUEBLES Y EQUIPOS MENORES
CAMARA FOTOGRAFICA
UND
DIGITAL DE 18 MP
CARTEL DE OBRA SEGN DISEO DE 2.40 X
3.60 MATERIAL BANNER CON MARCO DE
FIERRO

UND

HERRAMIENTAS MANUALES
88 BALDE DE PLASTICO X 5 GLN UND
89 CARRETILLA TIPO BUGUI
CINCEL ACERADA PUNTA
PLANA DE 1" X0,30
COMBA DE 12 LIBRAS INCL
91
MANGO
90

UND
UND
UND

92 COMBA DE 20 LIBRAS

UND

93 COMBA DE 25 LIBRAS
DISCO DE CORTE PARA
94 CONCRETO DIAMANTADO DE
7"
DISCO DE CORTE PARA METAL
95
DE 7"
ESCOFINA MEDIA CAA DE
96
12"

UND

97 FLEXOMETRO DE 8M

UND

98 HILO DE NAYLON

RLL

99 INFLADOR PARA BUGUI

UND

100

LLANTAS C/CAMARA PARA


BUGUI (REPUESTO)

101 PALA TIPO CUCHARA


102

UND
UND
UND

UND
UND

PLASTICO POLIETILENO DE 2M
RLL
DOBLE ANCHO

103 RAFIA DE 1KG

RLL

104 WINCHA PVC DE 60M

UND

105

ZAPAPICO DE ARADO
ANGOSTO INCL. MANGO

UND

106 HOJA DE SIERRA PARA METAL PQTS


107 HOJA DE SIERRA PARA METAL
108 MANGUERA DE 1/2"

UND
M

AGLUTINANTES Y AGREGADOS
CEMENTO PORTLAND TIPO I
109
BOLS
42.5 Kg
110 ARENA FINA LIMPIA DE RIO

M3

111 ARENA GRUESA

M3

S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

E
S
E
YESO DE 28 KG
BOLS
S
BIENES PARA SEGURIDAD PERSONAL Y COLECTIVA
E
ANTEOJOS DE SEGURIDAD UV UND
S
E
BOTAS DE JEBE PUNTA
PAR
S
ACERADO (10 #39 Y 10 # 40)
E
CASCO DE PROTECCION TIPO
UND
S
KW C/ANARANJADO
E
CASCO DE SEGURIDAD C/
UND
S
AZUL (PERSONAL TECNICO)
CASCO DE SEGURIDAD
E
C/BLANCO (PERSONAL
UND
S
PROFESIONAL)
E
CHALECO DE SEGURIDAD C/ANARANJADO
UND
CON CINTA REFLEXIVA
S
CHALECO DE SEGURIDAD TERMICO
E
C/AZUL(PERSONAL PROFESIONAL UND
S
TECNICO)
CINTA DE SEGURIDAD DE
E
RLL
C/AMARILLO (2) ROJO (1)
S
VERDE (2)
E
CONOS DE SEGURIDAD
UND
S
(MEDIANO)
E
GUANTES DE JEBE # 9
PAR
S
PESADO
E
GUANTES DE LONA PALMA DE
PAR
S
GOMA REFORZADA
E
MALLA DE SEGURIDAD
RLL
S
1
C/NARANJA
E
MASCARILLA DE PROTECCION
UND
S
BUCAL
E
PONCHO PARA LLUVIA
UND
S
REFORZADO
ZAPATOS DE CUERO DE
E
SEGURIDAD CAA ALTA (5#
PAR
S
39 Y 5# 40)
COMBUSTIBLES, CARBURANTES, LUBRICANTES Y OTROS
E
ACEITE MULTIGRADO 20W50 UND
S
E
GRASA EP2
LBS
S
E
GASOLINA 84
GLN
S
E
PETROLEO
GLN
S
IMPLEMETOS DE PRIMEROS AUXILIOS
E
AGUA OXIGENADA 250ML
UND
S
E
ALCOHOL MEDICINAL DE 90 UND
S
E
ALCOHOL YODADO 1/2 LT
UND
S
E
ALGODN
RLL
S
E
DICLOXACILINA
CJA
S
E
ESPARADRAPO ROLLO
RLL
S
GRANDE
E
GASA
RLL
S
E
GOTAS OPTALMICAS PARA
UND
S
CONJUNTIVITIS
E
GUANTES QUIRURGICOS
PAR
S
E
IBIPROFENO
CJA
S
E
PARACETAMOL
CJA
S

112 PIEDRA CHANCADA DE 3/4"


113
114
115
116
117
118
119
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144

M3

10

145 VENDA MEDIANA


146
147
148
149

UND

UTILES DE ESCRITORIO
TONER HP LASER JET NT- CE
UND
285-A
ARCHIVADORES DE PALANCA
UND
LOMO ANCHO TAMAO OFICIO
CINTA ADHESIVA DE
UND
EMBALAJE GRANDE
CORRECTOR LIQUIDO TIPO
UND
LAPICERO

150

CUADERNO DE OBRA AUTOCOPIATIVO DE 1


X 3 COPIAS DE 50 HOJAS C/NUMERACIONEMPASTADO

UND

151

CUADERNO CUADRICULADO TAMAO A4 X


100 HOJAS

UND

152

CUADERNO ESPIRAL CUADRICULADO


TAMAO A4 X 200 HOJAS

UND

153 ENGRAPADOR TIPO ALICATE

UND

FOLDER MANILA A4 C/
FASTENER

UND

154

155 FOLIADOR DE 06 DIGITOS

UND

156 GOMA EN BARRA N 40

UND

157 GRAPAS 26/6


CJA
LAPICEROS C/AZUL DE TINTA
158 SECA 0.4MM DE ANCHO DE
CJA
TRAZO
NOTAS DE ENTRADA DE ALMACEN
159 AUTOCOPIATIVO 50 HOJAS 1/3 C/N 001-050 TAL
160

NOTAS DE SALIDA DE ALMACEN


AUTOCOPIATIVO 50 HOJAS 1/3 C/N 001-050

PAPEL BOND DE 80GR


161
TAMAO A-2
PAPEL BOND DE 80GR
162
TAMAO A-4 C/AMARILLO
PAPEL BOND DE 80GR
163
TAMAO A-4 C/ BLANCO
164

PARTES DIARIO DE EQUIPO MECANICO


AUTOCOPIATIVO 1/3 50 HOJAS C/N

165 PERFORADOR GRANDE

TAL
MLL
MLL
MLL
TAL
UND

166 PLUMON INDELEBLE GRANDE UND


167 RESALTADOR DE TEXTO

UND

168 VINCARD

CTO

E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S

O DE MATERIALES TRANFERIDOS DE ALMACEN CENTRAL


ESPONDIENTE AL MES DE MARZO DEL 2015

TEMA DE AGUA POTABLE Y DESAGUE EN LA ASOCIACIN PRO VIVIENDA LA FLORIDA I ETAPA DEL DISTRITO SIC
MES REPORTADO:

J
9

V
10

S
11

D
12

L
13

40

MA
14

ABRIL 2015
MI
J
V
15
16
17

S
18

April/2015

D
19

L
20

MA
21

MI
22

J
23

V
24

S
25

ALMACEN CENTRAL
EL 2015

ENDA LA FLORIDA I ETAPA DEL DISTRITO SICUANI,

D
26

L
27

MA
28

MI
29

J
30

TOTA TOTA
SALD
L
L
O
ENT. SAL

40

39

-3

-1

-1

-1

10

10

-1

-1

MUNICIPALIDAD PROVINCIAL DE CANCHIS


GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
SUB GERENCIA DE INFRAESTRUCTURA URBANA

MOVIMIENTO DE MAQUINARIAS

LIDAD PROVINCIAL DE CANCHIS

E INFRAESTRUCTURA URBANA Y RURAL

ENCIA DE INFRAESTRUCTURA URBANA

ENTO DE MAQUINARIAS

Muebles
Escritorios y Oficina
Roperos y Dormitorio
Muebles de sala y comedor
Sofs cama, Bancos y Sillas
Aire Libre
Camping
Parrillas
Piscinas
Decojardn
Juegos al Aire Libre
Electrohogar
Refrigeracin
Lavadoras y Secadoras
Cocinas
Electrodomsticos
Ventilacin
Decohogar
Menaje
Menaje Institucional
Textil de Cama
Iluminacin Interior
Artculos Decorativos
Baos y Cocinas
Sanitarios y Lavamanos
Grifera
Muebles para Cocina
Accesorios para Bao
Pisos y Acabados
Pisos y Paredes
Pinturas
Puertas y Ventanas
Pegamentos y Adhesivos
Molduras
Ferretera
Herramientas Elctricas
Herramientas Manuales
Herram. Especializadas
Herram. para Construccin
Electricidad
Construccin
Fierro
Alambres
Barras de Construccin
Cemento y Complementos
Ladrillos y Casetones
Techumbre

MUNICIPALIDAD PROVINCIAL DE C

GERENCIA DE INFRAESTRUCTURA DE URB

SUB GERENCIA DE INFRAESTRUCTURA URB

VALORIZACION DE EQUIPO MECANICO - ACU


OBRA:

MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DESA


ETAPA DEL DISTRITO DE SICUANI, PROVINCIA DE CANCHIS - CUSCO

RESIDENTE:

ING. ALEDIO OSCAR NINA TTICA

SUPERVISOR:

ING. CHARLES ALFREDO CHIRINOS LLAMOCCA

CONTROLADOR DE MAQ.:
ANTERIOR
UNIDAD

VEHICULOS

MAQUINARIA PESADA

HM

MAQUINARIA PROPIA

ACTUAL

ACUMULADO

PLACA
Comb.

HM

Comb.

HM

CARGADOR FRONTAL

0.00

0.00

0.00

0.00

0.00

TRACTOR ORUGA

0.00

0.00

0.00

0.00

0.00

MOTONIVELADORA

0.00

0.00

0.00

0.00

0.00

RETROEXCAVADORA

0.00

0.00

7.30

11.00

7.30

COMPRESORA NEUMATICA

0.00

0.00

0.00

0.00

0.00

VOLQUETE DE 15 M3

0.00

0.00

0.00

0.00

0.00

CAMION DE 8 T

0.00

0.00

0.00

0.00

0.00

CAMIONETA TOYOTA

0.00

0.00

0.00

0.00

0.00

TOTAL
ANTERIOR
UNIDAD

VEHICULOS

MAQUINARIA PESADA

HM

MAQUINARIA ALQUILADA

ACTUAL

ACUMULADO

PLACA
Comb.

HM

Comb.

HM

CARGADOR FRONTAL

0.00

0.00

0.00

0.00

0.00

RETROEXCAVADORA

0.00

0.00

7.30

0.00

7.30

MOTONIVELADORA

0.00

0.00

0.00

0.00

0.00

CISTERNA 4000 GLN

0.00

0.00

0.00

0.00

0.00

RODILLO COMPACTADOR

0.00

0.00

0.00

0.00

0.00

VOLQUETE DE 15 M3

0.00

0.00

0.00

0.00

0.00

MUNICIPALIDAD PROVINCIAL DE C

GERENCIA DE INFRAESTRUCTURA DE URB

SUB GERENCIA DE INFRAESTRUCTURA URB

OBRA:

MAQUINARIA ALQUILADA

VALORIZACION DE EQUIPO MECANICO - ACU

MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DESA


ETAPA DEL DISTRITO DE SICUANI, PROVINCIA DE CANCHIS - CUSCO

RESIDENTE:

ING. ALEDIO OSCAR NINA TTICA

SUPERVISOR:

ING. CHARLES ALFREDO CHIRINOS LLAMOCCA

CONTROLADOR DE MAQ.:

VEHICULOS

ANTERIOR
UNIDAD

HM
CAMIONETA TOYOTA

ACTUAL

ACUMULADO

PLACA
Comb.
0.00

0.00

HM

Comb.
0.00

TOTAL

0.00

HM
0.00

MUNICIPALIDAD PROVINCIAL DE C

GERENCIA DE INFRAESTRUCTURA DE URB

SUB GERENCIA DE INFRAESTRUCTURA URB

VALORIZACION DE EQUIPO MECANICO - ACU


OBRA:

MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DESA


ETAPA DEL DISTRITO DE SICUANI, PROVINCIA DE CANCHIS - CUSCO

RESIDENTE:

ING. ALEDIO OSCAR NINA TTICA

SUPERVISOR:

ING. CHARLES ALFREDO CHIRINOS LLAMOCCA

CONTROLADOR DE MAQ.:
ANTERIOR
UNIDAD

ACTUAL

HM

Comb.

HM

ANTERIOR
UNIDAD

MAQ. LIVIANA

Comb.

ACTUAL

HM

ACUMULADO

SERIE
DM

ALQUILADO

ACUMULADO

PLACA

Comb.

DM

Comb.

DM

MEZCLADORA DE CONCRETO

0.00

0.00

13.00

5.00

13.00

VIBRADORA DE CONCRETO

0.00

0.00

13.00

6.00

13.00

MOTOR DE CAMA BAJA

0.00

0.00

0.00

0.00

0.00

CORTADORA DE PAVIMENTO

0.00

0.00

0.00

0.00

0.00

MOTOR DE CISTERNA

0.00

0.00

0.00

0.00

0.00

MOTOBOMBA DE AGUA

0.00

0.00

0.00

0.00

0.00

COMPACTADOR TIPO CANGURO

0.00

0.00

6.40

1.00

6.40

PLANCHA COMPACTADORA

0.00

0.00

11.04

2.00

11.04

TOTAL
ANTERIOR

ACTUAL

ACUMULADO

DIAS

DIAS

DIAS

TEODOLITO

0.00

0.00

0.00

NIVEL TOPOGRAFICO

26.00

26.00

52.00

ESTACION TOTAL

0.00

0.00

0.00

MIRA TOPOGRAFICA

0.00

0.00

0.00

JALONES

0.00

0.00

0.00

EQ. TOP.

ALQUILADO

UNIDAD

SERIE

MUNICIPALIDAD PROVINCIAL DE C

GERENCIA DE INFRAESTRUCTURA DE URB

SUB GERENCIA DE INFRAESTRUCTURA URB

VALORIZACION DE EQUIPO MECANICO - ACU


OBRA:

MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DESA


ETAPA DEL DISTRITO DE SICUANI, PROVINCIA DE CANCHIS - CUSCO

RESIDENTE:

ING. ALEDIO OSCAR NINA TTICA

SUPERVISOR:

ING. CHARLES ALFREDO CHIRINOS LLAMOCCA

CONTROLADOR DE MAQ.:
ANTERIOR
UNIDAD

ACTUAL

ACUMULADO

PLACA
HM

Comb.

HM

Comb.

TOTAL

HM

PROVINCIAL DE CANCHIS

STRUCTURA DE URBANA Y RURAL


INFRAESTRUCTURA URBANA

EQUIPO MECANICO - ACUMULADO

ISTEMA DE AGUA POTABLE Y DESAGUE EN LA ASOCIACION PRO VIVIENDA LA FLORIDA I


OVINCIA DE CANCHIS - CUSCO

ACUMULADO
P.U. (COMB.)

SUB TOTAL ACUMULADO

Comb.

0.00

14.00

0.00

0.00

16.00

0.00

0.00

16.00

0.00

11.00

16.00

176.00

0.00

16.00

0.00

0.00

16.00

0.00

0.00

16.00

0.00

0.00

16.00

0.00

TOTAL

S/. 176.00
ACUMULADO
P.U. (COMB.) SUB TOTAL ACUMULADO

P.U. (HM)

Comb.

SUB TOTAL
ACUMULADO

0.00

16.00

0.00

150.00

0.00

0.00

16.00

0.00

130.00

949.00

0.00

16.00

0.00

0.00

0.00

0.00

16.00

0.00

350.00

0.00

0.00

16.00

0.00

175.00

0.00

0.00

16.00

0.00

110.00

0.00

PROVINCIAL DE CANCHIS

STRUCTURA DE URBANA Y RURAL


INFRAESTRUCTURA URBANA

EQUIPO MECANICO - ACUMULADO

ISTEMA DE AGUA POTABLE Y DESAGUE EN LA ASOCIACION PRO VIVIENDA LA FLORIDA I


OVINCIA DE CANCHIS - CUSCO

ACUMULADO
P.U. (COMB.)

SUB TOTAL ACUMULADO

Comb.
0.00

TOTAL

16.00

0.00

S/. 0.00

0.00

0.00

S/. 949.00

PROVINCIAL DE CANCHIS

STRUCTURA DE URBANA Y RURAL


INFRAESTRUCTURA URBANA

EQUIPO MECANICO - ACUMULADO

ISTEMA DE AGUA POTABLE Y DESAGUE EN LA ASOCIACION PRO VIVIENDA LA FLORIDA I


OVINCIA DE CANCHIS - CUSCO

ACUMULADO
P.U. (COMB.)

SUB TOTAL ACUMULADO

P.U. (DM)

SUB TOTAL ACUMULADO

Comb.

ACUMULADO
Comb.

5.00

0.00

0.00

6.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.00

0.00

0.00

2.00

0.00

0.00

TOTAL

S/. 0.00
ACUMULADO
P.U. (DIA)

SUB TOTAL ACUMULADO

0.00

0.00

0.00

52.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

DIAS

PROVINCIAL DE CANCHIS

STRUCTURA DE URBANA Y RURAL


INFRAESTRUCTURA URBANA

EQUIPO MECANICO - ACUMULADO

ISTEMA DE AGUA POTABLE Y DESAGUE EN LA ASOCIACION PRO VIVIENDA LA FLORIDA I


OVINCIA DE CANCHIS - CUSCO

ACUMULADO
P.U. (COMB.)

SUB TOTAL ACUMULADO

Comb.

TOTAL

S/. 0.00

MUNICIPALIDAD PROVINCIAL DE CANC

GERENCIA DE INFRAESTRUCTURA URBANA Y R

SUB GERENCIA DE INFRAESTRUCTURA DE URBA

CONTROL DIARIO DE EQUIPO MECANICO - ABRIL 20

MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DESAGUE EN LA ASOCIACION PRO VIVIENDA LA FLORID
ING.
ALEDIO OSCAR NINA TTICA
ING.
CHARLES ALFREDO CHIRINOS LLAMOCCA
0

OBRA:
RESIDENTE:
SUPERVISOR:
CONTROLADOR DE MAQ.:

ABRIL 2015

MAQUINARIA PROPIA
VEHICULOS
MAQ.PESADA

UNIDAD

RETROEXCAVADORA

COMPRESORA NEUMATICA

FECHA

10

11

12

13

14

15

16

17

18

DIA

Mi

Ma

Mi

Ma

Mi

Combust

11

HM

7.30

Combust
HM

VOLQUETE DE 15 M3
CAMION DE 8 T
CAMIONETA TOYOTA

Combust
HM
Combust
HM
Combust
HM

MEZCLADORA

Combust

1.0

DE CONCRETO

DM

VIBRADORA
DE CONCRETO
MOTOR DE CAMA BAJA

LIVIANO

PLACA

Combust
DM
Combust
HM

2.0
X

1.0
X

1.0

1.0

MUNICIPALIDAD PROVINCIAL DE CANC

GERENCIA DE INFRAESTRUCTURA URBANA Y R

SUB GERENCIA DE INFRAESTRUCTURA DE URBA

CONTROL DIARIO DE EQUIPO MECANICO - ABRIL 20

MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y DESAGUE EN LA ASOCIACION PRO VIVIENDA LA FLORID
ING.
ALEDIO OSCAR NINA TTICA
ING.
CHARLES ALFREDO CHIRINOS LLAMOCCA
0

OBRA:
RESIDENTE:
SUPERVISOR:
CONTROLADOR DE MAQ.:

ABRIL 2015

EQUIPO LIVIANO

UNIDAD

MOTO LINEAL
MOTOR DE CISTERNA
MOTO BOMBA DE AGUA

PLACA

FECHA

10

11

12

13

14

15

16

17

18

DIA

Mi

Ma

Mi

Ma

Mi

Combust
HM
Combust
DM
Combust
HM

COMPACTADOR TIPO CANGURO

Combust

MARTILLO

Combust

HM
DEMOLEDOR

EQ. TOPOGRAFICO

PLANCHA

HM

2.00

0.16

Combust

COMPACTADORA

HM

TEODOLITO

Dia

NIVEL TOPOGRAFICO

Dia

ESTACION TOTAL

Dia

MIRA TOPOGRAFICA

Dia

JALONES

Dia

PROVINCIAL DE CANCHIS

STRUCTURA URBANA Y RURAL

FRAESTRUCTURA DE URBANA

O DE EQUIPO MECANICO - ABRIL 2015

GUE EN LA ASOCIACION PRO VIVIENDA LA FLORIDA I ETAPA DEL DISTRITO DE SICUANI, PROVINCIA DE CANCHIS - CUSCO

ABRIL 2015
19

20

21

22

23

24

25

26

27

28

29

30

Ma

Mi

Ma

Mi

1.0
X

1.0

1.0
X

1.0
X

X
1.0

TOTAL
HM

Comb.

7.30

11.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

13.00

5.00

13.00

6.00

0.00

0.00

PROVINCIAL DE CANCHIS

STRUCTURA URBANA Y RURAL

FRAESTRUCTURA DE URBANA

O DE EQUIPO MECANICO - ABRIL 2015

GUE EN LA ASOCIACION PRO VIVIENDA LA FLORIDA I ETAPA DEL DISTRITO DE SICUANI, PROVINCIA DE CANCHIS - CUSCO

ABRIL 2015
19

20

21

22

23

24

25

26

27

28

29

30

Ma

Mi

Ma

Mi

1.0
6.40

1.0
2.40

8.24

0.5

0.5

2.30

3.00

TOTAL
HM

Comb.
0.00

0.00

0.00

0.00

0.00

0.00

6.40

1.00

2.16

0.00

11.04

2.00

0.00
X

26.00
0.00
0.00
0.00

MUNICIPALIDAD PROVINCIAL DE CANCHIS


GERENCIA INFRAESTRUCTURA URBANA Y RURAL
SUB GERENCIA DE INFRAESTRUCTURA URBANA

PARTES DIARIOS DE MAQUINARIAS

LIDAD PROVINCIAL DE CANCHIS

NFRAESTRUCTURA URBANA Y RURAL

ENCIA DE INFRAESTRUCTURA URBANA

IARIOS DE MAQUINARIAS

MUNICIPALIDAD PROVINCIAL DE CANCHIS


GERENCIA INFRAESTRUCTURA URBANA Y RURAL
SUB GERENCIA DE INFRAESTRUCTURA URBANA

MUNICIPALIDAD PROVINCIAL DE CA

GERENCIA INFRAESTRUCTURA URBANA

SUB GERENCIA DE INFRAESTRUCTURA URB

PARTES DIARIOS DE
MAQUINARIAS

PARTES DIARIOS DE
MAQUINARIAS

ROVINCIAL DE CANCHIS

TRUCTURA URBANA Y RURAL

FRAESTRUCTURA URBANA

DIARIOS DE
UINARIAS

MUNICIPALIDAD PROVINCIAL DE CANCHIS


GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
SUB GERENCIA DE INFRAESTRUCTURA URBANA

PANEL FOTOGRAFICO
(MINIMO 6 - MAX. 10)

FOTOGRAFICO

MINIMO 6 - MAX. 10)

MUNICIPALIDAD PROVINCIAL DE CANCHIS


GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
SUB GERENCIA DE INFRAESTRUCTURA URBANA

PANEL FOTOGRAFICO - ABRIL 2015

TRAZO, NIVELES Y REPLANTEO DE


ZANJAS POST - EXCAVACION

EXCANACION DE ZANJAS EN LA
CALLE FRANCISCODE ASIS EN TRE
EL BZ# 1 Y BZ#2

DESENCOFRADO NORMAL DE
BUZONES EN LA CALLE FRANCISCO
DE ASIS BZ-03

MUNICIPALIDAD PROVINCIAL DE CANCHIS


GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
SUB GERENCIA DE INFRAESTRUCTURA URBANA

PANEL FOTOGRAFICO - ABRIL 2015

SE OBSERVA EL BZ # 3 VACIADO
CON CONCRETO F'c=175 Kg/cm2
PARED - BASE

SE COLOCO EL ENCOFRADO Y
DESENCOFRADO LOSA TECHO DE
BUZON MAS EL ACERO DE
REFUERZO EN LOSA DE TECHO DE
BUZON

COLOCADO DE CONCRETO F'c=210


Kg/cm2 LOSA DE BUZONCON CON
ACERO DE REFUERZO DEL BZ#03

MUNICIPALIDAD PROVINCIAL DE CANCHIS


GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
SUB GERENCIA DE INFRAESTRUCTURA URBANA

PANEL FOTOGRAFICO - ABRIL 2015

COLOCADO DE TUBERIA PVC NTP


ISO 4435 UF C/ANILLO DE 200mm x
6m EN CALLE SAN FRANCISCO ASIS

SE REALIZO RELLENO Y
COMPACTADO CON MATERIAL
PROPIO EN CAPAS DE 0.20M

ELABORACION DE TAPAS DE
CONCRETO C/ TAPA Y MARCO DE F
G P/REGISTRO DE AGUA 25 X 30 CM

MUNICIPALIDAD PROVINCIAL DE CANCHIS


GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
SUB GERENCIA DE INFRAESTRUCTURA URBANA

PANEL FOTOGRAFICO - ABRIL 2015

SE UTILIZA EN LOS TRABAJOS


EQUIPOS LIVIANOS

SE RELLENO Y COMPACTADO CON


MATERIAL PROPIO EN CAPAS DE
0.20M ENLA CALLE SAN FRANCISCO
DE ASIS

PRUEBA HIDRAULICA EN TUBERIAS


DE DESAGUE EN UNTRAMO DE
0+025 ML JR:TITTO QOSIPA

MUNICIPALIDAD PROVINCIAL DE CANCHIS


GERENCIA DE INFRAESTRUCTURA URBANA Y RURAL
SUB GERENCIA DE INFRAESTRUCTURA URBANA

TAREO Y PLANILLAS
DEL MES DE ABRIL