Anda di halaman 1dari 46

DAFTAR HASIL PENGADAAN BARANG/JASA

DARI TANGGAL : 01 Januari s/d 31 Desember 2011


BIDANG
UNIT ORGANISASI
SUB UNIT
KABUPATEN/KOTA
PROVINSI

NO
1

NAMA/JENIS
BARANG/JASA
2

:
:
:
:
:

PERTANIAN
DINAS PETERNAKAN DAN PERIKANAN
DINAS PETERNAKAN DAN PERIKANAN
TAPIN
KALIMANTAN SELATAN
BIAYA UMUM
TERKAIT
PENGADAAN
BARANG/JASA
3

SPK/PERJANJIAN/KONTRAK

DPA/SP2D/KWITANSI

TANGGAL

NOMOR

TANGGAL

NOMOR
7
4,587,489,318

JUMLAH
HARGA
BANYAKNYA

JUMLAH

DIPERGUNAKAN

SATUAN
(Rp)
9
###
###
2,544,544
###
7,400,000

HARGA
(Rp)
10
555,459,999
42,181,000
269,134,545
79,518,138
14,800,000

PADA UNIT

###

10,000,000

DISNAKKAN

a
-

Belanja Modal Pengadaan Komputer/PC, dengan spTgl. 19 Mei 2011


Mother Board ASUS P5KPL
Processor : Intel Core 2 Duo 2.80 Ghz
Hardisk 80 GB SATA Seagate
Memory DDR2-Gb Visipro
Casing Uro 3010/3011/3012
CD Room
Monitor : LCD 15" Vision/LG Flatron 17
Keyboard, Mouse
Speaker kecil, tapolt

007/SPK/DISNAKKAN/2011

Tgl. 24 Mei 2011

1112/SP2D/2011

8
###
###
###
###
###
###
###
###
2 unit

b
-

Belanja Modal Pengadaan Komputer Note Book, d Tgl. 19 Mei 2011


Intel* Core TM 15-460M (2.53/2.80,1066)
Window 7 Home Premium
2 GB DDR3
500 GB SATA
DVD + RW Super Multi Double Layer
14.0 WXGA HD CSV LED (16:9)
Intel HD Graphic s up to 729 mb
WHL Webcam Card Reader
Prusslan Blue With Stormy Line

007/SPK/DISNAKKAN/2011

Tgl. 24 Mei 2011

1112/SP2D/2011

1 unit

c
-

Belanja Modal Pengadaan Printer, dengan spesif


Inkjet Multi Function

Tgl. 19 Mei 2011

007/SPK/DISNAKKAN/2011

Tgl. 24 Mei 2011

1112/SP2D/2011

2 unit

1,850,000

3,700,000

DISNAKKAN

d Belanja Modal Pengadaan UPS/stabilizer, spesifk


- UPS 600 V

Tgl. 19 Mei 2011

007/SPK/DISNAKKAN/2011

Tgl. 24 Mei 2011

1112/SP2D/2011

2 unit

600,000

1,200,000

DISNAKKAN

A Program Pelayanan Administrasi Perkantoran


A.1 Penyediaan peralatan dan perlengkapan kantor

B Program Peningkatan Sarana dan Prasarana Aparatur


B.1 Pengadaan perlengkapan gedung kantor

11
26,913,455
7,951,862
85,669,100
###
DISNAKKAN

KET
12

NO

NAMA/JENIS

BIAYA UMUM
TERKAIT
PENGADAAN
BARANG/JASA
3

SPK/PERJANJIAN/KONTRAK

DPA/SP2D/KWITANSI

JUMLAH
HARGA

JUMLAH

DIPERGUNAKAN

SATUAN
(Rp)
9

HARGA
(Rp)
10

PADA UNIT

TANGGAL

NOMOR

TANGGAL

NOMOR

BANYAKNYA

a Belanja Modal Pengadaan Lemari Arsip


- Bahan Kayu
- Ukuran Sedang

Tgl. 30 Mei 2011

011/SPK/DISNAKKAN/2011

Tgl. 14 Juni 2011

1704/SP2D/2011

5 unit

1,400,000

7,000,000

DISNAKKAN

b Belanja Modal Pengadaan AC


- Spesifkasi 1/2 PK

Tgl. 30 Mei 2011

011/SPK/DISNAKKAN/2011

Tgl. 14 Juni 2011

1704/SP2D/2011

2 unit

2,500,000

5,000,000

DISNAKKAN

c
-

Tgl. 30 Mei 2011

011/SPK/DISNAKKAN/2011

Tgl. 14 Juni 2011

1704/SP2D/2011

4 unit

3,725,000

14,900,000

DISNAKKAN

a Meja Rapat

Tgl. 18 April 2011

005a/SPK/DISNAKKAN/2011

Tgl. 04 Mei 2011

0869/SP2D/2011

1 set

18,950,000

DISNAKKAN

b Kursi Kerja Eselon III

Tgl. 18 April 2011

005a/SPK/DISNAKKAN/2011

Tgl. 04 Mei 2011

0869/SP2D/2011

5 buah

1,400,000

7,000,000

DISNAKKAN

Tgl. 18 April 2011

005a/SPK/DISNAKKAN/2011

Tgl. 04 Mei 2011

0869/SP2D/2011

20 buah

550,000

11,000,000

DISNAKKAN

BARANG/JASA

Belanja Modal Pengadaan AC


Spesifkasi 1 PK

11

B.2 Pengadaan Mebeleur

Kursi Rapat

###

C Program Peningkatan Ketahanan Pangan (Pertanian/Perkebunan)


C.1 Pengelolaan Sistem Informasi Data Peternakan dan Perikanan
a
-

Belanja Modal Pengadaan Komputer PC


Mother Board : ESC H61H H2 M3
Processor : Intel Core i3 2100
Hardisk Seagate 250 GB
Memory 2 GB/DDn 3 Visipro
Casing : Sambada
DVD RW
Monitor LCD 15,6"
Keyboard, Mouse
Cover, Mousepad
Speaker Kecil, Stavolt

b Belanja Modal Pengadaan Printer


- Multi Fungsi Injection (fotocopy L4)

Tgl. 22 Agustus 2011


016/SPK-PERIKANAN/DISNAKKAN/2011
Tgl. 15 Nopember 20113670/SP2D/2011

1 unit

7,900,000

7,900,000

DISNAKKAN

Tgl. 22 Agustus 2011


016/SPK-PERIKANAN/DISNAKKAN/2011
Tgl. 15 Nopember 20113670/SP2D/2011

1 unit

2,400,000

2,400,000

DISNAKKAN

27,090,909

DISNAKKAN

C.2 Pengembangan Rehabilitasi Infrastruktur Peternakan Kabupaten Tapin


a Belanja Modal Pengadaan Sepeda Motor Roda Tgl. 18 Nopember 2011 04/SPK/PKL-DISNAKKAN/2011 Tgl. 06 Desember 20115910/SP2D/2011
3 (DAK NDR)
- Merk : Kaisar
- Tahun pembuatan : 2011

1 unit

###

KET
12

NO
1

NAMA/JENIS
BARANG/JASA
2

BIAYA UMUM
TERKAIT
PENGADAAN
BARANG/JASA
3

SPK/PERJANJIAN/KONTRAK

DPA/SP2D/KWITANSI

TANGGAL

NOMOR

TANGGAL

NOMOR

BANYAKNYA

JUMLAH
HARGA

JUMLAH

DIPERGUNAKAN

SATUAN
(Rp)
9

HARGA
(Rp)
10

PADA UNIT

2,709,091

DISNAKKAN

11

- Type Triseda
b Belanja Modal Pengadaan Sepeda Motor Roda Tgl. 18 Nopember 2011 04/SPK/PKL-DISNAKKAN/2011 Tgl. 06 Desember 20115911/SP2D/2011
3 (Pendamping DAK NDR)

1 unit

2,709,091

- Merk : Kaisar
- Tahun pembuatan : 2011
- Type Triseda
c

Belanja Modal pengadaan konstruksi/pembelian gedung kantor (DAK Non DR)


1. Pembangunan/rehab Puskeswan

Tgl. 29 September 2011 01/SPK/PELELANGAN UMUM/ Tgl. 14 Desember 20116384/SP2D/2011


PUSKESWAN/DISNAKKAN/IX/2011

1 paket

###

250,863,636

DISNAKKAN

Tgl. 26 September 2011

03/SPK/PEMILIHAN
LANGSUNG/PRKDISNAKKAN/IX/2011

Tgl. 03 Maret 2011 2.01.03.16.42.5.2

1 paket

###

134,605,455

DISNAKKAN

Tgl. 24 Juni 2011

008/SPK/DISNAKKAN/2011

Tgl. 03 Maret 2011 2.01.03.16.42.5.2

36,340,909

DISNAKKAN

Pekerjaan persiapan
Pekerjaan tanah
Pekerjaan Beton Bertulang/Beton
Pekerjaan Pondasi Pas. BT, Plesteran
dan keramik
Pekerjaan rangka kap/atap/plafond/dinding
Pekerjaan kusen, pintu, jendela dan ventilasi
Pekerjaan alat penggantung
Pekerjaan sanitari
Pekerjaan instalasi listrik
Pekerjaan pengecatan
2. Pembangunan Rumah Kompos

Pekerjaan persiapan
Pekerjaan tanah
Pekerjaan Beton Bertulang/Beton
Pekerjaan Pondasi Pas. BT, Plesteran
Pekerjaan rangka kap/atap dan dinding
Pekerjaan sanitari
Pekerjaan pengecatan
Peralatan rumah kompos

3. Pembangunan UPPO
Pengayak Otomatis
Pengayak Manual
Mesin Jahit Karung
Tong Komposer

d Belanja Modal Pengadaan Konstruksi/pembelian gedung kantor (Pendamping DAK NDR)

1
1
1
1

unit
unit
unit
unit

###
6,350,000
2,350,000
1,550,000

26,090,909
6,350,000
2,350,000
1,550,000

KET
12

NO
1

NAMA/JENIS
BARANG/JASA
2

BIAYA UMUM
TERKAIT
PENGADAAN
BARANG/JASA
3

1. Pembangunan/rehab Puskeswan
-

SPK/PERJANJIAN/KONTRAK

DPA/SP2D/KWITANSI

TANGGAL

NOMOR

TANGGAL

NOMOR

BANYAKNYA

JUMLAH
HARGA

JUMLAH

DIPERGUNAKAN

SATUAN
(Rp)
9

HARGA
(Rp)
10

PADA UNIT
11

Tgl. 29 September 2011 01/SPK/PELELANGAN UMUM/ Tgl. 14 Desember 20116385/SP2D/2011


PUSKESWAN/DISNAKKAN/IX/2011

1 paket

###

25,086,364

DISNAKKAN

Tgl. 26 September 2011

03/SPK/PEMILIHAN
LANGSUNG/PRKDISNAKKAN/IX/2011

Tgl. 03 Maret 2011 2.01.03.16.42.5.2

1 paket

###

13,460,545

DISNAKKAN

Tgl. 24 Juni 2011

008/SPK/DISNAKKAN/2011

Tgl. 03 Maret 2011 2.01.03.16.42.5.2

3,634,091

DISNAKKAN

Pekerjaan persiapan
Pekerjaan tanah
Pekerjaan Beton Bertulang/Beton
Pekerjaan Pondasi Pas. BT, Plesteran
dan keramik
Pekerjaan rangka kap/atap/plafond/dinding
Pekerjaan kusen, pintu, jendela dan ventilasi
Pekerjaan alat penggantung
Pekerjaan sanitari
Pekerjaan instalasi listrik
Pekerjaan pengecatan
2. Pembangunan Rumah Kompos

Pekerjaan persiapan
Pekerjaan tanah
Pekerjaan Beton Bertulang/Beton
Pekerjaan Pondasi Pas. BT, Plesteran
Pekerjaan rangka kap/atap dan dinding
Pekerjaan sanitari
Pekerjaan pengecatan
Peralatan rumah kompos

3. Pembangunan UPPO
Pengayak Otomatis
Pengayak Manual
Mesin Jahit Karung
Tong Komposer

1
1
1
1

unit
unit
unit
unit

2,609,091
635,000
235,000
155,000

2,609,091
635,000
235,000
155,000

e Belanja Modal Alat Pertanian Lainnya (DAK NDR)


1. Pengadaan Peralatan Klinik dan Laboratorium
-

Tgl. 01 Juli 2011

04/SPK/LELANG/PETERNAKAN/ Tgl.26 Agustus 2011 3445/SP2D/2011


NAKkAN/2011

Tgl. 12 Juli 2011

015/SPK-PETERNAKAN/NAKKAN/2011Tgl. 03 Maret 2011 2.01.03.16.42.5.2

1 paket

###

179,134,545

DISNAKKAN

90,000,000

DISNAKKAN

Peralatan Medis
Peralatan Bedah
Peralatan Laboratorium
2. Pengadaan Peralatan Reproduksi
Vaginal Speculum kambing
Insemination Gun

1 Buah
3 Buah

1,181,818
454,545

1,181,818
1,363,635

KET
12

NO
1

NAMA/JENIS
BARANG/JASA

BIAYA UMUM
TERKAIT
PENGADAAN
BARANG/JASA
3

2
Thermos IB 0,5 ltr Stainless
Thermos IB 0,5 ltr Kaca
Container Kaps. 20 ltr
Container Kaps. 50 ltr
Tracor Sapi
Tracor Kambing
Spuit europlek 10 ml
Spuit europlek 20 ml
Jarum europlek
Gunting Straw
Automatic Drencing Gun 30 ml
Castrator 35 cm
Elektrik Dehorner
Aplicator
Vaginal Suture Tape
Thowing set
Vaginal Speculum sheep
Pregnancy detector
Vulva suture needle

3. Pengadaan Peralatan Peternakan


Ear Marking Plier
Aplicator
Tatooning Forceps
Automatic Syringe 5 ml
Automatic Syringe 10 ml
Spuit Mika 10 ml
Spuit Mika 20 ml
Digital Scale With Cage
Recharabel Dehorner
Industrial Glove
Sepatu Boat
Mastitis Test Detector
Hoof Timer
Surgical Equipment Kit
Hoof Rasp
Cool Box Big Size
Cool Box Medium Size
Wearpack
Scale Body Weight
Bottle Milk Cattle
Tulup

SPK/PERJANJIAN/KONTRAK

DPA/SP2D/KWITANSI

TANGGAL

NOMOR

TANGGAL

NOMOR

JUMLAH
HARGA
BANYAKNYA
8
2 Buah
2 Buah
1 Buah
1 Buah
5 Buah
5 Buah
2 set
2 set
5 set
2 set
1 Buah
1 Buah
1 Buah
2 Buah
1 Buah
1 set
1 unit
1 unit
2 Buah

SATUAN
(Rp)
9
181,818
363,636
###
###
718,182
590,909
181,818
272,727
327,273
727,273
2,045,455
2,909,091
3,272,727
818,182
318,182
2,636,364
4,181,818
###
318,182

Tgl. 28 Juni 2011 011/SPK-PETERNAKAN/NAKKAN/2011Tgl. 03 Maret 2011 2.01.03.16.42.5.2

JUMLAH

DIPERGUNAKAN

HARGA
(Rp)
10

PADA UNIT

79,518,138
500
2
1
1
1
5
5
1
1
5
10
1
1
1
1
2
2
10
2
2
2

buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah

10,909
1,090,909
727,273
1,272,727
1,636,364
254,545
290,909
###
3,090,909
54,545
127,273
###
1,636,364
###
772,727
863,636
727,273
136,364
236,364
181,818
909,091

11

363,636
727,272
13,545,455
22,090,909
3,590,910
2,954,545
363,636
545,454
1,636,365
1,454,546
2,045,455
2,909,091
3,272,727
1,636,364
318,182
2,636,364
4,181,818
22,545,455
636,364

5,454,500
2,181,818
727,273
1,272,727
1,636,364
1,272,725
1,454,545
26,818,182
3,090,909
272,725
1,272,730
12,363,636
1,636,364
12,090,909
772,727
1,727,272
1,454,546
1,363,640
472,728
363,636
1,818,182

DISNAKKAN

KET
12

NO
1
f

NAMA/JENIS
BARANG/JASA
2

BIAYA UMUM
TERKAIT
PENGADAAN
BARANG/JASA
3

DPA/SP2D/KWITANSI

TANGGAL

NOMOR

TANGGAL

NOMOR

BANYAKNYA

JUMLAH
HARGA

JUMLAH

DIPERGUNAKAN

SATUAN
(Rp)
9

HARGA
(Rp)
10

PADA UNIT
11

Belanja Modal Alat Pertanian Lainnya (Pendamping DAK NDR)


1. Pengadaan Peralatan Klinik dan Laboratorium

SPK/PERJANJIAN/KONTRAK

Tgl. 01 Juli 2011

04/SPK/LELANG/PETERNAKAN/ Tgl.26 Agustus 2011 3446/SP2D/2011


NAKkAN/2011

2. Pengadaan Peralatan Reproduksi


Vaginal Speculum kambing
Insemination Gun
Thermos IB 0,5 ltr Stainless
Thermos IB 0,5 ltr Kaca
Container Kaps. 20 ltr
Container Kaps. 50 ltr
Tracor Sapi
Tracor Kambing
Spuit europlek 10 ml
Spuit europlek 20 ml
Jarum europlek
Gunting Straw
Automatic Drencing Gun 30 ml
Castrator 35 cm
Elektrik Dehorner
Aplicator
Vaginal Suture Tape
Thowing set
Vaginal Speculum sheep
Pregnancy detector
Vulva suture needle

Tgl. 12 Juli 2011

015/SPK-PETERNAKAN/NAKKAN/2011Tgl. 03 Maret 2011 2.01.03.16.42.5.2

3. Pengadaan Peralatan Peternakan


Ear Marking Plier
Aplicator
Tatooning Forceps
Automatic Syringe 5 ml
Automatic Syringe 10 ml
Spuit Mika 10 ml
Spuit Mika 20 ml
Digital Scale With Cage
Recharabel Dehorner
Industrial Glove
Sepatu Boat

Tgl. 28 Juni 2011 011/SPK-PETERNAKAN/NAKKAN/2011Tgl. 03 Maret 2011 2.01.03.16.42.5.2

1 paket

###

17,913,455

DISNAKKAN

9,000,000

DISNAKKAN

Peralatan Medis
Peralatan Bedah
Peralatan Laboratorium

1
3
2
2
1
1
5
5
2
2
5
2
1
1
1
2
1
1
1
1
2

Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
set
set
set
set
Buah
Buah
Buah
Buah
Buah
set
unit
unit
Buah

118,182
45,455
18,182
36,364
1,354,545
2,209,091
71,818
59,091
18,182
27,273
32,727
72,727
204,545
290,909
327,273
81,818
31,818
263,636
418,182
2,254,545
31,818

500
2
1
1
1
5
5
1
1
5
10

buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah

1,091
109,091
72,727
127,273
163,636
25,455
29,091
2,681,818
309,091
5,455
12,727

118,182
136,365
36,364
72,728
1,354,545
2,209,091
359,090
295,455
36,364
54,546
163,635
145,454
204,545
290,909
327,273
163,636
31,818
263,636
418,182
2,254,545
63,636
7,951,862
545,500
218,182
72,727
127,273
163,636
127,275
145,455
2,681,818
309,091
27,275
127,270

DISNAKKAN

KET
12

BIAYA UMUM
TERKAIT
PENGADAAN
BARANG/JASA
3

SPK/PERJANJIAN/KONTRAK

DPA/SP2D/KWITANSI

JUMLAH
HARGA

JUMLAH

DIPERGUNAKAN

HARGA
(Rp)
10

PADA UNIT

8
1 buah
1 buah
1 buah
1 buah
2 buah
2 buah
10 buah
2 buah
2 buah
2 buah

SATUAN
(Rp)
9
1,236,364
163,636
1,209,091
77,273
86,364
72,727
13,636
23,636
18,182
90,909

g Belanja jasa pengawasan teknis pembangunanTgl. 29 September 2011


12/SPK/PNGW.PP/DISNAKKAN/2011
Tgl.15 Desember 20116470/SP2D/2011
Puskeswan

1 paket

8,300,000

8,300,000

DISNAKKAN

h Belanja jasa pengawasan teknis pembangunanTgl. 26 September 2011


05/SPK/PNGW.PRK/DISNAKKAN/2011
Tgl.15 Desember 20116471/SP2D/2011
Rumah Kompos

1 paket

4,500,000

4,500,000

DISNAKKAN

Belanja jasa perencanaan teknis


pembangunan Puskeswan

Tgl. 20 Juli 2011

Tgl.06 Oktober 2011 4251/SP2D/2011

1 paket

11,100,000

DISNAKKAN

Belanja jasa perencanaan teknis


pembangunan Rumah Kompos

Tgl. 25 Juli 2011

10/SPK/PT.PRK/DISNAKKAN/2011Tgl.15 Desember 20116468/SP2D/2011

1 paket

6,000,000

6,000,000

DISNAKKAN

Tgl. 03 Maret 2011 2.01.03.16.42.5.3

1 paket
1 tahun

4,212,000
4,160,000
###

4,212,000
4,160,000
10,147,100

DISNAKKAN
DISNAKKAN
DISNAKKAN

37,250,000
16,000,000
20,000,000
1,000,000
250,000

DISNAKKAN

150,545,455

DISNAKKAN

NO
1

NAMA/JENIS
BARANG/JASA
2
Mastitis Test Detector
Hoof Timer
Surgical Equipment Kit
Hoof Rasp
Cool Box Big Size
Cool Box Medium Size
Wearpack
Scale Body Weight
Bottle Milk Cattle
Tulup

TANGGAL

NOMOR

TANGGAL

NOMOR

05/SPK/DED
PETERNAKAN/NAKKAN/ 2011

Belanja Alat Tulis Kantor


Belanja Perjalanan Dinas Dalam Daerah
Belanja Perjalanan Dinas Luar Daerah

BANYAKNYA

1 paket

###

11

1,236,364
163,636
1,209,091
77,273
172,728
145,454
136,360
47,272
36,364
181,818

C.3 Kawin suntik sapi


a
-

Belanja Bahan obat-obatan


N2 Cair
Straw
Plastiek Sheet dan Glove
Termos IB

Tgl. 02 Mei 2011

002/SPK/DISNAKKAN/2011

Tgl.05 Oktober 2011 4241/SP2D/2011

400
1000
500
1

liter
dosis
buah
buah

40,000
20,000
2,000
250,000

D Program Pengembangan Budidaya Perikanan


D.1 Pengawasan, Pengendalian Sumber Daya Kelautan dan Perikanan
a Belanja Modal Pengadaan Speed Boat (DAK NDR Tgl. 29 April 2011

dengan spesifkasi :
Panjang 6 meter
Lebar 1,6

01/SPK/LELANG SEDERHANA/
SPEED BOAT/IV/2011

Tgl.28 Juni 2011

1953/SP2D/2011

2 unit

###

KET
12

NO
1
-

NAMA/JENIS
BARANG/JASA

BIAYA UMUM
TERKAIT
PENGADAAN
BARANG/JASA
3

2
Tinggi 0,75
Bahan Fiber Glass
Kapasitas 6 org
Tangki Bahan Bakar 24 ltr
Lampu Sorot 2 bh
Outboard mesin tempel, kecepatan max
15 knot
Dan kelengkapan lainnya

b Belanja Modal Pengadaan Speed Boat


(Pendamping DAK NDR)
dengan spesifkasi :
- Panjang 6 meter
- Lebar 1,6
- Tinggi 0,75
- Bahan Fiber Glass
- Kapasitas 6 org
- Tangki Bahan Bakar 24 ltr
- Lampu Sorot 2 bh
- Outboard mesin tempel, kecepatan max
15 knot
- Dan kelengkapan lainnya
c

Belanja bahan lainnya berupa Peralatan


Pengawasan lainnya (Handy Talky dan
Kelengkapan Lainnya)(DAK NDR)

Daya Pancar 5 watt, DC 13,8 volt dengan 144.000


s/d 148.000
Peralatan lainnya
Power 7A, Antenna Vertikel 2 Meter Band,
Tali antenna RG 58, PPT ekstra dan konektor

d Belanja bahan lainnya berupa Peralatan


Pengawasan lainnya (Handy Talky dan
Kelengkapan Lainnya)(DAK NDR)
-

SPK/PERJANJIAN/KONTRAK

DPA/SP2D/KWITANSI

TANGGAL

NOMOR

TANGGAL

NOMOR

BANYAKNYA

Tgl. 29 April 2011

01/SPK/LELANG SEDERHANA/
SPEED BOAT/IV/2011

Tgl.28 Juni 2011

1954/SP2D/2011

JUMLAH
HARGA

JUMLAH

DIPERGUNAKAN

SATUAN
(Rp)
9

HARGA
(Rp)
10

PADA UNIT
11

2 unit

7,527,273

15,054,545

DISNAKKAN

Tgl. 18 Juli 2011

013/SPK-PERIKANAN/DISNAKKAN/ Tgl.24 Agustus 2011 3175/SP2D/2011


2011

25 buah

1,800,000

45,000,000

DISNAKKAN

Tgl. 18 Juli 2011

013/SPK-PERIKANAN/DISNAKKAN/ Tgl.24 Agustus 2011 3182/SP2D/2011


2011

25 buah

180,000

4,500,000

DISNAKKAN

Daya Pancar 5 watt, DC 13,8 volt dengan 144.000


s/d 148.000
Peralatan lainnya
Power 7A, Antenna Vertikel 2 Meter Band,
Tali antenna RG 58, PPT ekstra dan konektor

D.2 Rehabilitasi Sarana dan Prasarana Fisik Kolam Pembesaran


BAT Budidaya Air Tawar dan Pasar Benih

KET
12

NO
1

NAMA/JENIS
BARANG/JASA
2

BIAYA UMUM
TERKAIT
PENGADAAN
BARANG/JASA
3

a Belanja modal pengadaan konstruksi bangunan


Rehabilitasi Kolam BAT dan Pasar Benih
- Rehabilitasi Saluran BAT
- Rehabilitasi Saluran Pasar Benih

SPK/PERJANJIAN/KONTRAK

DPA/SP2D/KWITANSI

TANGGAL

NOMOR

TANGGAL

NOMOR

BANYAKNYA

Tgl. 24 Juni 2011

009/SPK/DISNAKKAN/2011

Tgl.27 Juli 2011

2506/SP2D/2011

1 paket

JUMLAH
HARGA

JUMLAH

DIPERGUNAKAN

SATUAN
(Rp)
9

HARGA
(Rp)
10

PADA UNIT

###

11

36,000,000

DISNAKKAN

63,636,364

DISNAKKAN

90,454,535

DISNAKKAN

D.3 Pengadaan Alat dan Sarana Pengolahan Ikan


a Belanja bahan lainnya (DAK Non DR)

1. Pengadaan Sarana Sistem Rantai Dingin


Tgl. 01 September 2011 018/SPK/COOL BOX/DISNAKKAN/ Tgl.06 Oktober 2011 4247/SP2D/2011
2011
Box dengan Spesifikasi :
Volume/Kapasitas : 72 ktr
Ukuran/Dimensi : 71x42x44 cm
Dinding berlapis dua yang disiolasi dengan polyurethane
foam, dapat mempertahankan panas dan dingin sempurna
Memiliki tube pembuangan air di bagian bawah
memiliki handle dikiri dan kanan
Warna : biru/merah

56 unit

1,136,364

2. Pengadaan Sarana Pengolahan


Tgl. 01 September 2011 019/SPK/Pengadaan Langsung Tgl.12 Oktober 2011 4374/SP2D/2011
Kerupuk dan Sarana Pengering Kerupuk
/DISNAKKAN/2011
2.1 Mesin Molen Stainless
Kapasitas 60 -80 kg/jam
Motor 0,5 - 1 PK (370-750watt)
Kerangka Besi
Dimensi 80x45x95 cm
Bahan Stailess steel

2 unit

2.2 Microwive 1000 watt


1000 watt

1 unit

2.3 Mesin Pencetak Kerupuk


Kapasitas 1-2 kwt/hari
Motor press 3/4 PK
Dimensi 220x100xs245 cm
Bahan Besi

1 unit

###

34,545,455

2.4 Genset 5000 watt


5000 watt

1 unit

###

18,181,818

2.5 Para-para penjemuran ikan


ukuran 2x1x0,2 m

40 unit

###

6,818,182

222,727

22,000,000

6,818,182

8,909,080

KET
12

NO
1

NAMA/JENIS
BARANG/JASA
2

BIAYA UMUM
TERKAIT
PENGADAAN
BARANG/JASA
3

SPK/PERJANJIAN/KONTRAK

DPA/SP2D/KWITANSI

TANGGAL

NOMOR

TANGGAL

NOMOR

BANYAKNYA

JUMLAH
HARGA

JUMLAH

DIPERGUNAKAN

SATUAN
(Rp)
9

HARGA
(Rp)
10

PADA UNIT

6,363,636

DISNAKKAN

9,045,465

DISNAKKAN

11

b Belanja bahan lainnya (Pendamping DAK Non DR)

1. Pengadaan Sarana Sistem Rantai Dingin


Tgl. 01 September 2011 018/SPK/COOL BOX/DISNAKKAN/ Tgl.06 Oktober 2011 4248/SP2D/2011
2011
Box dengan Spesifikasi :
Volume/Kapasitas : 72 ktr
Ukuran/Dimensi : 71x42x44 cm
Dinding berlapis dua yang disiolasi dengan polyurethane
foam, dapat mempertahankan panas dan dingin sempurna
Memiliki tube pembuangan air di bagian bawah
memiliki handle dikiri dan kanan
Warna : biru/merah
2. Pengadaan Sarana Pengolahan
Kerupuk dan Sarana Pengering Ikan

56 unit

113,636

Tgl. 01 September 2011 019/SPK/Pengadaan Langsung Tgl.12 Oktober 2011 4373/SP2D/2011


/DISNAKKAN/2011

2.1 Mesin Molen Stainless


Kapasitas 60 -80 kg/jam
Motor 0,5 - 1 PK (370-750watt)
Kerangka Besi
Dimensi 80x45x95 cm
Bahan Stailess steel

2 unit

1,100,000

2,200,000

2.2 Microwive 1000 watt


1000 watt

1 unit

681,818

681,818

2.3 Mesin Pencetak Kerupuk


Kapasitas 1-2 kwt/hari
Motor press 3/4 PK
Dimensi 220x100xs245 cm
Bahan Besi

1 unit

3,454,545

3,454,545

2.4 Genset 5000 watt


5000 watt

1 unit

1,818,182

1,818,182

40 unit

22,273

890,920

30 unit

3,104,091

93,122,727

2.5 Para-para penjemuran ikan


ukuran 2x1x0,2 m
D. 4 Pengembangan Kolam Lahan Marjinal
a Belanja bahan lainnya (DAK NDR)
Pembuatan Kolam pada Lahan Marjinal
-

Pekerjaan Persiapan

Tgl. 29 September 2011 02/SPK/PEMILIHAN LANGSUNG-Tgl. 03 Nopember 20115033/SP2D/2011


KOLAM MARJINAL/DISNAKKAN/ IX/
2011

DISNAKKAN

KET
12

NO

NAMA/JENIS
BARANG/JASA

1
2
- Pekerjaan Galian Tanah

BIAYA UMUM
TERKAIT
PENGADAAN
BARANG/JASA
3

SPK/PERJANJIAN/KONTRAK

DPA/SP2D/KWITANSI

TANGGAL

NOMOR

TANGGAL

NOMOR

BANYAKNYA

JUMLAH
HARGA

JUMLAH

DIPERGUNAKAN

SATUAN
(Rp)
9

HARGA
(Rp)
10

PADA UNIT

310,409

9,312,273

DISNAKKAN

11

b Belanja Bahan Lainnya (Pendamping DAK NDR)


Pembuatan Kolam pada Lahan Marjinal

Tgl. 29 September 2011 02/SPK/PEMILIHAN LANGSUNG-Tgl. 03 Nopember 20115035/SP2D/2011


KOLAM MARJINAL/DISNAKKAN/ IX/
2011

Pekerjaan Persiapan
Pekerjaan Galian Tanah

Belanja jasa pengawasan teknis pembangunanTgl. 29 September 2011 028/WAS-KM/DISNAKKAN/ TPN/


Lahan Marjinal
2011

d Belanja jasa perencanaan teknis


pembangunan Lahan Marjinal

Tgl. 28 April 2011

30 unit

Tgl. 03 Maret 2011 2.05.03.20.33.5.2

1 paket

4,000,000

4,000,000

DISNAKKAN

07/KPA/PR-KM/DISNAKKAN/2011 Tgl. 03 Maret 2011 2.05.03.20.33.5.2

1 paket

5,000,000

5,000,000

DISNAKKAN

D.5 Penyediaan Sarana Statistik Kelautan dan Perikanan


a Belanja Modal Pengadaan Alat-alat angkutan dar
bermotor sepeda motor (DAK NDR)
Pengadaan Sepeda Motor
- Merk : Honda
- Tahun pembuatan : 2011
- Type Supra X 125D

Tgl. 30 Juni 2011

001/PL/SPK/DISNAKKAN/2011

Tgl. 17 Juni 2011

1765/SP2D/2011

1 unit

###

16,272,727

DISNAKKAN

b Belanja Modal Pengadaan Alat-alat angkutan dar


Tgl. 14 Nopember 2011 003/SPK/PL/DISNAKKAN/2011 Tgl. 13 Desember 20116259/SP2D/2011
bermotor sepeda motor (DAK NDR)
Pengadaan Sepeda Motor
- Merk : Yamaha = 3 unit
- Tahun pembuatan : 2011
- Type New Juviter MX CW

5 unit

###

98,238,182

DISNAKKAN

- Merk : Suzuki = 2 unit


- Tahun pembuatan : 2011
- Type Xeon
c

Belanja Modal Pengadaan Alat-alat angkutan dar


bermotor sepeda motor (Pendamping DAK NDR)
Pengadaan Sepeda Motor
- Merk : Honda
- Tahun pembuatan : 2011
- Type Supra X 125D

Tgl. 30 Juni 2011

001/PL/SPK/DISNAKKAN/2011

Tgl. 16 Juni 2011

1760/SP2D/2011

1 unit

1,627,273

1,627,273

DISNAKKAN

d Belanja Modal Pengadaan Alat-alat angkutan dar


Tgl. 14 Nopember 2011 003/SPK/PL/DISNAKKAN/2011 Tgl. 13 Desember 20116260/SP2D/2011
bermotor sepeda motor (Pendamping DAK NDR)
Pengadaan Sepeda Motor

5 unit

1,964,764

9,823,818

DISNAKKAN

KET
12

NO
1

NAMA/JENIS
BARANG/JASA
2
- Merk : Yamaha = 3 unit
- Tahun pembuatan : 2011
- Type New Juviter MX CW

BIAYA UMUM
TERKAIT
PENGADAAN
BARANG/JASA
3

SPK/PERJANJIAN/KONTRAK

DPA/SP2D/KWITANSI

TANGGAL

NOMOR

TANGGAL

NOMOR

BANYAKNYA

Tgl. 18 April 2011

004/SPK/DISNAKKAN/2011

JUMLAH
HARGA

JUMLAH

DIPERGUNAKAN

SATUAN
(Rp)
9

HARGA
(Rp)
10

PADA UNIT
11

- Merk : Suzuki = 2 unit


- Tahun pembuatan : 2011
- Type Xeon
e Belanja Modal Alat Pertanian Lainnya (Dak NDR)

1. Peralatan Statistik Lainnya


Proyektor/LCD, Spek : inclumed 3000
Handycam, Spek : 800 k
Hardisk eksternal, spek 500 GB
Stapler Besar

2. Peralatan Statistik
Hardisk Eksternal
Flashdisk
Mesin Tik
Kalkulator
White Board

Belanja Modal Alat Pertanian Lainnya (Pendamping Dak NDR)

1. Peralatan Statistik Lainnya


Proyektor/LCD, Spek : inclumed 3000
Handycam, Spek : 800 k
Hardisk eksternal, spek 500 GB
Stapler Besar

2. Peralatan Statistik
Hardisk Eksternal
Flashdisk
Mesin Tik
Kalkulator
White Board

Tgl. 03 Maret 2011 2.05.03.20.34.5.2

1 paket

###

Tgl. 25 Nopember 2011


026/SPK-KOMPUTER/DISNAKAN/2011
Tgl. 11 Nopember 2011
2.05.03.20.34.5.2

004/SPK/DISNAKKAN/2011

Tgl. 03 Maret 2011 2.05.03.20.34.5.2

DISNAKKAN

1,200,000
136,364
2,272,727
177,273
309,091

4,545,456
1,200,000
409,092
2,272,727
354,546
309,091

DISNAKKAN

paket
paket
paket
paket
paket

1 paket

2,090,000

2,090,000

DISNAKKAN

454,544
120,000
40,908
227,273
35,454
30,909

DISNAKKAN

120,000
13,636
227,273
17,727
30,909

13,577,273

DISNAKKAN

1
3
1
2
1

Tgl. 18 April 2011

20,900,000

Tgl. 25 Nopember 2011


026/SPK-KOMPUTER/DISNAKAN/2011
Tgl. 11 Nopember 2011
2.05.03.20.34.5.2
1
3
1
2
1

paket
paket
paket
paket
paket

g Belanja Modal Pengadaan Komputer (DAK NDR)

1. Komputer Note Book


dengan spesifkasi :
Dual core (2,5 KHz)

Tgl. 18 April 2011

004/SPK/DISNAKKAN/2011

Tgl. 03 Maret 2011 2.05.03.20.34.5.2

1 unit

###

KET
12

NO
1
-

NAMA/JENIS
BARANG/JASA
2
Casy, Main board & VGA
Memory DDR2 2 GB
Hardisk 160 GB
Keyboard+mouse+Speaker
Monitor : LCD 14"
Kamera
Tas

BIAYA UMUM
TERKAIT
PENGADAAN
BARANG/JASA
3

SPK/PERJANJIAN/KONTRAK

DPA/SP2D/KWITANSI

TANGGAL

NOMOR

TANGGAL

NOMOR

BANYAKNYA

2. Komputer PC
Core i3-530 BOX : 2,93 GHz
Zotac Intel H55
Venom RX DDR 3,2 GB
Seagate Barracuda 500GB 7200
Intel Grafhics
DVD RW LG 24X
Venom RX +PSU 300 W Pure Power
Key+Mouse Logitech
Pointer PM-308+Sub Woofer
UPS Flazer 600W
Rakit+Program

Tgl. 25 Nopember 2011


026/SPK-KOMPUTER/DISNAKAN/2011
Tgl. 11 Nopember 2011
2.05.03.20.34.5.2

1 unit

3. Laptop
DDR3/500GB/14"/CAM
1,2 Ghz, 3 MB, L3 Cache, 800 Mhz

Tgl. 25 Nopember 2011


026/SPK-KOMPUTER/DISNAKAN/2011
Tgl. 11 Nopember 2011
2.05.03.20.34.5.2

2 unit

JUMLAH
HARGA

JUMLAH

DIPERGUNAKAN

SATUAN
(Rp)
9

HARGA
(Rp)
10

PADA UNIT

9,090,909

DISNAKKAN

26,909,090

DISNAKKAN

9,090,909

###

11

h Belanja Modal Pengadaan Komputer (Pendamping DAK NDR)

1. Komputer Note Book


dengan spesifkasi :
Dual core (2,5 KHz)
Casy, Main board & VGA
Memory DDR2 2 GB
Hardisk 160 GB
Keyboard+mouse+Speaker
Monitor : LCD 14"
Kamera
Tas
2. Komputer PC
Core i3-530 BOX : 2,93 GHz
Zotac Intel H55
Venom RX DDR 3,2 GB
Seagate Barracuda 500GB 7200

Tgl. 18 April 2011

004/SPK/DISNAKKAN/2011

Tgl. 03 Maret 2011 2.05.03.20.34.5.2

1 unit

1,357,727

1,357,727

DISNAKKAN

Tgl. 25 Nopember 2011


026/SPK-KOMPUTER/DISNAKAN/2011
Tgl. 11 Nopember 2011
2.05.03.20.34.5.2

1 unit

909,091

909,091

DISNAKKAN

KET
12

NO
1

NAMA/JENIS
BARANG/JASA

BIAYA UMUM
TERKAIT
PENGADAAN
BARANG/JASA
3

SPK/PERJANJIAN/KONTRAK
TANGGAL

NOMOR

TANGGAL

NOMOR

BANYAKNYA

2
Intel Grafhics
DVD RW LG 24X
Venom RX +PSU 300 W Pure Power
Key+Mouse Logitech
Pointer PM-308+Sub Woofer
UPS Flazer 600W
Rakit+Program
3. Laptop
DDR3/500GB/14"/CAM
1,2 Ghz, 3 MB, L3 Cache, 800 Mhz

DPA/SP2D/KWITANSI

JUMLAH

DIPERGUNAKAN

SATUAN
(Rp)
9

HARGA
(Rp)
10

PADA UNIT
11

2 unit

1,345,455

2,690,910

DISNAKKAN

Tgl. 03 Maret 2011 2.01.03.20.34.5.2

1 unit

2,250,000

2,250,000

DISNAKKAN

2. Printer

Tgl. 25 Nopember 2011


026/SPK-KOMPUTER/DISNAKAN/2011
Tgl. 11 Nopember 2011
2.05.03.20.34.5.2

3 unit

2,681,818

8,045,454

DISNAKKAN

3. Printer portable

Tgl. 25 Nopember 2011


026/SPK-KOMPUTER/DISNAKAN/2011
Tgl. 11 Nopember 2011
2.05.03.20.34.5.2

1 unit

4,545,455

4,545,455

DISNAKKAN

Tgl. 03 Maret 2011 2.01.03.20.34.5.2

1 unit

225,000

225,000

DISNAKKAN

2. Printer

Tgl. 25 Nopember 2011


026/SPK-KOMPUTER/DISNAKAN/2011
Tgl. 11 Nopember 2011
2.05.03.20.34.5.2

3 unit

268,182

804,546

DISNAKKAN

3. Printer portable

Tgl. 25 Nopember 2011


026/SPK-KOMPUTER/DISNAKAN/2011
Tgl. 11 Nopember 2011
2.05.03.20.34.5.2

1 unit

454,545

454,545

DISNAKKAN

870,504,546

DISNAKKAN

Belanja Modal Pengadaan Printer (DAK NDR)

1. Printer, Dengan spesifkasi


Injeck Multi Fungsi

Tgl. 25 Nopember 2011


026/SPK-KOMPUTER/DISNAKAN/2011
Tgl. 11 Nopember 2011
2.05.03.20.34.5.2

JUMLAH
HARGA

Tgl. 18 April 2011

Belanja Modal Pengadaan Printer (Pendamping DAK NDR)

1. Printer, Dengan spesifkasi


Injeck Multi Fungsi

Tgl. 18 April 2011

004/SPK/DISNAKKAN/2011

004/SPK/DISNAKKAN/2011

D. 6 Pembangunan Sarana dan Prasarana Fisik Pengembangan


Kawasan Budidaya Air Tawar (BAT)
a Belanja Bahan (DAK NDR)

Pembangunan Keramba Jaring Apung


Pekerjaan Tanah
Pekerjaan pondasi/pasangan

Tgl. 03 Nopember 2011

01/SPK/PELELANGAN UMUM- Tgl. 16 Desember 20116569/SP2D/2011


KJA/DISNAKKAN/X/2011

44 unit

###

KET
12

NO

NAMA/JENIS
BARANG/JASA

1
2
- Pekerjaan plesteran
-

BIAYA UMUM
TERKAIT
PENGADAAN
BARANG/JASA
3

DPA/SP2D/KWITANSI

TANGGAL

NOMOR

TANGGAL

NOMOR

BANYAKNYA

JUMLAH
HARGA

JUMLAH

DIPERGUNAKAN

SATUAN
(Rp)
9

HARGA
(Rp)
10

PADA UNIT
11

Pekerjaan Beton
Pekerjaan Kayu
Pekerjaan cat-catan

B Belanja Bahan (Pendamping DAK NDR)

SPK/PERJANJIAN/KONTRAK

Tgl. 03 Nopember 2011

01/SPK/PELELANGAN UMUM- Tgl. 16 Desember 20116570/SP2D/2011


KJA/DISNAKKAN/X/2011

44 unit

1,978,419

87,050,454

DISNAKKAN

3,050,000
2,000,000
5,000,000
###
###

3,050,000
2,000,000
5,000,000
38,720,000
29,000,000

DISNAKKAN
DISNAKKAN
DISNAKKAN
DISNAKKAN
DISNAKKAN

###

13,636,364

DISNAKKAN

Pembangunan Keramba Jaring Apung


Pekerjaan Tanah
Pekerjaan pondasi/pasangan
Pekerjaan plesteran
Pekerjaan Beton
Pekerjaan Kayu
Pekerjaan cat-catan
Belanja bahan

Belanja
Belanja
Belanja
Belanja
Belanja

Alat Tulis Kantor


Perjalanan Dinas Dalam Daerah
Tgl. 03 Maret 2011 2.05.03.20.37.5.2
Perjalanan Dinas Luar Daerah
Jasa Perencanaa Tgl. 26 April 2011
06/KPA/PR-KJA/DISNAKKAN/2011
Jasa PengawasaTgl. 03 Nopember 201031/WAS-KJA/DISNAKKAN/TPN/2011
Tgl 28 Desember 20118369/SP2D/2011

1
1
1
1
1

paket
paket
paket
paket
paket

D.7 Penyediaan Sarana dan Prasarana Penyuluhan


a Belanja Modal Pengadaan Komputer Note Book
(DAK NDR)
1. Pengadaan Komputer Note Book
- Intel Core TM 13-370M Processor 2.4 Ghz
- Window 7
- 2 GB DOR3
- 500 GBN SATA
- DVD+RW Super Multi Double Layer
- 14.0" WXGA HD CSV LED
- VGA Nvidia Geforce GT330M
- Wif, Bluetooth, Card Reader

2. Pengadaan Printer
Multi fungsi injection

b Belanja Modal Pengadaan Komputer Note Book


(Pendamping DAK NDR)
1. Pengadaan Komputer Note Book
- Intel Core TM 13-370M Processor 2.4 Ghz
- Window 7

Tgl. 07 April 2011

003a/SPK/DISNAKKAN/2011

Tgl 27 April 2011

0651/SP2D/2011

1 unit

Tgl. 07 April 2011

003a/SPK/DISNAKKAN/2011

Tgl 27 April 2011

0651/SP2D/2011

1 unit

2,272,727

2,272,727

DISNAKKAN

Tgl. 07 April 2011

003a/SPK/DISNAKKAN/2011

Tgl 27 April 2011

0652/SP2D/2011

1 unit

1,363,636

1,363,636

DISNAKKAN

KET
12

NO

NAMA/JENIS

BIAYA UMUM
TERKAIT
PENGADAAN
BARANG/JASA
3

SPK/PERJANJIAN/KONTRAK

DPA/SP2D/KWITANSI

TANGGAL

NOMOR

TANGGAL

NOMOR

BANYAKNYA

Tgl. 07 April 2011

003a/SPK/DISNAKKAN/2011

Tgl 27 April 2011

0652/SP2D/2011

1 unit

Pengadaan Peralatan dan Sarana BBI Laintgl. 01 Nopember 2011


1. Berupa Kendaraan Roda 2 Bagi Petugas BBI
Pengadaan Sepeda Motor
- Merk : Honda
- Tahun pembuatan : 2011
- Type Revo Fit

002/SPK/PL/DISNAKKAN/2011 Tgl 16 Nopember 20115370/SP2D/2011

2 unit

2. Berupa Sarana Produksi BBI


Jala Uk 4mx3mx1,5m
Jala Uk 3mx3mx1,5m
Waring Uk 3mx3mx1,5m
Hapa Uk 3mx3mx1,5m
Drum Plastik
Tali polyethelyn

012/SPK-PERIKANAN/IX/2011

BARANG/JASA

1
-

2
2 GB DOR3
500 GBN SATA
DVD+RW Super Multi Double Layer
14.0" WXGA HD CSV LED
VGA Nvidia Geforce GT330M
Wif, Bluetooth, Card Reader

2. Pengadaan Printer
Multi fungsi injection

JUMLAH
HARGA

JUMLAH

DIPERGUNAKAN

SATUAN
(Rp)
9

HARGA
(Rp)
10

PADA UNIT

227,273

11

227,273

DISNAKKAN

31,240,909

DISNAKKAN

14,895,448
2,363,636
4,181,816
3,231,820
2,727,270
1,881,816
509,090

DISNAKKAN

KET
12

D.8 Pembangunan Sarana dan Prasarana Fisik BBI Linuh


Kabupaten Tapin
a Belanja Modal Bangunan Konstruksi Bangunan Lainnya (DAK NDR)

Tgl. 22 Juli 2011

Tgl. 03 Maret 2011 2.05.03.20.36.5.2

499,835,000

b Pembangunan Kolam Permanen


c Pembangunan Saluran Pembuangan
d Pembangunan Bangsal Packing Benih

###

4
8
10
10
6
2

buah
buah
buah
buah
buah
rol

1 paket
1 paket
Tgl. 29 September 2011 02/SPK/PELELANGAN UMU/BBIL- Tgl. 03 Maret 2011 2.05.03.20.36.5.2
DISNAKKAN/IX/2011

e Rehab Pagar Lingkungan 800 m


f Pengaspalan Jalan Lingkugan BBI 400 km

1 paket
1 paket
1 paket

590,909
522,727
323,182
272,727
313,636
254,545

###
###

### DISNAKKAN pembulatan


62,629,513
95,222,386

###

165,569,479

###
###

63,700,000
67,274,869

b Belanja Modal Bangunan Konstruksi Bangunan Lainnya (Pendamping DAK NDR)


Pengadaan Peralatan dan Sarana BBI LainTgl. 01 Nopember 2011 002/SPK/PL/DISNAKKAN/2011 Tgl 16 Nopember 20115369/SP2D/2011
1. Berupa Kendaraan Roda 2 Bagi Petugas BBI
Pengadaan Sepeda Motor

2 unit

1,562,046

3,124,091

DISNAKKAN

NO
1

NAMA/JENIS
BARANG/JASA
2
- Merk : Honda
- Tahun pembuatan : 2011
- Type Revo Fit

BIAYA UMUM
TERKAIT
PENGADAAN
BARANG/JASA
3

SPK/PERJANJIAN/KONTRAK

2. Berupa Sarana Produksi BBI


Jala Uk 4mx3mx1,5m
Jala Uk 3mx3mx1,5m
Waring Uk 3mx3mx1,5m
Hapa Uk 3mx3mx1,5m
Drum Plastik
Tali polyethelyn

DPA/SP2D/KWITANSI

TANGGAL

NOMOR

TANGGAL

NOMOR

BANYAKNYA

Tgl. 22 Juli 2011

012/SPK-PERIKANAN/IX/2011

JUMLAH

DIPERGUNAKAN

SATUAN
(Rp)
9

HARGA
(Rp)
10

PADA UNIT

Tgl. 03 Maret 2011 2.05.03.20.36.5.2


4
8
10
10
6
2

b Pembangunan Kolam Permanen


c Pembangunan Saluran Pembuangan
d Pembangunan Bangsal Packing Benih

JUMLAH
HARGA

buah
buah
buah
buah
buah
rol

1 paket
1 paket
Tgl. 29 September 2011 02/SPK/PELELANGAN UMU/BBIL- Tgl. 03 Maret 2011 2.05.03.20.36.5.2
DISNAKKAN/IX/2011

59,091
52,273
32,318
27,273
31,364
25,455

1,489,552
236,364
418,184
323,180
272,730
188,184
50,910

###
###

45,439,545
6,262,951
9,522,239

11

DISNAKKAN pembulatan

###

16,556,948

###
###

6,370,000
6,727,487

1085/SP2D/2011

1 paket

###

23,500,000

DISNAKKAN

h Belanja Jasa Pengawasan Teknis PembangunanTgl. 29 September 2011


013/SPK/PNGW.BBI/DISNAKKAN/2011
Tgl 15 Desember 20116469/SP2D/2011
Sarana dan Prasarana fsik BBI Linuh

1 paket

###

17,872,000

DISNAKKAN

1,000,000
1,997,000
5,000,000

DISNAKKAN
DISNAKKAN
DISNAKKAN

39,950,000

DISNAKKAN

g Belanja Jasa Perencanaan Teknis Pembangunan


Sarana dan Prasarana fsik BBI Linuh

Beanja modal

Tgl. 08 April 2011

05/SPK/PT. BBI/DISNAKKAN/2011

Belanja Alat Tulis Kantor


Perjalanan Dinas Dalam Daerah
Perjalanan Dinas Luar Daerah

Tgl 20 Mei 2011

Tgl. 03 Maret 2011 2.05.03.20.36.5.2

1 paket
1 paket
1 paket

Tgl. 03 Maret 2011 2.05.03.20.16.5.2

2 unit

1,000,000
1,997,000
5,000,000

D.9 Pembangunan Garasi Speed Boat


a Belanja Modal Pengadaan Konstruksi BangunanTgl. 19 September 2011 003/SPK/PL/DISNAKKAN/2011
lainnya berupa pembangunan Garasi Speed Boat
dengan Spesifkasi :
- Pekerjaan rangka bawah
- Pekerjaan Rangka Badan, Pintu dan Dinding
- Pekerjaan Rangka Kap dan Atap
- Pekerjaan Cat-catan
D.10 Pengembangan BBI Lokal Linuh
a Belanja bahan/bibit tanaman

###

12

DISNAKKAN

1 paket
1 paket
1 paket

e Rehab Pagar Lingkungan 800 m


f Pengaspalan Jalan Lingkugan BBI 400 km

KET

NO
1

BIAYA UMUM
TERKAIT
PENGADAAN
BARANG/JASA
3

NAMA/JENIS
BARANG/JASA

2
1.Pengadaan Pakan Ikan
Pakan Induk
Pakan Benih
Pakan Larva

2. Pengadaan Bahan Pakan Ikan


Telur Itik
Vitamin Mix
Dedak Halus
Tepung Jagung
Tepung Rebon
Tepung Tapioka

SPK/PERJANJIAN/KONTRAK

DPA/SP2D/KWITANSI

TANGGAL

NOMOR

4
Tgl. 18 April 2011

5
006/SPK/DISNAKKAN/2010

6
7
Tgl. 03 Maret 2011 2.05.03.20.13.5.2

8
1 paket

Tgl. 18 April 2011

006/SPK/DISNAKKAN/2010

Tgl. 03 Maret 2011 2.05.03.20.13.5.2

1 paket

1 botol
1 dus

b Belanja Obat Perikanan


- Ovaprium
- HCG Choroloss

TANGGAL

NOMOR

JUMLAH
HARGA
BANYAKNYA

SATUAN
(Rp)
9
###

JUMLAH

DIPERGUNAKAN

HARGA
(Rp)
10
37,925,000

DISNAKKAN

5,929,500

5,929,500

DISNAKKAN

1,000,000
375,000
625,000

DISNAKKAN

375,000
625,000

Tgl. 03 Maret 2011 2.05.03.20.13.5.2

PADA UNIT
11

D.11 Pembangunan Fishing Park/Taman Maunjun Lanjutan


a Belanja Modal Pengadaan Konstruksi Bangunan
Pemeliharaan Kolam Pancing
1. Konstruksi/bangunan pemeliharaan kola
-

Tgl. 18 Juli 2011

900/001h/Pemilihan Langsung/
Disnakkan/2011

Tgl. 03 Maret 2011 2.05.03.20.23.5.2

1 paket

###

198,454,000

DISNAKKAN

04/SPK/PNGW.PKP/DISNAKKAN/2011Tgl. 03 Maret 2011 2.05.03.20.23.5.2

1 paket

###

11,500,000

DISNAKKAN

04/SPK/PT. PKP/DISNAKKAN/2011 Tgl. 03 Maret 2011 2.05.03.20.23.5.2

1 paket

###

15,500,000

DISNAKKAN

Tgl. 03 Maret 2011 2.05.03.20.23.5.2

1 paket

1,200,000

1,200,000

DISNAKKAN

297

19,008,000

DISNAKKAN

Pekerjaan tanah
Pekerjaan siring pasangan batu gunung
2. Belanja Jasa Pengawasan Teknis Pemeliharaan
Kolam Pancing

Tgl. 18 Juli 2011

3. Belanja Jasa Perencanaan Teknis Pemeliharaan Tgl. 08 April 2011


Kolam Pancing
Belanja modal

ATK

D.12Stimulan Benih Bagi Kelompok Pelestari


a Belanja bahan/bibit tanaman
Pengadaan Benih Ikan Betok/Papuyu
D.13Pengembangan Kawasan Restocking
a Belanja Bahan/bibit tanaman

Tgl. 26 September 2011


021/SPK-PERIKANAN/DISNAKKAN/2011
Tgl. 03 Maret 2011 2.05.03.20.30.5.2

### ekor

KET
12

BIAYA UMUM
TERKAIT
NO
PENGADAAN
BARANG/JASA
BARANG/JASA
1
2
3
Pengadaan Benih Ikan Gurami

SPK/PERJANJIAN/KONTRAK

DPA/SP2D/KWITANSI

JUMLAH
HARGA

NAMA/JENIS

TANGGAL

NOMOR

TANGGAL

NOMOR

4
5
6
7
Tgl. 01 Nopember 2011
022/SPK-PERIKANAN/DISNAKKAN/2011
Tgl. 03 Maret 2011 2.05.03.20.31.5.2

BANYAKNYA
8
### ekor

SATUAN
(Rp)
9
594

55000 ekor

335

JUMLAH
HARGA
(Rp)
10
15,741,000

DIPERGUNAKAN
PADA UNIT
11
DISNAKKAN

D.14 Bantuan Sarana Produksi Perikanan melalui UPP (Usaha Pengembangan Perikanan)
a Belanja bahan/bibit tanaman
Pengadaan Sarana Produksi Perikanan berupa pakan dan ikan
1. Bibit Ikan Nila

Tgl. 03 Maret 2011 2.05.03.20.29.5.2

2. Pakan Ikan
Remukan 1 mm
Pelet 2 mm
Pelet 3 mm
Pelet 4 mm

1000
3600
5800
2000

Kg
Kg
Kg
Kg

### DISNAKKAN
18,425,000

8,988
8,100
8,064
8,148

8,988,000
29,160,000
46,771,000
16,296,000

29,459,000
4,767,000
24,692,000

DISNAKKAN

794,500
4,115,333

76,818,180

DISNAKKAN

18,117,275

DISNAKKAN

D.14Bantuan Rehabilitasi Induk Ikan Mas dan Nila untuk Unit Pembenihan Rakyat (UPR)
a Belanja Bahan/bibit tanaman
Belanja induk ikan mas dan ikan nila
- Induk Jantan
- Induk Betina

Tgl. 25 Nopember 2011


027/SPK-KOMPUTER/DISNAKKAN/2011
Tgl. 03 Maret 2011 2.05.03.20.28.5.2
6 paket
6 paket

D.15Pengembangan Sarana dan Prasarana Perikanan Tangkap (DAK + PAD)


a Belanja Bahan Lainnya (DAK NDR)
1. Pengadaan perahu kapal <3 GT
-

Tgl. 02 Mei 2011

02/SPK/LELANG SEDERHANA/
PERAHU<3GT/IV/2011

Tgl. 03 Maret 2011 2.05.03.20.21.5.2

5 buah

Tgl. 02 Mei 2011

02/SPK/LELANG SEDERHANA/
PERAHU<3GT/IV/2011

Tgl. 03 Maret 2011 2.05.03.20.21.5.2

5 unit

###

Bahan kayu ulin


Panjang 8 m
Mesin 9 HP bahan besi
Dayung 2 buah
Lantai Bawah 60 cm
Lantai atas 75 cm
Baling-baling/roda 415/10 1/2 besi
Has 7/8" panjang 2 m (besi)
Tali perahu rantai 3 m (besi)
Pengecatan luar dalam
Pondasi ulin pakai baut

2. Pengadaan alat penangkap ikan


Gilnet :

3,623,455

KET
12

BIAYA UMUM
TERKAIT
NO
PENGADAAN
BARANG/JASA
BARANG/JASA
1
2
3
- Ukuran mata jaring 13/4" dan 3"
- Ukuran panjang 100 m
- Panjang 100 yuard
- Kedalaman/tinggi 7 m
- Gelang kecil
- Gelang besar
- Tali

SPK/PERJANJIAN/KONTRAK

DPA/SP2D/KWITANSI

NAMA/JENIS

3. Pengadaan perahu + Alat Tangkap Ikan


-

NOMOR

TANGGAL

NOMOR

BANYAKNYA

JUMLAH

DIPERGUNAKAN

SATUAN
(Rp)
9

HARGA
(Rp)
10

PADA UNIT
11

Tgl. 14 Nopember 2011

024/SPK-ALAT
Tgl. 11 Nopember 2011
2.05.03.20.21.5.2
TANGKAP/DISNAKKAN/ 2011

3 buah

###

56,770,000

DISNAKKAN

Tgl. 14 Nopember 2011

024/SPK-ALAT
Tgl. 11 Nopember 2011
2.05.03.20.21.5.2
TANGKAP/DISNAKKAN/ 2011

2 paket

###

45,940,654

DISNAKKAN

1,536,364

7,681,820

DISNAKKAN

362,345

1,811,725

DISNAKKAN

Perahu bahan kayu ulin


Mesin perahu 9 HP bahan besi
Gilnet

4. Pengadaan alat tangkap ikan


-

TANGGAL

JUMLAH
HARGA

Sasunduk/Serok Besar
Tempirai
Rimpa 1"
Rimpa 3/4"
Gilnet/Jaring Insang

a Belanja Bahan Lainnya (Pendamping DAK NDR)


1. Pengadaan perahu kapal <3 GT
-

Tgl. 02 Mei 2011

02/SPK/LELANG SEDERHANA/
PERAHU<3GT/IV/2011

Tgl. 03 Maret 2011 2.05.03.20.21.5.2

5 buah

Tgl. 02 Mei 2011

02/SPK/LELANG SEDERHANA/
PERAHU<3GT/IV/2011

Tgl. 03 Maret 2011 2.05.03.20.21.5.2

5 unit

Bahan kayu ulin


Panjang 8 m
Mesin 9 HP bahan besi
Dayung 2 buah
Lantai Bawah 60 cm
Lantai atas 75 cm
Baling-baling/roda 415/10 1/2 besi
Has 7/8" panjang 2 m (besi)
Tali perahu rantai 3 m (besi)
Pengecatan luar dalam
Pondasi ulin pakai baut

2. Pengadaan alat penangkap ikan


Gilnet :

KET
12

BIAYA UMUM
TERKAIT
NO
PENGADAAN
BARANG/JASA
BARANG/JASA
1
2
3
- Ukuran mata jaring 13/4" dan 3"
- Ukuran panjang 100 m
- Panjang 100 yuard
- Kedalaman/tinggi 7 m
- Gelang kecil
- Gelang besar
- Tali

SPK/PERJANJIAN/KONTRAK

DPA/SP2D/KWITANSI

NAMA/JENIS

3. Pengadaan perahu + Alat Tangkap Ikan


-

NOMOR

TANGGAL

NOMOR

BANYAKNYA

JUMLAH

DIPERGUNAKAN

SATUAN
(Rp)
9

HARGA
(Rp)
10

PADA UNIT
11

Tgl. 14 Nopember 2011

024/SPK-ALAT
Tgl. 11 Nopember 2011
2.05.03.20.21.5.2
TANGKAP/DISNAKKAN/ 2011

3 buah

1,892,333

5,677,000

DISNAKKAN

Tgl. 14 Nopember 2011

024/SPK-ALAT
Tgl. 11 Nopember 2011
2.05.03.20.21.5.2
TANGKAP/DISNAKKAN/ 2011

2 paket

2,297,033

4,594,065

DISNAKKAN

277,500,000

DISNAKKAN

27,750,000

DISNAKKAN

Perahu bahan kayu ulin


Mesin perahu 9 HP bahan besi
Gilnet
4. Pengadaan alat tangkap ikan

TANGGAL

JUMLAH
HARGA

Sasunduk/Serok Besar
Tempirai
Rimpa 1"
Rimpa 3/4"
Gilnet/Jaring Insang

D.16 Bantuan Sarana Pemasaran Bergerak Bagi Pedagang Ikan Keliling


a Belanja Bahan Lainnya (DAK NDR)
Pengadaan Sepeda Motor Desain Pasif Bagi
Pedagang Ikan keliling
Merk : Honda
Tahun Pembuatan : 2011
Type Revo

Tgl. 10 Oktober 2011

03/SPK/PELELANGAN UMUM/
SPDMOTORDFDISNAKKAN/X/2011

Tgl. 03 Maret 2011 2.05.03.20.18.5.2

15 unit

Tgl. 10 Oktober 2011

03/SPK/PELELANGAN UMUM/
SPDMOTORDFDISNAKKAN/X/2011

Tgl. 03 Maret 2011 2.05.03.20.18.5.2

15 unit

###

b Belanja Bahan Lainnya (Pendamping DAK NDR)


Pengadaan Sepeda Motor Desain Pasif Bagi
Pedagang Ikan keliling
Merk : Honda
Tahun Pembuatan : 2011
Type Revo
E Pengembangan Ternak
E.1 Pemeliharaan Satwa

1,850,000

KET
12

BIAYA UMUM
TERKAIT
NO
PENGADAAN
BARANG/JASA
BARANG/JASA
1
2
3
a Belanja Bahan Material dan Belanja Jasa

SPK/PERJANJIAN/KONTRAK

DPA/SP2D/KWITANSI

NAMA/JENIS

Pembuatan Kandang Itik Terapung

TANGGAL

NOMOR

TANGGAL

NOMOR

BANYAKNYA

Tgl. 01 September 2011 020/SPK/Pengadaan Langsung/


DISNAKKAN/2011

Pekerjaan Persiapan
Pengadaan Drum Apung (Plastik)
Pengadaan Rangka Badan Kayu Ulin
Upah Pengerjaan Rangka Badan Kayu Ulin
Pengecatan

Program Pencegahan dan Penanggulangan Penyakit Ternak

Tgl. 03 Maret 2011 2.01.03.30.03.5.2

1 paket

JUMLAH
HARGA

JUMLAH

DIPERGUNAKAN

SATUAN
(Rp)
9

HARGA
(Rp)
10

PADA UNIT

###

11

29,480,000

DISNAKKAN

52,345,000
1,440,000
1,440,000
10,800,000
1,450,000
4,060,000
3,880,000
1,440,000
720,000
396,000
1,050,000
1,800,000
1,800,000
2,880,000
1,170,000
1,995,000
550,000
1,200,000
750,000
350,000
190,000
1,600,000
1,320,000
1,020,000
450,000
80,000
14,000
800,000
900,000
900,000

DISNAKKAN

F.1 Pemeliharaan Kesehatan dan Pencegahan Penyakit Menular Ternak


a
-

Belanja Bahan Obat-obatan Hewan dan Ikan


Vaksin ND
Vaksi SE
Vaksin Jembrana
Antivar 500gr
Ivomec 50ml
Monil
Bosalamine
Biosan TP 100 ml
Tridok LA
Vitamin A,D,E 50 ml, dll
Teramycin LA 100 ml
Pyroxy 50 ml
Pyroxy 100 ml
Vitamin B. Plek 50 ml
Vitamin B Plek 100 ml
Calcedik Plus 100 ml
Terramycin 10
Soanovil 50 ml
Sopaldin 50 ml
Flukecet 12,5%
Dovinil 50 ml
Vegantol E
Butox
Pota hormon 20 ml
Alkohol 70%
Aquadest 500 ml
Ovalomon 30 ml
Noroprost (PG2) 10 ml
Hematophan 50 ml

Tgl. 04 April 2011

001/SPK/DISNAKKAN/2011

Tgl. 03 Maret 2011 2.01.03.21.02.5.2


###
1,000
450
5
7
400
8
5
3
5
10
75
75
75
75
10
10
5
10
5
10
8
1
5
2
1
10
5
10

Dosis
144
Dosis
1,440
Dosis
24,000
Bungkus 290,000
Botol
580,000
Botol
9,700
Botol
180,000
Botol
144,000
Botol
132,000
Botol
210,000
Kotak
180,000
Botol
24,000
Botol
38,400
Botol
15,600
Botol
26,600
Botol
55,000
Botol
120,000
Botol
150,000
Botol
35,000
Botol
38,000
Botol
160,000
Botol
165,000
Liter
1,020,000
Botol
90,000
Liter
40,000
Botol
14,000
Botol
80,000
Botol
180,000
Botol
90,000

KET
12

NO
1
-

NAMA/JENIS
BARANG/JASA
2
Premium C Aquatic
San O2 Aquatic
Biovit
PK
Glukose

BIAYA UMUM
TERKAIT
PENGADAAN
BARANG/JASA
3

SPK/PERJANJIAN/KONTRAK

DPA/SP2D/KWITANSI

TANGGAL

NOMOR

TANGGAL

NOMOR

JUMLAH
HARGA
BANYAKNYA

SATUAN
(Rp)
8
9
50 Bungkus
39,000
50 Bungkus
12,000
50 Bungkus
21,000
1 Kg
2,000,000
1 Box
300,000

JUMLAH

DIPERGUNAKAN

HARGA
(Rp)
10
1,950,000
600,000
1,050,000
2,000,000
300,000

PADA UNIT

11,243,000
3,480,000
2,328,000
1,200,000
600,000
330,000
375,000
1,500,000
950,000
480,000

DISNAKKAN

11

F.2 Optimalisasi dan Revitalisasi Puskeswan


a
-

Belanja Bahan Obat-obatan ternak


Ivomec 50 ml
Munil
Biosalamin
Biosan TP 50 ml
Tridok LA 100 ml
Vitamin Oxy LA 50
Teramycin LA 100 ml
Pyroxy 50 ml
Pyroxy 100 ml

Tgl. 15 Nopember 2011


023/SPK-PETERNAKAN/NAKKAN/2011Tgl. 03 Maret 2011 2.01.03.21.09.5.2
6
240
8
5
3
5
10
50
15

Botol
Botol
Botol
Botol
Botol
Botol
Botol
Botol
Botol

TOTAL

580,000
9,700
150,000
120,000
110,000
75,000
150,000
19,000
32,000

###

Mengetahui :
Pengguna Anggaran

Rantau, 31 Desember 2011


Bendaharawan Barang

Ir. H. BASTIAN, MAP


NIP. 19630830 199403 1 011

MUSAHIR
NIP. 19691007 199402 1 003

KET
12

DANA ALOKASI KHUSUS (DAK) TRIWULAN I 2011


Provinsi
Kota / Kabupaten
SKPD
Bidang

: Kalimantan Selatan
: Tapin
: Dinas Peternakan dan Perikanan
:

Perencanaan Kegiatan
No

1
1

Jenis Kegiatan

Pelaksanaan Kegiatan
Jumlah

Satuan

Volume

Jumlah Penerima
Manfaat

DAK (Rp. Juta)

Pendamping (Rp.
Juta)
7

Swakelola Kontrak
Total Biaya (Rp. Juta) (Rp. Juta) (Rp. Juta)
8

10

Kesesuaian sasaran dan


lokasi dengan RKPD

Realisasi

Kesesuaian antara DPA-SKPD


dengan Petunjuk Teknis

Fisik (%)

Keuangan (%)

YA

TIDAK

YA

TIDAK

11

12

13a

13b

14a

14b

PENGEMBANGAN REHABILITASI
INFRASTRUKTUR PETERNAKAN
KABUPATEN TAPIN

A Pengadaan Alat-alat angkutan darat bermotor


sepeda motor
a. Pengadaan sepeda motor roda tiga

2 unit

30,000,000.00

27272728.00

2727272.00

30,000,000.00

B Pengadaan Alat-alat pengolahan pertanian dan


peternakan

a. Pengadaan peralatan klinik dan laboratorium


b. Pengadaan peralatan reproduksi
c. Pengadaan peralatan peternakan

1
1
1

Paket
Paket
Paket

200,000,000.00
100,000,000.00
88,140,000.00

181,818,182.00
90,909,091.00
80,127,273.00

18,181,818.00
9,090,909.00
8,012,727.00

200,000,000.00
100,000,000.00
88,140,000.00

Pengadaan Konstruksi/pembelian*) bangunan


a. Pembangunan/rehab puskeswan
b. Pembangunan rumah kompos
c. Pembangunan UPPO

1
1
1

Paket
Paket
Paket

280,000,000.00
150,000,000.00
40,000,000.00

254,545,455.00
136,363,636.00
36,363,636.00

25,454,545.00
13,636,364.00
3,636,364.00

280,000,000.00
150,000,000.00
40,000,000.00

15

Unit

330,000,000.00

300,000,000.00

30,000,000.00

330,000,000.00

5
5

buah
buah

200,000,000.00
21,900,000.00

181,818,180.00
19,900,000.00

18,181,820.00
2,000,000.00

200,000,000.00
21,900,000.00

BANTUAN SARANA PEMASARAN


BERGERAK BAGI PEDAGANG IKAN

A Pengadaan Sepeda Motor


a. Sepeda Motor Desain Khusus
3

PENGEMBANGAN SARANA DAN


PRASARANA PERIKANAN TANGKAP

A Belanja Bahan/Material
a. Pengandaan Perahu Kapal < 3 GT
b. Pengadaan alat penangkap ikan
4

PENGADAAN ALAT DAN SARANA


PENGOLAHAN IKAN

A Belanja bahan/material

Perencanaan Kegiatan
No

Jenis Kegiatan
Satuan

DAK (Rp. Juta)

Jumlah
Swakelola Kontrak
Pendamping (Rp.
Total Biaya (Rp. Juta) (Rp. Juta) (Rp. Juta)
Juta)
7
8
9
10
8,636,364.00
95,000,000.00
1,363,636.00
10,000,000.00
7,636,384.00
84,000,000.00
-

4
Paket
Paket
Unit

5
95,000,000.00
10,000,000.00
84,000,000.00

6
86,363,636.00
8,636,364.00
76,363,616.00

A Belanja Bahan/material
a. Pengadaan perahu motor penyuluhan

unit

120,000,000.00

109,090,910.00

10,909,090.00

120,000,000.00

B Pengadaan komputer
a. Pengadaan note book + Printer

paket

17,500,000.00

15,909,091.00

1,590,909.00

17,500,000.00

30

Unit

105,000,000.00

95,454,540.00

9,545,460.00

Unit

18,000,000.00

16,363,636.00

Paket

23,000,001.00

Unit

Unit

Kesesuaian sasaran dan


lokasi dengan RKPD

Realisasi

Fisik (%)

Keuangan (%)

11

12

YA

TIDAK

13a

Kesesuaian antara DPA-SKPD


dengan Petunjuk Teknis
YA

13b

TIDAK

14a

14b

105,000,000.00

1,636,364.00

18,000,000.00

20,909,092.00

2,090,909.00

23,000,001.00

15,000,000.00

13,636,364.00

1,363,636.00

15,000,000.00

2,500,000.00

2,272,727.00

227,273.00

2,500,000.00

4,545,450.00

50,000,000.00

PENYEDIAAN SARANA DAN PRASARANA


PENYULUHAN

PENGEMBANGAN KOLAM LAHAN


MARJINAL

A Belanja Bahan/material
a. Pembuatan kolam pada lahan marjinal
7

Jumlah Penerima
Manfaat

1
1
56

2
a. Pengadaan sarana pengolahan kerupuk
b. Pengadaan sarana pengering ikan
c. Pengadaan peralatan sistem rantai dingin

Volume

Pelaksanaan Kegiatan

PENYEDIAAN SARANA STATISTIK


KELAUTAN DAN PERIKANAN

A Pengadaan alat-alat angkutan darat bermotor


a. Pengadaan roda dua untuk operasional
petugas
B Pengadaan alat-alat pengolahan pertanian dan
peternakan
a. Peralatan statistik lainnya
C

Pengadaan komputer note book


a. Pengadaan note book

D Pengadaan printer
a. Pengadaan printer

53,181,819.00
8

PENGAWASAN DAN PENGENDALIAN


SUMBER DAYA KELAUTAN DAN
PERIKANAN

A Belanja bahan/material
a. Peralatan pengawasan lainnya
B Pengadaan alat-alat angkutan diatas air bermotor

25

Unit

50,000,000.00

45,454,550.00

Perencanaan Kegiatan
No

Jenis Kegiatan
Satuan

2
a. Pengadaan Speed boat pengawasan

Volume

Jumlah Penerima
Manfaat

DAK (Rp. Juta)

Pelaksanaan Kegiatan
Jumlah
Swakelola Kontrak
Pendamping (Rp.
Total Biaya (Rp. Juta) (Rp. Juta) (Rp. Juta)
Juta)
7
8
9
10
15,455,446.00
170,000,900.00
-

4
Unit

5
170,000,900.00

6
154,545,454.00

1
1
1
1
1
1

paket
paket
paket
paket
paket
paket

73,755,000.00
10,400,000.00
181,300,000.00
200,000,000.00
50,800,000.00
55,000,000.00

67,050,000.00
9,454,545.00
164,818,182.00
181,818,182.00
46,181,818.00
50,000,000.00

6,705,000.00
945,455.00
16,481,818.00
18,181,818.00
4,618,182.00
5,000,000.00

73,755,000.00
10,400,000.00
181,300,000.00
200,000,000.00
50,800,000.00
55,000,000.00

968,000,000.00

880,000,000.00

88,000,000.00

968,000,000.00

3,689,295,901.00

3,406,622,707.00

335,855,013.00

3,689,295,901.00

3,520,217,501.00
3,689,295,901.00
3,862,477,720.00

1,691,268,182.00
3,515,713,007.00

163,809,537.00
346,764,713.00

Kesesuaian sasaran dan


lokasi dengan RKPD

Realisasi

Fisik (%)

Keuangan (%)

11

12

YA

TIDAK

13a

Kesesuaian antara DPA-SKPD


dengan Petunjuk Teknis
YA

13b

TIDAK

14a

14b

PEMBANGUNAN SARANA DAN


PRASARANA FISIK BBI LINUH

A Pengadaan konstruksi bangunan lainnya


a. Pembangunan kolam permanen
b. Pembangunan saluran pembuangan
c. Pembangunan bangsal packing benih
d. Rehab pagar lingkungan
e. Pengaspalan jalan lingkungan BBI
f. Pengadaan peralatan dan sarana BBI
10 PEMBANGUNAN SARANA DAN
PRASARANA FISIK PENGEMBANGAN
KAWASAN BUDIDAYA AIR TAWAR
A Belanja bahan/material
a. Pembangunan KJA

44 unit

TOTAL

169078400
153706984
15371416

Mengetahui,
Kepala Dinas Peternakan dan Perika

Ir. H. Bastian, M.AP


NIP. 19630830 199403 1 011

Kodefikasi
Masalah

Ket

Kodefikasi
Masalah

Ket

Kodefikasi
Masalah

eternakan dan Perikanan,

Bastian, M.AP
0830 199403 1 011

Ket

DANA ALOKASI KHUSUS (DAK) TRIWULAN I 2011


Provinsi
Kota / Kabupaten
SKPD
Bidang

: Kalimantan Selatan
: Tapin
: Dinas Peternakan dan Perikanan
:

Perencanaan Kegiatan
No

1
2

Jenis Kegiatan

Satuan

Volume

Jumlah Penerima
Manfaat

Pelaksanaan Kegiatan
Jumlah

DAK (Rp. Juta)


6

Pendamping (Rp.
Juta)
7

Swakelola Kontrak
Total Biaya (Rp. Juta) (Rp. Juta) (Rp. Juta)
8

10

Kesesuaian sasaran dan


lokasi dengan RKPD

Realisasi

Kesesuaian antara DPA-SKPD


dengan Petunjuk Teknis

Fisik (%)

Keuangan
(%)

YA

TIDAK

YA

TIDAK

11

12

13a

13b

14a

14b

BANTUAN SARANA PEMASARAN


BERGERAK BAGI PEDAGANG IKAN

A Pengadaan Sepeda Motor


a. Sepeda Motor Desain Khusus

15

Unit

330,000,000.00

300,000,000.00

30,000,000.00

330,000,000.00

5
5

buah
buah

200,000,000.00
21,900,000.00

181,818,180.00
19,900,000.00

18,181,820.00
2,000,000.00

200,000,000.00
21,900,000.00

1
1
56

Paket
Paket
Unit

95,000,000.00
10,000,000.00
84,000,000.00

86,363,636.00
8,636,364.00
76,363,616.00

8,636,364.00
1,363,636.00
7,636,384.00

95,000,000.00
10,000,000.00
84,000,000.00

A Belanja Bahan/material
a. Pengadaan perahu motor penyuluhan

unit

120,000,000.00

109,090,910.00

10,909,090.00

120,000,000.00

B Pengadaan komputer
a. Pengadaan note book + Printer

paket

17,500,000.00

15,909,091.00

1,590,909.00

17,500,000.00

30

Unit

105,000,000.00

95,454,540.00

9,545,460.00

105,000,000.00

PENGEMBANGAN SARANA DAN


PRASARANA PERIKANAN TANGKAP

A Belanja Bahan/Material
a. Pengandaan Perahu Kapal < 3 GT
b. Pengadaan alat penangkap ikan
4

PENGADAAN ALAT DAN SARANA


PENGOLAHAN IKAN

A Belanja bahan/material
a. Pengadaan sarana pengolahan kerupuk
b. Pengadaan sarana pengering ikan
c. Pengadaan peralatan sistem rantai dingin
5

PENYEDIAAN SARANA DAN


PRASARANA PENYULUHAN

PENGEMBANGAN KOLAM LAHAN


MARJINAL

A Belanja Bahan/material
a. Pembuatan kolam pada lahan marjinal

Kodefikasi
Masalah

Ket

Perencanaan Kegiatan
No

Jenis Kegiatan

1
7

Satuan

Volume

Jumlah Penerima
Manfaat

Pelaksanaan Kegiatan
Jumlah

DAK (Rp. Juta)


6

Pendamping (Rp.
Juta)
7

Swakelola Kontrak
Total Biaya (Rp. Juta) (Rp. Juta) (Rp. Juta)
8

10

Kesesuaian sasaran dan


lokasi dengan RKPD

Realisasi

Kesesuaian antara DPA-SKPD


dengan Petunjuk Teknis

Fisik (%)

Keuangan
(%)

YA

TIDAK

YA

TIDAK

11

12

13a

13b

14a

14b

PENYEDIAAN SARANA STATISTIK


KELAUTAN DAN PERIKANAN

A Pengadaan alat-alat angkutan darat bermotor


a. Pengadaan roda dua untuk operasional
petugas

Unit

18,000,000.00

16,363,636.00

1,636,364.00

18,000,000.00

Paket

23,000,001.00

20,909,092.00

2,090,909.00

23,000,001.00

Unit

15,000,000.00

13,636,364.00

1,363,636.00

15,000,000.00

Unit

2,500,000.00

2,272,727.00

227,273.00

2,500,000.00

25

Unit

50,000,000.00

45,454,550.00

4,545,450.00

50,000,000.00

B Pengadaan alat-alat angkutan diatas air bermotor


a. Pengadaan Speed boat pengawasan
2

Unit

170,000,900.00

154,545,454.00

15,455,446.00

170,000,900.00

paket
paket
paket
paket
paket
paket

73,755,000.00
10,400,000.00
157,379,556.00
176,079,557.00
50,800,000.00
55,000,000.00
468,414,113.00

67,050,000.00
9,454,545.00
140,897,738.00
157,897,739.00
46,181,818.00
50,000,000.00

6,705,000.00
945,455.00
16,481,818.00
18,181,818.00
4,618,182.00
5,000,000.00

73,755,000.00
10,400,000.00
157,379,556.00
176,079,557.00
50,800,000.00
55,000,000.00

968,000,000.00

880,000,000.00

88,000,000.00

968,000,000.00

B Pengadaan alat-alat pengolahan pertanian


dan peternakan
a. Peralatan statistik lainnya
C

Pengadaan komputer note book


a. Pengadaan note book

D Pengadaan printer
a. Pengadaan printer

PENGAWASAN DAN PENGENDALIAN


SUMBER DAYA KELAUTAN DAN
PERIKANAN

A Belanja bahan/material
a. Peralatan pengawasan lainnya

PEMBANGUNAN SARANA DAN


PRASARANA FISIK BBI LINUH

A Pengadaan konstruksi bangunan lainnya


a. Pembangunan kolam permanen
b. Pembangunan saluran pembuangan
c. Pembangunan bangsal packing benih
d. Rehab pagar lingkungan
e. Pengaspalan jalan lingkungan BBI
f. Pengadaan peralatan dan sarana BBI

1
1
1
1
1
1

10 PEMBANGUNAN SARANA DAN


PRASARANA FISIK PENGEMBANGAN
KAWASAN BUDIDAYA AIR TAWAR
A Belanja bahan/material
a. Pembangunan KJA

44 unit

Kodefikasi
Masalah

Ket

Perencanaan Kegiatan
No

Jenis Kegiatan

2
TOTAL

Satuan

Volume

Jumlah Penerima
Manfaat

5
3,221,729,127.00

Pelaksanaan Kegiatan
Jumlah

DAK (Rp. Juta)


6
2,498,200,000.00

Pendamping (Rp.
Juta)
7
255,115,014.00

Swakelola Kontrak
Total Biaya (Rp. Juta) (Rp. Juta) (Rp. Juta)
8
2,753,315,014.00

10
-

Kesesuaian sasaran dan


lokasi dengan RKPD

Realisasi

Kesesuaian antara DPA-SKPD


dengan Petunjuk Teknis

Fisik (%)

Keuangan
(%)

YA

TIDAK

YA

TIDAK

11

12

13a

13b

14a

14b

Kodefikasi
Masalah

Ket

DANA ALOKASI KHUSUS (DAK) TRIWULAN II 2011


Provinsi
Kota / Kabupaten
SKPD
Bidang

: Kalimantan Selatan
: Tapin
: Dinas Peternakan dan Perikanan
:

Perencanaan Kegiatan
No

1
1

Jenis Kegiatan

Satuan

Volume

Jumlah
Penerima
Manfaat
5

Pelaksanaan Kegiatan
Jumlah

DAK (Rp.
Juta)
6

Pendamping
(Rp. Juta)
7

Swakelola
Total Biaya
(Rp. Juta)
(Rp. Juta)
8
9

Kontrak
(Rp. Juta)
10

Kesesuaian sasaran dan


lokasi dengan RKPD

Realisasi

Kesesuaian antara DPA-SKPD


dengan Petunjuk Teknis

Fisik (%)

Keuangan
(%)

YA

TIDAK

YA

TIDAK

11

12

13a

13b

14a

14b

PENGEMBANGAN REHABILITASI
INFRASTRUKTUR PETERNAKAN
KABUPATEN TAPIN

A Pengadaan Alat-alat angkutan darat bermotor


sepeda motor
a. Pengadaan sepeda motor roda tiga

2 unit

30.00

27.27

2.73

30.00

B Pengadaan Alat-alat pengolahan pertanian dan


peternakan

a. Pengadaan peralatan klinik dan laboratorium


b. Pengadaan peralatan reproduksi
c. Pengadaan peralatan peternakan

1
1
1

Paket
Paket
Paket

200.00
100.00
88.14

181.82
90.91
80.13

18.18
9.09
8.01

200.00
100.00
88.14

Pengadaan Konstruksi/pembelian*) bangunan


a. Pembangunan/rehab puskeswan
b. Pembangunan rumah kompos
c. Pembangunan UPPO

1
1
1

Paket
Paket
Paket

280.00
150.00
40.00

254.55
136.36
36.36

25.45
13.64
3.64

280.00
150.00
40.00

15

Unit

330.00

300.00

30.00

330.00

buah

221.90

201.72

20.18

221.90

104.43

100.00

47.06

BANTUAN SARANA PEMASARAN


BERGERAK BAGI PEDAGANG IKAN

A Pengadaan Sepeda Motor


a. Sepeda Motor Desain Khusus
3

PENGEMBANGAN SARANA DAN


PRASARANA PERIKANAN TANGKAP

A Belanja Bahan/Material
a. Pengadaan Perahu Kapal < 3 GT dan alat
penangkap ikan
4

PENGADAAN ALAT DAN SARANA


PENGOLAHAN IKAN

A Belanja bahan/material

Kodefikasi
Masalah

Ket

Perencanaan Kegiatan
No

Jenis Kegiatan

Pelaksanaan Kegiatan
Jumlah

1
1
56

4
Paket
Paket
Unit

Jumlah
Penerima
Manfaat
5
95.00
10.00
84.00

A Belanja Bahan/material
a. Pengadaan perahu motor penyuluhan

unit

120.00

109.09

10.91

120.00

B Pengadaan komputer
a. Pengadaan note book + Printer

paket

17.50

15.91

1.59

30

Unit

105.00

95.45

Unit

18.00

Paket

Satuan
1

2
a. Pengadaan sarana pengolahan kerupuk
b. Pengadaan sarana pengering ikan
c. Pengadaan peralatan sistem rantai dingin

DAK (Rp.
Juta)
6
86.36
8.64
76.36

Pendamping
(Rp. Juta)
7
8.64
1.36
7.64

Kontrak
(Rp. Juta)
10

Fisik (%)

Keuangan
(%)

YA

11

12

13a

TIDAK

Kesesuaian antara DPA-SKPD


dengan Petunjuk Teknis
YA

13b

TIDAK

14a

14b

17.50

17.50

100.00

100.00

9.55

105.00

16.36

1.64

18.00

17.90

100.00

99.44

23.00

20.91

2.09

23.00

22.99

100.00

99.96

Unit

15.00

13.64

1.36

15.00

14.94

100.00

99.57

Unit

2.50

2.27

0.23

2.50

2.48

100.00

99.00

25

Unit

50.00

45.45

4.55

50.00

PENYEDIAAN SARANA DAN PRASARANA


PENYULUHAN

PENGEMBANGAN KOLAM LAHAN


MARJINAL

A Belanja Bahan/material
a. Pembuatan kolam pada lahan marjinal
7

Volume

Swakelola
Total Biaya
(Rp. Juta)
(Rp. Juta)
8
9
95.00
10.00
84.00
-

Kesesuaian sasaran dan


lokasi dengan RKPD

Realisasi

PENYEDIAAN SARANA STATISTIK


KELAUTAN DAN PERIKANAN

A Pengadaan alat-alat angkutan darat bermotor


a. Pengadaan roda dua untuk operasional
petugas
B Pengadaan alat-alat pengolahan pertanian dan
peternakan
a. Peralatan statistik lainnya
C

Pengadaan komputer note book


a. Pengadaan note book

D Pengadaan printer
a. Pengadaan printer

PENGAWASAN DAN PENGENDALIAN


SUMBER DAYA KELAUTAN DAN
PERIKANAN

A Belanja bahan/material
a. Peralatan pengawasan lainnya
B Pengadaan alat-alat angkutan diatas air bermotor

Kodefikasi
Masalah

Ket

Perencanaan Kegiatan
No

Jenis Kegiatan

2
a. Pengadaan Speed boat pengawasan

Jumlah

4
Unit

1
1
1
1
1
1

paket
paket
paket
paket
paket
paket

73.76
10.40
181.30
200.00
50.80
55.00

67.05
9.45
164.82
181.82
46.18
50.00

6.71
0.95
16.48
18.18
4.62
5.00

73.76
10.40
181.30
200.00
50.80
55.00

968.00

880.00

88.00

968.00

3,689.30

3,353.44

335.86

3,689.30

345.83

Volume

DAK (Rp.
Juta)
6
154.55

Pendamping
(Rp. Juta)
7
15.46

Swakelola
Total Biaya
(Rp. Juta)
(Rp. Juta)
8
9
170.00
-

Kesesuaian sasaran dan


lokasi dengan RKPD

Realisasi

Jumlah
Penerima
Manfaat
5
170.00

Satuan
1

Pelaksanaan Kegiatan
Kontrak
(Rp. Juta)

Fisik (%)

Keuangan
(%)

10
165.60

11
100.00

12
97.41

YA

TIDAK

13a

Kesesuaian antara DPA-SKPD


dengan Petunjuk Teknis
YA

13b

TIDAK

14a

Kodefikasi
Masalah

14b

9.37

9.37

PEMBANGUNAN SARANA DAN


PRASARANA FISIK BBI LINUH

A Pengadaan konstruksi bangunan lainnya


a. Pembangunan kolam permanen
b. Pembangunan saluran pembuangan
c. Pembangunan bangsal packing benih
d. Rehab pagar lingkungan
e. Pengaspalan jalan lingkungan BBI
f. Pengadaan peralatan dan sarana BBI
10 PEMBANGUNAN SARANA DAN
PRASARANA FISIK PENGEMBANGAN
KAWASAN BUDIDAYA AIR TAWAR
A Belanja bahan/material
a. Pembangunan KJA
TOTAL

44 unit

Mengetahui,
Kepala Dinas Peternakan dan Perikanan,

Ir. H. Bastian, M.AP


NIP. 19630830 199403 1 011

Ket

DANA ALOKASI KHUSUS (DAK) TRIWULAN III 2011


Provinsi
Kota / Kabupaten
SKPD
Bidang

: Kalimantan Selatan
: Tapin
: Dinas Peternakan dan Perikanan
:

Perencanaan Kegiatan
No

1
1

Jenis Kegiatan

Satuan

Volume

Jumlah
Penerima
Manfaat
5

Pelaksanaan Kegiatan
Jumlah

DAK (Rp.
Juta)
6

Pendamping
(Rp. Juta)
7

Swakelola
Total Biaya
(Rp. Juta)
(Rp. Juta)
8
9

Kontrak
(Rp. Juta)
10

Kesesuaian sasaran dan


lokasi dengan RKPD

Realisasi

Kesesuaian antara DPA-SKPD


dengan Petunjuk Teknis

Fisik (%)

Keuangan
(%)

YA

TIDAK

YA

TIDAK

11

12

13a

13b

14a

14b

PENGEMBANGAN REHABILITASI
INFRASTRUKTUR PETERNAKAN
KABUPATEN TAPIN

A Pengadaan Alat-alat angkutan darat bermotor


sepeda motor
a. Pengadaan sepeda motor roda tiga

2 unit

30.00

27.27

2.73

30.00

B Pengadaan Alat-alat pengolahan pertanian dan


peternakan

a. Pengadaan peralatan klinik dan laboratorium


b. Pengadaan peralatan reproduksi
c. Pengadaan peralatan peternakan

1
1
1

Paket
Paket
Paket

200.00
100.00
88.14

181.82
90.91
80.13

18.18
9.09
8.01

200.00
100.00
88.14

197.05
99.00
87.47

100.00
100.00
100.00

98.52
99.00
99.24

Pengadaan Konstruksi/pembelian*) bangunan


a. Pembangunan/rehab puskeswan
b. Pembangunan rumah kompos
c. Pembangunan UPPO

1
1
1

Paket
Paket
Paket

280.00
150.00
40.00

254.55
136.36
36.36

25.45
13.64
3.64

280.00
150.00
40.00

11.10
148.07
39.98

30.00
-

3.96
30.00
99.94

15

Unit

330.00

300.00

30.00

330.00

buah

221.90

201.72

20.18

221.90

104.43

100.00

47.06

BANTUAN SARANA PEMASARAN


BERGERAK BAGI PEDAGANG IKAN

A Pengadaan Sepeda Motor


a. Sepeda Motor Desain Khusus
3

PENGEMBANGAN SARANA DAN


PRASARANA PERIKANAN TANGKAP

A Belanja Bahan/Material
a. Pengadaan Perahu Kapal < 3 GT dan alat
penangkap ikan
4

PENGADAAN ALAT DAN SARANA


PENGOLAHAN IKAN

A Belanja bahan/material

Kodefikasi
Masalah

Ket

Perencanaan Kegiatan
No

Jenis Kegiatan

Pelaksanaan Kegiatan
Jumlah

1
1
56

4
Paket
Paket
Unit

Jumlah
Penerima
Manfaat
5
95.00
10.00
84.00

A Belanja Bahan/material
a. Pengadaan perahu motor penyuluhan

unit

120.00

109.09

10.91

120.00

B Pengadaan komputer
a. Pengadaan note book + Printer

paket

17.50

15.91

1.59

30

Unit

105.00

95.45

Unit

18.00

Paket

Satuan
1

2
a. Pengadaan sarana pengolahan kerupuk
b. Pengadaan sarana pengering ikan
c. Pengadaan peralatan sistem rantai dingin

DAK (Rp.
Juta)
6
86.36
8.64
76.36

Pendamping
(Rp. Juta)
7
8.64
1.36
7.64

Kontrak
(Rp. Juta)
10

Fisik (%)

Keuangan
(%)

YA

11

12

13a

TIDAK

Kesesuaian antara DPA-SKPD


dengan Petunjuk Teknis
YA

13b

TIDAK

14a

14b

70.00

100.00

83.33

17.50

17.50

100.00

100.00

9.55

105.00

100.00

16.36

1.64

18.00

17.90

100.00

99.44

23.00

20.91

2.09

23.00

22.99

100.00

99.96

Unit

15.00

13.64

1.36

15.00

14.94

100.00

99.57

Unit

2.50

2.27

0.23

2.50

2.48

100.00

99.00

25

Unit

50.00

45.45

4.55

50.00

49.50

100.00

99.00

PENYEDIAAN SARANA DAN PRASARANA


PENYULUHAN

PENGEMBANGAN KOLAM LAHAN


MARJINAL

A Belanja Bahan/material
a. Pembuatan kolam pada lahan marjinal
7

Volume

Swakelola
Total Biaya
(Rp. Juta)
(Rp. Juta)
8
9
95.00
10.00
84.00
-

Kesesuaian sasaran dan


lokasi dengan RKPD

Realisasi

PENYEDIAAN SARANA STATISTIK


KELAUTAN DAN PERIKANAN

A Pengadaan alat-alat angkutan darat bermotor


a. Pengadaan roda dua untuk operasional
petugas
B Pengadaan alat-alat pengolahan pertanian dan
peternakan
a. Peralatan statistik lainnya
C

Pengadaan komputer note book


a. Pengadaan note book

D Pengadaan printer
a. Pengadaan printer

PENGAWASAN DAN PENGENDALIAN


SUMBER DAYA KELAUTAN DAN
PERIKANAN

A Belanja bahan/material
a. Peralatan pengawasan lainnya
B Pengadaan alat-alat angkutan diatas air bermotor

Kodefikasi
Masalah

Ket

Perencanaan Kegiatan
No

Jenis Kegiatan

2
a. Pengadaan Speed boat pengawasan

Jumlah

4
Unit

1
1
1
1
1
1

paket
paket
paket
paket
paket
paket

73.76
10.40
181.30
200.00
50.80
55.00

67.05
9.45
164.82
181.82
46.18
50.00

6.71
0.95
16.48
18.18
4.62
5.00

73.76
10.40
181.30
200.00
50.80
55.00

968.00

880.00

88.00

968.00

3,689.30

3,353.44

335.86

3,689.30

850.94

3,569.30

3,244.35
3,398.06

324.95
340.32

Volume

DAK (Rp.
Juta)
6
154.55

Pendamping
(Rp. Juta)
7
15.46

Swakelola
Total Biaya
(Rp. Juta)
(Rp. Juta)
8
9
170.00
-

Kesesuaian sasaran dan


lokasi dengan RKPD

Realisasi

Jumlah
Penerima
Manfaat
5
170.00

Satuan
1

Pelaksanaan Kegiatan
Kontrak
(Rp. Juta)

Fisik (%)

Keuangan
(%)

10
165.60

11
100.00

12
97.41

YA

TIDAK

13a

Kesesuaian antara DPA-SKPD


dengan Petunjuk Teknis
YA

13b

TIDAK

14a

Kodefikasi
Masalah

14b

23.07

23.07

PEMBANGUNAN SARANA DAN


PRASARANA FISIK BBI LINUH

A Pengadaan konstruksi bangunan lainnya


a. Pembangunan kolam permanen
b. Pembangunan saluran pembuangan
c. Pembangunan bangsal packing benih
d. Rehab pagar lingkungan
e. Pengaspalan jalan lingkungan BBI
f. Pengadaan peralatan dan sarana BBI
10 PEMBANGUNAN SARANA DAN
PRASARANA FISIK PENGEMBANGAN
KAWASAN BUDIDAYA AIR TAWAR
A Belanja bahan/material
a. Pembangunan KJA

44 unit

TOTAL

169078400
153707636.363636
15370763.6363636
153.7076363636
15.3707636364

Mengetahui,
Kepala Dinas Peternakan dan Perikanan,

Ir. H. Bastian, M.AP


NIP. 19630830 199403 1 011

Ket

DANA ALOKASI KHUSUS (DAK) TRIWULAN IV 2011


Provinsi
: Kalimantan Selatan
Kota / Kabupaten : Tapin
SKPD
: Dinas Peternakan dan Perikanan
Bidang

96248345
10534380

56961273
46077454

9629085
1059190

5696127
4607746

106782725 103038727 10688275


117471000 113342600 4,128,400

10303873

Perencanaan Kegiatan
No

1
1

Jenis Kegiatan

Satuan

Volume

Jumlah
Penerima
Manfaat
5

Pelaksanaan Kegiatan
Jumlah

DAK (Rp.
Juta)
6

9493545

Pendamping
(Rp. Juta)
7

Total Biaya
(Rp. Juta)
8

Swakelola Kontrak (Rp.


(Rp. Juta)
Juta)
9

10

85569835
9365620

8552735
940810

56961273
151896728

5696127
15189672
Kesesuaian sasaran dan
lokasi dengan RKPD

Realisasi

Kesesuaian antara DPA-SKPD


dengan Petunjuk Teknis

Fisik (%)

Keuangan
(%)

YA

TIDAK

YA

TIDAK

11

12

13a

13b

14a

14b

Kodefikasi
Masalah

Ket

PENGEMBANGAN REHABILITASI
INFRASTRUKTUR PETERNAKAN
KABUPATEN TAPIN

A Pengadaan Alat-alat angkutan darat bermotor


sepeda motor
a. Pengadaan sepeda motor roda tiga

1 unit

30.00

27.27

2.73

30.00

29.80

100.00

99.33

Adanya perubahan
jumlah pembelian
unit barang, yang
semula 2 unit
menjadi 1 unit

B Pengadaan Alat-alat pengolahan pertanian dan


peternakan
a. Pengadaan peralatan klinik dan laboratorium
b. Pengadaan peralatan reproduksi
c. Pengadaan peralatan peternakan
C

1
1
1

Paket
Paket
Paket

200.00
100.00
88.14

181.82
90.91
80.13

18.18
9.09
8.01

200.00
100.00
88.14

197.05
99.00
87.47

100.00
100.00
100.00

98.52
99.00
99.24

V
V
V

V
V
V

1
1
1

Paket
Paket
Paket

280.00
150.00
40.00

254.55
136.36
36.36

25.45
13.64
3.64

280.00
150.00
40.00

275.95
148.07
39.98

100.00
100.00
100.00

98.55
98.71
99.94

V
V
V

V
V
V

15

Unit

305.25

277.50

27.75

305.25

305.25

100.00

100.00

Pengadaan Konstruksi/pembelian*) bangunan


a. Pembangunan/rehab puskeswan
b. Pembangunan rumah kompos
c. Pembangunan UPPO
-

BANTUAN SARANA PEMASARAN


BERGERAK BAGI PEDAGANG IKAN

A Pengadaan Sepeda Motor


a. Sepeda Motor Desain Khusus

PENGEMBANGAN SARANA DAN


PRASARANA PERIKANAN TANGKAP

Dana Dialihkan ke
Kegiatan
Penyediaan Sarana
Statistik Kelautan
dan Perikanan
sebesar Rp.
24.750.000,-

Perencanaan Kegiatan
No

Jenis Kegiatan

Satuan

Volume

Jumlah
Penerima
Manfaat
5

Pelaksanaan Kegiatan
Jumlah

DAK (Rp.
Juta)
6

Pendamping
(Rp. Juta)
7

Total Biaya
(Rp. Juta)
8

Swakelola Kontrak (Rp.


(Rp. Juta)
Juta)
9

Kesesuaian sasaran dan


lokasi dengan RKPD

Realisasi

Kesesuaian antara DPA-SKPD


dengan Petunjuk Teknis

Fisik (%)

Keuangan
(%)

YA

TIDAK

YA

TIDAK

10

11

12

13a

13b

14a

14b

Kodefikasi
Masalah

Ket

A Belanja Bahan/Material

a. Pengadaan Perahu Kapal < 3 GT dan alat


penangkap ikan

paket

104.43

94.94

9.49

104.43

104.43

100.00

100.00

b. Pengadaan Perahu dan alat tangkap ikan

buah

62.66

56.96

5.70

62.66

62.45

100.00

99.66

b. Alat Penangkap Ikan

paket

50.69

46.08

4.61

50.69

50.53

100.00

99.70

a. Pengadaan sarana pengolahan kerupuk

Paket

90.00

81.82

8.18

90.00

89.70

100.00

99.67

b. Pengadaan sarana pengering ikan

Paket

9.80

8.64

1.16

9.80

9.80

100.00

100.00

56

Unit

70.00

63.64

6.36

70.00

70.00

100.00

100.00

unit

120.00

109.09

10.91

120.00

paket

17.50

15.91

1.59

17.50

17.50

100.00

100.00

30

Unit

105.00

95.45

9.55

105.00

102.44

100.00

97.56

Dana Dialihkan Ke
Kegiatan
Penyediaan Sarana
Statistik Kelautan
dan Perikanan
sebesar Rp.
4.128.400

PENGADAAN ALAT DAN SARANA


PENGOLAHAN IKAN

A Belanja bahan/material

c. Pengadaan peralatan sistem rantai dingin


5

Dana Dialihkan Ke
Kegiatan
Penyediaan Sarana
Statistik Kelautan
dan Perikanan
sebesar Rp.
19.200.000,-

PENYEDIAAN SARANA DAN PRASARANA


PENYULUHAN

A Belanja Bahan/material
a. Pengadaan perahu motor penyuluhan

B Pengadaan komputer
a. Pengadaan note book + Printer
6

PENGEMBANGAN KOLAM LAHAN


MARJINAL

A Belanja Bahan/material
a. Pembuatan kolam pada lahan marjinal

Dana Dialihkan Ke
Kegiatan
Penyediaan Sarana
Statistik Kelautan
dan Perikanan
sebesar Rp.
120.000.000,-

Perencanaan Kegiatan
No

Jenis Kegiatan

1
7

Satuan

Volume

Jumlah
Penerima
Manfaat
5

Pelaksanaan Kegiatan
Jumlah

DAK (Rp.
Juta)
6

Pendamping
(Rp. Juta)
7

Total Biaya
(Rp. Juta)
8

Swakelola Kontrak (Rp.


(Rp. Juta)
Juta)
9

10

Kesesuaian sasaran dan


lokasi dengan RKPD

Realisasi

Kesesuaian antara DPA-SKPD


dengan Petunjuk Teknis

Fisik (%)

Keuangan
(%)

YA

TIDAK

YA

TIDAK

11

12

13a

13b

14a

14b

Kodefikasi
Masalah

Ket

PENYEDIAAN SARANA STATISTIK


KELAUTAN DAN PERIKANAN

A Pengadaan alat-alat angkutan darat bermotor


a. Pengadaan roda dua untuk operasional
petugas

Unit

18.00

16.36

1.64

18.00

17.90

100.00

99.44

b. Pengadaan roda dua untuk operasional


petugas

Unit

110.00

100.00

10.00

110.00

108.06

100.00

98.24

a. Peralatan statistik lainnya


b. Peralatan statistik

1
1

Paket
Paket

23.00
5.08

20.91
4.62

2.09
0.46

23.00
5.08

22.99
5.00

100.00
100.00

99.96
98.46

V
V

V
V

Pengadaan komputer note book


a. Pengadaan note book

Unit

15.00

13.64

1.36

15.00

14.94

100.00

99.57

b. Pengadaan Komputer PC

Unit

10.00

9.09

0.91

10.00

10.00

100.00

100.00

c. Pengadaan Laptop

Unit

30.00

27.27

2.73

30.00

29.60

100.00

98.67

a. Pengadaan printer

Unit

2.50

2.27

0.23

2.50

2.48

100.00

99.00

b. Pengadaan printer

Unit

9.00

8.18

0.82

9.00

8.85

100.00

98.33

c. Pengadaan printer portable

Unit

5.00

4.55

0.45

5.00

5.00

100.00

100.00

25

Unit

50.00

45.45

4.55

50.00

49.50

100.00

99.00

Unit

170.00

154.55

15.46

170.00

165.60

100.00

97.41

B Pengadaan alat-alat pengolahan pertanian dan


peternakan

D Pengadaan printer

PENGAWASAN DAN PENGENDALIAN


SUMBER DAYA KELAUTAN DAN
PERIKANAN

A Belanja bahan/material
a. Peralatan pengawasan lainnya
B Pengadaan alat-alat angkutan diatas air bermotor
a. Pengadaan Speed boat pengawasan
9

PEMBANGUNAN SARANA DAN


PRASARANA FISIK BBI LINUH

A Pengadaan konstruksi bangunan lainnya

Dana Berasal dari:


- Kegiatan bantuan
sarana bergerak
sebesar Rp.
24.750.000,- Kegiatan
Perikanan Tangkap
sebesar Rp.
4.128.400,- Kegiatan Alat dan
Sarana Pengolahan
Ikan sebesar Rp.
19.200.000,- Kegiatan Sarana
Penyuluhan sebesar
Rp. 120.000.000,- Kegiatan
Pembangunan
Sarana dan
Prasarana fisik
Pengembangan
Kawasan BAT
Sebesar Rp.
1.000.000,-

Perencanaan Kegiatan
No

Jenis Kegiatan

2
a. Pembangunan kolam permanen
b. Pembangunan saluran pembuangan
c. Pembangunan bangsal packing benih
d. Rehab pagar lingkungan
e. Pengaspalan jalan lingkungan BBI
f. Pengadaan peralatan dan sarana BBI

Jumlah

Kesesuaian sasaran dan


lokasi dengan RKPD

Realisasi

4
paket

Jumlah
Penerima
Manfaat
5
73.76

1
1
1
1
1

paket
paket
paket
paket
paket

10.40
181.30
200.00
50.80
55.00

9.45
164.82
181.82
46.18
50.00

0.95
16.48
18.18
4.62
5.00

10.40
181.30
200.00
50.80
55.00

967.00

878.90

88.10

967.00

957.56

100.00

99.02

3,809.30

3,462.53

346.76

3,809.30

3,637.46

100.00

95.49

Satuan
1

Pelaksanaan Kegiatan

Volume

DAK (Rp.
Pendamping
Juta)
(Rp. Juta)
6
7
67.05
6.71

Total Biaya
(Rp. Juta)
8
73.76

Swakelola Kontrak (Rp.


(Rp. Juta)
Juta)
9

Kesesuaian antara DPA-SKPD


dengan Petunjuk Teknis

Fisik (%)

Keuangan
(%)

YA

TIDAK

YA

TIDAK

10

11

12

13a

13b

14a

14b

499.83

100.00

96.82

50.75

100.00

92.27

Kodefikasi
Masalah

Ket

10 PEMBANGUNAN SARANA DAN


PRASARANA FISIK PENGEMBANGAN
KAWASAN BUDIDAYA AIR TAWAR
A Belanja bahan/material
a. Pembangunan KJA

TOTAL

Note : Penambahan sebesar Rp. 1.000.000,dari dana pendamping DAK

44 unit

3,689.30
1000000

3,353.44
(0.00)
(610.00)

335.86
0.00
610.00

Dana Dialihkan Ke
Kegiatan
Penyediaan Sarana
Statistik Kelautan
dan Perikanan
sebesar Rp.
1.000.000,-

Mengetahui,
Kepala Dinas Peternakan dan Perikanan,
88.10

Ir. H. Bastian, M.AP


NIP. 19630830 199403 1 011

DANA ALOKASI KHUSUS (DAK) TRIWULAN IV 2011


Provinsi
: Kalimantan Selatan
Kota / Kabupaten : Tapin
SKPD
: Dinas Peternakan dan Perikanan
Bidang

96248345
10534380

56961273
46077454

9629085
1059190

5696127
4607746

106782725 103038727 10688275


117471000 113342600 4,128,400

10303873

Perencanaan Kegiatan
No

1
1

Jenis Kegiatan

Satuan

Volume

Jumlah
Penerima
Manfaat
5

Pelaksanaan Kegiatan
Jumlah

DAK (Rp.
Juta)
6

9493545

Pendamping
(Rp. Juta)
7

Total Biaya
(Rp. Juta)
8

Swakelola Kontrak (Rp.


(Rp. Juta)
Juta)
9

85569835
9365620

8552735
940810

56961273
151896728

5696127
15189672
Kesesuaian sasaran dan
lokasi dengan RKPD

Realisasi

Kesesuaian antara DPA-SKPD


dengan Petunjuk Teknis

Fisik (%)

Keuangan
(%)

YA

TIDAK

YA

TIDAK

10

11

12

13a

13b

14a

14b

Kodefikasi
Masalah

Ket

BANTUAN SARANA PEMASARAN


BERGERAK BAGI PEDAGANG IKAN

A Pengadaan Sepeda Motor


a. Sepeda Motor Desain Khusus

15

Unit

305.25

277.50

27.75

305.25

305.25

100.00

100.00

a. Pengadaan Perahu Kapal < 3 GT dan alat


penangkap ikan

paket

104.43

94.94

9.49

104.43

104.43

100.00

100.00

b. Pengadaan Perahu dan alat tangkap ikan

buah

62.66

56.96

5.70

62.66

62.45

100.00

99.66

b. Alat Penangkap Ikan

paket

50.69

46.08

4.61

50.69

50.53

100.00

99.70

a. Pengadaan sarana pengolahan kerupuk

Paket

90.00

81.82

8.18

90.00

89.70

100.00

99.67

b. Pengadaan sarana pengering ikan

Paket

9.80

8.64

1.16

9.80

9.80

100.00

100.00

56

Unit

70.00

63.64

6.36

70.00

70.00

100.00

100.00

Dana Dialihkan ke
Kegiatan
Penyediaan Sarana
Statistik Kelautan
dan Perikanan
sebesar Rp.
24.750.000,-

PENGEMBANGAN SARANA DAN


PRASARANA PERIKANAN TANGKAP

A Belanja Bahan/Material

Dana Dialihkan Ke
Kegiatan
Penyediaan Sarana
Statistik Kelautan
dan Perikanan
sebesar Rp.
4.128.400

PENGADAAN ALAT DAN SARANA


PENGOLAHAN IKAN

A Belanja bahan/material

c. Pengadaan peralatan sistem rantai dingin


-

Dana Dialihkan Ke
Kegiatan
Penyediaan Sarana
Statistik Kelautan
dan Perikanan
sebesar Rp.
19.200.000,-

Perencanaan Kegiatan
No

Jenis Kegiatan

1
4

Satuan

Volume

Jumlah
Penerima
Manfaat
5

Pelaksanaan Kegiatan
Jumlah

DAK (Rp.
Juta)
6

Pendamping
(Rp. Juta)
7

Total Biaya
(Rp. Juta)
8

Swakelola Kontrak (Rp.


(Rp. Juta)
Juta)
9

Kesesuaian sasaran dan


lokasi dengan RKPD

Realisasi

10

Kesesuaian antara DPA-SKPD


dengan Petunjuk Teknis

Fisik (%)

Keuangan
(%)

YA

TIDAK

YA

TIDAK

11

12

13a

13b

14a

14b

Kodefikasi
Masalah

Ket

PENYEDIAAN SARANA DAN PRASARANA


PENYULUHAN

A Belanja Bahan/material
a. Pengadaan perahu motor penyuluhan

unit

paket

17.50

15.91

1.59

30

Unit

105.00

95.45

a. Pengadaan roda dua untuk operasional


petugas

Unit

18.00

b. Pengadaan roda dua untuk operasional


petugas

Unit

1
1

Pengadaan komputer note book


a. Pengadaan note book
b. Pengadaan Komputer PC
c. Pengadaan Laptop

B Pengadaan komputer
a. Pengadaan note book + Printer
5

17.50

17.50

100.00

100.00

9.55

105.00

102.44

100.00

97.56

16.36

1.64

18.00

17.90

100.00

99.44

110.00

100.00

10.00

110.00

108.06

100.00

98.24

Paket
Paket

23.00
5.08

20.91
4.62

2.09
0.46

23.00
5.08

22.99
5.00

100.00
100.00

99.96
98.46

V
V

V
V

1
1

Unit
Unit

15.00
10.00

13.64
9.09

1.36
0.91

15.00
10.00

14.94
10.00

100.00
100.00

99.57
100.00

V
V

V
V

Unit

30.00

27.27

2.73

30.00

29.60

100.00

98.67

Unit

2.50

2.27

0.23

2.50

2.48

100.00

99.00

Dana Dialihkan Ke
Kegiatan
Penyediaan Sarana
Statistik Kelautan
dan Perikanan
sebesar Rp.
120.000.000,-

PENGEMBANGAN KOLAM LAHAN


MARJINAL

A Belanja Bahan/material
a. Pembuatan kolam pada lahan marjinal
6

PENYEDIAAN SARANA STATISTIK


KELAUTAN DAN PERIKANAN

A Pengadaan alat-alat angkutan darat bermotor

B Pengadaan alat-alat pengolahan pertanian dan


peternakan
a. Peralatan statistik lainnya
b. Peralatan statistik
C

D Pengadaan printer

a. Pengadaan printer

Dana Berasal dari:


- Kegiatan bantuan
sarana bergerak
sebesar Rp.
24.750.000,- Kegiatan
Perikanan Tangkap
sebesar Rp.
4.128.400,- Kegiatan Alat dan
Sarana Pengolahan
Ikan sebesar Rp.
19.200.000,- Kegiatan Sarana
Penyuluhan sebesar
Rp. 120.000.000,- Kegiatan
Pembangunan
Sarana dan
Prasarana fisik
Pengembangan
Kawasan BAT
Sebesar Rp.
1.000.000,-

Perencanaan Kegiatan
No

Jenis Kegiatan

Satuan

Volume

Jumlah
Penerima
Manfaat
5

Pelaksanaan Kegiatan
Jumlah

DAK (Rp.
Juta)
6

Pendamping
(Rp. Juta)
7

Total Biaya
(Rp. Juta)
8

Swakelola Kontrak (Rp.


(Rp. Juta)
Juta)
9

10

Kesesuaian sasaran dan


lokasi dengan RKPD

Realisasi

Kesesuaian antara DPA-SKPD


dengan Petunjuk Teknis

Fisik (%)

Keuangan
(%)

YA

TIDAK

YA

TIDAK

11

12

13a

13b

14a

14b

b. Pengadaan printer

Unit

9.00

8.18

0.82

9.00

8.85

100.00

98.33

c. Pengadaan printer portable

Unit

5.00

4.55

0.45

5.00

5.00

100.00

100.00

25

Unit

50.00

45.45

4.55

50.00

49.50

100.00

99.00

Unit

170.00

154.55

15.46

170.00

165.60

100.00

97.41

A Pengadaan konstruksi bangunan lainnya


a. Pembangunan kolam permanen
b. Pembangunan saluran pembuangan
c. Pembangunan bangsal packing benih
d. Rehab pagar lingkungan
e. Pengaspalan jalan lingkungan BBI

1
1
1
1
1

paket
paket
paket
paket
paket

73.76
10.40
157.38
176.08
50.80

67.05
9.45
140.90
157.90
46.18

6.71
0.95
16.48
18.18
4.62

73.76
10.40
157.38
176.08
50.80

493.00

100.00

96.82

f. Pengadaan peralatan dan sarana BBI

paket

55.00

50.00

5.00

55.00

50.75

100.00

92.27

967.00

878.90

88.10

967.00

957.56

100.00

99.02

2,753.32

2,498.20

255.12

2,753.32

2,753.32

100.00

100.00

2,753.32
2,633.32

2,498.20

255.12

PENGAWASAN DAN PENGENDALIAN


SUMBER DAYA KELAUTAN DAN
PERIKANAN

A Belanja bahan/material
a. Peralatan pengawasan lainnya
B Pengadaan alat-alat angkutan diatas air bermotor
a. Pengadaan Speed boat pengawasan
8

19.200.000,- Kegiatan Sarana


Penyuluhan sebesar
Rp. 120.000.000,- Kegiatan
Pembangunan
Kodefikasi
Ket
Sarana dan
Masalah
Prasarana fisik
Pengembangan
Kawasan BAT
Sebesar Rp.
1.000.000,-

PEMBANGUNAN SARANA DAN


PRASARANA FISIK BBI LINUH

PEMBANGUNAN SARANA DAN


PRASARANA FISIK PENGEMBANGAN
KAWASAN BUDIDAYA AIR TAWAR

A Belanja bahan/material
a. Pembangunan KJA

TOTAL

Note : Penambahan sebesar Rp. 1.000.000,dari dana pendamping DAK

44 unit

2,753.32

Dana Dialihkan Ke
Kegiatan
Penyediaan Sarana
Statistik Kelautan
dan Perikanan
sebesar Rp.
1.000.000,-

Mengetahui,
Kepala Dinas Peternakan dan Perikanan,

Perencanaan Kegiatan
No

Jenis Kegiatan

Satuan

Volume

Jumlah
Penerima
Manfaat
5

Pelaksanaan Kegiatan
Jumlah

DAK (Rp.
Juta)
6

Pendamping
(Rp. Juta)
7

Total Biaya
(Rp. Juta)
8

Swakelola Kontrak (Rp.


(Rp. Juta)
Juta)
9

10

Kesesuaian sasaran dan


lokasi dengan RKPD

Realisasi

Kesesuaian antara DPA-SKPD


dengan Petunjuk Teknis

Fisik (%)

Keuangan
(%)

YA

TIDAK

YA

TIDAK

11

12

13a

13b

14a

14b

Kodefikasi
Masalah

Ir. H. Bastian, M.AP


NIP. 19630830 199403 1 011

Ket

Anda mungkin juga menyukai

  • Laporan Dak Pertanian 2013
    Laporan Dak Pertanian 2013
    Dokumen13 halaman
    Laporan Dak Pertanian 2013
    Dinas Peternakan dan Perikanan Kabupaten Tapin
    100% (3)
  • Dak 2012
    Dak 2012
    Dokumen19 halaman
    Dak 2012
    Dinas Peternakan dan Perikanan Kabupaten Tapin
    Belum ada peringkat
  • Dak 2013
    Dak 2013
    Dokumen23 halaman
    Dak 2013
    Dinas Peternakan dan Perikanan Kabupaten Tapin
    Belum ada peringkat
  • Dak 2010
    Dak 2010
    Dokumen19 halaman
    Dak 2010
    Dinas Peternakan dan Perikanan Kabupaten Tapin
    Belum ada peringkat
  • LKPJ 2014
    LKPJ 2014
    Dokumen77 halaman
    LKPJ 2014
    Dinas Peternakan dan Perikanan Kabupaten Tapin
    Belum ada peringkat
  • RFK Dak Pertanian 2013
    RFK Dak Pertanian 2013
    Dokumen2 halaman
    RFK Dak Pertanian 2013
    Dinas Peternakan dan Perikanan Kabupaten Tapin
    Belum ada peringkat
  • Tapin DLM Angka 2014
    Tapin DLM Angka 2014
    Dokumen29 halaman
    Tapin DLM Angka 2014
    Dinas Peternakan dan Perikanan Kabupaten Tapin
    Belum ada peringkat
  • Dak 2014
    Dak 2014
    Dokumen19 halaman
    Dak 2014
    Dinas Peternakan dan Perikanan Kabupaten Tapin
    Belum ada peringkat
  • LPPD Disnakkan 2014
    LPPD Disnakkan 2014
    Dokumen90 halaman
    LPPD Disnakkan 2014
    Dinas Peternakan dan Perikanan Kabupaten Tapin
    100% (1)
  • Bahan APN Disnakkan 2015
    Bahan APN Disnakkan 2015
    Dokumen13 halaman
    Bahan APN Disnakkan 2015
    Dinas Peternakan dan Perikanan Kabupaten Tapin
    Belum ada peringkat
  • E Proposal Deptan DAK 2016
    E Proposal Deptan DAK 2016
    Dokumen3 halaman
    E Proposal Deptan DAK 2016
    Dinas Peternakan dan Perikanan Kabupaten Tapin
    Belum ada peringkat
  • Format Surat Usulan Daerah DAK 2016 - 26 Juni 2015 - Versi 29 Juni 2015 - KAB-KOTA SORE. EDIT
    Format Surat Usulan Daerah DAK 2016 - 26 Juni 2015 - Versi 29 Juni 2015 - KAB-KOTA SORE. EDIT
    Dokumen149 halaman
    Format Surat Usulan Daerah DAK 2016 - 26 Juni 2015 - Versi 29 Juni 2015 - KAB-KOTA SORE. EDIT
    Dinas Peternakan dan Perikanan Kabupaten Tapin
    100% (4)
  • LPPD Disnakkan 2014
    LPPD Disnakkan 2014
    Dokumen90 halaman
    LPPD Disnakkan 2014
    Dinas Peternakan dan Perikanan Kabupaten Tapin
    100% (1)
  • KB 2
    KB 2
    Dokumen6 halaman
    KB 2
    Dinas Peternakan dan Perikanan Kabupaten Tapin
    Belum ada peringkat
  • Lakip Disnakkan 2013
    Lakip Disnakkan 2013
    Dokumen79 halaman
    Lakip Disnakkan 2013
    Dinas Peternakan dan Perikanan Kabupaten Tapin
    Belum ada peringkat
  • Rincian Dana Alokasi Khusus Per Provinsi Kabupaten Kota 2015 PDF
    Rincian Dana Alokasi Khusus Per Provinsi Kabupaten Kota 2015 PDF
    Dokumen8 halaman
    Rincian Dana Alokasi Khusus Per Provinsi Kabupaten Kota 2015 PDF
    Dinas Peternakan dan Perikanan Kabupaten Tapin
    100% (1)
  • Evaluasi Dak 2010-2011
    Evaluasi Dak 2010-2011
    Dokumen26 halaman
    Evaluasi Dak 2010-2011
    Dinas Peternakan dan Perikanan Kabupaten Tapin
    Belum ada peringkat
  • LKPJ 2014
    LKPJ 2014
    Dokumen77 halaman
    LKPJ 2014
    Dinas Peternakan dan Perikanan Kabupaten Tapin
    Belum ada peringkat
  • BAB II Renja Perubahan
    BAB II Renja Perubahan
    Dokumen9 halaman
    BAB II Renja Perubahan
    Dinas Peternakan dan Perikanan Kabupaten Tapin
    Belum ada peringkat
  • BAB IV Renja Perubahan
    BAB IV Renja Perubahan
    Dokumen1 halaman
    BAB IV Renja Perubahan
    Dinas Peternakan dan Perikanan Kabupaten Tapin
    Belum ada peringkat
  • Lampiran 111
    Lampiran 111
    Dokumen13 halaman
    Lampiran 111
    Dinas Peternakan dan Perikanan Kabupaten Tapin
    Belum ada peringkat
  • Rapat Teknis Dak 2014
    Rapat Teknis Dak 2014
    Dokumen27 halaman
    Rapat Teknis Dak 2014
    Dinas Peternakan dan Perikanan Kabupaten Tapin
    Belum ada peringkat
  • Usul DAK 2015
    Usul DAK 2015
    Dokumen16 halaman
    Usul DAK 2015
    Dinas Peternakan dan Perikanan Kabupaten Tapin
    Belum ada peringkat
  • BAB III Renja Perubahan
    BAB III Renja Perubahan
    Dokumen20 halaman
    BAB III Renja Perubahan
    Dinas Peternakan dan Perikanan Kabupaten Tapin
    Belum ada peringkat
  • BAB I Renja Perubahan
    BAB I Renja Perubahan
    Dokumen3 halaman
    BAB I Renja Perubahan
    Dinas Peternakan dan Perikanan Kabupaten Tapin
    Belum ada peringkat
  • RENJA
    RENJA
    Dokumen83 halaman
    RENJA
    Dinas Peternakan dan Perikanan Kabupaten Tapin
    100% (1)
  • Indikator Kinerja Utama
    Indikator Kinerja Utama
    Dokumen9 halaman
    Indikator Kinerja Utama
    Dinas Peternakan dan Perikanan Kabupaten Tapin
    Belum ada peringkat
  • Rumusan Valdak 2014
    Rumusan Valdak 2014
    Dokumen3 halaman
    Rumusan Valdak 2014
    Dinas Peternakan dan Perikanan Kabupaten Tapin
    Belum ada peringkat
  • O Rencana Kegiatan Dana Alokasi Khusus Dak Bidang Kelautan Dan Perikanan Dinas Kelautan Dan Perikanan Kabupaten Kab. Tapin Tahun 2013 PDF
    O Rencana Kegiatan Dana Alokasi Khusus Dak Bidang Kelautan Dan Perikanan Dinas Kelautan Dan Perikanan Kabupaten Kab. Tapin Tahun 2013 PDF
    Dokumen3 halaman
    O Rencana Kegiatan Dana Alokasi Khusus Dak Bidang Kelautan Dan Perikanan Dinas Kelautan Dan Perikanan Kabupaten Kab. Tapin Tahun 2013 PDF
    Dinas Peternakan dan Perikanan Kabupaten Tapin
    Belum ada peringkat