Anda di halaman 1dari 8
Week No: Date Log Details Supervisor Remarks 8/6 © Absent due to unfit health condition Nefed 916 * Meet & Greet with Highway & Bridge Department staff #1 was assigned to work on SILK Highway UPM — UNITEN Interchange Upgrading Project by Mr. Asti Yahya, Technical Director of H&B department under supervision of Raymi, design engineer. * Design engineer has briefed the current progress of the project and gave a short lecture on longitudinal barrier - its significance & types (single & double mounted guard rail, NIB, PARAPET). Task given: Verify the barrier placement on the drawings at RAMP A, ERL Crossing & Signage Gantry whether they are correctly drawn. Checke rt 10/6 # I was tasked on selecting suitable ERL Crossing bridge protec barrier for client. Design engineer proposed 5 barrier combinations for client to choose from. I was tasked to find typical design of each barrier type and tabulate the cost for each combination for comparison purposes #1 worked side by side with Quantity Surveyor, Azad to get the cost per unit length for all barrier types. n Checked 11/6 ‘© [ found the typical design for barriers in reference book with help of design engineer [submitted the design to the drafter to get the drawing produced I revised the table for bridge barrier costing after being reviewed by design engineer ‘*[ learned briefly how to read electrical drawing; reference used ‘was street lighting drawing scheme for SILK highway. 12/6 #T had discussion with QS about determining cost of end treatment for barriers. I learned how the costs were derived as explained by Qs ‘Received drawings from drafter today; some amendments had to be done after Mr. Asri has reviewed them, thus another request was sent to drafter. ‘The costing for barriers options were revised again and finalized. I was tasked to analyze each option, and recommend most suitable one to the client under design engineer supervision. Supervisor's Signature: Date: Week No: Date Log Details Supervisor Remarks 15/6 * Went for site visit at Batu Arang highway upgrading project, it is still in planning stage, Falling Weight Deflectometer test is to be carried out on existing road, the purpose of visit was to show the contractor the start and finish point of the test. Current situation on Ramp A: An extra 2 m_ reserve of rainage/street lights/furniture was instructed to be added by LLM, but the company is refusing it. | was tasked to justify by tabulating the extra costs and works involved. *T have worked with design engineers - Azizul & Ain to get the price rate of relocation of certain furniture to work out the total cost. 16/6 *PARAPET drawings need to be amended as required; I have repeatedly dealt with drafters to explain the specifications needed for the drawings. (Details in training report) ©The table from yesterday was amended to make it more presentable, + An IEM veteran member came over and gave a lecture on peat soil — its characteristics, testing methods and the engineering challenges related to constructions. Checked 1716 * Supervisor and the other team went for site visit and I did not get to follow due to the car was full, so no specific task today. Started drafting the report ~ reading and collecting information on company profile ‘©The department organized a small feast before 1 day of Ramadhan —a good way to strengthen bonds between colleagues Checked 18/6 I moved on to another project — Upgrading of Route B49 Persiaran Mokhtar Dahari which is in pre-tendering process. Drawings have been produced, Ir. Abdul Samat Talib, a Road Safety Auditor (RSA) paid a visit to review the safety aspect of the design and gave comments and guidelines to comply with safety requirement. Valuable advice and information were obtained during this meeting abectod 19/6 «SILK emailed the company and has decided to adopt option 1 from the barrier options recommended. #1 was tasked to amend the guardrail layout according to the adopted option. # I was also tasked to design the detail drawings for option 1 barrier components (NJB 1070, 810 & double beam guardrail). Drafting request was sent to drafters. Chockeel Supervisor's Signature: . Date: oy &. Week No: Date Log Details Supervisor Remarks 22/6 © Guardrail layout for SILK Upgrade was revised © All signboards with 4 posts were assigned with guardrails as safety measure. * Revised layout was sent to drafter for drawing re-production Clucke ol 23/6 © Option 1 has been adopted onto guardrail layout plan and drawing has been amended by drafter The detail drawing of barrier sections of option 1 have also been produced © The design of New Jersey Barrier had to be revised due to new added information from senior designer, Hanis Checkec| 24/6 © Barrier design was revised again ~ railing was added on top of barrier with advice from senior designer. * Some mistakes in dimensioning the barrier were reviewed and rectified. * The senior geometry designer, Pok Nik taught me on how to calculate allowable clearance for signboards including the ruling and techniques on placing them. Checked 25/6 ‘There were clearance issues with barrier design on anchoring the barrier onto vehicular box culvert for ERL overpass. My team and 1 contacted HILTI who supplies the conneetions to provide us the sizes. Design was revised again and resubmitted to drafters. © Meeting with Ir. Samat, Road Safety Officer to review pre-tender drawing of B49 Persiaran Mokhtar Dahari Upgrading Project Chicked 26/6 Design Engineer and I had discussion on finalizing the design on the NIB of PARAPET, few revisions were made to make the design conform to regulations and according to client request. Clycted Date: Supervisor's Signature: kc Week No: .. Date Log Details Supervisor Remarks 29/6 © Had personal matter to attend to in the morning, I have informed the managing director and he approved it. I entered office after Tunch time. ¢ I had a short discussion on submission plan for all drawings related to PARAPET on ERL Bridge. checked 30/6 ‘+ Reviewed and compiled all drawings related to PARAPET barrier arrangement — guardrail layout, NIB details, double beam guardrail details, and barrier arrangement layout. * helped the design engineer in designing all drawings; 1 worked with drafter to specify the details needed for drawings to be produced. © Alll drawings were finished and ready for submission to client (SILK) checked 7 Today was a free day for most staff, most works have been submitted to client Being an intern, I did not have much work today as other staff moved on to other projects and I was not briefed about them. Checked SILK requested DPI to change dimension of border in all gantry signboards to 70mm. Since my supervisor had to go for site visit, the discussion on task was delayed until tomorrow morning. checked) 3/7 Supervisor briefed the task of yesterday; I printed all existing gantry signboard details drawings, amended the dimension of border to 70mm, and submitted them to drafter, Deadline was before noon, Checteeal Supervisor's Signature: JH. Week No: Date Log Details Supervisor Remarks 7 I did design review on B49 Persiaran Mokhtar Dahari Upgrading project. There were add-ons to be made on the design of arrow sign in the signboards. I was tasked to design the add ons by referring to IKR Guide Signs Design & Application. I submitted the design to the drafters. There were also mistakes in gap between letters, and 1 had it rectified as instructed, cwelced WT © The drafter has done the revised drawing, I made a mistake in the design and it has been corrected by my supervisor. © Signboard layout design was revised and its drawing was produced; I was tasked to review it to make sure all amendments were made as instructed. Some mistakes were found so I returned it to drafter for correction. #1 did taking off of the signboard layout of the project in order to prepare the BQ. Checked 8/7 Thad half day off today to attend to family matters. 1 went in after lunch time, ‘ Not much work during this period, so I cleaned the desk and tidied up the PC. checked o7 SILK has requested via email to standardize the dimension of border of all signboards. Since all drafters were attending to more urgent deadlines, T had to do the amendments on the signboards myself using AutoCAD, Design Engineer has helped me in this task. clucked 10/7 ‘1 continued the drafting work on signboards amendment; design engineer has taught me some tricks and tips on using AutoCAD. * My task was to standardize the borders of signboards to 60mm, resize the route number to 450mm x 300mm. ‘There were 19 signboards needed to be amended. I learned how to use these AutoCAD commands: Fillet, Radius, Stretch & Offset * Once the drafting was finished, it was submitted via email Checked Supervisor's Signature: .. Week No:.. Log Details Supervisor Remarks 13/7 ‘The amended drawing was returned with few errors; I reviewed them and rectified the mistakes. Cwecked} 14/7 | followed the director for site visit at B35 state road in Ijok. I was informed that there was problem with construction on u-tum section. The U-turn constructed did not comply with the drawing specification in a way that it can’t accommodate long truck. SYABAS has complaint that their tank lorries are not able to use the U-turn claiming that its turning radius was not enough, I did a ‘measurement on the U-turn and it was not constructed according to the plan Design engineer said that he has designed it specifically to allow SYABAS lorries to safely do a U-turn, therefore a revised design has been proposed checked 15/7 Bidul Fitri Holiday 16/7 Eidul Fitri Holiday 17 Eidul Fitri Holiday Supervisor's Signature: ee ‘Week No: Date Log Details Supervisor Remarks 207 Hari Raya Aidilfitri Holiday 21/7 Hari Raya Aidilfitri Holiday 22/7 * Design engineer gave me brief introduction on new task — Proposed Free Flow Access from LATAR Expressway to Bandar Tasik Puteri, Rawang. * Technical Director has ordered me to verify the as-built drawing of B42 Upgrading project. I have compared the as-built drawing given by the contractor with the issued drawing by DPI and I found major inconsistencies. I have consulted the design engineer to verify my finding and she agreed, commented and advised me to explain them to Technical Director when he gets back in the office. checked 23/7 ‘© I went for site visit at Federal Road 54 from LATAR to Assam Jawa where soil investigation was being carried out. The method used was rotary wash boring. I have taken photos of the work. The project is in proposal stage and Technical Director has made a decision to place me at this site twice a week to assist the design engineer at the site © Design Engineer gave a lecture on how a highway project is procured. Clucked 24/7 © The lecture on highway project continued in the morning. # I was tasked to do the presentation slides of FTS4 Upgrading Work Proposal which will be used in presentation to JKR. The contract proposed is design and built. Supervisor's Signature: ‘Week No: Date Log Details Supervisor Remarks ‘Technical Director ordered me to verify the as-built drawing of B42 Jalan Raja Musa upgrading project which has finished in construction, I had to compare as-built drawing with the issued . construction drawings and put a remark on any significant Checkeo| differences. Design engineer has helped me in completing this task 20/7 28/7 20/7 30/7 31/7 Supervisor's Signature: Date:

Anda mungkin juga menyukai