Anda di halaman 1dari 17

PERHITUNGAN HARGA SATUAN TERTINGGI BGN

KABUPATEN/KOTA

MALUKU TENGGARA

PROVINSI
BULAN / TRIWULAN

MALUKU
November / IV (Empat)

TAHUN ANGGARAN

2011
GEDUNG PER-M2

GEDUNG BERTINGKAT
KLAS SEDERHANA

KLAS TIDAK
SEDERHANA

#REF!

#REF!

GEDUNG TIDAK
BERTINGKAT

RUMAH NEG

KLAS TIDAK
SEDERHANA

KLAS SEDERHANA

#REF!

#REF!

TIPE C

#REF!

PAGAR PER-M1
GEDUNG
KLAS SEDERHANA

DEPAN

#REF!

RUMAH NEG

KLAS TIDAK
SEDERHANA

#REF!

TIPE C

#REF!

SAMPING
MENU UTAMA

Langgur, 03 November 2011


BUPATI MALUKU TENGGARA,

Ir. ANDERIAS RENTANUBUN

TERTINGGI BGN

V (Empat)
(DALAM RUPIAH)

RUMAH NEGARA
TIPE B

#REF!

TIPE A

#REF!

RUMAH NEGARA
TIPE B

#REF!

NU UTAMA

ggur, 03 November 2011

UPATI MALUKU TENGGARA,

TIPE A

#REF!

ANDERIAS RENTANUBUN

HARGA SATUAN BANGUNAN GEDUNG NEGARA PER-M2


GEDUNG TIDAK
BERTINGKAT

GEDUNG BERTINGKAT
KLAS
SEDERHANA

KLAS TIDAK
SEDERHANA

KLAS
SEDERHANA

RUMAH NEGARA

KLAS TIDAK
SEDERHANA

TIPE C

TIPE B
0

DATA HARGA BAHAN BANGUNAN DAN UPAH KERJA


DATA HARGA BAHAN BANGUNAN
NO

NAMA BAHAN

1
A.
1
2
3
4
5
6
B.
7
C.
8
D.
9
10
11
12
E.
13
14
F.
15
16
17
18

SATUAN

HARGA DASAR
(BASIC PRICE)
Rp

BAHAN PASANGAN
PASIR BETON
PASIR PASANG
PASIR URUG
SEMEN PC (50 Kg)
KERIKIL BETON UK. 3 cm s/d 4 cm
KERIKIL KORAL

m3
m3
m3
zak
m3
m3

536,300
536,300
429,000
82,000
429,000
321,800

m3

321,800

m2

72,600

bh
bh
bh
bh

2,400
1,200
1,200
3,600

lbr
lbr

54,500
151,300

bh
bh
m
lbr

0
0
81,100
105,900

BAHAN PONDASI
BATU KALI / BATU BELAH / BATU GUNUNG

BAHAN LANTAI
KERAMIK 30 X 30

BAHAN DINDING
BATAKO UK. 20 X 40 X 10
BATU BATA UK. 5.5 X 11 X 23
BATU TELA UK. 20 X 30 X 10
BETON ROSTER / KERAWANG

BAHAN PENUTUP LANGIT-LANGIT


ETERNIT, UK. 100 X 100
KAYU LAPIS 4 MM UK 120 X 240

BAHAN PENUTUP ATAP


BUBUNGAN GENTENG PLENTONG "S"
GENTENG PLENTONG "S"
SENG DATAR BJLS 0.3
SENG GELOMBANG KECIL

19
20

BUBUNGAN ASBES GELOMBANG


ASBES GELOMBANG KECIL

m
lbr

46,000
71,400

G.
21
22
23
24
25
26
27
H.
28
29
30
31
32
33
I.
34
35
36
37
38
39
40
41
42
43
44
44
45
46
47
J
48
49
50
K.
51
52
53

BAHAN KAYU
KAYU
KAYU
KAYU
KAYU
KAYU
KAYU
KAYU

BALOK KLAS I
BALOK KLAS II
PAPAN KLAS II
PAPAN KLAS III
PAPAN KLAS IV
LAPIS 4 mm UK. 8" X 4"
LAPIS 12 mm UK. 8" X 4"

m3
m3
m3
m3
m3
lbr
lbr

4,477,000
3,388,000
3,388,000
2,420,000
2,178,000
108,900
223,900

Kg
Kg
Kg
Kg
m
m

19,100
27,800
27,500
35,700
302,500
151,300

bh
bh
bh
m
m
m
m
m
m
m
m
bh
bh
bh
bh

2,087,300
3,025,000
14,500
28,600
56,900
63,800
3,000
3,700
30,700
44,800
73,800
1,089,000
302,500
986,200
251,100

Kg
Kg
Kg

27,800
32,100
27,800

m2
bh
titik

102,900
151,300
272,300

BAHAN BESI
BESI BETON POLOS DIA. 10 mm
BESI BETON ULIR DIA. 13 mm
KAWAT BENDRAT / BETON
PAKU UK. 3 CM - 7 CM
PAGAR BRC JADI (T 1M)
BESI PROFIL C a PIPA BESI DIA. 2"

BAHAN SANITAIR / SALURAN AIR


BAK MANDI FIBRE GLASS 70 X 70 X 66
BAK RESERVOIR FIGRE GLASS KAP. 1000 ltr
BUIS BETON 1/2 DIA. 20 CM
PIPA GIP DIA. 1"
PIPA GIP DIA. 1 1/2"
PIPA GIP DIA. 2"
PIPA PVC DIA. 1/2"
PIPA PVC DIA. 3/4"
PIPA PVC DIA. 2"
PIPA PVC DIA. 3"
PIPA PVC DIA. 4"
KLOSET DUDUK KERAMIK
KLOSET JONGKOK KERAMIK STANDAR
URINOAR KERAMIK STANDAR
WASTAFEL GANTUNG KERAMIK

BAHAN FINISHING
CAT BESI
CAT DINDING
CAT KAYU

BAHAN LAIN - LAIN


KACA BENING 5 MM
POMPA TANGAN
INSTALASI LISTRIK

DATA UPAH KERJA


NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14

TENAGA KERJA
MANDOR
KEPALA TUKANG
TUKANG BATU
LADEN TUKANG BATU
TUKANG BESI
LADEN TUKANG BESI
TUKANG KAYU
LADEN TUKANG KAYU
TUKANG CAT
LADEN TUKANG CAT
TUKANG BONGKAR
PEKERJA GALIAN & URUG
TUKANG LISTRIK
TUKANG PIPA

SATUAN
ORG
ORG
ORG
ORG
ORG
ORG
ORG
ORG
ORG
ORG
ORG
ORG
ORG
ORG

HARGA SURVAI
(Rp)
78,750
75,000
63,750
68,750
65,000
65,000
65,000
65,000
65,000
65,000
65,000
60,000
65,000
65,000

Langgur, 03 November 2011


BUPATI MALUKU TENGGARA,

Ir. ANDERIAS RENTANUBUN

(DALAM RUPIAH)

PER-M2

AH NEGARA
TIPE A
0

PAH KERJA

KETERANGAN

PILIH SALAH SATU SESUAI


DENGAN BAHAN YANG
TERSEDIA

PILIH SALAH SATU SESUAI


BAHAN YANG TERSEDIA

PILIH SALAH SATU SESUAI


DENGAN BAHAN YANG
TERSEDIA

PILIH SALAH SATU SESUAI


DENGAN BAHAN YANG
TERSEDIA

STRUKTUR PEMBIAYAAN TUGAS PEMBANTUAN


BELANJA MODAL PEMBANGUNAN/REHABILITASI GEDUNG KANTOR
TAHUN ANGGARAN 2012

Program : Bina Pembangunan Daerah


Satker
Kab/Kota : Maluku Tenggara
Kegiatan : Pembangunan Sarana dan Prasarana Kantor Pemerintahan Daerah
NO
1

URAIAN KEGIATAN
2

BELANJA MODAL PEMBANGUNAN/REHAB GED. KANTOR


Biaya Perencanaan
1
Biaya Pengawasan
2
Biaya Konstruksi Fisik Pemb. Kantor Camat Kei Kecil
3
Biaya Pengelola Proyek
4
- Unsur Lokasi Proyek (65%)
- Unsur Inst. Teknis (35%)

VOLUME
3

SATUAN
4

JUMLAH
5

Paket
Paket
1,152 m2
Paket

74,323,610
52,733,133
1,531,888
12,808,385

1,904,600,000
74,323,610
52,733,133
1,764,734,873
12,808,385

Langgur, 03 November 2011


Kepala Dinas Pekerjaan Umum,
Perumahan, Pertambangan dan Energi
Kabupaten Maluku Tenggara

PROTUS REMETWA, ST
NIP. 19570905 198103 1 021

BIAYA PENGAWASAN TEKNIS


Pekerjaan
Volume
Lokasi
Jangka Waktu

NO

: Pengawasan Teknis Pembangunan Gedung Kantor Camat Kei Kecil Tahap IV


: 1 (satu) Paket
: Langgur, Kab. Maluku Tenggara
: 90 (sembilan puluh) hari

URAIAN KEGIATAN

SATUAN WAKTU Kwantitas

Harga
Satuan
(Rp)

A. BIAYA LANGSUNG PERSONIL


I

II

III

30,000,000

BIAYA TENAGA AHLI


1 Ketua Tim (Penanggung Jawab Teknis)
2 Ahli Arsitektur
3 Ahli Sipil
4 Ahli M.E.P
5 Ahli Estimator
6 Ahli Spesifikasi

OH
OH
OH
OH
OH
OH

90
90
90
90
90
90

1
1
1
1
1
1

150,000
100,000
-

13,500,000
9,000,000
22,500,000

BIAYA ASISTEN TENAGA AHLI


1 Ass. Ketua Tim
2 Ass. Ahli Arsitektur
3 Ahli Sipil
4 Ass. Ahli M.E.P
5 Ass. Ahli Estimator
6 Ass. Ahli Spesifikasi

OH
OH
OH
OH
OH
OH

1
1
1
1
1
1

Bulan
Bulan
OH
OH
Bulan
Bulan
OH

3
3
3
3
-

1
1
1
1
-

750,000
1,000,000
750,000
-

2,250,000
3,000,000
2,250,000
7,500,000
16,439,212

1
1
1
1
1
1
1
1

500,000
1,000,000
1,500,000
-

1,500,000
1,000,000
1,500,000
2,500,000

1
1

1
1

30,000
-

BIAYA STAF PENDUKUNG


1 Administrasi
2 Sekretaris
3 Juru Gambar/Drafter
4 Juru Hitung
5 Operator Komputer
6 Office Boy/Pramubakti
7 Tenaga Surveyor/Pengukuran (1 team)

B. BIAYA LANGSUNG NON PERSONIL


I

II

Jumlah Harga
(Rp)

BIAYA KANTOR
1 Biaya Sewa Kantor
2 Biaya Pemeliharaan Kantor
3 Alat Tulis Kantor (ATK)
4 Sewa Komputer Lengkap
5 Sewa Kamera Digital
6 Sewa Alat Ukur
7 Sewa Alat Gambar
8 Sewa Alat Laboratorium

Bulan
Bulan
Ls
Unit
Set
Set
Set
Set

BIAYA TRANSPORT
1 Biaya Tiket
2 Uang Harian

Kali
Kali

3 Transportasi Lokal
4 Peralatan Penunjang Survey (1 team)

Kali
Set

3
1
1
1

90

2,700,000
2,700,000

III BIAYA PELAPORAN


1 Laporan Pendahuluan
2 Laporan Antara
3 Laporan Akhir
4 Dokumen Lelang
5 Biaya Rapat

Ex
Ex
Ex
Ex
LS

1
3
1

1
3
1

1,500,000
3,000,000
739,212

1,500,000
9,000,000
739,212

11,239,212
BIAYA PERENCANAAN TEKNIS
Pekerjaan
Volume
Lokasi
Jangka Waktu

NO

: Perencanaan Teknis Pembangunan Gedung Kantor Camat Kei Kecil Tahap IV


: 1 (satu) Paket
: Langgur, Kab. Maluku Tenggara
: 21 (dua puluh satu) hari

URAIAN KEGIATAN

SATUAN WAKTU Kwantitas

Harga
Satuan
(Rp)

A. BIAYA LANGSUNG PERSONIL


I

II

III

40,825,000

BIAYA TENAGA AHLI


1 Ketua Tim (Penanggung Jawab Teknis)
2 Ahli Arsitektur
3 Ahli Sipil
4 Ahli M.E.P
5 Ahli Estimator
6 Ahli Spesifikasi

OH
OH
OH
OH
OH
OH

21
21
21
21
21
21

1
1
1
1
1
1

250,000
200,000
200,000
200,000
200,000
-

5,250,000
4,200,000
4,200,000
4,200,000
4,200,000
22,050,000

BIAYA ASISTEN TENAGA AHLI


1 Ass. Ketua Tim
2 Ass. Ahli Arsitektur
3 Ahli Sipil
4 Ass. Ahli M.E.P
5 Ass. Ahli Estimator
6 Ass. Ahli Spesifikasi

OH
OH
OH
OH
OH
OH

21
21
21
21
21
21

1
1
1
1
1
1

175,000
100,000
100,000
100,000
100,000
-

3,675,000
2,100,000
2,100,000
2,100,000
2,100,000
12,075,000

Bulan
Bulan
OH
OH
Bulan
Bulan
OH

1
1
21
21
1
1
-

1
1
1
1
1
1
-

750,000
100,000
100,000
1,000,000
750,000
-

750,000
2,100,000
2,100,000
1,000,000
750,000
6,700,000
25,241,918

1
1
1
1
1
1
1
1

1,500,000
1,500,000
1,500,000
1,500,000
3,000,000
-

400,000
1,500,000

2,000,000
2,000,000
2,500,000
2,500,000

BIAYA STAF PENDUKUNG


1 Administrasi
2 Sekretaris
3 Juru Gambar/Drafter
4 Juru Hitung
5 Operator Komputer
6 Office Boy/Pramubakti
7 Tenaga Surveyor/Pengukuran (1 team)

B. BIAYA LANGSUNG NON PERSONIL


I

II

III

Jumlah Harga
(Rp)

BIAYA KANTOR
1 Biaya Sewa Kantor
2 Biaya Pemeliharaan Kantor
3 Alat Tulis Kantor (ATK)
4 Sewa Komputer Lengkap
5 Sewa Kamera Digital
6 Sewa Alat Ukur
7 Sewa Alat Gambar
8 Sewa Alat Laboratorium

Ls
Ls
Ls
Unit
Set
Set
Set
Set

BIAYA TRANSPORT
1 Biaya Tiket
2 Uang Harian
3 Transportasi Lokal
4 Peralatan Penunjang Survey (1 team)

Kali
Kali
Kali
Set

2
1

1
1
1
1

BIAYA PELAPORAN
1 Laporan Pendahuluan
2 Laporan Antara
3 Laporan Akhir
4 Dokumen Lelang

Ex
Ex
Ex
Ex

1
1
3
1

1
1
1
1

1
1
1
1
1

1,500,000
1,500,000
1,500,000
1,500,000
3,000,000
7,500,000

800,000
1,500,000
2,300,000
2,000,000
2,000,000
7,500,000
2,500,000

LS

5 Biaya Rapat

1,441,918

1,441,918
15,441,918

REKAPITULASI BIAYA PERENCANAAN


Pekerjaan
Volume
Lokasi
Jangka Waktu

: Perencanaan Teknis Pembangunan Gedung Kantor Camat Kei Kecil Tahap IV


: 1 (satu) Paket
: Langgur, Kab. Maluku Tenggara
: 21 (dua puluh satu) hari

NO
1

JUMLAH
3

URAIAN KEGIATAN
2
A. BIAYA LANGSUNG PERSONIL

I
II
III

BIAYA TENAGA AHLI


BIAYA ASISTEN TENAGA AHLI
BIAYA STAF PENDUKUNG

22,050,000.00
12,075,000.00
6,700,000.00

B. BIAYA LANGSUNG NON PERSONIL


I
II
III

BIAYA KANTOR
BIAYA TRANSPORT
BIAYA PELAPORAN

7,500,000.00
2,300,000.00
15,441,918.00

JUMLAH
PPN 10%
TOTAL
PEMBULATAN

66,066,918.00
6,606,691.80
72,673,609.80
72,673,610.00
Terbilang :

Tujuh Puluh Dua Juta Enam Ratus Tujuh Puluh Tiga Ribu Enam Ratus Sepuluh Rupiah

Langgur, 03 November 2011


Kepala Dinas Pekerjaan Umum,
Perumahan, Pertambangan dan Energi
Kabupaten Maluku Tenggara,

PROTUS REMETWA, ST
NIP. 19570905 198103 1 021

REKAPITULASI BIAYA PENGAWASAN


Pekerjaan
Volume
Lokasi
Jangka Waktu

: Pengawasan Teknis Pembangunan Gedung Kantor Camat Kei Kecil Tahap IV


: 1 (satu) Paket
: Langgur, Kab. Maluku Tenggara
: 90 (sembilan puluh) hari

NO
1

JUMLAH
3

URAIAN KEGIATAN
2
A. BIAYA LANGSUNG PERSONIL

I
II
III

BIAYA TENAGA AHLI


BIAYA ASISTEN TENAGA AHLI
BIAYA STAF PENDUKUNG

22,500,000.00
7,500,000.00

B. BIAYA LANGSUNG NON PERSONIL


I
II
III

BIAYA KANTOR
BIAYA TRANSPORT
BIAYA PELAPORAN

2,500,000.00
2,700,000.00
11,239,212.00

JUMLAH
PPN 10%
TOTAL
PEMBULATAN

46,439,212.00
4,643,921.20
51,083,133.20
51,083,133.00
Terbilang :

Lima Puluh Satu Juta Delapan Puluh Tiga Ribu Seratus Tiga Puluh Tiga Rupiah

Langgur, 03 November 2011


Kepala Dinas Pekerjaan Umum,
Perumahan, Pertambangan dan Energi
Kabupaten Maluku Tenggara,

PROTUS REMETWA, ST
NIP. 19570905 198103 1 021