Anda di halaman 1dari 11

KOLEJ VOKASIONAL MIRI

LORONG 10, JALAN JEE FOH, KROKOP


98000 MIRI, SARAWAK.

KERTAS KERJA
PROGRAM
KOD MODUL
TAJUK MODUL
TAHUN / SEMESTER
JAM KREDIT
JUMLAH JAM
KELAS/KULIAH
KOMPETENSI
STANDARD
PEMBELAJARAN

NAMA PELAJAR:

TEKNOLOGI AUTOMOTIF
MAT 501
4 WHEEL DRIVE TRAIN SYSTEM
TAHUN 1 SEMESTER 5 DIPLOMA VOKASIONAL MALAYSIA
3.0
5.0 JAM / SEMINGGU
1. OVERHAUL FOUR-WHEEL DRIVE TRANSFER CASE
1.1 IDENTIFY FOUR-WHEEL DRIVE TRANSFER CASES
LOCATION
1.2 REMOVE FOUR-WHEEL DRIVE TRANSFER CASE
1.3 DISMANTLE FOUR-WHEEL DRIVE TRANSFER CASE
1.4 ASSEMBLE FOUR-WHEEL TRANSFER CASE
1.5 INSTALL FOUR-WHEEL DRIVE TRANSFER CASE
TARIKH:

TAJUK : PART TIME 4WD TRANSFER CASE SHAFT DISASSEMBLY AND ASSEMBLY
OBJEKTIF :
Selepas aktiviti ini pelajar-pelajar mesti boleh :
1. Membuka dan memasang rear output shaft dengan teknik yang betul
2. Membuka dan memasang front output shaft dengan teknik yang betul

Page | 1

ARAHAN AM :
Anda dikehendaki membuka dan memasang part time 4 wheel drive rear outputshaft, membuka dan
memasang front output shaft menggunakan teknik yang betul. Masa yang diberikan adalah selama 2
jam. Sila patuhi langkah-langkah keselamatan semasa melaksanakan tugas dan pastikan tempat
kerja sentiasa kemas dan bersih semasa atau selepas menjalankan tugas.
PERALATAN/PERKAKASAN/BAHAN :

BIL
1.
2.
3.
7.
8.

ITEM
4 wheel drive transfer case
Service manual
Peralatan tangan
Oil Seal
Takungan (tray)

Bil/Unit
1 unit
1 unit
1 set
1 set
2 unit

ARAHAN KERJA :
1. Sediakan bahan, peralatan dan kelengkapan yang sesuai.
2. Sangga kenderaan dan julang ia setinggi mengikut kesesuaian kerja
3. Membuka dan memasang rear output shaft dengan teknik yang betul
4. Membuka dan memasang front output shaft dengan teknik yang betul

GAMBAR RAJAH : REAR OUTPUT SHAFT (PART TIME 4WD)


Page | 2

Page | 3

LANGKAH KERJA
1.

Clutch Hub Removal

BUTIRAN KERJA
1.1 Use special tool to support the low speed gear.
1.2 Use a press to push at the front end of the rear output shaft and then
remove the hub and gear.
NOTE: The clutch hub may fit loosely on the shaft, so that
removal is possible without using a press.

2.

Jam Nut Removal

2.1 Remove the staked nut from the shaft.


2.2 Hold the drive sprocket in a soft-jaw vise.
2.3 Shift the clutch sleeve to the drive sprocket side.

2.4 Use special tool to remove the jam nut

3.

Radial Ball Bearing

3.1 Use special tool to support the ball bearing.

Removal

3.2 Use a press to push at a rear end of the rear output shaft,and then
remove the radial ball bearing.
NOTE: The bearing may fit loosely on the shaft, so that removal is
possible without using a press.

Page | 4

LANGKAH KERJA
4.

Clutch Hub Removal

BUTIRAN KERJA
4.1 Place special tool so that the load is applied at the bearing
4.2 Use a press to push at the rear end of the rear output shaft,
and then remove the clutch hub and ball bearing

5.

Ball Bearing/Stopper

5.1 Use special tool to the rear output shaft

Plate Installation

5.2 After installing the ball bearing, fit the stopper plate onto the rear
output shaft
5.3 Use special tools to press in the ball bearing

6.

Clutch Hub

6.1 Use special tool to the rear output shaft.

Installation

6.2 Confirm the clutch hub installation direction, and fit onto the rear
output shaft.
6.3 Use special tools to press in the clutch hub.
NOTE: The clutch hub may fit loosely on the shaft, so that installation
is possible without using a press.

Page | 5

LANGKAH KERJA
7.

BUTIRAN KERJA

Ball Bearing

7.1 Use special tool to support the rear output shaft.

Installation

7.2 Use special tools to install the radial ball bearing.


NOTE: The ball bearing may be fitted loosely on the shaft, so
that installation is possible without using a press.

8.

Jam Nut Installation

8.1 Hold the drive sprocket in a soft-jaws vise


8.2 Shift the clutch sleeve to the drive sprocket side
8.3 Using special tool MB991013, tighten the jam nut to the specified
torque

8.4 Stake the two places of the jam nut as shown in illustration.

Page | 6

LANGKAH KERJA
9.

BUTIRAN KERJA

Clutch Hub

9.1 Use special tool to support the drive sprocket.

Installation

9.2 Confirm the clutch hub installation direction, and fit onto the rear
output shaft.
9.3 Use special tools to press in the clutch hub.

10. Snap

Ring

Installation

10.1 Install the thickest snap ring that can be fitted in the snap
ring groove of the rear output shaft.
10.2 Make sure that the clutch hub end play meets the standard value.
Standard value: 0 0.08 mm (0 0.003 inch)

Page | 7

GAMBAR RAJAH : FRONT OUTPUT SHAFT (PART TIME 4 WD)

LANGKAH KERJA

BUTIRAN KERJA

1.

Ball Bearing Removal

1.1 Use special tool to support the ball bearing

2.

Ball Bearing

2.1 Use special tool to support the front output shaft

Installation

2.2 Use special tools to install the ball bearing

Page | 8

LANGKAH KERJA
3.

BUTIRAN KERJA

Ball Bearing

3.1 Use special tool to support the front output shaft.

Installation

3.2 Use special tools to install the ball bearing.

Page | 9

PERATURAN PEMARKAHAN AMALI


PROGRAM DIPLOMA VOKASIONAL MALAYSIA
MTA 501: 4 WHEEL DRIVE TRAIN SYSTEM
1. Skala Markah:
0- Tidak menjalankan tugasan.
1- Menjalankan tugasan dan tidak mengikut kriteria yang ditetapkan.(1%-49%)
2- Menjalankan tugasan dan mengikut sebahagian kriteria yang ditetapkan.(50%-74%)
3- Menjalankan tugasan dan mengikut kriteria yang ditetapkan.(75%-100%)
2. Wajaran:
1- Perkara yang penting/ Tidak memerlukan kemahiran tinggi.
2- Perkara penting/ Perlu kemahiran tinggi.
3- Perkara sangat penting/ Mempengaruhi kefungsian.
3. Tandakan () di ruang markah yang disediakan

SKALA MARKAH:
Skala 0 = Calon tidak melakukan tugasan/ tidak mengikut kriteria yang ditetapkan
Skala 1 = Calon mengikut sebahagian daripada kriteria yang ditetapkan
Skala 2 = Calon mengikut kriteria ditetapkan
Skala 3 = Calon mengikut dan melebihi kriteria ditetapkan

BI
L

1.

WAJARAN
(1 3)

MARKAH
DIPEROLE
HI

PERATUS
MARKAH
DIPEROLEHI

PROSES KERJA -40%


Menyediakan peralatan dan bahan kerja

Melaksanakan kerja dengan tempoh


yang telah ditetapkan.

JUMLAH

2.

MARKAH
DIBERI

ASPEK DINILAI

/ 9 x 40

HASIL KERJA-40%
Membuka dan memasang rear output

/ 27 x 40

Page | 10

shaft dengan teknik yang betul


Membuka dan memasang komponen
front output shaft dengan teknik betul
Tiada kerosakan pada ceraian
komponen
JUMLAH

3.

3
9

FAKTOR KRITIKAL -10%


Proses membuka, pemeriksaan dan
pemasangan ke atas komponen
menggunakan kaedah yang betul
mengikut manual servis pengeluar.
JUMLAH

4.

/ 9x 10
3
3

KESELAMATAN DAN NILAI - 10%


Sentiasa menjaga kebersihan tempat
kerja
Semua peralatan di simpan / di jaga
dengan baik

2
2

Sentiasa mengamalkan langkahkeselamatan semasa melakukan kerja.

Persediaan diri

Berhemah dan berdisplin

Etika

Profesionalisma

2
JUMLAH

/ 42 x 10

14

JUMLAH MARKAH KESELURUHAN


TANDA TANGAN
PEMERIKSA
NAMA PEMERIKSA
TARIKH
TERAMPIL / TIDAK
TERAMPIL
NAMA PENGESAH

TANDA TANGAN
PENGESAH

Page | 11

Anda mungkin juga menyukai