a
SAMKG
Q07-14-M-YP-0654-09
22 August 2009
MIDMAC CONTRACTING Co, WALL.
P.O BOX 2758
DOHA
QATAR
Attn.: Mr. JACK GHANTOUS
PROJECT DIRECTOR
Subj. : AL SADD DEVELOPMENT COMPLEX -528 PROJECT
ELECTROMECHANICAL WORKS
APARTMENTS MAIN PPRC RISER PIPE SUPPORTS
Dear Sir,
Please find enclosed herewith Apartments Main PPRC Riser Pipe Supports Calculation for Al Sadd
Development Complex project for approval.AL-SADD COMPLEX
APARTMENTS
MAIN PPRC RISER PIPE SUPPORTS
CALCULATION
Rev 0
SAMKO
SAMKO INTERNATIONAL CO WLL
21 AUG 2009
By. Yuksel POLATAPARTMENS MAIN FEED LINE TO ROOM PPRC 63mm PIPE.
Pipe ; Aquatherm Fusion Faser composit SDR 7.4
Pipe full weight 1.63kg + 1.15 Kg= 3.15Kg/m
Pipe Span on vertical 1.5m
Pipe Load = 3,15 * 1.5 = 4.72 kg
Used Support Hilti ML- C30 Channel.
Span is 300 mm ot less.
C-Channel safe load at 100 mm span is 48 kg as per manufacturer table.
(see attached document)
For 300 mm span safe load =48*100/300= 16 kg
C-30 Hilti Channel is more safe.ML system: for light-duty channel instaliations
Use
For instalation wth
Channels Brackets 1 chanel washer
1 Pipe ing sales (Channel enccaps
Angle supponts fubher inlay
Insert. attach That's a.
ML-C installation channel Features
Protwotion: Senezmi galvanised, 20 mevons we Trae types of channel = tree load ranges.
Available
instaiiess ste! ‘wA dimension gia as an instalation aid.
vw Serratod channel enes.
swAn innovative desi.
1% 3 Ban ML-CA5®
2» 3 Seem
3 Bam
Technical data “PN og
‘Chae vec a single spn wlth load at id span, U2 £
Spode.) 2 z =
cee Tam _Fo_ Tosa ata tal
ate
tats 2 04 60 ce
et AGF a a TH es po 1 ee PAR
etc, ane we wed
ML-E channel endcap Atventage
Materia plastic PP 1 Optimal edge protection
5 sori2t
20 aoriz2
30 307123
NIL-S pipe ring sadcile Advantages
Protection: galvanised 1 Simple compact, tie saving,
sw Single part mace ol eta
sm Sulablefor petting
an be tte arremoved wahouta too
sm Cane shifted tas wien pstioned over
fastening,
ss Soteble oa he types of chan
a 5 MLS aortas
4 MSM 8 307126
4 MLS-m0 2r127
Technical data
Fear este Fac = OOH