Anda di halaman 1dari 14

Drawing Plotted:

14/9/2015 3:40:55 PM

STRUKTUR

Project No.

2820056

PROYEK RICHS JAKARTA

UNTUK PERMOHONAN IMB

STRUCTURAL DRAWING LIST


Rev
A
A
A
A
A
A
A
A
A
A
A
A
A
A

JUDUL GAMBAR
HALAMAN MUKA
BNG KANTOR- DENAH DAN DETIL PONDASI
BNG KANTOR - DENAH LANTAI DAN DENAH ATAP
BANGUNAN KANTOR - POTONGAN DAN DETIL
BANGUNAN PRODUKSI/GUDANG DENAH DAN DETIL PONDASI
BANGUNAN PRODUKSI/GUDANG DENAH LANTAI DASAR
BANGUNAN PRODUKSI/GUDANG DENAH RANGKA TAP
BANGUNAN PRODUKSI/GUDANG - POTONGAN LEMBAR 1
BANGUNAN PRODUKSI/GUDANG - POTONGAN LEMBAR 2
BANGUNAN PRODUKSI/GUDANG - DETIL LEMBAR 1
BANGUNAN PRODUKSI/GUDANG - DETIL LEMBAR 2
BANGUNAN UTILITY - DENAH DAN DETIL PONDASI
BANGUNAN UTILITY - DENAH LANTAI DAN ATAP
BANGUNAN UTILITY - POTONGAN DAN DETIL

Prepared for

By
Beca

ORIGINAL DRAWING
IN COLOUR

14 SEPTEMBER 2015
UNTUK PERMOHONAN IMB
Drawing No.

2820056-SE-0000

Rev.

Document No. D:\Revit\Richs\2852551-SE-RICHS-2016 - IMB_MIS1.rvt

No.
GAMBAR
SE-0000
SE-0001
SE-0002
SE-0003
SE-0101
SE-0102
SE-0103
SE-0111
SE-0112
SE-0121
SE-0122
SE-0201
SE-0202
SE-0203

Drawing Plotted:

14/9/2015 3:48:26 PM

KETERANGAN
TRUE
NOR
102.39 TH

GAMBAR INI DISAJIKAN UNTUK DIBACA BERSAMASAMA DENGAN GAMBAR-GAMBAR ARSITEKTUR.

UKURAN-UKURAN JARAK, KETINGGIAN DAN AS


BANGUNAN DITENTUKAN BERSAMA-SAMA
DENGAN GAMBAR-GAMBAR ARSITEKTUR.

PROJECT NORTH

OF COLUMN

OF COLUMN

SLAB BETON

SLAB BETON

300

BALOK SLOOF

LANTAI KERJA
T = 50mm

LEVEL
LANTAI DASAR

LANTAI KERJA
T = 50mm

450

1000

PC
4

KOLOM BETON
T1
T2

600
2200

PASIR URUG
DIPADATKAN
BALOK SLOOF

TANAH URUG

600

600

1600

P2
A
P6
C

PC
4

: Fy = 240 MPa
: Fy = 400 MPa

W6

5100

B2
B1
400

P6
B

PC
4

LEVEL MUKA
TANAH ASLI

TEMBOK PENAHAN
TANAH
T = 150 THK
TULANGAN D16-150

LEVEL P - PONDASI
RL -2.200

PC
4

W7

BALOK SLOOF
400x600

PC
4

MUTU TULANGAN
< 10mm BJTP24
D > 10mm BJTD40

1000

TANAH

PC
4

PC
4
PC
4

5100

O6

: Fc' = 30 MPa
: Fc' = 30 MPa
: Fc' = 25 MPa
: Fc' = 30 MPa

1200

PC
4

PC
4

5575
5575

O7

W5
PC
4

P2
A

W4

SKEMATIK DETAIL TEMBOK PENAHAN TANAH


1 : 25

POTONGAN PILE CAP PC4


1 : 25

P2
A

W3
1700
350
TYP

B2
T2

350
TYP

W2

TITIK POINT KOLOM

350
TYP

PC
6A

O1

PC
4

PC
4

4783

PC
4

O2

PC
4

PC
4

4783

PC
4

O3

PC
4

PC
4

4783

O4

PC
4

PC
4

5100

40800

PASIR URUG
DIPADATKAN

TANAH URUG

W8

O8

O5

U1

600

PC
6A

O9

PC
4

PC
4

600

150

U2

MUTU BETON :
PELAT LANTAI & BALOK
KOLOM
PILE CAP
TEMBOK PENAHAN

TEMBOK PENAHAN
T = 150 THK
5570

5570

T1

1000

B1

12140

UNTUK PERMOHONAN IMB

No.

Revision

Original
Scale (A1)

Design
Drawn

As indicated

OB

OC WA

H
EL-2.200 TOP OF PILE CAP
(TYP.)

350
TYP

OA

Dsg Verifier

Reduced
Scale (A3)

Dwg Check

14.09.2015
By

YHN
STN
JO3
HP1

Chk

Appd

Date

SEP'2015
SEP'2015
SEP'2015
SEP'2015

Drawing Originator

T3

DENAH PONDASI PILE CAP


1 : 200

PC4 SKEMATIK DETAIL PEMBESIAN PILE CAP


1 : 20

TIANG PANCANG PRECAST PRESTLILE


CONCRETE 350x350
DIPANCANG SAMPAI KEDALAMAN
L=9.0m /TANAH KERAS DARI
MUKA TANAH ASLI

Client

RICH PRODUCTS, CORP


JL. UTAMA MODERN INDUSTRI
BLOCK BA NO.5
KAWASAN MODERN INDUSTRI,
CIKANDE, SERANG, BANTEN

Project

PROYEK RICHS JAKARTA

Title

BNG KANTOR- DENAH DAN DETIL


PONDASI

Discipline

UNTUK PERMOHONAN IMB


DO NOT SCALE

STRUKTUR
Drawing No.

Rev.

2820056-SE-0001

A
IF IN DOUBT ASK.

Document No. D:\Revit\Richs\2852551-SE-RICHS-2016 IMB_MIS1.rvt

Drawing Plotted:

14/9/2015 3:41:28 PM

KETERANGAN
TRUE
NOR
102.39 TH

GAMBAR INI DISAJIKAN UNTUK DIBACA BERSAMASAMA DENGAN GAMBAR-GAMBAR ARSITEKTUR.

UKURAN-UKURAN JARAK, KETINGGIAN DAN AS


BANGUNAN DITENTUKAN BERSAMA-SAMA
DENGAN GAMBAR-GAMBAR ARSITEKTUR.

PROJECT NORTH

UA TD

U2

U2

1
SE-0003

MUTU BETON :
PELAT LANTAI & BALOK
KOLOM
PILE CAP
TEMBOK PENAHAN

: Fc' = 30 MPa
: Fc' = 30 MPa
: Fc' = 25 MPa
: Fc' = 30 MPa

MUTU TULANGAN
< 10mm BJTP24
D > 10mm BJTD40

: Fy = 240 MPa
: Fy = 400 MPa

B2

B2

B2

B1
B1

B6
B6
B6
B6

B2

B1

B6

B1

5570

W4

W3

W2

B1

5570

PLAT BETON
T=150mm
TULANGAN D10-200
ATAS BAWAH

B6

B2

B2

B1

B6

B1
B1

B2

B2

B2

B1

B2

B1

B1

B2

B1

B1

B6

B1

B2
B2
B2

B2

B1

1000

B2
B2
B2
B2
B2

B2

B2

B2

O1

B2

B1

B2

B1

B1

4783

B6

W2

W5

? - [?]
B2

B1

B1

O2

W6

B1

B2

B1

B2

B1

B2
B2
B2

B1

B1

4783

W3

B2

B1
B2

W7

B1

B1

B2

B2

B2

B2

B1

5100

B1

W8

B1

B2

B1

5100

40800

B1

5100

B6

W4

B6

1000

12140

UNTUK PERMOHONAN IMB

No.

Revision

Original
Scale (A1)

Design
Drawn

As indicated

OA
A
-

OB

OC WA

DENAH LANTAI DASAR


1 : 200

OA
B
-

OB

OA

OC WA

OB

Dsg Verifier

Reduced
Scale (A3)

OC WA

Dwg Check

14.09.2015
By

YHN
STN
JO3
HP1

Chk

Appd

Date

SEP'2015
SEP'2015
SEP'2015
SEP'2015

Drawing Originator

DENAH LANTAI 1

1 : 200

DENAH ATAP DAK


1 : 200

Client

RICH PRODUCTS, CORP


JL. UTAMA MODERN INDUSTRI
BLOCK BA NO.5
KAWASAN MODERN INDUSTRI,
CIKANDE, SERANG, BANTEN

Project

Title

PROYEK RICHS JAKARTA

BNG KANTOR - DENAH LANTAI


DAN DENAH ATAP

Discipline

UNTUK PERMOHONAN IMB


DO NOT SCALE

STRUKTUR
Drawing No.

Rev.

2820056-SE-0002

A
IF IN DOUBT ASK.

Document No. D:\Revit\Richs\2852551-SE-RICHS-2016 IMB_MIS1.rvt

B1

5570

B2

U1

B2

B1

12140

12140

B1

O4
O3

B1

C2
B2
B1

B2

B1

B2
B2

B1

5575

B6
B6
B6
B6

B1

C2

PLAT BETON
T=150mm
TULANGAN D10-200
ATAS BAWAH

O5

B1

B1

B2
B2

B1

5575

C2
B6
B1

C2
B1

C2
B1

C2
B1

C2

W5

B1

B2

B2

B1

SE-0003

C2

B2

B2

B1

C2
B2

B1

C2

B2
B2
B2
B2
B2
B2
B2
B2
B2

B2

B2

B1

B2
B2

B1

B1

5570

O6

B2

B2

1000

SE-0003

O7

B1

B1

B1

W7

C2

C2
B2
B2

B1

C2
B1

C2
B1

C2
B1

B2

B2

B2

B1

O1

B1

C2

B1

B1

B2
B2
B2
B2
B2
B2

B2

W8

B1
B2

C2

B2

C2
B1

C2
B1

C2
C2
B1

B1

B1

O9

O8

B2

B2

C2
4783

B6

W2

B2

U1

B1

B1

B1

O2

B1

B2

B1

W3

B2

B2

B2

B1

4783

B6

C2

O3

B1

B1

C2

O4

B2

C2
B2

B1

B1

5100

40800

O5

B1

C2
B2

C2

B2
B2

5575
5100

2
SE-0003

5100

B6

W4

B1

C2

B1

5570

5575

B6
B6

W5

O6

4783

B1

B2

PLAT BETON
T=150mm
TULANGAN D10-200
ATAS BAWAH

B6

C2

B1

B6

C2
B1

B2

B2

B1

B6

C2
B1
B1

W6

B1

B2

3
SE-0003

O7

C2
B2

B1

5570

W7

B1

B2

B1

C2
B2

B1

O8

C2
B1

B2

B1

B2

B1

B1
C2
B2

B2
B2

B1

W8

C2

B2

B2

UA TD

T1

O9

B1

B2
B2
B2
B2
B2
B2
B2
B2
B2

B1

U1

C2

C2
B2
B2

B1

C2
B1

C2
B1

B2

B1

B1

C2

B1

B2

B1

O1

C2
B1

B2

B2

B2

C2
B1

B1

C2
B2

4783

O2

B2

C2
B2

C2
B2

4783
4783

O3

B1

B2

B2
B2

B1

5100

O4

B2

B1

B2

B1

C2

40800

SE-0003

5100

B2

B1

C2

C2

B2

B1

5100

B2

C2

O7

B2

B1
C2
B2

B2

B1

3
SE-0003

5575

B2

C2

O8

B1

B1
C2
B2

C2

B2

B1

5575

B2

B1

TC

T2

T1

O9

TB

SE-0003

T1

O5

TA

UA TD

T2

SE-0003

O6

TC

B2

U2

TB

B2

T2

TA

B2

TC

B1

TB

4783

TA

Drawing Plotted:

KETERANGAN

U1
OA

PC4

B1

PC4

B1

PC4

1
SE-0002

B1

PC4

B1

B1

PC4

PC4

LEVEL 0 - LT DASAR
LEVEL P - PONDASI

C2

C2

B1

C2

C2

C2

C2
B1

PC4

B1

B1
PC4

RL 0.000 m

B1

B1

PC4

PC4

ATAS

BAWAH

TENGAH

ATAS

BAWAH

TENGAH

5D19

2D10

5D19

5D19

2D10

D10-150

JENIS TULANGAN

POTONGAN

PC4

4200
P6C

POTONGAN

SE-0002

1 : 200

LEVEL 3 - ATAP KANTOR


RL 8.400 m

20-D22
PINGGIR

TENGAH

SAMBUNGAN

D10-150

D10-150

D10-150
LEVEL 1 - LT KANTOR
RL 4.200 m

ATAS

BAWAH

TENGAH

ATAS

BAWAH

TENGAH

2D16

2D16

2D10

2D16

2D16

2D10

SENGKANG

D10-150

D10-200

JENIS TULANGAN
SENGKANG

20-D22
PINGGIR

TENGAH

SAMBUNGAN

D10-150

D10-150

D10-150

250

LEVEL 0 - LT DASAR

500

RL 0.000 m
A

400

400

250

500

400

400

B1

1 : 200

200

LEVEL 1
LT KANTOR
RL 4.200 m

ATAS

BAWAH

TENGAH

ATAS

BAWAH

TENGAH

3D16

3D16

2D10

3D16

3D16

2D10

SENGKANG

UNTUK PERMOHONAN IMB

No.

D10-150

D10-200

500

LEVEL 0
LT DASAR
RL 0.000 m

JENIS TULANGAN

B1

PC4

PC4

500

BALOK
B2
250x400

B1

500

600

LEVEL 3
ATAP KANTOR
RL 8400 m

200

: Fy = 240 MPa
: Fy = 400 MPa

OA

SENGKANG

JENIS TULANGAN

RL 0.000 m

400

D10-150

BALOK
B6
200x400

B1

LEVEL P - PONDASI

PC4

SE-0002

5D19

SENGKANG

B1

RL -2.200 m

1 : 200

600

JENIS TULANGAN

LEVEL 1 - LT KANTOR

LEVEL 0 - LT DASAR

500

BALOK SLOOF
400x600

B1

RL 4.200 m

B1

RL -2.200 m

POTONGAN

400

RL 8.400 m

B1

B1

4200

B1

B1

Revision

Original
Scale (A1)

Design
Drawn

As indicated

Dsg Verifier

Reduced
Scale (A3)

A
JENIS TULANGAN
SENGKANG

300

20-D22
PINGGIR

TENGAH

SAMBUNGAN

D10-150

D10-150

D10-150

PENJELAS

Dwg Check

14.09.2015
By

YHN
STN
JO3
HP1

Chk

Appd

Date

SEP'2015
SEP'2015
SEP'2015
SEP'2015

Drawing Originator

1 : 50

300
500

Client

JL. UTAMA MODERN INDUSTRI


BLOCK BA NO.5
KAWASAN MODERN INDUSTRI,
CIKANDE, SERANG, BANTEN

500

LEVEL P
PONDASI
RL -2.200 m

Project

ATAS

JENIS TULANGAN

5D19

SENGKANG
AREA

BAWAH

TENGAH

ATAS

3D19

2D10

3D19

BAWAH

TENGAH

5D19

2D10

D10-150

D10-200

PINGGIR

TENGAH

JENIS TULANGAN
SENGKANG

20-D22
PINGGIR

TENGAH

SAMBUNGAN

D10-150

D10-150

D10-150

GRID

TABEL PENJELAS BALOK BETON


1 : 20

PROYEK RICHS JAKARTA

Title

BANGUNAN KANTOR - POTONGAN


DAN DETIL

SEMUA GRID

TABEL PENJELAS KOLOM BETON


1 : 20

Discipline

UNTUK PERMOHONAN IMB


DO NOT SCALE

STRUKTUR
Drawing No.

Rev.

2820056-SE-0003

A
IF IN DOUBT ASK.

Document No. D:\Revit\Richs\2852551-SE-RICHS-2016 IMB_MIS1.rvt

600

RICH PRODUCTS, CORP

BALOK
B1
300x600

600

TEMBOK PENAHAN
TANAH
T = 150 THK

B1

RL 4.200 m

1200
2200

B1

RL -2.200 m

B1

C2

C2

LEVEL P - PONDASI

B1

C2

B1

LEVEL 0 - LT DASAR

MUTU TULANGAN
< 10mm BJTP24
D > 10mm BJTD40

OC

4200

C2

RL 4.200 m

B1

LEVEL 1 - LT KANTOR

OB

: Fc' = 30 MPa
: Fc' = 30 MPa
: Fc' = 25 MPa
: Fc' = 30 MPa

1200
2200

B1

OA

MUTU BETON :
PELAT LANTAI & BALOK
KOLOM
PILE CAP
TEMBOK PENAHAN

LEVEL 3 - ATAP KANTOR

C2

B1

C2

B1

C2

B1

C2

C2

B1

C2

B1

C2

B1

C2

C2

B1

OC

C2

RL 8.400 m

OB

C2

RL 8.400 m

4200

LEVEL 3 - ATAP KANTOR

C2

O1

C2

O2

C2

O3

C2

O4

C2

O5

C2

O6

C2

O7

C2

O8

C2

O9

RL 0.000 m

WA

WA

LEVEL 3 - ATAP KANTOR

LEVEL 1 - LT KANTOR

14/9/2015 3:41:44 PM

Drawing Plotted:

KETERANGAN

W2
TRUE
NOR
102.39 TH

KOLOM BAJA
LIHAT GAMBAR BAJA

UK

6000

6000

6000

B5

6000

6000

6000

WA

WB

WC

WD

WE

WF

WG

WH

WI

WJ

WK

WL

300
1200

MUTU BETON :
PELAT LANTAI & BALOK
KOLOM
PILE CAP
TEMBOK PENAHAN

: Fc' = 30 MPa
: Fc' = 30 MPa
: Fc' = 25 MPa
: Fc' = 30 MPa

MUTU TULANGAN
< 10mm BJTP24
D > 10mm BJTD40

: Fy = 240 MPa
: Fy = 400 MPa

BALOK SLOOF

600
PARIMETER PILE CAP
P2A EL-2.200 TOP OF PILE CAP

6442

3000

PENJELAS PILE CAP LIHAT PADA GAMBAR SE-0122

200
400

6442
6442

3000

LEVEL P - PONDASI
RL -2.200 m

W6

3000
3000

W5
1

SECTION

1 : 25

W4
W2

150 THK SLAB


BETON ATAS

W3

OF COLUMN

200 INSULATION
200 BETON
BAWAH SLAB

20mm GAP
COMPRESSIBLE FILLER BOARD
& JOINT SEALANT

LEVEL 0 - LT DASAR

W2

RL 0.000 m

375
200
800

KOLOM BETON

PILE CAP P1
LIHAT DI POTONGAN 2
SE-0122
(TYP)

6260

74260

OC

W7

3000

B5

P1

6000

TIANG PANCANG
PRECAST PRESTLILE
CONCRETE 350x350
DIPANCANG SAMPAI
KEDALAMAN
L=9.0m /TANAH KERAS
DARI MUKA TANAH ASLI

P2
B

P1

P2
B

P1

P2
B

P1

P2
B

P2
B

6000

UKURAN-UKURAN JARAK, KETINGGIAN DAN AS


BANGUNAN DITENTUKAN BERSAMA-SAMA
DENGAN GAMBAR-GAMBAR ARSITEKTUR.

MUKA TANAH ASLI

SEMUA PARIMETER PILE CAP


EL-2.200 TOP OF PILE CAP
(TYP.)

P1

P1
P1

AREA 2( P1 EL -0.375 TOP OF PILE CAP)


6000

PILE CAP P1
EL-0.00 TOP
OF PILE CAP

P1
B5

B5

B5

B5

B5

P2
B

B5

B5

B5
B5

B5

B5

B5

B5

B5
B5

B5

B5

KOLOM BETON

P2
B

B5

B5

B5
B5

B5

P2
B

B5

B5

B5
B5

B5
B5

B5

B5

GAMBAR INI DISAJIKAN UNTUK DIBACA BERSAMASAMA DENGAN GAMBAR-GAMBAR ARSITEKTUR.

WM

BALOK SLOOF

LEVEL P - PONDASI

RL -2.200 m

UNTUK PERMOHONAN IMB

No.

Revision

Original
Scale (A1)

A
-

Design
Drawn

As indicated

DENAH PONDASI

Dsg Verifier

Reduced
Scale (A3)

1 : 200

Dwg Check

14.09.2015
By

YHN
STN
JO3
HP1

Chk

Appd

Date

SEP'2015
SEP'2015
SEP'2015
SEP'2015

Drawing Originator

2
-

SECTION

Client

1 : 25

RICH PRODUCTS, CORP


JL. UTAMA MODERN INDUSTRI
BLOCK BA NO.5
KAWASAN MODERN INDUSTRI,
CIKANDE, SERANG, BANTEN

Project

PROYEK RICHS JAKARTA

Title

BANGUNAN PRODUKSI/GUDANG
DENAH DAN DETIL PONDASI

Discipline

UNTUK PERMOHONAN IMB


DO NOT SCALE

STRUKTUR
Drawing No.

Rev.

2820056-SE-0101

A
IF IN DOUBT ASK.

Document No. D:\Revit\Richs\2852551-SE-RICHS-2016 IMB_MIS1.rvt

6000

B5

B5

SE-0101

AREA 1( P1 EL 0.000 TOP OF PILE CAP)


7000

B5

B5

PILE CAP P1
LIHAT DI POTONGAN 2
SE-0122
(TYP)

W1
1000

B5

B5

B5

B5

B5

P2
B

P1

P2
B

P1

P2
B

P1

P2
B

P1

P2
B

P1
P2
B

P1

P2
B

P1

P2
B

P1

PC
6A

1
SE-0101

B5

P1

O1

B5

B5

P2
A

B5

1000

P2
B
B5
B5

P1
B5

P2
A

B5

P1
B5
B5

P1
B5

P2
A
B5
B5

P1
3000

B5

B5

B5

B5

RL 0.000 m

W8

P2
A

B5
B5

B5

P1

B5

B5

B5

B5

B5

P2
A

B5
B5
B5
B5

B5

B5

B5

P1

P1

P2
B

B5
B5
B5

B5
B5
B5
B5
B5
B5
B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

B5
B5

B5

P1
B5
B5
B5
B5
B5
B5

B5

B5

B5

B5

B5

B5

B5
B5

B5

B5
B5

B5
B5
B5
B5
B5
B5
B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

B5
B5
B5

B5
B5

B5

P1

P2
B
B5
B5
B5
B5
B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

P2
B

B5

B5

B5

B5

P2
A

O2

W1

B5

B5

B5

P2
A

B5

SE-0102

B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

O3

B5

B5

B5

O4

B5

B5

SEMUA PARIMETER PILE CAP


EL-2.200 TOP OF PILE CAP
(TYP.)

B5

B5

B5

B5

B5

B5

B5

B5
B5

P6
B

B5

B5

O5

B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

O6

B5

B5

B5

P6
C

B5

B5

O7

B5
B5

B5

P2
A

B5

B5

B5

B5

B5

B5

B5

B5

B5

P1

P2
B

O8

B5

B5

B5

P1

P2
B

P1

P2
B

P1

P2
B

P1

P2
B

P1

P2
B

P1

P2
B

P1

P2
B

P1

P2
B

O9

P2
B

PILE CAP P1
LIHAT DI POTONGAN 3
SE-0122
(TYP)

T1

LEVEL 0 - LT DASAR

800

PILE CAP P1
LIHAT DI POTONGAN 1
SE-0122
(TYP)

38650

UJ

6442

UI

6442

UH

6442

UG

2500 1825

UF

3000

UE

3000

UD

3000

UC

3000

UB

1825 2500

UA

PROJECT NORTH

14/9/2015 3:42:00 PM

Drawing Plotted:

14/9/2015 3:42:30 PM

KETERANGAN
TRUE
NOR
102.39 TH

UA
TD

PROJECT NORTH

TE UB

UC

SE-0111

SE-0111

UD

UE

UF

UG

UH

UI

T1

UJ

GAMBAR INI DISAJIKAN UNTUK DIBACA BERSAMASAMA DENGAN GAMBAR-GAMBAR ARSITEKTUR.

UKURAN-UKURAN JARAK, KETINGGIAN DAN AS


BANGUNAN DITENTUKAN BERSAMA-SAMA
DENGAN GAMBAR-GAMBAR ARSITEKTUR.

UK

SE-0111

SE-0111

B5

B5

B5

B5

B5

B5

6442

W4

3000

6442

3000
3000

W5

6442

3000

38650

3000

6442

W6

W3
6442

3000
1825 2500

: Fy = 240 MPa
: Fy = 400 MPa

6442

2500 1825
3000

3000

3000

3000

C1
B5
B5

C3

B5

MUTU TULANGAN
< 10mm BJTP24
D > 10mm BJTD40

W7

C3
B5

B5

C1

B5

B5

B5

B5

B5

B5

B5
B5

B5

B5

B5

B5
C1

B5

B5

B5
B5

B5

B5

B5

B5

: Fc' = 30 MPa
: Fc' = 30 MPa
: Fc' = 25 MPa
: Fc' = 30 MPa

W8

C3

B5

B5

B5

B5

B5

B5

B5
C1

B5

B5

B5

B5
B5

B5

B5
B5

B5

B5
B5

B5

B5

B5

B5

B5

B5

B5

C3

B5
B5
B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

W2

7
6000

6000

6000

6000

SE-0112

6000

6000

6000

B5

C4

C4

C4

B5

SE-0101

C4

C4

SE-0101

7000

B5

B5

B5

B5

B5

B5
C1

C1

C1

C1

C1

C1
B5

B5

B5

B5

C4

B5

C1

C1

C1

B5

B5

B5

B5

B5
B5

B5

C3

O2
O1

B5

B5

B5

B5
C1

1
SE-0102

B5

B5

B5

B5

O3

B5

B5
B5

B5

B5
B5

B5
B5
B5

B5

B5

B5

C3

B5
B5

B5

C1
B5
B5
B5

B5
B5
B5
B5
B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

B5
B5

C1
B5

B5

B5

B5
B5

B5

B5

B5

B5

B5

B5

B5

B5
B5
B5

B5
B5
B5
B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

B5
B5

B5

B5

B5
B5

B5

B5

B5

B5

C3

B5

B5

B5

B5
B5
B5

B5

B5

B5

B5

B5

O4

B5

B5

B5

B5

B5

B5

B5

B5

B5

6
SE-0112

B5

B5

B5

B5

B5
B5

C3

B5

B5

B5

B5

6000

6000

6000

6260

W1

UNTUK PERMOHONAN IMB

No.

WA

WB

WC

WD

WE

WF

WG
A
-

OC
DI ISI DENGAN COMPRESSIBLE
FILLER BOARD &
JOINT SEALANT
LEVEL 0 - LT DASAR

WH

WI

WJ

WK

WL

Revision

Original
Scale (A1)

WM

Design
Drawn

As indicated

Dsg Verifier

Reduced
Scale (A3)

DENAH LANTAI DASAR


1 : 200

Dwg Check

14.09.2015
By

YHN
STN
JO3
HP1

Chk

Appd

Date

SEP'2015
SEP'2015
SEP'2015
SEP'2015

Drawing Originator

WA
20
GAP

350
Client

RL 0.000 m

RICH PRODUCTS, CORP

300

200

JL. UTAMA MODERN INDUSTRI


BLOCK BA NO.5
KAWASAN MODERN INDUSTRI,
CIKANDE, SERANG, BANTEN

Project

B1 (OFFICE)
300x600
B6 (OFFICE)
200x400

BALOK SLOOF BAGUNAN PRODUKSI /GUDANG


350x500

SAMBUNGAN ANTARA LANTAI ANTARA BANGUNAN PRODUKSI & KANTOR

NTS

PROYEK RICHS JAKARTA

Title

BANGUNAN PRODUKSI/GUDANG
DENAH LANTAI DASAR

Discipline

UNTUK PERMOHONAN IMB


DO NOT SCALE

STRUKTUR
Drawing No.

Rev.

2820056-SE-0102

A
IF IN DOUBT ASK.

Document No. D:\Revit\Richs\2852551-SE-RICHS-2016 IMB_MIS1.rvt

O5

B5

B5

B5

B5

B5

B5

B5

B5

B5

C1

C1

C3

B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

B5

O6

B5

B5

B5

B5

B5

B5

B5

B5

B5
B5

B5

B5

C3

O7

B5

B5

B5

B5

O8

B5

B5

SE-0112

B5

B5

B5

B5

B5

B5

B5

C1

B5

C1

B5

C1

B5

C1

B5

C1

B5

C1

C1

C1

O9

MUTU BETON :
PELAT LANTAI & BALOK
KOLOM
PILE CAP
TEMBOK PENAHAN

Drawing Plotted:

14/9/2015 3:42:58 PM

KETERANGAN
TRUE
NOR
102.39 TH

PROJECT NORTH

WA

WB

WC

WD

WE

WF

WG

WH

WI

WJ

WK

WL

GAMBAR INI DISAJIKAN UNTUK DIBACA BERSAMASAMA DENGAN GAMBAR-GAMBAR ARSITEKTUR.

UKURAN-UKURAN JARAK, KETINGGIAN DAN AS


BANGUNAN DITENTUKAN BERSAMA-SAMA
DENGAN GAMBAR-GAMBAR ARSITEKTUR.

WM

MUTU BAJA STRUKTUR :


BJ 41 / JIS SS400
: Fy = 250 MPa

SE-0111

SE-0111

SE-0111

SE-0111

T3

1
RB

1
RB

1
RB

1
RB

1
RB

1
RB

1
RB

1
RB

TR2

RB
1

TR2

TR2

TR2

TR2

TR2

TR2

TR2

TR1

TR1

TR1

TR2

TR2

TR2

TR2

TR2

TR2

TR2

TR2

TR2

TR2

TR2

1
RB

RB
1

1
RB
TR2

TR2

TR2

TR2

TR2

TR2

TR2

TR2

TR2

TR2

TR2

TR1

TR1

TR1

TR1

TR1

TR1

TR1

TR2

TR2

6000

6442

RB
1

T3

T3

T3

12000

6000

6000

W2

VB

GARIS BATAS ATAP

6000

6000

B10
B11
RB1
T2
T3
T4
VB

UKURAN
WF400x200
WF350x175x7x11
BESI BETON DIA20mm
C 200x75x20x3.2
WF300x150x6.5x9
WF200x100
RANGKAP L 100 x100 x 10

6260

GORDING BAJA T2 (LIHAT TABEL)


DENGAN DUA BARIS PENGIKAT BESI DIA20mm DISETIAP DUA RANGKA ATAP

A
-

DENAH RANGKA ATAP ATAS


1 : 200
A

UNTUK PERMOHONAN IMB

No.

Revision

Original
Scale (A1)

SE-0111

SE-0111

Design
Drawn

As indicated

Dsg Verifier

Reduced
Scale (A3)

B11

C1

T3

RB
1

1
RB

RB
1

WM
VB

T3

B11

T3

C1

C1

C1

WL

1
RB

1
RB

RB
1

WK

B11

T3

B11

T3

B11

WJ

C1

WI

C1

WH

T4

C4

T4

C4

T4

C4

C4

VB

C4

6000

RB
1

RB
1

RB
1

RB
1

RB
1

RB
1

RB
1

RB
1

RB
1

T3

1
RB

6000

1
RB

T3

VB

6000

1
RB

7000

T3

1
RB

T3

1
RB

T3

1
RB

T3

1
RB

T3

1
RB

T3

1
RB

1
RB

T3

1
RB

RB
1

VB

W3

TR2

TR2

1
RB

RB
1

TABEL RANGKA BAJA


TIPE

T4

Appd

Date

SEP'2015
SEP'2015
SEP'2015
SEP'2015

Client

RICH PRODUCTS, CORP


JL. UTAMA MODERN INDUSTRI
BLOCK BA NO.5
KAWASAN MODERN INDUSTRI,
CIKANDE, SERANG, BANTEN

W1
Project

GORDING BAJA T2 (LIHAT TABEL)


DENGAN DUA BARIS PENGIKAT BESI DIA20mm DISETIAP DUA RANGKA BAJA

YHN
STN
JO3
HP1

Chk

W2

SE-0112

Dwg Check

14.09.2015
By

Drawing Originator

B11

TR2

RB
1

TR1

TR1

TR1

TR1

B10

TR2

1
RB

TR2

1
RB

1
RB

W4

TR2

6442

TR2

RB
1

TR2

B10

TR2

C4

TR2

6442

RB
1

1
RB

TR2

1
RB

TR2

RB
1

W5

RB
1

PUNCAK ATAP

1
RB

PROYEK RICHS JAKARTA

Title

BANGUNAN PRODUKSI/GUDANG
DENAH RANGKA TAP

DENAH RANGKA ATAP BAWAH

Discipline

1 : 200

UNTUK PERMOHONAN IMB


DO NOT SCALE

STRUKTUR
Drawing No.

Rev.

2820056-SE-0103

A
IF IN DOUBT ASK.

Document No. D:\Revit\Richs\2852551-SE-RICHS-2016 IMB_MIS1.rvt

TR2

RB
1

W6

TR2

6442

TR2

1
RB

38650

TR2

TR1

TR1

TR1

RB
1

TR1

TR1

TR1

B10

TR1

TR2

1
RB

TR2

W7

TR2

1
RB

TR2

TR2

1
RB

RB
1

SE-0112

TR2

6442

TR2

RB
1

TR2

RB
1

RB
1
TR2

B10

TR2

RB
1

TR2

1
RB

TR1

TR2

RB
1

W8

T3

RB
1

6442

T3

RB
1

T3

RB
1

T3

RB
1

T3

RB
1

T3

RB
1

T3

RB
1

T3

RB
1

T3
1
RB

RB
1
1
RB

VB

T3
1
RB

T3

SE-0112

GARIS BATAS ATAP

VB

VB

Drawing Plotted:

14/9/2015 3:43:25 PM

KETERANGAN

W8

W7

W6

W5

W4

W3

W8

W6

W5

W4

W3

W2

GAMBAR INI DISAJIKAN UNTUK DIBACA BERSAMASAMA DENGAN GAMBAR-GAMBAR ARSITEKTUR.

UKURAN-UKURAN JARAK, KETINGGIAN DAN AS


BANGUNAN DITENTUKAN BERSAMA-SAMA
DENGAN GAMBAR-GAMBAR ARSITEKTUR.
MUTU BAJA STRUKTUR :
BJ 41 / JIS SS400
: Fy = 250 MPa

TR1

LEVEL 4 - ATAP PRODUKSI/GUDANG

RL 14.227 m

RL 14.227 m

T4

T4

T4

T4

T4

T4

T4

T4

T4

T4

T4

T4

LEVEL 2 - ATAP UTILITY

LEVEL 2 - ATAP UTILITY

RL 6.250 m

RL 6.250 m

T4

T4

T4

T4
RL 0.000 m

C1

C3

C3

C3

C3

RL 0.000 m

C3

C1

LEVEL 0 - LT DASAR

C1

T4

C1

T4

LEVEL 0 - LT DASAR

W7

TR1

B10

B10

LEVEL 4 - ATAP PRODUKSI/GUDANG

W2

LEVEL U - LT UTILITY
RL -1.050 m

LEVEL P - PONDASI

RL -2.200 m

LEVEL P - PONDASI

1
SE-0102

W7

POTONGAN

1 : 200

W6

SE-0102

W5

W4

W3

W2

W1

W8

W7

TR1

TR1
LEVEL 4 - ATAP PRODUKSI/GUDANG

LEVEL 4 - ATAP PRODUKSI/GUDANG

RL 14.227 m

RL 14.227 m

W6

W5

W4

W3

W2

W1

B10

T4

T4

T4

T4

T4

T4

T4

T4

T4

T4

T4

B11

LEVEL 0 - LT DASAR

T4

T4

T4

C1

C3

C3

C3

C3

C1

C1

C1

T4

T4

T4

B11

LEVEL 0 - LT DASAR
RL 0.000 m

C4

C4

RL 0.000 m

LEVEL U - LT UTILITY

RL -1.050 m

LEVEL P - PONDASI

UNTUK PERMOHONAN IMB

No.

RL -2.200 m

LEVEL P - PONDASI

Revision

Original
Scale (A1)

RL -2.200 m

Design
Drawn

As indicated

Dsg Verifier

Reduced
Scale (A3)

Dwg Check

14.09.2015
By

YHN
STN
JO3
HP1

Chk

Appd

Date

SEP'2015
SEP'2015
SEP'2015
SEP'2015

Drawing Originator

3
SE-0102

POTONGAN

1 : 200

SE-0102

POTONGAN
1 : 200

Client

RICH PRODUCTS, CORP


JL. UTAMA MODERN INDUSTRI
BLOCK BA NO.5
KAWASAN MODERN INDUSTRI,
CIKANDE, SERANG, BANTEN

Project

PROYEK RICHS JAKARTA

Title

BANGUNAN PRODUKSI/GUDANG POTONGAN LEMBAR 1

Discipline

UNTUK PERMOHONAN IMB


DO NOT SCALE

STRUKTUR
Drawing No.

Rev.

2820056-SE-0111

A
IF IN DOUBT ASK.

Document No. D:\Revit\Richs\2852551-SE-RICHS-2016 IMB_MIS1.rvt

RL 6.250 m

1 : 200

B10
T4

LEVEL 2 - ATAP UTILITY

POTONGAN

C3

W8

9000

9000

RL -2.200 m

Drawing Plotted:

14/9/2015 3:43:58 PM

KETERANGAN

WA

WB

WC

WD

WE

WF

WG

WH

WI

WJ

WK

WL

WM

GAMBAR INI DISAJIKAN UNTUK DIBACA BERSAMASAMA DENGAN GAMBAR-GAMBAR ARSITEKTUR.

UKURAN-UKURAN JARAK, KETINGGIAN DAN AS


BANGUNAN DITENTUKAN BERSAMA-SAMA
DENGAN GAMBAR-GAMBAR ARSITEKTUR.

LEVEL 4 - ATAP PRODUKSI/GUDANG


RL 14.227 m

MUTU BAJA STRUKTUR :


BJ 41 / JIS SS400
: Fy = 250 MPa

VB

VB

VB

VB

T3

T3

T3

T3

T3

VB

VB

T3

T3

T3

T3

T3

T3

T3

T3

T3

T3

T3

T3

T3

LEVEL 0 - LT DASAR
RL 0.000 m

VB

VB

VB

T3

T3

T3

T3

T3

C1

VB

VB

C1

C1

C1

C1

C1

VB

VB

C1

C1

C1

C1

C1

VB

VB

C1

RL 6.250 m

C1

LEVEL 2 - ATAP UTILITY

T3

VB

VB

VB

LEVEL P - PONDASI

P2
B

P1

P2
B

P1

P2
B

P1

P2
B

P1

P2
B

P1

P1
P2
B
P2
A

P2
B

P2
A

P2
B

P1

P2
B

P1

P2
A

B
P1
P2

P2
A

P2
B

P2
B
P1

P2
A

P1

PC
6A

RL -2.200 m

POTONGAN

SE-0102

WA

WB
TR2

WC
TR2

1 : 200

WD

WE

TR2

TR2

WF
TR2

WG

WH
TR2

TR2

WI

WJ

TR2

WK

TR2

WL

TR2

WM

TR2

TR2

LEVEL 4 - ATAP PRODUKSI/GUDANG

C3

C3

RL 14.227 m

LEVEL 0 - LT DASAR
RL 0.000 m

P2
A

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

UNTUK PERMOHONAN IMB

No.

Original
Scale (A1)

POTONGAN

SE-0102

Revision
Design
Drawn

As indicated

Dsg Verifier

Reduced
Scale (A3)

1 : 200

Dwg Check

14.09.2015
By

YHN
STN
JO3
HP1

Chk

Appd

Date

SEP'2015
SEP'2015
SEP'2015
SEP'2015

Drawing Originator

WH

WI

WJ

WK

WL

WM
Client

LEVEL 1 - LT KANTOR
RL 4.200 m

RL 0.000 m

VB

VB

JL. UTAMA MODERN INDUSTRI


BLOCK BA NO.5
KAWASAN MODERN INDUSTRI,
CIKANDE, SERANG, BANTEN

C4

C4

C4

C4

C4

C4

LEVEL 0 - LT DASAR

RICH PRODUCTS, CORP

LEVEL P - PONDASI

Project

PROYEK RICHS JAKARTA

P2
B

P1

P2
B

P1

P2
B

P1

P2
B

P1

P2
B

P2
B

RL -2.200 m

Title

BANGUNAN PRODUKSI/GUDANG POTONGAN LEMBAR 2

Discipline

7
SE-0102

POTONGAN

UNTUK PERMOHONAN IMB

1 : 200
DO NOT SCALE

STRUKTUR
Drawing No.

Rev.

2820056-SE-0112

A
IF IN DOUBT ASK.

Document No. D:\Revit\Richs\2852551-SE-RICHS-2016 IMB_MIS1.rvt

P1

P1

P1

P1

P1
P6
B

P1

LEVEL P - PONDASI
RL -2.200 m

Drawing Plotted:

14/9/2015 3:45:16 PM

KETERANGAN

WM

U1

GAMBAR INI DISAJIKAN UNTUK DIBACA BERSAMASAMA DENGAN GAMBAR-GAMBAR ARSITEKTUR.

UKURAN-UKURAN JARAK, KETINGGIAN DAN AS


BANGUNAN DITENTUKAN BERSAMA-SAMA
DENGAN GAMBAR-GAMBAR ARSITEKTUR.

W2

W2

W8

MUTU TULANGAN
< 10mm BJTP24
D > 10mm BJTD40

KUDA KUDA BAJA TRUSS


DENGAN MATERIAL
PROFIL BAJA T
DAN BAJA SIKU.

: Fy = 240 MPa
: Fy = 400 MPa

MUTU BAJA STRUKTUR :


BJ 41 / JIS SS400
: Fy = 250 MPa
IKATAN ANGIN
BESI BETON DIAMETER
16

LEVEL 4 - ATAP PRODUKSI/GUDANG


RL 14.227 m

LEVEL 4 - ATAP PRODUKSI/GUDANG


RL 14.227 m

C3

15.00

RANGKA CLADDING
C-200x65x20x3.2
TYPIKAL

SAMBUNGAN ANTARA
KOLOM KE TRUSS
MENGGUNAKAN PLAT DAN BAUT

CLADDING SHEET

CLADDING SHEET

SAMBUNGAN ANTARA
KOLOM KE TRUSS
MENGGUNAKAN PLAT DAN BAUT
RANGKA CLADDING
C-200x65x20x3.2
TIPIKAL

T4

DETAIL PRINSIP AS WM
1 : 25

C1

SE-0112

C1

C1

SEMUA BRACING
MENNGUNAKAN MATERIAL
BAJA SIKU.

FLASHING

KERB BATU BATA


LEBAR 150mm DAN TINGGI 300mm
DI PASANG SEKELILING LANTAI DAK ATAP

LEVEL 2 - ATAP UTILITY


RL 6.250 m

W1
FLASHING

BALOK PENGIKAT
ANTARA KOLOM

T4
LEVEL 1 - LT KANTOR
RL 4.200 m

B11

KOLOM BAJA

C4

SAMBUNGAN DENGAN
END PLATE DAN BAUT

SAMBUNGAN ANTARA
KOLOM BAJA KE KOLOM BETON
MENGGUNAKAN ANGKUR BAUT
DAN PLAT BAJA
LEVEL 0 - LT DASAR
RL 0.000 m

AREA KORIDOR

AREA GUDANG

LEVEL 0 - LT DASAR

AREA GUDANG

RL 0.000 m

LEVEL 0 - LT DASAR

P1

RL -1.050 m

Revision

Original
Scale (A1)

Design
Drawn

As indicated

AREA UNLOADING

RL 0.000 m

LEVEL U - LT UTILITY

UNTUK PERMOHONAN IMB

No.

Dsg Verifier

Reduced
Scale (A3)

Dwg Check

14.09.2015
By

YHN
STN
JO3
HP1

Chk

Appd

Date

SEP'2015
SEP'2015
SEP'2015
SEP'2015

Drawing Originator

P1
DINDING BETON

LEVEL P - PONDASI

LEVEL P - PONDASI

RL -2.200 m

RL -2.200 m

LEVEL P - PONDASI
RL -2.200 m
Client

P2B
P2B

P1

P1

RICH PRODUCTS, CORP

P2B

JL. UTAMA MODERN INDUSTRI


BLOCK BA NO.5
KAWASAN MODERN INDUSTRI,
CIKANDE, SERANG, BANTEN

Project

A
SE-0111

DETAIL PRINSIP AS W8
1 : 50

B
SE-0111

DETAIL PRINSIP AS W2

1 : 50

SE-0111

DETAIL PRINSIP AS W2 ( AREA BONGKAR MUAT )


1 : 50

PROYEK RICHS JAKARTA

Title

BANGUNAN PRODUKSI/GUDANG DETIL LEMBAR 1

Discipline

UNTUK PERMOHONAN IMB


DO NOT SCALE

STRUKTUR
Drawing No.

Rev.

2820056-SE-0121

A
IF IN DOUBT ASK.

Document No. D:\Revit\Richs\2852551-SE-RICHS-2016 IMB_MIS1.rvt

P2B

Drawing Plotted:

14/9/2015 3:53:26 PM

KETERANGAN

150 THK SLAB


BETON ATAS
200 INSULATION
200 SLAB BETON
BAWAH

OF PILE
T1
T2

OF PILE

200 INSULATION
T1

LEVEL
LANTAI DASAR

SLAB BETON

LEVEL
LANTAI DASAR

T2

OF PILE

T1
T2

200 SLAB
BETON BAWAH

MUTU BETON :
PELAT LANTAI & BALOK
KOLOM
PILE CAP
TEMBOK PENAHAN

: Fc' = 30 MPa
: Fc' = 30 MPa
: Fc' = 25 MPa
: Fc' = 30 MPa

MUTU TULANGAN
< 10mm BJTP24
D > 10mm BJTD40

: Fy = 240 MPa
: Fy = 400 MPa

LEVEL MUKA
TANAH ASLI

TANAH URUG

LEVEL MUKA
TANAH ASLI

TANAH URUG

B2

TIANG PANCANG PRECAST


PRESTLILE CONCRETE 350x350
DIPANCANG SAMPAI KEDALAMAN
L=9.0m /TANAH KERAS DARI
MUKA TANAH ASLI

350

B2
B1

350

POTONGAN

1 : 25

1 : 25

TIANG PANCANG PRECAST


PRESTLILE CONCRETE 350x350
DIPANCANG SAMPAI KEDALAMAN
L=9.0m /TANAH KERAS DARI
MUKA TANAH ASLI

POTONGAN
1 : 25

OF COLUMN

OF COLUMN

SLAB BETON

SLAB BETON

BALOK BETON

BALOK BETON
LEVEL
LANTAI DASAR

LEVEL
LANTAI DASAR

LEVEL P
PONDASI

BALOK SLOOF 400x600

700
2200
T1

B1

TIANG PANCANG PRECAST


PRESTLILE CONCRETE 350x350
DIPANCANG SAMPAI KEDALAMAN
L=9.0m /TANAH KERAS DARI
MUKA TANAH ASLI

B2
B1

POTONGAN

1 : 25

50 TOP PILE
INTO FOOTING

B2

50 TOP PILE
INTO FOOTING

TIANG PANCANG PRECAST


PRESTLILE CONCRETE 350x350
DIPANCANG SAMPAI KEDALAMAN
L=9.0m /TANAH KERAS DARI
MUKA TANAH ASLI

LEVEL MUKA
TANAH ASLI

LEVEL P
PONDASI

T2

600

T2

TANAH URUG

600

2200
T1

1000

BALOK SLOOF 400x600

LEVEL MUKA
TANAH ASLI

TEMBOK PENAHAN
TANAH
T = 150 THK
TULANGAN D16-150

1000

700

TANAH URUG

500

BALOK BETON

500

BALOK BETON

TANAH URUG

TIANG PANCANG PRECAST


PRESTLILE CONCRETE 350x350
DIPANCANG SAMPAI KEDALAMAN
L=9.0m /TANAH KERAS DARI
MUKA TANAH ASLI

350

POTONGAN

TEMBOK PENAHAN
TANAH
T = 150 THK
TULANGAN D16-150

1200
LEVEL MUKA
TANAH ASLI

B1

B2
B1

800

800

1200

1200

800

200

LEVEL
LANTAI DASAR

175 THK 150 THK


SLAB BETON ATAS

UNTUK PERMOHONAN IMB

No.

Revision

Original
Scale (A1)

Design
Drawn

As indicated

Dsg Verifier

Reduced
Scale (A3)

POTONGAN

Dwg Check

14.09.2015
By

YHN
STN
JO3
HP1

Chk

Appd

Date

SEP'2015
SEP'2015
SEP'2015
SEP'2015

Drawing Originator

1 : 25

Client

600

450

300

350

1000

Project

350
350

1700

1000

PROYEK RICHS JAKARTA

350

1700
Title

P2A DENAH PILE CAP


1 : 25

BANGUNAN PRODUKSI/GUDANG DETIL LEMBAR 2

P2B DENAH PILE CAP


-

1 : 25

Discipline

UNTUK PERMOHONAN IMB


DO NOT SCALE

STRUKTUR
Drawing No.

Rev.

2820056-SE-0122

A
IF IN DOUBT ASK.

Document No. D:\Revit\Richs\2852551-SE-RICHS-2016 IMB_MIS1.rvt

JL. UTAMA MODERN INDUSTRI


BLOCK BA NO.5
KAWASAN MODERN INDUSTRI,
CIKANDE, SERANG, BANTEN

900

300

450

RICH PRODUCTS, CORP

Drawing Plotted:

14/9/2015 3:45:48 PM

KETERANGAN
TRUE
NOR
102.39 TH

GAMBAR INI DISAJIKAN UNTUK DIBACA BERSAMASAMA DENGAN GAMBAR-GAMBAR ARSITEKTUR.

UKURAN-UKURAN JARAK, KETINGGIAN DAN AS


BANGUNAN DITENTUKAN BERSAMA-SAMA
DENGAN GAMBAR-GAMBAR ARSITEKTUR.

PROJECT NORTH

UA

UB

UC

UD

UE

UF

UG

UH

UI

UJ

UK

49000
4667

MUTU TULANGAN
< 10mm BJTP24
D > 10mm BJTD40

: Fy = 240 MPa
: Fy = 400 MPa

P2
A

P2
A

P2
A

P3

P3

P3

DINDING BETON T=150


DIPASANG DARI EL-2.200 SAMPAI
+0.000 (ELEVASI BANGUNAN GUDANG)

P3

P3

P3

P3

P3

11975

P2
A

P3

6000

ELEVASI TOP OF PILE CAP


-2.200
( TYP)

ELEVASI TOP OF PILE CAP


-2.200
( TYP)

P2
A

P2
A

P2
A

P2
A

P2
A

P2
A

P2
A

P2
A

P2
A

U1

P2
A

PC
6A

5975

U2

: Fc' = 30 MPa
: Fc' = 30 MPa
: Fc' = 25 MPa
: Fc' = 30 MPa

4667

P2
A

4667

P2
A

5000

P2
A

5000

P2
A

5000

P2
A

5000

P2
A

5000

P2
A

U3

5000

P2
A

P2
A

5000

MUTU BETON :
PELAT LANTAI & BALOK
KOLOM
PILE CAP
TEMBOK PENAHAN

W8

WA

WB

WC

WD
A

WE

WF

WG

WH

WI

WJ

DENAH PONDASI BANGUNAN UTILITY

1 : 200
CATATAN :
SEMUA PILE CAP YANG DI BERI LABEL ADALAH PILE
CAP UNTUK AREA UTILITY.

PLAT LANTAI BETON

LANTAI BETON

BALOK SLOOF

BALOK SLOOF

KOLOM BETON

TIANG PANCANG PRECAST


PRESTLILE CONCRETE 350x350
DIPANCANG SAMPAI KEDALAMAN
L=9.0m /TANAH KERAS DARI
MUKA TANAH ASLI

1
SE-0201

M.T.A

50 (TYP)

M.T.A

50 (TYP)

M.T.A

600
PILE CAP

600
PILE CAP

400

400

200

200

KOLOM BETON

TIANG PANCANG PRECAST


PRESTLILE CONCRETE 350x350
DIPANCANG SAMPAI KEDALAMAN
L=9.0m /TANAH KERAS DARI
MUKA TANAH ASLI

UNTUK PERMOHONAN IMB


Revision

Original
Scale (A1)

POTONGAN

1 : 25

A
No.

Drawn

As indicated

POTONGAN

SE-0201

Design
Dsg Verifier

Reduced
Scale (A3)

1 : 25

Dwg Check

14.09.2015
By

YHN
STN
JO3
HP1

Chk

Appd

Date

SEP'2015
SEP'2015
SEP'2015
SEP'2015

Drawing Originator

1620
1070

550

TITK POINT KOLOM

350

Client

300

RICH PRODUCTS, CORP

500

300

350

1000

Project

350

350

1700

Title

P3
-

920

BANGUNAN UTILITY - DENAH DAN


DETIL PONDASI

P2A DENAH PILE CAP

300
350

PROYEK RICHS JAKARTA

350

1 : 25

Discipline

UNTUK PERMOHONAN IMB

DENAH PILE CAP


1 : 25
DO NOT SCALE

STRUKTUR
Drawing No.

Rev.

2820056-SE-0201

A
IF IN DOUBT ASK.

Document No. D:\Revit\Richs\2852551-SE-RICHS-2016 IMB_MIS1.rvt

1700

1000

JL. UTAMA MODERN INDUSTRI


BLOCK BA NO.5
KAWASAN MODERN INDUSTRI,
CIKANDE, SERANG, BANTEN

600

500

350
350

700

1
SE-0201

2
SE-0201

Drawing Plotted:

14/9/2015 3:46:04 PM

KETERANGAN
TRUE
NOR
102.39 TH

300

GAMBAR INI DISAJIKAN UNTUK DIBACA BERSAMASAMA DENGAN GAMBAR-GAMBAR ARSITEKTUR.

UKURAN-UKURAN JARAK, KETINGGIAN DAN AS


BANGUNAN DITENTUKAN BERSAMA-SAMA
DENGAN GAMBAR-GAMBAR ARSITEKTUR.

300

UB
5000

5000

UE

UD

UC
5000

UF

5000

5000

UG
5000

UI

UH
5000

UJ

4667

UK

4667

500

4667

2
SE-0203

B3

B3

B3

B3

B3

B3

B3

B3

B3

B3

B3

B3

ATAS

BAWAH

TENGAH

2D10

3D19

5D19

2D10

D10-150

B3

D10-200

400

: Fc' = 30 MPa
: Fc' = 30 MPa
: Fc' = 25 MPa
: Fc' = 30 MPa

MUTU TULANGAN
< 10mm BJTP24
D > 10mm BJTD40

: Fy = 240 MPa
: Fy = 400 MPa

400

B3

B3

B3

TENGAH

3D19

PLAT BETON T=200mm


DENGAN TULANGAN D13-150
(2 LAYER) ATAS BAWAH

B3
400x600

B3

B3
B3

B3

B3

B3

B3

B3

B3

B3
B3

B3

B3

B3

B3

B3

B3

B3

B3
B3

B3

B3

B3

B3

5975

B3

B3

U1

B3

B3

B3

B3

6000

B3

U2

BAWAH

SENGKANG

1
SE-0203

ATAS
5D19

B3

600

B3

B3

U3

B3

JENIS TULANGAN

MUTU BETON :
PELAT LANTAI & BALOK
KOLOM
PILE CAP
TEMBOK PENAHAN

600

UA

BALOK
B4
300x500

500

PROJECT NORTH

SEMUA BALOK ANAK


ADALAH B4, KECUALI DITULIS LAIN

B3

JENIS TULANGAN

W8

ATAS

BAWAH

5D19

5D19

SENGKANG

2D10

ATAS

BAWAH

TENGAH

5D19

5D19

2D10

D10-150

D10-150

250

250

WA

WB

WC

WD
B

WE

WF

WG

WH

WI

WJ

DENAH LANTAI

1 : 200

JENIS TULANGAN

400

BALOK
B2
250x400

400

DINDING BETON T=200mm


TIPIKAL

ATAS

BAWAH

TENGAH

ATAS

BAWAH

TENGAH

3D16

3D16

2D10

3D16

3D16

2D10

SENGKANG
AREA

D10-150

D10-200

PINGGIR

TENGAH

TABEL PENJELAS BALOK BETON


1 : 20

UA

UB

UC

5000

5000

UD
5000

UE

UF

5000

5000

UG

UH

UI

UJ

UK

5000

5000

4667

4667

4667

B4

B4

B4

B4

B4

PLAT BETON T=200mm


DENGAN TULANGAN D13-150
(2 LAYER) ATAS BAWAH

B4

B4

UNTUK PERMOHONAN IMB

No.

B4

Revision
Design
Drawn

B4
B4

C2

B4
B4

C2

B4
B4

C2

B4
B4

C2

B4
B4

C2

B4
B4

C2

B4
B4

C2

B4
B4

C2

B4
B4

C2

C2

C2

B4

B4

As indicated

B4

14.09.2015
By

Chk

Appd

Date

C2

B4

C2

B4
B4

C2

B4

C2

C2

B4

B4

B4

B4
B4

C2

B4

C2

C2

B4

B4

B4

B4
B4

LANTAI DASAR
& LANTAI ATAP DAK

Original
Scale (A1)

SEMUA BALOK ANAK


ADALAH B2, KECUALI DITULIS LAIN

JENIS TULANGAN
SENGKANG

16-D22
PINGGIR
D10-150

W8

TENGAH
D10-150

Dsg Verifier

Reduced
Scale (A3)

Dwg Check

YHN
STN
JO3
HP1

SEP'2015
SEP'2015
SEP'2015
SEP'2015

SAMBUNGAN
D10-150

Drawing Originator

450

PONDASI PILE CAP

450

Client

RICH PRODUCTS, CORP


JL. UTAMA MODERN INDUSTRI
BLOCK BA NO.5
KAWASAN MODERN INDUSTRI,
CIKANDE, SERANG, BANTEN

WA

WB

WC

WD
C
-

WE

WF

WG

WH

WI

WJ

JENIS TULANGAN
SENGKANG

DENAH ATAP

GRID

1 : 200

16-D22

Project

PINGGIR

TENGAH

SAMBUNGAN

D10-150

D10-150

D10-150

SEMUA GRID
Title

TABEL PENJELAS KOLOM BETON


1 : 20

UNTUK PERMOHONAN IMB


DO NOT SCALE

PROYEK RICHS JAKARTA

BANGUNAN UTILITY - DENAH


LANTAI DAN ATAP

Discipline

STRUKTUR
Drawing No.

Rev.

2820056-SE-0202

A
IF IN DOUBT ASK.

Document No. D:\Revit\Richs\2852551-SE-RICHS-2016 IMB_MIS1.rvt

5975

U1

B4

C2

C2

U2

B4

B4

6000

SE-0203

450

C2

C2

C2

C2

450

C2

B4

C2

B4

C2

B4

C2

B4

C2

B4

C2

U3

C2

SE-0203

Drawing Plotted:

14/9/2015 3:46:18 PM

KETERANGAN

U3

UA
TD

TE UB

UD

5000

5000

UE
5000

UF
5000

UG
5000

UH
5000

UI
4667

UJ
4667

GAMBAR INI DISAJIKAN UNTUK DIBACA BERSAMASAMA DENGAN GAMBAR-GAMBAR ARSITEKTUR.

UKURAN-UKURAN JARAK, KETINGGIAN DAN AS


BANGUNAN DITENTUKAN BERSAMA-SAMA
DENGAN GAMBAR-GAMBAR ARSITEKTUR.

UK
RL 6.250 m

LEVEL 2 - ATAP UTILITY

: Fc' = 30 MPa
: Fc' = 30 MPa
: Fc' = 25 MPa
: Fc' = 30 MPa

MUTU TULANGAN
< 10mm BJTP24
D > 10mm BJTD40

: Fy = 240 MPa
: Fy = 400 MPa

C2

B4

C2

B4

C2

B4

C2

B4

C2

B4

C2

B4

C2

B4

C2

B4

C2

B4

C2

B4

C2

RL 6.250 m

MUTU BETON :
PELAT LANTAI & BALOK
KOLOM
PILE CAP
TEMBOK PENAHAN
LEVEL 2 - ATAP UTILITY

4667

200

5000

UC

LEVEL U - LT UTILITY

RL -1.050 m

B3

B3

B3

B3

B3

B3

B3

B3

B3

B3

P2
A

P2
A

P2
A

P2
A

P2
A

P2
A

P2
A

P2
A

P2
A

P2
A

P2
A

LEVEL P - PONDASI
RL -2.200 m

POTONGAN
1 : 200

7300

SE-0202

U3

U2

U1 W8

LEVEL 2 - ATAP UTILITY


RL 6.250 m

B4

B4

C2

C2

RL 0.000 m

C2

C1

LEVEL 0 - LT DASAR
LEVEL U - LT UTILITY
RL -1.050 m

B3

B3

P2
B

P2
A

P2
A

P3

LEVEL P - PONDASI

UNTUK PERMOHONAN IMB

No.

LEVEL U - LT UTILITY

Original
Scale (A1)

RL -1.050 m

Drawn
Dsg Verifier

Reduced
Scale (A3)

Dwg Check

14.09.2015
By

YHN
STN
JO3
HP1

Chk

Appd

Date

SEP'2015
SEP'2015
SEP'2015
SEP'2015

Drawing Originator

POTONGAN

1150

2
SE-0202

Design

As indicated

200

MUKA TANAH ASLI

Revision

1 : 200
LEVEL P - PONDASI
RL -2.200 m

Client

RICH PRODUCTS, CORP


JL. UTAMA MODERN INDUSTRI
BLOCK BA NO.5
KAWASAN MODERN INDUSTRI,
CIKANDE, SERANG, BANTEN

Project

A
-

PROYEK RICHS JAKARTA

Title

DETAIL PRINSIP

BANGUNAN UTILITY - POTONGAN


DAN DETIL

1 : 25

Discipline

UNTUK PERMOHONAN IMB


DO NOT SCALE

STRUKTUR
Drawing No.

Rev.

2820056-SE-0203

A
IF IN DOUBT ASK.

Document No. D:\Revit\Richs\2852551-SE-RICHS-2016 IMB_MIS1.rvt

RL -2.200 m