BILL No.

4 Third Ring Rd Project/Commerical Building The work of the concrete structure and buildings

Total Price

Unit price

QTY

Description

Unit

S.No

Prepration

Stint

Stint

Stint

Stint

All preparatory items include a preview preview due diligence site and processing
Consultative office equipment and tools and provide electricity, water and work wall
protection and number 2 plate illuminated for the project, cranes, scaffolding,
guard and work borings and necessary business space and review structural
design

Cleanliness and the evacuation of the site and include the removal of waste and
the roots of the plant and remove any old facilities or trees, if any, and all the
necessary to start a business

Civil works
The general location
Excavation, backfilling and compaction and settlement

2169

m3

303

m3

Includes drilling in all types of soil, including rock materials soil, which coincides
with the drilling of the level of the current location and even the level of depth that
allows to establishment them and dewatering when found necessary to protect and
support aspects of the mechanical and dad to carry out reclamation and
procedures so that the level of the bottom of the floor slab by elevations required
drawings and specifications and the transfer of drilling output to the approved
places and not to use the output of drilling in the rubble as instructed by the
supervising engineer's report and recommendations of the soil

Backfill soil fit your hand and mechanically with the use of water on the layers
every 30 cm according to the plans and specifications and report soil and
instructions

According to the outer wall charts

Ready-mix concrete Work



Concrete in contact with the soil

The supply of ordinary concrete is poured armed with a thickness of 150 mm,
including the intensity of wood and leveling up the level of drilling and using sulfur
resistant cement and concrete fracture strength of not less than 250 kg / cm 2 with
a barrier halitosis down foundations thickness of 500 microns
227

m3

2722

m3
m3

383

m3

348

m3

Supply and pour concrete for Bashh including the intensity of wood and fittings
SABIC greased epoxy and preparation surfaces, processing and use of sulfur
resistant cement and not less breakage strength 300 kg / cm 2 after 28 days

Kh.m armed walls like the previous item

Kh.m water tank (comprehensive walls and columns)

Non-contact with the soil concrete


Supply and pour concrete for the following parts including the
intensity of wood and fittings SABIC and treatment of
surfaces and ordinary Portland cement used on the fracture
strength of not less than 350 kg / cm 2 after 28 days from the
date of casting

Kh.m columns (of the role of the basement until the surface)
comprehensive walls of the elevator
-

- 1745

m3

- 5868

m3

Kh.m Bishop + beams

Page 1 of 25

Total Price

Unit price

QTY

Description

Unit

S.No

TOTAL SR

building work
Supply and Building Block Larry discharger (volcanic) and Red Ward vertical
schemes by using cement mortar necessary according to the specifications and
drawings with the work of the corners Gelovanez necessary to install with columns
and beams and installation of iron clasped each Mdemaqin insulator with a foreign
buildings from the inside

4833

m2

Block discharger thickness of 200 mm for external walls

m2

Block discharger thickness of 100 mm with the internal walls of the confrontation
external walls

4361
7778

m2

Block discharger 200 mm internal walls

Total SR

Insulation work
-

1315

Isolate bathrooms and kitchens

m2

3798

m2

Isolate down Allepeshh Foreign walls of basements and reservoir

4360

m2

Aspro isolate thermal foam surfaces thickness of 50 mm

1327

m2
m2

Isolating aspects of the walls surfaces with floors offer 25 cm

m2

Supply blocker water leak water tank thickness of 250 mm

1171

m2

Supply and poured concrete foam tendencies surfaces average thickness of 8 to


13 cm

3798

m2

isolate the water tank from the inside epoxy

215

Total SR

Architectural works
The general location
252

385

Supply and poured concrete floors external pier thickness of 100 mm according to
the plans and specifications
Antrlk business facilities as required drawings and specifications

Supply and installation works of Foreign edgings Normal and Agricultural


according to the charts and technical assets and instructions Engineer
102

252



73

Aluminium door size; 2.10x1.80m D-1 ( TYPE A ) 1

152

Wooden Door size ; 0.80x2.10mD-1a ( TYPE A ) 3


42

Wooden Door size; 0.90x2.10m D-D ( TYPE D ) 2

Page 2 of 25

Description

S.No

QTY

Unit

Total Price

Unit price

1 ) Aluminium window size 2.10x0.60mW 3 ( TYPE C


3 ) Aluminium window Size; 2.10x0.50m W 4 ( TYPE C
4 ) Aluminium window size 0.50x2.10mW 6 ( TYPE D

136.00

26.00

88.00
1,968.00 2

312.00 2

Material cost not



Exceeded sr250/m2

materialo purchase not Exceeded SR 600 300


250/ m2

1207

1175

8136

2882

material cost not Exceeded SR 250/m2

1235

759

4012

)(

5159

Epoxy paint 2 3+

6300

35.00 4313

35.00 19740

45.00 19023

1171
SR

45.00 4313

250.00 7479

250.00 758
45.00 1235

Material l cost not Exceeded SR 350/ m2

3160

250.00 195

1,250.00 324

45

15,000.00 2

45.00 3720

125.00 636

85.00 483

115,000.00 1

SR

Page 3 of 25

Description

S.No

Unit

QTY

Total Price

Unit price

200 ) (SCREW
120 54/44
)(
:





480/ 100 ) (END SUCTION



:




:
)) FCU
"0.2 2
:





:

( FCU-01 ) 6 2400/3

( FCU-02 ) 4 1600/ 3

11

( FCU-03 ) 3 1200/ 3

) (AXIAL 500/3

14

SR

Page 4 of 25

Description

S.No

Unit

QTY

Total Price

Unit price

) (AXIAL
300
1.5 :





:

( )EX.F.-01 12000/24000/ 3
( )EX.F.-02 12000/24000/ 3
( )EX.F.-03 12000/24000/ 3
( )EX.F.-04 12000/24000/ 3
( )EX.F.-05 12000/24000/ 3

0
0
0
0
0

0
0
0
0
0

) (PRESSURIZATION FAN


:





:

( S.F.-1 ) 20000/ 3

( S.F.-1 ) 20000/ 3


40

Page 5 of 25

S.No

Description

Unit

QTY

Total Price

Unit price

BUTTERFLY VALVE 5
BUTTERFLY VALVE 4
BUTTERFLY VALVE 3
BUTTERFLY VALVE 2.5
BALL VALVE 2
BALANCE VALVE 5
BALANCE VALVE 4
BALANCE VALVE 3
BALANCE VALVE 2.5
BALANCE VALVE 2

2
22

12

138

11

69

0
0
0
0
0
0
0
0
0
0

SR

0
0
0
0
0
0
0
0
0
0
0



)(SMACNA

0.6

) (SMACNA


24/ 3 1

Page 6 of 25

Description

S.No

Unit

QTY

Total Price

Unit price


84/ 3 2

"24" 24

32

"20" 20

40

"24" 24

32

"26" 8

200

0.5 3

) (B.M.S.

.

) (BTU-METER


.



Page 7 of 25

73

Description

S.No

Unit

QTY

Unit price

SR


1
2
3

.
.


.
.

5

SDR7.4
) 20(


. ) (
6
7

8
9

10
11
12

uPVC 10
.

.
.

. 6 uPVC
. uPVC

.
.

13

14


.
:

Page 8 of 25

Total Price

Description

S.No

Unit

QTY

Total Price

Unit price

60


.


.
3

.
4

.


50

150

160

81

150

156

SR


. 4


. 4 Garage drain
:

Page 9 of 25

33

Description

S.No

Unit

QTY

Total Price

Unit price


20 SDR7.4




.

32

20

40

20

50

105

63

75

75

165

90

175

110

245

125

20

160

20

32

39

40

50

75

90

110

125

160

SR

Page 10 of 25

Description

S.No

Unit

QTY

Total Price

Unit price

3 10
3


3
20/3 85)1
+1 +1 (
:

.


.

.
) ) ( K.S.B
(
) (

Circulating 2
pumps
. 60/3 20

:

) 6(

180

1,375

330

195

Page 11 of 25

Description

S.No

Unit

3
2

QTY

Unit price

14

Total Price

16

-

: 6060 1.0 -
6060 125

3 3
1.5

) (3
5/ 15

.
1

SR
) 10(
. 4

0.60*0.6
.
. 60*60
60*60
. 90 90
90
.

40

:
Page 12 of 25

1
1

SR

0
0

0
0

0
0

Description

S.No

Unit

QTY

Total Price

Unit price




NFPA
.UL listed & FM approved

3
Shop drawings
)
(.
4

6
7
8

10

) As built
& )
As built (.


NFPA
.

.Inner diameter
.


.

) (.






ASTM A53
40
....
NFPA.

1,359

1.5
2

.
.

750
300

0
0

0
0

2.5

250

Page 13 of 25

Description

S.No

Unit

QTY

Total Price

Unit price

600

900

150

(ZONE
)CONTROL STATION
:
ULFM OS & Y
) (TEST & DRAIN
TAMPER SUPERVISORY SWITCH
) (WATER FLOW SWITCH

1
4
4

0
0
0

SR
1

0
0
0
0

& OS
(Pressure gauge , flow Y
)switch
UL/FM.

6
1

38



) (PENDENT
68 UL/FM
5.6

Page 14 of 25

135

Description

S.No

Unit


UL/FM ) (UPRIGHT
68
5.6

QTY

Unit price

655

Total Price


:
1 30
1.5 1
. 6

44

:
2.5 30
3 2.5
. )(Landing Valve
6

48

)( ) 4/2.52.5(
4
4
.



) (A,B,C 6
.

10 CO2

. 6 Dry Pouder


) ( horizontal split case fire pump


: NFPA 20 UL/FM
750 :/
Page 15 of 25

155

Description

S.No

Unit

125 :

QTY

Unit price

Total Price

SR


)(pump vertical turbine multi_stage jokey

:
75 :/
185 :


:
.

.

.
) - -
. -(

.
Flow metar
main pressure reducing valve
unti-vortex fire pump suction palte with elbows

Page 16 of 25

Description

S.No

Unit

QTY

Total Price

Unit price

2
2.5 4

4


. 6
OS & Y
2.5

80

SR

0
0


1600.. 380/13800- . 50 -/
cable box,b bar box and housing
(


) (RMU )13.8.(
) (R.M.U



L.B.S 630 3
L.B.S 630 1
1



) 380(

. 2500

Page 17 of 25

80

Description

S.No

Unit

13.8..
P.V.C XLPE 120*32

QTY

Unit price

75

Total Price


400.. . 50 -0.8
50/ 380-
- - -
- - - -
12



600
.

MDB-01

MDB-02

EMDB

SR


) (XLPE\PVC
) (UPVC

.

Page 18 of 25

Description

S.No

Unit

QTY

Total Price

Unit price

16+25*4 2

30

16+35*4 2

2,500

70+120*4 2

30

2 )2(4*240+120

20

2 4*240+120

200

2 4*185+95

50

2 4*50+25

60

ELP-B2

ELP-B1

ELP-G

ELP-P1

ELP-P2

ELP-P3

ELP-S

ELP-(TY)F

DB-FAN

DB-PUMP

LP-G



) (P.V.C

16

82

16-

16 )(

26
SR

Page 19 of 25

0
0

Description

S.No

Unit

QTY

Total Price

Unit price

LCP

) (Isolators



:

20 220 -

14

25 220 -

13

32 220 -

60 380 -
60 380 -
400 380 -
100 380 -
250 380 -
60 380 -
60 380 -

76

1 16 -

2 16 -

16

Page 20 of 25

1,180

Description

S.No

Unit

QTY

Total Price

Unit price


.

. ) (

F1

670

F2

120

S1

234

S2

WM1

127

WM2

21

EM1

45

EM2

22

SR




1 (



0.1


) 30/3/( ) (PABX
(S.L.A) 8
400 - 2


Page 21 of 25

Description

S.No

Unit


2 )CAT3(40.6
) (RJ11

QTY

Unit price

12

Total Price

76

40

200

3
30

400

20

HR "32

: 16 DVR DVD writer and RJ45 port & 400-fps recording for
each camera Hard disk calculations should be based
on 2CIF & a fps for (3) month minimum

H-R 3/1
)( auto iris ,varry focal lens
16

IP44

16

21

SR

Page 22 of 25

Description

S.No

Unit

QTY

Total Price

Unit price


) (
750 1*22

225

172

) (

25

) 95/(

27

19

19

:

)(EARL STREAMER
65
.

79

SR

Page 23 of 25

Description

S.No

Unit

QTY

Total Price

Unit price


800 . 22 . 1.75/

- 4

SR
BILL No. 4 Third Ring Rd Project/Commerical BuildingGENERAL SUMMARY

1
2
3
4
5
6
7
8

Page 24 of 25

BILL No. 4 Third Ring Rd Project/Commerical Building -

Summary


0
0
0
0
0
0
0
0

1
2
3
4
5
6
7
8

Page 25 of 25