Anda di halaman 1dari 4

CAR No: JAS-001

CONSTRUCTION QUALITY SURVEILLANCE


Date

:01/09/2015

NAME: Jasscan Inspection Pte Ltd

DATE: _01/09/2015_____

NAME/NRIC No: DEEPAN RAJ

METHOD: ___MT______

COMPANY: JASSCAN

PROJECT: 22-0508_______

S/NO

DESCRIPTION

RESULTS

ACCEPTED
YES

Selection of Equipments

Selection of type of ferromagnetic particles

Selection of Magnetization current

Magnetization techniques

Preparation of test surface

Selecting magnetic field

Application of equipment

Determining types of indication

Demagnetization Method

10

Evolution of indication Accordance with


code and specifications

No

Need to be
Brief

Result Meet Specification: Yes/No


Additional Comments: The NDT Technician is not familiar to Codes and standards using
Acceptance Criteria ABS & AWS D1.1and require to bring pie gauge and slotted shim
To verification of the magnetic field strength
Surveillance Completed by JSPL NDT Level III

V.S.Naidu

CAR No: JAS-001


CORRECTIVE ACTION REQUEST
Date

:01/09/2015

Step 1 - Details of Observation:


Discipline

: Magnetic Particle Testing

Item Description

: SP2

Procedure Reference : ABS/AWS D1.1


Item location

: BAY-7

Responsible Contractor/Representative: JASSCAN


Step 2 - Description of Observation or Deviation
Job Number 22-0508, Project Name: FPSO LIBRA, MT was performed on 21/8/15 with reference to MT
Procedure but The NDT Technician miss interpreted and marked several places to create perplexity
All defects are insufficient welding on the edge of the weld but NDT Technician interpreted as undercut
Make sure all your NDT Technicians are well trained by qualified personnel particularly interoperation of
welding defects
JSPL seek JASSCAN to explain
1. How the MT Technician miss interpreted as he has valid Employed based certification
2. What corrective action JASSCAN is going to take to prevent reoccurrences in future?
Attachments: Yes (or) No

Yes (Describe): Perceive Next Page

Recorded by : V.S.Naidu
Sign / Date : 01/09/2015

Received by:
Sign / Date :

Step 3 - Root Cause & Corrective Action Details (shall be within 5 working days of issue)

Attachments: Yes (or) No


Replied by Name:

Yes (Describe):

Sign / Date:
Target Closing Date:
Step 4 - Closing of Observation (Or) Deviation :

Contractor Name:
Sign / Date:

Verified by(JSPL Level III)


Sign / Date:

Approved By :
Sign / Date:

Agreed by (QA/QC Mgr)


Sign / Date:

Insufficient Fill (weld)

Insufficient Fill (weld)

Insufficient Fill (weld)

Anda mungkin juga menyukai