Anda di halaman 1dari 142

EDIFICACIN 5 PISOS- CONCRETO ARMADO II

METRADO DE CARGAS
METRADO DE CARGAS
CARGAS UNITARIAS
LOSA
MACIZA

Pe

Peso

0.15 m

2400 Kg/m

0.36 Tn/m

VIGA
V-101

Pe

Peso

0.35 m

0.30 m

2400 Kg/m

0.25 Tn/m

VIGA
V-102

Pe

Peso

0.35 m

0.30 m

2400 Kg/m

0.25 Tn/m

Pe

Peso

0.35 m

0.30 m

2400 Kg/m

0.25 Tn/m

Pe

Peso

0.40 m

0.30 m

2400 Kg/m

0.29 Tn/m

Pe

Peso

2.60 m

0.15 m

1900 Kg/m

0.74 Tn/m

Pe

Peso

1.20 m

0.15 m

1900 Kg/m

0.34 Tn/m

COLUM.
C-1
COLUM.
C-2

MURO
H=2.6
MURO
H=1.2

TABIQ. 1NIVEL

0.10 Tn/m

TAB. 2,3,4 Y
5NIVEL

0.18 Tn/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 1

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


METRADO DE CARGAS

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 2

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


METRADO DE CARGAS
REACCIONES EN APOYOS DE ESCALERA
CARGAS UNITARIAS
ESCALERA DEL 1 AL 2 NIVEL
Cp= 0.175 m
Peso propio:

p= 0.250 m
t= 0.150 m

=[/2+(1+ (/)
^2 )]

Pe= 2400 Kg/m


Wpp= 649.44 Kg/m

Tramo III

Tramo III
Descanso
(Tramo II)
Tramo I

Descanso
(Tramo II)

NPT

Tramo I
NPT

VISTA LATERAL

VISTA FRONTAL

1)Carga por unidad de ancho y unidad de longitud


horizontal:
a)Tramo I

c) Tramo III:

Peso propio:

649.44 Kg/m

Peso propio:

649.44 Kg/m

Acabados:

100.00 Kg/m

Acabados:

100.00 Kg/m

Wm=
S/C:

749.44 Kg/m

Wm= 749.44 Kg/m

400.00 Kg/m
Wl=

S/C:

400.00 Kg/m

400.00 Kg/m
Wl=

400.00 Kg/m

b) Descanso:
Peso propio:

360.00 Kg/m

Acabados:

100.00 Kg/m

Wm=
S/C:

460.00 Kg/m
400.00 Kg/m

Wl=

400.00 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 3

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


METRADO DE CARGAS

2)Anlisis de la Escalera:
TRAMOS I y II: En vista frontal

400.00 Kg/m

Wl=
Wm=

749.44 Kg/m
460.00 Kg/m

R1m= 878.91 Kg/m


R1v= 500.00 Kg/m

R2m= 705.25 Kg/m


R2v= 500.00 Kg/m

1.50 m

1.00 m
2.50 m

TRAMOS II y III: En vista lateral

Wl=

400.00 Kg/m
Wm=

Wm=

749.44 Kg/m

460.00 Kg/m

R2m=
R2v=

###
###
R3m= 1075.91 Kg/m
R3v= 600.00 Kg/m

1.00 m
3.00 m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 4

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


METRADO DE CARGAS

ESCALERA DEL 2 NIVEL HASTA AZOTEA

=[/2+(1+ (/)
^2 )]
DESCANSO

Cp= 0.175 m

2 NIVEL

p= 0.250 m
t= 0.150 m
Pe= 2400 Kg/m
Wpp= 649.44 Kg/m
DESCANSO

1)Carga por unidad de ancho y unidad


de longitud horizontal:

1 NIVEL

a)Tramo Inclinado

B
Peso propio:

649.44 Kg/m

Acabados:

100.00 Kg/m

Wm=
S/C:

749.44 Kg/m
400.00 Kg/m

Wl=

A1

400.00 Kg/m

A2

b) Descanso:

A3

Peso propio:

360.00 Kg/m

Acabados:

100.00 Kg/m

Wm=
S/C:

A4
A5

460.00 Kg/m
400.00 Kg/m

Wv=

400.00 Kg/m

c) Gradas en descanzo:

A1=

0.375 m

A2=

0.232 m

Peso propio:

780.00 Kg/m

A3=

0.143 m

Acabados:

100.00 Kg/m

A4=

0.375 m

880.00 Kg/m

A5=

0.375 m

Wm=
S/C:

400.00 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 5

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


METRADO DE CARGAS
Wv=

400.00 Kg/m

Wv=

400.00 Kg/m

880.00 Kg/m
Wm=

749.44 Kg/m

460.00 Kg/m

Rcm= 1496.23 Kg/m


Rcv= 840.00 Kg/m
Rbm= 1112.57 Kg/m
Rbv= 840.00 Kg/m

2.20 m

1.25 m

0.75 m

4.20 m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 6

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


METRADO DE CARGAS

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 7

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


METRADO DE CARGAS

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 8

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


METRADO DE CARGAS

A1
A2
A3
A4
A5

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 9

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


METRADO DE CARGAS

1496.23 Kg/m
840.00 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 10

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI
DISTRIBUCIN DE CARGAS EN VIGAS: MTODO DE COEFICIENTES DEL ACI
VIGAS 1 NIVEL
1)DETERMINACIN DE CARGAS LTIMAS
a) CARGA MUERTA
LOSA
MACIZA

Pe

Peso

0.15 m

2400 Kg/m

360.00 Kg/m
A

TABIQ. 1NIVEL

101.50 Kg/m

3.48

4.52

PAO 2

200.00 Kg/m

CM

786.09 Kg/m /m

1.7

CV

340.00 Kg/m /m

= Wum + Wuv =

V -1 0 2

1.4

2 .5 9

Wuv

PAO 4

V-101

V -1 0 2

V-101

Wum

PAO 3

PAO 5

1126.09 Kg/m /m
V-101

V -1 0 2

3 .3 3

V-101

V -1 0 2

2 .2 8

PAO 8

V -1 0 2

PAO 7

V-101

V-101

1 .6 6

PAO 6

V-101

V -1 0 2

200.00 Kg/m

V -1 0 2

CV=

V -1 0 2

561.50 Kg/m
3 .2 3

CM=

V-101

V -1 0 2

V-101

Wu

PAO 1

V-101

PAO 9
V-101

V -1 0 2

S/C VIVIENDA

3 .2 0

b) CARGA VIVA

V-101

V -1 0 2

100.00 Kg/m

V -1 0 2

ACABADOS

.6 3

7'

1'

3.48
A

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

4.52
B

Pgina 11

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

2)DETERMINACIN DE CORTANTES EN PAOS

PAO 1:

CASO 9

Utilizando tablas del mtodo del ACI:

lll
lll
lll
lll
ll

2.95

l
l
l
l

l
l
l
l

A=

l
l
l
l

l
l
l
l

l
l
l
l

lllllllllllllllllllll

l
l
l
l

lllllllllllllllllllll
B= 3.03
m= A =

Ca

Cb

0.670

0.330

0.974

0.691

0.309

0.95

0.710

0.290

0.974

= /
= /

PAO 2:

Ca=

0.691

Vuam=

801.35 Kg/m

Vbm=

Cb=

0.309

Vuav=

346.60 Kg/m

Vubv=

Vua=

1147.95 Kg/m

Vub=

526.96 Kg/m

CASO 9

Utilizando tablas del mtodo del ACI:

lll
lll
lll
lll
ll

2.95

l
l
l
l

l
l
l
l

l
l
l
l

A=

l
l
l
l

l
l
l
l

l
l
l
l

lllllllllllllllllllll

lllllllllllllllllllll
B= 4.07
m= A =

Ca

Cb

0.75

0.860

0.140

0.72

0.875

0.125

0.70

0.890

0.110

0.72

= /

Ca=

0.875

Vuam=

1014.68 Kg/m

Vbm=

Cb=

0.125

Vuav=

438.87 Kg/m

Vubv=

= /

Ing. OVIDIO SERRANO ZELADA

Vua=

1453.55 Kg/m

Vub=

286.20 Kg/m

ING CIVIL-UNPRG

Pgina 12

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

PAO 3:

CASO 4

Utilizando tablas del mtodo del ACI:

lll
lll
lll
lll
ll

2.83

l
l
l
l

l
l
l
l

l
l
l
l

A=

l
l
l
l

l
l
l
l

l
l
l
l

lllllllllllllllllllll

B=
m= A =

3.03

Ca

0.95

0.550

0.93

0.566

0.90

0.600

0.93

= /

Ca=

0.566

Vuam=

629.58 Kg/m

Cb=

0.434

Vuav=

272.31 Kg/m

= /

PAO 4:

Vua=

901.89 Kg/m

Vub=

740.41 Kg/m

CASO 9

Utilizando tablas del mtodo del ACI:

lll
lll
lll
lll
ll

2.83

l
l
l
l

l
l
l
l

l
l
l
l

A=

l
l
l
l

l
l
l
l

l
l
l
l

lllllllllllllllllllll

Ca

0.70

0.890

lllllllllllllllllllll
B=
m= A =

4.07

0.70

= /

Ca=

0.890

Vuam=

989.97 Kg/m

Cb=

0.110

Vuav=

428.18 Kg/m

= /

Ing. OVIDIO SERRANO ZELADA

Vua=

1418.15 Kg/m

Vub=

252.08 Kg/m

ING CIVIL-UNPRG

Pgina 13

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

PAO 5:

CASO 5
lllllllllllllllllllll

A=

2.29

Utilizando tablas del mtodo del ACI:

lllllllllllllllllllll
B=
m= A =

4.07

Ca

0.6

0.970

0.56

0.977

0.55

0.980

0.56

= /

Ca=

0.977

Vuam=

879.80 Kg/m

Cb=

0.023

Vuav=

380.53 Kg/m

= /
1260.33 Kg/m

Vub=

51.63 Kg/m

CASO 4

Utilizando tablas del mtodo del ACI:

lll
lll
lll
lll
ll

3.03

l
l
l
l

l
l
l
l

l
l
l
l

A=

l
l
l
l

l
l
l
l

l
l
l
l

PAO 6:

Vua=

Ca

1.00

0.500

lllllllllllllllllllll
B=
m= A =

3.03

1.00

= /

Ca=

0.500

Vuam=

595.47 Kg/m

Cb=

0.500

Vuav=

257.55 Kg/m

= /
Vua=

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

853.02 Kg/m

Pgina 14

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI
Vub=

PAO 7:

853.02 Kg/m

CASO 9

Utilizando tablas del mtodo del ACI:

lll
lll
lll
lll
ll

3.03

l
l
l
l

l
l
l
l

l
l
l
l

A=

l
l
l
l

l
l
l
l

l
l
l
l

lllllllllllllllllllll

lllllllllllllllllllll
B=
m= A =

4.07

Ca

0.75

0.860

0.74

0.863

0.70

0.890

0.74

= /

Ca=

0.863

Vuam=

1028.15 Kg/m

Cb=

0.137

Vuav=

444.69 Kg/m

= /

PAO 8:

Vua=

1472.85 Kg/m

Vub=

313.22 Kg/m

CASO 9

Utilizando tablas del mtodo del ACI:

lll
lll
lll
lll
ll

2.03

l
l
l
l

l
l
l
l

A=

l
l
l
l

l
l
l
l

l
l
l
l

lllllllllllllllllllll

l
l
l
l

lllllllllllllllllllll
B=
m= A =

3.03

Ca

0.7

0.890

0.67

0.908

0.65

0.920

0.67

= /

Ing. OVIDIO SERRANO ZELADA

Ca=

0.908

Vuam=

724.50 Kg/m

Cb=

0.092

Vuav=

313.36 Kg/m

ING CIVIL-UNPRG

Pgina 15

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI
= /

PAO 9:

Vua=

1037.85 Kg/m

Vub=

156.92 Kg/m

CASO 4

Utilizando tablas del mtodo del ACI:

lll
lll
lll
lll
ll

2.03

l
l
l
l

l
l
l
l

l
l
l
l

A=

l
l
l
l

l
l
l
l

l
l
l
l

lllllllllllllllllllll

B=
m= A =

4.07

Ca

0.50

0.940

0.50

= /

Ca=

0.940

Vuam=

750.01 Kg/m

Cb=

0.060

Vuav=

324.39 Kg/m

= /

PAO 10:

Vua=

1074.41 Kg/m

Vub=

137.50 Kg/m

La relacin entre el largo y el ancho de este pao, es mayor a 2, por lo que ser una losa armada en
direccin; para el anlisis podemos utilizar cualquiera de los mtodos aplicados a vigas, por lo tanto
en voladizo, se tiene el siguiente cortante:

L= 1.51 m
Vua=

Ing. OVIDIO SERRANO ZELADA

Vuam=

1187.00 Kg/m

Vuav=

513.40 Kg/m

1700.40 Kg/m

ING CIVIL-UNPRG

Pgina 16

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

3)RESUMEN DE CORTANTES
a) CORTANTES EN DIRECCIN X-X

Unidades: Kg/m

526.96

286.20
Pao 1

Pao 2

526.96

740.41

286.20

252.08
Pao 3

Pao 4

740.41

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

252.08

Pgina 17

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

51.63
Pao 5

51.63

853.02

313.22
Pao 6

Pao 7

853.02

156.92

313.22

137.50
Pao 8

Pao 9

156.92

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

137.50

Pgina 18

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Ing. OVIDIO SERRANO ZELADA

PAO 8

1074.41

1472.8466899259

1472.85

ING CIVIL-UNPRG

PAO 7

853.01619774

853.02

901.8879336277

PAO 5

1260.33

1453.55

PAO 4

PAO 6

1260.33

1418.15

1453.55
PAO 2

1418.1464668303

PAO 3

1147.95

PAO 1

1037.85

Unidades: Kg/m

901.89

1147.95

b) CORTANTES EN DIRECCIN Y-Y

PAO 9

Pgina 19

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

c) VERIFICACIN POR CORTANTE


h

15.00 cm

100 cm

En losa, no debe haber refuerzo por cortante, por lo que todo este esfuerzo de
tomado por el concreto.

=. =
^ . )
(
Vc=

11520.64 Kg/m

Este cortante es mayor a cada uno de los cortantes a los que est sometida la losa, lo cual es satisfactorio.

4)DISTRIBUCIN DE CARGAS EN VIGAS


a) VIGAS EN DIRECCIN X-X: V-101

0.30 m

0.45 m

VIGA EJE 7:
Wu

> Tramo A-B


qum=

1178.67 Kg/m

1178.67 Kg/m

quv=

509.80 Kg/m

509.80 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

0.00 Kg/m

0.00 Kg/m

Wum=

1531.47 Kg/m

Wuv=

509.80 Kg/m
Wu

> Tramo B-C


qum=

1014.68 Kg/m

1014.68 Kg/m

quv=

438.87 Kg/m

438.87 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

0.00 Kg/m

0.00 Kg/m

Ing. OVIDIO SERRANO ZELADA

Wum=

1367.48 Kg/m

Wuv=

438.87 Kg/m

ING CIVIL-UNPRG

Pgina 20

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

B
Wuv=438.87
Wuv=509.80
Wum=1367.48
Wum=1531.47

4.07

3.03 m

VIGA EJE 6:
Wu

> Tramo A-B


qum=

1430.93 Kg/m

1430.93 Kg/m

quv=

618.90 Kg/m

618.90 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

741.00 Kg/m

1037.40 Kg/m

Wum=

2821.13 Kg/m

Wuv=

618.90 Kg/m
Wu

> Tramo B-C


qum=

2004.65 Kg/m

2004.65 Kg/m

quv=

867.05 Kg/m

867.05 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

741.00 Kg/m

1037.40 Kg/m

Ing. OVIDIO SERRANO ZELADA

Wum=

3394.85 Kg/m

Wuv=

867.05 Kg/m

ING CIVIL-UNPRG

Pgina 21

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Wuv=618.90

Wuv=867.05

2,821.13

3,394.85
Wum=1783.73

Wum=3394.85
Wum=2357.45

2.00 m

1.19 m

0.95 m

1.93 m

4.07

3.03 m

VIGA EJE 5:
Wu

> Tramo A-B


qum=

629.58 Kg/m

629.58 Kg/m

quv=

272.31 Kg/m

272.31 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

741.00 Kg/m

1037.40 Kg/m

Wum=

2019.78 Kg/m

Wuv=

272.31 Kg/m
Wu

> Tramo B-C


qum=

1869.77 Kg/m

1869.77 Kg/m

quv=

808.71 Kg/m

808.71 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

741.00 Kg/m

1037.40 Kg/m

Ing. OVIDIO SERRANO ZELADA

Wum=

3259.97 Kg/m

Wuv=

808.71 Kg/m

ING CIVIL-UNPRG

Pgina 22

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Wuv=272.31
2,019.78

Wuv=808.71
3,259.97

Wum=3259.97
Wum=2222.57

2.00 m

1.19 m

0.95 m

1.93 m

4.07

3.03 m

VIGA EJE 4:
Wu

> Tramo A-B


qum=

595.47 Kg/m

595.47 Kg/m

quv=

257.55 Kg/m

257.55 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

741.00 Kg/m

1037.40 Kg/m

Wum=

1985.67 Kg/m

Wuv=

257.55 Kg/m
Wu

> Tramo B-C


qum=

1907.95 Kg/m

1907.95 Kg/m

quv=

825.22 Kg/m

825.22 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

0.00 Kg/m

0.00 Kg/m

Ing. OVIDIO SERRANO ZELADA

Wum=

2260.75 Kg/m

Wuv=

825.22 Kg/m

ING CIVIL-UNPRG

Pgina 23

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Wuv=257.55

Wuv=825.22

Wum=1985.67

Wum=2260.75

4.07

3.03 m

VIGA EJE 3:
Wu

> Tramo A-B


qum=

1319.96 Kg/m

1319.96 Kg/m

quv=

570.91 Kg/m

570.91 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

741.00 Kg/m

1037.40 Kg/m

Wum=

2710.16 Kg/m

Wuv=

570.91 Kg/m
Wu

> Tramo B-C


qum=

1778.16 Kg/m

1778.16 Kg/m

quv=

769.09 Kg/m

769.09 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

0.00 Kg/m

0.00 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 24

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Wum=

2130.96 Kg/m

Wuv=

769.09 Kg/m

Wuv=570.91

Wuv=769.09

Wum=2710.16

Wum=2130.96

4.07

3.03 m

VIGA EJE 2:
Wu

> Tramo A-B


qum=

1911.50 Kg/m

1911.50 Kg/m

quv=

826.76 Kg/m

826.76 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

0.00 Kg/m

0.00 Kg/m

Wum=

2264.30 Kg/m

Wuv=

826.76 Kg/m
Wu

> Tramo B-C


qum=

750.01 Kg/m

750.01 Kg/m

quv=

324.39 Kg/m

324.39 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 25

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI
Muro=

342.00 Kg/m

478.80 Kg/m

Escalera(rm)=

1075.91 Kg/m

1506.28 Kg/m

Escalera(rv)=

600.00 Kg/m

1020.00 Kg/m

Wum=

3087.89 Kg/m

Wuv=

1344.39 Kg/m

B
1344.39
Wuv=826.76

Wuv=324.39
2609.09

Wum=2264.30

Wum=1581.61

3.07 m

1.00 m

4.07

3.03 m

b) VIGAS EN DIRECCIN Y-Y: V-102

0.30 m

0.40 m

VIGA EJE A:
> Tramo 2-3
> Tramo 6-7
Wu

qum=

109.54 Kg/m

qum=

367.85 Kg/m

367.85 Kg/m

quv=

47.38 Kg/m

quv=

159.10 Kg/m

159.10 Kg/m

PP.Viga=

252.00 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

741.00 Kg/m

Muro=

741.00 Kg/m

1037.40 Kg/m
Wum=

Wum=

1758.05 Kg/m

Wuv=

159.10 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Wuv=

Pgina 26

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

> Tramo 5-6

> Tramo 1'-2


Wu

qum=

516.86 Kg/m

516.86 Kg/m

qum=

0.00 Kg/m

quv=

223.55 Kg/m

223.55 Kg/m

quv=

0.00 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

PP.Viga=

252.00 Kg/m

Muro=

741.00 Kg/m

1037.40 Kg/m

Muro=

741.00 Kg/m

Wum=

1907.06 Kg/m

Wum=

Wuv=

223.55 Kg/m

Wuv=

> Tramo 4-5


Wu
qum=

0.00 Kg/m

0.00 Kg/m

quv=

0.00 Kg/m

0.00 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

741.00 Kg/m

1037.40 Kg/m

Wum=

1390.20 Kg/m

Wuv=

0.00 Kg/m

> Tramo 3-4


Wu
qum=

595.47 Kg/m

595.47 Kg/m

quv=

257.55 Kg/m

257.55 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

741.00 Kg/m

1037.40 Kg/m

Wuv=

257.55 Kg/m

Ing. OVIDIO SERRANO ZELADA

2.95 m

Wum=1758.05

Wuv=159.10

1985.67 Kg/m

Wum=

ING CIVIL-UNPRG

Pgina 27

1'

1.51 m

2.03 m

3.03 m

2.29 m

2.83 m

Wum=1907.06
Wum=1985.67
Wum=1499.74

1'

1390.20

Wuv=47.38

Wuv=257.55

Wum=1390.20

Wuv=223.55

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

VIGA EJE B:
> Tramo 2-3
> Tramo 6-7
Wu

qum=

205.52 Kg/m

qum=

567.64 Kg/m

567.64 Kg/m

quv=

88.89 Kg/m

quv=

245.51 Kg/m

245.51 Kg/m

PP.Viga=

252.00 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

741.00 Kg/m

Muro=

0.00 Kg/m

0.00 Kg/m
Wum=

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 28

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI
Wum=

920.44 Kg/m

Wuv=

245.51 Kg/m

> Tramo 5-6

Wuv=

> Tramo 1'-2


Wu

qum=

692.82 Kg/m

692.82 Kg/m

qum=

0.00 Kg/m

quv=

299.66 Kg/m

299.66 Kg/m

quv=

0.00 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

PP.Viga=

252.00 Kg/m

Muro=

0.00 Kg/m

0.00 Kg/m

Muro=

741.00 Kg/m

Esc (rm)

1112.57 Kg/m

1557.60 Kg/m

Esc (rv)

840.00 Kg/m

1428.00 Kg/m

Wum=
Wuv=

Wum=

2603.22 Kg/m

Wuv=

1727.66 Kg/m

> Tramo 4-5


Wu
qum=

36.04 Kg/m

36.04 Kg/m

quv=

15.59 Kg/m

15.59 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

741.00 Kg/m

1037.40 Kg/m

Wum=

1426.24 Kg/m

Wuv=

1443.59 Kg/m

> Tramo 3-4


Wu
qum=

814.12 Kg/m

814.12 Kg/m

quv=

352.12 Kg/m

352.12 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

0.00 Kg/m

0.00 Kg/m

Wuv=

352.12 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

2.95 m

Wum=920.44

Wuv=245.51

1166.92 Kg/m

Wum=

Pgina 29

Wum=920.44

Wuv=245.51

6
5

2.83 m
4

2.29 m
3

3.03 m
1

1.51 m

1390.20

2.03 m

Wum=558.32

1.15 m

1595.72

Wuv=88.89

Wuv=352.12

Wum=1166.92

Wuv=1443.59

Wum=1426.24

Wuv=299.66

Wum=1045.62

2.00 m

2603.22

1727.66

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

VIGA EJE C:
> Tramo 2-3
> Tramo 6-7
qum=

199.79 Kg/m

Ing. OVIDIO SERRANO ZELADA

Wu

qum=

95.98 Kg/m

199.79 Kg/m

quv=

41.51 Kg/m

ING CIVIL-UNPRG

Pgina 30

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI
quv=

86.41 Kg/m

86.41 Kg/m

PP.Viga=

252.00 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

741.00 Kg/m

Muro=

741.00 Kg/m

1037.40 Kg/m
Wum=

Wum=

1589.99 Kg/m

Wuv=

86.41 Kg/m

Wuv=

> Tramo 5-6


Wu
qum=

175.97 Kg/m

175.97 Kg/m

quv=

76.11 Kg/m

76.11 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

741.00 Kg/m

1037.40 Kg/m

Wum=

1566.17 Kg/m

Wuv=

76.11 Kg/m

> Tramo 4-5


Wu
qum=

36.04 Kg/m

36.04 Kg/m

quv=

15.59 Kg/m

15.59 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

741.00 Kg/m

1037.40 Kg/m

Wum=

1426.24 Kg/m

Wuv=

15.59 Kg/m

> Tramo 3-4


Wu
qum=

218.65 Kg/m

218.65 Kg/m

quv=

94.57 Kg/m

94.57 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

741.00 Kg/m

1037.40 Kg/m

Wuv=

94.57 Kg/m

Ing. OVIDIO SERRANO ZELADA

1608.85 Kg/m

Wum=

ING CIVIL-UNPRG

Pgina 31

Ing. OVIDIO SERRANO ZELADA


2

3.03 m

2.03 m

Wum=1608.85

Wuv=94.57

Wum=1486.18

Wuv=41.51

ING CIVIL-UNPRG
2.29 m

Wum=1426.24

Wuv=15.59

2.83 m

Wum=1566.17

Wuv=76.11

2.95 m

Wum=1589.99

Wuv=86.41

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Pgina 32

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

IENTES DEL ACI

4.52

PAO 2

V -1 0 2

V-101

V-101

3 .2 3

V -1 0 2

PAO 4

V -1 0 2

2 .5 9

V-101

PAO 5

V -1 0 2

3 .3 3

V-101

PAO 7

V-101

V -1 0 2

2 .2 8

PAO 9

3 .2 0

.6 3

7'

V-101

1 .6 6

4.52
C

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 33

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Cb
0.330
0.309
0.290

Vbm=

367.85 Kg/m

Vubv=

159.10 Kg/m

Cb
0.140
0.125
0.110

Vbm=

199.79 Kg/m

Vubv=

86.41 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 34

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Cb
0.450
0.434
0.400

Vbm=

516.86 Kg/m

Vubv=

223.55 Kg/m

Cb
0.110

Vbm=

175.97 Kg/m

Vubv=

76.11 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 35

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Cb
0.030
0.023
0.020

Vbm=

36.04 Kg/m

Vubv=

15.59 Kg/m

Cb
0.500

Vbm=

595.47 Kg/m

Vubv=

257.55 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 36

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Cb
0.140
0.137
0.110

Vbm=

218.65 Kg/m

Vubv=

94.57 Kg/m

Cb
0.110
0.092
0.080

Vbm=

109.54 Kg/m

Vubv=

47.38 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 37

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Cb
0.060

Vbm=

95.98 Kg/m

Vubv=

41.51 Kg/m

e ser una losa armada en una


cados a vigas, por lo tanto al estar

7.00 Kg/m

3.40 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 38

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 39

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 40

PAO 10

1074.4062762558

PAO 8

1700.40

1037.8533768214

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

PAO 9

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 41

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

o que todo este esfuerzo debe ser

al es satisfactorio.

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 42

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 43

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

3394.85

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 44

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

3259.97

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 45

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 46

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 47

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

C
1344.39

2609.09

1.00 m

Wu
109.54 Kg/m
47.38 Kg/m
352.80 Kg/m
1037.40 Kg/m

1499.74 Kg/m
47.38 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 48

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Wu
0.00 Kg/m
0.00 Kg/m
352.80 Kg/m
1037.40 Kg/m

1390.20 Kg/m
0.00 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 49

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Wu
205.52 Kg/m
88.89 Kg/m
352.80 Kg/m
1037.40 Kg/m

1595.72 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 50

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI
88.89 Kg/m

Wu
0.00 Kg/m
0.00 Kg/m
352.80 Kg/m
1037.40 Kg/m

1390.20 Kg/m
0.00 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 51

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Wu
95.98 Kg/m
41.51 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 52

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI
352.80 Kg/m
1037.40 Kg/m

1486.18 Kg/m
41.51 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 53

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 54

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI
DISTRIBUCIN DE CARGAS EN VIGAS: MTODO DE COEFICIENTES DEL ACI
VIGAS 2 - 4 NIVEL
1)DETERMINACIN DE CARGAS LTIMAS
a) CARGA MUERTA
LOSA
MACIZA

Pe

Peso

0.15 m

2400 Kg/m

360.00 Kg/m
A

TABIQ. 1NIVEL

178.35 Kg/m

3.48

4.52

PAO 2

200.00 Kg/m

CM

893.69 Kg/m /m

1.7

CV

340.00 Kg/m /m

= Wum + Wuv =

V -1 0 2

1.4

2 .5 9

Wuv

PAO 4

V-101

V -1 0 2

V-101

Wum

PAO 3

PAO 5

1233.69 Kg/m /m
V-101

V -1 0 2

3 .3 3

V-101

V -1 0 2

2 .2 8

PAO 8

V -1 0 2

PAO 7

V-101

V-101

1 .6 6

PAO 6

V-101

V -1 0 2

200.00 Kg/m

V -1 0 2

CV=

V -1 0 2

638.35 Kg/m
3 .2 3

CM=

V-101

V -1 0 2

V-101

Wu

PAO 1

V-101

PAO 9
V-101

V -1 0 2

S/C VIVIENDA

3 .2 0

b) CARGA VIVA

V-101

V -1 0 2

100.00 Kg/m

V -1 0 2

ACABADOS

.6 3

7'

1'

3.48
A

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

4.52
B

Pgina 55

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

2)DETERMINACIN DE CORTANTES EN PAOS

PAO 1:

CASO 9

Utilizando tablas del mtodo del ACI:

lll
lll
lll
lll
ll

2.95

l
l
l
l

l
l
l
l

A=

l
l
l
l

l
l
l
l

l
l
l
l

lllllllllllllllllllll

l
l
l
l

lllllllllllllllllllll
B= 3.03
m= A =

Ca

Cb

0.670

0.330

0.974

0.691

0.309

0.95

0.710

0.290

0.974

=//
=//

PAO 2:

Ca=

0.691

Vuam=

911.04 Kg/m

Vbm=

Cb=

0.309

Vuav=

346.60 Kg/m

Vubv=

Vua=

1257.63 Kg/m

Vub=

577.31 Kg/m

CASO 4

Utilizando tablas del mtodo del ACI:

lll
lll
lll
lll
ll

2.95

l
l
l
l

l
l
l
l

l
l
l
l

A=

l
l
l
l

l
l
l
l

l
l
l
l

lllllllllllllllllllll

B= 4.07
m= A =

Ca

Cb

0.75

0.760

0.240

0.72

0.785

0.215

0.70

0.810

0.190

0.72

=//

Ca=

0.785

Vuam=

1035.03 Kg/m

Vbm=

Cb=

0.215

Vuav=

393.77 Kg/m

Vubv=

=//

Ing. OVIDIO SERRANO ZELADA

Vua=

1428.80 Kg/m

Vub=

539.31 Kg/m

ING CIVIL-UNPRG

Pgina 56

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

PAO 3:

CASO 4

Utilizando tablas del mtodo del ACI:

lll
lll
lll
lll
ll

2.83

l
l
l
l

l
l
l
l

l
l
l
l

A=

l
l
l
l

l
l
l
l

l
l
l
l

lllllllllllllllllllll

B=
m= A =

3.03

Ca

0.95

0.550

0.93

0.566

0.90

0.600

0.93

=//

Ca=

0.566

Vuam=

715.76 Kg/m

Cb=

0.434

Vuav=

272.31 Kg/m

=//
Vua=

988.06 Kg/m

Vub=

811.15 Kg/m

PAO 4: La relacin entre el largo y el ancho de este pao, es mayor a 2, por lo que ser una losa armada en una
direccin; para el anlisis podemos utilizar cualquiera de los mtodos aplicados a vigas, por lo tanto al es
en voladizo, se tiene el siguiente cortante:

=
L =

Vua=

Ing. OVIDIO SERRANO ZELADA

0.83

Vuam=

741.77 Kg/m

Vuav=

282.20 Kg/m

1023.97 Kg/m

ING CIVIL-UNPRG

Pgina 57

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

PAO 5:

CASO 5
lllllllllllllllllllll

A=

2.29

Utilizando tablas del mtodo del ACI:

lllllllllllllllllllll
B=
m= A =

4.07

Ca

0.6

0.970

0.56

0.977

0.55

0.980

0.56

=//

Ca=

0.977

Vuam=

1000.22 Kg/m

Cb=

0.023

Vuav=

380.53 Kg/m

=//
1380.75 Kg/m

Vub=

56.56 Kg/m

CASO 4

Utilizando tablas del mtodo del ACI:

lll
lll
lll
lll
ll

3.03

l
l
l
l

l
l
l
l

l
l
l
l

A=

l
l
l
l

l
l
l
l

l
l
l
l

PAO 6:

Vua=

Ca

1.00

0.500

lllllllllllllllllllll
B=
m= A =

3.03

1.00

=//

Ca=

0.500

Vuam=

676.97 Kg/m

Cb=

0.500

Vuav=

257.55 Kg/m

=//
Vua=

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

934.52 Kg/m

Pgina 58

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI
Vub=

PAO 7:

934.52 Kg/m

CASO 9

Utilizando tablas del mtodo del ACI:

lll
lll
lll
lll
ll

3.03

l
l
l
l

l
l
l
l

l
l
l
l

A=

l
l
l
l

l
l
l
l

l
l
l
l

lllllllllllllllllllll

lllllllllllllllllllll
B=
m= A =

4.07

Ca

0.75

0.860

0.74

0.863

0.70

0.890

0.74

=//

Ca=

0.863

Vuam=

1168.88 Kg/m

Cb=

0.137

Vuav=

444.69 Kg/m

=//

PAO 8:

Vua=

1613.58 Kg/m

Vub=

343.15 Kg/m

CASO 9

Utilizando tablas del mtodo del ACI:

lll
lll
lll
lll
ll

2.03

l
l
l
l

l
l
l
l

A=

l
l
l
l

l
l
l
l

l
l
l
l

lllllllllllllllllllll

l
l
l
l

lllllllllllllllllllll
B=
m= A =

3.03

Ca

0.7

0.890

0.67

0.908

0.65

0.920

0.67

=//

Ing. OVIDIO SERRANO ZELADA

Ca=

0.908

Vuam=

823.66 Kg/m

Cb=

0.092

Vuav=

313.36 Kg/m

ING CIVIL-UNPRG

Pgina 59

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI
=//

PAO 9:

Vua=

1137.02 Kg/m

Vub=

171.92 Kg/m

CASO 4

Utilizando tablas del mtodo del ACI:

lll
lll
lll
lll
ll

2.03

l
l
l
l

l
l
l
l

l
l
l
l

A=

l
l
l
l

l
l
l
l

l
l
l
l

lllllllllllllllllllll

Ca

0.50

0.970

lllllllllllllllllllll
B=
m= A =

4.07

0.50

=//

Ca=

0.970

Vuam=

879.89 Kg/m

Cb=

0.030

Vuav=

334.75 Kg/m

=//

PAO 10:

Vua=

1214.63 Kg/m

Vub=

75.32 Kg/m

La relacin entre el largo y el ancho de este pao, es mayor a 2, por lo que ser una losa armada en
direccin; para el anlisis podemos utilizar cualquiera de los mtodos aplicados a vigas, por lo tanto
en voladizo, se tiene el siguiente cortante:

L= 1.36 m
Vua=

PAO 11:

Vuam=

1215.42 Kg/m

Vuav=

462.40 Kg/m

1677.82 Kg/m

La relacin entre el largo y el ancho de este pao, es mayor a 2, por lo que ser una losa armada en
direccin; para el anlisis podemos utilizar cualquiera de los mtodos aplicados a vigas, por lo tanto
en voladizo, se tiene el siguiente cortante:

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 60

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI
La relacin entre el largo y el ancho de este pao, es mayor a 2, por lo que ser una losa armada en
direccin; para el anlisis podemos utilizar cualquiera de los mtodos aplicados a vigas, por lo tanto
en voladizo, se tiene el siguiente cortante:

L= 1.50 m
Vua=

Vuam=

1340.54 Kg/m

Vuav=

510.00 Kg/m

1850.54 Kg/m

3)RESUMEN DE CORTANTES
a) CORTANTES EN DIRECCIN X-X

Unidades: Kg/m

577.31

539.31
Pao 1

Pao 2

577.31

539.31

811.15
Pao 3

Pao 4

811.15

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 61

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

56.56
Pao 5

56.56

934.52

343.15
Pao 6

Pao 7

934.52

171.92

343.15

75.32
Pao 8

Pao 9

171.92

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

75.32

Pgina 62

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

1137.02

934.5224934181

PAO 8

1214.63

1613.58
PAO 7

1380.75

PAO 5

1428.80

PAO 4

1380.75

1023.97

1428.80
PAO 2

PAO 6

1613.5782236478

988.0639579301

PAO 3

1257.63

PAO 1

934.52

Unidades: Kg/m

988.06

1257.63

b) CORTANTES EN DIRECCIN Y-Y

PAO 9

Pgina 63

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

c) VERIFICACIN POR CORTANTE


h

15.00 cm

100 cm

En losa, no debe haber refuerzo por cortante, por lo que todo este esfuerzo de
tomado por el concreto.

=. =
^ . )
(
Vc=

11520.64 Kg/m

Este cortante es mayor a cada uno de los cortantes a los que est sometida la losa, lo cual es satisfactorio.

4)DISTRIBUCIN DE CARGAS EN VIGAS


a) VIGAS EN DIRECCIN X-X: V-201

0.30 m

0.45 m

VIGA EJE 7:
Wu

> Tramo A-B


qum=

1340.01 Kg/m

1340.01 Kg/m

quv=

509.80 Kg/m

509.80 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

0.00 Kg/m

0.00 Kg/m

Wum=

1692.81 Kg/m

Wuv=

509.80 Kg/m
Wu

> Tramo B-C


qum=

1035.03 Kg/m

1035.03 Kg/m

quv=

393.77 Kg/m

393.77 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

0.00 Kg/m

0.00 Kg/m

Ing. OVIDIO SERRANO ZELADA

Wum=

1387.83 Kg/m

Wuv=

393.77 Kg/m

ING CIVIL-UNPRG

Pgina 64

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

B
Wuv=393.77
Wuv=509.80
Wum=1387.83
Wum=1692.81

3.03 m

4.07 m

VIGA EJE 6:
Wu

> Tramo A-B


qum=

1626.79 Kg/m

1626.79 Kg/m

quv=

618.90 Kg/m

618.90 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

0.00 Kg/m

0.00 Kg/m

Wum=

1979.59 Kg/m

Wuv=

618.90 Kg/m
Wu

> Tramo B-C


qum=

1776.79 Kg/m

1776.79 Kg/m

quv=

675.97 Kg/m

675.97 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

741.00 Kg/m

1037.40 Kg/m

Ing. OVIDIO SERRANO ZELADA

Wum=

3166.99 Kg/m

Wuv=

675.97 Kg/m

ING CIVIL-UNPRG

Pgina 65

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Wuv=618.90

Wuv=675.97
Wum=3166.99

Wum=1979.59

Wum=2129.59

1.93 m
3.03 m

4.07 m

VIGA EJE 5:
Wu

> Tramo A-B


qum=

715.76 Kg/m

715.76 Kg/m

quv=

272.31 Kg/m

272.31 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

741.00 Kg/m

1037.40 Kg/m

Wum=

2105.96 Kg/m

Wuv=

272.31 Kg/m
Wu

> Tramo B-C


qum=

1741.99 Kg/m

1741.99 Kg/m

quv=

662.73 Kg/m

662.73 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

0.00 Kg/m

0.00 Kg/m

Ing. OVIDIO SERRANO ZELADA

Wum=

2094.79 Kg/m

Wuv=

662.73 Kg/m

ING CIVIL-UNPRG

Pgina 66

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI
A

Wuv=272.31

Wuv=662.73

2,105.96

Wum=2094.79

3.03 m

4.07 m

VIGA EJE 4:
Wu

> Tramo A-B


qum=

676.97 Kg/m

676.97 Kg/m

quv=

257.55 Kg/m

257.55 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

741.00 Kg/m

1037.40 Kg/m

Wum=

2067.17 Kg/m

Wuv=

257.55 Kg/m
Wu

> Tramo B-C


qum=

2169.11 Kg/m

2169.11 Kg/m

quv=

825.22 Kg/m

825.22 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

0.00 Kg/m

0.00 Kg/m

Wum=

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

2521.91 Kg/m

Pgina 67

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI
Wuv=
A

825.22 Kg/m

Wuv=257.55

Wuv=825.22

Wum=2067.17

Wum=2521.91

4.07

3.03 m

VIGA EJE 3:
Wu

> Tramo A-B


qum=

1500.64 Kg/m

1500.64 Kg/m

quv=

570.91 Kg/m

570.91 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

741.00 Kg/m

1037.40 Kg/m

Wum=

2890.84 Kg/m

Wuv=

570.91 Kg/m
Wu

> Tramo B-C


qum=

2048.77 Kg/m

2048.77 Kg/m

quv=

779.44 Kg/m

779.44 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

0.00 Kg/m

0.00 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 68

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Wum=

2401.57 Kg/m

Wuv=

779.44 Kg/m

Wuv=570.91

Wuv=779.44

Wum=2890.84

Wum=2401.57

4.07

3.03 m

VIGA EJE 2:
Wu

> Tramo A-B


qum=

2039.09 Kg/m

2039.09 Kg/m

quv=

775.76 Kg/m

775.76 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

741.00 Kg/m

1037.40 Kg/m

Wum=

3429.29 Kg/m

Wuv=

775.76 Kg/m
Wu

> Tramo B-C


qum=

2220.43 Kg/m

2220.43 Kg/m

quv=

844.75 Kg/m

844.75 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 69

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI
PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

0.00 Kg/m

0.00 Kg/m

Wum=

2573.23 Kg/m

Wuv=

844.75 Kg/m

Wuv=775.76

Wuv=844.75

Wum=3429.29

Wum=2573.23

3.07 m

1.00 m

4.07

3.03 m

b) VIGAS EN DIRECCIN Y-Y: V-202

0.30 m

0.40 m

VIGA EJE A:
> Tramo 2-3
> Tramo 6-7
Wu

qum=

124.54 Kg/m

qum=

418.20 Kg/m

418.20 Kg/m

quv=

47.38 Kg/m

quv=

159.10 Kg/m

159.10 Kg/m

PP.Viga=

252.00 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

741.00 Kg/m

Muro=

741.00 Kg/m

1037.40 Kg/m
Wum=

Wum=

1808.40 Kg/m

Wuv=

159.10 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Wuv=

Pgina 70

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

> Tramo 5-6

> Tramo 1'-2


Wu

qum=

587.60 Kg/m

587.60 Kg/m

qum=

0.00 Kg/m

quv=

223.55 Kg/m

223.55 Kg/m

quv=

0.00 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

PP.Viga=

252.00 Kg/m

Muro=

741.00 Kg/m

1037.40 Kg/m

Muro=

741.00 Kg/m

Wum=

1977.80 Kg/m

Wum=

Wuv=

223.55 Kg/m

Wuv=

> Tramo 4-5


Wu
qum=

0.00 Kg/m

0.00 Kg/m

quv=

0.00 Kg/m

0.00 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

741.00 Kg/m

1037.40 Kg/m

Wum=

1390.20 Kg/m

Wuv=

0.00 Kg/m

> Tramo 3-4


Wu
qum=

676.97 Kg/m

676.97 Kg/m

quv=

257.55 Kg/m

257.55 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

741.00 Kg/m

1037.40 Kg/m

Wuv=

257.55 Kg/m

Ing. OVIDIO SERRANO ZELADA

2.95 m

Wum=1808.40

Wuv=159.10

2067.17 Kg/m

Wum=

ING CIVIL-UNPRG

Pgina 71

1'

1.36 m

2.03 m

3.03 m

2.29 m

2.83 m

Wum=1977.80
Wum=2067.17
Wum=1514.74

1'

1390.20

Wuv=47.38

Wuv=257.55

Wum=1390.20

Wuv=223.55

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

VIGA EJE B:
> Tramo 2-3
> Tramo 6-7
Wu

qum=

179.10 Kg/m

qum=

808.88 Kg/m

808.88 Kg/m

quv=

68.14 Kg/m

quv=

307.73 Kg/m

307.73 Kg/m

PP.Viga=

252.00 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

0.00 Kg/m

Muro=

0.00 Kg/m

0.00 Kg/m
Wum=

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 72

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI
Wum=

1161.68 Kg/m

Wuv=

307.73 Kg/m

> Tramo 5-6

Wuv=

> Tramo 1'-2


Wu

qum=

587.60 Kg/m

587.60 Kg/m

qum=

0.00 Kg/m

quv=

223.55 Kg/m

223.55 Kg/m

quv=

0.00 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

PP.Viga=

252.00 Kg/m

Muro=

741.00 Kg/m

1037.40 Kg/m

Muro=

741.00 Kg/m

Esc (rm)

1112.57 Kg/m

1557.60 Kg/m

Esc (rv)

840.00 Kg/m

1428.00 Kg/m

Wum=
Wuv=

Wum=

3535.40 Kg/m

Wuv=

1651.55 Kg/m

> Tramo 4-5


Wu
qum=

40.98 Kg/m

40.98 Kg/m

quv=

15.59 Kg/m

15.59 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

741.00 Kg/m

1037.40 Kg/m

Wum=

1431.18 Kg/m

Wuv=

15.59 Kg/m

> Tramo 3-4


Wu
qum=

925.55 Kg/m

925.55 Kg/m

quv=

352.12 Kg/m

352.12 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

0.00 Kg/m

0.00 Kg/m

Wuv=

352.12 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

2.95 m

Wum=1161.68

Wuv=307.73

1278.35 Kg/m

Wum=

Pgina 73

Wum=1161.68

Wuv=307.73

6
5

2.83 m
4

2.29 m

Wum=1431.18

1'

1.50 m

2.03 m

1.15 m

3.03 m

Wum=1278.35
Wum=531.90

1'

1390.20

Wuv=68.14

Wuv=352.12

Wuv=15.59

Wuv=223.55

Wum=1977.80

2.00 m

3535.40

1651.55

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

VIGA EJE C:
> Tramo 2-3
> Tramo 6-7
qum=

390.68 Kg/m

Ing. OVIDIO SERRANO ZELADA

Wu

qum=

54.56 Kg/m

390.68 Kg/m

quv=

20.76 Kg/m

ING CIVIL-UNPRG

Pgina 74

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI
quv=

148.63 Kg/m

148.63 Kg/m

PP.Viga=

252.00 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

741.00 Kg/m

Muro=

741.00 Kg/m

1037.40 Kg/m
Wum=

Wum=

1780.88 Kg/m

Wuv=

148.63 Kg/m

> Tramo 5-6

Wuv=

> Tramo 1'-2


Wu

qum=

0.00 Kg/m

0.00 Kg/m

qum=

0.00 Kg/m

quv=

0.00 Kg/m

0.00 Kg/m

quv=

0.00 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

PP.Viga=

252.00 Kg/m

Muro=

741.00 Kg/m

1037.40 Kg/m

Muro=

741.00 Kg/m

Wum=

1390.20 Kg/m

Wum=

Wuv=

0.00 Kg/m

Wuv=

> Tramo 4-5


Wu
qum=

40.98 Kg/m

40.98 Kg/m

quv=

15.59 Kg/m

15.59 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

741.00 Kg/m

1037.40 Kg/m

Wum=

1431.18 Kg/m

Wuv=

15.59 Kg/m

> Tramo 3-4


Wu
qum=

248.58 Kg/m

248.58 Kg/m

quv=

94.57 Kg/m

94.57 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

741.00 Kg/m

1037.40 Kg/m

Wuv=

94.57 Kg/m

Ing. OVIDIO SERRANO ZELADA

1638.78 Kg/m

Wum=

ING CIVIL-UNPRG

Pgina 75

Ing. OVIDIO SERRANO ZELADA

1'

1'

Wum=1444.76

2.03 m

1.50 m

Wuv=20.76

1390.20

ING CIVIL-UNPRG
3.03 m

Wum=1638.78

Wuv=94.57

2.29 m

Wum=1431.18

Wuv=15.59

2.83 m

Wum=1390.20

2.95 m

Wum=1780.88

Wuv=148.63

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Pgina 76

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

IENTES DEL ACI

4.52

PAO 2

V -1 0 2

V-101

V-101

3 .2 3

V -1 0 2

PAO 4

V -1 0 2

2 .5 9

V-101

PAO 5

V -1 0 2

3 .3 3

V-101

PAO 7

V-101

V -1 0 2

2 .2 8

PAO 9

3 .2 0

.6 3

7'

V-101

1 .6 6

4.52
C

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 77

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Cb
0.330
0.309
0.290

Vbm=

418.20 Kg/m

Vubv=

159.10 Kg/m

Cb
0.240
0.215
0.190

Vbm=

390.68 Kg/m

Vubv=

148.63 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 78

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Cb
0.450
0.434
0.400

Vbm=

587.60 Kg/m

Vubv=

223.55 Kg/m

r una losa armada en una


os a vigas, por lo tanto al estar

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 79

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Cb
0.030
0.023
0.020

Vbm=

40.98 Kg/m

Vubv=

15.59 Kg/m

Cb
0.500

Vbm=

676.97 Kg/m

Vubv=

257.55 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 80

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Cb
0.140
0.137
0.110

Vbm=

248.58 Kg/m

Vubv=

94.57 Kg/m

Cb
0.110
0.092
0.080

Vbm=

124.54 Kg/m

Vubv=

47.38 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 81

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Cb
0.030

Vbm=

54.56 Kg/m

Vubv=

20.76 Kg/m

e ser una losa armada en una


cados a vigas, por lo tanto al estar

5.42 Kg/m

2.40 Kg/m

e ser una losa armada en una


cados a vigas, por lo tanto al estar

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 82

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

0.54 Kg/m

0.00 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 83

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 84

PAO 9

1677.82
PAO 10

1850.54

1214.6325028314

PAO 8

1137.0209945358

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

PAO 11

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 85

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

o que todo este esfuerzo debe ser

al es satisfactorio.

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 86

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 87

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

3166.99

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 88

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI
C

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 89

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 90

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 91

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

1.00 m

Wu
124.54 Kg/m
47.38 Kg/m
352.80 Kg/m
1037.40 Kg/m

1514.74 Kg/m
47.38 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 92

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Wu
0.00 Kg/m
0.00 Kg/m
352.80 Kg/m
1037.40 Kg/m

1390.20 Kg/m
0.00 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 93

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Wu
179.10 Kg/m
68.14 Kg/m
352.80 Kg/m
0.00 Kg/m

531.90 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 94

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI
68.14 Kg/m

Wu
0.00 Kg/m
0.00 Kg/m
352.80 Kg/m
1037.40 Kg/m

1390.20 Kg/m
0.00 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 95

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Wu
54.56 Kg/m
20.76 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 96

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI
352.80 Kg/m
1037.40 Kg/m

1444.76 Kg/m
20.76 Kg/m

Wu
0.00 Kg/m
0.00 Kg/m
352.80 Kg/m
1037.40 Kg/m

1390.20 Kg/m
0.00 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 97

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 98

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI
DISTRIBUCIN DE CARGAS EN VIGAS: MTODO DE COEFICIENTES DEL ACI
VIGAS 5 NIVEL
1)DETERMINACIN DE CARGAS LTIMAS
a) CARGA MUERTA
LOSA
MACIZA

Pe

Peso

0.15 m

2400 Kg/m

360.00 Kg/m
A

TABIQ. 5NIVEL

70.00 Kg/m

3.48

4.52

PAO 2

100.00 Kg/m

CM

742.00 Kg/m /m

1.7

CV

170.00 Kg/m /m

= Wum + Wuv =

912.00 Kg/m /m

V -1 0 2

1.4

2 .5 9

Wuv

V-101

V -1 0 2

3 .3 3

V -1 0 2

2 .2 8

PAO 8

V -1 0 2

PAO 7

V-101

V-101

PAO 5
V-101

V-101

1 .6 6

PAO 6

PAO 4

V-101

V -1 0 2

V-101

Wum

PAO 3

V -1 0 2

100.00 Kg/m

V -1 0 2

CV=

V -1 0 2

530.00 Kg/m
3 .2 3

CM=

V-101

V -1 0 2

V-101

Wu

PAO 1

V-101

PAO 9
V-101

V -1 0 2

S/C VIVIENDA

3 .2 0

b) CARGA VIVA

V-101

V -1 0 2

100.00 Kg/m

V -1 0 2

ACABADOS

.6 3

7'

1'

3.48
A

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

4.52
B

Pgina 99

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

2)DETERMINACIN DE CORTANTES EN PAOS

PAO 1:

CASO 9

Utilizando tablas del mtodo del ACI:

lll
lll
lll
lll
ll

2.95

l
l
l
l

l
l
l
l

A=

l
l
l
l

l
l
l
l

l
l
l
l

lllllllllllllllllllll

l
l
l
l

lllllllllllllllllllll
B= 3.03
m= A =

Ca

Cb

0.670

0.330

0.974

0.691

0.309

0.95

0.710

0.290

0.974

=//
=//

PAO 2:

Ca=

0.691

Vuam=

756.40 Kg/m

Vbm=

Cb=

0.309

Vuav=

173.30 Kg/m

Vubv=

Vua=

929.70 Kg/m

Vub=

426.77 Kg/m

CASO 4

Utilizando tablas del mtodo del ACI:

lll
lll
lll
lll
ll

2.95

l
l
l
l

l
l
l
l

l
l
l
l

A=

l
l
l
l

l
l
l
l

l
l
l
l

lllllllllllllllllllll

B= 4.07
m= A =

Ca

Cb

0.75

0.760

0.240

0.72

0.785

0.215

0.70

0.810

0.190

0.72

=//

Ca=

0.785

Vuam=

859.34 Kg/m

Vbm=

Cb=

0.215

Vuav=

196.88 Kg/m

Vubv=

=//

Ing. OVIDIO SERRANO ZELADA

Vua=

1056.23 Kg/m

Vub=

398.68 Kg/m

ING CIVIL-UNPRG

Pgina 100

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

PAO 3:

CASO 4

Utilizando tablas del mtodo del ACI:

lll
lll
lll
lll
ll

2.83

l
l
l
l

l
l
l
l

l
l
l
l

A=

l
l
l
l

l
l
l
l

l
l
l
l

lllllllllllllllllllll

B=
m= A =

3.03

Ca

0.95

0.550

0.93

0.566

0.90

0.600

0.93

=//

Ca=

0.566

Vuam=

594.27 Kg/m

Cb=

0.434

Vuav=

136.15 Kg/m

=//
Vua=

730.42 Kg/m

Vub=

599.64 Kg/m

PAO 4: La relacin entre el largo y el ancho de este pao, es mayor a 2, por lo que ser una losa armada en una
direccin; para el anlisis podemos utilizar cualquiera de los mtodos aplicados a vigas, por lo tanto al es
en voladizo, se tiene el siguiente cortante:

=
L =

Vua=

Ing. OVIDIO SERRANO ZELADA

0.83

Vuam=

615.86 Kg/m

Vuav=

141.10 Kg/m

756.96 Kg/m

ING CIVIL-UNPRG

Pgina 101

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

PAO 5:

CASO 5
lllllllllllllllllllll

A=

2.29

Utilizando tablas del mtodo del ACI:

lllllllllllllllllllll
B=
m= A =

4.07

Ca

0.6

0.970

0.56

0.977

0.55

0.980

0.56

=//

Ca=

0.977

Vuam=

830.45 Kg/m

Cb=

0.023

Vuav=

190.26 Kg/m

=//
1020.71 Kg/m

Vub=

41.82 Kg/m

CASO 4

Utilizando tablas del mtodo del ACI:

lll
lll
lll
lll
ll

3.03

l
l
l
l

l
l
l
l

l
l
l
l

A=

l
l
l
l

l
l
l
l

l
l
l
l

PAO 6:

Vua=

Ca

1.00

0.500

lllllllllllllllllllll
B=
m= A =

3.03

1.00

=//

Ca=

0.500

Vuam=

562.07 Kg/m

Cb=

0.500

Vuav=

128.78 Kg/m

=//
Vua=

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

690.84 Kg/m

Pgina 102

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI
Vub=

PAO 7:

690.84 Kg/m

CASO 9

Utilizando tablas del mtodo del ACI:

lll
lll
lll
lll
ll

3.03

l
l
l
l

l
l
l
l

l
l
l
l

A=

l
l
l
l

l
l
l
l

l
l
l
l

lllllllllllllllllllll

lllllllllllllllllllll
B=
m= A =

4.07

Ca

0.75

0.860

0.74

0.863

0.70

0.890

0.74

=//

Ca=

0.863

Vuam=

970.48 Kg/m

Cb=

0.137

Vuav=

222.35 Kg/m

=//

PAO 8:

Vua=

1192.83 Kg/m

Vub=

253.67 Kg/m

CASO 9

Utilizando tablas del mtodo del ACI:

lll
lll
lll
lll
ll

2.03

l
l
l
l

l
l
l
l

A=

l
l
l
l

l
l
l
l

l
l
l
l

lllllllllllllllllllll

l
l
l
l

lllllllllllllllllllll
B=
m= A =

3.03

Ca

0.7

0.890

0.67

0.908

0.65

0.920

0.67

=//

Ing. OVIDIO SERRANO ZELADA

Ca=

0.908

Vuam=

683.86 Kg/m

Cb=

0.092

Vuav=

156.68 Kg/m

ING CIVIL-UNPRG

Pgina 103

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI
=//

PAO 9:

Vua=

840.54 Kg/m

Vub=

127.09 Kg/m

CASO 4

Utilizando tablas del mtodo del ACI:

lll
lll
lll
lll
ll

2.03

l
l
l
l

l
l
l
l

l
l
l
l

A=

l
l
l
l

l
l
l
l

l
l
l
l

lllllllllllllllllllll

Ca

0.50

0.970

lllllllllllllllllllll
B=
m= A =

4.07

0.50

=//

Ca=

0.970

Vuam=

730.54 Kg/m

Cb=

0.030

Vuav=

167.37 Kg/m

=//

PAO 10:

Vua=

897.91 Kg/m

Vub=

55.68 Kg/m

La relacin entre el largo y el ancho de este pao, es mayor a 2, por lo que ser una losa armada en
direccin; para el anlisis podemos utilizar cualquiera de los mtodos aplicados a vigas, por lo tanto
en voladizo, se tiene el siguiente cortante:

L= 1.36 m
Vua=

PAO 11:

Vuam=

1009.12 Kg/m

Vuav=

231.20 Kg/m

1240.32 Kg/m

La relacin entre el largo y el ancho de este pao, es mayor a 2, por lo que ser una losa armada en
direccin; para el anlisis podemos utilizar cualquiera de los mtodos aplicados a vigas, por lo tanto
en voladizo, se tiene el siguiente cortante:

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 104

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI
La relacin entre el largo y el ancho de este pao, es mayor a 2, por lo que ser una losa armada en
direccin; para el anlisis podemos utilizar cualquiera de los mtodos aplicados a vigas, por lo tanto
en voladizo, se tiene el siguiente cortante:

L= 1.50 m
Vua=

Vuam=

1113.00 Kg/m

Vuav=

255.00 Kg/m

1368.00 Kg/m

3)RESUMEN DE CORTANTES
a) CORTANTES EN DIRECCIN X-X

Unidades: Kg/m

426.77

398.68
Pao 1

Pao 2

426.77

398.68

599.64
Pao 3

Pao 4

599.64

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 105

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

41.82
Pao 5

41.82

690.84

253.67
Pao 6

Pao 7

690.84

127.09

253.67

55.68
Pao 8

Pao 9

127.09

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

55.68

Pgina 106

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

897.91

690.84

PAO 8

1192.827768059

1192.83
PAO 7

1020.71

PAO 5

1056.23

PAO 4

PAO 6

1020.71

756.96

1056.23
PAO 2

840.54

730.4201980198

PAO 3

929.70

PAO 1

690.84

Unidades: Kg/m

730.42

929.70

b) CORTANTES EN DIRECCIN Y-Y

PAO 9

Pgina 107

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

c) VERIFICACIN POR CORTANTE


h

15.00 cm

100 cm

En losa, no debe haber refuerzo por cortante, por lo que todo este esfuerzo de
tomado por el concreto.

=. =
^ . )
(
Vc=

11520.64 Kg/m

Este cortante es mayor a cada uno de los cortantes a los que est sometida la losa, lo cual es satisfactorio.

4)DISTRIBUCIN DE CARGAS EN VIGAS


a) VIGAS EN DIRECCIN X-X: V-201

0.30 m

0.45 m

VIGA EJE 7:
Wu

> Tramo A-B


qum=

1112.56 Kg/m

1112.56 Kg/m

quv=

254.90 Kg/m

254.90 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

0.00 Kg/m

0.00 Kg/m

Wum=

1465.36 Kg/m

Wuv=

254.90 Kg/m
Wu

> Tramo B-C


qum=

859.34 Kg/m

859.34 Kg/m

quv=

196.88 Kg/m

196.88 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

0.00 Kg/m

0.00 Kg/m

Ing. OVIDIO SERRANO ZELADA

Wum=

1212.14 Kg/m

Wuv=

196.88 Kg/m

ING CIVIL-UNPRG

Pgina 108

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

B
Wuv=196.88
Wuv=254.90
Wum=1212.14
Wum=1465.36

3.03 m

4.07 m

VIGA EJE 6:
Wu

> Tramo A-B


qum=

1350.67 Kg/m

1350.67 Kg/m

quv=

309.45 Kg/m

309.45 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

0.00 Kg/m

0.00 Kg/m

Wum=

1703.47 Kg/m

Wuv=

309.45 Kg/m
Wu

> Tramo B-C


qum=

1475.20 Kg/m

1475.20 Kg/m

quv=

337.98 Kg/m

337.98 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

342.00 Kg/m

478.80 Kg/m

Ing. OVIDIO SERRANO ZELADA

Wum=

2306.80 Kg/m

Wuv=

337.98 Kg/m

ING CIVIL-UNPRG

Pgina 109

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Wuv=309.45

Wuv=337.98
Wum=2306.80

Wum=1703.47

1.93 m
3.03 m

4.07 m

VIGA EJE 5:
Wu

> Tramo A-B


qum=

594.27 Kg/m

594.27 Kg/m

quv=

136.15 Kg/m

136.15 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

342.00 Kg/m

478.80 Kg/m

Wum=

1425.87 Kg/m

Wuv=

136.15 Kg/m
Wu

> Tramo B-C


qum=

1446.31 Kg/m

1446.31 Kg/m

quv=

331.36 Kg/m

331.36 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

0.00 Kg/m

0.00 Kg/m

Ing. OVIDIO SERRANO ZELADA

Wum=

1799.11 Kg/m

Wuv=

331.36 Kg/m

ING CIVIL-UNPRG

Pgina 110

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI
A

Wuv=136.15

Wuv=331.36

Wum=1425.87

Wum=1799.11

3.03 m

4.07 m

VIGA EJE 4:
Wu

> Tramo A-B


qum=

562.07 Kg/m

562.07 Kg/m

quv=

128.78 Kg/m

128.78 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

342.00 Kg/m

478.80 Kg/m

Wum=

1393.67 Kg/m

Wuv=

128.78 Kg/m
Wu

> Tramo B-C


qum=

1800.93 Kg/m

1800.93 Kg/m

quv=

412.61 Kg/m

412.61 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

0.00 Kg/m

0.00 Kg/m

Wum=

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

2153.73 Kg/m

Pgina 111

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI
Wuv=
A

412.61 Kg/m

Wuv=128.78

Wuv=412.61

Wum=1393.67

Wum=2153.73

4.07

3.03 m

VIGA EJE 3:
Wu

> Tramo A-B


qum=

1245.92 Kg/m

1245.92 Kg/m

quv=

285.45 Kg/m

285.45 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

342.00 Kg/m

478.80 Kg/m

Wum=

2077.52 Kg/m

Wuv=

285.45 Kg/m
Wu

> Tramo B-C


qum=

1701.02 Kg/m

1701.02 Kg/m

quv=

389.72 Kg/m

389.72 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

0.00 Kg/m

0.00 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 112

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Wum=

2053.82 Kg/m

Wuv=

389.72 Kg/m

Wuv=285.45

Wuv=389.72

Wum=2077.52

Wum=2053.82

4.07

3.03 m

VIGA EJE 2:
Wu

> Tramo A-B


qum=

1692.98 Kg/m

1692.98 Kg/m

quv=

387.88 Kg/m

387.88 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

0.00 Kg/m

0.00 Kg/m

Wum=

2045.78 Kg/m

Wuv=

387.88 Kg/m
Wu

> Tramo B-C


qum=

1843.54 Kg/m

1843.54 Kg/m

quv=

422.37 Kg/m

422.37 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 113

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI
PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

0.00 Kg/m

0.00 Kg/m

Wum=

2196.34 Kg/m

Wuv=

422.37 Kg/m

Wuv=387.88

Wuv=422.37

Wum=2045.78

Wum=2196.34

3.07 m

1.00 m

4.07

3.03 m

b) VIGAS EN DIRECCIN Y-Y: V-202

0.30 m

0.40 m

VIGA EJE A:
> Tramo 2-3
> Tramo 6-7
Wu

qum=

103.40 Kg/m

qum=

347.22 Kg/m

347.22 Kg/m

quv=

23.69 Kg/m

quv=

79.55 Kg/m

79.55 Kg/m

PP.Viga=

252.00 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

342.00 Kg/m

Muro=

342.00 Kg/m

478.80 Kg/m
Wum=

Wum=

1178.82 Kg/m

Wuv=

79.55 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Wuv=

Pgina 114

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

> Tramo 5-6

> Tramo 1'-2


Wu

qum=

487.87 Kg/m

487.87 Kg/m

qum=

0.00 Kg/m

quv=

111.78 Kg/m

111.78 Kg/m

quv=

0.00 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

PP.Viga=

252.00 Kg/m

Muro=

342.00 Kg/m

478.80 Kg/m

Muro=

342.00 Kg/m

Wum=

1319.47 Kg/m

Wum=

Wuv=

111.78 Kg/m

Wuv=

> Tramo 4-5


Wu
qum=

0.00 Kg/m

0.00 Kg/m

quv=

0.00 Kg/m

0.00 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

342.00 Kg/m

478.80 Kg/m

Wum=

831.60 Kg/m

Wuv=

0.00 Kg/m

> Tramo 3-4


Wu
qum=

562.07 Kg/m

562.07 Kg/m

quv=

128.78 Kg/m

128.78 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

342.00 Kg/m

478.80 Kg/m

Wuv=

128.78 Kg/m

Ing. OVIDIO SERRANO ZELADA

2.95 m

Wum=1178.82

Wuv=79.55

1393.67 Kg/m

Wum=

ING CIVIL-UNPRG

Pgina 115

1'

1.36 m

2.03 m

3.03 m

2.29 m

2.83 m

Wum=1319.47
Wum=1393.67
Wum=935.00

1'

831.60

Wuv=23.69

Wuv=128.78

Wum=831.60

Wuv=111.78

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

VIGA EJE B:
> Tramo 2-3
> Tramo 6-7
Wu

qum=

148.70 Kg/m

qum=

671.58 Kg/m

671.58 Kg/m

quv=

34.07 Kg/m

quv=

153.87 Kg/m

153.87 Kg/m

PP.Viga=

252.00 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

0.00 Kg/m

Muro=

0.00 Kg/m

0.00 Kg/m
Wum=

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 116

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI
Wum=

1024.38 Kg/m

Wuv=

153.87 Kg/m

> Tramo 5-6

Wuv=

> Tramo 1'-2


Wu

qum=

487.87 Kg/m

487.87 Kg/m

qum=

0.00 Kg/m

quv=

111.78 Kg/m

111.78 Kg/m

quv=

0.00 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

PP.Viga=

252.00 Kg/m

Muro=

342.00 Kg/m

478.80 Kg/m

Muro=

342.00 Kg/m

Esc (rm)

1112.57 Kg/m

1557.60 Kg/m

Esc (rv)

840.00 Kg/m

1428.00 Kg/m

Wum=
Wuv=

Wum=

2877.06 Kg/m

Wuv=

1539.78 Kg/m

> Tramo 4-5


Wu
qum=

34.02 Kg/m

34.02 Kg/m

quv=

7.79 Kg/m

7.79 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

342.00 Kg/m

478.80 Kg/m

Wum=

865.62 Kg/m

Wuv=

7.79 Kg/m

> Tramo 3-4


Wu
qum=

768.45 Kg/m

768.45 Kg/m

quv=

176.06 Kg/m

176.06 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

0.00 Kg/m

0.00 Kg/m

Wuv=

176.06 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

2.95 m

Wum=1024.38

Wuv=153.87

1121.25 Kg/m

Wum=

Pgina 117

Wum=1024.38

Wuv=153.87

6
5

2.83 m
4

2.29 m

Wum=865.62

1'

1.50 m

2.03 m

1.15 m

3.03 m

Wum=1121.25
Wum=501.50

1'

831.60

Wuv=34.07

Wuv=176.06

Wuv=7.79

Wuv=111.78

Wum=1319.47

2.00 m

2877.06

1539.78

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

VIGA EJE C:
> Tramo 2-3
> Tramo 6-7
qum=

324.37 Kg/m

Ing. OVIDIO SERRANO ZELADA

Wu

qum=

45.30 Kg/m

324.37 Kg/m

quv=

10.38 Kg/m

ING CIVIL-UNPRG

Pgina 118

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI
quv=

74.32 Kg/m

74.32 Kg/m

PP.Viga=

252.00 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

342.00 Kg/m

Muro=

342.00 Kg/m

478.80 Kg/m
Wum=

Wum=

1155.97 Kg/m

Wuv=

74.32 Kg/m

> Tramo 5-6

Wuv=

> Tramo 1'-2


Wu

qum=

0.00 Kg/m

0.00 Kg/m

qum=

0.00 Kg/m

quv=

0.00 Kg/m

0.00 Kg/m

quv=

0.00 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

PP.Viga=

252.00 Kg/m

Muro=

342.00 Kg/m

478.80 Kg/m

Muro=

342.00 Kg/m

Wum=

831.60 Kg/m

Wum=

Wuv=

0.00 Kg/m

Wuv=

> Tramo 4-5


Wu
qum=

34.02 Kg/m

34.02 Kg/m

quv=

7.79 Kg/m

7.79 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

342.00 Kg/m

478.80 Kg/m

Wum=

865.62 Kg/m

Wuv=

7.79 Kg/m

> Tramo 3-4


Wu
qum=

206.39 Kg/m

206.39 Kg/m

quv=

47.29 Kg/m

47.29 Kg/m

PP.Viga=

252.00 Kg/m

352.80 Kg/m

Muro=

342.00 Kg/m

478.80 Kg/m

Wuv=

47.29 Kg/m

Ing. OVIDIO SERRANO ZELADA

1037.99 Kg/m

Wum=

ING CIVIL-UNPRG

Pgina 119

Ing. OVIDIO SERRANO ZELADA

1'

1'

Wum=876.90

2.03 m

1.50 m

Wuv=10.38

831.60

ING CIVIL-UNPRG
3.03 m

Wum=1037.99

Wuv=47.29

2.29 m

Wum=865.62

Wuv=7.79

2.83 m

Wum=831.60

2.95 m

Wum=1155.97

Wuv=74.32

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Pgina 120

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

IENTES DEL ACI

4.52

PAO 2

V -1 0 2

V-101

V-101

3 .2 3

V -1 0 2

PAO 4

V -1 0 2

2 .5 9

V-101

PAO 5

V -1 0 2

3 .3 3

V-101

PAO 7

V-101

V -1 0 2

2 .2 8

PAO 9

3 .2 0

.6 3

7'

V-101

1 .6 6

4.52
C

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 121

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Cb
0.330
0.309
0.290

Vbm=

347.22 Kg/m

Vubv=

79.55 Kg/m

Cb
0.240
0.215
0.190

Vbm=

324.37 Kg/m

Vubv=

74.32 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 122

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Cb
0.450
0.434
0.400

Vbm=

487.87 Kg/m

Vubv=

111.78 Kg/m

r una losa armada en una


os a vigas, por lo tanto al estar

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 123

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Cb
0.030
0.023
0.020

Vbm=

34.02 Kg/m

Vubv=

7.79 Kg/m

Cb
0.500

Vbm=

562.07 Kg/m

Vubv=

128.78 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 124

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Cb
0.140
0.137
0.110

Vbm=

206.39 Kg/m

Vubv=

47.29 Kg/m

Cb
0.110
0.092
0.080

Vbm=

103.40 Kg/m

Vubv=

23.69 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 125

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Cb
0.030

Vbm=

45.30 Kg/m

Vubv=

10.38 Kg/m

e ser una losa armada en una


cados a vigas, por lo tanto al estar

9.12 Kg/m

1.20 Kg/m

e ser una losa armada en una


cados a vigas, por lo tanto al estar

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 126

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

3.00 Kg/m

5.00 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 127

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 128

PAO 10

1368.00

PAO 8

840.535770297

1240.32

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

PAO 11

897.9096

PAO 9

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 129

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

o que todo este esfuerzo debe ser

al es satisfactorio.

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 130

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 131

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 132

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI
C

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 133

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 134

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 135

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

1.00 m

Wu
103.40 Kg/m
23.69 Kg/m
352.80 Kg/m
478.80 Kg/m

935.00 Kg/m
23.69 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 136

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Wu
0.00 Kg/m
0.00 Kg/m
352.80 Kg/m
478.80 Kg/m

831.60 Kg/m
0.00 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 137

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Wu
148.70 Kg/m
34.07 Kg/m
352.80 Kg/m
0.00 Kg/m

501.50 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 138

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI
34.07 Kg/m

Wu
0.00 Kg/m
0.00 Kg/m
352.80 Kg/m
478.80 Kg/m

831.60 Kg/m
0.00 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 139

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Wu
45.30 Kg/m
10.38 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 140

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI
352.80 Kg/m
478.80 Kg/m

876.90 Kg/m
10.38 Kg/m

Wu
0.00 Kg/m
0.00 Kg/m
352.80 Kg/m
478.80 Kg/m

831.60 Kg/m
0.00 Kg/m

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 141

EDIFICACIN 5 PISOS- CONCRETO ARMADO II


DISTRIBUCIN DE CARGAS EN VIGAS-MTODO DEL ACI

Ing. OVIDIO SERRANO ZELADA

ING CIVIL-UNPRG

Pgina 142

Anda mungkin juga menyukai