Anda di halaman 1dari 41

DRAWING FILING SYSTEM

company

phase

zone

document

number

ZHJV

LEGEND
company

ZHJV

phase

W
A

WORKING DRAWING
AS-BUILT DRAWING

HD
A1
A2
P1
P2
SC
BA
GE

HIGHWAY
ABUTMENT 1
ABUTMENT 2
PYLON 1
PYLON 2
STAY CABLE
BRIDGE ACCSESSORIES
GENERAL

zone

document

number

SI
CO
RE
FW
EW
EM
FO
AB
ST
PT
LP
CM
AS
BL
DR
BC
AC
UT
HR
EJ
BP
LY
0001 to 0999

ZENITAKA HYUNDAI JOINT VENTURE

SITE INSTALLATION
CONCRETE OUTLINE
REINFORCEMENT
FABRICATION WORKS
EARTHWORKS
ELECRO-MECHANICAL
FORMWORK
ABUTMENT
STRUCTURE
POST-TENSIONING
LIGHTENING PROTECTION
COMMON
APPROACH SLAB
BEARING & LATERAL SUPPORT
DRAINAGE
BOX CULVERT
ACCESS FACILITY (Ladder, Step, Door)
UTILITY (Power, Communication, Light)
HAND RAIL
EXPANSION JOINT
BORED PILE
LAYOUT
DRAWING NUMBER

revision

revision

1,2,3....etc
A,B,C..etc

REVISION CODE FOR WORKING DRAWINGS


REVISION CODE FOR AS-BUILT DRAWINGS

CONSTRUCTION SEQUENCE
Scale=1:200

STEP 1:
1. INSTALL REBAR FOR BOTTOM SLAB.
2. INSTALL CONVENTIONAL SIDE FORM FOR BOTTOM SLAB.
3. CAST BOTTOM SLAB.

STEP 2:
1. INSTALL REBAR FOR CENTER HIGHER SLAB.LEAVE
STARTER BAR OUTSIDE FOR WALL.
2. INSTALL CONVENTIONAL SIDE FORM.
3. CAST THE CENTER HIGHER SLAB.

STEP 3:
1. INSTALL REBAR FOR WALL.
2. BEND REBAR FOR WALKWAY SLAB.
3. INSTALL WALL SYSTEM FORMWORK.
4. ADJUST THE VERTICALITY AND CAST.

STEP 4:
1. REMOVE WALL SYSTEM FORMWORK.
2. BACK FILLING.
3. LEAN CONCRETE.
4. CAST WALKWAY SLAB.
5. INSTALL CONVENTIONAL SIDE FORM.
6. CAST THE MIDDLE SLAB.

STEP 5:
1. INSTALL REBAR AND PT TENDONS FOR WALL.
2. INSTALL BOX-OUT FOR CABLE ANCHOR.
3. INSTALL WALL SYSTEM FORMWORK.
4. ADJUST THE VERTICALITY AND CAST.

STEP 6:
1. REMOVE WALL SYSTEM FORMWORK AND BOX-OUT.
2. BACK FILLING AND LEAN CONCRETE.
3. ARRANGE SCAFFOLDING FOR TOP SLAB AND CABLE
ANCHOR.
4. INSTALL REBAR/PT TENDONS FOR CABLE ANCHOR AND
TOP SLAB.
5. CAST TOP SLAB.

ENGINEERING CONSULTANT:

EMPLOYER:

ENGINEERING CONTRACTOR:

DRAWING TITLE:

PROJECT DOCUMENT NUMBER:

company

GOVERNMENT OF UGANDA

REV

ESTABLISHED

CHECKED

APPROVED

DATE

DESCRIPTION

STAT.

UGANDA NATIONAL ROADS AUTHORITY


PLOT 11, YUSUF LULE ROAD
P O BOX 28487
KAMPALA - UGANDA
Email: executive@unra.go.ug

A2_ ABUTMENT
SCALE :

ORIENTAL CONSULTANTS CO., LTD.


EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
PYUNGHWA ENGINEERING CONSULTANTS LTD

ZENITAKA-HYUNDAI Joint Venture


P.O.BOX 7158, Kampala, Uganda

FILE NAME:

phase

zone

document

number

STRUCTURE DIMENSION AND CONSTRUCTION JOINT LAYOUT PLAN - LOWER PART


Scale=1:120
PORTION 2

PORTION 1

4000

500

4000

500

4000

500

4000

500

4000

500

4000

500

4000

500

4000

500

4000

500

500

500

3720

3400

500

8900

500

3450

3450

500

500

1100

18440

500

1100

500

1250

3450

3450

8900

500

500

3720

3400

500

500

PORTION 3

NOTE:
ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.
ENGINEERING CONSULTANT:

EMPLOYER:

ENGINEERING CONTRACTOR:

DRAWING TITLE:

PROJECT DOCUMENT NUMBER:

company

GOVERNMENT OF UGANDA

REV

ESTABLISHED

CHECKED

APPROVED

DATE

DESCRIPTION

STAT.

UGANDA NATIONAL ROADS AUTHORITY


PLOT 11, YUSUF LULE ROAD
P O BOX 28487
KAMPALA - UGANDA
Email: executive@unra.go.ug

A2_ ABUTMENT
SCALE :

ORIENTAL CONSULTANTS CO., LTD.


EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
PYUNGHWA ENGINEERING CONSULTANTS LTD

ZENITAKA-HYUNDAI Joint Venture


P.O.BOX 7158, Kampala, Uganda

FILE NAME:

phase

zone

document

number

FORMWORK LAYOUT PLAN FOR PORTION 1

WM01

WM02

WM02

WM04

316

312
135

NM05

414

NM03

NM04

NM06

110
82

NM08

367

82

NM07

WM19
WM20

NM08

91

NM07

94

NM07

82

82

NM08

82

WM15
WM18

82

WM15
WM18

181

WM19
WM20

82

82

112

NM01

NM01

NM02

NM05

NM04

NM03

NM03

NM04
NM03

NM03

NM04

NM04

NM03

NM04

NM03

NM08

473

422

NM06

NM07

NM13

NM03

NM06

139
NM06

82

146

82

NM05

NM05

NM12

281

NM05

NM06

NM06

277

151
NM05

166

NM01

NM01

NM02
NM01

NM01

NM02

NM02

NM01

NM01

NM02

186

NM13

NM02

WM21
NM12

247

WM21

243

WM04

348

WM01

PORTION 1

Scale=1:100

82

PORTION 1

NM04

NM04

NM03

68

NM07

289
NM05

WM12

NM01

37
NM08

230

310

18
NM07

281

NM02

63

NM02

NM08

NM01

NM02

NM02

NM07

308

NM08

247

NM01

243

NM02

NM02

NM01

NM08

NM02

NM02

NM01

NM07

52

WM23

NM07

NM01

WM23

348

82

82

277

NM03

NM04
NM08

NM05

82

NM07

NM04

NM03

NM04

NM03

NM04

58

WM22

NM08

277

WM22

NM03

NM04

NM04

NM03

337

WM12

NOTE:
1.ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.
2.PLEASE REFER TO DRAWING NO ZHJV-W-A2-FF-0015-0, ZHJV-W-A2-FF-0016-0,
ZHJV-W-A2-FF-0017-0 AND ZHJV-W-A2-FF-0018-0 FOR FORMWORK PANEL ASSEMBLY DRAWING.
ENGINEERING CONSULTANT:

EMPLOYER:

ENGINEERING CONTRACTOR:

DRAWING TITLE:

PROJECT DOCUMENT NUMBER:

company

GOVERNMENT OF UGANDA

REV

ESTABLISHED

CHECKED

APPROVED

DATE

DESCRIPTION

STAT.

UGANDA NATIONAL ROADS AUTHORITY


PLOT 11, YUSUF LULE ROAD
P O BOX 28487
KAMPALA - UGANDA
Email: executive@unra.go.ug

A2_ ABUTMENT
SCALE :

ORIENTAL CONSULTANTS CO., LTD.


EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
PYUNGHWA ENGINEERING CONSULTANTS LTD

ZENITAKA-HYUNDAI Joint Venture


P.O.BOX 7158, Kampala, Uganda

FILE NAME:

phase

zone

document

number

FORMWORK ACCESSORY LAYOUT PLAN FOR PORTION 1


Scale=1:100

PORTION 1
193

790

740

1441

760

880

828

WM01

630

1515

380 900

900

910

1572

850

900

850

650

WM02

1650

1537

PORTION 1

3050

1892

2750

1961

2800

693

1040

548

1670

798

650

1490

900

900

940

1945

940

900

900

1407

817

2080

799

1500

1500

1890

857

2750

756

1800

1500

798

803

900

1909

819

849

1800

869

2700

1006

1231

959

1500

716
187

700

800

700

940

1050

1262

3350

1469

1030

ENGINEERING CONSULTANT:

ENGINEERING CONTRACTOR:

3400

1957

DRAWING TITLE:

2500

733

PROJECT DOCUMENT NUMBER:

company

GOVERNMENT OF UGANDA

CHECKED

3100

1500

1500
1155

809

900

908

1800

EMPLOYER:

ESTABLISHED

2800

1750

1194

834
1500

1699

1230

900

NOTE:
1.ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.

REV

715

790

809

1200
800

1500

814

1799

1030

NM08

836

700

700 456

1029

1800

900

NM08

1019

750

800

2100

826

1230

700

846

832

800

NM04

950

WM12

785

1800

1800

800

1730

1847

900

NM07

1801

1258

722
940

NM02

NM01

NM02

900

750

NM02

NM01

900

NM07

900

508

780 561

WM23

506

900

900

850

NM05

900

1416

NM02

900

900

750
NM07

508

900

800

700

750

NM03

NM04

940

700

860

1892

1448

NM01

850

NM08

900

NM07

900

WM22

500

800

700

NM04

NM03

750

NM08

900

700

940

807

802

834

800

2086

NM04

940

836

1500

925

1800

1232

800

1155

1075

820

700

WM15
WM18

900

1531

930

1416

NM03

722

900

700 478

1497

800

647

836

700
900

WM19
WM20

798

650

1111

900

815

900
1729

750

750
940

2101

NM06

NM08

1091

1200

900
900

NM01

700 458

800

NM03

NM04

800

1500

2122

849

800

NM05

700
940

701

340

817

900

1030

798 573
900
900

1840

800

900

1739

1680

1230

1490

900

978

1100

650

700

750
NM03
NM07

798

800

722

700

NM05

NM03

1418

NM06

800

NM03

700

750

NM04

800

700 478

701

700 478

900

NM06

NM04

1627

800

850

NM13

900

NM05

500

NM01

NM02

780

900

NM02

NM01

900

900

NM12

900

NM01

NM02

WM21

508

760 545

WM04

APPROVED

DATE

DESCRIPTION

STAT.

UGANDA NATIONAL ROADS AUTHORITY


PLOT 11, YUSUF LULE ROAD
P O BOX 28487
KAMPALA - UGANDA
Email: executive@unra.go.ug

A2_ ABUTMENT
SCALE :

ORIENTAL CONSULTANTS CO., LTD.


EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
PYUNGHWA ENGINEERING CONSULTANTS LTD

ZENITAKA-HYUNDAI Joint Venture


P.O.BOX 7158, Kampala, Uganda

FILE NAME:

phase

zone

document

number

FORMWORK LAYOUT PLAN FOR PORTION 2


Scale=1:100

PORTION 2

140

142

122

138

NM06

96

96

82

82

82
NM04

82

82

107

82

82

107

NM04

82

NM03

125

NM03

82

82

126

NM06

178

174

129

212

144

148

PORTION 1

209

PORTION 1

140

PORTION 2

77
82

82

178

65
NM05

79

61

209

63
212

55

144

144

75

82

174

NM05

NOTE:
1.ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.
2.PLEASE REFER TO DRAWING NO ZHJV-W-A2-FF-0015-0, ZHJV-W-A2-FF-0016-0,
ZHJV-W-A2-FF-0017-0 AND ZHJV-W-A2-FF-0018-0 FOR FORMWORK PANEL ASSEMBLY DRAWING.
ENGINEERING CONSULTANT:

EMPLOYER:

ENGINEERING CONTRACTOR:

DRAWING TITLE:

PROJECT DOCUMENT NUMBER:

company

GOVERNMENT OF UGANDA

REV

ESTABLISHED

CHECKED

APPROVED

DATE

DESCRIPTION

STAT.

UGANDA NATIONAL ROADS AUTHORITY


PLOT 11, YUSUF LULE ROAD
P O BOX 28487
KAMPALA - UGANDA
Email: executive@unra.go.ug

A2_ ABUTMENT
SCALE :

ORIENTAL CONSULTANTS CO., LTD.


EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
PYUNGHWA ENGINEERING CONSULTANTS LTD

ZENITAKA-HYUNDAI Joint Venture


P.O.BOX 7158, Kampala, Uganda

FILE NAME:

phase

zone

document

number

FORMWORK ACCESSORY LAYOUT PLAN FOR PORTION 2


Scale=1:100

746 527
900

PORTION 2

900

1680

424

1680

826
1281

940

2114

940

900

900

458

958

700

798

650

1490

900

900

940

2085

940

900

900

458

978

700

1800

1045

800

478 700

900

940

782

1205

785

650

1495

900

940

2015

940

900

469

943

NM03

1500

808
1800

1062

1800

848

1099

1800

1550

1042

1800

848

1372

NM05

600 700

862

1234

1520

900

1200

900
900

1500

NM05

1166

700

977

1800

1800
1800

1320

1017

527 746

508

900

1800

848

900

730
900
900

900

900

634

492 712

850

NM06

1072

1129

1068

1500

NM04

1800

808

900

1500

800

800

750
1416

848

1800

722
900

850

750

700
800

750
800
478 700

900

849

1101

900

940

1480

NM04

900

1910

NM06

1091

1496

850

1169

1525

722
750
700

650

500

1800

601 700

796

650 523

3300

1700

763

1500

1191

700 600

1463

990

900
800

800

800
750

650 538

700

759

1418

3000

1453

1395

1490

700

700 478

800

895

800

600 701

NM03

1901

750

850

730

633

700 478

500

900

920
850

PORTION 1

1882

2950

1291

1500

900

508

850

1720

598

969

910

1017

PORTION 1
900

380 900

858

1465

1500

630

1740

828

880

900

760

712 492

1422

900

740

1700

PORTION 2
790

800

300

NOTE:
1.ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.

900

1450

ENGINEERING CONSULTANT:

EMPLOYER:

3350

1500

ENGINEERING CONTRACTOR:

3360

1480

DRAWING TITLE:

2970

PROJECT DOCUMENT NUMBER:

company

GOVERNMENT OF UGANDA

REV

ESTABLISHED

CHECKED

APPROVED

DATE

DESCRIPTION

STAT.

UGANDA NATIONAL ROADS AUTHORITY


PLOT 11, YUSUF LULE ROAD
P O BOX 28487
KAMPALA - UGANDA
Email: executive@unra.go.ug

A2_ ABUTMENT
SCALE :

ORIENTAL CONSULTANTS CO., LTD.


EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
PYUNGHWA ENGINEERING CONSULTANTS LTD

ZENITAKA-HYUNDAI Joint Venture


P.O.BOX 7158, Kampala, Uganda

FILE NAME:

phase

zone

document

number

FORMWORK LAYOUT PLAN FOR PORTION 3


Scale=1:100

PORTION 3

PORTION 2

PORTION 3
WM01

115

108

72

72

106

106

110

94

WM05

WM05

93

61

74

72

96

42

142

90

107

WM08

WM08

42

111

106

WM01

PORTION 2

63

NOTE:
1.ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.
2.PLEASE REFER TO DRAWING NO ZHJV-W-A2-FF-0015-0, ZHJV-W-A2-FF-0016-0,
ZHJV-W-A2-FF-0017-0 AND ZHJV-W-A2-FF-0018-0 FOR FORMWORK PANEL ASSEMBLY DRAWING.
ENGINEERING CONSULTANT:

EMPLOYER:

ENGINEERING CONTRACTOR:

DRAWING TITLE:

PROJECT DOCUMENT NUMBER:

company

GOVERNMENT OF UGANDA

REV

ESTABLISHED

CHECKED

APPROVED

DATE

DESCRIPTION

STAT.

UGANDA NATIONAL ROADS AUTHORITY


PLOT 11, YUSUF LULE ROAD
P O BOX 28487
KAMPALA - UGANDA
Email: executive@unra.go.ug

A2_ ABUTMENT
SCALE :

ORIENTAL CONSULTANTS CO., LTD.


EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
PYUNGHWA ENGINEERING CONSULTANTS LTD

ZENITAKA-HYUNDAI Joint Venture


P.O.BOX 7158, Kampala, Uganda

FILE NAME:

phase

zone

document

number

FORMWORK ACCESSORY LAYOUT PLAN FOR PORTION 3


Scale=1:100

PORTION 3
760

1727

880

828

630

1460

PORTION 2

430 900

900

910

1307

PORTION 3

700
WM01

508
900

900
455

900

900

800

700

1417

700

800

700 600

2032

600 700

800
750

1402

700

570

800

800

750

700

722

600 700

700 478

900

900

747

WM08

724 446

WM08

450

1137

WM01

1488

PORTION 2

900

899

940

2120

940

900

900

1410

700

798

1716

900

899

940

2086

940

900

900

1445

700

800

1486

750

800
478 700

722

700

750

800

800

750

700

1222

1702

940

897

903

1417

900

940

1995

600 700

900

508

900

720 451 899

900

900
900
1142

1705

900

900

940

2085

940

900

900

1412

700

WM05

WM05

450

899

453

796

800
1315

NOTE:
1.ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.
ENGINEERING CONSULTANT:

EMPLOYER:

ENGINEERING CONTRACTOR:

DRAWING TITLE:

PROJECT DOCUMENT NUMBER:

company

GOVERNMENT OF UGANDA

REV

ESTABLISHED

CHECKED

APPROVED

DATE

DESCRIPTION

STAT.

UGANDA NATIONAL ROADS AUTHORITY


PLOT 11, YUSUF LULE ROAD
P O BOX 28487
KAMPALA - UGANDA
Email: executive@unra.go.ug

A2_ ABUTMENT
SCALE :

ORIENTAL CONSULTANTS CO., LTD.


EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
PYUNGHWA ENGINEERING CONSULTANTS LTD

ZENITAKA-HYUNDAI Joint Venture


P.O.BOX 7158, Kampala, Uganda

FILE NAME:

phase

zone

document

number

STRUCTURE DIMENSION AND CONSTRUCTION JOINT LAYOUT PLAN - UPPER PART


Scale=1:120
PORTION 3
3885

750

3783

750

3797

750

PORTION 1
3789

750

3821

750

3835

750

3815

750

4247

500

4000

500

4000

500

4000

500

4000

500

4000

500

4000

500

4000

500

4000

1250

3866

750

3736

750

3718

750

3704

750

3711

500

500

3720

3400

500

8900

500

3450

18440

500

500 1100 500

4000

3450

500

500

1250

4500

4500

8900

3720

3400

500

500

1250

PORTION 2
3764

750

750

3680

750

3665

750

3685

750

4004

500

NOTE:
ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.
ENGINEERING CONSULTANT:

EMPLOYER:

ENGINEERING CONTRACTOR:

DRAWING TITLE:

PROJECT DOCUMENT NUMBER:

company

GOVERNMENT OF UGANDA

REV

ESTABLISHED

CHECKED

APPROVED

DATE

DESCRIPTION

STAT.

UGANDA NATIONAL ROADS AUTHORITY


PLOT 11, YUSUF LULE ROAD
P O BOX 28487
KAMPALA - UGANDA
Email: executive@unra.go.ug

A2_ ABUTMENT
SCALE :

ORIENTAL CONSULTANTS CO., LTD.


EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
PYUNGHWA ENGINEERING CONSULTANTS LTD

ZENITAKA-HYUNDAI Joint Venture


P.O.BOX 7158, Kampala, Uganda

FILE NAME:

phase

zone

document

number

FORMWORK LAYOUT PLAN FOR PORTION 1

PORTION 1
WM01

WM02

PORTION 1

Scale=1:100
WM01

WM03

WM02

WM03

WM04

WM04

281

316

312

349

NM01

NM01

139

NM12

NM13

297

82

82

414

NM06

NM03

NM04

NM04

NM03

112

135

NM14

110

WM21

WM21

82

NM08

367

82

NM15

NM03

NM04

NM03

WM16

NM08

82

WM16

146

NM06

NM04

NM03

NM03

NM04

NM14

82

WM15

NM15

NM04

WM15

82

WM21

WM21

348

277

NM16

NM12

NM12

NM02

NM01

NM01

NM02
NM01

NM01

NM02

166

NM02

247

186

151

WM14

NM16

NM11

NM13

NM02

NM01

WM14

WM13

NM12

NM01

NM02

NM11

243

WM21

WM21

WM13

91

94

NM07

82

NM08

NM07

82

82

WM17

NM08

82

WM21

WM21
WM17

NM14

NM04

NM04

NM03

68

NM15

289
NM05

WM12

WM12

WM11

ENGINEERING CONSULTANT:

348
NM02

NM01

156

NM02

277

63

NM01

37
NM16

310

NM02

NM02

18
NM12

NM12

355

WM11

WM10
NOTE:
1.ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.
2.PLEASE REFER TO DRAWING NO ZHJV-W-A2-FF-0019-0, ZHJV-W-A2-FF-0020-0,
ZHJV-W-A2-FF-0021-0 FOR FORMWORK PANEL ASSEMBLY DRAWING.
3.PLEASE REFER TO DRAWING NO ZHJV-W-A2-FF-0018-0 FOR CONSOLE BRACKET AND PUSH-PULL
PROP ARRANGEMENT PLAN.
EMPLOYER:

NM16

WM21

WM21

NM12

NM12

308

NM16

247

NM01

WM20

NM12

243

NM02

NM02

NM02

NM01

NM16

NM02

NM01

WM20

52

WM19

NM12

NM01

WM19

277

WM21

WM21

82

NM05

NM03

NM04

NM04

NM03

NM04

NM03

NM04

58

WM18

NM15

82

NM14

82

WM18

NM03

NM04

NM04

NM03

337

WM10

ENGINEERING CONTRACTOR:

DRAWING TITLE:

PROJECT DOCUMENT NUMBER:

company

GOVERNMENT OF UGANDA

REV

ESTABLISHED

CHECKED

APPROVED

DATE

DESCRIPTION

STAT.

UGANDA NATIONAL ROADS AUTHORITY


PLOT 11, YUSUF LULE ROAD
P O BOX 28487
KAMPALA - UGANDA
Email: executive@unra.go.ug

A2_ ABUTMENT
SCALE :

ORIENTAL CONSULTANTS CO., LTD.


EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
PYUNGHWA ENGINEERING CONSULTANTS LTD

ZENITAKA-HYUNDAI Joint Venture


P.O.BOX 7158, Kampala, Uganda

FILE NAME:

phase

zone

document

number

FORMWORK LAYOUT PLAN FOR PORTION 2


Scale=1:100

PORTION 2

PORTION 1

PORTION 2

PORTION 1

NM14

NM12

NM12

NM16

174

129

212

NM15

140

209

NM12

148

NM11

178

NM16

NM13

144

NM12

140

WM21

WM21
NM11

NM13

125

82
107

96

96

82

NM16

82
82

NM15

178

55
NM12

79

NM16

63
NM16

212

NM12

209

NM12

144

NM16

144

NM12

75

174

WM21

NM12

NM14

WM21

NM15

82

77
NM14

138

82

82

107

122

NM14

82

82

WM21

82

WM21

WM21

82
WM21

82

NM15

82

WM21

WM21

126

NM12

NOTE:
1.ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.
2.PLEASE REFER TO DRAWING NO ZHJV-W-A2-FF-0019-0, ZHJV-W-A2-FF-0020-0,
ZHJV-W-A2-FF-0021-0 FOR FORMWORK PANEL ASSEMBLY DRAWING.
ENGINEERING CONSULTANT:

EMPLOYER:

ENGINEERING CONTRACTOR:

DRAWING TITLE:

PROJECT DOCUMENT NUMBER:

company

GOVERNMENT OF UGANDA

REV

ESTABLISHED

CHECKED

APPROVED

DATE

DESCRIPTION

STAT.

UGANDA NATIONAL ROADS AUTHORITY


PLOT 11, YUSUF LULE ROAD
P O BOX 28487
KAMPALA - UGANDA
Email: executive@unra.go.ug

A2_ ABUTMENT
SCALE :

ORIENTAL CONSULTANTS CO., LTD.


EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
PYUNGHWA ENGINEERING CONSULTANTS LTD

ZENITAKA-HYUNDAI Joint Venture


P.O.BOX 7158, Kampala, Uganda

FILE NAME:

phase

zone

document

number

FORMWORK LAYOUT PLAN FOR PORTION 3


Scale=1:100

PORTION 3

PORTION 2

PORTION 3
WM01

NM12

NM16

NM12

NM13

NM11

116

236

NM13

NM12

232

NM16

NM12

NM16

82
82

NM14

NM15

221 NM12

NM16

68

93

106

42

217

88

NM12

NM12

135

72

NM12

57

NM14

72

NM15

NM15

78

146

NM14

NM14

110
NM12

NM16

82

NM15

71

72

106

42

NM11

110

WM01

PORTION 2

NM16

NM12

NOTE:
1.ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.
2.PLEASE REFER TO DRAWING NO ZHJV-W-A2-FF-0019-0, ZHJV-W-A2-FF-0020-0 AND
ZHJV-W-A2-FF-0021-0 FOR FORMWORK PANEL ASSEMBLY DRAWING.
ENGINEERING CONSULTANT:

EMPLOYER:

ENGINEERING CONTRACTOR:

DRAWING TITLE:

PROJECT DOCUMENT NUMBER:

company

GOVERNMENT OF UGANDA

REV

ESTABLISHED

CHECKED

APPROVED

DATE

DESCRIPTION

STAT.

UGANDA NATIONAL ROADS AUTHORITY


PLOT 11, YUSUF LULE ROAD
P O BOX 28487
KAMPALA - UGANDA
Email: executive@unra.go.ug

A2_ ABUTMENT
SCALE :

ORIENTAL CONSULTANTS CO., LTD.


EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
PYUNGHWA ENGINEERING CONSULTANTS LTD

ZENITAKA-HYUNDAI Joint Venture


P.O.BOX 7158, Kampala, Uganda

FILE NAME:

phase

zone

document

number

STEEL FORM ARRANGEMENT FOR ANCHOR


Scale=1:100

1500

1500

1500

1500

1500

1500

1500

1500

1500

1651

An

1500

r fo

1500

1500

1500

1500

L=2500

L=1000

-3

L=2500

L=1500

rm

L=2500

L=1000

L=2000

cho

m-

L=1500

for

L=2500

L=2000

L=1000

Beam-12

Beam-11

L=2000

m-

L=2500

for

Beam-10
An
cho
r

L=2500

L=1500

L=2000
L=2500

L=2500

L=2000
L=2500

1500

441

Beam-5 Beam-2

Beam-6 Beam-3

Beam-9
An
ch

L=2500

Beam-4

or

L=2000

L=1500
L=2500

L=2000
L=2500

L=1000
L=2500

L=1500
L=2500

L=2000
1500

Beam-7

Beam-1

L=2500

form

-3

L=1000
1500

Detail "A"
Beam-14
Beam-11
An
cho
r fo
rm3

Beam-2

L=1000

-3

L=2500

L=1500

for
m

L=2500

L=2500

L=2000

Beam-9
An
cho
r

Beam-13
Beam-10
An
cho
r

L=2500

Beam-3

Beam-12

L=2500

Beam-4

STEEL FORM ARRANGEMENT FOR ANCHOR - PORTION 2

L=2500

STEEL FORM ARRANGEMENT FOR ANCHOR - PORTION 1

1500

95

STEEL FORM ARRANGEMENT FOR ANCHOR - PORTION 3


Beam-8 Beam-3

Beam-9 Beam-4

Beam-2

0
60

Detail "A"

m-

1500

1500

1500

1500

1500

1500

L=2000

An
ch

or f
orm

L=2500

L=1000
L=2500

L=1500
L=2500

L=2000
L=2500

L=1000
L=2500

L=2500

L=2500

L=2500

L=1500

4
L=2000

for

L=1000

ch
or

10

76

An

-3

1500

DETAIL A

600

NOTE:
1.ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.
2.BOLT M16X50 USED FOR CONNECTING STEEL FORM.
ENGINEERING CONSULTANT:

EMPLOYER:

ENGINEERING CONTRACTOR:

DRAWING TITLE:

PROJECT DOCUMENT NUMBER:

company

GOVERNMENT OF UGANDA

REV

ESTABLISHED

CHECKED

APPROVED

DATE

DESCRIPTION

STAT.

UGANDA NATIONAL ROADS AUTHORITY


PLOT 11, YUSUF LULE ROAD
P O BOX 28487
KAMPALA - UGANDA
Email: executive@unra.go.ug

A2_ ABUTMENT
SCALE :

ORIENTAL CONSULTANTS CO., LTD.


EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
PYUNGHWA ENGINEERING CONSULTANTS LTD

ZENITAKA-HYUNDAI Joint Venture


P.O.BOX 7158, Kampala, Uganda

FILE NAME:

phase

zone

document

number

FORMWORK PANEL TYPICAL ASSEMBLY DRAWING


Scale=1:40
Timber plank 40x80

370

2340

650

650

650

370

Plywood size

L<80

Plywood

40

Lifting hook

4
1220

SCALE = 1:20

1500

20

20

1200

5250

5170

1200

1200

80<L<120

Plywood

1220

1500

1220

1500

1220

CASE 1

SCALE = 1:20

1220

1220

CASE 2
2

1000

1000

810

HOLE POSITION FOR TIE ROD

740

900

900

20

20

20

Plywood

810

40

2340

PLYWOOD SIZE

120<L<300

1
900

1220

Timber beam

1220

1000

Steel waling

740

790

CASE 3

790

SCALE = 1:20

40

300

TIMBER BEAM POSITION

300

300

250 190 300

300

300

WM01

280

NO.

2520

STEEL WALING LENGTH

1
2
3
4
5
1
2
3
4
5

DESCRIPTION

Plywood

Timber Beam
Timber Plank
Lifting Hook
Steel Waler
Flange clamp

SPEC.
-18*1220*2340
-18*1220*2340
-18*1220*2340
-18*1220*2340
-18*370*2340
H20/L=5170
40*80/L=2520
Double [12/ L=2520

UNIT
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
set
pcs

QUANTITY
1
1
1
1
1
9
4
2
4
44

20

L>300

20

Plywood

CASE 4

SCALE = 1:20

NOTE:
ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.
ENGINEERING CONSULTANT:

EMPLOYER:

ENGINEERING CONTRACTOR:

DRAWING TITLE:

PROJECT DOCUMENT NUMBER:

company

GOVERNMENT OF UGANDA

REV

ESTABLISHED

CHECKED

APPROVED

DATE

DESCRIPTION

STAT.

UGANDA NATIONAL ROADS AUTHORITY


PLOT 11, YUSUF LULE ROAD
P O BOX 28487
KAMPALA - UGANDA
Email: executive@unra.go.ug

A2_ ABUTMENT
SCALE :

ORIENTAL CONSULTANTS CO., LTD.


EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
PYUNGHWA ENGINEERING CONSULTANTS LTD

ZENITAKA-HYUNDAI Joint Venture


P.O.BOX 7158, Kampala, Uganda

FILE NAME:

phase

zone

document

number

FORMWORK PANEL ASSEMBLY DRAWING FOR A2 - PART 1


Scale=1:40
2340

PLYWOOD SIZE
810

HOLE POSITION FOR TIE ROD

20 20

740

2440

790

500

20

2440

1100

700

800

750

2440

1175

1030

40

900

900

300

300

250 190 300

300

300

30

280

270

300

300

300

300

300

300

320

2520

2440
630

828

280

300

320

320

260

300

300

330

30

40

30

300

330

300

300

300

300

300

4800

2440
880

20
760

20

2440

632

2440

1170

260

330

750

800

18

300

300

300

250

300

30

300

300

300

300

300 150 270 250

30

300

4800

270 300

300

320

280

300

300

300

300

300

700

1460

320 200 180 220 300

785

650

280

300

300

300

330

30

90 300

300

300

300

270 240

20

Lifting hook

900

380

360

Plywood size

1848

1028

900

900

900

560

650

900

2440

650

910

20

30

1800

40
1430

20

250

315

Timber plank 40x80

2440

300

38

4800

30

2440

300

1750

40

300

330

4800

40

300

965

370

300

STEEL WALING LENGTH

280

940

40

TIMBER BEAM POSITION

1150

2440

28

40

300

260

320

320

300

280

300

300

300

300

330

330

180

210

4800

380

300

300

300

300

300

300

320

280

300

320

320

260

280

20

4440

30

1500

30

320

1220

300

20

2440

1987

650

850

20

900

850

20

137

1987
257

2440

700

800

700

20

940

1030

300

320

320

260 260

317 200 250

307

300

270

300

330

1987
697

2440

900

300

300

300

300

300

300

380 153

4620

4620

20

320

900

20

20

900

2440
985

1030

2440
940

900

900

1155

Steel waling
40

227 260 260

320

320

300

280

320

300

300

300

300

300

300

300

30

220 300

300

320

1200

280

320

1220

300

330

300

300

320

4620

300

280

320

320

260

300

300

280

1000

300

30

Timber beam
900

4800

40

NOTE:
ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.
ENGINEERING CONSULTANT:

EMPLOYER:

ENGINEERING CONTRACTOR:

DRAWING TITLE:

PROJECT DOCUMENT NUMBER:

company

GOVERNMENT OF UGANDA

REV

ESTABLISHED

CHECKED

APPROVED

DATE

DESCRIPTION

STAT.

UGANDA NATIONAL ROADS AUTHORITY


PLOT 11, YUSUF LULE ROAD
P O BOX 28487
KAMPALA - UGANDA
Email: executive@unra.go.ug

1220

300

900

300

1200

300

1000

300

5170

153 300

5250

1220

1040

1500

330

A2_ ABUTMENT
SCALE :

ORIENTAL CONSULTANTS CO., LTD.


EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
PYUNGHWA ENGINEERING CONSULTANTS LTD

ZENITAKA-HYUNDAI Joint Venture


P.O.BOX 7158, Kampala, Uganda

FILE NAME:

phase

zone

document

number

FORMWORK PANEL ASSEMBLY DRAWING FOR A2 - PART 2


Scale=1:40
2440
450

18

2440

940

940

2120

430
40

30

TIMBER BEAM POSITION

270

300

300

300

300

300

300

320

280

300

320

320

260

300

300

330

30

4800

STEEL WALING LENGTH

20

20

850

20

2440

300

798

1848

650

1490

900

450
28

300

300

300

300 200 230

180

30

380

300

300

300 300

300

1620

2440
470

1640
490

430

20

PLYWOOD SIZE
HOLE POSITION FOR TIE ROD

300

320

280

300

320

320

260

280

20

4440

2440

900

1410

700

800

1848

600
450

2440

900

1490

20

650

798

40
28
30

270

300

300

300

300

300

300

280

320

300

320

320

260

300

300

330

30
20

4800

280

260

320

320

300

280

320 300
4440

300

300

300

300

300

380

180

1687

170 200 300

335

315

Lifting hook
Plywood size

Timber plank 40x80

2440

935

20

2085

940

1220

2440
465

650

Flange clamp

650

40

1320

340

25

40

22

488

530

350

830

363 125

327

450

330

300

260

300

320

320

300

280

320

300

300

300

300

300

300

270

30

1500

30

1500

40

1220

3920

4000

4800

805

695

1445

20
900

1200

600

2440
435

Timber beam

1200

Steel waling
2440

260

320

320

300

280

320

300

300

300

300

300

300

270

30

4800

40

NOTE:
ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.
ENGINEERING CONSULTANT:

EMPLOYER:

350

300

300

300

350

330

300

30

1220

40

ENGINEERING CONTRACTOR:

DRAWING TITLE:

PROJECT DOCUMENT NUMBER:

company

GOVERNMENT OF UGANDA

REV

ESTABLISHED

CHECKED

APPROVED

DATE

DESCRIPTION

STAT.

UGANDA NATIONAL ROADS AUTHORITY


PLOT 11, YUSUF LULE ROAD
P O BOX 28487
KAMPALA - UGANDA
Email: executive@unra.go.ug

A2_ ABUTMENT
SCALE :

ORIENTAL CONSULTANTS CO., LTD.


EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
PYUNGHWA ENGINEERING CONSULTANTS LTD

ZENITAKA-HYUNDAI Joint Venture


P.O.BOX 7158, Kampala, Uganda

FILE NAME:

phase

zone

document

number

FORMWORK PANEL ASSEMBLY DRAWING FOR A2 - PART 3


Scale=1:30

18

PLYWOOD SIZE
HOLE POSITION FOR TIE ROD

1966
786

18
740

1966
811

440

650

505

420

420
304

300

300

200

300

300

280

126 224

240

240

300

2100

300

300

380

2100

Flange clamp

1966

18
520

18

650

796

420

500

1220

1564
850

214

1500

20

1500

990

650

126

Plywood size

650

TIMBER BEAM POSITION


STEEL WALING LENGTH

40

Lifting hook

300

300

300

398

380

18

300

300

1620

330

300

180 194 126


4650

2100
4570

304

300

300

300

384

150 228

1620

308

1220

Timber beam

1220

318

536

214

1000

18

850

300

500

20

1000

1564

300

18

1200

1200

Steel waling

154

40

840

NOTE:
ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.
ENGINEERING CONSULTANT:

EMPLOYER:

ENGINEERING CONTRACTOR:

DRAWING TITLE:

PROJECT DOCUMENT NUMBER:

company

GOVERNMENT OF UGANDA

REV

ESTABLISHED

CHECKED

APPROVED

DATE

DESCRIPTION

STAT.

UGANDA NATIONAL ROADS AUTHORITY


PLOT 11, YUSUF LULE ROAD
P O BOX 28487
KAMPALA - UGANDA
Email: executive@unra.go.ug

A2_ ABUTMENT
SCALE :

ORIENTAL CONSULTANTS CO., LTD.


EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
PYUNGHWA ENGINEERING CONSULTANTS LTD

ZENITAKA-HYUNDAI Joint Venture


P.O.BOX 7158, Kampala, Uganda

FILE NAME:

phase

zone

document

number

FORMWORK PANEL ASSEMBLY DRAWING FOR A2 - PART 4


Scale=1:40
490

490

900

900

1020

640

2440

820

800

18
700

300

300

300

300

300

300 210 200

10

330

310

300

300

300

300

900

490

280

300

300

300

300

250 200 300

300

900

10

18
700

300

250 200 320

1020

18
900

295

440

900

910

300

320

320

300

300

300

300

300

300

300

10

380

300

320

320

300

300

18

460

1020

900

900

300

300

280

Plywood size

380

380

300

300

300

300

300

2880

1020

490
220

300

300

300

2440

595

925

800

700

440

40

300 210 200

10

300

320

320

300

300

300

300

300

300

300

380

3420
4650

2880

18

2440
440

700

1020
800

700

2440
460

820

1200

Steel waling
1020

700

800

900

1220

300

Flange clamp

1200

300

10

1500

750

420

300

300

1500

800

40

380

320

4570

700

320

3420

2440
460

300

420

18

300

990

300

600
40

300

300

300

300

300

310

330

380

10

300

300

280

320

300

300

300

320

320

300

10

Timber beam

3420

3420

40

NOTE:
ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.
ENGINEERING CONSULTANT:

EMPLOYER:

1220

300

1000

270

300

330

1000

380

300

420

420

40

ENGINEERING CONTRACTOR:

DRAWING TITLE:

PROJECT DOCUMENT NUMBER:

company

GOVERNMENT OF UGANDA

REV

ESTABLISHED

CHECKED

APPROVED

380

1220

300

300

650

300

300

Lifting hook

940

650

300

455

420

420
300

10

3420

2440
440

300

40

300

300

40

40

200 210 300

320

2440
900

3420

800

300

420

380

2440
750

380

380

2440
940

2880

490
220

330

270

40

300

300

40

420
300

525

3420

1020
900

40

200 210 300

300

3420

2440

640

880

40

2880

490

880

420

300

1020

610

40
420

380

TIMBER BEAM POSITION


STEEL WALING LENGTH

2440
565

440

420

40

700

420

2440

PLYWOOD SIZE
HOLE POSITION FOR TIE ROD

DATE

DESCRIPTION

STAT.

UGANDA NATIONAL ROADS AUTHORITY


PLOT 11, YUSUF LULE ROAD
P O BOX 28487
KAMPALA - UGANDA
Email: executive@unra.go.ug

A2_ ABUTMENT
SCALE :

ORIENTAL CONSULTANTS CO., LTD.


EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
PYUNGHWA ENGINEERING CONSULTANTS LTD

ZENITAKA-HYUNDAI Joint Venture


P.O.BOX 7158, Kampala, Uganda

FILE NAME:

phase

zone

document

number

FORMWORK PANEL ASSEMBLY DRAWING FOR A2 - PART 1


Scale=1:40
2340

PLYWOOD SIZE
934

HOLE POSITION FOR TIE ROD

20 20

740

2440

666

500

20

2440

1100

700

800

750

2440

1256

1030

40

770

900

920

1034

40

320

TIMBER BEAM POSITION

330

300

250 240 250 250

300

30

280

270

300

300

300

300

300

300

320

2440

2440
318

920

280

300

320

320

260

300

300

330

30

40

30

300

330

300

360

240

300

300

260

4800

2520

STEEL WALING LENGTH

1285

2440

900

20

770

20

330

300

300

300

300

300

250

30

4800

2440

687

330

2440

1170

750

800

700

1460

40

40
18
270

300

250 250

300

330

330

300

30

300

300

300

300 200 250 270 250

30

300

4800

270 300

300

320

280

300

300

320 200 180 220 300

280

300

300

300

330

1750
658

30

650

442
38

4800

30

70 330

250 250 250 200 220 230

20

1800
2440

2440

1494

770

900

20

920

308

20

2440

488

1848

1028

900

900

900

560
28

40

330

300

300

300

300

300

300

280

320

30

300

300

300

300

330

330

4800

20

1987

525

850

380

300

300

300

300

300

300

900

20
850

320

280

300

320

320

260

280

20

4440

30

2440
1040

180

210

20

262

2440
337

1987

770

900

920

20

403

1097

Lifting hook

300

300

290

280 200 250

410

300

300

270

300

300

300

1987
697

2440

900

300 200 300

300

300

267 153

4620

4620

20

300

900

20

20

900

2440
1055

1030

Steel waling

2440
920

900

1234

771

40

227 260 260

320

320

300

280

320

300

300

300

300

300

300

300

30

220 300

300

320

330

300

300

320

4620

300

280

1060

300

320 170 250 160 300

300

330

Timber beam

30

1220

300

900

300

844

300

536

300

900

300 218 250

844

300

2200

300

2280

153 300

536

Plywood size

40

4800

NOTE:
ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.
ENGINEERING CONSULTANT:

EMPLOYER:

ENGINEERING CONTRACTOR:

DRAWING TITLE:

PROJECT DOCUMENT NUMBER:

company

GOVERNMENT OF UGANDA

REV

ESTABLISHED

CHECKED

APPROVED

DATE

DESCRIPTION

STAT.

UGANDA NATIONAL ROADS AUTHORITY


PLOT 11, YUSUF LULE ROAD
P O BOX 28487
KAMPALA - UGANDA
Email: executive@unra.go.ug

A2_ ABUTMENT
SCALE :

ORIENTAL CONSULTANTS CO., LTD.


EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
PYUNGHWA ENGINEERING CONSULTANTS LTD

ZENITAKA-HYUNDAI Joint Venture


P.O.BOX 7158, Kampala, Uganda

FILE NAME:

phase

zone

document

number

FORMWORK PANEL ASSEMBLY DRAWING FOR A2 - PART 2


Scale=1:30

1841

520

440

179

300

300

200

300

300

1439

280

380

300

300

330

300

180 194 126

300

18

143

273

300

300

811

273

PLYWOOD SIZE
HOLE POSITION FOR TIE ROD

214

650

143

126 224

240

240

300

1620

300

300

304

TIMBER BEAM POSITION


STEEL WALING LENGTH

1841

1966

375

300

20

850

1620

520

505

420
304

1439
375

2100

850

214

18

796

2100

20

18

650

300

300

380

380

18

650

671

420

251

1966

18
740

420

661

420

18

300

300

330

300

249

251

2100

2100

Timber plank 40x80


Lifting hook

250

300

204

204

300

250

250

300

460

536

376

298

18

150 228

1620

308

154

840

Timber beam

40

300

1620

850

1220

250

338

900

300

338

18

300

298

1564

900

18

850

20

1600

376

20

1680

1564

480

Flange clamp
18

480

Plywood size

NOTE:
ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.
ENGINEERING CONSULTANT:

EMPLOYER:

ENGINEERING CONTRACTOR:

DRAWING TITLE:

PROJECT DOCUMENT NUMBER:

company

GOVERNMENT OF UGANDA

REV

ESTABLISHED

CHECKED

APPROVED

DATE

DESCRIPTION

STAT.

UGANDA NATIONAL ROADS AUTHORITY


PLOT 11, YUSUF LULE ROAD
P O BOX 28487
KAMPALA - UGANDA
Email: executive@unra.go.ug

A2_ ABUTMENT
SCALE :

ORIENTAL CONSULTANTS CO., LTD.


EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
PYUNGHWA ENGINEERING CONSULTANTS LTD

ZENITAKA-HYUNDAI Joint Venture


P.O.BOX 7158, Kampala, Uganda

FILE NAME:

phase

zone

document

number

FORMWORK PANEL ASSEMBLY DRAWING FOR A2 - PART 3


2440
490

490

900

900

1020

640
280

2440
940

18

900

900

Scale=1:30
18

440

2440
570

40

850

900

850

290

300

300

300 210 200


10

300

320

320

300

300

300

300

300

300

300

380

380

330

270

300

300

300

3420

2440

18

900

900

2440

490

440

1020

900

900

940

18

280

300

300

300

420

380

380

300

300

300

300

300

2880

300

700

300

320

320

300

10

460

925

700

440

300

300

300

700

380

800

750

300

490
220

320

320

300

300

300

300

300

300

300

380

10

300

300

800

300

300

440

380

300

300

280

900

800

700

320

300

300

300

320

300

300

320

300

300

300

300

300

310

395

330

320

300

10

310 200 300

245

300

300

900

920

245

300

300

300

300

300

300

275

300

300

300

300

270

770
225

440

330

380

300

275

35

Lifting hook

35

900

770

395
420

35

275

300

480

2440
920

300

300

300

300

300

245

Timber beam

300 200 310

3120
300

3420

NOTE:
ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.

Note :
Waling cut from waling L=3420mm
ENGINEERING CONSULTANT:

EMPLOYER:

40

300

300

Plywood size

420
300

225

225

40

300

920

Timber plank 40x80


310 200 300

18
700

360

Note :
Waling cut from waling L=3420mm

1600

800

300

40

1680

2440

300

300

40

10

40

310

300

3120

1020

330

300

900

Flange clamp

700

300

770

770

3420

820

522

770

770

420
270

18
770

3120

2440

820

420

330

10

2440
900

170 270 250 250

395

40

380

250 250 270 170

2440

600

3420

1020

700

320

420

300 210 200

2440

300

40

2880

18

300

920

1020

700

420
300

300

3420

2440
460

420

300

300

40

420

10

40

380

300

3420

2440
460

300

348

420
300
2880

18

360

1020

800

40

300

348
40

2440

595

40

300

920

3420

1020

18

800

200 210 300

900

3420

2440
750

1020

770

420

490
220

TIMBER BEAM POSITION

460

300

10

420

300

330

40

420
300

310

STEEL WALING LENGTH

2440
522

40

200 210 300

300

3420

900

640

300

1220

490

300

480

300
2880

900

300

300

300

420

300

40

420

420

40
380

10

PLYWOOD SIZE
HOLE POSITION FOR TIE ROD

1020

ENGINEERING CONTRACTOR:

DRAWING TITLE:

PROJECT DOCUMENT NUMBER:

company

GOVERNMENT OF UGANDA

REV

ESTABLISHED

CHECKED

APPROVED

DATE

DESCRIPTION

STAT.

UGANDA NATIONAL ROADS AUTHORITY


PLOT 11, YUSUF LULE ROAD
P O BOX 28487
KAMPALA - UGANDA
Email: executive@unra.go.ug

A2_ ABUTMENT
SCALE :

ORIENTAL CONSULTANTS CO., LTD.


EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
PYUNGHWA ENGINEERING CONSULTANTS LTD

ZENITAKA-HYUNDAI Joint Venture


P.O.BOX 7158, Kampala, Uganda

FILE NAME:

phase

zone

document

number

Anda mungkin juga menyukai