RENCANA ANGGARAN BIAYA RUMAH TYPE 45

PROJECT

: PEMBANGUNAN RUMAH TIMGGAL

DI
TANGGAL

: 10 MARET 2014

NO.

KETERANGAN

VOLUME

HARGA
SATUAN (Rp)

PEKERJAAN PERSIAPAN :
1 Pembersihan lapangan
2 Pengukuran bouwplan bangunan.

II

III.

1,500,000

38.00 m'

17,500

3 Direksikeet dan gudang kerja

1.00 LS

800,000

4 Mobilisasi & demobilisasi.

1.00 LS

5,000,000

5 Listril kerja, air kerja dll

1.00 LS

2,000,000

1 Galian tanah pondasi.

27.18 m3

50,000

2 Urugan tanah + pemadatan di bawah lantai t = 30 cm.

19.44 m3

75,000

PEKERJAAN TANAH & URUGAN :

3 Urugan pasir di bawah pondasi t = 5 cm

2.27 m

85,000

4 Penimbunan kembali

1.00 LS

339,750

1 Lantai dasar cor 1:3:5 t = 5 cm.

2.70 m3

500,000

2 Lantai kerja pondasi cor 1:3:5 t = 5 cm

2.27 m3

500,000

PEKERJAAN PONDASI :

5 Cor Pondasi menerus + 20 % batu koral

IV.

1.00 LS

27.18 m

500,000

1 Sloof 15 x 20 cm

2.27 m3

2,600,000

2 Kolom praktis

1.17 m3

3,000,000

3 Ring balok.

2.27 m

3,000,000

4 Cor konopi

1.00 m4

3,000,001

PEKERJAAN BETON BERTULANG :

NO.

KETERANGAN

VOLUME

HARGA
SATUAN (Rp)

V.

VI.

VII.

PEKERJAAN PASANGAN :
1 Pasang dinding b.bata 1/2 batu 1 : 4

283.13 m2

70,000

2 Plesteran 1 : 4

566.25 m2

35,000

1 Titik lampu + saklar broco standard.

7.00 ttk

170,000

2 Titik stop kontak + stop kontak broco standard.

3.00 ttk

170,000

3 Switc box

1.00 unt

600,000

3.00 ttk

150,000

2 Pipa PVC 3" u/ air hujan ex.Invilon type d.

12.00 m'

35,000

3 Pipa PVC 3" u/ air kotoran ex.Invilon type d.

12.00 m'

35,000

4 Pipa PVC 4" u/saluran kotoran ex. Invilon type d

PEKERJAAN INSTALASI LISTRIK :

PEKERJAAN INSTALASI AIR/SANITARY :


1 Titik air bersih ex. Maspion aw.

VIII

IX

12.00 m'

50,000

5 Elbow, soket, tee dll u/ sambungan instalasi air

1.00 LS

500,000

6 Bak kontrol

1.00 unt

120,000

7 Septictank

1.00 unt

3,000,000

1 Kosen Pj1 + 1 pintu.

1.00 unt

2,200,000

2 Kosen P2 + 1 pintu

3.00 unt

1,500,000

3 Pintu k. mandi pvc.

1.00 unt

350,000

4 Kosen J1 + 1 daun.

1.00 unt

600,000

5 Kosen J2 + 2 daun.

3.00 unt

900,000

PEKERJAAN KOSEN, PINTU DAN JENDELA :

PEKERJAAN ALAT PENGGANTUNG & KUNCI


1 Kunci pintu standard

4.00 set

150,000

12.00 bh

25,000

3 Engsel nylon 3" u/ jendela.

8.00 bh

20,000

4 Grendel antik u/ jendela

7.00 bh

10,000

5 Tarikan jendela antik

7.00 bh

10,000

2 Engsel nylon 4" u/ pintu.

NO.

KETERANGAN

VOLUME

HARGA
SATUAN (Rp)

PEKERJAAN ATAP :
1 Rangka atap baja ringan

80.00 M2

185,000

2 Pasang atap Spandek t = 35 mm.

80.00 m2

75,000

6.00 m

55,000

45.00 M2

185,000

2 Pasang keramik k, mandi

1.00 unt

3,500,000

3 Pasang closet duduk

1.00 unt

1,250,000

45.00 M2

85,000

1 Cat dinding

566.25 M2

17,500

2 Cat plafond

45.00 M2

17,500

3 Rabung spandek.

XI.

PEKERJAAN KERAMIK :
1 Pasang keramik lantai

XII

PEKERJAAN PLAFOND :
1 Pasang plafond gypsumbord t = 9 mm

XIII

PEKERJAAN CAT

REKAPITULASI :
I

PEKERJAAN PENDAHULUAN ..................................................................................

II

PEKERJAAN TANAH & URUGAN ..................................................................................

III.

PEKERJAAN PONDASI .................................................................................................

IV.

PEKERJAAN BETON BERTULANG :

PEKERJAAN PASANGAN .............................................................................................

VI

PEKERJAAN INSTALASI LISTRIK ..................................................................................

VII

PEKERJAAN INSTALASI AIR BERSIH & KOTOR ............................................................

VIII.

PEKERJAAN KOSEN, PINTU DAN JENDELA .................................................................

IX.

PEKERJAAN ALAT PENGGANTUNG & KUNCI ...............................................................

PEKERJAAN ATAP ......................................................................................................

XI

PEKERJAAN KERAMIK ......................................................................................................

XII

PEKERJAAN PLAFOND ......................................................................................................

XIII

PEKERJAAN CAT ......................................................................................................

JUMLAH ......................................
DIBULATKAN ..............................

NB :

Harga tersebut diatas belum termasuk :


- segala bentuk pajak ppn, pph, dan imb dll.
- pekerjaan tambah/kurang akan diperhitungkan kemudian .
- pemasukan api PLN, PDAM, Gas Negara dll.

JUMLAH
(Rp)

1,500,000
665,000
800,000
5,000,000
2,000,000
9,965,000

1,359,000
1,458,000
192,525
339,750
3,349,275

1,350,000
1,132,500
13,590,000

16,072,500
5,889,000
3,510,000
6,795,000
3,000,001

19,194,001

JUMLAH
(Rp)
19,818,750
19,818,750

39,637,500

1,190,000
510,000
600,000

2,300,000

450,000
420,000
420,000
600,000
500,000
120,000
3,000,000

5,510,000

2,200,000
4,500,000
350,000
600,000
2,700,000

10,350,000

600,000
300,000
160,000
70,000
70,000

JUMLAH
(Rp)

14,800,000
6,000,000
330,000

21,130,000

8,325,000
3,500,000
1,250,000

13,075,000

3,825,000

3,825,000

9,909,375
787,500

10,696,875

Rp

9,965,000

Rp

3,349,275

Rp

16,072,500

Rp

19,194,001

Rp

39,637,500

Rp

2,300,000

Rp

5,510,000

Rp

10,350,000

Rp

21,130,000

Rp

13,075,000

Rp

3,825,000

Rp

10,696,875

JUMLAH

Rp

155,105,151

Rp

156,300,000