Avg rate for G+ 6 building

Coef

unit

Excavation & PCC @ Rs. 270/sq.m


RCC ( .38-.42)
Shuttering ( 8times of RCC)
reinforcement ( 4.5-5.25)

1
0.38 .38cum/sq.m
3.04 8 times of Concrete
5 5.kgs/sq.ft

Brickwork
230mm
115mm

0.06 .06cum/cum
1.05 1.05sq.m/sq.m

Plaster
Internal ( 2-2.5)
External ( 1-1.5)
Ceiling (.85-.9)

Misc works like railing ,waterproofing

TOTAL

2.25
1.15
0.875

building
avg mrt rate
rate in sq.m rate in sq.ft
270
270
25.09 A
6400
2432
226.02
350
1064
98.88
65
3497
325
6993.00

5000
900

300
945
1245.00

200
375
150

450
431.25
131.25

649.91 B

27.88
87.83
115.71 C

41.82
40.08
12.20

1012.50

94.10 D

1000.00

92.94 E

10520.50
PER SQ.M

977.74
PER SQ.FT

Avg rate for G+ 12 building


Coef
Excavation & PCC @ Rs. 270/sq.m
RCC ( .38-.42)
Shuttering ( 8times of RCC)
reinforcement ( 5-5.75)

Brickwork
230mm
115mm

Plaster
Internal ( 2-2.5)
External ( 1-1.5)
Ceiling (.85-.9)

Misc works like railing ,waterproofing

TOTAL

unit
1
0.4 .4cum/sq.m
3.2 8 times of Concrete
5.5 5.5kgs/sq.ft

0.06 .06cum/cum
1.05 1.05sq.m/sq.m

2.25
1.15
0.875

building
avg mrt rate
rate in sq.m rate in sq.ft
270
270
25.09 A
6600
2640
245.35
375
1200
111.52
68
4024.24
374
7864.24

5200
900

312
945
1257.00

200
425
150

450
488.75
131.25

730.88 B

29.00
87.83
116.82 C

41.82
45.42
12.20

1070.00

99.44 D

1000.00

92.94 E

11461.24

1065.17

PER SQ.M

PER SQ.FT