Buku Rencana Aksi Perbatasan 2015
Buku Rencana Aksi Perbatasan 2015
NO
1
1.
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
2
3
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Aceh
Sabang
Pemeliharaan Rutin Jalan
Infrastruktur Jalan
Infrastruktur Air Minum
Infrastruktur Sanitasi
Sukakarya
1.4 Km
21,052,910,000
21,052,910,000
7,956,680,000
RPM
Tanjung
Beringin
3,9 km
4,671,610,000
2,387,750,000
1,395,800,000
639,390,000
4,001,680,000
DAK
DAK
DAK
DAK
APBN
230,605,998,000
48,874,204,000
10,223,344,000
29,969,700,000
2,306,190,000
3,864,220,000
1,684,390,000
826,360,000
RPM
RPM
DAK
DAK
DAK
DAK
113,982,465,000
6,607,626,000
2,100,000,000
40,000,000,000
44,337,500,000
10,000,000,000
3,437,339,000
RPM
RPM
RPM
RPM
RPM
APBN
Riau
Rokan Hilir
Pelebaran Jalan Sp. Balam - sp. Batang
Pelebaran SP. Batang - SP. Kulim Seksi A
Infrastruktur Irigasi
Infrastruktur Jalan
Infrastruktur Air minum
Infrastruktur Sanitasi
1 Km
2.6 Km
1 Km
km
3 Km
4 Km
1 Km
0,20 km
Bengkalis
17 km
Indragiri Hilir
Rekonstruksi Jalan Kuala Cinaku - Rumbai Jaya
Infrastruktur Irigasi
Infrastruktur Jalan
Infrastruktur Air minum
5 Km
Page 1
7,500,000,000
29,152,100,000
20,000,000,000
3,757,340,000
2,966,490,000
1,283,810,000
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
RPM
DAK
DAK
DAK
Sumatera Utara
Serdang Bedagai
Infrastruktur Irigasi
Infrastruktur Jalan
Infrastruktur Air minum
Infrastruktur Sanitasi
Rehabilitasi Jaringan Irigasi Rawa Pematang Cermai 4000 ha
SUMBER
PEMBIAYAAN
5
3,690,297,851,000
4,229,520,000
4,229,520,000
642,760,000
1,414,840,000
1,147,580,000
1,024,340,000
19.54 Km
ANGGARAN
(Rp.)
APBNP
RPM
DAK
DAK
DAK
Rupat Utara
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
5,086,640,000
924,000,000
1,732,730,000
1,662,420,000
767,490,000
APBN
DAK
DAK
DAK
0,15 km
25,796,669,000
2,051,230,000
2,775,220,000
1,703,480,000
829,400,000
3,437,339,000
DAK
DAK
DAK
DAK
APBN
Rangsang Barat
750 ha
15,000,000,000
APBNP
Rangsang Barat
7,713,920,000
1,879,690,000
3,404,410,000
1,500,380,000
929,440,000
DAK
DAK
DAK
DAK
15.4 Km
Kepulauan Meranti
Irigasi
Jalan
Air minum
Sanitasi
Kepulauan Riau
Natuna
376,145,246,000
88,234,060,000
5,875,000,000
12,300,000,000
44,000,000,000
2,914,720,000
2,505,910,000
1,119,500,000
1,093,930,000
18,425,000,000
RPM
RPM
RPM
DAK
DAK
DAK
DAK
APBN
248,345,505,000
25,991,308,000
RPM
5 Km
16,425,000,000
RPM
7.5 Km
25,000,000,000
RPM
2.5 Km
5 Km
10 Km
9.5 Km
Batam
Page 2
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
6
DAK
Dumai
Infrastruktur Irigasi
Infrastruktur Jalan
Infrastruktur Air minum
Infrastruktur Sanitasi
Pembangunan Pengamanan Pantai Tj. Kedabu
SUMBER
PEMBIAYAAN
5
1,144,460,000
Infrastruktur Sanitasi
ANGGARAN
(Rp.)
Bunguran Utara
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
3
Peningkatan Struktur Jalan Sp. Sembulang - Pelabuhan Galang
Seksi II
4
7.5 Km
5
25,000,000,000
6
RPM
3.9 Km
12,866,865,000
RPM
Pelebaran Jalan Sp. Kabil - Sp. Jam (JL. JEND. Sudirman) (Batam)
Pembangunan
Pembangunan
Pembangunan
Pembangunan
Katamso)
4,400,000,000
RPM
30 Km
30 Km
1.5 Km
3.4 Km
1 Km
28,000,000,000
28,000,000,000
15,000,000,000
39,100,000,000
RPM
RPM
RPM
RPM
0,05 km
10,000,000,000
APBN
Belakang
Padang
km
4,200,000,000
APBN
Belakang
Padang
0,10 km
6,993,522,000
2.7 Km
2.5 km
06 km
Kalimantan Barat
DAK
DAK
DAK
4,588,170,000
2,481,100,000
1,211,000,000
896,070,000
DAK
DAK
DAK
27,882,841,000
5,890,000,000
10,100,000,000
1,595,140,000
2,444,320,000
1,128,670,000
848,990,000
5,875,721,000
1,158,429,111,000
Page 3
Nongsa
2,558,890,000
3,794,650,000
1,015,270,000
7,094,670,000
2,866,260,000
2,231,620,000
1,021,730,000
975,060,000
Irigasi
Jalan
Air minum
Sanitasi
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
5073800
DAK
DAK
DAK
DAK
APBN
DAK
DAK
DAK
DAK
Karimun
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
1
Sambas
67 m
9.2 Km
Infrastruktur Irigasi
Infratstruktur Jalan
Infratstruktur Air Minum
Infratstruktur Sanitasi
Pembangunan Sarana Prasarana Pengaman Pantai Desa
Kalimantan (Tahap1)
km
ANGGARAN
(Rp.)
5
134,260,470,000
10,067,500,000
20,000,000,000
6,501,240,000
2,381,930,000
1,299,460,000
1,076,540,000
8,022,800,000
SUMBER
PEMBIAYAAN
6
RPM
RPM
DAK
DAK
DAK
DAK
Paloh
0.105 km
10,000,000,000
1 Kws
1 Kws
1 Kws
6,911,000,000
33,000,000,000
35,000,000,000
4 Km
218,764,156,000
10,000,000,000
RPM
126 m
147 m
10,000,000,000
14,190,000,000
RPM
RPM
11.3 Km
89,519,046,000
RPM
1 Kws
1 Kws
1 Kws
30,000,000,000
25,000,000,000
32,000,000,000
2,690,070,000
3,121,680,000
1,219,200,000
1,024,160,000
DAK
DAK
DAK
DAK
319,452,285,000
15,000,000,000
RPM
10,000,000,000
RPM
2,500,000,000
RPM
Bengkayang
7.5 Km
4 Km
0.1 Km
10.5 Km
8.2 Km
Page 4
107,598,685,000
36,661,500,000
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Paloh
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Pembangunan Jalan Baru Bts.Kota Sanggau - Sekadau (Relokasi)
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
4
2 Km
5
12,000,000,000
6
RPM
3 Km
1 Kwsn
1 Kwsn
1 Kwsn
1 Paket
16,500,000,000
30,763,000,000
35,000,000,000
35,000,000,000
9,700,000,000
2,970,300,000
2,714,580,000
1,492,370,000
1,551,850,000
RPM
4 Km
2.8 Km
81,790,420,000
10,000,000,000
9,691,500,000
RPM
RPM
0.2 Km
4,000,000,000
RPM
40 m
1 Km
1.5 Km
2 Km
10,000,000,000
10,000,000,000
9,799,750,000
15,129,000,000
4,906,600,000
4,934,900,000
1,775,740,000
1,552,930,000
RPM
RPM
RPM
RPM
DAK
DAK
DAK
DAK
3 Km
0.3 Km
404,161,780,000
7,500,000,000
7,100,000,000
RPM
RPM
6 Km
7.3 Km
55 m
m
2.5 km
3.4 Km
33,000,000,000
33,050,000,000
13,750,000,000
12,400,000,000
18,000,000,000
27,500,000,000
RPM
RPM
RPM
RPM
RPM
RPM
Pelebaran
Pelebaran
Pelebaran
Pelebaran
Pelebaran
2.2 Km
3 Km
2.3 Km
4 Km
2.5 Km
18,000,000,000
24,000,000,000
14,500,000,000
30,000,000,000
18,250,000,000
RPM
RPM
RPM
RPM
RPM
Sintang
Kapuas Hulu
Jalan
Jalan
Jalan
Jalan
Jalan
Page 5
DAK
DAK
DAK
DAK
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Infrastruktur Irigasi
Infrastruktur Jalan
Infrastruktur Air Minum
Infrastruktur Sanitasi
Pembangunan Sarana dan Prasarana Air Baku Sungai Poton
(lanjutan Tahap IV)
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
km
5
2,970,440,000
5,110,860,000
1,321,130,000
1,527,350,000
35,000,000,000
m3/det
15,000,000,000
APBNP
Putusibau Utara
0.08
m3/det
26,400,000,000
APBNP
Badau
1 Kwsn
1 Kwsn
19,782,000,000
40,000,000,000
8.5 Km
54,692,660,000
54,692,660,000
51,000,000,000
RPM
2,073,420,000
1,004,660,000
614,580,000
DAK
DAK
DAK
Kalimantan Timur
Mahakam Ulu
Pembangunan/Pelebaran Jalan Paralel Tiong Onang-Long
Pahangai
Infrastruktur Jalan
Infrastruktur Air Minum
Infrastruktur Sanitasi
Kalimantan Utara
Nunukan
2,095,283,000
875,990,000
KEGIATAN KEBINAMARGAAN
PENINGKATAN STRUKTUR JALAN MENSALONG - SP.3 APAS
PENINGKATAN STRUKTUR JALAN SP.3 APAS - SIMANGGARIS
15,750,000,000
80,147,582,000
75,074,912,000
15,750,000,000
53,000,000,000
58,000,000,000
53,000,000,000
42,600,000,000
42,600,000,000
47,100,000,000
24,800,000,000
36,174,000,000
Page 6
6
DAK
DAK
DAK
DAK
APBN
Putusibau Utara
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
SIMANGGARIS - SEI ULAR
REKONSTRUKSI/PENINGKATAN STRUKTUR JALAN:
LINGKAR PULAU SEBATIK
DANA ALOKASI KHUSUS
DAK Irigasi
Peningkatan Jaringan Irigasi dan Pipanisasi Tang Paye ( D.I.
Berian Baru )
ANGGARAN
(Rp.)
5
58,700,000,000
59,000,000,000
300,000,000
600,000,000
400,000,000
10,585,000,000
2,109,800,000
1,491,920,000
498,307,000
498,307,000
498,307,000
325,495,000
325,495,000
225,000,000
650,990,000
225,000,000
1,708,120,000
995,820,000
DAK Sanitasi
Pembangunan MCK ++ Desa Kunyit
MCK
MCK
MCK
MCK
MCK
250,000,000
218,500,000
Pembangunan
Pembangunan
Pembangunan
Pembangunan
Pembangunan
400,000,000
Long Layu
Pa Upan
Pembeliangan
Long Kewan
Long Sebuluan
Malinau
1,219,293,000
KEGIATAN KEBINAMARGAAN
Pemeliharaan Berkala Jalan Malinau - Long Bawang
6,600,000,000
Page 7
SUMBER
PEMBIAYAAN
6
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Peningkatan Struktur Jalan Sekatak Buji - Mainau 2
Peningkatan Struktur Jalan Malinau - Mensalong
ANGGARAN
(Rp.)
5
15,750,000,000
15,750,000,000
44,300,000,000
16,353,530,000
14,000,000,000
12,250,000,000
1,851,950,000
SUMBER
PEMBIAYAAN
6
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
1,379,810,000
DAK Jalan
10,000,000,000
8,046,480,000
3,760,050,000
1,851,950,000
859,350,000
DAK Sanitasi
Pembangunan IPAL komunal desa Malinau Seberang
406,431,000
406,431,000
406,431,000
0.25 km
58,199,930,000
22,141,950,000
2,461,030,000
3,105,600,000
1,280,160,000
1,295,160,000
10,000,000,000
DAK
DAK
DAK
DAK
APBN
Tatoraeng
0,45 km
4,000,000,000
APBN
Tahuna
36,057,980,000
Page 8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Infrastruktur Irigasi
Infrastruktur Jalan
Infrastruktur Air Minum
Infrastruktur Sanitasi
Pembangunan Pengaman Pantai Kalama (lanjutan) kab.Kep.
Talaud
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
0.3km
5
2,211,730,000
1,722,060,000
1,173,560,000
1,243,040,000
29,707,590,000
6
DAK
DAK
DAK
DAK
APBN
1.6 Km
1 Km
454,522,650,000
74,916,337,000
9,744,577,000
3,000,000,000
RPM
RPM
3 Km
5.5 Km
3 Km
4 buah
10,351,250,000
19,241,250,000
10,493,000,000
4,448,410,000
2,741,600,000
1,252,550,000
1,185,440,000
5,148,260,000
RPM
RPM
RPM
DAK
DAK
DAK
DAK
APBN
6 buah
7,310,000,000
APBN
3.9 Km
3.2 Km
37,203,510,000
7,849,000,000
6,480,000,000
RPM
RPM
2.8Km
6,200,000,000
RPM
2.7 Km
9,112,000,000
3,325,460,000
2,222,750,000
1,197,060,000
817,240,000
RPM
DAK
DAK
DAK
DAK
2.8 Km
227,948,010,000
6,200,000,000
RPM
3.0 Km
6,840,000,000
RPM
2,669,570,000
DAK
Belu
Infrastruktur Irigasi
Page 9
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Miangas
Semau
Selatan(2bh)
Semau (2 bh)
Kupang barat(2
bh)
Kupang Timur
(2bh), Fatuleu
(2bh)
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Infrastruktur Jalan
Infrastruktur Air Minum
Infrastruktur Sanitasi
Pembangunan Embung Kecil 6 buah
6 buah
ANGGARAN
(Rp.)
5
1,778,000,000
1,282,630,000
1,206,810,000
7,310,000,000
1
1
1
1
1
1
Kws
Kws
Kws
Kws
Kws
Kws
13,882,000,000
20,296,000,000
135,000,000,000
400,000,000
4,000,000,000
25,000,000,000
1 Kws
2,083,000,000
Alor
SUMBER
PEMBIAYAAN
6
DAK
DAK
DAK
APBN
1.67 Km
39,986,083,000
4,162,500,000
RPM
4.9 Km
11,027,200,000
RPM
2.5 Km
10,947,123,000
RPM
3 buah
3,411,510,000
2,638,740,000
1,291,010,000
1,263,000,000
5,245,000,000
DAK
DAK
DAK
DAK
APBN
Infrastruktur Irigasi
Infrastruktur Jalan
Infrastruktur Air Minum
Infrastruktur Sanitasi
Pembangunan Embung Kecil 8 buah
8 buah
36,305,530,000
3,835,730,000
2,050,180,000
1,223,060,000
1,627,010,000
9,929,550,000
DAK
DAK
DAK
DAK
APBN
0.7 km
17,640,000,000
APBNP
Infrastruktur Irigasi
Infrastruktur Jalan
Infrastruktur Air Minum
Infrastruktur Sanitasi
Pembangunan Embung Kecil 3 buah di Kab. Alor
Rote Ndao
Malaka
38,163,180,000
Page 10
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Tasifeto Timur (2
tasifeto
bh)
Selatan(2bh) dan
Raimanuk (2 bh)
Alor Timur
Pantai baru
Rote Rimur (2 bh)
(2bh) Lobalain
(2bh) dan Rote
Barat daya (2bh)
Lobalain
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
3
Pembangunan Embung Kecil 6 buah
4
6 buah
5
7,310,000,000
1 Kws
25,000,000,000
Infrastruktur
Infrastruktur
Infrastruktur
Infrastruktur
Irigasi
Jalan
Air Minum
Sanitasi
2,535,690,000
1,542,470,000
1,066,620,000
708,400,000
Maluku
Maluku Barat Daya
SUMBER
PEMBIAYAAN
6
APBN
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Malaka barat (2
malaka Timur
bh), malaka
(2bh) dan Reinhat
Timur dan
(2bh)
Reinhat
DAK
DAK
DAK
DAK
1 buah
314,126,530,000
44,590,040,000
33,205,000,000
2,389,570,000
3,107,310,000
1,408,140,000
1,600,020,000
956,000,000
RPM
04
04
04
04
APBN
1 buah
945,000,000
APBN
Kec. PP.
Terselatan
1 buah
979,000,000
APBN
Kec. PP.
Terselatan
6 Km
15 Km
15 Km
169 Km
5.5 Km
7 Km
264,742,610,000
23,495,000,000
60,000,000,000
60,000,000,000
67,400,000,000
18,452,550,000
28,000,000,000
1,780,710,000
2,872,260,000
1,311,210,000
1,430,880,000
RPM
RPM
RPM
RPM
RPM
RPM
DAK
DAK
DAK
DAK
4,793,880,000
2,185,460,000
1,281,980,000
1,326,440,000
DAK
DAK
DAK
10 Km
Kepulauan Aru
Infrastruktur Jalan
Infrastruktur Air Minum
Infrastruktur Sanitasi
Maluku Utara
67,582,055,000
Page 11
Kec. PP.
Terselatan
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
1
Morotai
6 Km
7.2 Km
0.5 km
Papua
Merauke
ANGGARAN
(Rp.)
5
67,582,055,000
20,937,925,000
25,511,000,000
1,659,280,000
2,451,220,000
921,260,000
1,101,370,000
15,000,000,000
SUMBER
PEMBIAYAAN
6
RPM
RPM
DAK
DAK
DAK
DAK
APBNP
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Morotai Selatan
4 Km
939,571,528,000
174,033,380,000
20,000,000,000
3 Km
15,000,000,000
RPM
2 Km
10,000,000,000
RPM
2 Km
10,000,000,000
RPM
8 Km
40,000,000,000
RPM
2.5 Km
15,000,000,000
RPM
6.3 m
3,000,000,000
8,709,700,000
10,496,680,000
2,302,120,000
1,824,120,000
5,032,220,000
RPM
DAK
DAK
DAK
DAK
APBN
Ulilin
5,032,220,000
APBN
Muting
19 Km
5,034,080,000
APBNP
Eligobel
RPM
19 Km
6,534,080,000
APBNP
Muting
24.4 km
8,034,080,000
APBNP
Ulilin
19.7 km
8,034,080,000
APBNP
Naukenjerai
Boven Digoel
110,242,920,000
Page 12
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Pemeliharaan Berkala / Rehabilitasi Jalan Tanah Merah Mindiptana
Eskalasi Rekonstruksi/Peningkatan Struktur Jalan Mandom Getentiri (MYC)
Eskalasi Rekonstruksi/Peningkatan Struktur Jalan Tanah Merah Getentiri I (MYC)
Rekonstruksi/Peningkatan Struktur Jalan Tanah Merah Mindiptana "A1"
Infrastruktur Jalan
Infrastruktur Air Minum
Infrastruktur Sanitasi
Pembangunan Jaringan Reklamasi Rawa Asiki (400Ha)
Pembangunan Jaringan Reklamasi Rawa Getentiri (360Ha)
5
9,500,000,000
6
RPM
1 Km
4,200,000,000
RPM
1 Km
3,100,000,000
RPM
74,000,000,000
RPM
1 Km
2,200,000,000
RPM
19.0 km
14.0 km
3,605,660,000
1,422,380,000
1,146,720,000
6,034,080,000
5,034,080,000
04
04
04
APBNP
APBNP
Keerom
Pemeliharaan Rutin Jalan
Pemeliharaan Rutin Jembatan
Pemeliharaan Berkala Jalan Waris - Yetti [62.004]
Pemeliharaan Berkala Jalan Abepura - Arso
Pemeliharaan Berkala Jalan Yetti - Senggi - Usku
Rekonstruksi / Peningkatan Struktur Jalan Arso - Waris - Yetti
SUMBER
PEMBIAYAAN
4
1.9 Km
14.8 Km
ANGGARAN
(Rp.)
310.72 Km
2804 m
2.2 Km
1.8 Km
1.7 Km
6.9 Km
208,597,833,000
14,687,923,000
1,304,500,000
10,000,000,000
7,000,000,000
7,500,000,000
34,500,000,000
01
01
RPM
RPM
RPM
RPM
7.5 Km
45,000,000,000
RPM
4.4 Km
6 Km
20,000,000,000
30,000,000,000
RPM
RPM
1.8Km
1.9 Km
14,000,000,000
15,000,000,000
2,062,890,000
3,544,660,000
1,114,440,000
1,366,020,000
1,517,400,000
RPM
RPM
DAK
DAK
DAK
DAK
APBN
2 Km
433,332,985,000
7,000,000,000
RPM
400 m
200,500,000,000
RPM
Jayapura
Pemeliharaan Berkala Holtekang - Koya - Skouw / BTS.PNG
[62.032]
Pembangunan Jembatan Holtekamp
Page 13
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Jair
Jair
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
3
Pelebaran Jalan Raya Abepura
Infrastruktur Jalan
Infrastruktur Air Minum
Infrastruktur Sanitasi
Rehabilitasi Tanggul Penutup Lanjutan DI Koya 5000 ha Kota
Jayapura
4
1.8 Km
5
30,000,000,000
2,020,650,000
2,680,070,000
1,639,930,000
6,000,000,000
6
RPM
DAK
DAK
DAK
APBN
Muara Tami
0.2 km
4,500,000,000
APBN
Muara Tami
5,905,725,000
APBN
Muara tami
0.7km
1,5 km
2.0 km
9,000,000,000
9,054,910,000
5,055,900,000
APBNP
APBNP
APBNP
Muara tami
Muara Tami
Muara Tami
2.0 km
9,055,900,000
APBNP
Muara Tami
1.5 Km
8,055,900,000
APBNP
Muara Tami
6,000,000,000
APBN
Jayapura Utara
1 Kws
1 Kws
1 Kws
67,664,000,000
35,000,000,000
20,000,000,000
1 Kws
1 Kws
700,000,000
3,500,000,000
Pegunungan Bintang
Infrastruktur Jalan
Infrastruktur Air Minum
Infrastruktur Sanitasi
8,780,120,000
4,926,460,000
2,004,810,000
1,848,850,000
DAK
DAK
DAK
Infrastruktur Jalan
Infrastruktur Air Minum
Infrastruktur Sanitasi
4,584,290,000
2,471,280,000
1,158,570,000
954,440,000
DAK
DAK
DAK
Infrastruktur Irigasi
Infrastruktur Jalan
Infrastruktur Air Minum
9,044,430,000
9,044,430,000
3,244,180,000
3,397,570,000
1,324,480,000
DAK
DAK
DAK
Supiori
Papua Barat
Raja Ampat
Page 14
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
Infrastruktur Sanitasi
2.
ANGGARAN
(Rp.)
5
1,078,200,000
1 Paket
3,411,421,184,558
76,275,052,000
76,275,052,000
1,114,400,000
1 Paket
1 Paket
KEMENTERIAN PERHUBUNGAN
Aceh
Sabang
Pengadaan dan Pemasangan Perlengkapan Jalan (termasuk
supervisi) Km.0 -Kota Sabang
SUMBER
PEMBIAYAAN
6
DAK
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
SATKER
PENGEMBANGAN
LLAJ Aceh
955,059,000
3,260,095,000
KSOP SABANG
DISNAV SABANG
x
x
1 Paket
1,678,688,000
DISNAV SABANG
1 Paket
1,167,300,000
DISNAV SABANG
1 Paket
2,987,590,000
DISNAV SABANG
1 Paket
1,633,595,000
DISNAV SABANG
1 Paket
9,856,500,000
DISNAV SABANG
1 Paket
1,398,620,000
DISNAV SABANG
1 Paket
636,443,000
DISNAV SABANG
1 Paket
1,118,490,000
DISNAV SABANG
1 Paket
151,757,000
DISNAV SABANG
1 Paket
151,757,000
DISNAV SABANG
1 Paket
151,757,000
DISNAV SABANG
1 Paket
1,186,422,000
DISNAV SABANG
1 Paket
10,005,100,000
DISNAV SABANG
1 Paket
900,000,000
DISNAV SABANG
1 Paket
4,800,000,000
DISNAV SABANG
1 Paket
3,800,000,000
DISNAV SABANG
Page 15
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Pelapisan landas pacu dengan hotmix tebal rata-rata 5cm
termasuk marking dan pengawasan
4
1 Paket
ANGGARAN
(Rp.)
5
18,876,154,000
SUMBER
PEMBIAYAAN
6
Bandara Maimun
Saleh
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
x
Paket
433,125,000
Unit Pelaks.
Bandar Udara
Maimun Saleh
Paket
501,000,000
Unit Pelaks.
Bandar Udara
Maimun Saleh
Paket
250,000,000
Unit Pelaks.
Bandar Udara
Maimun Saleh
Paket
350,000,000
Unit Pelaks.
Bandar Udara
Maimun Saleh
Pembuatan musholah
Paket
265,000,000
Unit Pelaks.
Bandar Udara
Maimun Saleh
Paket
361,200,000
Unit Pelaks.
Bandar Udara
Maimun Saleh
Paket
75,000,000
Unit Pelaks.
Bandar Udara
Maimun Saleh
Paket
50,000,000
Unit Pelaks.
Bandar Udara
Maimun Saleh
Paket
250,000,000
Unit Pelaks.
Bandar Udara
Maimun Saleh
Paket
600,000,000
Unit Pelaks.
Bandar Udara
Maimun Saleh
Paket
50,000,000
Unit Pelaks.
Bandar Udara
Maimun Saleh
Paket
210,000,000
Unit Pelaks.
Bandar Udara
Maimun Saleh
Paket
550,000,000
Unit Pelaks.
Bandar Udara
Maimun Saleh
Page 16
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
3
Pengadaan dan Pengiriman PKP-PK FT Tipe IV (APBNP)
4
Paket
5
6,500,000,000
Paket
138,986,173,000
24,224,605,000
23,834,615,000
Paket
389,990,000
Paket
20,000,000,000
20,000,000,000
Paket
94,761,568,000
9,387,974,000
Paket
Riau
Rokan Hilir
SUMBER
PEMBIAYAAN
6
Unit Pelaks.
Bandar Udara
Maimun Saleh
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
x
KSOP BAGAN
SIAPI-API
UPP PANIPAHAN
Satker
Pengembangan
LLASDP Riau
Satker
Pengembangan
LLASDP Riau
3,500,000,000
Satker
Pengembangan
LLAJ Riau
Paket
Paket
Paket
Paket
1,059,337,000
9,350,000,000
1,919,737,000
6,388,082,000
DISNAV
DISNAV
DISNAV
DISNAV
DUMAI
DUMAI
DUMAI
DUMAI
x
x
x
x
Paket
2,573,527,000
DISNAV DUMAI
Paket
1,141,343,000
DISNAV DUMAI
Paket
2,117,165,000
DISNAV DUMAI
Paket
Paket
Paket
43,972,695,000
8,643,157,000
4,708,551,000
DISNAV DUMAI
DISNAV DUMAI
DISNAV DUMAI
x
x
x
Paket
558,588,636,000
6,000,000,000
6,000,000,000
Satker
Pengembangan
LLAJ Kepri
Kepulauan Meranti
Dumai
Kepulauan Riau
Batam
Peningkatan Perangkat ATCS di Kota Batam
Page 17
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
Bintan
Pemb. Derm. Penyeb. Tambelan
Paket
164,750,518,000
25,000,000,000
Paket
Paket
Paket
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Satker
Pengembangan
LLASDP Kepri
16,710,153,000
KSOP TANJUNG
PINANG
42,404,791,000
KSOP TANJUNG
PINANG
2,600,000,000
DISNAV
TANJUNG
PINANG
Paket
2,600,000,000
DISNAV
TANJUNG
PINANG
Paket
3,850,000,000
DISNAV
TANJUNG
PINANG
Paket
1,689,053,000
DISNAV
TANJUNG
PINANG
Paket
1,689,053,000
DISNAV
TANJUNG
PINANG
Paket
1,258,234,000
DISNAV
TANJUNG
PINANG
Paket
1,258,234,000
DISNAV
TANJUNG
PINANG
Paket
6,810,000,000
DISNAV
TANJUNG
PINANG
Paket
1,000,000,000
DISNAV
TANJUNG
PINANG
Paket
10,000,000,000
KSOP TANJUNG
PINANG
Paket
47,881,000,000
KSOP TANJUNG
PINANG
Paket
249,053,335,000
23,040,127,000
UPP Tarempa
Natuna
Page 18
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
3
Pengembangan Faspel Laut Subi
Pembangunan Faspel Laut Pulau Laut Pulau Terluar
Pembangunan Faspel Laut Letung
Pembangunan Faspel Laut Midai
Pembangunan Faspel Laut Pulau Laut
Pembangunan Faspel Laut Subi
Pembangunan Faspel Laut Serasan
Pemb. Derm. Penyeb. Penagi
4
Paket
Paket
Paket
Paket
Paket
Paket
Paket
Paket
5
75,824,962,000
23,834,615,000
8,500,000,000
5,000,000,000
35,000,000,000
25,253,631,000
27,600,000,000
25,000,000,000
Paket
74,600,000,000
10,000,000,000
Paket
Pemb. Derm. Penyeb. Matak (Kep. Anambas) Lintas Tanjung Uban Matak Thp VI (Termasuk supervisi)
Kepulauan Anambas
SUMBER
PEMBIAYAAN
6
UPP Tarempa
UPP Tarempa
UPP Tarempa
UPP Tarempa
UPP Tarempa
UPP Tarempa
UPP Tarempa
Satker
Pengembangan
LLASDP Kepri
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
x
x
x
x
x
x
x
x
Satker
Pengembangan
LLASDP Kepri
600,000,000
Satker
Pengembangan
LLASDP Kepri
Paket
25,000,000,000
Satker
Pengembangan
LLASDP Kepri
Paket
39,000,000,000
Satker Sementara
Pembangunan
Faspel Laut Pulau
Terluar
Pengad. & Pemas. Rambu Suar 1 (Satu) Unit di Pel. Penyeb. Selat
Belia (Termasuk desain dan supervisi)
Paket
64,184,783,000
550,000,000
Satker
Pengembangan
LLASDP Kepri
(termasuk
Paket
1,216,464,000
Satker
Pengembangan
LLAJ Kepri
Paket
26,028,112,000
Unit Pelaks.
Bandar Udara
Seibati
Paket
34,162,399,000
Unit Pelaks.
Bandar Udara
Seibati
Paket
399,808,000
Unit Pelaks.
Bandar Udara
Seibati
Karimun
Page 19
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
x
3
Pengadaan dan Pemasangan PAPI 1 sisi, 1 ujung pada Runway 27
4
Paket
5
850,000,000
6
Unit Pelaks.
Bandar Udara
Seibati
Paket
150,000,000
Unit Pelaks.
Bandar Udara
Seibati
Paket
100,000,000
Unit Pelaks.
Bandar Udara
Seibati
Paket
200,000,000
Unit Pelaks.
Bandar Udara
Seibati
Paket
450,000,000
Unit Pelaks.
Bandar Udara
Seibati
Paket
50,000,000
Unit Pelaks.
Bandar Udara
Seibati
Paket
14,000,000
Unit Pelaks.
Bandar Udara
Seibati
Paket
14,000,000
Unit Pelaks.
Bandar Udara
Seibati
Pemb. Der. Penyeb Ciremai di Kabupaten Sambas Lts. Sumpit Ciremai (Termasuk supervisi) Selesai
Paket
167,621,437,000
26,737,862,000
7,853,662,000
Satker
Pengembangan
LLASDP Kalbar
Paket
6,000,000,000
Satker
Pengembangan
LLASDP Kalbar
Paket
12,884,200,000
Satker
Pengembangan
LLASDP Kalbar
Paket
106,887,318,000
25,000,000,000
Satker
Pengembangan
LLASDP Kalbar
Kalimantan Barat
Sambas
Sanggau
Page 20
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
x
3
Peningk. Dermaga Sungai Tayan Kab. Sanggau
4
Paket
5
15,420,112,000
6
Satker
Pengembangan
LLASDP Kalbar
Pekerjaan cut and fill di daerah sisi udara (Treshould R/W 09)
termasuk pengawasan
Paket
4,000,000,000
Unit Pelas.
Bandar Udara
Tebelian Sintang
Paket
12,299,300,000
Unit Pelas.
Bandar Udara
Tebelian Sintang
Paket
1,949,150,000
Unit Pelas.
Bandar Udara
Tebelian Sintang
Paket
2,800,000,000
Unit Pelas.
Bandar Udara
Tebelian Sintang
Paket
900,000,000
Unit Pelas.
Bandar Udara
Tebelian Sintang
Paket
965,000,000
Unit Pelas.
Bandar Udara
Tebelian Sintang
Paket
7,799,000,000
Unit Pelas.
Bandar Udara
Tebelian Sintang
Paket
14,500,000,000
Unit Pelas.
Bandar Udara
Tebelian Sintang
Pembuatan bak air (kapasitas 12.000 Ltr) dan sumur bor termasuk
pompa dan instalasinya
Paket
75,000,000
Unit Pelas.
Bandar Udara
Tebelian Sintang
Paket
1,248,756,000
Unit Pelas.
Bandar Udara
Tebelian Sintang
Page 21
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
x
3
Pengadaan dan pemasangan AC split 2 PK
4
Paket
5
300,000,000
6
Unit Pelas.
Bandar Udara
Tebelian Sintang
Paket
120,000,000
Unit Pelas.
Bandar Udara
Tebelian Sintang
Paket
1,500,000,000
Unit Pelas.
Bandar Udara
Tebelian Sintang
Paket
3,267,000,000
Unit Pelas.
Bandar Udara
Tebelian Sintang
Paket
99,000,000
Unit Pelas.
Bandar Udara
Tebelian Sintang
Paket
300,000,000
Unit Pelas.
Bandar Udara
Tebelian Sintang
Paket
125,000,000
Unit Pelas.
Bandar Udara
Tebelian Sintang
Pengadaan sirine 5 PK
Paket
250,000,000
Unit Pelas.
Bandar Udara
Tebelian Sintang
Paket
1,000,000,000
Unit Pelas.
Bandar Udara
Tebelian Sintang
Paket
200,000,000
Unit Pelas.
Bandar Udara
Tebelian Sintang
Page 22
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
x
3
Pengadaan dan pemasangan conveyor tipe 0
4
Paket
5
1,000,000,000
6
Unit Pelas.
Bandar Udara
Tebelian Sintang
Paket
500,000,000
Unit Pelas.
Bandar Udara
Tebelian Sintang
Paket
7,200,000,000
Unit Pelas.
Bandar Udara
Tebelian Sintang
Paket
450,000,000
Unit Pelas.
Bandar Udara
Tebelian Sintang
Paket
550,000,000
Unit Pelas.
Bandar Udara
Tebelian Sintang
Paket
150,000,000
Unit Pelas.
Bandar Udara
Tebelian Sintang
Pengadaan APAR 6 kg
Paket
35,000,000
Unit Pelas.
Bandar Udara
Tebelian Sintang
Pengadaan HT
Paket
35,000,000
Unit Pelas.
Bandar Udara
Tebelian Sintang
Paket
30,000,000
Unit Pelas.
Bandar Udara
Tebelian Sintang
Paket
2,750,000,000
Unit Pelas.
Bandar Udara
Tebelian Sintang
Page 23
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
4
Paket
Kapuas Hulu
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
6
Unit Pelas.
Bandar Udara
Tebelian Sintang
70,000,000
Paket
33,996,257,000
7,365,600,000
Paket
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
x
U.P. Bandar
Udara Pangsuma
Putussibau
9,319,350,000
U.P. Bandar
Udara Pangsuma
Putussibau
Paket
300,000,000
U.P. Bandar
Udara Pangsuma
Putussibau
Paket
497,000,000
U.P. Bandar
Udara Pangsuma
Putussibau
Paket
2,239,307,000
U.P. Bandar
Udara Pangsuma
Putussibau
Paket
480,000,000
U.P. Bandar
Udara Pangsuma
Putussibau
Paket
2,700,000,000
U.P. Bandar
Udara Pangsuma
Putussibau
Paket
650,000,000
U.P. Bandar
Udara Pangsuma
Putussibau
Paket
250,000,000
U.P. Bandar
Udara Pangsuma
Putussibau
Page 24
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
x
3
Pengadaan dan pemasangan Rotating Beacon
4
Paket
5
185,000,000
6
U.P. Bandar
Udara Pangsuma
Putussibau
Paket
250,000,000
U.P. Bandar
Udara Pangsuma
Putussibau
Paket
85,000,000
U.P. Bandar
Udara Pangsuma
Putussibau
Paket
400,000,000
U.P. Bandar
Udara Pangsuma
Putussibau
Paket
750,000,000
U.P. Bandar
Udara Pangsuma
Putussibau
Paket
200,000,000
U.P. Bandar
Udara Pangsuma
Putussibau
Paket
275,000,000
U.P. Bandar
Udara Pangsuma
Putussibau
Paket
350,000,000
U.P. Bandar
Udara Pangsuma
Putussibau
Paket
1,750,000,000
U.P. Bandar
Udara Pangsuma
Putussibau
Paket
5,500,000,000
U.P. Bandar
Udara Pangsuma
Putussibau
Page 25
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
3
Pengadaan dan pengiriman kendaraan patroli
4
Paket
5
450,000,000
Paket
10,415,000,000
10,415,000,000
4,746,000,000
Paket
Kalimantan Timur
Mahakam Hulu
SUMBER
PEMBIAYAAN
6
U.P. Bandar
Udara Pangsuma
Putussibau
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
x
Unit Pelaks,
Bandar Udara
Data Dawai
2,640,000,000
Unit Pelaks,
Bandar Udara
Data Dawai
Paket
1,803,000,000
Unit Pelaks,
Bandar Udara
Data Dawai
Paket
900,000,000
Unit Pelaks,
Bandar Udara
Data Dawai
Paket
35,000,000
Unit Pelaks,
Bandar Udara
Data Dawai
Paket
181,000,000
Unit Pelaks,
Bandar Udara
Data Dawai
Paket
110,000,000
Unit Pelaks,
Bandar Udara
Data Dawai
Kalimantan Utara
Nunukan
96,738,864,000
41,868,464,000
Peningkatan Bandara Yuvai Semaring
Peningkatan Bandara Nunukan
Dermaga S. Simanggaris
27,315,584,000
6,908,880,000
7,644,000,000
Malinau
54,870,400,000
Peningkatan Bandara Long Ampung
Peningkatan Bandara Malinau
40,698,400,000
14,172,000,000
304,706,244,705
10,000,000,000
Page 26
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
3
Pembangunan Terminal ALBN Kevamenanu
4
Paket
5
10,000,000,000
Paket
34,178,111,705
3,210,711,705
Paket
Belu
SUMBER
PEMBIAYAAN
6
Satker
Pengembangan
LLAJ NTT
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
x
Satker
Pengembangan
ASDP NTT
21,295,400,000
Bandara Haliwen
Atambua
Paket
2,700,000,000
U.P. Bandara
Haliwen Atambua
Paket
3,800,000,000
U.P. Bandara
Haliwen Atambua
Paket
162,000,000
U.P. Bandara
Haliwen Atambua
Paket
360,000,000
U.P. Bandara
Haliwen Atambua
Paket
500,000,000
U.P. Bandara
Haliwen Atambua
Paket
300,000,000
U.P. Bandara
Haliwen Atambua
Paket
850,000,000
U.P. Bandara
Haliwen Atambua
Paket
850,000,000
U.P. Bandara
Haliwen Atambua
Paket
150,000,000
U.P. Bandara
Haliwen Atambua
Paket
Paket
115,751,404,000
28,684,425,000
20,478,701,000
KSOP Kupang
KSOP Kupang
x
x
Kupang
Page 27
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
x
3
Pembangunan Menara Suar 40 M Darat Konstruksi Beton di TG.
Motamasin dan Fasilitas Penunjang
4
Paket
5
6,707,330,000
6
Disnav Kupang
Paket
2,669,512,000
Disnav Kupang
Paket
6,000,000,000
Disnav Kupang
Paket
2,376,680,000
Disnav Kupang
Paket
1,500,000,000
Disnav Kupang
Paket
Paket
1,334,756,000
5,000,000,000
Disnav Kupang
Disnav Kupang
x
x
Paket
9,000,000,000
Disnav Kupang
Paket
Paket
22,000,000,000
10,000,000,000
Disnav Kupang
KSOP Kupang
x
x
Paket
114,061,246,000
21,221,546,000
Unit
Penyelenggara
Pelabuhan Ba'a
Paket
1,521,600,000
Unit
Penyelenggara
Pelabuhan Ba'a
Paket
2,744,000,000
Unit
Penyelenggara
Pelabuhan Ba'a
Paket
30,000,000,000
Unit
Penyelenggara
Pelabuhan Ba'a
Paket
15,000,000,000
Unit
Penyelenggara
Pelabuhan Ba'a
Paket
2,310,000,000
Unit Pelaks.
Bandar Udara a
DC Saudale
Paket
135,000,000
Unit Pelaks.
Bandar Udara a
DC Saudale
Rote Ndao
Page 28
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
x
3
pembangunan jalan akses menuju terminal baru beserta lanskap
termasuk pengawaasan
4
Paket
5
1,001,700,000
6
Unit Pelaks.
Bandar Udara a
DC Saudale
Paket
13,310,000,000
Unit Pelaks.
Bandar Udara a
DC Saudale
Paket
1,000,000,000
Unit Pelaks.
Bandar Udara a
DC Saudale
Paket
500,000,000
Unit Pelaks.
Bandar Udara a
DC Saudale
Penambahan catu daya listrik PLN dari 16,5 kVA menjadi 131 kVA
dan instalasi ground cable
Paket
1,600,000,000
Unit Pelaks.
Bandar Udara a
DC Saudale
Paket
60,000,000
Unit Pelaks.
Bandar Udara a
DC Saudale
Paket
250,000,000
Unit Pelaks.
Bandar Udara a
DC Saudale
Paket
5,500,000,000
Unit Pelaks.
Bandar Udara a
DC Saudale
Paket
450,000,000
Unit Pelaks.
Bandar Udara a
DC Saudale
Pengadaan Binocullar
Paket
60,000,000
Unit Pelaks.
Bandar Udara a
DC Saudale
Paket
8,980,000,000
Unit Pelaks.
Bandar Udara a
DC Saudale
Paket
8,417,400,000
Unit Pelaks.
Bandar Udara a
DC Saudale
Paket
Paket
30,715,483,000
2,033,085,000
13,596,428,000
KSOP Kalabahi
UP Bandar Udara
Mali Alor
x
x
Paket
6,851,520,000
UP Bandar Udara
Mali Alor
Alor
Page 29
NO
PROVINSI/
KABUPATEN/KOTA
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
x
PROGRAM/KEGIATAN
VOLUME
3
Pekerjaan pagar sisi darat sepanjang 500 m termasuk pengawasan
4
Paket
5
431,450,000
6
UP Bandar Udara
Mali Alor
Paket
800,000,000
UP Bandar Udara
Mali Alor
Paket
400,000,000
UP Bandar Udara
Mali Alor
Paket
1,100,000,000
UP Bandar Udara
Mali Alor
Paket
525,000,000
UP Bandar Udara
Mali Alor
Paket
135,000,000
UP Bandar Udara
Mali Alor
Paket
2,453,000,000
UP Bandar Udara
Mali Alor
Paket
1,100,000,000
UP Bandar Udara
Mali Alor
Paket
250,000,000
UP Bandar Udara
Mali Alor
Paket
1,040,000,000
UP Bandar Udara
Mali Alor
Paket
141,554,027,000
76,350,857,000
802,459,000
Paket
Paket
1,987,000,000
770,465,000
x
x
Paket
Paket
146,444,000
1,543,507,000
x
x
Paket
1,173,982,000
Paket
Paket
10,000,000,000
810,000,000
x
x
Paket
Paket
Sulawesi Utara
Kepulauan Sangihe
Page 30
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
x
3
Pengadaan dan pemasangan Rotating Beacon
4
Paket
5
6
180,000,000 UP. Bandar Udara
Naha
Paket
Paket
Paket
BANDARA SIAU
Paket
Paket
65,203,170,000
20,000,000,000
Paket
14,152,000,000
Paket
Paket
Paket
Kepulauan Talaud
Satker
Pengembangan
LLASDP Sulut
Satker
Pengembangan
LLASDP Sulut
1,631,220,000
UPP Lirung
1,001,945,000
1,441,553,000
UPP Lirung
UPP Lirung
x
x
Paket
Paket
670,712,000
1,160,901,000
UPP Lirung
UPP Lirung
x
x
Paket
Paket
210,277,000
1,102,807,000
UPP Lirung
UPP Lirung
x
x
Paket
Paket
Paket
210,277,000
461,439,000
1,569,762,000
UPP Lirung
UPP Lirung
UPP Lirung
x
x
x
Paket
Paket
210,277,000
14,700,000,000
UPP Lirung
U.P. Bandar
Udara
Melongguane
x
x
Pembangunan rumah dinas type 36-2 unit (kopel) dan type 72-1
unit
Paket
720,000,000
U.P. Bandar
Udara
Melongguane
Paket
90,000,000
U.P. Bandar
Udara
Melongguane
Page 31
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
x
3
pengadaan dan pemasangan pagar BRC tinggi 2,2 M
4
Paket
5
2,400,000,000
6
U.P. Bandar
Udara
Melongguane
Paket
400,000,000
U.P. Bandar
Udara
Melongguane
Paket
2,750,000,000
U.P. Bandar
Udara
Melongguane
Paket
160,000,000
U.P. Bandar
Udara
Melongguane
Paket
160,000,000
U.P. Bandar
Udara
Melongguane
Paket
777,291,982,524
100,424,559,464
25,000,000,000
Satker
Pengembangan
LLASDP Maluku
Paket
Paket
7,824,109,464
36,360,450,000
UPP Wonreli
UPP Wonreli
x
x
Paket
Paket
Paket
Paket
7,000,000,000
10,000,000,000
11,000,000,000
840,000,000
UPP Wonreli
UPP Wonreli
UPP Wonreli
U.P. Bandar
Udara Kisar
x
x
x
x
Paket
756,000,000
U.P. Bandar
Udara Kisar
Paket
720,000,000
U.P. Bandar
Udara Kisar
Paket
174,000,000
U.P. Bandar
Udara Kisar
Paket
400,000,000
U.P. Bandar
Udara Kisar
Paket
350,000,000
U.P. Bandar
Udara Kisar
Maluku
Maluku Barat Daya
527,534,616,566
Page 32
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
3
Pemb. Derm. Penyeb Wunlah Thp. II (Termasuk Supervisi)
4
Paket
5
16,559,000,000
Paket
Paket
Paket
Paket
Paket
Paket
43,450,485,000
34,730,549,000
26,359,917,000
6,395,621,566
2,450,000,000
1,496,189,000
UPP
UPP
UPP
UPP
UPP
Saumlaki
Saumlaki
Saumlaki
Saumlaki
Saumlaki
Unit
Penyelenggara
Pelabuhan
Wonreli
x
x
x
x
x
x
Paket
Paket
Paket
Paket
16,000,000,000
39,877,085,000
10,000,000,000
6,400,000,000
UPP Saumlaki
UPP Saumlaki
UPP Saumlaki
Bandara
Saumlaki
x
x
x
x
Paket
Paket
Paket
4,765,000,000
5,000,000,000
6,870,000,000
Paket
7,000,000,000
U.P. Bandar
Udara Saumlaki
Paket
14,716,000,000
U.P. Bandar
Udara Saumlaki
Paket
2,277,000,000
U.P. Bandar
Udara Saumlaki
Paket
800,000,000
U.P. Bandar
Udara Saumlaki
Paket
90,000,000
U.P. Bandar
Udara Saumlaki
Paket
600,000,000
U.P. Bandar
Udara Saumlaki
Paket
60,000,000
U.P. Bandar
Udara Saumlaki
Paket
150,000,000
U.P. Bandar
Udara Saumlaki
Paket
150,000,000
U.P. Bandar
Udara Saumlaki
Paket
60,000,000
U.P. Bandar
Udara Saumlaki
Paket
280,000,000
U.P. Bandar
Udara Saumlaki
Page 33
6
Satker
Pengembangan
LLASDP Maluku
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
x
U.P. Bandar
Udara Saumlaki
x
x
x
NO
PROVINSI/
KABUPATEN/KOTA
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
x
PROGRAM/KEGIATAN
VOLUME
3
Pengadaan trolly bagage
4
Paket
5
250,000,000
6
U.P. Bandar
Udara Saumlaki
Paket
10,000,000
U.P. Bandar
Udara Saumlaki
Paket
8,361,000,000
U.P. Bandar
Udara Saumlaki
Paket
1,137,000,000
U.P. Bandar
Udara Saumlaki
Paket
150,000,000
U.P. Bandar
Udara Saumlaki
Paket
1,281,200,000
U.P. Bandar
Udara Saumlaki
Paket
1,630,670,000
U.P. Bandar
Udara Saumlaki
Paket
14,000,000
U.P. Bandar
Udara Saumlaki
Paket
6,550,000,000
U.P. Bandar
Udara Saumlaki
Paket
9,900,000,000
U. P. Bandar
Tual Baru
Paket
11,030,900,000
U. P. Bandar
Tual Baru
Paket
330,000,000
U. P. Bandar
Tual Baru
Paket
1,512,000,000
U. P. Bandar
Tual Baru
Paket
900,000,000
U. P. Bandar
Tual Baru
Pemotongan Pohon
Paket
250,000,000
U. P. Bandar
Tual Baru
Paket
230,000,000
U. P. Bandar
Tual Baru
Paket
450,000,000
U. P. Bandar
Tual Baru
Paket
350,000,000
U. P. Bandar
Tual Baru
Paket
800,000,000
U. P. Bandar
Tual Baru
Paket
1,700,000,000
U. P. Bandar
Tual Baru
Paket
480,000,000
U. P. Bandar
Tual Baru
Page 34
NO
PROVINSI/
KABUPATEN/KOTA
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
x
PROGRAM/KEGIATAN
VOLUME
3
Pengadaan Power Quality 80 kva
4
Paket
5
900,000,000
6
U. P. Bandar
Tual Baru
Paket
250,000,000
U. P. Bandar
Tual Baru
Paket
650,000,000
U. P. Bandar
Tual Baru
Paket
1,250,000,000
U. P. Bandar
Tual Baru
Paket
300,000,000
U. P. Bandar
Tual Baru
Paket
150,000,000
U. P. Bandar
Tual Baru
Paket
6,500,000,000
U. P. Bandar
Tual Baru
Paket
550,000,000
U. P. Bandar
Tual Baru
Paket
750,000,000
U. P. Bandar
Tual Baru
Paket
Paket
Paket
950,000,000
400,000,000
2,600,000,000
Bandara Larat
Bandara Larat
U.P. Bandar
Udara Saumlaki
x
x
x
Paket
34,924,000,000
U.P. Bandar
Udara Saumlaki
Paket
2,356,000,000
U.P. Bandar
Udara Saumlaki
Paket
26,284,000,000
U.P. Bandar
Udara Saumlaki
Pekerjaan Pengawasan
Paket
1,500,000,000
U.P. Bandar
Udara Saumlaki
Paket
7,250,000,000
U.P. Bandar
Udara Saumlaki
Paket
2,750,000,000
U.P. Bandar
Udara Saumlaki
Paket
2,390,000,000
U.P. Bandar
Udara Saumlaki
Paket
45,825,000,000
U. P. Bandar
Tual Baru
Paket
25,800,000,000
U. P. Bandar
Tual Baru
Paket
5,402,000,000
U. P. Bandar
Tual Baru
Page 35
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
x
3
Pekerjaan Talud Penahan daerah runway strip
4
Paket
5
13,320,000,000
6
U. P. Bandar
Tual Baru
Paket
20,825,000,000
U. P. Bandar
Tual Baru
Paket
15,730,000,000
U. P. Bandar
Tual Baru
Paket
3,750,000,000
U. P. Bandar
Tual Baru
Pekerjaan Pengawasan
Paket
3,000,000,000
U. P. Bandar
Tual Baru
Paket
1,000,000,000
U. P. Bandar
Tual Baru
Paket
825,000,000
U. P. Bandar
Tual Baru
Paket
5,500,000,000
U. P. Bandar
Tual Baru
Paket
149,332,806,493
17,960,708,000
Satker
Pengembangan
LLASDP Maluku
Paket
29,070,350,000
UPP Dobo
Paket
9,566,548,493
UPP Dobo
Paket
Paket
Paket
Paket
Paket
4,000,000,000
10,000,000,000
10,000,000,000
12,000,000,000
21,123,000,000
UPP Dobo
UPP Dobo
UPP Dobo
UPP Dobo
Bandara Dobo
x
x
x
x
x
Paket
19,699,200,000
Bandara Dobo
Paket
600,000,000
U.P. Bandar
Udara Dobo
Paket
168,000,000
U.P. Bandar
Udara Dobo
Pembangunan Rumah Dinas type 36-4 Unit dan Type 54-2 Unit
Paket
1,260,000,000
U.P. Bandar
Udara Dobo
Kepulauan Aru
Page 36
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
x
3
Pengadaan Meubelair untuk Gedung Kantor
4
Paket
5
300,000,000
6
U.P. Bandar
Udara Dobo
Paket
300,000,000
U.P. Bandar
Udara Dobo
Paket
800,000,000
U.P. Bandar
Udara Dobo
Paket
35,000,000
U.P. Bandar
Udara Dobo
Paket
5,500,000,000
U.P. Bandar
Udara Dobo
Paket
400,000,000
U.P. Bandar
Udara Dobo
Paket
6,550,000,000
U.P. Bandar
Udara Dobo
Paket
Paket
Paket
52,902,393,945
52,902,393,945
8,764,249,945
35,000,000,000
1,164,000,000
UPP Daruba
UPP Daruba
U. P. Bandara
Gamarmalamo
Galela
x
x
x
Paket
792,000,000
U. P. Bandara
Gamarmalamo
Galela
Paket
1,625,000,000
U. P. Bandara
Gamarmalamo
Galela
Paket
40,000,000
U. P. Bandara
Gamarmalamo
Galela
Paket
50,000,000
U. P. Bandara
Gamarmalamo
Galela
Paket
14,000,000
U. P. Bandara
Gamarmalamo
Galela
Paket
35,000,000
U. P. Bandara
Gamarmalamo
Galela
Paket
1,560,000,000
U. P. Bandara Leo
Wattimena
Maluku Utara
Morotai
Page 37
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
x
3
Pembuatan Gedung Operasional 4 Unit Type 36
4
Paket
5
792,000,000
6
U. P. Bandara Leo
Wattimena
Paket
660,000,000
U. P. Bandara Leo
Wattimena
Paket
1,062,144,000
U. P. Bandara Leo
Wattimena
Paket
650,000,000
U. P. Bandara Leo
Wattimena
Paket
350,000,000
U. P. Bandara Leo
Wattimena
Paket
270,000,000
U. P. Bandara Leo
Wattimena
Paket
14,000,000
U. P. Bandara Leo
Wattimena
Paket
60,000,000
U. P. Bandara Leo
Wattimena
Paket
791,320,095,000
280,321,947,000
1,000,000,000
Satker
Pengembangan
LLAJ Papua
Paket
1,000,000,000
Satker
Pengembangan
LLAJ Papua
Paket
38,144,288,000
KSOP Jayapura
Paket
Paket
Paket
50,216,441,000
25,000,000,000
2,371,461,000
KSOP Jayapura
KSOP Jayapura
Disnav Jayapura
x
x
x
Paket
2,371,461,000
Disnav Jayapura
Paket
1,190,594,000
Disnav Jayapura
Paket
868,570,000
Disnav Jayapura
Paket
832,887,000
Disnav Jayapura
Paket
957,449,000
Disnav Jayapura
Paket
1,767,458,000
Disnav Jayapura
Papua
Jayapura
Page 38
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
x
3
Rehabilitasi Gedung Srop Biak (Type 70)
4
Paket
5
678,252,000
6
Disnav Jayapura
Paket
576,974,000
Disnav Jayapura
Paket
400,000,000
Disnav Jayapura
Paket
572,527,000
Disnav Jayapura
Paket
1,522,307,000
Disnav Jayapura
Paket
580,131,000
Disnav Jayapura
Rehab KN Aldebran
Paket
3,285,742,000
Disnav Jayapura
Paket
6,000,000,000
Disnav Jayapura
Paket
27,800,000,000
Bandara Sentani
Paket
2,450,000,000
Bandara Sentani
Paket
4,310,005,000
Bandara Sentani
Paket
1,938,000,000
Bandara Sentani
Paket
1,928,400,000
Bandara Sentani
Paket
2,500,000,000
Bandara Sentani
Paket
3,500,000,000
Bandara Sentani
Paket
6,000,000,000
Bandara Sentani
Paket
4,239,000,000
Bandara Sentani
Paket
3,620,000,000
Bandara Sentani
Paket
5,300,000,000
Bandara Sentani
Paket
1,500,000,000
Bandara Sentani
Paket
1,000,000,000
Bandara Sentani
Page 39
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
x
3
Pengadaan Kursi penumpang 1 set @ 3 seat
4
Paket
5
3,400,000,000
6
Bandara Sentani
Paket
3,000,000,000
Bandara Sentani
Paket
48,000,000,000
Bandara Sentani
Paket
13,000,000,000
Bandara Sentani
Paket
2,500,000,000
Bandara Sentani
Paket
5,000,000,000
Bandara Sentani
Paket
13,699,400,000
12,074,400,000
Bandara Senggeh
Paket
450,000,000
Bandara Senggeh
Paket
650,000,000
Bandara Senggeh
Paket
175,000,000
Bandara Senggeh
Paket
350,000,000
Bandara Senggeh
Paket
25,094,842,000
1,890,000,000
Bandara Oksibil
Paket
4,125,000,000
Bandara Oksibil
Paket
Paket
Paket
Paket
Paket
800,000,000
2,449,000,000
1,356,000,000
480,000,000
5,868,500,000
Bandara
Bandara
Bandara
Bandara
Bandara
Oksibil
Oksibil
Oksibil
Oksibil
Oksibil
x
x
x
x
x
Paket
2,479,646,000
Bandara Batom
Paket
Paket
Paket
3,710,696,000
312,000,000
624,000,000
Bandara Batom
Bandara Batom
Bandara Batom
x
x
x
Keerom
Pegunungan Bintang
Page 40
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
3
Penyusunan RTT sisi udara dan sisi darat
4
Paket
5
1,000,000,000
Paket
72,391,262,000
1,345,262,000
Paket
Boven Digoel
SUMBER
PEMBIAYAAN
6
Bandara Batom
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
x
Satker
Pengembangan
LLAJ Papua
5,340,000,000
Bandara
Mindiptanah
Paket
9,210,000,000
Bandara
Mindiptanah
Paket
1,296,000,000
Bandara
Mindiptanah
Paket
540,000,000
Bandara
Mindiptanah
Paket
250,000,000
Bandara
Mindiptanah
Paket
175,000,000
Bandara
Mindiptanah
Paket
900,000,000
Bandara
Mindiptanah
Paket
500,000,000
Bandara
Mindiptanah
Paket
60,000,000
Bandara
Mindiptanah
Pekerjaan Pelapisan landas pacu dengan aspal kolakan tebal ratarata 5 cm termasuk marking dan pengawasan
Paket
11,225,000,000
Bandara Bomakia
Paket
4,050,000,000
Bandara Bomakia
Paket
900,000,000
Bandara Bomakia
Paket
500,000,000
Bandara Tanah
Merah
Paket
900,000,000
Bandara Tanah
Merah
Paket
15,000,000,000
Bandara Tanah
Merah
Paket
4,800,000,000
Bandara Tanah
Merah
Paket
2,340,000,000
Bandara Tanah
Merah
Paket
1,300,000,000
Bandara Tanah
Merah
Page 41
NO
PROVINSI/
KABUPATEN/KOTA
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
x
PROGRAM/KEGIATAN
VOLUME
4
Paket
5
720,000,000
6
Bandara Tanah
Merah
Paket
1,296,000,000
Bandara Tanah
Merah
Paket
250,000,000
Bandara Tanah
Merah
Paket
250,000,000
Bandara Tanah
Merah
Paket
250,000,000
Bandara Tanah
Merah
Paket
120,000,000
Bandara Tanah
Merah
Paket
450,000,000
Bandara Tanah
Merah
Paket
6,500,000,000
Bandara Tanah
Merah
Paket
324,000,000
Bandara Tanah
Merah
Paket
1,600,000,000
Bandara Tanah
Merah
Paket
399,812,644,000
35,777,419,000
KSOP Merauke
Paket
Paket
560,000,000
4,500,000,000
KSOP Merauke
Disnav Merauke
x
x
Paket
10,000,000,000
Disnav Merauke
Paket
1,935,250,000
Disnav Merauke
Paket
703,750,000
Disnav Merauke
Paket
14,019,380,000
Disnav Merauke
Paket
1,606,161,000
Disnav Merauke
Paket
1,606,161,000
Disnav Merauke
Paket
1,716,161,000
Disnav Merauke
Paket
1,716,161,000
Disnav Merauke
Merauke
Page 42
NO
PROVINSI/
KABUPATEN/KOTA
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
x
PROGRAM/KEGIATAN
VOLUME
3
Pembangunan rambu suar 10 m laut single pipe 4 kaki merah dan
hijau di Muara Selat Muli
4
Paket
5
3,284,596,000
6
Disnav Merauke
Paket
1,684,893,000
Disnav Merauke
Paket
6,978,896,000
Disnav Merauke
Paket
1,605,741,000
Disnav Merauke
Paket
1,772,114,000
Disnav Merauke
Paket
1,662,114,000
Disnav Merauke
Paket
726,933,000
Disnav Merauke
Paket
690,000,000
U.P. Bandara
Mopah
Paket
7,700,000,000
U.P. Bandara
Mopah
Paket
1,950,000,000
U.P. Bandara
Mopah
Paket
2,484,000,000
U.P. Bandara
Mopah
Paket
1,811,250,000
U.P. Bandara
Mopah
Paket
64,393,168,000
U.P. Bandara
Mopah
Paket
41,128,366,000
U.P. Bandara
Mopah
Paket
3,677,922,000
U.P. Bandara
Mopah
Paket
450,000,000
U.P. Bandara
Mopah
Paket
720,000,000
U.P. Bandara
Mopah
Paket
500,000,000
U.P. Bandara
Mopah
Paket
808,800,000
U.P. Bandara
Mopah
Paket
350,000,000
U.P. Bandara
Mopah
Paket
7,822,364,000
U.P. Bandara
Mopah
Page 43
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
x
3
Lanjutan pemagaran areal bandara termasuk pengawasan
4
Paket
5
2,523,145,000
6
U.P. Bandara
Mopah
Paket
2,100,000,000
U.P. Bandara
Mopah
Paket
5,839,778,000
U.P. Bandara
Mopah
Paket
8,500,000,000
U.P. Bandara
Mopah
Paket
4,500,000,000
U.P. Bandara
Mopah
Paket
500,000,000
U.P. Bandara
Mopah
Paket
150,000,000
U.P. Bandara
Mopah
Paket
1,000,000,000
U.P.Bandara
Kamur
Paket
4,462,740,000
U.P.Bandara
Kamur
Paket
8,848,560,000
U.P.Bandara
Kamur
Paket
960,000,000
U.P.Bandara
Kamur
Paket
96,000,000,000
U.P.Bandara
Kamur
Paket
Paket
980,758,000
18,684,420,000
Bandara Kimam
Bandara Kimam
x
x
Paket
Paket
Paket
720,000,000
834,143,000
180,000,000
Bandara Kimam
Bandara Kimam
Bandara Kimam
x
x
x
Paket
Paket
Paket
Paket
Paket
Paket
1,440,000,000
1,815,000,000
1,500,000,000
160,000,000
1,000,000,000
10,772,500,000
Bandara
Bandara
Bandara
Bandara
Bandara
Bandara
x
x
x
x
x
x
Papua Barat
295,021,279,385
Page 44
Okaba
Okaba
Okaba
Okaba
Okaba
Okaba
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
Paket
Paket
Paket
5
295,021,279,385
1,423,389,385
20,000,000,000
700,000,000
Paket
Raja Ampat
SUMBER
PEMBIAYAAN
6
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
UPP Saonek
UPP Saonek
U.P. Bandara
Domine Eduard
Osok
x
x
x
800,000,000
U.P. Bandara
Domine Eduard
Osok
Paket
37,428,020,000
U.P. Bandara
Domine Eduard
Osok
Paket
3,809,220,000
U.P. Bandara
Domine Eduard
Osok
Paket
25,474,910,000
U.P. Bandara
Domine Eduard
Osok
Paket
5,174,660,000
U.P. Bandara
Domine Eduard
Osok
Paket
1,512,100,000
U.P. Bandara
Domine Eduard
Osok
Paket
95,000,000,000
U.P. Bandara
Domine Eduard
Osok
Paket
2,100,000,000
U.P. Bandara
Domine Eduard
Osok
Paket
600,000,000
U.P. Bandara
Domine Eduard
Osok
Paket
900,000,000
U.P. Bandara
Domine Eduard
Osok
Paket
1,308,600,000
U.P. Bandara
Domine Eduard
Osok
Paket
450,000,000
U.P. Bandara
Domine Eduard
Osok
Page 45
NO
PROVINSI/
KABUPATEN/KOTA
3.
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
x
PROGRAM/KEGIATAN
VOLUME
3
Reinstalasi Pengadaan dan Pemasangan Peralatan Airfield Lighting
System
4
Paket
5
6,992,500,000
6
U.P. Bandara
Domine Eduard
Osok
Paket
7,038,800,000
U.P. Bandara
Domine Eduard
Osok
Paket
750,000,000
U.P. Bandara
Domine Eduard
Osok
Paket
448,000,000
U.P. Bandara
Domine Eduard
Osok
Paket
52,811,080,000
U.P. Bandara
Domine Eduard
Osok
Paket
25,000,000,000
U.P. Bandara
Domine Eduard
Osok
Paket
2,000,000,000
U.P. Bandara
Domine Eduard
Osok
Paket
3,000,000,000
U.P. Bandara
Domine Eduard
Osok
Paket
300,000,000
U.P. Bandara
Domine Eduard
Osok
6 Unit
1 Unit
1,260,331,497,000
94,300,000,000
94,300,000,000
59,300,000,000
35,000,000,000
3 Unit
1 Unit
9,500,000,000
9,500,000,000
2,000,000,000
7,500,000,000
Riau
Kepulauan Meranti
69,000,000,000
69,000,000,000
Page 46
Sukakarya
P. Berhala
P. Berhala
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
3
Pembangunan PLTD Kapasitas 1500 Kw
4
3 Unit
5
19,500,000,000
1 Unit
3 Unit
15,000,000,000
19,500,000,000
1 Unit
15,000,000,000
4 Unit
141,400,000,000
70,700,000,000
35,700,000,000
1 Unit
35,000,000,000
4 Unit
1 Unit
70,700,000,000
35,700,000,000
35,000,000,000
2 Unit
1 Unit
103,431,497,000
20,581,497,000
13,800,000,000
6,781,497,000
3 Unit
1 Unit
33,000,000,000
19,500,000,000
13,500,000,000
Entikong
2 Unit
1 Unit
17,850,000,000
11,100,000,000
6,750,000,000
Badau
2 Unit
1 Unit
23,550,000,000
16,800,000,000
6,750,000,000
Jagoi Babang
2 Unit
1 Unit
8,450,000,000
1,700,000,000
6,750,000,000
3 Unit
1 Unit
3 Unit
43,100,000,000
43,100,000,000
14,800,000,000
6,750,000,000
14,800,000,000
Kepulauan Riau
Natuna
Kepulauan Anambas
Pembangunan PLTD Kapasitas 4000 Kw
Pembangunan PLTS Hybrid Kapasitas 350 Kw
Kalimantan Barat
Sambas
Sanggau
Kapuas Hulu
Bengkayang
Sintang
Kalimantan Timur
Mahakam Ulu
Page 47
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Rangsang Barat
Rangsang Pesisir
Bunguran Timur
Anambas
Paloh
Long Apari
Long Pahangai
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Pembangunan PLTS Hybrid Kapasitas 75 Kw
4
1 Unit
Kalimantan Utara
Nunukan
ANGGARAN
(Rp.)
5
6,750,000,000
SUMBER
PEMBIAYAAN
6
2 unit
6 unit
2 unit
2 unit
3 unit
100 Kw
100 Kw
200 Kw
100 Kw
150 Kw
176,800,000,000
150,600,000,000
13,800,000,000
18,400,000,000
23,600,000,000
16,800,000,000
19,500,000,000
9,000,000,000
9,000,000,000
18,000,000,000
9,000,000,000
13,500,000,000
01
01
01
01
01
01
01
01
01
01
Pembangunan PLTD
Pembangunan PLTS Hibryd
5 Unit
100 Kw
26,200,000,000
17,200,000,000
9,000,000,000
01
01
3 Unit
187,150,000,000
27,200,000,000
14,900,000,000
1 Unit
12,300,000,000
2 Unit
1 Unit
29,100,000,000
16,800,000,000
12,300,000,000
2 Unit
29,100,000,000
16,800,000,000
1 Unit
12,300,000,000
2 Unit
29,100,000,000
16,800,000,000
1 Unit
12,300,000,000
3 Unit
1 Unit
72,650,000,000
29,600,000,000
43,050,000,000
Pembangunan PLTD
Malinau
Rote Ndao
Malaka
Belu
Page 48
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Lumbis Ogong
Simanggaris
Sebatik
Sebuku
Tulin Onsoi
Lumbis Ogong
Simanggaris
Sebatik
Sebuku
Tulin Onsoi
Kayan Hulu
Amfoang Timur
Kefamenanu
Kobalima Timur
Atambua Barat
NO
1
PROVINSI/
KABUPATEN/KOTA
2
Sulawesi Utara
Kepulauan Talaud
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
Unit
Unit
Unit
Unit
5
26,400,000,000
26,400,000,000
1,700,000,000
11,500,000,000
1,700,000,000
11,500,000,000
2 Unit
1 Unit
2 Unit
265,900,000,000
113,300,000,000
16,800,000,000
12,000,000,000
16,800,000,000
Pembangunan
Pembangunan
Pembangunan
Pembangunan
Pembangunan
1
3
1
2
1
Pembangunan
Pembangunan
Pembangunan
Pembangunan
PLTD
PLTS
PLTD
PLTS
kapasitas 200 Kw
Hybrid Kapasitas 100 Kw
kapasitas 200 Kw
Hybrid Kapasitas 100 Kw
2
1
2
1
Maluku
Maluku Barat Daya
Unit
Unit
Unit
Unit
Unit
12,000,000,000
14,900,000,000
12,000,000,000
16,800,000,000
12,000,000,000
2 Unit
123,800,000,000
13,100,000,000
Pembangunan
Pembangunan
Pembangunan
Pembangunan
1
3
1
5
PLTS
PLTD
PLTS
PLTD
Unit
Unit
Unit
Unit
12,000,000,000
14,900,000,000
12,000,000,000
41,800,000,000
1 Unit
30,000,000,000
2 Unit
1 Unit
28,800,000,000
16,800,000,000
12,000,000,000
3 Unit
69,850,000,000
69,850,000,000
29,600,000,000
1 Unit
40,250,000,000
2 Unit
73,500,000,000
44,100,000,000
1,700,000,000
Kepulauan Aru
Maluku Utara
Morotai
Papua
Boven Digoel
Pembangunan PLTD kapasitas 200 Kw
Page 49
SUMBER
PEMBIAYAAN
6
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Miangas
P. Karatung
Wetar
Pulau-Pulau
Terselatan/P.Kis
ar
P. Leti
P. Moa
Tanimbar
Selatan
P. Selaru
P. Yamdena
Saumlaki
P.Aru
Morotai Selatan
Waropko
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
2 Unit
1 Unit
14,700,000,000
1,700,000,000
13,000,000,000
Arso Timur
2 Unit
1 Unit
14,700,000,000
1,700,000,000
13,000,000,000
Sota
7 Titik
100,000,000,000
76,000,000,000
38,000,000,000
14,000,000,000
01
Kec Krayan:
Desa long
Umung, Desa
Long Lembudud,
Desa Trang
Baru, Desa long
Midang dan
Desa Binuang,
Pa'Padi,long
Puak
Pembangunan BTS
2 Titik
4,000,000,000
01
Kec Krayan
Selatan: Long
Ruangan,
Pa'Padi
Pembangunan BTS
7 Titik
14,000,000,000
01
Kec Lumbis
Ogong : Tau
Lumbis,
Panas,Labang,
Suman
Tobal,Binter,
Suka Maju, Ubal
Pembangunan BTS
1 Titik
2,000,000,000
01
Kec Sebatik
Tengah
Merauke
Page 50
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
5
13,000,000,000
1,700,000,000
13,000,000,000
1,700,000,000
13,000,000,000
1
2
1
2
1
Keerom
4.
SUMBER
PEMBIAYAAN
4
Unit
Unit
Unit
Unit
Unit
Pembangunan
Pembangunan
Pembangunan
Pembangunan
Pembangunan
3
PLTS Kapasitas 100 Kw
PLTD kapasitas 200 Kw
PLTS Kapasitas 100 Kw
PLTD kapasitas 200 Kw
PLTS Kapasitas 100 Kw
ANGGARAN
(Rp.)
Mindiptana
Kombut
NO
PROVINSI/
KABUPATEN/KOTA
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Kec Simanggaris
PROGRAM/KEGIATAN
VOLUME
3
Pembangunan BTS
4
1 Titik
5
2,000,000,000
6
01
Pembangunan BTS
1 Titik
2,000,000,000
01
kel Nunukan
Selatan
Pembangunan BTS
2 Titik
38,000,000,000
4,000,000,000
01
Pembangunan BTS
2 Titik
4,000,000,000
01
Pembangunan BTS
2 Titik
4,000,000,000
01
Kec Bahau
Hulu: Apau ping,
long Berini
Pembangunan BTS
7 Titik
14,000,000,000
01
Kec Pujungan:
Long Aran, long
Paliaran,Long
Jelet, Long
Pua,Setarap,
Long Masahan,
Long Ketaman
Pembangunan BTS
4 Titik
8,000,000,000
01
Kec Kayan
Selatan: Long
Payau, long
Bena,Long
Lame, Long
Belaka Pitau
Pembangunan BTS
1 Titik
2,000,000,000
01
Kec Malinau
Selatan Hilir :
Setulang
Pembangunan BTS
1 Titik
2,000,000,000
01
Kec Malinau
Utara Timur :
Salap
Malinau
12,000,000,000
12,000,000,000
Pembangunan BTS
12,000,000,000
12,000,000,000
Papua
Page 51
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
5.
808,262,790,000
13,091,920,000
13,091,920,000
4,581,870,000
3,573,450,000
2,083,640,000
2,852,960,000
04
04
04
04
Sekolah Dasar
SMP
SMA
SMK
27,274,240,000
27,274,240,000
6,818,980,000
5,819,700,000
6,544,620,000
8,090,940,000
04
04
04
04
04
04
04
Pendidikan
Pendidikan
Pendidikan
Pendidikan
Riau
Rokan Hilir
1. Program
2. Program
3. Program
4. Program
Pendidikan
Pendidikan
Pendidikan
Pendidikan
Sekolah Dasar
SMP
SMA
SMK
76,760,950,000
19,476,650,000
7,777,040,000
5,044,990,000
6,654,620,000
1. Program
2. Program
3. Program
4. Program
Pendidikan
Pendidikan
Pendidikan
Pendidikan
Sekolah Dasar
SMP
SMA
SMK
38,205,120,000
15,409,390,000
9,244,740,000
6,288,450,000
7,262,540,000
04
04
04
04
1. Program
2. Program
3. Program
4. Program
Pendidikan
Pendidikan
Pendidikan
Pendidikan
Sekolah Dasar
SMP
SMA
SMK
19,079,180,000
7,185,060,000
4,893,620,000
3,246,540,000
3,753,960,000
04
04
04
04
1. Program
2. Program
3. Program
4. Program
Pendidikan
Pendidikan
Pendidikan
Pendidikan
Sekolah Dasar
SMP
SMA
SMK
94,017,240,000
15,076,770,000
4,566,090,000
4,568,910,000
2,450,190,000
3,491,580,000
04
04
04
04
Indragiri Hilir
Pelalawan
Kepulauan Riau
Karimun
Bintan
20,059,360,000
Page 52
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
1. Program
2. Program
3. Program
4. Program
Pendidikan
Pendidikan
Pendidikan
Pendidikan
3
Sekolah Dasar
SMP
SMA
SMK
1. Program
2. Program
3. Program
4. Program
Pendidikan
Pendidikan
Pendidikan
Pendidikan
1. Program
2. Program
3. Program
4. Program
1. Program
2. Program
3. Program
4. Program
VOLUME
4
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
5
9,261,150,000
3,965,580,000
2,588,700,000
4,243,930,000
6
04
04
04
04
Sekolah Dasar
SMP
SMA
SMK
16,309,990,000
4,826,880,000
3,991,480,000
3,328,220,000
4,163,410,000
04
04
04
04
Pendidikan
Pendidikan
Pendidikan
Pendidikan
Sekolah Dasar
SMP
SMA
SMK
16,156,230,000
5,333,120,000
4,102,760,000
3,373,620,000
3,346,730,000
04
04
04
04
Pendidikan
Pendidikan
Pendidikan
Pendidikan
Sekolah Dasar
SMP
SMA
SMK
26,414,890,000
5,183,430,000
6,811,290,000
6,254,260,000
8,165,910,000
04
04
04
04
04
04
04
04
Natuna
Anambas
Batam
Pendidikan
Pendidikan
Pendidikan
Pendidikan
Sekolah Dasar
SMP
SMA
SMK
164,075,020,000
28,436,560,000
6,442,240,000
7,816,600,000
6,862,660,000
7,315,060,000
1. Program
2. Program
3. Program
4. Program
Pendidikan
Pendidikan
Pendidikan
Pendidikan
Sekolah Dasar
SMP
SMA
SMK
21,792,010,000
6,457,990,000
6,075,020,000
4,505,810,000
4,753,190,000
04
04
04
04
1. Program
2. Program
3. Program
4. Program
Pendidikan
Pendidikan
Pendidikan
Pendidikan
Sekolah Dasar
SMP
SMA
SMK
21,786,160,000
5,942,280,000
5,218,090,000
5,399,870,000
5,225,920,000
04
04
04
04
Belu
Alor
25,864,820,000
Page 53
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
1. Program
2. Program
3. Program
4. Program
Pendidikan
Pendidikan
Pendidikan
Pendidikan
3
Sekolah Dasar
SMP
SMA
SMK
1. Program
2. Program
3. Program
4. Program
Pendidikan
Pendidikan
Pendidikan
Pendidikan
1. Program
2. Program
3. Program
4. Program
1. Program
2. Program
3. Program
4. Program
VOLUME
4
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
5
7,926,200,000
6,586,830,000
3,862,010,000
7,489,780,000
6
04
04
04
04
Sekolah Dasar
SMP
SMA
SMK
21,149,070,000
7,990,610,000
5,002,300,000
3,510,190,000
4,645,970,000
04
04
04
04
Pendidikan
Pendidikan
Pendidikan
Pendidikan
Sekolah Dasar
SMP
SMA
SMK
23,130,560,000
7,539,830,000
5,915,250,000
5,153,980,000
4,521,500,000
04
04
04
04
Pendidikan
Pendidikan
Pendidikan
Pendidikan
Sekolah Dasar
SMP
SMA
SMK
21,915,840,000
8,704,450,000
5,504,800,000
3,261,970,000
4,444,620,000
04
04
04
04
04
04
04
04
Rote Ndao
Malaka
Sabu Raijua
Kalimantan Barat
Sambas
1. Program
2. Program
3. Program
4. Program
Pendidikan
Pendidikan
Pendidikan
Pendidikan
Sekolah Dasar
SMP
SMA
SMK
113,592,790,000
33,566,920,000
8,917,340,000
7,290,910,000
4,579,470,000
12,779,200,000
1. Program
2. Program
3. Program
4. Program
Pendidikan
Pendidikan
Pendidikan
Pendidikan
Sekolah Dasar
SMP
SMA
SMK
26,265,040,000
7,641,250,000
6,895,840,000
6,118,260,000
5,609,690,000
04
04
04
04
1. Program
2. Program
3. Program
4. Program
Pendidikan
Pendidikan
Pendidikan
Pendidikan
Sekolah Dasar
SMP
SMA
SMK
28,217,230,000
9,732,940,000
6,806,420,000
4,855,040,000
6,822,830,000
04
04
04
04
Sintang
Sanggau
Kapuas Hulu
5,368,660,000
Page 54
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
1. Program
2. Program
3. Program
4. Program
Pendidikan
Pendidikan
Pendidikan
Pendidikan
3
Sekolah Dasar
SMP
SMA
SMK
1. Program
2. Program
3. Program
4. Program
Pendidikan
Pendidikan
Pendidikan
Pendidikan
Sekolah Dasar
SMP
SMA
SMK
20,174,940,000
5,685,550,000
5,691,430,000
4,586,320,000
4,211,640,000
04
04
04
04
1. Program
2. Program
3. Program
4. Program
Pendidikan
Pendidikan
Pendidikan
Pendidikan
Sekolah Dasar
SMP
SMA
SMK
16,464,810,000
16,464,810,000
5,073,800,000
4,562,530,000
2,918,060,000
3,910,420,000
04
04
04
04
1. Program
2. Program
3. Program
4. Program
Pendidikan
Pendidikan
Pendidikan
Pendidikan
Sekolah Dasar
SMP
SMA
SMK
42,475,410,000
20,995,510,000
8,623,330,000
5,756,850,000
2,777,600,000
3,837,730,000
04
04
04
04
1. Program
2. Program
3. Program
4. Program
Pendidikan
Pendidikan
Pendidikan
Pendidikan
Sekolah Dasar
SMP
SMA
SMK
21,479,900,000
6,076,510,000
5,665,620,000
4,289,770,000
5,448,000,000
04
04
04
04
1. Program
2. Program
3. Program
4. Program
Pendidikan
Pendidikan
Pendidikan
Pendidikan
Sekolah Dasar
SMP
SMA
SMK
73,527,900,000
25,068,340,000
10,426,000,000
6,631,980,000
3,504,070,000
4,506,290,000
04
04
04
04
1. Program
2. Program
3. Program
4. Program
Pendidikan
Pendidikan
Pendidikan
Pendidikan
Sekolah Dasar
SMP
SMA
SMK
30,077,880,000
7,951,240,000
7,810,550,000
6,192,780,000
8,123,310,000
04
04
04
04
5,368,660,000
-
Bengkayang
Kalimantan Utara
Nunukan
Sulawesi Utara
Kepulauan Talaud
Kepulauan Sangihe
Maluku
Maluku Tenggara Barat
Page 55
04
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
Kepulauan Aru
1. Program
2. Program
3. Program
4. Program
Pendidikan
Pendidikan
Pendidikan
Pendidikan
Sekolah Dasar
SMP
SMA
SMK
18,381,680,000
5,982,550,000
5,590,290,000
2,829,850,000
3,978,990,000
04
04
04
04
1. Program
2. Program
3. Program
4. Program
Pendidikan
Pendidikan
Pendidikan
Pendidikan
Sekolah Dasar
SMP
SMA
SMK
18,785,860,000
18,785,860,000
7,127,560,000
4,812,330,000
2,971,890,000
3,874,080,000
04
04
04
04
1. Program
2. Program
3. Program
4. Program
Pendidikan
Pendidikan
Pendidikan
Pendidikan
Sekolah Dasar
SMP
SMA
SMK
143,830,630,000
17,697,400,000
5,075,800,000
4,597,930,000
3,479,550,000
4,544,120,000
04
04
04
04
1. Program
2. Program
3. Program
4. Program
Pendidikan
Pendidikan
Pendidikan
Pendidikan
Sekolah Dasar
SMP
SMA
SMK
15,527,930,000
5,640,900,000
3,997,050,000
2,451,110,000
3,438,870,000
04
04
04
04
1. Program
2. Program
3. Program
4. Program
Pendidikan
Pendidikan
Pendidikan
Pendidikan
Sekolah Dasar
SMP
SMA
SMK
21,734,500,000
9,611,570,000
4,913,360,000
3,045,750,000
4,163,820,000
04
04
04
04
1. Program
2. Program
3. Program
4. Program
Pendidikan
Pendidikan
Pendidikan
Pendidikan
Sekolah Dasar
SMP
SMA
SMK
36,227,460,000
11,778,440,000
9,533,520,000
6,668,740,000
8,246,760,000
04
04
04
04
34,246,460,000
11,241,750,000
9,656,710,000
5,640,380,000
04
04
04
Maluku Utara
Morotai
Papua
Jayapura
Keerom
Supiori
Merauke
Pegunungan Bintang
Page 56
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
SUMBER
PEMBIAYAAN
5
7,707,620,000
6
04
1. Program
2. Program
3. Program
4. Program
Pendidikan
Pendidikan
Pendidikan
Pendidikan
Sekolah Dasar
SMP
SMA
SMK
18,396,880,000
5,951,450,000
5,642,700,000
2,529,130,000
4,273,600,000
04
04
04
04
1. Program
2. Program
3. Program
4. Program
Pendidikan
Pendidikan
Pendidikan
Pendidikan
Sekolah Dasar
SMP
SMA
SMK
24,366,020,000
24,366,020,000
6,825,570,000
6,962,850,000
5,379,360,000
5,198,240,000
04
04
04
04
KEMENTERIAN KESEHATAN
Aceh
Sabang
Program Dana Alokasi Khusus (DAK) Bidang Pelayanan Kesehatan
Dasar
457,812,968,750
6,855,740,000
6,855,740,000
3,434,730,000
04
2,169,030,000
04
1,251,980,000
04
8,384,930,000
8,384,930,000
4,035,920,000
04
2,381,860,000
04
1,967,150,000
04
26,535,402,000
3,911,482,000
3,911,482,000
03
1,600,000,000
1,600,000,000
03
Papua Barat
Raja Ampat
6.
ANGGARAN
(Rp.)
Sumatera Utara
Serdang Berdagai
Program Dana Alokasi Khusus (DAK) Bidang Pelayanan Kesehatan
Dasar
Riau
Rokan Hilir
Bengkalis
Indragiri Hilir
8,921,460,000
Page 57
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
Kepulauan
PROGRAM/KEGIATAN
VOLUME
3
Program Dana Alokasi Khusus (DAK) Bidang Pelayanan Kesehatan
Dasar
SUMBER
PEMBIAYAAN
5
3,974,650,000
6
04
3,302,780,000
04
1,644,030,000
04
4,450,000,000
4,450,000,000
04
7,652,460,000
3,833,740,000
04
2,617,490,000
04
1,201,230,000
04
58,315,980,000
12,038,280,000
3,469,340,000
04
2,977,110,000
04
1,473,830,000
04
4,118,000,000
03
9,632,920,000
4,054,210,000
04
3,843,210,000
04
1,735,500,000
04
13,769,980,000
3,800,450,000
04
2,830,240,000
04
2,489,290,000
04
Meranti
Tugas Pembantuan BUK
Pelalawan
Program Dana Alokasi Khusus (DAK) Bidang Pelayanan Kesehatan
Dasar
Kepulauan Riau
Natuna
Program Dana Alokasi Khusus (DAK) Bidang Pelayanan Kesehatan
Dasar
Kepulauan
ANGGARAN
(Rp.)
Anambas
Program Dana Alokasi Khusus (DAK) Bidang Pelayanan Kesehatan
Dasar
Batam
Program Dana Alokasi Khusus (DAK) Bidang Pelayanan Kesehatan
Dasar
Page 58
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
5
4,650,000,000
6
03
9,875,150,000
3,696,550,000
04
1,682,820,000
04
1,295,780,000
04
3,200,000,000
03
12,999,650,000
3,496,470,000
04
2,676,250,000
04
2,076,930,000
04
Karimun
Program Dana Alokasi Khusus (DAK) Bidang Pelayanan Kesehatan
Dasar
4,750,000,000
03
70,607,530,000
15,584,460,000
4,656,460,000
04
3,714,540,000
04
2,413,460,000
04
4,800,000,000
03
13,630,050,000
4,257,870,000
04
2,898,820,000
04
2,023,360,000
04
4,450,000,000
03
14,797,320,000
5,507,800,000
04
Kalimantan Barat
Sambas
Program Dana Alokasi Khusus (DAK) Bidang Pelayanan Kesehatan
Dasar
Bengkayang
Program Dana Alokasi Khusus (DAK) Bidang Pelayanan Kesehatan
Dasar
Sanggau
Program Dana Alokasi Khusus (DAK) Bidang Pelayanan Kesehatan
Dasar
Page 59
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Program Dana Alokasi Khusus (DAK) Bidang Pelayanan Kesehatan
Rujukan
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
5
1,623,160,000
6
04
2,816,360,000
04
4,850,000,000
03
14,727,680,000
5,213,970,000
04
3,243,690,000
04
1,570,020,000
04
4,700,000,000
03
11,868,020,000
6,833,280,000
04
2,858,910,000
04
2,175,830,000
04
5,636,880,000
5,636,880,000
3,014,380,000
04
2,622,500,000
03
16,844,746,750
5,571,266,000
3,310,536,000
03
2,260,730,000
04
Sintang
Program Dana Alokasi Khusus (DAK) Bidang Pelayanan Kesehatan
Dasar
Kapuas Hulu
Program Dana Alokasi Khusus (DAK) Bidang Pelayanan Kesehatan
Dasar
Kalimantan Timur
Mahakam Ulu
Program Dana Alokasi Khusus (DAK) Bidang Pelayanan
Kefarmasian
Tugas Pembantuan BUK
Kalimantan Utara
Malinau
Tugas Pembantuan BUK (Pengadaan Mobil Pusling double Gardan 1 unit) 7 Unit
Nunukan
11,273,480,750
Page 60
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Pulau Sapi,
Malinau
Sebrang,
Setulang, Long
Loreh, Long
Berang, Sungai
Boh, Data Dian
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
3
Program Dana Alokasi Khusus (DAK) Pelayanan Sosial Dasar:
Pembangunan Rumah dinas Paramedis Pusk. Sei Taiwan (Kopel)
Pembangunan Rumah dinas Paramedis Pusk. Laprie (Kopel)
Pembangunan Rumah dinas Paramedis Pusk. Lumbis Ogong (Kopel)
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
624,520,250
624,520,250
624,520,250
04
04
04
Sebatik
Sebatik Utara
Lumbis Ogong
1,345,000,000
860,000,000
992,000,000
4,500,000,000
04
04
03
03
Simanggaris
Sebatik
1,702,920,000
04
74,979,930,000
11,835,340,000
4,589,500,000
04
1,399,910,000
04
1,895,930,000
04
3,950,000,000
03
12,131,500,000
4,649,340,000
04
2,077,410,000
04
1,404,750,000
04
4,000,000,000
03
12,371,730,000
3,724,240,000
04
1,937,240,000
04
2,042,750,000
04
Belu
Program Dana Alokasi Khusus (DAK) Bidang Pelayanan Kesehatan
Dasar
Page 61
Sedadap,
Seimenggaris,
Setabu, Lapri,
Sungai Taiwan,
Long Bawan, Aji
Kuning
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
5
4,667,500,000
6
03
8,245,900,000
3,631,700,000
04
2,557,980,000
04
2,056,220,000
04
11,866,740,000
3,644,810,000
04
2,775,010,000
04
1,446,920,000
04
4,000,000,000
03
9,269,870,000
4,002,180,000
04
3,365,440,000
04
1,902,250,000
04
9,258,850,000
4,600,030,000
04
2,621,400,000
04
2,037,420,000
04
25,725,890,000
11,577,470,000
5,484,270,000
04
3,716,900,000
04
2,376,300,000
04
Rote Ndao
Program Dana Alokasi Khusus (DAK) Bidang Pelayanan Kesehatan
Dasar
Alor
Program Dana Alokasi Khusus (DAK) Bidang Pelayanan Kesehatan
Dasar
Sabu Raijua
Program Dana Alokasi Khusus (DAK) Bidang Pelayanan Kesehatan
Dasar
Sulawesi Utara
Kepulauan Sangihe
Program Dana Alokasi Khusus (DAK) Bidang Pelayanan Kesehatan
Dasar
Page 62
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
Kepulauan Talaud
14,148,420,000
5,824,270,000
04
5,805,790,000
04
2,518,360,000
04
35,521,060,000
8,558,220,000
6,036,330,000
04
2,521,890,000
04
14,914,020,000
4,999,750,000
04
3,863,600,000
04
2,050,670,000
04
4,000,000,000
03
12,048,820,000
5,802,110,000
04
3,404,150,000
04
2,027,920,000
04
Maluku
Maluku Barat Daya
Program Dana Alokasi Khusus (DAK) Bidang Pelayanan Kesehatan
Dasar
Program Dana Alokasi Khusus (DAK) Bidang Pelayanan
Kefarmasian
Maluku Tenggara Barat
Program Dana Alokasi Khusus (DAK) Bidang Pelayanan Kesehatan
Dasar
Kepulauan Aru
Program Dana Alokasi Khusus (DAK) Bidang Pelayanan Kesehatan
Dasar
814,640,000
03
9,653,830,000
9,653,830,000
4,171,230,000
04
3,427,630,000
04
2,054,970,000
04
Maluku Utara
Morotai
Program Dana Alokasi Khusus (DAK) Bidang Pelayanan Kesehatan
Dasar
Page 63
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
5
104,838,720,000
20,927,450,000
11,210,590,000
04
6,200,040,000
04
3,516,820,000
04
16,723,040,000
6,141,270,000
04
3,933,920,000
04
2,147,850,000
04
4,500,000,000
03
30,895,550,000
17,970,670,000
04
6,580,300,000
04
6,344,580,000
04
12,264,900,000
6,412,740,000
04
3,874,020,000
04
1,978,140,000
04
7,823,910,000
4,885,920,000
04
2,937,990,000
04
16,203,870,000
5,883,760,000
04
Papua
Merauke
Program Dana Alokasi Khusus (DAK) Bidang Pelayanan Kesehatan
Dasar
Boven Digoel
Program Dana Alokasi Khusus (DAK) Bidang Pelayanan Kesehatan
Dasar
Pegunungan Bintang
Program Dana Alokasi Khusus (DAK) Bidang Pelayanan Kesehatan
Dasar
Keerom
Program Dana Alokasi Khusus (DAK) Bidang Pelayanan Kesehatan
Dasar
Jayapura
Program Dana Alokasi Khusus (DAK) Bidang Pelayanan Kesehatan
Dasar
Program Dana Alokasi Khusus (DAK) Bidang Pelayanan
Kefarmasian
Supiori
Program Dana Alokasi Khusus (DAK) Bidang Pelayanan Kesehatan
Dasar
Page 64
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Program Dana Alokasi Khusus (DAK) Bidang Pelayanan Kesehatan
Rujukan
SUMBER
PEMBIAYAAN
5
4,327,130,000
6
04
1,992,980,000
04
4,000,000,000
03
13,912,330,000
13,912,330,000
5,861,420,000
04
4,574,670,000
04
3,476,240,000
04
67,606,850,000
1,972,010,000
1,972,010,000
1,972,010,000
04
1,910,060,000
1,910,060,000
1,910,060,000
04
1 Unit
3,824,050,000
1,913,820,000
1,913,820,000
04
1 Unit
1,910,230,000
1,910,230,000
04
1 Unit
4,000,000,000
4,000,000,000
4,000,000,000
04
1 Unit
8,279,930,000
1,922,570,000
1,922,570,000
04
1 Unit
2,031,500,000
2,031,500,000
04
Papua Barat
Raja Ampat
Program Dana Alokasi Khusus (DAK) Bidang Pelayanan Kesehatan
Dasar
7.
ANGGARAN
(Rp.)
KEMENTERIAN PERDAGANGAN
Aceh
Sabang
Peningkatan Sarana Distribusi Perdagangan (Pasar)
1 Unit
Sumatera Utara
Serdang Bedagai
Peningkatan Sarana Distribusi Perdagangan (Pasar)
Riau
Indragiri Hilir
Peningkatan Sarana Distribusi Perdagangan (Pasar)
Pelalawan
Peningkatan Sarana Distribusi Perdagangan (Pasar)
Kepulauan Riau
Kepulauan Anambas
Pembangunan Gudang Non SRG
Kalimantan Barat
Sambas
Sanggau
Sintang
2,232,180,000
Page 65
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
3
Peningkatan Sarana Distribusi Perdagangan (Pasar)
4
1 Unit
5
2,232,180,000
6
04
1 Unit
2,093,680,000
2,093,680,000
04
1 Unit
1,650,000,000
04
Kec. Sebatik
Barat
1 Unit
3,300,000,000
04
Kec. Krayan
selatan
1 Unit
1,908,700,000
04 (DAK
tambahan 2015)
1 Unit
2,061,800,000
2,061,800,000
1 Unit
10,027,050,000
1,912,710,000
1,912,710,000
04
1 Unit
2,175,150,000
2,175,150,000
04
1 Unit
2,128,690,000
2,128,690,000
04
1 Unit
1,979,070,000
1,979,070,000
04
1 Unit
1,831,430,000
1,831,430,000
04
1 Unit
4,841,170,000
2,403,620,000
2,403,620,000
04
1 Unit
2,437,550,000
2,437,550,000
04
Bengkayang
Kalimantan Utara
Nunukan
8,920,500,000
6,858,700,000
Malinau
Alor
Peningkatan Sarana Distribusi Perdagangan (Pasar)
Rote Ndao
Peningkatan Sarana Distribusi Perdagangan (Pasar)
Belu
Sulawesi Utara
Kepulauan Talaud
Kepulauan Sangihe
Maluku
Maluku Barat Daya
7,589,440,000
2,676,900,000
Page 66
04 (DAK
tambahan 2015)
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
SUMBER
PEMBIAYAAN
3
Peningkatan Sarana Distribusi Perdagangan (Pasar)
4
1 Unit
5
2,676,900,000
6
04
1 Unit
2,559,070,000
2,559,070,000
04
Kepulauan Aru
Maluku Utara
Morotai
Peningkatan Sarana Distribusi Perdagangan (Pasar)
1 Unit
2,358,440,000
2,358,440,000
2,358,440,000
04
1 Unit
10,931,780,000
3,169,420,000
3,169,420,000
04
1 Unit
2,821,190,000
2,821,190,000
04
1 Unit
2,761,660,000
2,761,660,000
04
1 Unit
2,179,510,000
2,179,510,000
04
1 Unit
2,952,420,000
2,952,420,000
2,952,420,000
1 Unit
Papua
Supiori
Boven Digoel
Peningkatan Sarana Distribusi Perdagangan (Pasar)
Keerom
Peningkatan Sarana Distribusi Perdagangan (Pasar)
Jayapura
Papua Barat
Raja Ampat
322,023,443,001
4,770,930,000
4,770,930,000
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
2,353,470,000
2,353,470,000
8.
ANGGARAN
(Rp.)
Jalan
Jalan
Jalan
Jalan
Jalan
dsn
dsn
dsn
dsn
dsn
1
1
1
1
1
Riau
Rokan Hilir
Paket
Paket
Paket
Paket
Paket
5,697,680,000
5,697,680,000
1,178,000,000
1,400,000,000
984,000,000
1,186,680,000
949,000,000
33,988,580,000
5,709,300,000
Page 67
04
04
04
04
04
Perbaungan
Perbaungan
Sei Rampah
Sei Rampah
Sei Rampah
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Infrastruktur Kawasan Perbatasan (Transportasi Desa)
5
5,709,300,000
6
04
1 Paket
11,865,170,000
5,986,170,000
04
1 Unit
5,879,000,000
04
1 Unit
6,062,360,000
4,662,360,000
1,400,000,000
03
Kepulauan Meranti
Infrastruktur Kawasan Perbatasan (Transportasi Desa)
Pembangunan Gedung Kantor BPP Kabupaten
SUMBER
PEMBIAYAAN
4
1 Paket
Indragiri Hilir
Pembangunan Jalan Desa KW.Gaung , Desa Guntung, Desa
Kateman
ANGGARAN
(Rp.)
Pelalawan
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Kateman
Tembelabar
5,626,250,000
5,626,250,000
4,725,500,000
4,725,500,000
1 Paket
35,073,968,001
5,814,370,001
1,523,124,369
04
1 Paket
1,454,410,680
04
Pulau Tiga
1 Paket
1 Paket
1,553,398,058
485,436,893
04
04
Pulau Tiga
Pulau Tiga
1
1
1
1
Paket
Paket
Paket
Paket
20,194,175
1,165,049
407,708,738
368,932,039
04
04
04
04
1 Paket
1 Unit
1 Unit
12,380,760,000
4,544,760,000
1,000,000,000
6,836,000,000
04
03
04
1 Paket
1 Paket
1 Paket
5,495,330,000
1,599,994,500
1,408,685,600
1,501,649,900
04
04
04
Bulang
Bulang
Belakang
Padang
1 Paket
985,000,000
04
Belakang
Padang
Kepulauan Anambas
Batam
Page 68
Bunguran Barat
Jemaja
Jemaja
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
Bintan
Pembangunan/pengaspalan jalan kp.melayu desa gunung kijang
1 Paket
5,841,028,000
2,789,028,000
04
1 Paket
2,552,000,000
04
1 Unit
Karimun
Realisasinya masih 0%, masalahnya masih dalam proses lelang
Pembangunan Kantor Desa
1 Paket
1 Unit
Kalimantan Barat
Sambas
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Bintan timur
500,000,000
03
Desa Kelong
5,542,480,000
4,892,480,000
04
Moro
650,000,000
03
Desa Pangke
Barat, Kec.
Meral Barat
04
03
1 Paket
1 Unit
35,506,860,000
7,061,670,000
5,561,670,000
1,500,000,000
1 Paket
1 Paket
1 Paket
4 Unit
6,200,000,000
700,000,000
1,000,000,000
3,000,000,000
1,500,000,000
04
04
04
03
1 Paket
7,003,540,000
1,700,000,000
04
Tayan Hilir
1 Paket
1,600,000,000
04
Bonti
1 Paket
1,235,000,000
04
Kapuas
1 Paket
1,213,540,000
04
Kapuas
Bengkayang
Sanggau
Page 69
Desa Temajuk
(Kec. Paloh)
Jagoi
Jagoi
Siding
Desa Sekida,
Semunying
(Kec.Jagoi
Babang) dan
Desa Siding,
Tangguh (Kec.
Siding)
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Kapuas
Desa Palapasang
Kec. Entikong
dan Desa
Melenggang Kec.
Sekayam
3
Pengadaan moda transportasi pedesaan Desa Kambong
Pembangunan Rumah Singgah/Guest House
4
1 Paket
2 Unit
5
365,000,000
890,000,000
6
04
03
1 Paket
6,868,360,000
1,208,360,000
04
1 Paket
1,500,000,000
04
Ketungau
Tengah
1 Paket
975,000,000
04
Ketungau
Tengah
1 Paket
2,500,000,000
04
1 Paket
685,000,000
04
1 Paket
1 Paket
8,373,290,000
5,173,290,000
1,000,000,000
04
04
2 Unit
2,200,000,000
03
Empanang
1 Unit
12,812,450,000
12,812,450,000
5,833,450,000
6,979,000,000
04
04
Long Bagun
1 Paket
18,189,605,000
12,479,625,000
2,585,000,000
04
Lumbis
1 Paket
2,922,625,000
04
Lumbis
1 Unit
1 Unit
1 Unit
5,472,000,000
500,000,000
500,000,000
04
03
03
Sebatik
Sebatik Tengah
1 Unit
500,000,000
03
Sebatik Barat
Sintang
Kapuas Hulu
Page 70
Tempunak
Batang Lupar
Batang Lupar
Sembakung
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
1
Malinau
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
5
5,709,980,000
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
1.410 x 5
(PxL)
2,583,909,000
04
Desa Sembuak
warod (Malinau
Utara)
2000 x 6
(PxL)
3,126,071,000
04
1 Unit
53,827,280,000
210,000,000
210,000,000
03
1 Paket
3 Unit
13,112,570,000
5,820,570,000
1,500,000,000
04
03
1 Unit
5,792,000,000
04
1 Paket
3 Unit
6,691,630,000
5,591,630,000
1,100,000,000
04
03
1 Paket
2 Unit
12,517,640,000
5,766,640,000
1,100,000,000
03
5,651,000,000
04
Belu
1 Paket
1 Unit
7,851,670,000
6,351,670,000
1,500,000,000
04
03
1 Paket
5,940,640,000
5,940,640,000
04
Rote Ndao
Page 71
Desa
Netemnanu
Utara, Nifu dan
Nunuama
(Kec.Amfoang
Timur)
Desa Lakmanen
dan Maumede
Malaka Tengah
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
1 Paket
1 Unit
5
7,503,130,000
6,003,130,000
1,500,000,000
1 Paket
3 Unit
15,238,890,000
7,541,460,000
5,541,460,000
2,000,000,000
04
03
1 Paket
2 Unit
7,697,430,000
6,597,430,000
1,100,000,000
04
03
1 Paket
21,847,750,000
6,764,100,000
6,764,100,000
04
1 Paket
1 Unit
8,034,710,000
7,034,710,000
1,000,000,000
04
03
1 Paket
7,048,940,000
7,048,940,000
04
1 Paket
6,946,080,000
6,946,080,000
6,946,080,000
04
1 Unit
67,439,920,000
764,700,000
764,700,000
03
Skouw Distrik
Muara Tami
1 Paket
1 Paket
20,517,820,000
1,401,820,000
4,500,000,000
04
04
Ulilin
1 Paket
4,000,000,000
04
Alor
Sulawesi Utara
Kepulauan Sangihe
Kepulauan Talaud
Maluku
Maluku Barat Daya
Infrastruktur Kawasan Perbatasan (Transportasi Desa)
Maluku Tenggara Barat
Kepulauan Aru
Maluku Utara
Morotai
Papua
Papua
Perbaikan Tower Pemantau/Mercusuar di PPLB
Merauke
Page 72
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
04
03
Kelurahan
Apengsembeka,
Soataloara,
Sawang
(Kec.Tahuna)
Miangas
Saumlaki
NO
PROVINSI/
KABUPATEN/KOTA
SUMBER
PEMBIAYAAN
VOLUME
4
1 Unit
1 Unit
5
9,266,000,000
1,350,000,000
6
04
03
1 Paket
8,589,820,000
8,589,820,000
04
1 Paket
14,865,790,000
14,865,790,000
04
1 Paket
8,125,780,000
8,125,780,000
04
1 Paket
1 Unit
7,662,190,000
6,662,190,000
1,000,000,000
04
03
1 Paket
6,913,820,000
6,913,820,000
04
1 Paket
10,683,450,000
10,683,450,000
8,183,450,000
04
1 Unit
2,500,000,000
03
5 Unit
4 Unit
828,806,896,550
64,329,600,000
5,194,100,000
59,135,500,000
01
01
5 Unit
4 Unit
1 Paket
277,251,600,000
5,194,100,000
59,135,500,000
212,922,000,000
01
01
01
Perundingan RI-Malaysia
3 Kali
688,813,000
688,813,000
01
Boven Digoel
Pegunungan Bintang
Keerom
Jayapura
Supiori
Papua Barat
Raja Ampat
ANGGARAN
(Rp.)
PROGRAM/KEGIATAN
KEMENTERIAN PERTAHANAN
Kodam VI/MLW
Pengadaan PPTA (Fix Wing)
Pengadaan PPTA (Fix Wing KL)
Kodam XII/TPR
Lain-Lain
Kepulauan Riau
14,350,000,000
Page 73
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Kampung
Baidup, Distrik
Ulilin
Distrik Muara
Tami
Ayau dan
Kepulauan
Ayau
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
1
Natuna
Pembangunan
Pembangunan
Pembangunan
Pembangunan
1
1
1
1
Paket
Paket
Paket
Paket
Riau
Rokan Hilir
ANGGARAN
(Rp.)
5
14,350,000,000
4,150,000,000
4,150,000,000
4,150,000,000
1,900,000,000
4,150,000,000
4,150,000,000
4,150,000,000
8,300,000,000
8,300,000,000
4,150,000,000
4,150,000,000
Maluku
Maluku Barat daya
Kalimantan Barat
Kalimantan Barat
SUMBER
PEMBIAYAAN
6
01
01
01
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Pulau Laut
Pulau Subi
Pulau Serasan
Bunguran Timur
Pasir Limau
Kapas
Wetar
Wetar
Pembangunan JIPP
Pembangunan Jalan Administrasi
80 Km
59 Km
256,849,461,950
157,774,869,000
90,805,680,000
66,969,189,000
7 Unit
14 Unit
14 Unit
2 Giat
1 Giat
1 Giat
1 Paket
14,737,628,350
420,000,000
490,000,000
811,720,000
900,000,000
180,000,000
413,000,000
3,036,335,000
01
01
01
01
01
01
01
1 Paket
411,588,000
01
Kec. Sajingan
Besar
1 Paket
506,131,450
01
Kec. Sajingan
Besar
1 Unit
663,500,000
01
Kec. Sajingan
Besar
2 Unit
663,500,000
01
Kec. Sajingan
Besar
1 Unit
195,200,000
01
Kec. Sajingan
Besar
1 Unit
195,200,000
01
Kec. Sajingan
Besar
Sambas
Page 74
01
01
Kec. Sajingan
Besar
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
SUMBER
PEMBIAYAAN
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Kec. Paloh
Kec. Paloh
Kec. Paloh
Kec. Paloh
Palu
Palu
Palu
Palu
4
1 Paket
1 Paket
1 Unit
1 Unit
1 Paket
1 Paket
1 Unit
1 Unit
5
2,912,907,000
506,131,450
663,500,000
195,200,000
208,884,000
506,131,450
663,500,000
195,200,000
6
01
01
01
01
01
01
01
01
10 Unit
20 Unit
20 Unit
2 Giat
1 Giat
1 Giat
1 Giat
1 Paket
1 Paket
1 Paket
1 Paket
1 Paket
1 Paket
1 Paket
1 Paket
1 Paket
1 Unit
1 Unit
1 Unit
1 Unit
1 Unit
1 Unit
1 Unit
1 Unit
1 Paket
32,157,901,500
600,000,000
700,000,000
115,960,000
900,000,000
150,000,000
180,000,000
413,000,000
3,178,277,000
3,159,763,000
3,036,335,000
311,472,000
506,131,450
506,131,450
506,131,450
506,131,450
506,131,450
663,500,000
663,500,000
663,500,000
663,500,000
195,200,000
195,200,000
195,200,000
195,200,000
3,036,335,000
01
01
01
01
01
01
01
01
01
01
01
01
01
01
01
01
01
01
01
01
01
01
01
01
01
Kec. Entikong
Kec. Entikong
Kec. Entikong
Kec. Entikong
Kec. Entikong
Kec. Entikong
Kec. Entikong
Kec. Entikong
Kec. Entikong
Kec. Entikong
Kec. Entikong
Kec. Entikong
Kec. Entikong
Kec. Entikong
Kec. Entikong
Kec. Entikong
Kec. Entikong
Kec. Sekayam
1
1
1
1
1
1
1
2,912,907,000
92,700,000
40,788,000
540,750,000
506,131,450
506,131,450
506,131,450
01
01
01
01
01
01
01
Kec. Sekayam
Kec. Sekayam
Kec. Sekayam
Kec. Sekayam
Kec. Sekayam
Kec. Sekayam
Kec. Sekayam
Pos
Pos
Pos
Pos
Pos
Pos
Pos
Pos
3
Sei Daun/Camar Bulan (Pengadaan Pos Pamtas)
Sei Daun/Camar Bulan (Pengadaan Alsatri)
Sei Daun/Camar Bulan (Pembangunan PLTS )
Sei Daun/Camar Bulan (Pengadaan Penjernih Air )
Temanjuk (Pengadaan Pos Pamtas)
Temanjuk (Pengadaan Alsatri)
Temanjuk (Pembangunan PLTS)
Temanjuk (Pengadaan Penjernih Air)
ANGGARAN
(Rp.)
Sanggau
Page 75
Paket
Paket
Paket
Paket
Paket
Paket
Paket
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Pos Sei Beruang (Pengadaan Alsatri)
Pos Kout Balai Karangan (Pengadaan Alsatri)
Pos Guinai Banir/Tapang Piuntang (Pembangunan PLTS)
Pos Sei Seira (Pembangunan PLTS)
Pos Segumun (Pembangunan PLTS)
Pos Sei Beruang (Pembangunan PLTS)
Pos Sei Tekam (Pembangunan PLTS)
Pos Guinai Banir/Tapang Piuntang (Pengadaan Penjernih Air)
Pos
Pos
Pos
Pos
4
1 Paket
1 Paket
1 Unit
1 Unit
1 Unit
1 Unit
1 Unit
1 Unit
1
1
1
1
Unit
Unit
Unit
Unit
Sintang
5
506,131,450
506,131,450
663,500,000
663,500,000
663,500,000
663,500,000
663,500,000
195,200,000
6
01
01
01
01
01
01
01
01
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Kec. Sekayam
Kec. Sekayam
Kec. Sekayam
Kec. Sekayam
Kec. Sekayam
Kec. Sekayam
Kec. Sekayam
Kec. Sekayam
195,200,000
195,200,000
195,200,000
195,200,000
01
01
01
01
Kec. Sekayam
Kec. Sekayam
Kec. Sekayam
Kec. Sekayam
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
9 Unit
18 Unit
18 Unit
1 Giat
1 Paket
20,574,394,700
540,000,000
630,000,000
104,364,000
450,000,000
3,283,191,000
01
01
01
01
01
1 Paket
3,159,763,000
01
Kec. Ketungau
Tengah
1 Paket
506,131,450
01
Kec. Ketungau
Tengah
Ketungau
Tengah
1 Paket
506,131,450
01
Kec. Ketungau
Tengah
1 Unit
663,500,000
01
Kec. Ketungau
Tengah
1 Unit
663,500,000
01
Kec. Ketungau
Tengah
1 Unit
195,200,000
01
Kec. Ketungau
Tengah
1 Unit
195,200,000
01
Kec. Ketungau
Tengah
1 Paket
3,159,763,000
01
Kec. Ketungau
Hulu
1 Paket
695,250,000
01
Kec. Ketungau
Hulu
1 Paket
84,975,000
01
Kec. Ketungau
Hulu
1 Paket
278,100,000
01
Kec. Ketungau
Hulu
Page 76
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Kec. Ketungau
Hulu
3
Pos Sepanbadak (Pengadaan Alsatri)
4
1 Paket
5
506,131,450
6
01
1 Paket
506,131,450
01
Kec. Ketungau
Hulu
1 Paket
506,131,450
01
Kec. Ketungau
Hulu
1 Paket
506,131,450
01
Kec. Ketungau
Hulu
1 Unit
663,500,000
01
Kec. Ketungau
Hulu
1 Unit
663,500,000
01
Kec. Ketungau
Hulu
1 Unit
663,500,000
01
Kec. Ketungau
Hulu
1 Unit
663,500,000
01
Kec. Ketungau
Hulu
1 Unit
195,200,000
01
Kec. Ketungau
Hulu
1 Unit
195,200,000
01
Kec. Ketungau
Hulu
1 Unit
195,200,000
01
Kec. Ketungau
Hulu
1 Unit
195,200,000
01
Kec. Ketungau
Hulu
9,831,836,450
420,000,000
490,000,000
811,720,000
900,000,000
180,000,000
3,036,335,000
695,250,000
506,131,450
663,500,000
663,500,000
195,200,000
195,200,000
216,300,000
01
01
01
01
01
01
01
01
01
01
01
01
01
663,500,000
01
Bengkayang
Pengadaan PPTA (MR)
Pengadaan Alat Transportasi
Pengadaan Alat Komunikasi
Bela Negara
Sosialisasi Batas Darat
Gunung Anggas (Pembangunan Pos Pamtas)
Pos Siding (Renovasi Pas Pamtas)
Pos Siding (Pengadaan Alsatri)
Pos Gunung Anggas (Pembangunan PLTS)
Pos Siding (Pembangunan PLTS)
Pos Gunung Anggas (Pengadaan Penjernih Air)
Pos Siding Anggas (Pengadaan Penjernih Air)
Pos Semunying (Renovasi Pos Pamtas)
7 Unit
14 Unit
14 Unit
2 Giat
1 Giat
1 Paket
1 Paket
1 Paket
1 Unit
1 Unit
1 Unit
1 Unit
1 Unit
1 Unit
Page 77
Kec. Siding
Kec. Siding
Kec. Siding
Kec. Siding
Kec. Siding
Kec. Siding
Kec. Siding
Kec. Jagoi
Babang
Kec. Jagoi
Babang
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Pos Semunying (Pengadaan Penjernih Air)
4
1 Unit
Kapuas Hulu
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
5
195,200,000
6
01
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Kec. Jagoi
Babang
12 Unit
24 Unit
24 Unit
2 Giat
1 Paket
21,772,831,950
720,000,000
840,000,000
139,152,000
230,000,000
3,036,335,000
01
01
01
01
01
1 Paket
3,036,335,000
01
Kec. Puring
Kencana
1 Paket
883,122,000
01
Kec. Puring
Kencana
1 Paket
40,788,000
01
Kec. Puring
Kencana
1 Paket
736,038,000
01
Kec. Puring
Kencana
1 Paket
506,131,450
01
Kec. Puring
Kencana
1 Paket
506,131,450
01
Kec. Puring
Kencana
1 Paket
506,131,450
01
Kec. Puring
Kencana
1 Paket
506,131,450
01
Kec. Puring
Kencana
1 Unit
663,500,000
01
Kec. Puring
Kencana
1 Unit
663,500,000
01
Kec. Puring
Kencana
1 Unit
663,500,000
01
Kec. Puring
Kencana
1 Unit
663,500,000
01
Kec. Puring
Kencana
1 Unit
663,500,000
01
Kec. Puring
Kencana
1 Unit
195,200,000
01
Kec. Puring
Kencana
1 Unit
195,200,000
01
Kec. Puring
Kencana
1 Unit
195,200,000
01
Kec. Puring
Kencana
Page 78
Puring Kencana
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Kec. Puring
Kencana
3
Pos Langau (Pengadaan Penjernih Air)
4
1 Unit
5
195,200,000
6
01
1 Unit
195,200,000
01
Kec. Puring
Kencana
1 Paket
275,628,000
01
Kec. Nanga
Badau
1 Paket
257,088,000
01
Kec. Nanga
Badau
1 Paket
506,131,450
01
Kec. Nanga
Badau
1 Paket
506,131,450
01
Kec. Nanga
Badau
1 Paket
506,131,450
01
Kec. Nanga
Badau
1 Unit
663,500,000
01
Kec. Nanga
Badau
1 Unit
663,500,000
01
Kec. Nanga
Badau
1 Unit
195,200,000
01
Kec. Nanga
Badau
1 Unit
195,200,000
01
Kec. Nanga
Badau
1 Paket
506,131,450
01
Kec. Batang
Lupar
1 Paket
506,131,450
01
Kec. Batang
Lupar
1 Paket
506,131,450
01
Kec. Batang
Lupar
1 Paket
506,131,450
01
Kec. Batang
Lupar
1 Unit
2 Unit
2 Unit
1 Giat
1 Paket
1 Paket
1 Paket
1 Paket
1 Paket
1 Paket
35,783,424,500
35,783,424,500
60,000,000
37,000,000
11,596,000,000
450,000,000
3,519,469,000
3,421,080,000
3,421,080,000
2,968,573,000
3,508,314,000
501,681,450
01
01
01
01
01
01
01
01
01
01
Kalimantan Timur
Mahakam Hulu
Page 79
Kec. Long
Kec. Long
Kec. Long
Kec. Long
Kec. Long
Kec. Long
Apari
Apari
Apari
Apari
Apari
Apari
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
Pos
Pos
Pos
Pos
Pos
Pos
Pos
Pos
Pos
Pos
Pos
Pos
Pos
Pos
VOLUME
3
Sungai Marutai (Pengadaan Alsatri)
Persinggahan (Pengadaan Alsatri)
Danum Bayong (Pengadaan Alsatri)
Sungai Cini (Pengadaan Alsatri)
Sungai Cini (Pembangunan PLTS)
Danum Bayong (Pembangunan PLTS)
Lasantuyan (Pembangunan PLTS)
Sungai Marutai (Pembangunan PLTS)
Persinggahan (Pembangunan PLTS)
Sungai Cini (Pengadaan Penjernih Air)
Danum Bayong (Pengadaan Penjernih Air)
Lasantuyan (Pengadaan Perjernih Air)
Sungai Marutai (pengadaan Penjernih Air)
Persinggahan (Pengadaan Penjernih Air)
4
1 Paket
1 Paket
1 Paket
1 Paket
1 Unit
1 Unit
1 Unit
1 Unit
1 Unit
1 Unit
1 Unit
1 Unit
1 Unit
1 Unit
Kalimantan Utara
Nunukan
ANGGARAN
(Rp.)
5
501,681,450
501,681,450
501,681,450
501,681,450
663,500,000
663,500,000
663,500,000
663,500,000
663,500,000
195,200,250
195,200,250
195,200,250
195,200,250
195,200,250
73,780,125,400
45,550,219,500
Pembangunan JIPP
Pembangunan Jalan Administrasi
Pengadaan PTTA (MR)
Pengadaan Alat Transportasi
Pengadaan Alat Komunikasi
Renovasi Pos Sei Kaca
Renovasi Pos Simanggaris
Pengadaan Alsatri Pos Sei Kaca
Pengadaan Alsatri Pos Simanggaris
Pembangunan PLTS Pos Sei Kaca
Pembangunan PLTS Pos Simanggaris
Pengadaan Penjernih Air Pos Sei Kaca
Pengadaan Penjernih Air Pos Simanggaris
Renovasi Pos Simantobol
Renovasi Pos Labang
Renovasi Pos Simantipal
Pengadaan Alsatri Pos Simantobol
Pengadaan Alsatri Pos Labang
Pengadaan Alsatri Pos Simantipal
Pembangunan PLTS Pos Labang
Pembangunan PLTS Pos Simantipal
Pembangunan PLTS Pos Simantobol
Pengadaan Penjernih Air Pos Labang
Pengadaan Penjernih Air Pos Simantipal
Pengadaan Penjernih Air Pos Simantobol
Renovasi Rumdis
22,701,420,000
5,675,355,000
1,320,000,000
1,540,000,000
255,112,000
1,634,950,000
1,759,995,000
501,681,450
506,131,450
663,500,000
663,500,000
195,200,250
195,200,250
161,476,000
1,604,637,000
1,596,016,000
506,131,450
501,681,450
506,131,450
663,500,000
663,500,000
663,500,000
195,200,250
195,200,250
195,200,250
486,000,000
Page 80
SUMBER
PEMBIAYAAN
6
01
01
01
01
01
01
01
01
01
01
01
01
01
01
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Kec. Long Apari
Kec. Long Apari
Kec. Long Apari
Kec. Long Apari
Kec. Long Apari
Kec. Long Apari
Kec. Long Apari
Kec. Long Apari
Kec. Long Apari
Kec. Long Apari
Kec. Long Apari
Kec. Long Apari
Kec. Long Apari
Kec. Long Apari
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
Malinau
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
28,229,905,900
360,000,000
420,000,000
69,576,000
3,422,406,000
501,681,450
663,500,000
195,200,250
3,455,959,000
3,392,504,000
500,836,150
501,681,450
663,500,000
663,500,000
195,200,250
195,200,250
3,367,907,000
3,455,959,000
501,681,450
501,681,450
663,500,000
663,500,000
195,200,250
195,200,250
1,601,300,000
506,131,450
663,500,000
195,200,250
518,400,000
1 Paket
33,379,338,850
5,311,763,900
3,445,301,000
APBN
Kec. Pulau
Batek
1 Paket
501,631,450
APBN
Kec. Pulau
Batek
1 Unit
663,500,000
APBN
Kec. Pulau
Batek
1 Unit
195,200,000
APBN
Kec. Pulau
Batek
4,500,000
APBN
Kec. Amfoang
Timur
1 Paket
Page 81
NO
PROVINSI/
KABUPATEN/KOTA
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Kec. Amfoang
Timur
PROGRAM/KEGIATAN
VOLUME
3
Pengadaan Alsatri Pos Natukan
4
1 Paket
5
501,631,450
6
APBN
1 Paket
1 Unit
1 Unit
1 Paket
15,061,097,800
1,521,940,000
663,500,000
195,200,000
3,092,533,000
APBN
APBN
APBN
APBN
Kec. Naibenu
Kec. Naibenu
Kec. Naibenu
Kec.
Kefamenanu
1 Paket
2,347,983,000
APBN
Kec.
Kefamenanu
1 Paket
506,131,450
APBN
Kec.
Kefamenanu
1 Unit
663,500,000
APBN
Kec.
Kefamenanu
APBN
Kec.
Kefamenanu
1 Unit
195,200,000
1 Paket
506,131,450
1 Paket
506,131,450
1 Paket
1 Paket
1 Paket
1 Paket
1 Unit
1 Unit
1 Paket
1,521,940,000
663,500,000
195,200,000
1,121,876,000
663,500,000
195,200,000
501,631,450
APBN
APBN
APBN
APBN
APBN
APBN
APBN
Kec. Mutis
Kec. Mutis
Kec. Mutis
Bikomi Nilulat
Bikomi Nilulat
Bikomi Nilulat
Kec. Bijael
Sunan
Pos
Pos
Pos
Pos
1 Paket
1 Unit
1 Unit
1 Paket
12,500,345,700
403,760,000
663,500,000
195,200,000
692,160,000
APBN
APBN
APBN
APBN
Kec. Lasiolat
Kec. Lasiolat
Kec. Lasiolat
Kec. Tasifeto
Timur
1 Paket
873,369,000
APBN
Kec. Tasifeto
Timur
1 Paket
279,748,000
APBN
Kec. Tasifeto
Timur
1 Unit
663,500,000
APBN
Kec. Tasifeto
Timur
Belu
Page 82
Kec. Bikomi
Nilulat
Kec. Bikomi
Nilulat
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Kec. Tasifeto
Timur
3
Pos Fatubesi Atas (Pembangunan PLTS)
4
1 Unit
5
663,500,000
6
APBN
1 Unit
663,500,000
APBN
Kec. Tasifeto
Timur
1 Unit
195,200,000
APBN
Kec. Tasifeto
Timur
1 Unit
195,200,000
APBN
Kec. Tasifeto
Timur
1 Unit
195,200,000
APBN
Kec. Tasifeto
Timur
1 Paket
4,500,000
APBN
Kec. Tasifeto
Timur
1 Paket
1 Unit
1 Unit
1 Paket
1 Unit
1 Unit
1 Paket
1 Paket
1 Unit
1 Unit
403,760,000
663,500,000
195,200,000
138,947,000
663,500,000
195,200,000
506,131,450
1,158,044,000
663,500,450
195,200,000
APBN
APBN
APBN
APBN
APBN
APBN
APBN
APBN
APBN
APBN
Kec. Raihat
Kec. Raihat
Kec. Raihat
1 Paket
1 Paket
1 Paket
506,131,450
506,131,450
4,500,000
APBN
APBN
APBN
Kec. Atambua
Kec. Atambua
Kec. Nanaet
Duabesi
1 Paket
506,131,450
APBN
Kec. Nanaet
Duabesi
1 Paket
506,131,450
APBN
Kec. Lamaknen
Selatan
1 Paket
506,131,450
506,131,450
APBN
Kec. Kobalima
Timur
1 Paket
8,300,000,000
4,150,000,000
4,150,000,000
Tabukan Utara
1 Paket
4,150,000,000
4,150,000,000
Nanusa
Malaka
Sulawesi Utara
Kepulauan Tahuna
Pembangunan Posal Marore
Kepulauan Sangihe
Pembangunan Posal Miangas
Page 83
Kec. Miomabar
Kec. Miomabar
Kec. Miomabar
Kec. Miomabar
Kec. Atambua
Kec. Atambua
Kec. Atambua
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
Maluku
Maluku Barat Daya
8,300,000,000
8,300,000,000
4,150,000,000
4,150,000,000
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Wetar
Wetar
1 Paket
1 Paket
1 Unit
1 Unit
43,344,532,850
5,878,311,450
4,460,292,000
506,131,450
686,500,000
225,388,000
APBN
APBN
APBN
APBN
Kec. Oksibil
Kec. Oksibil
Kec. Oksibil
Kec. Oksibil
1 Paket
1 Unit
1 Unit
1 Paket
1 Paket
1 Paket
1 Paket
1 Paket
1 Paket
1 Unit
1 Unit
1 Unit
1 Unit
1 Unit
1 Unit
19,126,568,350
579,746,000
686,500,000
225,388,000
4,460,292,000
4,460,292,000
4,460,292,000
506,131,450
506,131,450
506,131,450
686,500,000
686,500,000
686,500,000
225,388,000
225,388,000
225,388,000
APBN
APBN
APBN
APBN
APBN
APBN
APBN
APBN
APBN
APBN
APBN
APBN
APBN
APBN
APBN
Ke. Kombut
Ke. Kombut
Ke. Kombut
Kec. Waropoko
Kec. Waropoko
Kec. Waropoko
Kec. Waropoko
Kec. Waropoko
Kec. Waropoko
Kec. Waropoko
Kec. Waropoko
Kec. Waropoko
Kec. Waropoko
Kec. Waropoko
Kec. Waropoko
Pos
Pos
Pos
Pos
Bupul
Bupul
Bupul
Bupul
1 Paket
1 Paket
1 Unit
1 Unit
1,997,765,450
579,746,000
506,131,450
686,500,000
225,388,000
APBN
APBN
APBN
APBN
Pos
Pos
Pos
Pos
Pos
1 Paket
1 Paket
1 Unit
1 Unit
1 Paket
16,341,887,600
2,406,086,000
506,131,450
686,500,000
225,388,000
520,789,000
APBN
APBN
APBN
APBN
APBN
Pos
Pos
Pos
Pos
Oksibil
Oksibil
Oksibil
Oksibil
Boven Digoel
Merauke
Merauke
Merauke
Merauke
Merauke
Keerom
Page 84
Kec. Bupul
Kec. Bupul
Kec. Bupul
Kec. Bupul
Kec. Skamto
Kec. Skamto
Kec. Skamto
Kec. Skamto
Kec. Arso Timur
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Wembi Keerom (Renovasi Pos)
4
1 Paket
5
149,062,000
6
APBN
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Kec. Arso Timur
1 Paket
506,131,450
APBN
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
1 Paket
506,131,450
APBN
1 Unit
686,500,000
APBN
1 Unit
686,500,000
APBN
1 Unit
225,388,000
APBN
1 Unit
225,388,000
APBN
1 Paket
1 Paket
1 Unit
1 Unit
1 Paket
1 Paket
1 Paket
1 Paket
1 Paket
1 Paket
1 Paket
1 Unit
1 Unit
1 Unit
1 Unit
1 Unit
1 Unit
1 Unit
1 Unit
149,062,000
506,131,450
686,500,000
225,388,000
540,441,000
540,441,000
151,410,000
540,441,000
506,131,450
506,131,450
506,131,450
686,500,000
686,500,000
686,500,000
686,500,000
225,388,000
225,388,000
225,388,000
225,388,000
506,131,450
01
01
01
01
01
01
01
01
01
01
01
01
01
01
01
01
01
01
01
01
Kec. Arso
Kec. Arso
Kec. Arso
Kec. Arso
Kec. Waris
Kec. Waris
Kec. Waris
Kec. Waris
Kec. Waris
Kec. Waris
Kec. Waris
Kec. Waris
Kec. Waris
Kec. Waris
Kec. Waris
Kec. Waris
Kec. Waris
Kec. Waris
Kec. Waris
Kec. Senggi
7,197,188,000
405,504,000
385,524,000
385,524,000
Kepulauan Meranti
Rakor dengan Instansi Terkait di Bandara, Pelabuhan dan Tempat
lainnya
Page 85
19,980,000
19,980,000
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
Kepulauan Riau
Batam
Rakor PLB (DN dan LN)
5,136,000,000
5,136,000,000
5,136,000,000
271,508,000
50,940,000
50,940,000
Kalimantan Barat
Kapuas Hulu
Sanggau
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
79,690,000
79,690,000
Sambas
Rakor PLB (DN dan LN)
140,878,000
140,878,000
447,789,000
447,789,000
447,789,000
Kalimantan Utara
Nunukan
Sulawesi Utara
Kepulauan Sangihe
91,090,000
91,090,000
91,090,000
700,508,000
261,040,000
261,040,000
439,468,000
439,468,000
144,789,000
144,789,000
144,789,000
Belu
Papua
Merauke
1 Kawasan
Sumatera Utara
Serdang Berdagai
261,514,607,000
200,000,000
200,000,000
200,000,000
1,273,000,000
1,273,000,000
Page 86
Sukakarya
NO
PROVINSI/
KABUPATEN/KOTA
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
PROGRAM/KEGIATAN
VOLUME
3
Dukungan Perlindungan Perkebunan/Pengendalian OPT tanaman
karet
4
100 Ha
5
123,000,000
1 Kawasan
200,000,000
Tanjung
Beringin
1 Kawasan
200,000,000
Teluk Mengkudu
3 Klp
750,000,000
150 Ha
6,427,353,000
2,826,272,000
1,123,950,000
1 Dok
164,072,000
200 Ha
173,250,000
1 Kawasan
200,000,000
1 Kawasan
200,000,000
2 Klp
625,000,000
1 Klp
340,000,000
100 Ha
969,755,000
247,600,000
150 Org
104,930,000
5 Ha
Indragiri Hilir
Page 87
77,500,000
100 Ha
139,725,000
1 Kawasan
1 Kawasan
200,000,000
200,000,000
Gaung
Enok
Kepulauan Meranti
Peningkatan Produksi dan Produktivitas Tanaman Rempah dan
Penyegar/Indikasi geografis tan. Rempah penyegar
1 Keg
1,618,826,000
40,700,000
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Peningkatan Produksi dan Produktivitas Tanaman
Tahunan/Peremajaan karet
4
150 Ha
1 Keg
ANGGARAN
(Rp.)
5
1,121,750,000
SUMBER
PEMBIAYAAN
6
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
56,376,000
1 Kawasan
200,000,000
Rangsang Barat
1 Kawasan
200,000,000
Rangsang Pesisir
1 Kawasan
1 Kawasan
400,000,000
200,000,000
200,000,000
Bukit Batu
Bantan
1 Kawasan
612,500,000
200,000,000
Sungai Sembilan
1 Kawasan
1 Klp
200,000,000
212,500,000
Bengkalis
Dumai
Kepulauan Riau
Bintan
Peningkatan Produksi dan Produktivitas Tanaman
Tahunan/Peremajaan karet
100 Ha
1 Kawasan
Karimun
Peningkatan Produksi dan Produktivitas Tanaman
Tahunan/Peremajaan karet
100 Ha
1 Kawasan
Natuna
Peningkatan Produksi dan Produktivitas Tanaman
Tahunan/Perluasan karet di wil perbatasan
200 Ha
Batam
Dumai Barat
4,204,359,000
1,003,075,000
803,075,000
200,000,000
Bintan Timur
1,003,775,000
803,775,000
200,000,000
Tebing
1,597,509,000
1,597,509,000
400,000,000
200,000,000
1 Kawasan
1 Kawasan
200,000,000
Bulang Lintang
1 Kawasan
200,000,000
200,000,000
Palmatak
Anambas
Kawasan Mandiri Pangan
Page 88
Belakang
Padang
NO
1
PROVINSI/
KABUPATEN/KOTA
2
Kalimantan Barat
Kalimantan Barat
PROGRAM/KEGIATAN
VOLUME
2 Kab
5
129,301,832,000
178,750,000
178,750,000
2 KT
24,530,100,000
198,940,000
Bengkayang
Dukungan Perlindungan Perkebunan/SLPHT karet
ANGGARAN
(Rp.)
100 Ha
627,000,000
24 OB
10,800,000
100 Org
84,200,000
4 OT
SUMBER
PEMBIAYAAN
6
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Kec. Monterado
dan Kec.
Samalantan
30,500,000
200 Ha
1,306,500,000
100 Ha
188,000,000
100 Ha
747,750,000
1 Kawasan
1 Kawasan
200,000,000
200,000,000
250,000,000
Jagoi Babang
Siding
Desa : Tirta
Kencana
Kecamatan :
Bengkayang
400,000,000
Desa : Bumi
Emas
Kecamatan :
Bengkayang
2 Klp
200,000,000
1 Klp
299,850,000
2 Klp
325,000,000
1 Klp
340,000,000
1 Klp
300,000,000
Page 89
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Peningkatan Produksi Pakan Ternak/Penguatan Pakan Sapi
Potong Penggemukan (Persilangan)
4
2 Klp
Tanaman Pangan
PENGEMBANGAN OPTIMASI LAHAN
PENGEMBANGAN JARINGAN IRIGASI
2000 Ha
5000 Ha
Kapuas Hulu
Peningkatan Produksi dan Produktivitas Tanaman
Tahunan/Pengawalan revitalisasi perkebunan
1 Dok
400 Ha
1 Keg
1 Kawasan
1 Kawasan
1 Klp
1 Klp
Tanaman Pangan
Pengembangan optimasi lahan
Pengembangan jaringan irigasi
1000 Ha
450 Ha
Sambas
ANGGARAN
(Rp.)
5
534,710,000
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
9,636,850,000
2,400,000,000
6,250,000,000
13,952,453,000
34,127,000
2,556,200,000
42,276,000
200,000,000
200,000,000
Embalon Hulu
Putussibau
Utara
300,000,000
Kecamatan :
Hulu Gurung
299,850,000
340,000,000
3,155,000,000
1,200,000,000
5,625,000,000
200 Ha
55,040,485,000
2,759,500,000
168 Org
206,100,000
1 Dok
150 Ha
986,250,000
200 Ha
483,250,000
1 Dok
157,702,000
Page 90
SUMBER
PEMBIAYAAN
14,955,000
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
6
3
Dukungan Perlindungan Perkebunan/Pengendalian OPT kelapa
4
100 Ha
100 Ha
134,700,000
10 Ha
1 Kawasan
1 Kawasan
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
95,783,000
21,525,000
200,000,000
200,000,000
99,500,000
Sajingan Besar
Galing
Kec. Paloh dan
Sajingan Besar
250,000,000
Desa : Twi
Mentibar
Kecamatan :
Selakau
800,000,000
Desa : Twi
Mentibar
Kecamatan :
Selakau
200,000,000
Desa : Teluk
Pandan
Kecamatan :
Galing
300,000,000
Desa : Lubuk
Dagang
Kecamatan :
Sambas
2 Klp
200,000,000
1 Klp
299,850,000
1 Klp
75,000,000
1 Klp
340,000,000
1 Klp
300,000,000
2 Klp
534,710,000
8 Desa
3200 Ha
24000 Ha
Page 91
3,256,460,000
9,285,200,000
3,840,000,000
30,000,000,000
Kec. Paloh
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
Sanggau
Dukungan Penanganan Pasca Panen dan Pembinaan
Usaha/Penanganan pascapanen tanaman karet
2 KT
100 Ha
24 OB
26,280,664,000
143,000,000
10,800,000
100 Ha
1,394,500,000
100 Org
86,200,000
1 Dok
200 Ha
1 KT
180 Org
2 Ha
Kec. Kapuas
627,500,000
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
27,964,000
1,311,500,000
90,450,000
155,955,000
37,970,000
134,700,000
Kec. Kapuas
Lingku Liku dan
Kec. Balai Desa
Kebadu
200,000,000
200,000,000
250,000,000
Entikong
Sekayam
Desa : Embala
Kecamatan :
Parindu
200,000,000
Kecamatan :
Bonti, Parindu
300,000,000
Kecamatan :
Balai, Kembayan
1 Kawasan
1 Kawasan
1 Klp
5 Desa
3000 Ha
6000 Ha
Page 92
100,000,000
2,101,625,000
7,808,500,000
3,600,000,000
7,500,000,000
Entikong
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
1
Sintang
2 Kt
ANGGARAN
(Rp.)
5
9,319,380,000
198,940,000
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Kec. Kelam
Permai dan Kec.
Binjai Hulu
100 Ha
1 Dok
150 Ha
986,750,000
1 Kawasan
200,000,000
250,000,000
Ketungau Hulu
Kecamatan :
Ketungau Hilir
250,000,000
Kecamatan :
Ketungau Hilir
134,700,000
SUMBER
PEMBIAYAAN
1 Klp
299,850,000
1 Klp
340,000,000
Tanaman Pangan
Pengembangan optimasi lahan
Pengembangan jaringan irigasi
Kec. Sungai
Tebelian
30,140,000
1200 Ha
4000 Ha
189,000,000
1,440,000,000
5,000,000,000
1 Dok
7,822,962,000
4,652,962,000
22,556,000
75 Ha
708,750,000
100 Ha
989,990,000
2 KT
133,586,000
Kec. Sekolaq
Darat dan Kec.
Mook Manaar
Bulatan
1 Kawasan
1 Kawasan
1 Klp
200,000,000
200,000,000
312,500,000
Long Hubung
Long Bagun
Kalimantan Timur
Kutai Barat
Peningkatan Produksi dan Produktivitas Tanaman
Tahunan/Pengawalan revitalisasi perkebunan
45 ekor
Tanaman Pangan
1,328,800,000
756,780,000
Page 93
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
Berau
Pengembangan optimasi lahan
Pengembangan jaringan irigasi
1600 Ha
1000 Ha
3,170,000,000
1,920,000,000
1,250,000,000
100 Ha
9,381,309,000
2,841,125,000
986,125,000
Kalimantan Utara
Malinau
Peningkatan Produksi dan Produktivitas Tanaman
Tahunan/Perluasan karet di wil perbatasan
Kawasan Mandiri Pangan
Peningkatan Produksi Ternak/ Pengembangan Budidaya Sapi
Potong
Tanaman Pangan
Pengembangan optimasi lahan
Pengembangan jaringan irigasi
1 Kawasan
1 Klp
200,000,000
305,000,000
500 Ha
300 Ha
600,000,000
375,000,000
375,000,000
Nunukan
Peningkatan Produksi dan Produktivitas Tanaman
Tahunan/Pengawalan revitalisasi perkebunan
1 Dok
1 Kawasan
1 Kawasan
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Malinau Utara
6,540,184,000
30,822,000
200,000,000
200,000,000
105,900,000
Sebatik
Lumbis
1,872,455,000
Sebatik
567,207,000
Sebatik
166,800,000
Krayan dan
Sebatik
200,000,000
Nunukan
Selatan
Page 94
1 Klp
330,000,000
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
3
Peningkatan Kuantitas dan Kualitas Benih dan Bibit/Penguatan
Sapi/Betina Bunting
4
2 Klp
5
100,000,000
2 Klp
625,000,000
Tanaman Pangan
PENGEMBANGAN OPTIMASI LAHAN
PENGEMBANGAN JARINGAN IRIGASI
400 Ha
1000 Ha
2 Kab
Alor
Peningkatan Produksi dan Produktivitas Tanaman Rempah dan
Penyegar/Intensifikasi kakao
150 Ha
SUMBER
PEMBIAYAAN
6
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
412,000,000
480,000,000
1,250,000,000
38,529,372,000
196,000,000
196,000,000
3,606,147,000
1,024,550,000
24 Ob
10,800,000
300 Ha
772,250,000
150 Ha
332,940,000
250 Org
160,410,000
1 Kawasan
1 Kawasan
200,000,000
200,000,000
250,000,000
Alor Selatan
Alor Timur
Kecamatan :
Teluk Mutiara,
Alor Tengah
Utara, Alor Barat
Laut, Lembur,
Alor Barat Daya
200,000,000
Kecamatan :
Alor Timur Laut,
Alor Barat Laut
Tanaman Pangan
455,197,000
Belu
13,068,860,000
277,150,000
142,715,000
Page 95
NO
PROVINSI/
KABUPATEN/KOTA
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Kobalima Timur
PROGRAM/KEGIATAN
VOLUME
4
1 Kawasan
5
200,000,000
1 Kawasan
200,000,000
608,500,000
Tasifeto Timur
Atambua
900,000,000
Atambua
153,000,000
Raihat dan
Lamaknen Utara
262 Ha
300,000,000
13 Desa
5,280,495,000
Tanaman Pangan
Pengembangan optimasi lahan
Pengembangan jaringan irigasi
1000 Ha
5000 H
3,182,000,000
1,200,000,000
625,000,000
1 Unit
7,822,240,000
161,890,000
Kupang
Dukungan Perlindungan Perkebunan/Operasional laboratorium
lapangan
Tasifeto Barat,
Lamaknen
Selatan, Tasifeto
Timur
Kec. Oebobo
1 Kawasan
200,000,000
Amfoang Timur
1 Kawasan
200,000,000
400,000,000
Amfoang Utara
Kecamatan :
Kupang Tengah,
Kupang Timur,
Amfoang Utara
800,000,000
Masyarakat (Non
Kelompok)
400,000,000
Kecamatan :
Kupang Tengah,
Kupang Timur
1,716,680,000
Amfoang Timur
4 Desa
Tanaman Pangan
3,943,670,000
Page 96
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
Rote Ndao
Peningkatan Produksi dan Produktivitas Tanaman
Tahunan/Peremajaan kelapa
100 Ha
6,412,750,000
261,200,000
100 Ha
248,550,000
400,000,000
360,000,000
312,500,000
Tanaman Pangan
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Kecamtan : Rote
Timur, Rote
Barat Laut,
Pantai Baru,
Lobalain
4,830,500,000
5,321,575,000
491,200,000
1 Klp
1 Klp
Tanaman Pangan
PENGEMBANGAN OPTIMASI LAHAN
PENGEMBANGAN JARINGAN IRIGASI
1 Kawasan
1000 Ha
1000 Ha
Malaka
111,375,000
Kec. Muimafo
Timur, Kec.
Insana, Kec.
Insana Barat,
Kec. Insana
Tengah, Kec.
Insana Utara,
Kec. Insana
Fafinesu dan
Kec. Muimafo
Tengah
200,000,000
200,000,000
312,500,000
Bikomi Nilulat
Bikomi Utara
75,000,000
1,481,500,000
1,200,000,000
1,250,000,000
2,101,800,000
Page 97
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Peningkatan Produksi dan Produktivitas Tanaman
Tahunan/Peremajaan kelapa
4
200 Ha
ANGGARAN
(Rp.)
5
491,800,000
300 Ha
1000 Ha
360,000,000
1,250,000,000
1 KT
1,513,045,000
877,170,000
173,650,000
1 Klp
303,520,000
1 Kawasan
1 Kawasan
200,000,000
200,000,000
1 Kawasan
1 Kawasan
150 Ha
635,875,000
200,000,000
200,000,000
235,875,000
Sulawesi Utara
Kepulauan Sangihe
Kepulauan Talaud
Maluku
Maluku Tenggara Barat
SUMBER
PEMBIAYAAN
6
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Kec. Tahuna
Timur
Kendahe
Nusa Tabukan
Beo
Lirung
Kec. Beo dan
Kec. Ehsang
4,271,750,000
1,849,250,000
611,750,000
1 Kawasan
1 Kawasan
30 Ekor
200,000,000
200,000,000
675,000,000
1 Klp
162,500,000
1 Kawasan
712,500,000
200,000,000
1 Kawasan
200,000,000
1 Klp
312,500,000
Kepulauan Aru
Page 98
1 Kawasan
1 Klp
1,710,000,000
200,000,000
330,000,000
Selaru
Nirunmas
Aru Selatan
Timur
Aru Tengah
Timur
Letti
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
3
Peningkatan Kuantitas dan Kualitas Benih dan Bibit/Pembibitan
Kambing/Domba
4
2 Klp
5
380,000,000
1 Paket
800,000,000
300 Ha
2,854,636,000
2,854,636,000
795,061,000
150 Ha
406,100,000
200 Ha
313,075,000
25 Ekor
625,000,000
1 Klp
315,400,000
1 Kawasan
1 Kawasan
200,000,000
200,000,000
Maluku Utara
Morotai
SUMBER
PEMBIAYAAN
6
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Kec. Morotai
Selatan dan Kec.
Morotai Selatan
Timur
Morotai Jaya
Morotai Timur
50 Ha
53,911,289,000
37,900,325,000
6,661,500,000
8 Org
187,200,000
3 Unit
2,850,000,000
2 Unit
600,000,000
10 Unit
60,000,000
5 Unit
75,000,000
5 Ha
49,175,000
1 Unit
96,200,000
Abepura
20 Ha
65,400,000
Kunik
Page 99
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Kawasan Mandiri Pangan
Kawasan Mandiri Pangan
Pengkajian dan Percepatan Diseminasi Inovasi Teknologi
Pertanian/Pengembangan LL berbasi kelapa melalui
pendampingan teknologi dan kelembagaan di wilayah perbatasan
4
1 Kawasan
1 Kawasan
ANGGARAN
(Rp.)
5
200,000,000
200,000,000
93,700,000
SUMBER
PEMBIAYAAN
6
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Noukenjerai
Sota
Noukenjeri
300,000,000
Kecamatan :
Merauke, Malind
400,000,000
Kecamatan :
Muting, Ulilin
2 Klp
200,000,000
1 Klp
340,000,000
5 Klp
1,555,000,000
1 Klp
285,000,000
20.000 Stek
120,000,000
1 Unit
Tanaman Pangan
Pengembangan optimasi lahan
Pengembangan jaringan irigasi
7700 Ha
2500 Ha
Boven Digoel
425,700,000
10,146,450,000
9,240,000,000
3,750,000,000
985,024,000
22,524,000
1 Kawasan
1 Kawasan
200,000,000
200,000,000
250,000,000
1 Klp
312,500,000
100 Ha
1 Keg
Page 100
2,702,450,000
444,300,000
78,150,000
Waropko
Mindiptana
Kecamatan :
Mandobo
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Pengembangan Pengolahan Hasil Pertanian (Ditjen
PPHP)/Fasilitasi Pemasaran Unit Poktan/Gapoktan
ANGGARAN
(Rp.)
5
200,000,000
400,000,000
Tanaman Pangan
PENGEMBANGAN OPTIMASI LAHAN
PENGEMBANGAN JARINGAN IRIGASI
230,000,000
600,000,000
750,000,000
Keerom
Peningkatan Produksi dan Produktivitas Tanaman
Tahunan/Pengawalan revitalisasi perkebunan
1 Dok
200 Ha
1 Keg
78,150,000
30 Ekor
570,000,000
1 Klp
319,000,000
20.000 Stek
120,000,000
1 Klp
100,000,000
Muara Tami
855,910,000
200,000,000
200,000,000
312,500,000
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Muara Tami
5,264,540,000
12,500,000
1 Kawasan
1 Kawasan
1 Klp
SUMBER
PEMBIAYAAN
Waris
Arso Timur
250,000,000
Arso, Arso
Timur, Skanto
250,000,000
Arso, Arso
Timur, Skanto,
Senggi
800,000,000
Kecamatan :
Towe, Web
Tanaman Pangan
PENGEMBANGAN JARINGAN IRIGASI
746,480,000
450,000,000
300 Ha
Supiori
Kawasan Mandiri Pangan
1 Kawasan
1 Kawasan
Page 101
1,245,000,000
200,000,000
200,000,000
250,000,000
Supiori Selatan
Kep Aruri
Supiori Timur
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Pengembangan Pengolahan Hasil Pertanian (Ditjen
PPHP)/Revitalisasi dan fasilitasi agroindustri perkebunan (kelapa)
Tanaman Pangan
5
350,000,000
SUMBER
PEMBIAYAAN
6
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Supiori Barat
245,000,000
Pegunungan Bintang
Kawasan Mandiri Pangan
Kawasan Mandiri Pangan
Pengembangan Pengolahan Hasil Pertanian (Ditjen
PPHP)/Revitalisasi Penggilingan Padi (RMU)
1 Kawasan
1 Kawasan
770,000,000
200,000,000
200,000,000
250,000,000
Tanaman Pangan
120,000,000
Tanaman Pangan
5,043,950,000
5,043,950,000
Jayapura
Papua Barat
Raja Ampat
Kawasan Mandiri Pangan
Kawasan Mandiri Pangan
Peningkatan Produksi Ternak/Pengembangan Budidaya Sapi
Potong
KEPRI, KALTARA,
KALBAR, NTT, Maluku,
Papua
Belu, TTU, Nunukan,
Sambas, Kepri, Kep. Aru,
Jayapura, Boven Diegoel,
Merauke
ANGGARAN
(Rp.)
1 Kawasan
1 Kawasan
1 Klp
Oksibil
Serambakon
Non Kelompok
690,500,000
690,500,000
200,000,000
200,000,000
290,500,000
Walgeo Selatan
Meos Mansar
1,133,200,000
1,133,200,000
1 Paket
1 Unit
Page 102
Atambua,
Sebatik Barat,
Krayan, Paloh,
Sajingan Besar,
Bintan, PulauPulau Aru,
Muara Tami,
Kombut,
Mindiptana,
Sota, Noukenjeri
251,086,374,000
4,577,696,000
4,577,696,000
1,013,856,000
03
Sukakarya
3,563,840,000
04
Sukakarya
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
Sumatera Utara
Serdang Berdagai
6,095,230,000
6,095,230,000
780,950,000
03
1 Unit
5,314,280,000
04
1 Unit
14,328,240,000
4,924,130,000
4,924,130,000
04
1 Unit
4,890,600,000
4,890,600,000
04
1 Unit
4,513,510,000
4,513,510,000
04
1 Unit
48,211,063,000
3,925,390,000
3,925,390,000
04
03
04
1 Paket
Indragiri Hilir
Kepulauan Meranti
Pembangunan infrastruktur kelautan dan perikanan
Kepulauan Riau
Karimun
Pembangunan infrastruktur kelautan dan perikanan
Bintan
Pengembangan Demfarm Budidaya Ikan
Pembangunan infrastruktur kelautan dan perikanan
1 Paket
1 Unit
9,097,895,000
3,921,055,000
5,176,840,000
1 Paket
15,006,223,000
1,258,855,000
03
1 Paket
921,488,000
03
1 Paket
1 Paket
1 Unit
4,630,080,000
3,000,000,000
5,195,800,000
03
03
04
1 Paket
1 Paket
13,256,080,000
2,517,710,000
1,000,000,000
03
03
1 Paket
500,000,000
03
1 Paket
3,000,000,000
03
1 Unit
6,238,370,000
04
Batam
Natuna
Page 103
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
Kepulauan Anambas
Pembangunan Kapal Penangkap Ikan 10 -20 GT
Pembangunan infrastruktur kelautan dan perikanan
1 Paket
1 Unit
6,925,475,000
1,258,855,000
5,666,620,000
03
04
1 Unit
1 Paket
1 Unit
1 Unit
1 Unit
26,852,041,000
11,510,831,000
2,000,000,000
770,262,000
2,772,278,000
755,841,000
5,212,450,000
03
03
03
03
04
3,330,730,000
3,330,730,000
04
1 Unit
4,858,430,000
4,858,430,000
04
1 Unit
3,157,240,000
3,157,240,000
04
1 Unit
3,994,810,000
3,994,810,000
04
Kalimantan Barat
Sambas
Sanggau
Kapuas Hulu
Sintang
Bengkayang
Kalimantan Utara
Nunukan
Pembangunan infrastruktur kelautan dan perikanan
Pembangunan Kapal Penangkapan Ikan 10 - 20 GT (APBN-P)
Pengembangan / Fasilitasi Lingkungan Sekaya Maritim (APBN-P)
1 Unit
1 Paket
1 Paket
15,980,104,000
10,871,754,000
4,197,730,000
1,103,856,000
4,648,680,000
04
03
03
1 Paket
921,488,000
03
5,108,350,000
5,108,350,000
04
32,101,378,000
5,755,190,000
1,137,000,000
4,618,190,000
03
04
Malinau
Pembangunan infrastruktur kelautan dan perikanan
1 Unit
1 Paket
1 Unit
Alor
6,393,750,000
Page 104
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
3
Pengembangan garam rakyat (APBN-P)
Pembangunan infrastruktur kelautan dan perikanan
4
1 Paket
1 Unit
5
918,000,000
5,475,750,000
6
03
04
1 Paket
1 Unit
3,648,580,000
890,000,000
2,758,580,000
03
04
1 Paket
1 Paket
10,912,138,000
4,645,080,000
921,488,000
03
03
Belu
1 Paket
2,000,000,000
03
1 Unit
3,345,570,000
04
1 Paket
1 Unit
5,391,720,000
674,400,000
4,717,320,000
03
04
1 Unit
10,616,550,000
5,090,630,000
5,090,630,000
04
1 Unit
5,525,920,000
5,525,920,000
04
1 Unit
22,760,730,000
6,547,810,000
6,547,810,000
04
03
03
Rote Ndao
Sulawesi Utara
Kepulauan Talaud
Kepulauan Sangihe
Maluku
Maluku Barat Daya
1 Paket
1 Paket
9,704,930,000
2,157,250,000
100,000,000
1 Paket
1,000,000,000
03
1 Unit
6,447,680,000
04
1 Unit
6,507,990,000
6,507,990,000
04
10,651,143,000
10,651,143,000
Page 105
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
3
Pembangunan Kapal Penangkap Ikan 10 -20 GT
Pembinaan dan Pengembangan Sarana Prasarana Pengolahan
Hasil Perikanan
4
1 Paket
1 Paket
5
1,078,855,000
597,628,000
6
03
03
1 Paket
2,000,000,000
03
1 Paket
1 Unit
810,710,000
6,163,950,000
03
04
1 Unit
44,942,969,000
5,647,210,000
5,647,210,000
04
1 Unit
3,332,590,000
3,332,590,000
04
1 Unit
2,703,710,000
2,703,710,000
04
Papua
Supiori
Boven Digoel
Keerom
Merauke
Pembangunan Kapal Nelayan Tahun 2015 beserta alat tangkap
1 Paket
22,830,429,000
211,771,000
03
1 Paket
3,166,670,000
03
1 Paket
921,488,000
03
1 Paket
960,880,000
03
1 Paket
639,120,000
03
1 Paket
3,899,781,000
03
1 Paket
1 Unit
2,650,219,000
10,380,500,000
03
04
1 Unit
5,290,200,000
5,290,200,000
04
1 Unit
5,138,830,000
5,138,830,000
1 Unit
Pegunungan Bintang
Pembangunan infrastruktur kelautan dan perikanan
Jayapura
Pembangunan infrastruktur kelautan dan perikanan
Papua Barat
Raja Ampat
Pengembangan Demfam budidaya rumput laut
1 Paket
Page 106
13,969,230,000
13,969,230,000
682,130,000
03
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
3
Pengembangan Pusat Pemasaran dan Distribusi Hasil Perikanan
4
1 Paket
5
825,000,000
6
03
1
1
1
1
1
1
1
1
1
1
Paket
Paket
Paket
Paket
Paket
Paket
Paket
Paket
Paket
Paket
161,000,000
125,000,000
150,000,000
204,000,000
100,000,000
78,500,000
125,000,000
75,000,000
200,000,000
250,000,000
03
03
03
03
03
03
03
03
03
03
1 Paket
86,500,000
03
1 Paket
1 Paket
160,000,000
210,000,000
03
03
1 Paket
1 Paket
1 Paket
1 Paket
1 Paket
1 Paket
1 Unit
50,000,000
400,000,000
300,000,000
150,000,000
75,000,000
100,000,000
9,462,100,000
1 Paket
531,150,000,000
20,000,000,000
20,000,000,000
20,000,000,000
Paket
paket
paket
Paket
11,750,000,000
8,000,000,000
1,500,000,000
1,000,000,000
2,500,000,000
3,000,000,000
1 paket
3,750,000,000
1,250,000,000
1,500,000,000
1,000,000,000
1
1
2
1
Kepulauan Anambas
Pengadaan PLTS 5 Kwp
Pembangunan Fasilitas Air Bersih
Pengembangan Potensi Sumber Daya
Page 107
03
03
03
03
03
03
1 Unit
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
1
PROVINSI/
KABUPATEN/KOTA
2
Kalimantan Barat
Sambas
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
2
2
1
1
1
paket
paket
paket
Paket
Paket
5
147,626,000,000
33,540,000,000
2,000,000,000
3,000,000,000
24,540,000,000
3,000,000,000
1,000,000,000
Pembangunan Jembatan
Pembangunan Jalan
Pengembangan Potensi Sumber Daya
Pengadaan PLTS 5 Kwp (APBNP)
Pengadaan PLTS 10 Kwp (APBNP)
Pembangunan Fasilitas Air Bersih (APBNP)
MIT (Media Informasi Televisi) (APBNP)
Alat Peraga (Pendidikan) (APBNP)
1
2
2
5
1
2
1
1
paket
paket
paket
paket
paket
paket
Paket
Paket
22,050,000,000
1,500,000,000
3,000,000,000
2,000,000,000
6,250,000,000
2,300,000,000
3,000,000,000
3,000,000,000
1,000,000,000
3
1
2
1
1
paket
paket
paket
Paket
Paket
13,000,000,000
4,500,000,000
1,500,000,000
3,000,000,000
3,000,000,000
1,000,000,000
Pembangunan Embung
Pengadaan PLTS 5 Kwp (APBNP)
Pembangunan Fasilitas Air Bersih (APBNP)
Pembangunan Jembatan (APBNP)
Pembangunan Jalan (APBNP)
Pembangunan Embung (APBNP)
MIT (Media Informasi Televisi) (APBNP)
Alat Peraga (Pendidikan) (APBNP)
1
5
2
1
1
1
1
1
paket
paket
paket
paket
paket
paket
Paket
Paket
50,132,000,000
1,500,000,000
6,250,000,000
3,000,000,000
8,500,000,000
25,382,000,000
1,500,000,000
3,000,000,000
1,000,000,000
2
5
2
1
1
1
paket
paket
paket
paket
paket
Paket
28,904,000,000
2,000,000,000
6,250,000,000
3,000,000,000
5,000,000,000
9,654,000,000
3,000,000,000
Sanggau
Kapuas Hulu
Sintang
Bengkayang
Page 108
SUMBER
PEMBIAYAAN
6
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
1
PROVINSI/
KABUPATEN/KOTA
2
Kalimantan Timur
Mahakam ulu
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
8 paket
2 paket
5
13,000,000,000
13,000,000,000
10,000,000,000
3,000,000,000
5 paket
2 paket
1 paket
29,750,000,000
19,250,000,000
6,250,000,000
3,000,000,000
10,000,000,000
Pembangunan Jembatan
Pengadaan PLTS 5 Kwp (APBNP)
MIT (Media Informasi Televisi) (APBNP)
Alat Peraga (Pendidikan) (APBNP)
1
4
1
1
paket
paket
Paket
Paket
10,500,000,000
1,500,000,000
5,000,000,000
3,000,000,000
1,000,000,000
Kalimantan Utara
Nunukan
Malinau
SUMBER
PEMBIAYAAN
6
1
2
1
1
1
paket
paket
Paket
paket
Paket
72,800,000,000
33,000,000,000
1,000,000,000
2,500,000,000
25,000,000,000
1,500,000,000
3,000,000,000
1
1
2
1
1
paket
paket
paket
Paket
Paket
9,000,000,000
1,500,000,000
1,000,000,000
2,500,000,000
3,000,000,000
1,000,000,000
9,000,000,000
Pembangunan Embung
Pengembangan Potensi Sumber Daya
Pengadaan PLTS 5 Kwp (APBNP)
MIT (Media Informasi Televisi) (APBNP)
Alat Peraga (Pendidikan) (APBNP)
1 paket
1 paket
1 Paket
3,500,000,000
1,000,000,000
1,500,000,000
1,000,000,000
3,500,000,000
1 paket
1 paket
2,500,000,000
1,500,000,000
1,000,000,000
2,500,000,000
Pembangunan Jalan
Pengembangan Potensi Sumber Daya
1 paket
5,000,000,000
1,500,000,000
5,000,000,000
Pembangunan Jalan
Alor
Malaka
Belu
Page 109
33,000,000,000
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
3
Pembangunan Embung
Pengembangan Potensi Sumber Daya
Alat Peraga (Pendidikan) (APBNP)
4
1 paket
1 paket
1 Paket
2
1
1
1
1
1
paket
paket
paket
paket
paket
paket
10,300,000,000
2,500,000,000
1,500,000,000
1,500,000,000
1,000,000,000
2,300,000,000
1,500,000,000
10,300,000,000
2
1
1
1
1
paket
paket
paket
paket
Paket
9,500,000,000
2,500,000,000
1,500,000,000
1,000,000,000
1,500,000,000
3,000,000,000
9,500,000,000
Rote Ndao
Sabu Raijua
5
1,500,000,000
1,000,000,000
1,000,000,000
SUMBER
PEMBIAYAAN
6
72,800,000,000
Sulawesi Utara
Kepulauan Talaud
Pengadaan PLTS 5 Kwp
Pengembangan Potensi Sumber Daya
Pembangunan Fasilitas Air Bersih (APBNP)
Pembangunan Jalan (APBNP)
2
1
1
1
paket
paket
paket
paket
24,330,000,000
24,330,000,000
2,500,000,000
1,000,000,000
1,500,000,000
19,330,000,000
Pembangunan Jembatan
Pengembangan Potensi Sumber Daya
1 paket
1 paket
63,844,000,000
2,500,000,000
1,500,000,000
1,000,000,000
1 paket
1 paket
27,094,000,000
1,000,000,000
26,094,000,000
2
1
1
1
2
1
34,250,000,000
2,500,000,000
1,500,000,000
1,000,000,000
1,250,000,000
3,000,000,000
25,000,000,000
Maluku
Maluku Barat Daya
Kepulauan Aru
Page 110
paket
paket
paket
paket
paket
paket
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
1
PROVINSI/
KABUPATEN/KOTA
2
Maluku Utara
Morotai
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
1 paket
1 paket
1 paket
5
22,500,000,000
22,500,000,000
1,000,000,000
1,500,000,000
20,000,000,000
1 paket
1 paket
1 Paket
93,300,000,000
5,500,000,000
1,000,000,000
1,500,000,000
3,000,000,000
2
1
2
1
1
1
2
paket
paket
paket
paket
paket
Paket
Paket
35,800,000,000
3,000,000,000
1,000,000,000
2,500,000,000
2,300,000,000
25,000,000,000
1,000,000,000
1,000,000,000
1
1
1
1
2
paket
paket
paket
Paket
Paket
19,500,000,000
1,000,000,000
1,500,000,000
15,000,000,000
1,000,000,000
1,000,000,000
1
1
1
2
paket
paket
Paket
Paket
6,500,000,000
1,000,000,000
1,500,000,000
3,000,000,000
1,000,000,000
2
1
1
1
paket
paket
paket
paket
26,000,000,000
2,500,000,000
1,000,000,000
1,500,000,000
20,000,000,000
Boven Digoel
Keerom
Merauke
Pegunungan Bintang
Page 111
SUMBER
PEMBIAYAAN
6
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Fasilitasi Pembangunan Pondok Singgah Yang di Bangun di Papua
dan Papua Barat (APBNP-Quick Wins)
4
2 Paket
Papua Barat
Raja Ampat
ANGGARAN
(Rp.)
5
1,000,000,000
SUMBER
PEMBIAYAAN
6
paket
paket
paket
paket
Paket
32,250,000,000
32,250,000,000
1,500,000,000
1,000,000,000
3,750,000,000
25,000,000,000
1,000,000,000
1 Paket
1 Paket
709,193,000
138,926,000
69,691,000
62,335,000
01
01
1 Paket
6,900,000
01
1 Paket
1 Paket
85,165,000
27,645,000
57,520,000
01
01
1 Paket
56,400,000
56,400,000
01
1 Paket
140,250,000
73,030,000
01
1 Paket
67,220,000
01
1 Paket
110,627,000
56,332,000
01
1 Paket
54,295,000
01
1 Paket
69,235,000
62,335,000
01
1
1
2
1
2
Sumatera Utara
Riau
Kepulauan Riau
Kalimantan Barat
Kalimantan Utara
Page 112
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
4
1 Paket
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
5
6,900,000
6
01
1 Paket
54,295,000
54,295,000
01
1 Paket
54,295,000
54,295,000
01
Papua
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
1 Kegiatan
1,720,000,000
215,000,000
215,000,000
215,000,000
1 Kegiatan
215,000,000
215,000,000
215,000,000
Kuala Kampar
1 Kegiatan
215,000,000
215,000,000
215,000,000
Sebuku
1 Kegiatan
215,000,000
215,000,000
215,000,000
Long Apari
215,000,000
215,000,000
215,000,000
Tahuna
215,000,000
215,000,000
215,000,000
Teluk Mutiara
215,000,000
215,000,000
215,000,000
Pulau Leti
Riau
Pelalawan
Kalimantan Utara
Nunukan
Kalimantan Timur
Mahakam Ulu
Sulawesi Utara
Kepulauan Sangihe
Maluku
Maluku Barat Daya
Papua Barat
215,000,000
Page 113
Tanjung
Beringin
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
1
Raja Ampat
ANGGARAN
(Rp.)
5
215,000,000
215,000,000
SUMBER
PEMBIAYAAN
6
Kepulauan
Ayau
10,075,133,500
213,464,000
213,464,000
106,732,000
106,732,000
01
01
561,440,000
122,809,000
122,809,000
02
438,631,000
438,631,000
01
446,460,000
199,280,000
199,280,000
02
247,180,000
247,180,000
02
1,337,201,000
730,712,000
427,624,000
01
216,233,000
86,855,000
01
02
606,489,000
91,930,000
426,504,000
02
01
88,055,000
02
2,352,441,000
335,137,000
221,987,000
113,150,000
01
02
Riau
Rokan Hilir
Indragiri Hilir
Kepulauan Riau
Natuna
Kepulauan Anambas
Kalimantan Barat
Sambas
Pelatihan Teknis dan Fasilitasi Sarana Produksi IKM Tenun
Pelatihan Peningkatan Desain Produk Rotan dan Bambu
Pendampingan Sentra Tenun Songket
Sanggau
Pengembangan Produksi Alsintan/Pande Besi
Pelatihan Teknis dan Fasilitasi Sarana Produksi IKM
Mebel/Furniture
Pendampingan Sentra Aneka Kerajinan Anyaman
Kalimantan Timur
Kutai Barat
Pelatihan Teknis Produksi IKM Anyaman
Pelatihan Peningkatan Mutu dan Desain Anyaman Rotan
Page 114
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
5
2,017,304,000
1,919,564,000
97,740,000
01
02
Pelatihan
Pelatihan
Pelatihan
Pelatihan
Pelatihan
1,541,932,000
345,490,000
105,520,000
52,630,000
56,680,000
72,830,000
57,830,000
02
02
02
02
02
202,606,000
202,606,000
01
467,303,000
237,532,000
163,206,000
66,565,000
01
01
02
66,565,000
66,565,000
02
459,968,000
163,406,000
237,532,000
59,030,000
01
01
02
826,442,000
86,610,000
86,610,000
02
739,832,000
649,802,000
01-02
Nunukan
Sulawesi Utara
Kepulauan Sangihe
Kepulauan Talaud
Page 115
90,030,000
02
156,980,000
81,340,000
81,340,000
02
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
1
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
2
Kepulauan Aru
Pelatihan WUB Ikan Asap Cair
Maluku Utara
Morotai
ANGGARAN
(Rp.)
5
75,640,000
75,640,000
SUMBER
PEMBIAYAAN
6
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
02
630,340,500
630,340,500
539,851,500
90,489,000
02
56,725,000
02
1,258,275,000
01
02
1 Kegiatan
03
Sukakarya
1 Kegiatan
1,500,000,000
1,500,000,000
1,500,000,000
03
Batang Lupar
1 Kegiatan
750,000,000
750,000,000
750,000,000
03
3,132,638,000
3,132,638,000
3,132,638,000
04
Kalimantan Timur
Mahakam Ulu
Pembangunan Prasarana Pengembangan Kawasan Ekowisata
Sungai (Dermaga Sungai)
145,910,000
56,725,000
Kalimantan Utara
Malinau
Pembangunan Landscape Aula Kesenian Desa Setulang
01
22,882,638,000
1,500,000,000
1,500,000,000
1,500,000,000
Kalimantan Barat
Kapuas Hulu
Pengembangan Kawasan Danau Sentarum
2,008,433,000
2,008,433,000
490,798,000
1 Unit
7,500,000,000
1,000,000,000
Page 116
Malinau Selatan
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Jalan Bampalola, Are Parkir Takpala, Pos Pemantauan Takpala,
Tempat Penjualan Souvenir Takpala
Kupang
ANGGARAN
(Rp.)
5
1,000,000,000
6
03
04
1 Unit
6,500,000,000
6,500,000,000
1 Unit
6,500,000,000
6,500,000,000
6,500,000,000
Maluku
Maluku Tenggara Barat
Papua Barat
Raja Ampat
SUMBER
PEMBIAYAAN
2,000,000,000
2,000,000,000
2,000,000,000
03
16,950,852,000
763,104,000
763,104,000
763,104,000
04
1,283,008,000
763,104,000
763,104,000
04
519,904,000
519,904,000
04
Indragiri Hilir
Kepulauan Riau
Karimun
3,012,912,000
517,904,000
Page 117
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Desa Bampalola
Kecamatan Alor
Barat Laut dan
(Jalan Wisata) dan
Desa Lembur
Barat Kecamatan
Alor Tengah Utara
(Area Parkir,
Pusat Saouvenir,
Pos Pemantau)
Waisal Distrik
Kota Waisal
Kabupaten Raja
Ampat
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Penempatan dan Pemberdayaan Tenaga Kerja
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
5
517,904,000
6
04
1,247,504,000
1,247,504,000
04
1,247,504,000
1,247,504,000
04
2,325,768,000
522,704,000
522,704,000
04
757,656,000
757,656,000
04
522,704,000
522,704,000
04
522,704,000
522,704,000
04
2,022,608,000
1,011,304,000
1,011,304,000
04
1,011,304,000
1,011,304,000
04
2,103,632,000
1,051,816,000
1,051,816,000
04
1,051,816,000
1,051,816,000
04
1,029,524,000
1,029,524,000
1,029,524,000
04
2,113,632,000
1,056,816,000
1,056,816,000
04
Bintan
Batam
Kalimantan Barat
Sambas
Sanggau
Kapuas Hulu
Bengkayang
Kalimantan Utara
Nunukan
Malinau
Belu
Sulawesi Utara
Kepulauan Sangihe
Maluku
Maluku Barat Daya
Page 118
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
1
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
2
Maluku Tenggara Barat
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
5
1,056,816,000
1,056,816,000
04
570,416,000
570,416,000
570,416,000
04
1,726,248,000
575,416,000
575,416,000
04
575,416,000
575,416,000
04
575,416,000
575,416,000
04
52,896,363,000
272,012,500
272,012,500
106,012,500
100,000,000
66,000,000
02
02
02
Sukakarya
02
Tanjung
Beringin
Maluku Utara
Morotai
Papua
Boven Digoel
Merauke
Jayapura
295 KSM
50 Org
22 Org
Sumatera Utara
Serdang Bedagai
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
1504 KSM
1,446,387,500
1,446,387,500
620,387,500
35 KUBE
63 Org
700,000,000
126,000,000
02
02
298 KSM
6,544,050,000
323,680,000
175,880,000
02
48,800,000
96,000,000
3,000,000
02
02
02
1,310,890,000
120,025,000
208,445,000
178,445,000
02
02
02
Riau
Rokan hilir
44 Org
1 Org
Bengkalis
Bantuan Tunai Bersyarat / PKH
Bantuan Tunai Bersyarat / PKH
Bantuan Tunai Bersyarat / PKH
240 KSM
472 KSM
372 KSM
Page 119
Pasir Limau
Kapas
Bukit Batu
Bantan
Rupat Utara
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
3
Bantuan Tunai Bersyarat / PKH
Bantuan Tunai Bersyarat / PKH
Kesejahteraan Sosial Anak (PKSA)
Asistensi Lanjut Usia (ASLUT)
Asistensi Sosial Orang dengan Kecacatan Berat (ASODKB)
4
515 KSM
650 KSM
72 Org
60 Org
4 Org
5
255,275,000
327,500,000
89,200,000
120,000,000
12,000,000
6
02
02
02
02
02
133 KSM
123 KSM
138 KSM
2,204,365,000
60,730,000
54,755,000
69,280,000
02
02
02
40 KUBE
300 KK
476 Org
48 Org
800,000,000
600,000,000
523,600,000
96,000,000
02
02
02
02
Indragiri Hilir
Kepulauan Meranti
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Rupat
Bengkalis
Kateman
Tanah Merah
Gaung Anak Seka
1.207 KSM
1,779,195,000
533,795,000
02
1.321 KSM
526,510,000
02
Rangsang
674 KSM
895 KSM
304,065,000
373,575,000
02
02
Pulau Merbau
Rangsang Barat
Rangsang Pesisir
Merbau
29 KK
21,750,000
03
26 KK
19,500,000
03
170 KSM
160 KSM
338 Org
48 Org
604,050,000
73,625,000
62,625,000
371,800,000
96,000,000
02
02
02
02
Dumai Timur
Dumai Barat
242 KSM
71 Org
48 Org
15 Org
321,870,000
102,770,000
78,100,000
96,000,000
45,000,000
02
02
02
02
Kuala Kampar
Dumai
Pelalawan
Kepulauan Riau
Natuna
4,804,850,000
836,000,000
Page 120
Tebing Tinggi
Timur
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
3
Bantuan Stimulan UEP KUBE Perdesaan
Asistensi Lanjut Usia (ASLUT)
Asistensi Sosial Orang dengan Kecacatan Berat (ASODKB)
4
35 KUBE
50 Org
12 Org
5
700,000,000
100,000,000
36,000,000
6
02
02
02
50 Org
4 Org
112,000,000
100,000,000
12,000,000
02
02
Anambas
Batam
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
190 KSM
2,369,550,000
62,875,000
02
Belakang
Padang
60 KSM
424 KSM
94 KSM
152 KSM
199 KSM
266 KSM
391 KSM
30 KK
820 Org
24 Org
21 Org
26,000,000
154,712,500
39,750,000
65,875,000
68,375,000
113,687,500
159,275,000
600,000,000
968,000,000
48,000,000
63,000,000
02
02
02
02
02
02
02
02
02
02
02
Batam Kota
Bulang
SeKupang
Lubuk Raja
Nongsa
Batu Ampar
Batu Aji
Bantuan
Bantuan
Bantuan
Bantuan
/ PKH
/ PKH
/ PKH
/ PKH
126 KSM
221 KSM
52 KSM
83 KSM
1,097,062,500
45,887,500
71,137,500
15,900,000
29,137,500
02
02
02
02
Bintan Utara
Tambelan
Bintan Pesisir
Teluk Sembung
35 KUBE
76 Org
16 Org
700,000,000
35,000,000
152,000,000
48,000,000
02
02
02
02
85 KSM
86 KSM
99 KSM
56 Org
50 Org
38 Org
390,237,500
34,687,500
34,325,000
35,625,000
71,600,000
100,000,000
114,000,000
02
02
02
02
02
02
Bintan
Tunai
Tunai
Tunai
Tunai
Bersyarat
Bersyarat
Bersyarat
Bersyarat
Karimun
Kalimantan Barat
4,415,755,500
Page 121
Kundul
Meral
Moro
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
260 KSM
133 KSM
5
1,996,680,000
93,750,000
65,230,000
904 Org
75 Org
137 Org
1,276,700,000
150,000,000
411,000,000
02
02
02
89 KSM
8 Org
73,090,000
49,090,000
24,000,000
02
02
Siding
79 KSM
873 Org
75 Org
135 Org
680,243,000
29,240,000
96,003,000
150,000,000
405,000,000
02
02
02
02
Sekayan
210 KSM
745,487,500
91,487,500
02
Ketunggau Hulu
873 KSM
406,500,000
02
Ketungau
Tengah
225 Org
247,500,000
02
173 KSM
920,255,000
70,255,000
02
35 KUBE
75 Org
700,000,000
150,000,000
02
02
166,100,000
166,100,000
166,100,000
02
20 Org
18 Org
740,350,000
94,000,000
40,000,000
54,000,000
02
02
176 KSM
357 KSM
646,350,000
82,125,000
157,500,000
02
02
Sambas
Bengkayang
Sanggau
Sintang
Kalimantan Timur
Mahakam Ulu
Kesejahteraan Sosial Anak (PKSA)
Kalimantan Utara
Malinau
Asistensi Lanjut Usia (ASLUT)
Asistensi Sosial Orang dengan Kecacatan Berat (ASODKB)
Nunukan
Bantuan Tunai Bersyarat / PKH
Bantuan Tunai Bersyarat / PKH
Page 122
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
02
02
Paloh
Sanjingan Besar
Puttussibau
Utara
Sebatik Barat
Sebatik
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Bantuan Tunai Bersyarat / PKH
Bantuan Tunai Bersyarat / PKH
Kesejahteraan Sosial Anak (PKSA)
Asistensi Lanjut Usia (ASLUT)
Asistensi Sosial Orang dengan Kecacatan Berat (ASODKB)
4
103 KSM
251 KSM
161 PKH
20 Org
16 Org
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
5
43,750,000
97,875,000
177,100,000
40,000,000
48,000,000
6
02
02
02
02
02
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Lumbis
Sebuku
235 KSM
9,703,132,500
3,374,950,000
97,250,000
02
Amfoang Timur
232 KSM
339 KSM
120 KSM
300 KK
60 KK
60 KK
60 KK
60 KK
60 KK
35 Org
103 Org
48 Org
84,750,000
131,250,000
50,700,000
600,000,000
1,800,000,000
108,000,000
30,000,000
30,000,000
30,000,000
63,000,000
206,000,000
144,000,000
02
02
02
02
03
03
03
03
03
02
02
02
Amarasi Barat
Amarasi Timur
Semau Selatan
280 KSM
297 KSM
999,712,500
118,675,000
129,000,000
02
02
Insana Utara
288 KSM
118,187,500
02
Miaomaffo Barat
232 KSM
21 Org
90 Org
113 Org
91,750,000
23,100,000
180,000,000
339,000,000
02
02
02
02
Mutis
346 KSM
952,252,500
159,925,000
02
Lakmanaen
Selatan
85 KSM
185 KSM
137 KSM
198 KSM
147 KSM
61 Org
43,600,000
76,712,500
70,970,000
87,375,000
59,570,000
67,100,000
02
02
02
02
02
02
Atambua
Lekmanen
Lasiolat
Raihat
Nanet Dubesi
Belu
Page 123
Amfoang
Amfoang
Amfoang
Amfoang
Amfoang
Kota Kefamenanu
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Asistensi Lanjut Usia (ASLUT)
Asistensi Sosial Orang dengan Kecacatan Berat (ASODKB)
6
02
02
43 Kube
860,000,000
860,000,000
02
1,552,967,500
629,337,500
02
164,875,000
49,630,000
275,000,000
156,625,000
22,500,000
120,000,000
135,000,000
02
02
02
02
03
02
02
Rote Barat
Rote Selatan
Lobalan
Pantai Baru
1,816,812,500
259,237,500
517,000,000
02
02
Teluk Mutiara
Alor Barat Daya
1.305 KSM
388 KSM
98 KSM
613 KSM
331 KSM
25 KK
60 Org
45 Org
Alor
Bantuan Tunai Bersyarat / PKH
Bantuan Tunai Bersyarat / PKH
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
5
162,000,000
225,000,000
Rote Ndao
Bantuan Tunai Bersyarat / PKH
SUMBER
PEMBIAYAAN
4
81 Org
75 Org
Malaka
Bantuan Stimulan UEP KUBE Perdesaan
ANGGARAN
(Rp.)
642 KSM
1.208 KSM
Rote Timur
197 KSM
30 Kube
94 KK
26 Org
77 Org
96,375,000
600,000,000
84,600,000
28,600,000
231,000,000
02
02
03
02
02
Alor Selatan
327 KSM
146,437,500
146,437,500
02
Raijua
197 KSM
218 KSM
30 KUBE
68 KK
68 KK
68 KK
68 KK
68 KK
66 KK
70 KK
57 KK
3,782,512,500
3,607,012,500
53,625,000
60,287,500
600,000,000
1,632,000,000
122,400,000
27,200,000
27,200,000
27,200,000
59,400,000
126,000,000
102,600,000
02
02
02
03
03
03
03
03
03
03
03
Tabuka Utara
Kendahe
Sabu Raijua
Sulawesi Utara
Kepulauan Sangihe
Bantuan Tunai Bersyarat / PKH
Bantuan Tunai Bersyarat / PKH
Batuan Stimulan UEP KUBE Perdesaan
Pembangunan Rumah Sederhana Bagi Warga KAT
Bantuan Jaminan Hidup warga KAT
Bantuan Bibit Tanaman warga KAT
Bantuan Peralatan Kerja warga KAT
Bantuan Peralatan Rumah Tangga warga KAT
Bantuan Jaminan Hidup warga KAT
Bantuan Jaminan Hidup warga KAT
Bantuan Jaminan Hidup warga KAT
Page 124
Matara
Tabuka Tengah
Tabuka Tengah
Tabuka Tengah
Tabuka Tengah
Tabuka Tengah
Tatoreng
Tabuka Selatan
Samako
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
3
Kesejahteraan Sosial Anak (PKSA)
Asistensi Lanjut Usia (ASLUT)
Asistensi Sosial Orang dengan Kecacatan Berat (ASODKB)
4
461 Org
59 Org
48 Org
5
507,100,000
118,000,000
144,000,000
6
02
02
02
45 Org
60 Org
2 Org
175,500,000
49,500,000
120,000,000
6,000,000
02
02
02
02
02
02
Kepulauan Talaud
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
35 KUBE
355 Org
80 Org
3,900,762,500
1,020,000,000
700,000,000
160,000,000
160,000,000
261 KSM
2,290,637,500
114,500,000
02
Taninbar
Selatan
302 KSM
466 KSM
263 KSM
131 KSM
135 KSM
35 KUBE
250 KK
47 KK
02
02
02
02
02
02
02
03
02
02
02
Selaru
Wertamrian
Nirunmas
Taninbar Utara
Yaru
63 Org
14 Org
140,287,500
209,750,000
122,875,000
65,625,000
73,100,000
700,000,000
500,000,000
70,500,000
126,000,000
126,000,000
42,000,000
284 KSM
590,125,000
133,250,000
02
Aru Tengah
Selatan
288 KSM
136,875,000
02
Aru Selatan
Timur
31 Org
80 Org
160,000,000
160,000,000
02
02
191 KSM
1,082,625,000
1,082,625,000
94,125,000
02
Morotai Selatan
171 KSM
88,500,000
02
Morotai Jaya
Kepulauan Aru
Page 125
Wertamrian
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Bantuan Stimulan UEP KUBE Perdesaan
Asistensi Lanjut Usia (ASLUT)
4
40 KUBE
50 Org
11,639,825,000
5,848,200,000
400,000,000
4,760,000,000
122,400,000
27,200,000
27,200,000
27,200,000
409,200,000
75,000,000
02
03
03
03
03
03
02
02
28,600,000
28,600,000
02
29 KK
29 KK
29 KK
29 KK
29 KK
25 KK
25 KK
25 KK
25 KK
25 KK
44 Org
105 Org
9 Org
4,269,400,000
2,030,000,000
52,200,000
11,600,000
11,600,000
11,600,000
1,750,000,000
45,000,000
10,000,000
10,000,000
10,000,000
48,400,000
252,000,000
27,000,000
03
03
03
03
03
03
03
03
03
03
02
02
02
Towe
Towe
Towe
Towe
Towe
Senggi
Senggi
Senggi
Senggi
Senggi
549 KSM
1.270 KSM
1,493,625,000
213,250,000
469,875,000
02
02
Muara Tami
Jayapura Utara
345,500,000
384,000,000
81,000,000
02
02
02
4,398,000,000
4,398,000,000
4,200,000,000
03
Boven Digoel
26 Org
Keerom
Pembangunan Rumah Sederhana Bagi Warga KAT
Bantuan Jaminan Hidup warga KAT
Bantuan Bibit Tanaman warga KAT
Bantuan Peralatan Kerja warga KAT
Bantuan Peralatan Rumah Tangga warga KAT
Pembangunan Rumah Sederhana Bagi Warga KAT
Bantuan Jaminan Hidup warga KAT
Bantuan Bibit Tanaman warga KAT
Bantuan Peralatan Kerja warga KAT
Bantuan Peralatan Rumah Tangga warga KAT
Kesejahteraan Sosial Anak (PKSA)
Asistensi Lanjut Usia (ASLUT)
Asistensi Sosial Orang dengan Kecacatan Berat (ASODKB)
Jayapura
Bantuan Tunai Bersyarat / PKH
Bantuan Tunai Bersyarat / PKH
Kesejahteraan Sosial Anak (PKSA)
Asistensi Lanjut Usia (ASLUT)
Asistensi Sosial Orang dengan Kecacatan Berat (ASODKB)
305 Org
192 Org
27 Org
Papua Barat
Raja Ampat
Pembangunan Rumah Sederhana Bagi Warga KAT
60 KK
Page 126
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
6
02
02
200 KK
68 KK
68 KK
68 KK
68 KK
68 KK
372 Org
25 Org
SUMBER
PEMBIAYAAN
5
800,000,000
100,000,000
Papua
Merauke
Bantuan Stimulan UEP Perkotaan
Pembangunan Rumah Sederhana Bagi Warga KAT
Bantuan Jaminan Hidup warga KAT
Bantuan Bibit Tanaman warga KAT
Bantuan Peralatan Kerja warga KAT
Bantuan Peralatan Rumah Tangga warga KAT
Kesejahteraan Sosial Anak (PKSA)
Asistensi Sosial Orang dengan Kecacatan Berat (ASODKB)
ANGGARAN
(Rp.)
Ngguti
Ngguti
Ngguti
Ngguti
Ngguti
Wawarbumi
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
Bantuan
Bantuan
Bantuan
Bantuan
VOLUME
3
Jaminan Hidup warga KAT
Bibit Tanaman warga KAT
Peralatan Kerja warga KAT
Peralatan Rumah Tangga warga KAT
4
60 KK
60 KK
60 KK
60 KK
20 Unit
ANGGARAN
(Rp.)
5
108,000,000
30,000,000
30,000,000
30,000,000
18,000,000,000
18,000,000,000
6 Kegiatan
142,314,820,000
3,044,290,000
3,044,290,000
1,155,350,000
4 kegiatan
1,888,940,000
Bidang Kehutanan :
6 Kegiatan
3,004,810,000
3,004,810,000
1,292,310,000
4 Kegiatan
1,712,500,000
Sumatera Utara
Serdang Bedagai
1. Sarana
2. Sarana
3. Sarana
4. Sarana
Page 127
SUMBER
PEMBIAYAAN
6
03
03
03
03
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Wawarbumi
Wawarbumi
Wawarbumi
Wawarbumi
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
Riau
Rokan Hilir
Bidang Kehutanan :
6 Kegiatan
14,038,460,000
3,722,430,000
1,921,480,000
4 kegiatan
1,800,950,000
Bidang Kehutanan :
6 Kegiatan
3,272,650,000
1,853,680,000
4 kegiatan
1,418,970,000
6 Kegiatan
1,975,340,000
1,975,340,000
1. Sarana
2. Sarana
3. Sarana
4. Sarana
Indragiri Hilir
1. Sarana
2. Sarana
3. Sarana
4. Sarana
Kepulauan Meranti
Bidang Kehutanan :
1. Rehabilitasi Hutan dan Lahan
2. Penataan areal kerja KPHP/KPHL
3. Peningkatan sarpras KPHP/KPHL
4. Peningkatan Sarpras dan Perlindungan Hutan
5. Peningkatan sarpras Pengolahan Hutan &Non Hutan
6. Peningkatan Sarpras Penyuluhan Hutan
Page 128
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
Dumai
6 Kegiatan
1,612,400,000
1,612,400,000
Bidang Kehutanan :
6 Kegiatan
3,455,640,000
1,822,180,000
4 Kegiatan
1,633,460,000
Bidang Kehutanan :
6 Kegiatan
14,641,370,000
3,231,640,000
1,337,400,000
4 Kegiatan
1,894,240,000
Bidang Kehutanan :
1. Rehabilitasi Hutan dan Lahan
2. Penataan areal kerja KPHP/KPHL
3. Peningkatan sarpras KPHP/KPHL
4. Peningkatan Sarpras dan Perlindungan Hutan
5. Peningkatan sarpras Pengolahan Hutan &Non Hutan
6. Peningkatan Sarpras Penyuluhan Hutan
Pelalawan
1. Sarana
2. Sarana
3. Sarana
4. Sarana
Kepulauan Riau
Natuna
1. Sarana
2. Sarana
3. Sarana
4. Sarana
Page 129
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
Kepulauan Anambas
Bidang Kehutanan :
6 Kegiatan
3,374,270,000
1,409,560,000
4 Kegiatan
1,964,710,000
Bidang Kehutanan :
6 Kegiatan
2,661,770,000
1,262,340,000
4 Kegiatan
1,399,430,000
6 Kegiatan
2,693,920,000
1,239,350,000
1. Sarana
2. Sarana
3. Sarana
4. Sarana
Batam
1. Sarana
2. Sarana
3. Sarana
4. Sarana
Bintan
Bidang Kehutanan :
1. Rehabilitasi Hutan dan Lahan
2. Penataan areal kerja KPHP/KPHL
3. Peningkatan sarpras KPHP/KPHL
4. Peningkatan Sarpras dan Perlindungan Hutan
5. Peningkatan sarpras Pengolahan Hutan &Non Hutan
6. Peningkatan Sarpras Penyuluhan Hutan
Page 130
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
ANGGARAN
(Rp.)
PROGRAM/KEGIATAN
VOLUME
4
4 Kegiatan
5
1,454,570,000
Bidang Kehutanan :
6 Kegiatan
2,679,770,000
1,510,830,000
4 Kegiatan
1,168,940,000
Bidang Kehutanan
6 Kegiatan
19,824,640,000
3,524,220,000
1,530,720,000
4 Kegiatan
1,993,500,000
6 Kegiatan
3,374,640,000
1,530,930,000
Karimun
1. Sarana
2. Sarana
3. Sarana
4. Sarana
Kalimantan Barat
Sambas
1. Sarana
2. Sarana
3. Sarana
4. Sarana
Bengkayang
Bidang Kehutanan
Page 131
SUMBER
PEMBIAYAAN
6
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
3
1. Rehabilitasi Hutan dan Lahan
2. Penataan areal kerja KPHP/KPHL
3. Peningkatan sarpras KPHP/KPHL
4. Peningkatan Sarpras dan Perlindungan Hutan
5. Peningkatan sarpras Pengolahan Hutan &Non Hutan
6. Peningkatan Sarpras Penyuluhan Hutan
Bidang Lingkungan Hidup :
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
4 Kegiatan
1,843,710,000
Bidang Kehutanan
6 Kegiatan
3,611,820,000
1,909,030,000
4 Kegiatan
1,702,790,000
Bidang Kehutanan
6 Kegiatan
4,775,890,000
2,546,280,000
4 Kegiatan
2,229,610,000
1. Sarana
2. Sarana
3. Sarana
4. Sarana
Sanggau
1. Sarana
2. Sarana
3. Sarana
4. Sarana
Sintang
Page 132
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
3
4. Sarana Perlindungan dan Pengelolaan LH
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
Kapuas Hulu
Bidang Kehutanan
6 Kegiatan
4,538,070,000
2,448,880,000
4 Kegiatan
2,089,190,000
6 Kegiatan
1,841,940,000
1,841,940,000
1,841,940,000
6 Kegiatan
3,333,140,000
1,715,780,000
1,715,780,000
4 Kegiatan
1,617,360,000
1,617,360,000
1. Sarana
2. Sarana
3. Sarana
4. Sarana
Kalimantan Timur
Mahakam Ulu
Bidang Kehutanan
1. Rehabilitasi Hutan dan Lahan
2. Penataan areal kerja KPHP/KPHL
3. Peningkatan sarpras KPHP/KPHL
4. Peningkatan Sarpras dan Perlindungan Hutan
5. Peningkatan sarpras Pengolahan Hutan &Non Hutan
6. Peningkatan Sarpras Penyuluhan Hutan
Kalimantan Utara
Malinau
Bidang Kehutanan
1. Rehabilitasi Hutan dan Lahan
2. Penataan areal kerja KPHP/KPHL
3. Peningkatan sarpras KPHP/KPHL
4. Peningkatan Sarpras dan Perlindungan Hutan
5. Peningkatan sarpras Pengolahan Hutan &Non Hutan
6. Peningkatan Sarpras Penyuluhan Hutan
Nunukan
Bidang Lingkungan Hidup :
Page 133
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
1. Sarana
2. Sarana
3. Sarana
4. Sarana
3
pemantauan dan pengawasan kualitas LH
pengendalian pencemaran LH
Adaptasi dan Mitigasi Perubahan Iklim
Perlindungan dan Pengelolaan LH
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
6 Kegiatan
20,832,570,000
2,757,410,000
1,110,160,000
4 Kegiatan
1,647,250,000
Bidang Kehutanan
6 Kegiatan
2,889,530,000
1,303,650,000
4 Kegiatan
1,585,880,000
6 Kegiatan
2,962,400,000
1,316,950,000
1. Sarana
2. Sarana
3. Sarana
4. Sarana
1. Sarana
2. Sarana
3. Sarana
4. Sarana
Belu
Bidang Kehutanan
1. Rehabilitasi Hutan dan Lahan
2. Penataan areal kerja KPHP/KPHL
Page 134
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
3
3. Peningkatan sarpras KPHP/KPHL
4. Peningkatan Sarpras dan Perlindungan Hutan
5. Peningkatan sarpras Pengolahan Hutan &Non Hutan
6. Peningkatan Sarpras Penyuluhan Hutan
Bidang Lingkungan Hidup :
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
4 Kegiatan
1,645,450,000
Bidang Kehutanan
6 Kegiatan
2,229,730,000
1,354,360,000
4 Kegiatan
875,370,000
Bidang Kehutanan
6 Kegiatan
3,406,040,000
1,866,780,000
4 Kegiatan
1,539,260,000
1. Sarana
2. Sarana
3. Sarana
4. Sarana
Malaka
1. Sarana
2. Sarana
3. Sarana
4. Sarana
Rote Ndao
1. Sarana
2. Sarana
3. Sarana
4. Sarana
Page 135
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
Bidang Kehutanan
6 Kegiatan
5
3,650,860,000
1,716,950,000
4 Kegiatan
1,933,910,000
Bidang Kehutanan
6 Kegiatan
2,936,600,000
1,341,400,000
4 Kegiatan
1,595,200,000
Bidang Kehutanan
6 Kegiatan
6,409,790,000
3,233,330,000
1,248,130,000
4 Kegiatan
1,985,200,000
Alor
1. Sarana
2. Sarana
3. Sarana
4. Sarana
Sabu Raijua
1. Sarana
2. Sarana
3. Sarana
4. Sarana
Sulawesi Utara
Kepulauan Sangihe
Page 136
SUMBER
PEMBIAYAAN
6
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
1. Sarana
2. Sarana
3. Sarana
4. Sarana
3
pemantauan dan pengawasan kualitas LH
pengendalian pencemaran LH
Adaptasi dan Mitigasi Perubahan Iklim
Perlindungan dan Pengelolaan LH
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
Kepulauan Talaud
Bidang Kehutanan
6 Kegiatan
3,176,460,000
1,241,410,000
4 Kegiatan
1,935,050,000
Bidang Kehutanan
6 Kegiatan
12,852,420,000
4,024,280,000
1,725,830,000
4 Kegiatan
2,298,450,000
6 Kegiatan
3,303,620,000
1,293,030,000
1. Sarana
2. Sarana
3. Sarana
4. Sarana
Maluku
Maluku Tenggara Barat
1. Sarana
2. Sarana
3. Sarana
4. Sarana
Kepulauan Aru
Bidang Kehutanan
1. Rehabilitasi Hutan dan Lahan
2. Penataan areal kerja KPHP/KPHL
Page 137
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
3
3. Peningkatan sarpras KPHP/KPHL
4. Peningkatan Sarpras dan Perlindungan Hutan
5. Peningkatan sarpras Pengolahan Hutan &Non Hutan
6. Peningkatan Sarpras Penyuluhan Hutan
Bidang Lingkungan Hidup :
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
4 Kegiatan
2,010,590,000
Bidang Kehutanan
6 Kegiatan
5,524,520,000
2,039,020,000
4 Kegiatan
3,485,500,000
6 Kegiatan
3,200,410,000
3,200,410,000
1,270,850,000
4 Kegiatan
1,929,560,000
1. Sarana
2. Sarana
3. Sarana
4. Sarana
1. Sarana
2. Sarana
3. Sarana
4. Sarana
Maluku Utara
Morotai
Bidang Kehutanan
a. Rehabilitasi Hutan dan Lahan
b. Penataan areal kerja KPHP/KPHL
c. Peningkatan sarpras KPHP/KPHL
d. Peningkatan sarpras perlindungan dan pengamanan hutan
e. Peningkatan sarpras pengolahan HH kayu/bukan kayu
f. Peningkatan sarpras penyuluhan kehutanan
Bidang Lingkungan
a. Sarana pemantauan dan pengawasan kualitas LH
b. Sarana pengendalian pencemaran LH
c. Sarana adaptasi dan mitigasi perubahan iklim
d. Sarana perlindungan dan pengelolaan LH
Page 138
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
Bidang Kehutanan
6 Kegiatan
5
34,489,180,000
6,726,860,000
2,739,330,000
4 Kegiatan
3,987,530,000
Bidang Kehutanan
6 Kegiatan
4,038,720,000
1,304,500,000
4 Kegiatan
2,734,220,000
Bidang Kehutanan
6 Kegiatan
9,764,930,000
3,056,450,000
4 Kegiatan
6,708,480,000
Papua
Merauke
1. Sarana
2. Sarana
3. Sarana
4. Sarana
Boven Digoel
1. Sarana
2. Sarana
3. Sarana
4. Sarana
Pegunungan Bintang
Page 139
SUMBER
PEMBIAYAAN
6
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
1. Sarana
2. Sarana
3. Sarana
4. Sarana
3
pemantauan dan pengawasan kualitas LH
pengendalian pencemaran LH
Adaptasi dan Mitigasi Perubahan Iklim
Perlindungan dan Pengelolaan LH
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
Keerom
Bidang Kehutanan
6 Kegiatan
5,690,600,000
2,836,360,000
4 Kegiatan
2,854,240,000
Bidang Kehutanan
6 Kegiatan
4,945,480,000
2,064,910,000
4 Kegiatan
2,880,570,000
6 Kegiatan
3,322,590,000
1,490,750,000
1. Sarana
2. Sarana
3. Sarana
4. Sarana
Jayapura
1. Sarana
2. Sarana
3. Sarana
4. Sarana
Supiori
Bidang Kehutanan
1. Rehabilitasi Hutan dan Lahan
2. Penataan areal kerja KPHP/KPHL
3. Peningkatan sarpras KPHP/KPHL
Page 140
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
3
4. Peningkatan Sarpras dan Perlindungan Hutan
5. Peningkatan sarpras Pengolahan Hutan &Non Hutan
6. Peningkatan Sarpras Penyuluhan Hutan
Bidang Lingkungan Hidup :
1. Sarana pemantauan dan pengawasan kualitas LH
2. Sarana pengendalian pencemaran LH
3. Sarana Adaptasi dan Mitigasi Perubahan Iklim
4. Sarana Perlindungan dan Pengelolaan LH
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
4 Kegiatan
1,831,840,000
6 Kegiatan
4,801,800,000
4,801,800,000
1,531,290,000
4 Kegiatan
3,270,510,000
Papua Barat
Raja Ampat
Bidang Kehutanan
1. Rehabilitasi Hutan dan Lahan
2. Penataan areal kerja KPHP/KPHL
3. Peningkatan sarpras KPHP/KPHL
4. Peningkatan Sarpras dan Perlindungan Hutan
5. Peningkatan sarpras Pengolahan Hutan &Non Hutan
6. Peningkatan Sarpras Penyuluhan Hutan
Bidang Lingkungan Hidup :
1. Sarana pemantauan dan pengawasan kualitas LH
2. Sarana pengendalian pencemaran LH
3. Sarana Adaptasi dan Mitigasi Perubahan Iklim
4. Sarana Perlindungan dan Pengelolaan LH
22. KEMENTERIAN AGAMA
Aceh
Sabang
Pembinaan Kerukunan Hidup Umat Beragama
Pembinaan Administrasi Kepegawaian
Pembinaan Administrasi Keuangan dan BMN
Pembinaan Administrasi Organisasi dan Tata Laksana
Pembinaan Administrasi Perencanaan
Pembinaan Administrasi Umum
Pengelolaan dan Pembinaan Pemberdayaan Wakaf
Pengelolaan dan Pembinaan Pemberdayaan Zakat
Pengelolaan dan Pembinaan Penerangan Agama Islam
Pengelolaan Urusan Agama Islam dan Pembinaan Syariah
Dukungan Manajemen dan Pelaksanaan Tugas Teknis Lainnya
Bimas Islam
659,227,972,000
20,842,921,000
20,842,921,000
440,000,000
71,000,000
657,291,000
33,060,000
54,860,000
929,650,000
26,880,000
26,880,000
361,080,000
359,010,000
880,636,000
72,000,000
384,830,000
Page 141
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Dukungan Manajemen Pendidikan dan Pelayanan Tugas Teknis
Lainnya Pendidikan Islam
Pelayanan Haji Dalam Negeri
Pembinaan Haji dan Umrah
Dukungan Manajemen dan Pelaksanaan Tugas Teknis Lainnya
Penyelenggaraan Haji dan Umrah
ANGGARAN
(Rp.)
5
6,986,260,000
9,900,000
41,790,000
151,009,000
2,080,060,000
7,276,725,000
Riau
Rokan Hilir
Pembinaan
Pembinaan
Pembinaan
Pembinaan
Pembinaan
Pembinaan
Pembinaan
Pembinaan
30,103,824,000
30,103,824,000
98,968,000
95,289,000
101,611,000
572,522,000
68,808,000
133,610,000
805,301,000
81,848,000
27,308,000
85,000,000
90,232,000
777,101,000
989,782,000
2,678,409,000
1,303,000,000
143,554,000
13,323,754,000
Page 142
5,720,203,000
89,000,000
35,000,000
82,016,000
430,969,000
SUMBER
PEMBIAYAAN
6
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Penyelenggaraan Administrasi Perkantoran Pendidikan Bimas
Hindu
Pengelolaan dan Pembinaan Pendidikan Agama Budha
Penyelenggaraan Administrasi Perkantoran Pendidikan Bimas
Budha
ANGGARAN
(Rp.)
5
120,683,000
18,000,000
87,880,000
18,320,000
46,598,000
12,000,000
244,627,000
802,610,000
1,019,821,000
26,579,711,000
26,579,711,000
126,990,000
100,000,000
130,000,000
794,145,000
118,290,000
200,000,000
1,023,461,000
80,000,000
100,000,000
85,000,000
483,400,000
694,476,000
1,861,523,000
172,000,000
245,000,000
2,022,945,000
5,107,970,000
141,332,000
8,000,000
Page 143
SUMBER
PEMBIAYAAN
6
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Pembinaan Haji dan Umrah
Dukungan Manajemen dan Pelaksanaan Tugas Teknis Lainnya
Penyelenggaraan Haji dan Umrah
ANGGARAN
(Rp.)
5
155,134,000
228,609,000
5,736,763,000
6,964,673,000
Kalimantan Barat
Bengkayang
Pembinaan Kerukunan Hidup Umat Beragama
Pembinaan Administrasi Kepegawaian
Pembinaan Administrasi Keuangan dan BMN
Pembinaan Administrasi Perencanaan
Pembinaan Administrasi Umum
Pengelolaan dan Pembinaan Pemberdayaan Wakaf
Pengelolaan dan Pembinaan Pemberdayaan Zakat
Pengelolaan dan Pembinaan Penerangan Agama Islam
Pengelolaan Urusan Agama Islam dan Pembinaan Syariah
Dukungan Manajemen dan Pelaksanaan Tugas Teknis Lainnya
Bimas Islam
236,089,302,000
31,702,756,000
100,000,000
56,394,000
819,158,000
77,800,000
652,330,000
61,800,000
35,000,000
385,000,000
1,905,380,000
2,155,351,000
85,270,000
35,702,000
440,800,000
9,371,163,000
95,700,000
113,700,000
455,390,000
6,237,347,000
482,832,000
280,750,000
2,075,210,000
4,226,290,000
7,200,000
Page 144
SUMBER
PEMBIAYAAN
6
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Penyelenggaraan Administrasi Perkantoran Pendidikan Bimas
Hindu
ANGGARAN
(Rp.)
5
279,237,000
198,014,000
95,060,000
489,330,000
239,428,000
67,845,000
10,056,000
168,219,000
Kapuas Hulu
Pembinaan Kerukunan Hidup Umat Beragama
Pembinaan Administrasi Kepegawaian
Pembinaan Administrasi Keuangan dan BMN
Pembinaan Administrasi Perencanaan
Pembinaan Administrasi Umum
Pembinaan Administrasi Kerukunan Hidup Umat Beragama
Penyediaan Sarana dan Prasarana Aparatur Kementerian Agama
Pengelolaan dan Pembinaan Pemberdayaan Wakaf
Pengelolaan dan Pembinaan Pemberdayaan Zakat
Pengelolaan dan Pembinaan Penerangan Agama Islam
Pengelolaan Urusan Agama Islam dan Pembinaan Syariah
Dukungan Manajemen dan Pelaksanaan Tugas Teknis Lainnya
Bimas Islam
37,978,408,000
100,000,000
80,994,000
1,037,884,000
151,570,000
954,788,000
50,000,000
2,000,000,000
61,800,000
35,000,000
332,000,000
4,697,240,000
2,686,648,000
108,330,000
42,158,000
582,700,000
7,510,136,000
18,000,000
5,400,000
2,944,894,000
297,840,000
Page 145
SUMBER
PEMBIAYAAN
6
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Pengelolaan dan Pembinaan Urusan Agama Katolik
Dukungan Manajemen dan Pelaksanaan Tugas Teknis Lainnya
Bimas Katolik
Penyelenggaraan Administrasi Perkantoran Pendidikan Bimas
Katolik
Pelayanan Haji Dalam Negeri
Pembinaan Haji dan Umrah
Dukungan Manajemen dan Pelaksanaan Tugas Teknis Lainnya
Penyelenggaraan Haji dan Umrah
ANGGARAN
(Rp.)
5
167,400,000
2,044,388,000
4,491,112,000
70,745,000
10,136,000
348,620,000
2,711,911,000
4,436,714,000
Sambas
Pembinaan Kerukunan Hidup Umat Beragama
Pembinaan Administrasi Kepegawaian
Pembinaan Administrasi Keuangan dan BMN
Pembinaan Administrasi Perencanaan
Pembinaan Administrasi Umum
Pengelolaan dan Pembinaan Pemberdayaan Wakaf
Pengelolaan dan Pembinaan Pemberdayaan Zakat
Pengelolaan dan Pembinaan Penerangan Agama Islam
Pengelolaan Urusan Agama Islam dan Pembinaan Syariah
Dukungan Manajemen dan Pelaksanaan Tugas Teknis Lainnya
Bimas Islam
Peningkatan Akses, Mutu, Kesejahteraan dan Subsidi Pendidikan
Agama Islam
70,580,967,000
150,000,000
62,994,000
929,220,000
98,470,000
1,292,860,000
63,800,000
35,000,000
643,200,000
933,240,000
3,732,973,000
110,620,000
37,496,000
6,008,300,000
35,771,663,000
239,700,000
77,700,000
186,749,000
942,854,000
170,840,000
120,000,000
Page 146
SUMBER
PEMBIAYAAN
6
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Dukungan Manajemen dan Pelaksanaan Tugas Teknis Lainnya
Bimas Katolik
ANGGARAN
(Rp.)
5
638,386,000
913,114,000
54,215,000
11,411,000
340,059,000
14,400,000
135,107,000
5,565,560,000
11,301,036,000
49,285,887,000
100,000,000
64,314,000
1,030,237,000
107,330,000
674,670,000
50,000,000
61,800,000
35,000,000
377,800,000
1,668,050,000
2,124,646,000
219,500,000
28,746,000
593,300,000
Page 147
12,820,110,000
113,700,000
113,700,000
155,156,000
6,027,976,000
SUMBER
PEMBIAYAAN
6
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Pengelolaan dan Pembinaan Pendidikan Agama Katolik
Pengelolaan dan Pembinaan Urusan Agama Katolik
Dukungan Manajemen dan Pelaksanaan Tugas Teknis Lainnya
Bimas Katolik
Penyelenggaraan Administrasi Perkantoran Pendidikan Bimas
Katolik
Pelayanan Haji Dalam Negeri
Pembinaan Haji dan Umrah
Dukungan Manajemen dan Pelaksanaan Tugas Teknis Lainnya
Penyelenggaraan Haji dan Umrah
ANGGARAN
(Rp.)
5
525,482,000
254,600,000
2,730,412,000
7,416,031,000
53,270,000
10,386,000
169,571,000
4,235,512,000
7,524,588,000
Sintang
Pembinaan Kerukunan Hidup Umat Beragama
Pembinaan Administrasi Kepegawaian
Pembinaan Administrasi Keuangan dan BMN
Pembinaan Administrasi Perencanaan
Pembinaan Administrasi Umum
Pengelolaan dan Pembinaan Pemberdayaan Wakaf
Pengelolaan dan Pembinaan Pemberdayaan Zakat
Pengelolaan dan Pembinaan Penerangan Agama Islam
Pengelolaan Urusan Agama Islam dan Pembinaan Syariah
Dukungan Manajemen dan Pelaksanaan Tugas Teknis Lainnya
Bimas Islam
Peningkatan Akses, Mutu, Kesejahteraan dan Subsidi Pendidikan
Agama Islam
46,541,284,000
101,960,000
69,594,000
1,210,450,000
83,800,000
644,960,000
61,800,000
35,000,000
315,600,000
732,350,000
2,243,790,000
109,960,000
38,788,000
512,700,000
13,030,072,000
77,700,000
113,700,000
140,129,000
7,831,580,000
401,040,000
147,800,000
Page 148
SUMBER
PEMBIAYAAN
6
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Dukungan Manajemen dan Pelaksanaan Tugas Teknis Lainnya
Bimas Katolik
Penyelenggaraan Administrasi Perkantoran Pendidikan Bimas
Katolik
Pelayanan Haji Dalam Negeri
Pembinaan Haji dan Umrah
Dukungan Manajemen dan Pelaksanaan Tugas Teknis Lainnya
Penyelenggaraan Haji dan Umrah
ANGGARAN
(Rp.)
5
2,097,355,000
6,137,202,000
57,275,000
10,136,000
239,928,000
3,106,730,000
6,989,885,000
Kalimantan Utara
Malinau
Pembinaan
Pembinaan
Pembinaan
Pembinaan
Pembinaan
Pembinaan
Pembinaan
Pembinaan
32,289,056,000
10,442,071,000
40,000,000
34,685,000
108,977,000
1,167,658,000
13,889,000
93,309,000
1,017,346,000
48,360,000
12,000,000
35,040,000
29,400,000
343,255,000
693,136,000
1,329,416,000
30,000,000
42,000,000
Page 149
624,237,000
1,828,318,000
40,000,000
40,000,000
189,502,000
SUMBER
PEMBIAYAAN
6
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Penyelenggaraan Administrasi Perkantoran Pendidikan Bimas
Kristen
ANGGARAN
(Rp.)
5
1,311,712,000
250,000,000
75,000,000
356,348,000
391,800,000
100,000
35,000,000
19,350,000
242,233,000
21,846,985,000
47,200,000
20,455,000
64,115,000
1,003,179,000
33,808,000
24,670,000
960,701,000
50,000,000
10,000,000
185,000,000
54,000,000
80,000,000
461,519,000
1,310,858,000
4,163,299,000
48,000,000
66,000,000
4,370,116,000
5,488,840,000
40,000,000
Page 150
SUMBER
PEMBIAYAAN
6
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
3
Pengelolaan dan Pembinaan Urusan Agama Kristen
Dukungan Manajemen dan Pelaksanaan Tugas Teknis Lainnya
Bimas Kristen
Penyelenggaraan Administrasi Perkantoran Pendidikan Bimas
Kristen
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
40,000,000
102,343,000
2,159,431,000
292,317,000
310,648,000
52,000,000
35,000,000
19,800,000
353,686,000
222,060,930,000
38,966,754,000
89,294,000
25,437,000
44,530,000
1,022,624,000
45,100,000
732,490,000
20,875,000
33,516,000
250,000,000
20,000,000
30,810,000
87,690,000
1,253,730,000
809,615,000
166,290,000
76,800,000
Page 151
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Peningkatan Akses, Mutu, Kesejahteraan dan Subsidi RA/BA dan
Madrasah
Dukungan Manajemen Pendidikan dan Pelayanan Tugas Teknis
Lainnya Pendidikan Islam
Pengelolaan dan Pembinaan Pendidikan Agama Kristen
Pengelolaan dan Pembinaan Urusan Agama Kristen
Dukungan Manajemen dan Pelaksanaan Tugas Teknis Lainnya
Bimas Kristen
Penyelenggaraan Administrasi Perkantoran Pendidikan Bimas
Kristen
Pengelolaan dan Pembinaan Pendidikan Agama Katolik
Pengelolaan dan Pembinaan Urusan Agama Katolik
Dukungan Manajemen dan Pelaksanaan Tugas Teknis Lainnya
Bimas Katolik
Penyelenggaraan Administrasi Perkantoran Pendidikan Bimas
Katolik
Pelayanan Haji Dalam Negeri
Pembinaan Haji dan Umrah
Pengelolaan Dana Haji
Dukungan Manajemen dan Pelaksanaan Tugas Teknis Lainnya
Penyelenggaraan Haji dan Umrah
ANGGARAN
(Rp.)
5
2,621,630,000
5,126,745,000
174,200,000
137,220,000
30,000,000
7,420,116,000
145,000,000
111,000,000
726,645,000
1,134,363,000
49,430,000
48,640,000
1,000,000
163,864,000
6,745,672,000
9,622,428,000
Belu
Pembinaan
Pembinaan
Pembinaan
Pembinaan
Pembinaan
Pembinaan
Pembinaan
35,567,712,000
489,294,000
25,437,000
50,530,000
1,929,365,000
25,330,000
1,127,150,000
29,000,000
20,000,000
30,810,000
70,730,000
334,735,000
849,305,000
113,370,000
Page 152
SUMBER
PEMBIAYAAN
6
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
3
Peningkatan Akses, Mutu, Kesejahteraan dan Subsidi Pendidikan
Keagamaan Islam
Peningkatan Akses, Mutu, Kesejahteraan dan Subsidi RA/BA dan
Madrasah
Dukungan Manajemen Pendidikan dan Pelayanan Tugas Teknis
Lainnya Pendidikan Islam
Pengelolaan dan Pembinaan Pendidikan Agama Kristen
Pengelolaan dan Pembinaan Urusan Agama Kristen
Dukungan Manajemen dan Pelaksanaan Tugas Teknis Lainnya
Bimas Kristen
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
6
25,000,000
731,595,000
2,122,182,000
97,270,000
89,820,000
30,000,000
2,347,860,000
1,422,842,000
427,800,000
2,968,038,000
19,891,869,000
10,800,000
54,648,000
46,200,000
47,930,000
47,610,000
1,000,000
110,192,000
125,816,969,000
8,000,000
161,224,000
37,905,000
1,797,240,000
4,118,158,000
Pembinaan
Pembinaan
Pembinaan
Pembinaan
Pembinaan
95,260,000
24,937,000
52,300,000
1,319,239,000
41,130,000
Page 153
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Pembinaan Administrasi Umum
Pembinaan Administrasi Informasi Keagamaan dan Kehumasan
Pengelolaan dan Pembinaan Pemberdayaan Wakaf
Pengelolaan dan Pembinaan Pemberdayaan Zakat
Pengelolaan dan Pembinaan Penerangan Agama Islam
Pengelolaan Urusan Agama Islam dan Pembinaan Syariah
Dukungan Manajemen dan Pelaksanaan Tugas Teknis Lainnya
Bimas Islam
ANGGARAN
(Rp.)
5
970,436,000
54,300,000
20,000,000
30,810,000
74,330,000
383,110,000
1,271,823,000
130,870,000
135,250,000
714,280,000
3,685,705,000
437,420,000
122,820,000
30,000,000
13,732,320,000
236,000,000
161,400,000
1,541,409,000
3,976,399,000
43,030,000
38,630,000
21,000,000
199,526,000
2,681,280,000
4,168,598,000
Page 154
265,828,000
1,217,882,000
SUMBER
PEMBIAYAAN
6
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Peningkatan Akses, Mutu, Kesejahteraan dan Subsidi RA/BA dan
Madrasah
Dukungan Manajemen Pendidikan dan Pelayanan Tugas Teknis
Lainnya Pendidikan Islam
Pembinaan
Pembinaan
Pembinaan
Pembinaan
Pembinaan
Pembinaan
ANGGARAN
(Rp.)
5
262,658,000
647,362,000
96,360,000
36,610,000
1,187,491,000
40,350,000
492,150,000
15,000,000
32,766,000
20,000,000
30,810,000
146,330,000
1,181,760,000
1,396,215,000
493,290,000
25,000,000
935,240,000
8,102,403,000
514,570,000
133,620,000
2,919,478,000
11,023,682,000
470,000,000
150,600,000
3,139,143,000
6,884,227,000
Page 155
171,500,000
100,800,000
69,580,000
SUMBER
PEMBIAYAAN
6
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Penyelenggaraan Administrasi Perkantoran Pendidikan Bimas
Hindu
ANGGARAN
(Rp.)
5
896,757,000
74,965,000
186,780,000
21,000,000
107,862,000
260,470,000
969,015,000
19,290,638,000
3,503,509,000
15,787,129,000
21,709,495,000
89,294,000
25,437,000
38,620,000
1,119,537,000
36,400,000
974,770,000
25,000,000
20,000,000
30,810,000
67,130,000
295,585,000
642,827,000
93,870,000
25,000,000
446,790,000
789,020,000
123,455,000
89,820,000
Page 156
SUMBER
PEMBIAYAAN
6
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
3
Dukungan Manajemen dan Pelaksanaan Tugas Teknis Lainnya
Bimas Kristen
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
6
30,000,000
2,231,448,000
596,000,000
327,000,000
1,630,789,000
11,769,101,000
44,230,000
45,330,000
1,000,000
101,232,000
37,457,575,000
26,947,953,000
40,000,000
32,050,000
863,299,000
17,600,000
1,231,482,000
233,000,000
28,720,000
15,760,000
318,650,000
646,180,000
875,946,000
25,000,000
22,640,000
1,897,200,000
9,255,144,000
144,080,000
70,000,000
1,638,753,000
Page 157
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Penyelenggaraan Administrasi Perkantoran Pendidikan Bimas
Kristen
ANGGARAN
(Rp.)
5
5,179,375,000
75,000,000
103,800,000
354,633,000
21,020,000
51,910,000
97,963,000
727,972,000
2,980,776,000
10,509,622,000
40,000,000
37,050,000
927,553,000
22,000,000
710,863,000
40,000,000
19,000,000
12,000,000
48,000,000
295,090,000
760,894,000
30,000,000
22,640,000
540,800,000
476,625,000
431,080,000
80,000,000
654,754,000
Page 158
4,402,715,000
SUMBER
PEMBIAYAAN
6
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
3
Pengelolaan dan Pembinaan Pendidikan Agama Katolik
Pengelolaan dan Pembinaan Urusan Agama Katolik
Dukungan Manajemen dan Pelaksanaan Tugas Teknis Lainnya
Bimas Katolik
Penyelenggaraan Administrasi Perkantoran Pendidikan Bimas
Katolik
Pelayanan Haji Dalam Negeri
Pembinaan Haji dan Umrah
Dukungan Manajemen dan Pelaksanaan Tugas Teknis Lainnya
Penyelenggaraan Haji dan Umrah
Maluku Utara
Morotai
Pembinaan
Pembinaan
Pembinaan
Pembinaan
Pembinaan
Pembinaan
Pembinaan
Pembinaan
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
75,000,000
118,200,000
401,766,000
168,000,000
24,840,000
81,350,000
89,402,000
13,995,163,000
13,995,163,000
144,320,000
102,000,000
43,760,000
877,265,000
266,000,000
17,500,000
513,320,000
33,000,000
24,000,000
2,500,000,000
26,850,000
44,650,000
170,000,000
425,938,000
738,596,000
167,754,000
16,000,000
4,297,855,000
1,327,125,000
Page 159
20,000,000
94,000,000
40,000,000
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Penyelenggaraan Administrasi Perkantoran Pendidikan Bimas
Kristen
Pelayanan Haji Dalam Negeri
Pembinaan Haji dan Umrah
Dukungan Manajemen dan Pelaksanaan Tugas Teknis Lainnya
Penyelenggaraan Haji dan Umrah
Peningkatan Akses, Mutu, Kesejahteraan dan Subsidi RA/BA dan
Madrasah
Dukungan Manajemen Pendidikan dan Pelayanan Tugas Teknis
Lainnya Pendidikan Islam
Papua
Boven Digoel
Pembinaan
Pembinaan
Pembinaan
Pembinaan
Pembinaan
Pembinaan
ANGGARAN
(Rp.)
5
133,900,000
40,000,000
78,682,000
125,206,000
1,049,450,000
677,992,000
30,640,899,000
4,614,921,000
40,000,000
27,200,000
831,796,000
30,860,000
721,550,000
5,000,000
36,000,000
1,009,999,000
503,684,000
55,000,000
143,100,000
35,000,000
277,009,000
50,000,000
79,000,000
738,181,000
31,542,000
3,897,347,000
40,000,000
27,200,000
518,848,000
30,800,000
459,800,000
Page 160
SUMBER
PEMBIAYAAN
6
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
3
Pembinaan Administrasi Informasi Keagamaan dan Kehumasan
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
6
2,500,000
10,800,000
294,574,000
80,000,000
112,100,000
35,000,000
722,221,000
200,000,000
76,000,000
1,203,504,000
84,000,000
19,364,800,000
97,200,000
110,890,000
53,118,000
40,000,000
27,200,000
1,085,297,000
32,400,000
1,490,568,000
5,000,000
9,000,000
50,000,000
138,000,000
173,975,000
699,205,000
1,836,460,000
6,445,623,000
90,000,000
184,600,000
Page 161
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
3
Dukungan Manajemen dan Pelaksanaan Tugas Teknis Lainnya
Bimas Kristen
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
6
35,000,000
2,162,908,000
300,000,000
139,800,000
2,363,850,000
1,322,400,000
24,000,000
38,560,000
275,507,000
80,000,000
54,239,000
2,763,831,000
40,000,000
27,200,000
631,027,000
35,300,000
448,016,000
5,000,000
23,999,000
396,993,000
68,440,000
193,666,000
35,000,000
612,262,000
246,928,000
Papua Barat
Raja Ampat
9,168,591,000
9,168,591,000
50,000,000
52,000,000
220,380,000
Page 162
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
Pembinaan
Pembinaan
Pembinaan
Pembinaan
Pembinaan
Administrasi
Administrasi
Administrasi
Administrasi
Administrasi
VOLUME
3
Keuangan dan BMN
Organisasi dan Tata Laksana
Perencanaan
Umum
Informasi Keagamaan dan Kehumasan
ANGGARAN
(Rp.)
5
773,468,000
23,650,000
242,120,000
1,245,361,000
4,500,000
4,080,000
7,700,000
292,566,000
1,832,552,000
259,870,000
267,817,000
179,296,000
1,228,619,000
300,000,000
85,800,000
399,963,000
36,000,000
122,830,000
283,606,000
3 Paket
Page 163
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
39,740,000
10,000,000
242,100,000
569,638,000
394,935,000
SUMBER
PEMBIAYAAN
5,619,024,000
1,819,305,000
1,819,305,000
1,819,305,000
01
SUNGAI BETUNG
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
Sulawesi Utara
Kepulauan Sangihe
1 Paket
1,116,269,000
1,116,269,000
1,116,269,000
01
2 Paket
2,683,450,000
2,683,450,000
2,683,450,000
01
80 Pilar
80 BSP
6,979,561,000
2,766,888,000
876,888,000
680,000,000
196,888,000
80 NLP
630,000,000
630,000,000
40 NLP
1,260,000,000
1,260,000,000
16 Pilar
1,114,073,000
673,073,000
673,073,000
14 NLP
441,000,000
441,000,000
Polres Sangihe :
a. Pembangunan Tanggul Penahan Tanah Polsek Marore
Maluku
Maluku Tenggara Barat
Polres Maluku Tenggara Barat :
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
MARORE
BABAR,
SERWARU
Belu
Kalimantan Barat
Sintang
Sambas
Pemotretan Udara dan pembuatan peta segmen batas RI
Kalimantan Timur
Nunukan
348,600,000
174,300,000
Page 164
Mutis
Tasifeto Timur
Miomafo Barat
Amfoang Timur
Lasiolat
Ketungai
Tengah,
Ketungau Hulu
Pemotretan
Udara dan
pembuatan peta
segmen batas RI
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
3
Pembuatan peta kecamatan kawasan perbatasan RI-Malaysia
4
42 NLP
5
174,300,000
41 NLP
174,300,000
174,300,000
10 Pilar
2,750,000,000
2,750,000,000
2,750,000,000
1 Paket
48,726,825,000
24,425,000,000
24,425,000,000
14,000,000,000
1 Paket
10,425,000,000
2 Ops
1 Ops
9 Keg
6 Keg
22,857,745,000
18,864,345,000
7,986,800,000
9,058,495,000
1,115,190,000
703,860,000
Malinau
Papua
Merauke
Pembuatan, pemasangan dan pemeliharaan pilar batas RI-PNG
3,993,400,000
Page 165
SUMBER
PEMBIAYAAN
6
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Kayan
Hilir,Pulungan,B
ahau
Hulu,Krayan
Selatan, Krayan,
Lumbis ogong,
Tulin Onsoi, Sei
Menggaris,
Nunukan
Kayan
Hilir,Pulungan,B
ahau
Hulu,Krayan
Selatan, Krayan,
Lumbis ogong,
Tulin Onsoi, Sei
Menggaris,
Nunukan
Ulilin
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Operasi bersama kamla dengan Australia (kegiatan di Laut Timor
dan ZEE)
ANGGARAN
(Rp.)
4
1 Ops
5
3,993,400,000
1 Paket
1,444,080,000
722,040,000
722,040,000
1 Paket
722,040,000
722,040,000
Papua
Jayapura
Merauke
SUMBER
PEMBIAYAAN
6
51,873,205,000
2,500,000,000
2,500,000,000
1,500,000,000
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Sukakarya
1,000,000,000
1 Unit
1 Unit
172,000,000
172,000,000
43,000,000
43,000,000
01
01
Rangsang
Rangsang Barat
1 Unit
1 Unit
43,000,000
43,000,000
01
01
Merbau
Pulau Merbau
1 Unit
176,000,000
44,000,000
44,000,000
01
Serasan
1 Unit
44,000,000
44,000,000
01
Jemaja
1 Unit
1 Unit
88,000,000
44,000,000
44,000,000
01
01
Ungar
Meral Barat
Riau
Meranti
Kepulauan Riau
Natuna
Anambas
Karimun
Kalimantan Barat
Kapuas Hulu
4,122,000,000
1,788,000,000
1,500,000,000
1 Unit
1 Unit
Page 166
48,000,000
48,000,000
Badau
01
01
Badau
Puring Kencana
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Pengadaan Kendaraan Operasional Roda 2 (Trail)
Pengadaan Kendaraan Operasional Roda 2 (Trail)
Pengadaan Kendaraan Operasional Roda 2 (Trail)
4
1 Unit
1 Unit
1 Unit
1 Unit
Sanggau
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
5
48,000,000
48,000,000
48,000,000
6
01
01
01
48,000,000
01
546,000,000
450,000,000
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Batang Lupar
Embaloh Hulu
Putussibau
Utara
Putussibau
Selatan
Entikong
48,000,000
48,000,000
01
01
Entikong
Sekayam
1,596,000,000
1,500,000,000
01
Jagoi Babang
dan Siding
1 Unit
1 Unit
48,000,000
48,000,000
01
01
Jagoi Babang
Siding
1 Unit
96,000,000
48,000,000
01
Sajingan Besar
1 Unit
48,000,000
01
Paloh
1 Unit
1 Unit
96,000,000
48,000,000
48,000,000
01
01
Ketungau Hulu
Ketungau
Tengah
23,677,199,000
17,282,199,000
2,400,000,000
9,000,000,000
01
01
Lumbis Ogong
Nunukan
4,688,199,000
01
900,000,000
49,000,000
49,000,000
49,000,000
49,000,000
01
01
01
01
01
Sambas
Sintang
Pengadaan Kendaraan Operasional Roda 2 (Trail)
Pengadaan Kendaraan Operasional Roda 2 (Trail)
Kalimantan Utara
Nunukan
Pembangunan Tambatan Perahu Kec. Lumbis Ogong
Pembangunan Dermaga Ponton Pelabuhan Liem Hie Djung sebagai
sarana penyeberangan Kab Nunukan-Tawau Malaysia
Modernisasi Moda Transportasi Laut (Penyebrangan Kapal
Penumpang dan Barang Lintas Sebatik -Tawau Malaysia 30 GT)
Pengadaan
Pengadaan
Pengadaan
Pengadaan
Pengadaan
(Trail)
(Trail)
(Trail)
(Trail)
1
1
1
1
Page 167
Unit
Unit
Unit
Unit
Sebatik
Krayan
Krayan Selatan
Lumbis Ogong
Tulin Onsoi
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Pengadaan Kendaraan Operasional Roda 2 (Trail)
Pengadaan Kendaraan Operasional Roda 2 (Trail)
4
1 Unit
1 Unit
Malinau
Pembangunan Jalan Non Status Kec Kayan Hulu
Pengadaan Kendaraan Operasional Roda 2 (Trail)
Pengadaan Kendaraan Operasional Roda 2 (Trail)
Pengadaan Kendaraan Operasional Roda 2 (Trail)
Pengadaan Kendaraan Operasional Roda 2 (Trail)
Pengadaan Kendaraan Operasional Roda 2 (Trail)
1
1
1
1
1
Unit
Unit
Unit
Unit
Unit
Kalimantan Timur
Mahakam Ulu
Pembangunan Tambatan Perahu Kec. Long Apari
Pengadaan Speed Boat Operasional Sungai KPP Mahakam Ulu
Pengadaan Kendaraan Operasional Roda 2 (Trail)
Pengadaan Kendaraan Operasional Roda 2 (Trail)
1 Unit
1 Unit
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
5
49,000,000
49,000,000
6
01
01
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Sebuku
Sei Menggaris
6,395,000,000
6,150,000,000
49,000,000
49,000,000
49,000,000
49,000,000
49,000,000
01
01
01
01
01
01
Kayan Hulu
Kayan Hulu
Pujungan
Kayan Hilir
Bahau Hulu
Kayan Selatan
1,710,524,000
1,710,524,000
900,000,000
711,604,000
01
01
Long Apari
49,460,000
49,460,000
01
01
Long Apari
Long Pahangai
8,519,248,000
5,299,400,000
3,000,000,000
01
Kobalima Timur
1,200,000,000
01
Kobalima Timur
1,000,000,000
01
49,700,000
01
Kobalima Timur
Kobalima
Mahakam Ulu
1 Unit
1 Unit
49,700,000
01
1 Unit
1 Unit
1,822,848,000
1,574,348,000
49,700,000
49,700,000
01
01
01
1 Unit
49,700,000
01
Nanaet Duabesi
1 Unit
1 Unit
49,700,000
49,700,000
01
01
Raihat
Lasiolat
Belu
Alor
999,400,000
Page 168
Lamaknen
Lamaknen
Selatan
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
3
Pengadaan Bibit Rumput Laut dan Bibit Bawang di Kec. Teluk
Mutiara Kab. Alor
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
5
900,000,000
6
01
49,700,000
49,700,000
01
01
Alor Timur
Pantai Mutiara
Unit
Unit
Unit
Unit
Unit
Unit
298,200,000
49,700,000
49,700,000
49,700,000
49,700,000
49,700,000
49,700,000
01
01
01
01
01
01
Musi
Mutis
Miomafo Barat
Bikomi Utara
Bikomi Nilulat
Naibenu
1 Unit
49,700,000
49,700,000
01
Amfoang Timur
1 Unit
49,700,000
49,700,000
01
1,498,500,000
1,349,250,000
1,200,000,000
01
01
01
01
1 Unit
1 Unit
Pengadaan
Pengadaan
Pengadaan
Pengadaan
Pengadaan
Pengadaan
1
1
1
1
1
1
Operasional
Operasional
Operasional
Operasional
Operasional
Operasional
Roda
Roda
Roda
Roda
Roda
Roda
2
2
2
2
2
2
(Trail)
(Trail)
(Trail)
(Trail)
(Trail)
(Trail)
Kupang
Rote Ndao
Sulawesi Utara
Kepulauan Sangihe
Peningkatan Sarana Perikanan Budidaya Pembangunan Hatchery
di Kab. Sangihe
Pengadaan Kendaraan Operasional Roda 2 (Trail)
Pengadaan Kendaraan Operasional Roda 2 (Trail)
Pengadaan Kendaraan Operasional Roda 2 (Trail)
1 Unit
1 Unit
1 Unit
49,750,000
49,750,000
49,750,000
1 Unit
1 Unit
1 Unit
149,250,000
49,750,000
49,750,000
49,750,000
Kepulauan Talaud
Maluku
Maluku Tenggara Barat
Marore
Kendahe
Tabukan Utara
Miangas
Melonguane
Nanusa
2,249,400,000
2,099,700,000
500,000,000
1,450,000,000
Taninbar
Selatan
1 Unit
49,900,000
01
Tanimbar
Selatan
1 Unit
49,900,000
01
Tanimbar Utara
Page 169
NO
PROVINSI/
KABUPATEN/KOTA
PROGRAM/KEGIATAN
VOLUME
ANGGARAN
(Rp.)
SUMBER
PEMBIAYAAN
5
49,900,000
6
01
LOKASI KEGIATAN
LOKASI
NON LOKASI
PRIORITAS
PRIORITAS
7
8
Selaru
3
Pengadaan Kendaraan Operasional Roda 2 (Trail)
4
1 Unit
1 Unit
1 Unit
149,700,000
49,900,000
49,900,000
01
01
Wetar
Pulau-pulau
Terselatan
1 Unit
49,900,000
01
Pulau Leti
1 Unit
99,800,000
99,800,000
49,900,000
01
Morotai Selatan
1 Unit
49,900,000
01
Morotai Jaya
01
01
01
01
Ulilin
Elikobel
Sota
Naukenjerai
Maluku Utara
Morotai
Papua
Jayapura
7,148,534,000
2,748,534,000
1,248,534,000
1,500,000,000
Merauke
Pembangunan Speed Boat Surveyor di Kab Merauke
Pembangunan Asrama Siswa, Kec. Sota, Kab. Merauke
Pengadaan Kendaraan Operasional Roda 2 (Trail)
Pengadaan Kendaraan Operasional Roda 2 (Trail)
Pengadaan Kendaraan Operasional Roda 2 (Trail)
Pengadaan Kendaraan Operasional Roda 2 (Trail)
1
1
1
1
Unit
Unit
Unit
Unit
4,050,000,000
2,350,000,000
1,500,000,000
50,000,000
50,000,000
50,000,000
50,000,000
1 Unit
1 Unit
1 Unit
150,000,000
50,000,000
50,000,000
50,000,000
01
01
01
Arso Timur
Web
Senggi
Pengadaan
Pengadaan
Pengadaan
Pengadaan
1
1
1
1
200,000,000
50,000,000
50,000,000
50,000,000
50,000,000
01
01
01
01
Mindiptana
Waropko
Kombut
Jair
Keerom
Boven Digoel
Kendaraan
Kendaraan
Kendaraan
Kendaraan
Operasional
Operasional
Operasional
Operasional
Roda
Roda
Roda
Roda
2
2
2
2
(Trail)
(Trail)
(Trail)
(Trail)
TOTAL
Unit
Unit
Unit
Unit
13,035,487,236,359