Anda di halaman 1dari 6
L&T-SARGENT & LUNDY LIMITED L&T Engineering Cente, 124 Delhi Mathura Road, Faridabad - 121003, Haryana, tne Ph. : +91-129-4291000 / 1101 Fax : #91-129-4291103 Visit us at www Intsnl.com VENDOR DOCUMENT TRANS ‘AL Riis aeaap eae ‘Our Ref. TESUSSTPPIBHEL T-0359 an Dy. Manager (PG-II-3), Power sector, PEM. Date 17.05.19 HRD & ESI complex, Plot No. 25, Sector-16 A Your Ref PESO2-327-8CU-165 NOIDA -20130t (UP). Date 11.05.10 Project ‘SHREE SINGAM TPP STAGE - 2 X 600 MW Subject ‘Comments on PAE Sizing Calculation (R-2) Vendor: | BHEL SN] Deg’ Document No. Description Rev. | Shi. ] Copy | Action i Code 1 _ | PEDC-327-179-NOO3 | PHE Sizing Calculation @ [ss] a ‘ACTION CODE: COPIES TO 2 APPROVED AS SUBMITTED, PROCEED WITH | Taitals7 Deparment ‘with Encl | without Enct FABRIC/ CONSTRICTION / MANUFACTURING [Me UN Hoikar EDIPRG, MPPGCL, Rampur v 3. APPROVED SUBJECT TOCOMMENTS NOTED, — | Jebaipur-482008, PROCEED WITH CONSTRUCTION CONSIDERING [ Vir SK Shab COMMENTS AND RESUBMIT DRGS. AFTER | CE/Thermal J INCORPORATING COMMENTS, MPPGCL. Shakti Bhawan Rampur, Jabalpur-482008, 4 APPROVED EXCEPY AS NOTED.NOT CLEARED \fe-p.P- Agarwal FOR PROCEEDING WITH MFG. ACTION, AGM/PMG.BHEL, FABRICATION OR CONSTRUCTION. PS-PMG, BHEL House 5" Floor, ‘i RESUBMISSION REQUIRED FOR ACTION20R | A. Wing Siri Foe, ACTION-3 APPROVAL. New Deli -110049, Miz CRPATHAK = 5. DISAPPROVED. SEE ACCOMPANYING LETTER. | CE (Generation), 4 Project Manager, SSTPP (6 FOR INFORMATION & RECORDS ONLY HIG-31,DEENDAYALPURAM | (copies) KHANDWA-450001, ‘ADDITIONAL REMARKS = Your's Faitfally Please refer the attached comment resolution For L&T Sargent & Lundy Lid sheet CRS-VDT-BHEL-0340 BHEL to ensure the correctness of Heat Load & -epate\ Flow requirement of different Auxitiaries. Hemant Pandey Project Manager Head Offce: L&T Energy Conte, Chhani Joke Naka, Vadedara-300002, Guerat, India Py -r@1-266-2772300 277530" Fax:-+01-266.277 5288277 1352 Repd Office LAT Howes, Simla Estat, P.O, Box 278, Murbal -400 0, Phone :91-22.26% 9181/82 Fax: 91-22.2620229 i iS He EE eal u EH ie 3] Le Hi he 1 the contra: H der the 9 design ana ge i a HE BH H al be Seprentaeael get + See a = a Seetasn toantivees S a eee ‘sTATUS CONTRACT, = == LAT-SARGENT & LUNDY LIMITED sian Sra RESET For — Teak] ae fro POWER SECTOR | cone | DESK. ‘os | Peete satin faite coat fs sates [se es mewn rool orl a eae hess mp etn entans re Beare ae = ese oe cette ie rere eee ae & on tats ey 02 —— a a Seer 2 ‘ow cy SYETEX OME SENG ENLEUATIONG FOR TGA urn a coins 8 Sreoron ro sega Se SSSR mtiond = RGKST toe Manton e220, = Rowen = fuer aon oy) Gs Syren Re te} St Seopa 0) ‘exsee en 1MOaEE TT BP meeps) ‘Theva fo rsa aa per a = alow nw snc pentane = ae Onegn OUCH Fonts Oe am Wh Scigrowcrrenioaree Met ahkcane Deny Heo 5 = ‘age Yaenrw anne = to SeugnDucweceeere ee = we Dey A Fo eo we aap ch Ht se > oat ecu a eee eee —— ao ee om eye 80 CALCULATION FORT A rears ec Pies See nccabea wa Pesan Dl fae a ea t 36 dea. H-— tT: Mer aoe peal esac Pima ag ve Oates pace BuGwFiow can oaae [oven eur armEDTier roar Wow TEMP AT PRE OUTET 3 bee PRESSUREDROP THRO PE 7 we hewn won Teale ow Tew ATPHE WET owe GW TEMP ATPHE OUTLET ue1 bee PRESSURE DROP THRO PE wc a ite we oneal ea pe Ta RE SRN eT NSO. Fe SCRE Te ‘ACW DCW SYSTEM PHE SING CALCULATIONS FOR SC AU. eters eran soca 2) CWB AGW sytem PAD: Pene-2105.N001 1) OMOW pum Pa: Pe063%2:1ren0ot ©) OMCW system dan posohy & wee PeDesea sree Hea load = uxc,xar hers, m= Aas flow at (XO), 2 = ow ate He = ater erst (000 Ka) Gs Speticneat(t Kea KOC) Te Tempantre rence (0) ‘Me varius ow equrement ee under pelea Taal Pow Ra Tapas Feat at pov Rise cate? Woes ‘Sey Ps 7am “0 78 a 2 famsncomronoomucn vere as : 38 3 omsaearmas ace 2 ‘ te 4 [oan coun ea pemay ack a ® 1 5 _[inmovancurourrescoon |___ 330 fo 00 ) Tess ow = os whe 1) etait Load = 867 0 keaitr ‘ng 0% marge on eat 75187 x10 Kathir Tempree v0 * * Fe Pant Aha onthe ben nals 10 Cape Caleuation rary sd ow a OCW 6 = or wit Secon se Now ao (ACW se) = DCW towrate XOMEV temper nse "AGW eiparat e OW Tempera ie = om te 1 Seem se aw at (ACH) Stor wie 20 PME Parmeter: Design MCW Faw at PAE = ar we (eur MCW Heat Load PHE = sr Rea ‘ese OMCW cate. = ow Dong Temgersie arene = 5% ‘Debgn DMC ne pasar op 2 OP ame Dasgn ACW Pwr PHE = es Nee Design ACW Heat aa PE = 87 eee ‘esgn ACW inet mp. = 8% Deson Teenie aerocs = 990 Design AGH ie pressure = _10_ we (OVERALL TEMPERATURE RISE CALCULATION aaa oS is Fupmest ‘aus Flow Rate ean 1 fncinta ar awa Tare Tw 2 ome sncur sew ane 058 aa? 5 [seu rotrstne est ‘a0 ‘eo 9 YeFiow = us wi, 1 Teta eat ood = ohee20 0? Keay Temp re0 = oe oe pew RetimnesserTenparaire 9+ 03 2m "© Golan than ant deg C-Hetow Ta eer Pi ace PRE SENG CACHATONS DATE: onas.00 ACW OMCW SYSTEM PHE SIZING CALCULATIONS FOR SG AUX.: Passivated DM water out woe 807 Cub. Mme T = 8 deg.c ‘Aux. Cooling water in ——>- Passivated DM water in M= 807 | Cub. MMe M= 807 Cub. Me T2 3% degC + T= 4730 cep. c | ‘Aux. Cooling water out Me ‘307 Cub. Hr Te. 4539 deg. ‘The design parameters of PHE are summarised as under DMCWW FLOW 807 Cub. mae Mow TEMP. AT PHE INTLET 4739 Deg.c lomcw TEMP. AT PHE OUTLET 38 Deg. c lpRESSURE DROP THRO’ PHE 7 MWC. lacwFLow 807 Cub. mie ACW TEMP. AT PHE INTLET 36.00 Deg. ¢ |AMCW TEMP. AT PHE OUTLET 4599 Deg.c JPRESSURE DROP THRO’ PHE 7 we OTE: ‘Provision to accommodate 25% additonal plates fr future shall be provided in each PHE.

Anda mungkin juga menyukai