PROYECTO: CLASE 4
Moneda: Bolivianos
Tipo de Cambio
CDIGO
6.96
DESCRIPCIN
UND.
CANTIDAD
PRECIO
COSTO
UNITARIO
TOTAL
001
NACIONAL
SXS
ACERO CORRUGADO
KG
209.63
9.05
1,896.70
ASEL
KG
1.10
1,843.43
2,027.77
SWS
ALAMBRE DE AMARRE
KG
15.02
14.96
224.76
CDF
ARENA COMUN
M3
1.55
119.99
186.47
AR_C
ARENA CORRIENTE
M3
1.19
939.60
1,118.12
AREN
ARENA FINA
M3
0.06
995.28
59.72
NHN
M2
137.50
48.02
6,603.30
CSEP
1.00
21,368.59
21,368.59
C-BL
CEMENTO BLANCO
KG
0.25
34.80
8.70
C-PT
CEMENTO IP-30
KG
26.00
7.73
200.87
FRFR
CEMENTO PORTLAND
KG
2,086.00
1.25
2,613.34
YYJY
CLAVO
KG
9.16
19.98
182.97
CDC
GLB
RFRF
GRAVA
M3
GRIF
GRIFO DE 1/2"
6H
LADRILLO 6 HUECOS
LAV
1,146.00
0.50
574.28
5.35
199.96
1,068.99
PZA
1.00
271.44
271.44
PZA
24.00
8.70
208.80
LAVANDERIA DE HA
PZA
1.00
1,183.20
1,183.20
FVFV
MADERA DE CONSTRUCCION
P2
218.00
7.45
1,623.49
PPVC
LT
KIK
PERNOS DE ESPERA ( J )
PZA
DFFV
PINTURA ANTICORROSIVA
GB
BVGB
TPVC
0.04
396.72
15.87
875.00
0.42
365.40
GL
6.25
158.69
991.80
PZA
1.00
449.96
449.96
PZA
4.00
0.97
3.90
ML
3.00
22.27
66.82
SUBTOTAL NACIONAL
43,315.25
TOTAL
43,315.25