PRESUPUESTO DE MATERIALES

PROYECTO: CLASE 4
Moneda: Bolivianos

Tipo de Cambio

CDIGO

6.96

DESCRIPCIN

UND.

CANTIDAD

PRECIO

COSTO

UNITARIO

TOTAL

001

NACIONAL

SXS

ACERO CORRUGADO

KG

209.63

9.05

1,896.70

ASEL

ADITIVO SELLANTE ELSTICO

KG

1.10

1,843.43

2,027.77

SWS

ALAMBRE DE AMARRE

KG

15.02

14.96

224.76

CDF

ARENA COMUN

M3

1.55

119.99

186.47

AR_C

ARENA CORRIENTE

M3

1.19

939.60

1,118.12

AREN

ARENA FINA

M3

0.06

995.28

59.72

NHN

CALAMINA ACANALADA GALVAN. # 28

M2

137.50

48.02

6,603.30

CSEP

CMARA SPTICA PREFABICADA CIRCULAR (ELEM. FONDO,SUPPZA

1.00

21,368.59

21,368.59

C-BL

CEMENTO BLANCO

KG

0.25

34.80

8.70

C-PT

CEMENTO IP-30

KG

26.00

7.73

200.87

FRFR

CEMENTO PORTLAND

KG

2,086.00

1.25

2,613.34

YYJY

CLAVO

KG

9.16

19.98

182.97

CDC

GASTOS MATERIALES REPLANTEO

GLB

RFRF

GRAVA

M3

GRIF

GRIFO DE 1/2"

6H

LADRILLO 6 HUECOS

LAV

1,146.00

0.50

574.28

5.35

199.96

1,068.99

PZA

1.00

271.44

271.44

PZA

24.00

8.70

208.80

LAVANDERIA DE HA

PZA

1.00

1,183.20

1,183.20

FVFV

MADERA DE CONSTRUCCION

P2

218.00

7.45

1,623.49

PPVC

PEGAMENTO PARA PVC

LT

KIK

PERNOS DE ESPERA ( J )

PZA

DFFV

PINTURA ANTICORROSIVA

GB

PLAQUETA DE ALUMINIO FUNDIDO DE 60 X 40

BVGB
TPVC

0.04

396.72

15.87

875.00

0.42

365.40

GL

6.25

158.69

991.80

PZA

1.00

449.96

449.96

TONILLO Y RAMPLUG DE 2" X 6MM

PZA

4.00

0.97

3.90

TUBERA DE PVC 1" CONDUIT

ML

3.00

22.27

66.82

SUBTOTAL NACIONAL

43,315.25

TOTAL

43,315.25