Anda di halaman 1dari 16

DAFTAR ANALISA HARGA SATUAN

PROGRAM
KEGIATAN
LOKASI
TAHUN

: WAJIB BELAJAR PENDIDIKAN DASAR 9 TAHUN


: LANJUTAN PEMBANGUNAN RKB SDN 003 KECAMATAN SEBULU
: KECAMATAN SEBULU
: 2014

A. PEKERJAAN PERSIAPAN, PASIR DAN TANAH


KODE
ANALISA
A.1

INDEK

SAT.

URAIAN

HARGA
SATUAN
( Rp. )

HARGA
BAHAN
( Rp. )

1 M1 MENGUKUR DAN MEMASANG BOUWPLANK

0,012
0,007
0,020
0,100
0,010
0,100
0,005

M3
M3
Kg
OH
OH
OH
OH

Kayu Meranti 5/7 Cm


Kayu Papan 3/20 Cm
Paku Biasa
Tukang
Kepala Tukang Kayu
Pekerja
Mandor

3.100.000,00
3.200.000,00
2.100,00
110.000,00
115.000,00
80.000,00
125.000,00

37.200,00
22.400,00
42,00
11.000,00
1.150,00
8.000,00
625,00
59.642,00

A.2

M3
OH
OH

Tanah Urugan
Pekerja
Mandor

90.000,00
80.000,00
125.000,00

40.000,00
6.250,00
46.250,00

154.250,00

1 M3 URUGAN PASIR

1,200
0,300
0,010

M3
OH
OH

Pasir Urugan
Pekerja
Mandor

130.000,00
80.000,00
125.000,00

156.000,00
24.000,00
1.250,00
156.000,00

25.250,00

181.250,00

1 M3 URUGAN TANAH KEMBALI BEKAS GALIAN

0,250
0,008

OH
OH

Pekerja
Mandor

80.000,00
125.000,00

20.000,00
1.037,50
21.037,50

A.5

80.417,00

108.000,00

108.000,00

A.4

20.775,00

1 M3 URUGAN TANAH BAWAH LANTAI DENGAN PEMADATAN

1,200
0,500
0,050

A.3

UPAH
( Rp. )

JUMLAH
HARGA
( Rp. )

21.037,50

1 M3 GALIAN TANAH BIASA

0,750
0,025

OH
OH

Pekerja
Mandor

80.000,00
125.000,00

60.000,00
3.125,00
63.125,00

63.125,00

B. PEKERJAAN PONDASI
KODE
ANALISA
B.1

INDEK

SAT.

URAIAN

HARGA
SATUAN
( Rp. )

HARGA
BAHAN
( Rp. )

M3
OH
OH
OH
OH

Balok Ulin 10/10 cm


Tukang
Kepala Tukang
Pekerja
Mandor

4.500.000,00
110.000,00
115.000,00
80.000,00
125.000,00

90.000,00
15.950,00
1.667,50
24.000,00
1.875,00
90.000,00

43.492,50

133.492,50

1 M3 PASANGAN BATU GUNUNG 1 : 4

1,100
163,000
0,520
0,600
0,060
1,500
0,075

M3
Kg
M3
OH
OH
OH
OH

Batu Gunung
Semen Pc
Pasir Pasangan (Tgr)
Tukang
Kepala Tukang
Pekerja
Mandor

400.000,00
1.300,00
230.000,00
110.000,00
115.000,00
80.000,00
125.000,00

440.000,00
211.900,00
119.600,00

771.500,00

B.3

JUMLAH
HARGA
( Rp. )

1 TITIK TONGKAT ULIN UK. 10/10 CM - 200CM

0,020
0,145
0,015
0,300
0,015

B.2

UPAH
( Rp. )

66.000,00
6.900,00
120.000,00
9.375,00
202.275,00

973.775,00

1 M3 PASANGAN PONDASI BATU KOSONG / AANSTAMPING

1,200
0,432
0,390
0,039
0,780
0,039

M3
M3
OH
OH
OH
OH

Batu Gunung
Pasir Pasangan (Tgr)
Tukang
Kepala Tukang
Pekerja
Mandor

400.000,00
230.000,00
110.000,00
115.000,00
80.000,00
125.000,00

480.000,00
99.360,00
42.900,00
4.485,00
62.400,00
4.875,00
579.360,00

114.660,00

694.020,00

C. PEKERJAAN PASANGAN + PLESTERAN


KODE
ANALISA
C.1

INDEK

SAT.

URAIAN

HARGA
SATUAN
( Rp. )

HARGA
BAHAN
( Rp. )

1.300,00
1.300,00
230.000,00
110.000,00
115.000,00
80.000,00
125.000,00

65.000,00
14.950,00
9.890,00
11.000,00
1.150,00
25.600,00
1.875,00
89.840,00

39.625,00

129.465,00

1 M2 PASANGAN ROLAG BATA CAMP. 1 PC : 4 PS

100,000 Buah Batu Bata/ Batu Merah


26,550 Kg Semen Pc
0,093 M3 Pasir Pasangan
0,200 OH Tukang
0,020 OH Kepala Tukang
0,650 OH Pekerja
0,030 OH Mandor

1.300,00
1.300,00
230.000,00
110.000,00
115.000,00
80.000,00
125.000,00

130.000,00
34.515,00
21.390,00
22.000,00
2.300,00
52.000,00
3.750,00
185.905,00

C.3

JUMLAH
HARGA
( Rp. )

1 M2 PASANGAN BATU BATA CAMP. 1 PC : 4 PS


50,000 Buah Batu Bata/ Batu Merah
11,500 Kg Semen Pc
0,043 M3 Pasir Pasangan
0,100 OH Tukang
0,010 OH Kepala Tukang
0,320 OH Pekerja
0,015 OH Mandor

C.2

UPAH
( Rp. )

80.050,00

265.955,00

1 M2 PASANGAN BATU BATA CAMP. 1 PC : 2 PS

50,000 Buah Batu Bata/ Batu Merah


18,950 Kg Semen Pc
0,038 M3 Pasir Pasangan
0,100 OH Tukang
0,010 OH Kepala Tukang
0,320 OH Pekerja
0,015 OH Mandor

1.300,00
1.300,00
230.000,00
110.000,00
115.000,00
80.000,00
125.000,00

65.000,00
24.635,00
8.740,00
11.000,00
1.150,00
25.600,00
1.875,00
98.375,00

39.625,00

138.000,00

C.4

1 M2 PLESTERAN DINDING 1 PC : 4 PS t=20mm

8,320
0,032
0,200
0,020
0,260
0,013

Kg
M3
OH
OH
OH
OH

Semen Pc
Pasir Pasangan
Tukang
Kepala Tukang
Pekerja
Mandor

1.300,00
230.000,00
110.000,00
115.000,00
80.000,00
125.000,00

10.816,00
7.360,00
22.000,00
2.300,00
20.800,00
1.625,00
18.176,00

C.5

Kg
M3
OH
OH
OH
OH

Semen Pc
Pasir Pasangan
Tukang
Kepala Tukang
Pekerja
Mandor

1.300,00
230.000,00
110.000,00
115.000,00
80.000,00
125.000,00

17.721,60
6.210,00
22.000,00
2.300,00
20.800,00
1.625,00
23.931,60

46.725,00

70.656,60

1 M2 ACIAN

3,250
0,100
0,010
0,150
0,008

Kg
OH
OH
OH
OH

Semen Pc
Tukang
Kepala Tukang
Pekerja
Mandor

1.300,00
110.000,00
115.000,00
80.000,00
125.000,00

4.225,00
11.000,00
1.150,00
12.000,00
1.000,00
4.225,00

C.7

64.901,00

1 M2 PLESTERAN DINDING 1 PC : 2 PS , t=20mm

13,632
0,027
0,200
0,020
0,260
0,013

C.6

46.725,00

25.150,00

29.375,00

1 M2 PASANGAN KERAMIK LANTAI 40/40 CM

1,000
10,000
0,045
0,125
0,013
0,260
0,013

M2
Kg
M3
OH
OH
OH
OH

Keramik 40/40
Semen Pc
Pasir Pasangan
Tukang
Kepala Tukang
Pekerja
Mandor

75.000,00
1.300,00
230.000,00
110.000,00
115.000,00
80.000,00
125.000,00

75.000,00
13.000,00
10.350,00
13.750,00
1.495,00
20.800,00
1.625,00
98.350,00

37.670,00

136.020,00

C.8

1 M2 PASANGAN LANTAI KERAMIK WC 20/20 CM

1,000
10,040
0,045
0,130
0,013
0,270
0,014

M2
Kg
M3
OH
OH
OH
OH

Keramik 20/20 Cm
Semen Pc
Pasir Pasangan
Tukang
Kepala Tukang
Pekerja
Mandor

75.000,00
1.300,00
230.000,00
110.000,00
115.000,00
80.000,00
125.000,00

75.000,00
13.052,00
10.350,00
14.300,00
1.495,00
21.600,00
1.750,00
98.402,00

C.9

M2
Kg
M3
Kg
OH
OH
OH
OH

Keramik 20/25 Cm
Semen Pc
Pasir Pasangan
Semen warna
Tukang
Kepala Tukang
Pekerja
Mandor

75.000,00
1.300,00
230.000,00
20.000,00
110.000,00
115.000,00
80.000,00
125.000,00

75.000,00
12.090,00
4.140,00
38.800,00
19.800,00
2.070,00
29.600,00
4.625,00
130.030,00

56.095,00

186.125,00

1 M1 PASANGAN SALURAN AIR HUJAN

1,000
1,000
0,010
0,030
0,003
0,150
0,015

m2
m2
M3
OH
OH
OH
OH

Pas. Batu bata


Plasteran
Cor Rabat
Tukang
Kepala Tukang
Pekerja
Mandor

129.465,00
64.901,00
1.129.885,00
110.000,00
115.000,00
80.000,00
125.000,00

129.465,00
64.901,00
11.298,85
3.300,00
345,00
12.000,00
1.875,00
205.664,85

C.11

137.547,00

1 M2 PASANGAN DINDING WC/KM KERAMIK 25/20 CM

1,000
9,300
0,018
1,940
0,180
0,018
0,370
0,037

C.10

39.145,00

17.520,00

223.184,85

1 M2 PASANGAN BATU ALAM

1,000
9,300
0,018
0,180
0,018
0,370
0,037

M2
Kg
M3
OH
OH
OH
OH

Batu alam
Semen Pc
Pasir Pasangan
Tukang
Kepala Tukang
Pekerja
Mandor

350.000,00
1.300,00
230.000,00
110.000,00
115.000,00
80.000,00
125.000,00

350.000,00
12.090,00
4.140,00
19.800,00
2.070,00
29.600,00
4.625,00
366.230,00

56.095,00

422.325,00

D. PEKERJAAN BETON
KODE
ANALISA
D.1

INDEK

SAT.

URAIAN

HARGA
SATUAN
( Rp. )

HARGA
BAHAN
( Rp. )

M3
Kg
M3
HO
HO
HO
HO

Batu Split 1-2


Semen
Pasir Cor
Tukang
Kepala Tukang
Pekerja
Mandor

400.000,00
1.300,00
230.000,00
110.000,00
115.000,00
80.000,00
125.000,00

404.800,00
358.800,00
190.440,00
30.250,00
3.220,00
132.000,00
10.375,00
954.040,00

175.845,00

1.129.885,00

1 M3 BETON CAMPURAN 1 : 2 : 3

1,047
371,000
0,698
0,275
0,028
1,650
0,083

M3
Kg
M3
HO
HO
HO
HO

Batu Split 1-2


Semen
Pasir Cor
Tukang
Kepala Tukang
Pekerja
Mandor

400.000,00
1.300,00
230.000,00
110.000,00
115.000,00
80.000,00
125.000,00

418.800,00
482.300,00
160.540,00
30.250,00
3.220,00
132.000,00
10.375,00
1.061.640,00

D.3

JUMLAH
HARGA
( Rp. )

1 M3 BETON CAMPURAN 1 : 3 : 5 UNTUK PEKERJAAN COR LANTAI KERJA

1,012
276,000
0,828
0,275
0,028
1,650
0,083

D.2

UPAH
( Rp. )

175.845,00

1.237.485,00

1 M2 PASANG BEKISTING UNTUK FOOT PLAT

0,020
0,011
0,245
0,100
0,195
0,020
0,390
0,020

M3
M3
Kg
Lt
OH
OH
OH
OH

Papan Begisting (Meranti)


Balok Begisting (Meranti)
Paku Biasa
Minyak Bekisting
Tukang
Kepala Tukang
Pekerja
Mandor

3.200.000,00
3.100.000,00
19.000,00
5.000,00
110.000,00
115.000,00
80.000,00
125.000,00

64.000,00
34.720,00
4.655,00
500,00
21.450,00
2.242,50
31.200,00
2.437,50
103.875,00

57.330,00

161.205,00

D.4

1 M2 PASANG BEKISTING UNTUK SLOOF

0,035
0,024
0,300
0,100
0,260
0,026
0,520
0,026

Lbr
M3
Kg
Lt
OH
OH
OH
OH

Plywood 9mm
Balok Begisting (Meranti)
Paku Biasa
Minyak Bekisting
Tukang
Kepala Tukang
Pekerja
Mandor

135.000,00
3.100.000,00
19.000,00
5.000,00
110.000,00
115.000,00
80.000,00
125.000,00

4.687,50
75.020,00
5.700,00
500,00
28.600,00
2.990,00
41.600,00
3.250,00
85.907,50

D.5

162.347,50

1 M2 PASANG BEKISTING UNTUK KOLOM

0,400
0,200
0,018
0,350
2,000
0,330
0,033
0,660
0,033

Kg
Lt
M3
Lbr
Btg
OH
OH
OH
OH

Paku Biasa
Minyak Bekisting
Balok kayu Kls II
Plywood Tebal 9 mm
Dolken Kayu Galam
Tukang
Kepala Tukang
Pekerja
Mandor

19.000,00
5.000,00
3.200.000,00
135.000,00
10.000,00
110.000,00
115.000,00
80.000,00
125.000,00

7.600,00
1.000,00
57.600,00
47.250,00
20.000,00
36.300,00
3.795,00
52.800,00
4.125,00
133.450,00

D.6

76.440,00

97.020,00

230.470,00

1 M2 PASANG BEKISTING UNTUK BALOK

0,040
0,400
0,200
0,350
2,000
0,330
0,033
0,660
0,033

M3
Kg
Lt
Lbr
Btg
OH
OH
OH
OH

Kayu Begisting (Meranti)


Paku Biasa
Minyak Bekisting
Plywood Tebal 9 mm
Dolken Kayu Galam
Tukang
Kepala Tukang
Pekerja
Mandor

3.100.000,00
19.000,00
5.000,00
135.000,00
10.000,00
110.000,00
115.000,00
80.000,00
125.000,00

124.000,00
7.600,00
1.000,00
47.250,00
20.000,00
36.300,00
3.795,00
52.800,00
4.125,00
199.850,00

97.020,00

296.870,00

D.7

1 M2 PASANG BEKISTING UNTUK LISTPLANK

0,040
0,600
0,200
0,350
1,500
0,195
0,020
0,390
0,020

M3
Kg
Lt
Lbr
Btg
OH
OH
OH
OH

Kayu Begisting (Meranti)


Paku Biasa
Minyak Bekisting
Plywood Tebal 9 mm
Dolken Kayu Galam
Tukang
Kepala Tukang
Pekerja
Mandor

3.100.000,00
19.000,00
5.000,00
135.000,00
10.000,00
110.000,00
115.000,00
80.000,00
125.000,00

124.000,00
11.400,00
1.000,00
47.250,00
15.000,00
21.450,00
2.242,50
31.200,00
2.437,50
198.650,00

D.8

Kg
Lt
M3
Lbr
Btg
OH
OH
OH
OH

Paku Biasa
Minyak Bekisting
Balok kayu Kls II
Plywood Tebal 9 mm
Dolken Kayu Galam
Tukang
Kepala Tukang
Pekerja
Mandor

19.000,00
5.000,00
3.200.000,00
135.000,00
10.000,00
110.000,00
115.000,00
80.000,00
125.000,00

7.600,00
1.000,00
179.200,00
47.250,00
100.000,00
36.300,00
3.795,00
25.600,00
4.125,00
335.050,00

69.820,00

404.870,00

10 KG PEMBESIAN DENGAN BESI POLOS

10,500
0,150
0,070
0,0070
0,070
0,004

Kg
Kg
OH
OH
OH
OH

Besi Tulangan
Kawat Bindrat
Tukang
Kepala Tukang
Pekerja
Mandor

13.000,00
17.000,00
110.000,00
115.000,00
80.000,00
125.000,00

136.500,00
2.550,00

139.050,00

7.700,00
805,00
5.600,00
500,00
14.605,00

Untuk 1 Kg Pembesian
D.10

255.980,00

1 M2 PASANG BEKISTING UNTUK LANTAI

0,400
0,200
0,056
0,350
10,000
0,330
0,033
0,320
0,033

D.9

57.330,00

153.655,00
15.365,50

1 M3 BETON BERTULANG PEKERJAAN PLAT LANTAI T=10 CM

1,000
112,000
10,000

M3
Kg
M2

Cor Beton Struktur 1 : 2 : 3


Besi Beton (D.7)
Pekerjaan Begisting (D.8)

1.237.485,00
15.365,50
404.870,00

1.237.485,00
1.720.936,00
4.048.700,00
7.007.121,00

7.007.121,00

D.11

1 M3 BETON BERTULANG PEKERJAAN SLOOF 15/20 CM


1,000
174,160
13,333

M3
Kg
M2

Cor Beton Struktur 1 : 2 : 3


Besi Beton (D.7)
Pekerjaan Begisting (D.4)

1.237.485,00
15.365,50
162.347,50

1.237.485,00
2.676.055,48
2.164.633,29
6.078.173,77

D.12

1 M3 BETON BERTULANG PEKERJAAN KOLOM WC 20/20 CM

1,000
219,320
20,000

M3
Kg
M2

Cor Beton Struktur 1 : 2 : 3


Besi Beton (D.7)
Pekerjaan Begisting (D.5)

1.237.485,00
15.365,50
230.470,00

1.237.485,00
3.369.961,46
4.609.400,00
9.216.846,46

D.13

M3
Kg
M2

Cor Beton Struktur 1 : 2 : 3


Besi Beton (D.7)
Pekerjaan Begisting (D.5)

1.237.485,00
15.365,50
230.470,00

1.237.485,00
2.150.801,23
4.148.460,00
7.536.746,23

M3
Kg
M2

Cor Beton Struktur 1 : 2 : 3


Besi Beton (D.7)
Pekerjaan Begisting (D.5)

1.129.885,00
15.365,50
230.470,00

1.129.885,00
2.316.980,82
6.145.866,67
9.592.732,48

9.592.732,48

1 M3 BETON BERTULANG PEKERJAAN KOLOM TERAS 15/50CM

1,000
134,437
17,333

M3
Kg
M2

Cor Beton Struktur 1 : 2 : 3


Besi Beton (D.7)
Pekerjaan Begisting (D.5)

1.237.485,00
15.365,50
230.470,00

1.237.485,00
2.065.696,85
3.994.813,33
7.297.995,18

D.16

7.536.746,23

1 M3 BETON BERTULANG PEKERJAAN KOLOMS PRAKTIS 15/15 CM

1,000
150,791
26,667

D.15

9.216.846,46

1 M3 BETON BERTULANG PEKERJAAN KOLOM 20/25CM


1,000
139,976
18,000

D.14

6.078.173,77

7.297.995,18

1 M3 BETON BERTULANG PEKERJAAN RING BALK 15/20 CM


1,000
156,693
16,667

M3
Kg
M2

Cor Beton Struktur 1 : 2 : 3


Besi Beton (D.7)
Pekerjaan Begisting (D.6)

1.237.485,00
15.365,50
296.870,00

1.237.485,00
2.407.671,41
4.947.833,33
8.592.989,75

8.592.989,75

D.17

1 M3 BETON BERTULANG PEKERJAAN BALOK 15/30 CM


1,000
177,013
13,333

M3
Kg
M2

Cor Beton Struktur 1 : 2 : 3


Besi Beton (D.7)
Pekerjaan Begisting (D.6)

1.237.485,00
15.365,50
296.870,00

1.237.485,00
2.719.898,37
3.958.266,67
7.915.650,04

D.18

7.915.650,04

1 M3 BETON BERTULANG CANOPY TERAS 10X30X2

1,000
118,267
16,667

M3
Kg
M2

Cor Beton Struktur 1 : 2 : 3


Besi Beton (D.7)
Pekerjaan Begisting (D.7)

1.237.485,00
15.365,50
255.980,00

1.237.485,00
1.817.226,47
4.266.333,33
7.321.044,80

7.321.044,80

E. PEKERJAAN KUDA - KUDA DAN ATAP


KODE
ANALISA
E.1

INDEK

SAT.

URAIAN

HARGA
SATUAN
( Rp. )

HARGA
BAHAN
( Rp. )

Btg
Btg
bh
Ls
OH
OH
OH
OH

Btg Rangka Baja ringan C75


Btg Rangka Baja ringan AAA 40X30
bh Baut sekrub
Tools (Cutting well and Drill electric Pwr)
Pekerja
Tukang Baja Ringan
Kep Tukang
Mandor

100.000,00
55.000,00
300,00
9.000,00
80.000,00
110.000,00
115.000,00
125.000,00

120.000,00
52.250,00
5.400,00
9.000,00

186.650,00

Bh
Kg
OH
OH
OH
OH

Genteng Metal
Paku Genteng
Tukang
Kepala Tukang
Pekerja
Mandor

38.000,00
25.000,00
110.000,00
115.000,00
80.000,00
125.000,00

233.422,00

61.560,00
5.000,00
11.000,00
1.150,00
16.000,00
125,00
66.560,00

28.275,00

94.835,00

1 M1 MEMASANG BUBUNGAN ATAP (MODEL U)

1,100
0,050
0,150
0,015
0,250
0,013

Bh
Kg
OH
OH
OH
OH

Bubungan Model U
Paku Genteng
Tukang
Kepala Tukang
Pekerja
Mandor

40.000,00
25.000,00
110.000,00
115.000,00
80.000,00
125.000,00

44.000,00
1.250,00
16.500,00
1.725,00
20.000,00
1.625,00
45.250,00

E.4

25.600,00
17.380,00
1.817,00
1.975,00
46.772,00

1 M2 MEMASANG ATAP GENTENG METAL

1,620
0,200
0,100
0,010
0,200
0,001

E.3

JUMLAH
HARGA
( Rp. )

1 M2 RANGKA BAJA RINGAN


1,200
0,950
18,000
1,000
0,320
0,158
0,016
0,016

E.2

UPAH
( Rp. )

39.850,00

85.100,00

1 M1 PAPAN LISTPLANK KAYU ULIN

0,0108
0,100
0,200
0,025
0,100
0,005

M3
Kg
OH
OH
OH
OH

Papan Ulin
Paku Biasa
Tukang
Kepala Tukang
Pekerja
Mandor

5.500.000,00
19.000,00
110.000,00
115.000,00
80.000,00
125.000,00

59.400,00
1.900,00
22.000,00
2.875,00
8.000,00
625,00
61.300,00

33.500,00

94.800,00

F. PEKERJAAN RANGKA DAN PENUTUP PLAFOND


KODE
ANALISA
F.1

INDEK

SAT.

URAIAN

HARGA
SATUAN
( Rp. )

HARGA
BAHAN
( Rp. )

M1
Kg
OH
OH
OH
OH

Besi Kotak 2x4


Baut sekrup
Tukang
Kepala Tukang
Pekerja
Mandor

13.000,00
300,00
110.000,00
115.000,00
80.000,00
125.000,00

59.540,00
60,00
27.500,00
2.875,00
12.000,00
9.375,00
59.600,00

51.750,00

111.350,00

1 M2 PLAFOND GRC BOARD

0,375
0,030
0,100
0,010
0,070
0,004

Lbr
Kg
OH
OH
OH
OH

GRC BOARD Tebal 4 mm


Paku Plywood
Tukang
Kepala Tukang
Pekerja
Mandor

65.000,00
19.000,00
110.000,00
115.000,00
80.000,00
125.000,00

24.375,00
570,00
11.000,00
1.150,00
5.600,00
500,00
24.945,00

F.3

JUMLAH
HARGA
( Rp. )

1 M2 PENGGANTUNG DAN RANGKA PLAFOND

4,580
0,200
0,250
0,025
0,150
0,075

F.2

UPAH
( Rp. )

18.250,00

43.195,00

1 M1 LIST PLAFOND Kayu profil

1,050
0,010
0,050
0,002
0,050
0,003

M1
Kg
OH
OH
OH
OH

List kayu profil


Paku biasa
Tukang
Kepala Tukang
Pekerja
Mandor

9.000,00
19.000,00
110.000,00
115.000,00
80.000,00
125.000,00

9.450,00
190,00
5.500,00
230,00
4.000,00
375,00
9.640,00

10.105,00

19.745,00

G. PEKERJAAN KUSEN DAN PENGGANTUNG


KODE
ANALISA
G.1

INDEK

SAT.

URAIAN

HARGA
SATUAN
( Rp. )

HARGA
BAHAN
( Rp. )

M3
OH
OH
OH
OH

Kayu Bengkirai Kosen


Tukang
Kepala Tukang
Pekerja
Mandor

5.500.000,00
110.000,00
115.000,00
80.000,00
125.000,00

6.600.000,00
2.200.000,00
230.000,00
480.000,00
37.500,00
6.600.000,00

M3
OH
OH
OH
OH

Kosen Pintu Jendela


Tukang
Kepala Tukang
Pekerja
Mandor

9.547.500,00
110.000,00
115.000,00
80.000,00
125.000,00

6.600,00
1.150,00
9.600,00
125,00
17.475,00

79.533,75

1 M2 PASANG PINTU PANEL KAYU BENGKIRAI

0,040
2,500
0,250
1,000
0,050

M3
OH
OH
OH
OH

Kayu Bengkirai
Tukang
Kepala Tukang
Pekerja
Mandor

5.500.000,00
110.000,00
115.000,00
80.000,00
125.000,00

220.000,00
275.000,00
28.750,00
80.000,00
6.250,00

220.000,00
1 Buah Pintu Panel Double Bengkirai
1 Buah Pintu Panel Tunggal Bengkirai

G.2.1
G.2.2

390.000,00

610.000,00
1.921.500,00
960.750,00

1 M2 PASANG PINTU PANEL ULIN

0,040
2,500
0,250
1,000
0,050

M3
OH
OH
OH
OH

Kayu Ulin
Tukang
Kepala Tukang
Pekerja
Mandor

4.000.000,00
110.000,00
115.000,00
80.000,00
125.000,00

160.000,00
275.000,00
28.750,00
80.000,00
6.250,00
160.000,00

G.3.1

9.547.500,00

62.058,75

62.058,75

G.3

2.947.500,00

1 M1 PEKERJAAN DAN PEMASANGAN KUSEN PINTU DAN JENDELA


0,0065
0,060
0,010
0,120
0,001

G.2

JUMLAH
HARGA
( Rp. )

1 M3 MENGERJAKAN KUSEN PINTU DAN JENDELA

1,200
20,000
2,000
6,000
0,300

G.1.1

UPAH
( Rp. )

1 Buah Pintu Panel Ulin

390.000,00

550.000,00
808.500,00

G.4

1 M2 PASANG DAUN JENDELA KACA

0,035
2,000
0,200
0,800
0,040

M3
OH
OH
OH
OH

Kayu Bengkirai
Tukang
Kepala Tukang
Pekerja
Mandor

192.500,00
220.000,00
23.000,00
64.000,00
5.000,00

192.500,00
1 Buah Daun Jendela Type 1 uk. 40 x 65
1 Buah Daun Jendela Type 2 uk. 40 x 75
1 Buah Daun Jendela Type 3 uk.80 x 65
1 Buah Daun Jendela Type 4 uk. 65 x 100
1 Buah Daun Jendela Type 5 uk. 65 x 150
1 Buah Daun Jendela Type 6 uk. 60 x 100

G.5.1
G.5.2
G.5.3
G.5.4
G.5.5
G.5.6
G.5

5.500.000,00
110.000,00
115.000,00
80.000,00
125.000,00

M3
Kg
OH
OH
OH
OH

Kayu Meranti Merah


Paku Biasa
Tukang
Kepala Tukang
Pekerja
Mandor

3.200.000,00
19.000,00
110.000,00
115.000,00
80.000,00
125.000,00

66.560,00
988,00
76.230,00
7.935,00
13.840,00
1.125,00
67.548,00

99.130,00

166.678,00

1 BH PASANG KUNCI TANAM/BIASA

1,000
0,500
0,010
0,010
0,005

Bh
OH
OH
OH
OH

Kunci Tanam
Tukang
Kepala Tukang
Pekerja
Mandor

225.000,00
110.000,00
115.000,00
80.000,00
125.000,00

225.000,00
55.000,00
1.150,00
800,00
625,00
225.000,00

G.7

504.500,00
131.170,00
151.350,00
262.340,00
327.925,00
491.887,50
302.700,00

1 M2 PASANG JALUSI KAYU MERANTI MERAH


0,021
0,052
0,693
0,069
0,173
0,009

G.6

312.000,00

57.575,00

282.575,00

1 BH PASANG ENGSEL JENDELA KUPU-KUPU

1,000
0,100
0,010
0,010
0,001

Bh
OH
OH
OH
OH

Engsel Jendela
Tukang
Kepala Tukang
Pekerja
Mandor

35.000,00
110.000,00
115.000,00
80.000,00
125.000,00

35.000,00
11.000,00
1.150,00
800,00
62,50
35.000,00

13.012,50

48.012,50

G.8

1 BH PASANG ENGSEL PINTU

1,000
0,150
0,015
0,015
0,001

Bh
OH
OH
OH
OH

Engsel Pintu
Tukang
Kepala Tukang
Pekerja
Mandor

45.000,00
110.000,00
115.000,00
80.000,00
125.000,00

45.000,00
16.500,00
1.725,00
1.200,00
93,75
45.000,00

G.9

Bh
OH
OH
OH
OH

Hak Angin
Tukang
Kepala Tukang
Pekerja
Mandor

25.000,00
110.000,00
115.000,00
80.000,00
125.000,00

25.000,00
16.500,00
1.725,00
1.200,00
93,75
25.000,00

Bh
OH
OH
OH
OH

Handle
Tukang
Kepala Tukang
Pekerja
Mandor

25.000,00
110.000,00
115.000,00
80.000,00
125.000,00

44.518,75

25.000,00
16.500,00
1.725,00
1.200,00
93,75
25.000,00

19.518,75

44.518,75

1 BH GRENDEL

1,000
0,150
0,015
0,015
0,001

Bh
OH
OH
OH
OH

Grendel
Tukang
Kepala Tukang
Pekerja
Mandor

25.000,00
110.000,00
115.000,00
80.000,00
125.000,00

25.000,00
16.500,00
1.725,00
1.200,00
93,75
25.000,00

G.12

19.518,75

1 BH PASANG HANDLE

1,000
0,150
0,015
0,015
0,001

G.11

64.518,75

1 BH PASANG HAK ANGIN

1,000
0,150
0,015
0,015
0,001

G.10

19.518,75

19.518,75

44.518,75

1 M2 PASANG KACA BENING TEBAL 5 MM

1,100
0,150
0,015
0,015
0,001

M2
OH
OH
OH
OH

Kaca
Tukang
Kepala Tukang
Pekerja
Mandor

125.000,00
110.000,00
115.000,00
80.000,00
125.000,00

137.500,00
16.500,00
1.725,00
1.200,00
93,75
137.500,00

19.518,75

157.018,75

I. PEKERJAAN CAT-CATAN
KODE
ANALISA
I.1

INDEK

URAIAN
SAT.

HARGA
SATUAN
( Rp. )

HARGA
BAHAN
( Rp. )

Kg
Kg
OH
OH
OH
OH

Plamir
Cat Penutup setara mowilex min 3 layer
Tukang Cat
Kepala Tukang Cat
Pekerja
Mandor

35.000,00
60.000,00
110.000,00
115.000,00
80.000,00
125.000,00

3.500,00
15.600,00
6.930,00
724,50
1.600,00
375,00
19.100,00

9.629,50

28.729,50

1 M2 PENGECETAN TEMBOK BAGIAN LUAR EX. MOWILEX ATAU SETARA

0,100
0,260
0,063
0,006
0,020
0,003

Kg
Kg
OH
OH
OH
OH

Plamir
Cat Penutup setara mowilex min 3 layer
Tukang Cat
Kepala Tukang Cat
Pekerja
Mandor

35.000,00
85.000,00
110.000,00
115.000,00
80.000,00
125.000,00

3.500,00
22.100,00
6.930,00
724,50
1.600,00
375,00
25.600,00

I.3

JUMLAH
HARGA
( Rp. )

1 M2 PENGECETAN TEMBOK BAGIAN DALAM DAN PLAFON EX. MOWILEX ATAU SETARA

0,100
0,260
0,063
0,006
0,020
0,003

I.2

UPAH
( Rp. )

9.629,50

35.229,50

1 M2 PENGECETAN KAYU DENGAN CAT KILAP

0,150
0,350
0,070
0,105
0,040
0,003

Kg
Kg
OH
OH
OH
OH

Plamir
Cat Penutup
Tukang Cat
Kepala Tukang Cat
Pekerja
Mandor

35.000,00
50.000,00
110.000,00
115.000,00
80.000,00
125.000,00

5.250,00
17.500,00
7.700,00
12.075,00
3.200,00
375,00
22.750,00

23.350,00

46.100,00

Anda mungkin juga menyukai