Rab Kantin
Rab Kantin
No
A.
1
2
3
4
B.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
1
2
3
4
5
6
7
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
URAIAN
UPAH
Pekerja
Tukang
Kepala Tukang
Mandor
BAHAN
Pasangan dan beton
Tanah urug
Timbunan pilihan
Pasir urug
Pasir pasang
Pasir beton
Kerikil beton
Batu kali/batu belah (sungai/gunung)
Bata merah
Paving Block
Semen PC @ 50 Kg
Semen PC
Semen warna
Semen putih @ 50 Kg
Semen putih
Sirtu
Plywood 9 mm
Air
Besi beton polos
Besi beton ulir
Kawat beton
Paku kayu
Minyak bekisting
Kayu
Kayu kelas I
Kayu kelas II
Kayu kelas III
Kayu Perancah
Kayu/Papan Bekisting
Dolken kayu galam (8-10) cm, panjang 4 m
Lem Kayu
Atap dan plafond
Konstruksi kuda-kuda baja ringan
Multiplek / plywood 4 mm
Eternit Uk. 120x240 cm t=3,5 mm (setara Kalsi Board)
Genteng metal 0,3
Rabung seng genteng metal
List Profil
Paku Skrup
Seng Plat
Keramik
Keramik sisi kulit jeruk 20x20 cm
Keramik 20 x 20 cm
Keramik 20 x 25
Keramik 30x30 cm Polished
Keramik 30x30 cm Unpolished
Keramik 40x40 cm (polished)
Keramik 40x40 cm (unpolished)
HARGA SATUAN
Rp.
SATUAN
45,000.00
55,000.00
70,000.00
58,000.00
Orang/Hari
Orang/Hari
Orang/Hari
Orang/Hari
96,408.00
111,240.00
74,160.00
108,000.00
129,600.00
150,000.00
279,600.00
960.00
2,100.00
88,800.00
1,480.00
1,780.00
106,800.00
1,780.00
240,000.00
162,000.00
150.00
11,280.00
12,480.00
14,400.00
14,160.00
12,000.00
/M3
/M
/M
/M
/M
/M
/M
/Buah
/Buah
/Zak
/Kg
/Kg
/Zak
/Kg
/M
/Lbr
/Liter
/Kg
/Kg
/Kg
/Kg
/Liter
3,048,000.00
2,916,000.00
1,830,000.00
2,440,800.00
2,440,800.00
24,720.00
18,000.00
/M
/M
/M
/M
/M
/Btg
/Kg
150,000.00
65,000.00
102,000.00
75,000.00
30,000.00
12,000.00
300.00
108,000.00
/M2
/Lbr
/Lbr
/M2
/M'
/M'
/Bh
/Lbr
5,280.00
5,280.00
6,240.00
7,200.00
7,560.00
8,400.00
8,760.00
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
1
2
3
5
6
7
8
9
10
11
12
29,700.00
16,500.00
22,000.00
17,561.50
34,650.00
30,800.00
45,100.00
3,690.00
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Liter
/Lembar
120,000.00
108,000.00
42,000.00
30,000.00
60,000.00
18,000.00
30,000.00
32,400.00
36,000.00
/Ttk
/Ttk
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
30,000.00
24,000.00
60,000.00
720,000.00
390,000.00
15,000.00
21,600.00
861,000.00
492,000.00
344,400.00
3,690,000.00
3,478.44
5,150.01
20,677.53
23,370.00
35,670.00
69,955.02
86,100.00
9,225.00
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Unit
/Unit
/Unit
/Pkt
/M'
/M'
/M'
/M'
/M'
/M'
/M'
/Bh
136,800.00
108,000.00
30,000.00
20,400.00
12,000.00
10,800.00
13,200.00
48,000.00
108,000.00
165,000.00
201,600.00
/Bh
/Bh
/Psg
/Psg
/Bh
/Bh
/Bh
/Bh
/M2
/M2
/M2
Singkil,
2013
Konsultan Perencana :
CV. HIKMAH CONSULTANT
HILDA FAZLIANA
Direktris
1m'
Pengukuran dan Pemasangan Bouwplank
Bahan
Kayu 5/7 Kelas III
Paku biasa 2" - 5"
Kayu papan 3/20
0.012 M
0.020 Kg
0.007 M
x
x
x
Rp.
Rp.
Rp.
Jumlah (1)
Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.100
0.100
0.010
0.005
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)
OH
OH
OH
OH
RSNI T-12-2002.6.8
SNI 2835:2008.6.1
SNI 2835:2008.6.9
SNI 2835:2008.6.10
SNI 2835:2008.6.11
SNI 2835:2008.6.15
1 m
Membersihkan lapangan dan perataan
Tenaga
Pekerja
Mandor
0.100 OH
0.050 OH
1 m
Galian tanah biasa sedalam 1 meter
Tenaga
Pekerja
Mandor
0.750 OH
0.025 OH
1 m
Urugan kembali
Tenaga
Pekerja
Mandor
x
x
Rp.
Rp.
Jumlah
x
x
Rp.
Rp.
Jumlah
0.250 OH
0.008 OH
x
x
Rp.
Rp.
Jumlah
1 m
Memadatkan tanah (per 20 cm)
Tenaga
Pekerja
Mandor
0.500 OH
0.050 OH
x
x
Rp.
Rp.
Jumlah
1 m
Urugan pasir
Bahan
Pasir urug
1.200 M
Rp.
Jumlah (1)
Tenaga
Pekerja
Mandor
0.300 OH
0.010 OH
x
x
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)
1 m
Mengurug sirtu padat
Bahan
Sirtu
1.200 M
Rp.
Jumlah (1)
Tenaga
Pekerja
Mandor
0.250 Oh
0.025 Oh
x
x
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)
SNI 2835:2008.6.16
1 m
Urugan tanah urug
Bahan
Tanah urug
1.200 M
Rp.
Jumlah (1)
Tenaga
Pekerja
Mandor
0.300 OH
0.010 OH
x
x
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)
SNI 2835:2008.6.17
SNI 2836:2008.6.2
SNI 2836:2008.6.9
1 m
Urugan timbunan pilihan
Bahan
Timbunan pilihan
1.200 M
Rp.
Jumlah (1)
Tenaga
Pekerja
Mandor
0.300 OH
0.010 OH
x
x
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)
1 m
Pasang pondasi batu belah/gunung/kali, 1 Pc : 4 Pp
Bahan
Batu kali/batu belah (sungai/gunung)
1.200 M
Semen portland
163.000 Kg
Pasir pasang
0.520 M
x
x
x
Rp.
Rp.
Rp.
Jumlah (1)
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
1.500
0.750
0.075
0.075
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) +(2)
1 m
Pasang pondasi batu kosong
Bahan
Batu kali
Pasir urug
1.200 M
0.432 M
x
x
Rp.
Rp.
Jumlah (1)
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
0.780
0.390
0.039
0.039
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) +(2)
OH
OH
OH
OH
OH
OH
OH
OH
SNI 2836:2008.6.10
1 m
Pasang pondasi Cyclope 60% Beton Adukan 1Pc : 2Ps : 3Kr + 40% Batu Kali/Belah
Bahan
Batu kali/belah/gunung
0.480 M
x Rp.
Semen Pc
194.000 Kg
x Rp.
Pasir beton
0.312 M
x Rp.
Kerikil beton
0.468 M
x Rp.
Jumlah (1)
Tenaga
Pekerja
3.400 OH
x Rp.
Tukang batu
0.850 OH
x Rp.
Kepala tukang
0.085 OH
x Rp.
Mandor
0.170 OH
x Rp.
Jumlah (2)
Jumlah (1) +(2)
SNI 6897:2008.6.7
1 m
Pasangan bata merah tebal 1/2 bata, 1Pc : 2 Ps
Bahan
Bata merah 5 x 10 x 20 cm
70.000 Bh
Semen portland
18.950 Kg
Pasir pasang
0.038 M
x
x
x
Rp.
Rp.
Rp.
Jumlah (1)
Tenaga
Pekerja
Tukang batu
Kepala tukang
x
x
x
Rp.
Rp.
Rp.
0.300 OH
0.100 OH
0.010 OH
Mandor
SNI 6897:2008.6.8
0.015 OH
Rp.
Jumlah (2)
Jumlah (1) + (2)
1 m
Pasangan bata merah tebal 1/2 bata, 1Pc : 3 Ps
Bahan
Bata merah 5 x 10 x 20 cm
70.000 Bh
Semen portland
14.370 Kg
Pasir pasang
0.040 M
x
x
x
Rp.
Rp.
Rp.
Jumlah (1)
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)
0.300
0.100
0.010
0.015
OH
OH
OH
OH
SNI 6897:2008.6.9
SNI 2837:2008.6.2
SNI 2837:2008.6.3
SNI 2837:2008.6.4
SNI 2837:2008.6.23
1 m
Pasangan bata merah tebal 1/2 bata, 1Pc : 4 Ps
Bahan
Bata merah 5 x 10 x 20 cm
70.000 Bh
Semen portland
11.500 Kg
Pasir pasang
0.043 M
x
x
x
Rp.
Rp.
Rp.
Jumlah (1)
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
OH
OH
OH
OH
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)
10.224 Kg
0.020 M
x
x
Rp.
Rp.
1 m
Plesteran 1 Pc : 2 Ps, tebal 15 mm
Bahan
Semen portland
Pasir pasang
0.300
0.100
0.010
0.015
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
0.300
0.150
0.015
0.015
OH
OH
OH
OH
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)
1 m
Plesteran 1 Pc : 3 Ps, tebal 15 mm
Bahan
Semen portland
Pasir pasang
7.776 Kg
0.023 M
x
x
Rp.
Rp.
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
0.300
0.150
0.015
0.015
OH
OH
OH
OH
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)
1 m
Plesteran 1 Pc : 4 Ps, tebal 15 mm
Bahan
Semen portland
Pasir pasang
6.240 Kg
0.024 M
x
x
Rp.
Rp.
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
0.300
0.150
0.015
0.015
OH
OH
OH
OH
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)
1 m
Plesteran ciprat 1 Pc : 2 Ps
Bahan
Semen portland
Pasir pasang
4.320 Kg
0.006 M
x
x
Rp.
Rp.
Tenaga
Pekerja
0.300 OH
Rp.
SNI 2837:2008.6.27
Tukang batu
Kepala tukang
Mandor
0.100 OH
0.010 OH
0.015 OH
x
x
x
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)
1 m
Membuat acian
Bahan
Semen portland
3.325 Kg
Rp.
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
0.200
0.100
0.010
0.010
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)
OH
OH
OH
OH
SNI 91-0012-2007-6.66.a 1 m
0.045 M
40.000 Bh
x
x
Rp.
Rp.
Jumlah (1)
Tenaga
Pekerja
Tukang cat
Kepala tukang
Mandor
0.620
0.350
0.035
0.030
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)
x
x
Rp.
Rp.
Jumlah (1)
Tenaga
Pekerja
Tukang cat
Kepala tukang
Mandor
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)
1 m
Beton mutu f'c=7,4 Mpa (K100), slump(12 2) cm,w/c=0,87
Bahan
Semen Portland
247.000 Kg
Pasir Beton
0.621 M
Kerikil beton (maksimum 30 mm)
0.740 M
Air
215.000 ltr
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (1)
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
OH
OH
OH
OH
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)
1 m
Beton mutu f'c=12,2 Mpa (K150), slump(12 2) cm,w/c=0,72
Bahan
Semen Portland
299.000 Kg
Pasir Beton
0.571 M
Kerikil beton (maksimum 30 mm)
0.753 M
Air
215.000 ltr
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (1)
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
OH
OH
OH
OH
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)
1 m
Beton mutu f'c=14,5 Mpa (K175), slump(12 2) cm,w/c=0,66
Bahan
Semen portland
326.000 Kg
Pasir beton
0.543 M
Kerikil beton (maksimum 30 mm)
0.762 M
Air
215.000 ltr
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (1)
SNI 91-0012-2007-6.66.b 1 m
SNI 7394:2008.6.1
SNI 7394:2008.6.3
SNI 7394:2008.6.5
0.620
0.350
0.035
0.030
1.650
0.275
0.028
0.083
1.650
0.275
0.028
0.083
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
SNI 7394:2008.6.17
OH
OH
OH
OH
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)
10.500 Kg
0.150 Kg
x
x
Rp.
Rp.
Jumlah (1)
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)
Jumlah
1.650
0.275
0.028
0.083
0.070
0.070
0.007
0.004
OH
OH
OH
OH
SNI 7394:2008.6.20
1 m
Memasang bekisting untuk pondasi
Bahan
Papan/Kayu Klas III
Paku kayu
Minyak bekisting
0.040 M
0.300 Kg
0.100 Liter
x
x
x
Rp.
Rp.
Rp.
Jumlah (1)
Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.520
0.260
0.026
0.026
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)
Jumlah
OH
OH
OH
OH
Untuk 3x pakai
SNI 7394:2008.6.21
1 m
Memasang bekisting untuk sloof
Bahan
Papan/Kayu Klas III
Paku kayu
Minyak bekisting
0.045 M
0.300 Kg
0.100 Liter
x
x
x
Rp.
Rp.
Rp.
Jumlah (1)
Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.520
0.260
0.026
0.026
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)
Jumlah
OH
OH
OH
OH
Untuk 3x pakai
SNI 7394:2008.6.22
1 m
Memasang bekisting untuk kolom
Bahan
Papan/Kayu Klas III
Paku kayu
Minyak bekisting
Balok kayu kelas III
Plywood tebal 9 mm
Dolken kayu galam (8-10) cm, panjang 4 m
0.040
0.400
0.200
0.015
0.350
2.000
M
Kg
Liter
M
Lbr
Btg
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Jumlah (1)
Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.660
0.330
0.033
0.033
OH
OH
OH
OH
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)
Jumlah
Untuk 3x pakai
SNI 7394:2008.6.23
1 m
Memasang bekisting untuk balok
Bahan
Papan/Kayu Klas III
Paku kayu
Minyak bekisting
Balok kayu kelas III
Plywood tebal 9 mm
Dolken kayu galam (8-10) cm, panjang 4 m
0.040
0.400
0.200
0.018
0.350
2.000
M
Kg
Liter
M
Lbr
Btg
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Jumlah (1)
Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.660
0.330
0.033
0.033
OH
OH
OH
OH
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)
Jumlah
Untuk 3x pakai
SNI 7394:2008.6.24
1 m
Memasang bekisting untuk plat
Bahan
Papan/Kayu Klas III
Paku kayu
Minyak bekisting
Balok kayu kelas III
Plywood tebal 9 mm
Dolken kayu galam (8-10) cm, panjang 4 m
0.040
0.400
0.200
0.015
0.350
6.000
M
Kg
Liter
M
Lbr
Btg
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Jumlah (1)
Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.660
0.330
0.033
0.033
OH
OH
OH
OH
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)
Jumlah
Untuk 3x pakai
Pekerjaan Lain-lain
Rp.
Jumlah
1 m
Beton bertulang Sloof 18/25 cm
- Beton Cor K-175
- Pekerjaan Besi
- Cetakan Beton untuk Sloof
- Pekerjaan Lain-lain
1.000 M
176.613 Kg
11.667 M
1.000
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah
1 m
Beton bertulang kolom 18x18 cm
- Beton Cor K-175
- Pekerjaan Besi
- Cetakan Beton untuk kolom
- Pekerjaan Lain-lain
1.000 M
209.363 Kg
13.333 M
1.000
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah
1 m
Beton bertulang kolom praktis 13x13 cm
- Beton Cor K-175
- Pekerjaan Besi
- Cetakan Beton untuk kolom
- Pekerjaan Lain-lain
1.000 M
181.065 Kg
15.385 M
1.000
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah
1 m
Beton bertulang ring balok 15/20 cm
- Beton Cor K-175
- Pekerjaan Besi
- Cetakan Beton untuk balok
- Pekerjaan Lain-lain
1.000 M
191.600 Kg
14.359 M
1.000
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah
1 m
Beton bertulang balok latei/top geuvel 13/15 cm
- Beton Cor K-175
1.000 M
- Pekerjaan Besi
181.065 Kg
- Cetakan Beton untuk balok
15.385 M
- Pekerjaan Lain-lain
1.000
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah
1 m
Beton bertulang plat
- Beton Cor K-175
- Pekerjaan Besi
- Cetakan Beton untuk plat
- Pekerjaan Lain-lain
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah
1.000 M
108.500 Kg
13.500 M
1.000
7.000
21.000
2.100
0.350
x
x
x
Rp.
Rp.
Rp.
Jumlah (1)
OH
OH
OH
OH
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
1.000
3.000
0.300
0.050
OH
OH
OH
OH
Rp.
Rp.
Rp.
Jumlah (1)
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
1.000 BH
Rp.
Jumlah (1)
0.500 OH
0.050 OH
x
x
Rp.
Rp.
Jumlah (2)
1.000 PSG
Rp.
Jumlah (1)
0.100 OH
0.010 OH
x
x
Rp.
Rp.
Jumlah (2)
1.000 PSG
Rp.
Jumlah (1)
Tenaga
Tukang Kayu
Kepala Tukang
0.100 OH
0.010 OH
x
x
Rp.
Rp.
Jumlah (2)
1.100 M2
Rp.
Jumlah (1)
Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.160
0.160
0.016
0.008
x
x
x
x
Rp.
Rp.
Rp.
Rp.
OH
OH
OH
OH
Jumlah (2)
SNI 03 -3436-1994 1- m
1.000 M2
9.000 Bh
x
x
Rp.
Rp.
Jumlah (1)
0.200 OH
0.100 OH
0.010 OH
x
x
x
Rp.
Rp.
Rp.
Mandor
0.001 OH
Rp.
Jumlah (2)
SNI 03 -3436-1994 1- m1
1.020 M1
9.000 Bh
0.250
0.150
0.015
0.013
OH
OH
OH
OH
x
x
Rp.
Rp.
Jumlah (1)
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
SNI 3434:2008 (6.11 M3 konstruksi kuda-kuda konvensional, kayu kelas I, II, III bentan
Bahan
Balok Kayu
Besi strip tebal 5 mm
Paku 12 cm
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor
1.100
15.00
5.600
4.000
12.000
1.200
0.200
M3
Kg
Kg
OH
OH
OH
OH
x
x
x
Rp.
Rp.
Rp.
Jumlah (1)
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
1.100
3.000
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor
2.400
7.200
0.720
0.120
M3
Kg
OH
OH
OH
OH
x
x
Rp.
Rp.
Jumlah (1)
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
1.020
0.050
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor
0.100
0.200
0.020
0.005
M1
Kg
OH
OH
OH
OH
x
x
Rp.
Rp.
Jumlah (1)
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Bahan
List kayu profil
Paku
1.100 M'
0.010 Kg
x
x
Rp.
Rp.
Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.050 Oh
0.050 Oh
0.005 Oh
0.003 Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
SNI 2839:2008.6.121 m
Bahan
Kayu kelas II
Paku biasa 2" - 5"
Paku Tripleks
Tripleks tebal 4 mm
Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.023 M
0.060 Kg
0.030 Kg
0.390 Lbr
x
x
x
x
Rp.
Rp.
Rp.
Rp.
0.270 Oh
0.400 Oh
0.040 Oh
0.0135 Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
0.700
0.350
0.035
0.035
Bh
Kg
M
Kg
x
x
x
x
Rp.
Rp.
Rp.
Rp.
OH
OH
OH
OH
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
0.900
0.450
0.045
0.045
Bh
Kg
M
Kg
x
x
x
x
Rp.
Rp.
Rp.
Rp.
OH
OH
OH
OH
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
0.700
0.350
0.035
0.035
OH
OH
OH
OH
x
x
x
x
Rp.
Rp.
Rp.
Rp.
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
SNI 7395:2008.6.641 m
Rp.
Rp.
Rp.
Rp.
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
0.700
0.350
0.035
0.035
OH
OH
OH
OH
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
1 m
x
x
Rp.
Rp.
Jumlah
Pt-T-38-2000-C.6.8
1 m
0.200 Kg
0.150 Kg
0.170 Kg
0.260 Kg
0.500 Lbr
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Jumlah (1)
0.070 Oh
0.009 Oh
0.0060 Oh
0.0025 Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)
Pt-T-38-2000-C.6.14
1 m
Pengecatan tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
Bahan
Plamir
0.100 Kg
x Rp.
Cat dasar
0.120 Kg
x Rp.
Cat Tembok 2 x
0.240 Kg
x Rp.
Kertas Pasir
0.200 Lbr
x Rp.
Jumlah (1)
Tenaga
Pekerja
0.020 Oh
x Rp.
Tukang cat
0.063 Oh
x Rp.
Kepala tukang
0.0063 Oh
x Rp.
Mandor
0.0025 Oh
x Rp.
Jumlah (2)
Jumlah (1) + (2)
Pt-T-38-2000-C.6.15
1 m
0.240 Kg
0.200 Lbr
x
x
Rp.
Rp.
Jumlah (1)
0.020 Oh
0.063 Oh
0.0063 Oh
0.0025 Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)
x
x
x
Rp.
Rp.
Rp.
Jumlah (1)
Tenaga
Pekerja
Tukang cat
Kepala tukang
Mandor
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)
Tenaga
Pekerja
Tukang cat
Kepala tukang
Mandor
Pt-T-38-2000-C.6.16
1 m
0.080 Oh
0.063 Oh
0.0063 Oh
0.004 Oh
Singkil,
Konsultan Per
CV. HIKMAH CO
HILDA FAZL
ATUAN
1,830,000.00
14,160.00
2,440,800.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
21,960.00
283.20
17,085.60
39,328.80
45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,500.00
5,500.00
700.00
290.00
10,990.00
50,318.80
25,159.40
Jumlah
45,000.00 =
58,000.00 =
=
45,000.00
58,000.00
Jumlah
Rp
Rp
Rp
= Rp.
= Rp.
= Rp
4,500.00
2,900.00
7,400.00
33,750.00
1,450.00
35,200.00
45,000.00
58,000.00
=
=
=
Rp.
Rp.
Rp.
11,250.00
483.33
11,733.33
45,000.00
58,000.00
Jumlah
=
=
=
Rp.
Rp.
Rp.
22,500.00
2,900.00
25,400.00
74,160.00
Jumlah (1)
=
=
Rp.
Rp.
88,992.00
88,992.00
45,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
13,500.00
580.00
14,080.00
103,072.00
240,000.00
Jumlah (1)
=
=
Rp.
Rp.
288,000.00
288,000.00
45,000.00
58,000.00
=
=
Rp.
Rp.
11,250.00
1,450.00
Jumlah
Jumlah (2)
Jumlah (1) + (2)
=
=
Rp.
Rp.
12,700.00
300,700.00
96,408.00
Jumlah (1)
=
=
Rp.
Rp.
115,689.60
115,689.60
45,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
13,500.00
580.00
14,080.00
129,769.60
111,240.00
Jumlah (1)
=
=
Rp.
Rp.
133,488.00
133,488.00
45,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
13,500.00
580.00
14,080.00
147,568.00
279,600.00
1,480.00
108,000.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
335,520.00
241,240.00
56,160.00
632,920.00
45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
67,500.00
41,250.00
5,250.00
4,350.00
118,350.00
751,270.00
279,600.00
74,160.00
Jumlah (1)
=
=
=
Rp.
Rp.
Rp.
335,520.00
32,037.12
367,557.12
45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
35,100.00
21,450.00
2,730.00
2,262.00
61,542.00
429,099.12
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
134,208.00
287,120.00
40,435.20
70,200.00
531,963.20
45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
153,000.00
46,750.00
5,950.00
9,860.00
215,560.00
747,523.20
960.00
1,480.00
108,000.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
67,200.00
28,046.00
4,104.00
99,350.00
45,000.00
55,000.00
70,000.00
=
=
=
Rp.
Rp.
Rp.
13,500.00
5,500.00
700.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
Rp.
Rp.
Rp.
870.00
20,570.00
119,920.00
960.00
1,480.00
108,000.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
67,200.00
21,267.60
4,320.00
92,787.60
45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
13,500.00
5,500.00
700.00
870.00
20,570.00
113,357.60
960.00
1,480.00
108,000.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
67,200.00
17,020.00
4,644.00
88,864.00
45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
13,500.00
5,500.00
700.00
870.00
20,570.00
109,434.00
1,480.00
108,000.00
Jumlah (1)
=
=
=
Rp.
Rp.
Rp.
15,131.52
2,160.00
17,291.52
45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
13,500.00
8,250.00
1,050.00
870.00
23,670.00
40,961.52
1,480.00
108,000.00
Jumlah (1)
=
=
=
Rp.
Rp.
Rp.
11,508.48
2,484.00
13,992.48
45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
13,500.00
8,250.00
1,050.00
870.00
23,670.00
37,662.48
1,480.00
108,000.00
Jumlah (1)
=
=
=
Rp.
Rp.
Rp.
9,235.20
2,592.00
11,827.20
45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
13,500.00
8,250.00
1,050.00
870.00
23,670.00
35,497.20
1,480.00
108,000.00
Jumlah (1)
=
=
=
Rp.
Rp.
Rp.
6,393.60
648.00
7,041.60
45,000.00
Rp.
13,500.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
5,500.00
700.00
870.00
20,570.00
27,611.60
1,480.00
Jumlah (1)
=
=
Rp.
Rp.
4,921.00
4,921.00
45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
9,000.00
5,500.00
700.00
580.00
15,780.00
20,701.00
108,000.00
2,100.00
Jumlah (1)
=
=
=
Rp.
Rp.
Rp.
4,860.00
84,000.00
88,860.00
45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
27,900.00
19,250.00
2,450.00
1,740.00
51,340.00
140,200.00
108,000.00
2,100.00
Jumlah (1)
=
=
=
Rp.
Rp.
Rp.
4,860.00
16,800.00
21,660.00
45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
27,900.00
19,250.00
2,450.00
1,740.00
51,340.00
73,000.00
1,480.00
129,600.00
129,600.00
150.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
365,560.00
80,481.60
95,904.00
32,250.00
574,195.60
45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
74,250.00
15,125.00
1,960.00
4,814.00
96,149.00
670,344.60
1,480.00
129,600.00
129,600.00
150.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
442,520.00
74,001.60
97,588.80
32,250.00
646,360.40
45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
74,250.00
15,125.00
1,960.00
4,814.00
96,149.00
742,509.40
1,480.00
129,600.00
129,600.00
150.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
482,480.00
70,372.80
98,755.20
32,250.00
683,858.00
45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
74,250.00
15,125.00
1,960.00
4,814.00
96,149.00
780,007.00
11,280.00
14,400.00
Jumlah (1)
=
=
=
Rp.
Rp.
Rp.
118,440.00
2,160.00
120,600.00
45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)
Jumlah
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,150.00
3,850.00
490.00
232.00
7,722.00
128,322.00
12,832.20
1,830,000.00
14,160.00
12,000.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
73,200.00
4,248.00
1,200.00
78,648.00
45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)
Jumlah
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
23,400.00
14,300.00
1,820.00
1,508.00
41,028.00
119,676.00
39,892.00
1,830,000.00
14,160.00
12,000.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
82,350.00
4,248.00
1,200.00
87,798.00
45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)
Jumlah
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
23,400.00
14,300.00
1,820.00
1,508.00
41,028.00
128,826.00
42,942.00
1,830,000.00
14,160.00
12,000.00
1,830,000.00
162,000.00
24,720.00
Jumlah (1)
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
73,200.00
5,664.00
2,400.00
27,450.00
56,700.00
49,440.00
214,854.00
45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)
Jumlah
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
29,700.00
18,150.00
2,310.00
1,914.00
52,074.00
266,928.00
88,976.00
1,830,000.00
14,160.00
12,000.00
1,830,000.00
162,000.00
24,720.00
Jumlah (1)
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
73,200.00
5,664.00
2,400.00
32,940.00
56,700.00
49,440.00
220,344.00
45,000.00
55,000.00
70,000.00
58,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
29,700.00
18,150.00
2,310.00
1,914.00
Jumlah (2)
Jumlah (1) + (2)
Jumlah
=
=
=
Rp.
Rp.
Rp.
52,074.00
272,418.00
90,806.00
1,830,000.00
14,160.00
12,000.00
1,830,000.00
162,000.00
24,720.00
Jumlah (1)
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
73,200.00
5,664.00
2,400.00
27,450.00
56,700.00
148,320.00
313,734.00
45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)
Jumlah
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
29,700.00
18,150.00
2,310.00
1,914.00
52,074.00
365,808.00
121,936.00
45,000.00
Jumlah
= Rp.
= Rp.
90,000.00
90,000.00
780,007.00
12,832.20
42,942.00
90,000.00
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
780,007.00
2,266,337.62
500,990.00
90,000.00
3,637,334.62
780,007.00
12,832.20
88,976.00
90,000.00
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
780,007.00
2,686,587.41
1,186,346.67
90,000.00
4,742,941.08
780,007.00
12,832.20
88,976.00
90,000.00
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
780,007.00
2,323,463.43
1,368,861.54
90,000.00
4,562,331.97
780,007.00
12,832.20
90,806.00
90,000.00
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
780,007.00
2,458,649.52
1,303,881.03
90,000.00
4,632,537.55
780,007.00
12,832.20
90,806.00
90,000.00
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
780,007.00
2,323,463.43
1,397,015.38
90,000.00
4,590,485.82
780,007.00
12,832.20
121,936.00
90,000.00
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
780,007.00
1,392,293.70
1,646,136.00
90,000.00
3,908,436.70
### = Rp.
14,160.00 = Rp.
18,000.00 = Rp.
Jumlah
Jumlah
Jumlah
Jumlah
Jumlah
Jumlah
Jumlah (1)
45,000.00
55,000.00
70,000.00
58,000.00
Rp.
###
17,700.00
18,000.00
###
=
=
=
=
Rp.
Rp.
Rp.
Rp.
315,000.00
###
147,000.00
20,300.00
Jumlah (2)
Rp.
Rp.
###
###
Rp.
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Rp.
Rp.
45,000.00
55,000.00
70,000.00
58,000.00
116,640.00
9,000.00
108,000.00
233,640.00
45,000.00
165,000.00
21,000.00
2,900.00
233,900.00
467,540.00
136,800.00 = Rp.
Jumlah (1)
Rp.
=
=
Rp.
Rp.
Jumlah (2)
Rp.
Rp.
55,000.00
70,000.00
30,000.00 = Rp.
Jumlah (1)
Rp.
=
=
Rp.
Rp.
Jumlah (2)
Rp.
Rp.
55,000.00
70,000.00
20,400.00 = Rp.
Jumlah (1)
Rp.
=
=
Rp.
Rp.
Jumlah (2)
Rp.
Rp.
55,000.00
70,000.00
165,000.00 = Rp.
Jumlah (1)
Rp.
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Rp.
Rp.
45,000.00
55,000.00
70,000.00
58,000.00
75,000.00 = Rp.
300.00 = Rp.
Jumlah (1)
45,000.00
55,000.00
70,000.00
136,800.00
136,800.00
27,500.00
3,500.00
31,000.00
167,800.00
30,000.00
30,000.00
5,500.00
700.00
6,200.00
36,200.00
20,400.00
20,400.00
5,500.00
700.00
6,200.00
26,600.00
181,500.00
181,500.00
7,200.00
8,800.00
1,120.00
464.00
17,584.00
199,084.00
Rp.
75,000.00
2,700.00
77,700.00
=
=
=
Rp.
Rp.
Rp.
9,000.00
5,500.00
700.00
58,000.00
Rp.
Jumlah (2)
Rp.
Rp.
30,000.00 = Rp.
300.00 = Rp.
Jumlah (1)
Rp.
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Rp.
Rp.
45,000.00
55,000.00
70,000.00
58,000.00
58.00
15,258.00
92,958.00
30,600.00
2,700.00
33,300.00
11,250.00
8,250.00
1,050.00
754.00
21,304.00
54,604.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
3,352,800.00
277,500.00
79,296.00
3,709,596.00
45,000.00
55,000.00
70,000.00
58,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
180,000.00
660,000.00
84,000.00
11,600.00
Jumlah (2)
Rp.
935,600.00
Rp.
4,645,196.00
1,830,000.00
14,160.00
Jumlah (1)
=
=
=
Rp.
Rp.
Rp.
2,013,000.00
42,480.00
2,055,480.00
45,000.00
55,000.00
70,000.00
58,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
108,000.00
396,000.00
50,400.00
6,960.00
Jumlah (2)
Rp.
561,360.00
Rp.
2,616,840.00
15,000.00
14,160.00
Jumlah (1)
=
=
=
Rp.
Rp.
Rp.
15,300.00
708.00
16,008.00
45,000.00
55,000.00
70,000.00
58,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
4,500.00
11,000.00
1,400.00
290.00
Jumlah (2)
Rp.
17,190.00
Rp.
33,198.00
12,000.00 = Rp.
14,160.00 = Rp.
13,200.00
141.60
13,341.60
Jumlah (1)
45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Rp.
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
2,250.00
2,750.00
350.00
174.00
5,524.00
Rp.
18,865.60
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
42,090.00
849.60
424.80
25,350.00
68,714.40
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Rp.
Rp.
12,150.00
22,000.00
2,800.00
783.00
37,733.00
106,447.40
###
14,160.00
14,160.00
65,000.00
Jumlah (1)
45,000.00
55,000.00
70,000.00
58,000.00
5,280.00
1,480.00
108,000.00
1,780.00
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
139,920.00
15,392.00
4,860.00
2,883.60
163,055.60
45,000.00
55,000.00
70,000.00
58,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Rp.
Rp.
31,500.00
19,250.00
2,450.00
2,030.00
55,230.00
218,285.60
6,240.00
1,480.00
108,000.00
1,780.00
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
131,040.00
13,764.00
1,944.00
3,453.20
150,201.20
45,000.00
55,000.00
70,000.00
58,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Rp.
Rp.
40,500.00
24,750.00
3,150.00
2,610.00
71,010.00
221,211.20
8,400.00
1,480.00
108,000.00
1,780.00
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
54,600.00
14,800.00
4,860.00
2,670.00
76,930.00
45,000.00
55,000.00
70,000.00
58,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Rp.
Rp.
31,500.00
19,250.00
2,450.00
2,030.00
55,230.00
132,160.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
56,940.00
14,800.00
4,860.00
2,670.00
8,760.00
1,480.00
108,000.00
1,780.00
Rp.
79,270.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Rp.
Rp.
31,500.00
19,250.00
2,450.00
2,030.00
55,230.00
134,500.00
=
=
=
Rp.
Rp.
Rp.
3,600.00
2,320.00
5,920.00
45,000.00
55,000.00
70,000.00
58,000.00
45,000.00
58,000.00
Jumlah
17,561.50
16,500.00
22,000.00
34,650.00
3,690.00
Jumlah (1)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,512.30
2,475.00
3,740.00
9,009.00
1,845.00
20,581.30
45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,150.00
495.00
420.00
145.00
4,210.00
24,791.30
16,500.00
22,000.00
30,800.00
3,690.00
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
1,650.00
2,640.00
7,392.00
738.00
12,420.00
45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
900.00
3,465.00
441.00
145.00
4,951.00
17,371.00
30,800.00
3,690.00
Jumlah (1)
=
=
=
Rp.
Rp.
Rp.
7,392.00
738.00
8,130.00
45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
900.00
3,465.00
441.00
145.00
4,951.00
13,081.00
16,500.00
30,800.00
3,690.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
1,650.00
7,392.00
1,845.00
10,887.00
45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,600.00
3,465.00
441.00
232.00
7,738.00
18,625.00
Singkil,
2013
Konsultan Perencana :
CV. HIKMAH CONSULTANT
HILDA FAZLIANA
Direktris
SLOOF
22
25
28
29
U
U
U
U
22
25
28
29
15 X
20
Tulangan Utama
Sengkang
Luas Penampang
Selimut Beton
Dalam 1 m3 Panjangnya
Luas Bekisting dalam 1m3
Jumlah Sengkang
Panjang 1 Sengkang
Berat Besi
Berat Besi
Jumlah Berat
KOLOM
15 X
15
Tulangan Utama
Sengkang
Luas Penampang
Selimut Beton
Dalam 1 m3 Panjangnya
Luas Bekisting dalam 1m3
Jumlah Sengkang
Panjang 1 Sengkang
Berat Besi
Berat Besi
Jumlah Berat
Luas
(cm2)
0.288
0.503
0.636
0.758
1.131
1.327
1.540
2.011
2.545
2.835
3.142
Berat
(kg/m)
0.222
0.395
0.499
0.617
0.888
1.040
1.210
1.580
2.000
2.230
2.470
3.801
4.909
6.157
6.605
2.980
3.850
4.830
5.190
CM
= 5
=
8
=
0.030
=
2.5
=
33.33
=
11.67
=
222
=
0.58
= 5
=
4
CM
= 4
=
8
=
0.023
=
3
=
44.44
=
13.33
=
296
=
0.44
= 4
=
8
12
Polos BJ
0.89
150 Polos BJ
0.40
m2
cm
m
m2
11.67
Buah
m
12
=
148.00 kg
150 =
28.61 kg
=
176.61 kg
12
Polos BJ
0.89
150 Polos BJ
0.40
m2
cm
m
m2
13.33
Buah
m
12
=
157.87 kg
150 =
51.50 kg
=
209.36 kg
KOLOM PRAKTIS
13 X
13
Tulangan Utama
Sengkang
Luas Penampang
Selimut Beton
Dalam 1 m3 Panjangnya
Luas Bekisting dalam 1m3
Jumlah Sengkang
Panjang 1 Sengkang
Berat Besi
Berat Besi
Jumlah Berat
CM
= 4
=
6
=
0.017
=
2.5
=
59.17
=
15.38
=
394
=
0.40
= 4
=
6
RING BALK
13 X
15
Tulangan Utama
Sengkang
Luas Penampang
Selimut Beton
Dalam 1 m3 Panjangnya
Luas Bekisting dalam 1m3
Jumlah Sengkang
Panjang 1 Sengkang
Berat Besi
Berat Besi
Jumlah Berat
CM
= 5
=
8
=
0.020
=
2.5
=
51.28
=
14.36
=
342
=
0.44
= 5
=
8
BALOK LATAI
13 X
13
Tulangan Utama
Sengkang
Luas Penampang
Selimut Beton
Dalam 1 m3 Panjangnya
Luas Bekisting dalam 1m3
Jumlah Sengkang
Panjang 1 Sengkang
Berat Besi
Berat Besi
Jumlah Berat
CM
= 4
=
8
=
0.017
=
2.5
=
59.17
=
15.38
=
394
=
0.40
= 4
=
8
10
Polos BJ
0.62
150 Polos BJ
0.22
m2
cm
m
m2
15.38
Buah
m
10
=
146.04 kg
150 =
35.03 kg
=
181.07 kg
10
Polos BJ
0.62
150 Polos BJ
0.22
m2
cm
m
m2
14.36
Buah
m
10
=
158.21 kg
150 =
33.39 kg
=
191.60 kg
10
Polos BJ
0.62
150 Polos BJ
0.22
m2
cm
m
m2
15.38
Buah
m
10
=
146.04 kg
150 =
35.03 kg
=
181.07 kg
Penamaan
Berat Nominal
per Meter
(kg/m)
0.222
0.395
0.617
0.888
1.12
1.58
2.23
2.98
3.85
4.83
6.32
4. Sloof 15/20 cm
B=
15 cm =
H=
20 cm =
Panjang Sloof/M3 Beton =
Panjang Tulangan Utama =
Jumlah Tulangan Utama =
Diameter Tulangan Utama
Berat Tulangan Utma/M' =
Jarak Beugel Tumpuan =
Jarak Beugel Lapangan =
Jumlah Beugel Tumpuan =
Jumlah Beugel Lapangan =
Panjang Beugel =
Diameter Beugel =
Berat Tulangan Beugel/M'
Berat Tulangan
Tulangan Utama
Beugel Tumpuan
Beugel Lapangan
Bekisting
B
0.150
H
0.200
0.150 M'
0.200 M'
33.333 M'
33.333 M'
4 Ptg
12 mm
0.888 Kg/M'
0.1 M'
0.15 M'
334.000 Bh
223.000 Bh
0.56 M'
8 mm
0.395 Kg/M'
L
Ptg
Berat/m'
33.333
4.000
0.888
0.560 334.000
0.395
0.560 223.000
0.395
Berat Total Tulangan/M3 =
L
33.333
Luas
13.333 M2
Berat
118.400
73.881
49.328
241.608
Sat
Kg
Kg
Kg
Kg/M3
4. Sloof 18/25 cm
B=
18 cm =
H=
25 cm =
Panjang Sloof/M3 Beton =
Panjang Tulangan Utama =
Jumlah Tulangan Utama =
Diameter Tulangan Utama
Berat Tulangan Utma/M' =
Jarak Beugel Tumpuan =
Jarak Beugel Lapangan =
Jumlah Beugel Tumpuan =
Jumlah Beugel Lapangan =
Panjang Beugel =
Diameter Beugel =
Berat Tulangan Beugel/M'
Berat Tulangan
Tulangan Utama
Beugel Tumpuan
Beugel Lapangan
Bekisting
B
0.180
H
0.250
0.180 M'
0.250 M'
22.222 M'
22.222 M'
4 Ptg
12 mm
0.888 Kg/M'
0.1 M'
0.15 M'
334.000 Bh
223.000 Bh
0.72 M'
8 mm
0.395 Kg/M'
L
Ptg
Berat/m'
22.222
4.000
0.888
0.720 334.000
0.395
0.720 223.000
0.395
Berat Total Tulangan/M3 =
L
22.222
Luas
11.111 M2
Berat
78.933
94.990
63.421
237.344
Sat
Kg
Kg
Kg
Kg/M3
5. Kolom 20x40 cm
B=
20 cm =
H=
40 cm =
Panjang Kolom/M3 Beton =
Panjang Tulangan Utama =
Jumlah Tulangan Utama =
Diameter Tulangan Utama
Berat Tulangan Utma/M' =
Jarak Beugel =
Jumlah Beugel =
Panjang Beugel =
Diameter Beugel =
Berat Tulangan Beugel/M'
Berat Tulangan
Tulangan Utama
Beugel
Bekisting
B
0.200
H
0.400
0.200 M'
0.400 M'
12.500 M'
12.500 M'
8 Ptg
12 mm
0.888 Kg/M'
0.15 M'
84.000 Bh
1.06 M'
8 mm
0.395 Kg/M'
L
Ptg
Berat/m'
12.500
8.000
0.888
1.060
84.000
0.395
Berat Total Tulangan/M3 =
L
12.500
Luas
15.000 M2
Berat
Sat
88.800 Kg
35.171 Kg
123.971 Kg/M3
5. Kolom 25x25 cm
B=
25 cm =
H=
25 cm =
Panjang Kolom/M3 Beton =
Panjang Tulangan Utama =
Jumlah Tulangan Utama =
Diameter Tulangan Utama
Berat Tulangan Utma/M' =
Jarak Beugel =
Jumlah Beugel =
Panjang Beugel =
Diameter Beugel =
Berat Tulangan Beugel/M'
Berat Tulangan
Tulangan Utama
Beugel
Bekisting
B
0.250
H
0.250
0.250 M'
0.250 M'
16.000 M'
16.000 M'
8 Ptg
12 mm
0.888 Kg/M'
0.15 M'
84.000 Bh
0.86 M'
8 mm
0.395 Kg/M'
L
Ptg
Berat/m'
16.000
8.000
0.888
0.860
84.000
0.395
Berat Total Tulangan/M3 =
L
16.000
Luas
16.000 M2
Berat
Sat
113.664 Kg
28.535 Kg
142.199 Kg/M3
8. Kolom 13x15 cm
B=
13 cm =
H=
15 cm =
Panjang Kolom/M3 Beton =
Panjang Tulangan Utama =
Jumlah Tulangan Utama =
Diameter Tulangan Utama
Berat Tulangan Utma/M' =
Jarak Beugel =
Jumlah Beugel =
Panjang Beugel =
Diameter Beugel =
Berat Tulangan Beugel/M'
Berat Tulangan
Tulangan Utama
Beugel
Bekisting
B
0.130
H
0.150
0.130 M'
0.150 M'
51.282 M'
51.282 M'
4 Ptg
12 mm
0.888 Kg/M'
0.15 M'
342.000 Bh
0.42 M'
8 mm
0.395 Kg/M'
L
Ptg
Berat/m'
51.282
4.000
0.888
0.420 342.000
0.395
Berat Total Tulangan/M3 =
L
51.282
Luas
13.333 M2
Berat
Sat
182.154 Kg
56.738 Kg
238.892 Kg/M3
Bekisting
B
0.130
H
0.180
0.130 M'
0.180 M'
42.735 M'
42.735 M'
4 Ptg
12 mm
0.888 Kg/M'
0.1 M'
0.15 M'
214.000 Bh
143.000 Bh
0.48 M'
8 mm
0.395 Kg/M'
L
Ptg
Berat/m'
42.735
4.000
0.888
0.480 214.000
0.395
0.480 143.000
0.395
Berat Total Tulangan/M3 =
L
42.735
Luas
15.385 M2
Berat
151.795
40.574
27.113
219.482
Sat
Kg
Kg
Kg
Kg/M3
Bekisting
B
0.130
H
0.150
0.130 M'
0.150 M'
51.282 M'
51.282 M'
4 Ptg
12 mm
0.888 Kg/M'
0.15 M'
0.15 M'
171.000 Bh
171.000 Bh
0.42 M'
8 mm
0.395 Kg/M'
L
Ptg
Berat/m'
51.282
4.000
0.888
0.420 171.000
0.395
0.420 171.000
0.395
Berat Total Tulangan/M3 =
L
51.282
Luas
15.385 M2
Berat
182.154
28.369
28.369
238.892
Sat
Kg
Kg
Kg
Kg/M3
1 6.666667
13.33333
10.46667
0.08
12.5
130.8333
No
I.
1
2
3
Uraian Pekerjaan
Pekerjaan Persiapan
Pembersihan Lapangan
Pemasangan Bowplank
Administrasi dan dokumentasi
II.
1
2
3
M3
M3
M3
III.
1
2
3
Pekerjaan Ponadsi
Mengurug Pasir Urug bawah Pondasi
Pas Batu kosong
Pas Batu Gunung
IV.
1
2
3
4
5
5
V.
1
2
3
4
5
6
VI.
1
Pekerjaan Kayu
Pintu P1
Kusen Pintu
Satuan
Panjang
(m)
Ls
Ls
Ls
21
0.5
0.5
4
1.5
0.8
4
1.75
1.1
0.35
0.35
0.35
M3
0.15
M3
M3
M3
21
21
21
0.5
0.5
0.4
0.05
0.1
0.5
M3
M3
M3
M3
M3
M3
M3
21
0.15
0.13
21
3.6
1.1
1.89
0.15
0.15
0.13
0.13
0.13
0.1
0.1
0.2
3.05
3.05
0.15
0.15
1.4
1.6
M2
13.5
2.67
0.2
M2
M2
M2
M3
M2
M3
3.05
5
1.5
3.91
3.82
1.57
3.91
3.82
1.32
1.2
3.1
0.13
0.13
0.05
0.05
0.05
5
1.78
Daun Pintu
Kaca
M2
M2
Jendela Kaca J1
Kusen Jendela
M3
2
3
Jendela Kaca J2
Kusen Jendela
2
3
VII.
1
M3
1.056
0.43
1
1.78
0.13
0.13
0.05
0.05
0.5
0.38
1.6
1.48
0.13
0.13
0.05
0.05
0.7
0.58
1.6
1.48
4.6
1.04
1.2
1.6
M3
M3
M3
M3
M3
4
2.19
0.63
0.95
1.64
0.1
0.1
0.1
0.1
0.1
0.07
0.07
0.07
0.07
0.07
2
3
4
5
6
Gordeng
Atap Genteng Metal Multiroof tebal 0,25 mm
Rabung Seng
Kayu Lisplank
Rangka Plafond
M3
M2
M1
M1
M2
0.07
2.8
0.05
M2
69
3.2
12.8
5.6
4
1.5
4
1.5
VIII.
1
2
3
4
6
Pekerjaan Elektrikal
Pengadaan Listrik 4 Ampere
Box Zakering
Lampu Philips SL 18 Watt
Stop Kontak
Saklar Ganda
IX.
1
2
3
4
5
4
4
1.75
4
1.75
X.
Pekerjaan Finishing
Pengecatan dinding Luar dalam
Pengecatan Kusen dan daun Pintu/jendela
- Daun Pintu
- Daun Jendela
- Kusen Pintu
- Kusen Jendela
Penecatan Lisplank
Pembersihan Lapangan
M2
M2
M2
M2
0.08
0.08
0.23
0.23
3.854
3.16
6.53
5.62
1.08
0.96
Kuantitas
Jumlah
1
1
1
5.25
1.75
5.04
8.26875
2.772
16.08075
1.9505
1.6
0.2625
0.088
0.8
0.13125
0.044
16
2.625
2.64
0.525
1.05
4.2
8
2
1
1
0.63
0.549
0.10309
0.4095
0.0702
0.154
0.3024
0.4564
27.435
13.35
0.3
44.46
3.375
78.0615
0.97525
14.5924
2.0724
16.6648
3.72
0.0325
0.01157
1.4
1.89
213.35
2.952
7.38
3.408
1.3
1.295
0.78
3.82
1.6
1.056
1
0.04407
0.2906
0.7654
6
6
0.0299
0.00676
0.03666
1.4256
3.3744
0.04407
0.21996
0.15
1.35
4.05
4.71
8.76
350
2
2
2
2
2
2
1
0.0078
0.0104
0.0182
0.5232
1.7168
0.056
0.03066
0.00882
0.0133
0.01148
0.12026
0.36078
0.2415
35.84
12.8
22.4
16
2.625
16
2.625
18.625 17.69375
21.32
17.92
13.92
9.92
5.92
69
13.76
22.8
6.83
0.78944
3.9552
1.6059
1.3706
7.72114
0.104
0.078
NO
:
:
:
:
:
:
:
URAIAN PEKERJAAN
1
2
I. PEKERJAAN PERSIAPAN
1 Pekerjaan Pemasangan Bowlpank
2 Papan Nama Proyek
3 Administrasi dan dokumentasi
VOL.
SAT.
ANALISA
1.00
1.00
1.00
Ls
Unit
Ls
Taksir
Taksir
Taksir
5.25
1.75
16.08
1.95
M3
M3
M3
M3
SNI 2835:2008.6.1
SNI 2835:2008.6.9
SNI 2835:2008.6.16
SNI 2835:2008.6.11
II.
1
2
3
4
III.
1
2
3
PEKERJAAN PONDASI
Urugan pasir bawah Pondasi
Pas Batu kosong
Pas Batu gunung
0.53
1.05
4.20
M3
M3
M3
SNI 2835:2008.6.11
SNI 2836:2008.6.9
SNI 2836:2008.6.2
IV.
1
2
3
4
5
6
0.63
0.55
0.10
0.41
0.07
0.46
M3
M3
M3
M3
M3
M3
V.
1
2
3
4
5
44.46
78.06
0.98
16.66
3.72
M2
M2
M3
M2
M2
SNI 6897:2008.6.9
SNI 2837:2008.6.4
SNI 7394:2008.6.1
SNI 7395:2008.6.64.a
SNI 7395:2008.6.36
VI.
1
-
PEKERJAAN KAYU
Pintu Kaca P1
Kusen Pintu
Daun Pintu
Engsel
0.04
0.29
4.00
M3
M2
Bh
SNI 3434:2008.6.1
SNI 3434:2008.6.29
Pt T-30-2000-C.6.1.5
NO
URAIAN PEKERJAAN
1
- Kunci Tanam
- Kaca Tebal 5 mm
2
-
Jendela Kaca J1
Kusen
Daun Jendela Kaca
Engsel
Pegangan Jendela
Grendel
Hak angin
Kaca Tebal 5 mm
VOL.
SAT.
ANALISA
3
1.00
0.77
4
Bh
M2
5
Pt T-30-2000-C.6.1.2
Pt T-30-2000-C.6.2.3a
0.02
0.52
4.00
2.00
2.00
4.00
1.72
M3
M2
Bh
Bh
Bh
Bh
M2
SNI 3434:2008.6.1
SNI 3434:2008.6.29
Pt T-30-2000-C.6.1.5
Taksir
Taksir
Taksir
Pt T-30-2000-C.6.2.3a
NO
1
3
VII.
1
2
3
4
5
6
7
URAIAN PEKERJAAN
VOL.
SAT.
ANALISA
Jendela Kaca J2
Kusen
Daun Jendela Kaca
Engsel
Pegangan Jendela
Grendel
Hak angin
Kaca Tebal 5 mm
0.22
1.43
12.00
6.00
6.00
12.00
3.37
M3
M2
Bh
Bh
Bh
Bh
M2
SNI 3434:2008.6.1
SNI 3434:2008.6.29
Pt T-30-2000-C.6.1.5
Taksir
Taksir
Taksir
Pt T-30-2000-C.6.2.3a
0.36
0.24
35.84
12.80
22.40
17.69
1.00
M3
M3
M2
M1
M1
M2
Bh
1.00
4.00
2.00
2.00
Bh
Bh
Bh
Bh
Taksir
Taksir
Taksir
Taksir
78.06
7.72
4.48
1.00
M2
M2
M2
Ls
Pt-T-38-2000-C.6.14
Pt-T-38-2000-C.6.8
Pt-T-38-2000-C.6.8
Taksir
Singkil,
2
Konsultan Perencana :
CV. HIKMAH CONSULTAN
HILDA FAZLIANA
Direktris
(RAB)
HARGA
SATUAN
(Rp.)
6
JUMLAH
HARGA
(Rp.)
7
300,000.00
250,000.00
422,500.00
JUMLAH
300,000.00
250,000.00
422,500.00
972,500.00
35,200.00
11,733.33
129,769.60
103,072.00
184,800.00
20,533.33
2,086,792.50
201,041.94
2,493,167.76
JUMLAH
103,072.00
429,099.12
751,270.00
JUMLAH
3,637,334.62
4,742,941.08
4,562,331.97
4,632,537.55
4,590,485.82
3,908,436.70
JUMLAH
109,434.00
35,497.20
670,344.60
132,160.00
218,285.60
54,112.80
450,554.08
3,155,334.00
3,660,000.88
2,291,520.81
2,603,874.65
470,330.80
1,897,024.12
322,252.10
1,783,810.51
9,368,813.00
JUMLAH
4,865,435.64
2,770,964.68
653,753.57
2,202,419.97
812,022.43
11,304,596.29
4,880,600.00
467,540.00
36,200.00
215,088.04
135,867.12
144,800.00
HARGA
SATUAN
(Rp.)
6
167,800.00
199,084.00
JUMLAH
HARGA
(Rp.)
7
167,800.00
152,378.89
4,880,600.00
467,540.00
26,600.00
13,200.00
12,000.00
10,800.00
199,084.00
88,826.92
244,616.93
106,400.00
26,400.00
24,000.00
43,200.00
341,787.41
HARGA
SATUAN
(Rp.)
6
JUMLAH
HARGA
(Rp.)
7
4,880,600.00
467,540.00
26,600.00
13,200.00
12,000.00
10,800.00
199,084.00
JUMLAH
1,073,536.78
666,525.02
319,200.00
79,200.00
72,000.00
129,600.00
671,789.05
4,703,016.17
4,645,196.00
2,616,840.00
92,958.00
54,604.00
33,198.00
106,447.40
1,800,000.00
JUMLAH
1,675,893.81
631,966.86
3,331,614.72
698,931.20
743,635.20
1,883,453.68
1,800,000.00
10,765,495.48
60,000.00
42,000.00
18,000.00
32,400.00
JUMLAH
60,000.00
168,000.00
36,000.00
64,800.00
328,800.00
17,371.00
24,791.30
24,791.30
200,000.00
JUMLAH
1,356,006.32
191,417.10
111,065.02
200,000.00
1,858,488.44
JUMLAH
PPN 10 %
TOTAL
DI BULATKAN
Singkil,
2013
Konsultan Perencana :
CV. HIKMAH CONSULTANT
HILDA FAZLIANA
Direktris
45,454,878.02
4,545,487.80
50,000,365.82
50,000,000.00
:
:
:
:
:
:
:
NO
I.
II.
III.
IV.
V.
VI.
VII.
VIII.
IX.
TOTAL
JUMLAH
(Rp)
URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN
PEKERJAAN TANAH DAN GALIAN
PEKERJAAN PONDASI
PEKERJAAN BETON BERTULANG
PEKERJAAN LANTAI DAN DINDING
PEKERJAAN KAYU
PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP
PEKERJAAN ELEKTRIKAL
PEKERJAAN PENGECATAN DAN FINISHING
JUMLAH
PPN 10 %
TOTAL
DIBULATKAN
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Disetujui :
PPTK DINAS KESEHATAN
KABUPATEN ACEH SINGKIL
MUNAWARSYAH
NIP. 19731122 199503 1 004
Mengetahui / Menyetujui :
KEPALA DINAS KESEHATAN
KABUPATEN ACEH SINGKIL
N BIAYA (RAB)
ASI)
TOTAL
JUMLAH
(Rp)
972,500.00
2,493,167.76
3,660,000.88
9,368,813.00
11,304,596.29
4,703,016.17
10,765,495.48
328,800.00
1,858,488.44
45,454,878.02
4,545,487.80
50,000,365.82
50,000,000.00
Singkil,
2013
Konsultan Perencana :
CV. HIKMAH CONSULTANT
HILDA FAZLIANA
Direktris