DAFTAR HARGA UPAH DAN BAHAN

No
A.
1
2
3
4
B.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
1
2
3
4
5
6
7
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7

URAIAN
UPAH
Pekerja
Tukang
Kepala Tukang
Mandor
BAHAN
Pasangan dan beton
Tanah urug
Timbunan pilihan
Pasir urug
Pasir pasang
Pasir beton
Kerikil beton
Batu kali/batu belah (sungai/gunung)
Bata merah
Paving Block
Semen PC @ 50 Kg
Semen PC
Semen warna
Semen putih @ 50 Kg
Semen putih
Sirtu
Plywood 9 mm
Air
Besi beton polos
Besi beton ulir
Kawat beton
Paku kayu
Minyak bekisting
Kayu
Kayu kelas I
Kayu kelas II
Kayu kelas III
Kayu Perancah
Kayu/Papan Bekisting
Dolken kayu galam (8-10) cm, panjang 4 m
Lem Kayu
Atap dan plafond
Konstruksi kuda-kuda baja ringan
Multiplek / plywood 4 mm
Eternit Uk. 120x240 cm t=3,5 mm (setara Kalsi Board)
Genteng metal 0,3
Rabung seng genteng metal
List Profil
Paku Skrup
Seng Plat
Keramik
Keramik sisi kulit jeruk 20x20 cm
Keramik 20 x 20 cm
Keramik 20 x 25
Keramik 30x30 cm Polished
Keramik 30x30 cm Unpolished
Keramik 40x40 cm (polished)
Keramik 40x40 cm (unpolished)

HARGA SATUAN
Rp.

SATUAN

45,000.00
55,000.00
70,000.00
58,000.00

Orang/Hari
Orang/Hari
Orang/Hari
Orang/Hari

96,408.00
111,240.00
74,160.00
108,000.00
129,600.00
150,000.00
279,600.00
960.00
2,100.00
88,800.00
1,480.00
1,780.00
106,800.00
1,780.00
240,000.00
162,000.00
150.00
11,280.00
12,480.00
14,400.00
14,160.00
12,000.00

/M3
/M
/M
/M
/M
/M
/M
/Buah
/Buah
/Zak
/Kg
/Kg
/Zak
/Kg
/M
/Lbr
/Liter
/Kg
/Kg
/Kg
/Kg
/Liter

3,048,000.00
2,916,000.00
1,830,000.00
2,440,800.00
2,440,800.00
24,720.00
18,000.00

/M
/M
/M
/M
/M
/Btg
/Kg

150,000.00
65,000.00
102,000.00
75,000.00
30,000.00
12,000.00
300.00
108,000.00

/M2
/Lbr
/Lbr
/M2
/M'
/M'
/Bh
/Lbr

5,280.00
5,280.00
6,240.00
7,200.00
7,560.00
8,400.00
8,760.00

/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh

1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
1
2
3
5
6
7
8
9
10
11
12

Cat dan Residu


Dempul kayu
Plamur / dempul tembok
Cat dasar
Cat manie
Cat synthetik enamel (cat kayu mengkilap)
Cat acrylic emultion paint (cat tembok) / waterprofing
Minyak cat
Kertas amplas
Instalasi listrik
Instalasi Tititk lampu
Instalasi Stop kontak
Lampu Hemat Energi 24 watt
Lampu Hemat Energi 12 watt
Box Sekering + MCB
Stop Kontak
Schakelar tunggal
Schakelar ganda
Schakelar Triple
Sanitair
Tempat sabun keramik
Kran air biasa
Kran air sink/leher angsa
Bak air fiber kapasitas 0,3 M3
Closet jongkok (setara TOTO)
Floor drain
Pembuangan bak air
Wastafel + Accessories
Tempat Cuci Stainless Stell 2 Sink
Tempat Cuci Stainless Stell 1 Sink
Septictank + Resapan + Bak Kontrol
Pipa PVC 1/2"
Pipa PVC 3/4"
Pipa PVC 1 1/2"
Pipa PVC 2"
Pipa PVC 2 1/2"
Pipa PVC 3"
Pipa PVC 4"
Seal tape
Kunci-Kunci dan Kaca
Kunci tanam 2 slaag
Kunci tanam biasa
Engsel pintu
Engsel jendela / ventilasi
Grendel jendela
Hak angin jendela
Pegengan jendela
Pacok pintu (untuk pintu double)
Kaca Bening, t = 3 mm
Kaca Bening, t = 5 mm
Kaca Rayband, t = 5 mm

29,700.00
16,500.00
22,000.00
17,561.50
34,650.00
30,800.00
45,100.00
3,690.00

/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Liter
/Lembar

120,000.00
108,000.00
42,000.00
30,000.00
60,000.00
18,000.00
30,000.00
32,400.00
36,000.00

/Ttk
/Ttk
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh

30,000.00
24,000.00
60,000.00
720,000.00
390,000.00
15,000.00
21,600.00
861,000.00
492,000.00
344,400.00
3,690,000.00
3,478.44
5,150.01
20,677.53
23,370.00
35,670.00
69,955.02
86,100.00
9,225.00

/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Unit
/Unit
/Unit
/Pkt
/M'
/M'
/M'
/M'
/M'
/M'
/M'
/Bh

136,800.00
108,000.00
30,000.00
20,400.00
12,000.00
10,800.00
13,200.00
48,000.00
108,000.00
165,000.00
201,600.00

/Bh
/Bh
/Psg
/Psg
/Bh
/Bh
/Bh
/Bh
/M2
/M2
/M2

Singkil,
2013
Konsultan Perencana :
CV. HIKMAH CONSULTANT

HILDA FAZLIANA

Direktris

DAFTAR ANALISA HARGA SATUAN


RSNI T-12-2002.6.4

1m'
Pengukuran dan Pemasangan Bouwplank
Bahan
Kayu 5/7 Kelas III
Paku biasa 2" - 5"
Kayu papan 3/20

0.012 M
0.020 Kg
0.007 M

x
x
x

Rp.
Rp.
Rp.
Jumlah (1)

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

0.100
0.100
0.010
0.005

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)

OH
OH
OH
OH

Diambil 1/2 dari Jumlah (1) + (2)

RSNI T-12-2002.6.8

SNI 2835:2008.6.1

SNI 2835:2008.6.9

SNI 2835:2008.6.10

SNI 2835:2008.6.11

SNI 2835:2008.6.15

1 m
Membersihkan lapangan dan perataan
Tenaga
Pekerja
Mandor

0.100 OH
0.050 OH

1 m
Galian tanah biasa sedalam 1 meter
Tenaga
Pekerja
Mandor

0.750 OH
0.025 OH

1 m
Urugan kembali
Tenaga
Pekerja
Mandor

x
x

Rp.
Rp.
Jumlah

x
x

Rp.
Rp.
Jumlah

0.250 OH
0.008 OH

x
x

Rp.
Rp.
Jumlah

1 m
Memadatkan tanah (per 20 cm)
Tenaga
Pekerja
Mandor

0.500 OH
0.050 OH

x
x

Rp.
Rp.
Jumlah

1 m
Urugan pasir
Bahan
Pasir urug

1.200 M

Rp.
Jumlah (1)

Tenaga
Pekerja
Mandor

0.300 OH
0.010 OH

x
x

Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)

1 m
Mengurug sirtu padat
Bahan
Sirtu

1.200 M

Rp.
Jumlah (1)

Tenaga
Pekerja
Mandor

0.250 Oh
0.025 Oh

x
x

Rp.
Rp.

(dihitung 1/3 dari indeks pekerjaan galian)

Jumlah (2)
Jumlah (1) + (2)
SNI 2835:2008.6.16

1 m
Urugan tanah urug
Bahan
Tanah urug

1.200 M

Rp.
Jumlah (1)

Tenaga
Pekerja
Mandor

0.300 OH
0.010 OH

x
x

Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)

SNI 2835:2008.6.17

SNI 2836:2008.6.2

SNI 2836:2008.6.9

1 m
Urugan timbunan pilihan
Bahan
Timbunan pilihan

1.200 M

Rp.
Jumlah (1)

Tenaga
Pekerja
Mandor

0.300 OH
0.010 OH

x
x

Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)

1 m
Pasang pondasi batu belah/gunung/kali, 1 Pc : 4 Pp
Bahan
Batu kali/batu belah (sungai/gunung)
1.200 M
Semen portland
163.000 Kg
Pasir pasang
0.520 M

x
x
x

Rp.
Rp.
Rp.
Jumlah (1)

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

1.500
0.750
0.075
0.075

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) +(2)

1 m
Pasang pondasi batu kosong
Bahan
Batu kali
Pasir urug

1.200 M
0.432 M

x
x

Rp.
Rp.
Jumlah (1)

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

0.780
0.390
0.039
0.039

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) +(2)

OH
OH
OH
OH

OH
OH
OH
OH

SNI 2836:2008.6.10

1 m
Pasang pondasi Cyclope 60% Beton Adukan 1Pc : 2Ps : 3Kr + 40% Batu Kali/Belah
Bahan
Batu kali/belah/gunung
0.480 M
x Rp.
Semen Pc
194.000 Kg
x Rp.
Pasir beton
0.312 M
x Rp.
Kerikil beton
0.468 M
x Rp.
Jumlah (1)
Tenaga
Pekerja
3.400 OH
x Rp.
Tukang batu
0.850 OH
x Rp.
Kepala tukang
0.085 OH
x Rp.
Mandor
0.170 OH
x Rp.
Jumlah (2)
Jumlah (1) +(2)

SNI 6897:2008.6.7

1 m
Pasangan bata merah tebal 1/2 bata, 1Pc : 2 Ps
Bahan
Bata merah 5 x 10 x 20 cm
70.000 Bh
Semen portland
18.950 Kg
Pasir pasang
0.038 M

x
x
x

Rp.
Rp.
Rp.
Jumlah (1)

Tenaga
Pekerja
Tukang batu
Kepala tukang

x
x
x

Rp.
Rp.
Rp.

0.300 OH
0.100 OH
0.010 OH

Mandor

SNI 6897:2008.6.8

0.015 OH

Rp.
Jumlah (2)
Jumlah (1) + (2)

1 m
Pasangan bata merah tebal 1/2 bata, 1Pc : 3 Ps
Bahan
Bata merah 5 x 10 x 20 cm
70.000 Bh
Semen portland
14.370 Kg
Pasir pasang
0.040 M

x
x
x

Rp.
Rp.
Rp.
Jumlah (1)

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)

0.300
0.100
0.010
0.015

OH
OH
OH
OH

SNI 6897:2008.6.9

SNI 2837:2008.6.2

SNI 2837:2008.6.3

SNI 2837:2008.6.4

SNI 2837:2008.6.23

1 m
Pasangan bata merah tebal 1/2 bata, 1Pc : 4 Ps
Bahan
Bata merah 5 x 10 x 20 cm
70.000 Bh
Semen portland
11.500 Kg
Pasir pasang
0.043 M

x
x
x

Rp.
Rp.
Rp.
Jumlah (1)

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

OH
OH
OH
OH

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)

10.224 Kg
0.020 M

x
x

Rp.
Rp.

1 m
Plesteran 1 Pc : 2 Ps, tebal 15 mm
Bahan
Semen portland
Pasir pasang

0.300
0.100
0.010
0.015

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

0.300
0.150
0.015
0.015

OH
OH
OH
OH

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)

1 m
Plesteran 1 Pc : 3 Ps, tebal 15 mm
Bahan
Semen portland
Pasir pasang

7.776 Kg
0.023 M

x
x

Rp.
Rp.

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

0.300
0.150
0.015
0.015

OH
OH
OH
OH

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)

1 m
Plesteran 1 Pc : 4 Ps, tebal 15 mm
Bahan
Semen portland
Pasir pasang

6.240 Kg
0.024 M

x
x

Rp.
Rp.

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

0.300
0.150
0.015
0.015

OH
OH
OH
OH

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)

1 m
Plesteran ciprat 1 Pc : 2 Ps
Bahan
Semen portland
Pasir pasang

4.320 Kg
0.006 M

x
x

Rp.
Rp.

Tenaga
Pekerja

0.300 OH

Rp.

SNI 2837:2008.6.27

Tukang batu
Kepala tukang
Mandor

0.100 OH
0.010 OH
0.015 OH

x
x
x

Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)

1 m
Membuat acian
Bahan
Semen portland

3.325 Kg

Rp.

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

0.200
0.100
0.010
0.010

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)

OH
OH
OH
OH

SNI 91-0012-2007-6.66.a 1 m

Memasang Paving Block Baru


Bahan
Pasir Pasang
Paving Block

0.045 M
40.000 Bh

x
x

Rp.
Rp.
Jumlah (1)

Tenaga
Pekerja
Tukang cat
Kepala tukang
Mandor

0.620
0.350
0.035
0.030

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)

Memasang Paving Block Lama + 30% Paving Block Baru


Bahan
Pasir Pasang
0.045 M
Paving Block
8.000 Bh

x
x

Rp.
Rp.
Jumlah (1)

Tenaga
Pekerja
Tukang cat
Kepala tukang
Mandor

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)

1 m
Beton mutu f'c=7,4 Mpa (K100), slump(12 2) cm,w/c=0,87
Bahan
Semen Portland
247.000 Kg
Pasir Beton
0.621 M
Kerikil beton (maksimum 30 mm)
0.740 M
Air
215.000 ltr

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (1)

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

OH
OH
OH
OH

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)

1 m
Beton mutu f'c=12,2 Mpa (K150), slump(12 2) cm,w/c=0,72
Bahan
Semen Portland
299.000 Kg
Pasir Beton
0.571 M
Kerikil beton (maksimum 30 mm)
0.753 M
Air
215.000 ltr

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (1)

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

OH
OH
OH
OH

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)

1 m
Beton mutu f'c=14,5 Mpa (K175), slump(12 2) cm,w/c=0,66
Bahan
Semen portland
326.000 Kg
Pasir beton
0.543 M
Kerikil beton (maksimum 30 mm)
0.762 M
Air
215.000 ltr

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (1)

SNI 91-0012-2007-6.66.b 1 m

SNI 7394:2008.6.1

SNI 7394:2008.6.3

SNI 7394:2008.6.5

0.620
0.350
0.035
0.030

1.650
0.275
0.028
0.083

1.650
0.275
0.028
0.083

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

SNI 7394:2008.6.17

10 Kg Pembesian dengan besi polos


Bahan
Besi beton polos
Kawat beton
Tenaga
Pekerja
Tukang besi
Kepala tukang
Mandor

Untuk 1 Kg Pembesian dengan besi Beton Polos = 1/10 x

OH
OH
OH
OH

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)

10.500 Kg
0.150 Kg

x
x

Rp.
Rp.
Jumlah (1)

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)
Jumlah

1.650
0.275
0.028
0.083

0.070
0.070
0.007
0.004

OH
OH
OH
OH

SNI 7394:2008.6.20

1 m
Memasang bekisting untuk pondasi
Bahan
Papan/Kayu Klas III
Paku kayu
Minyak bekisting

0.040 M
0.300 Kg
0.100 Liter

x
x
x

Rp.
Rp.
Rp.
Jumlah (1)

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

0.520
0.260
0.026
0.026

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)
Jumlah

OH
OH
OH
OH

Untuk 3x pakai
SNI 7394:2008.6.21

1 m
Memasang bekisting untuk sloof
Bahan
Papan/Kayu Klas III
Paku kayu
Minyak bekisting

0.045 M
0.300 Kg
0.100 Liter

x
x
x

Rp.
Rp.
Rp.
Jumlah (1)

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

0.520
0.260
0.026
0.026

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)
Jumlah

OH
OH
OH
OH

Untuk 3x pakai
SNI 7394:2008.6.22

1 m
Memasang bekisting untuk kolom
Bahan
Papan/Kayu Klas III
Paku kayu
Minyak bekisting
Balok kayu kelas III
Plywood tebal 9 mm
Dolken kayu galam (8-10) cm, panjang 4 m

0.040
0.400
0.200
0.015
0.350
2.000

M
Kg
Liter
M
Lbr
Btg

x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Jumlah (1)

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

0.660
0.330
0.033
0.033

OH
OH
OH
OH

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)
Jumlah

Untuk 3x pakai
SNI 7394:2008.6.23

1 m
Memasang bekisting untuk balok
Bahan
Papan/Kayu Klas III
Paku kayu
Minyak bekisting
Balok kayu kelas III
Plywood tebal 9 mm
Dolken kayu galam (8-10) cm, panjang 4 m

0.040
0.400
0.200
0.018
0.350
2.000

M
Kg
Liter
M
Lbr
Btg

x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Jumlah (1)

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

0.660
0.330
0.033
0.033

OH
OH
OH
OH

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Jumlah (2)
Jumlah (1) + (2)
Jumlah

Untuk 3x pakai
SNI 7394:2008.6.24

1 m
Memasang bekisting untuk plat
Bahan
Papan/Kayu Klas III
Paku kayu
Minyak bekisting
Balok kayu kelas III
Plywood tebal 9 mm
Dolken kayu galam (8-10) cm, panjang 4 m

0.040
0.400
0.200
0.015
0.350
6.000

M
Kg
Liter
M
Lbr
Btg

x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Jumlah (1)

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

0.660
0.330
0.033
0.033

OH
OH
OH
OH

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)
Jumlah

Untuk 3x pakai

Pekerjaan Lain-lain

Untuk membongkar cetakan dan menyiram beton yang diperlukan


- Pekerja
2.000 OH

Rp.
Jumlah

Supl. SNI 7394:2008.2.b


SNI 7394:2008.6.5
SNI 7394:2008.6.17
SNI 7394:2008.6.21

1 m
Beton bertulang Sloof 18/25 cm
- Beton Cor K-175
- Pekerjaan Besi
- Cetakan Beton untuk Sloof
- Pekerjaan Lain-lain

1.000 M
176.613 Kg
11.667 M
1.000

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah

Supl. SNI 7394:2008.3.a


SNI 7394:2008.6.5
SNI 7394:2008.6.17
SNI 7394:2008.6.22

1 m
Beton bertulang kolom 18x18 cm
- Beton Cor K-175
- Pekerjaan Besi
- Cetakan Beton untuk kolom
- Pekerjaan Lain-lain

1.000 M
209.363 Kg
13.333 M
1.000

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah

Supl. SNI 7394:2008.3.b


SNI 7394:2008.6.5
SNI 7394:2008.6.17
SNI 7394:2008.6.22

1 m
Beton bertulang kolom praktis 13x13 cm
- Beton Cor K-175
- Pekerjaan Besi
- Cetakan Beton untuk kolom
- Pekerjaan Lain-lain

1.000 M
181.065 Kg
15.385 M
1.000

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah

Supl. SNI 7394:2008.4.a


SNI 7394:2008.6.5
SNI 7394:2008.6.17
SNI 7394:2008.6.23

1 m
Beton bertulang ring balok 15/20 cm
- Beton Cor K-175
- Pekerjaan Besi
- Cetakan Beton untuk balok
- Pekerjaan Lain-lain

1.000 M
191.600 Kg
14.359 M
1.000

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah

Supl. SNI 7394:2008.4.b


SNI 7394:2008.6.5
SNI 7394:2008.6.17
SNI 7394:2008.6.23

1 m
Beton bertulang balok latei/top geuvel 13/15 cm
- Beton Cor K-175
1.000 M
- Pekerjaan Besi
181.065 Kg
- Cetakan Beton untuk balok
15.385 M
- Pekerjaan Lain-lain
1.000

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah

Supl. SNI 7394:2008.5


SNI 7394:2008.6.5
SNI 7394:2008.6.17
SNI 7394:2008.6.24

1 m
Beton bertulang plat
- Beton Cor K-175
- Pekerjaan Besi
- Cetakan Beton untuk plat
- Pekerjaan Lain-lain

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah

1.000 M
108.500 Kg
13.500 M
1.000

SNI 3434:2008.6.1 1 m3 Membuat dan memasang kusen pintu dan


Bahan
1.100
Kayu kelas II
1.250
Paku kayu
1.000
Lem kayu
Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

7.000
21.000
2.100
0.350

kusen jendela, Kayu


M
Kg
Kg

x
x
x

Rp.
Rp.
Rp.
Jumlah (1)

OH
OH
OH
OH

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Jumlah (2)

Jumlah (1) + (2)

SNI 3434:2008.6.291 m2 Membuat dan memasang daun pintu panel lapis


Bahan
0.040 M
Kayu kelas II
0.500 Kg
Lem kayu
1.000 lbr
Seng plat
Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

1.000
3.000
0.300
0.050

OH
OH
OH
OH

seng plat, Kay


x
x
x

Rp.
Rp.
Rp.
Jumlah (1)

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (2)

Jumlah (1) + (2)

Pt T-30-2000-C.6.1.1 bh Memasang Kunci tanam 2 slaag


Bahan
Kunci tanam 2 slaag
Tenaga
Tukang Kayu
Kepala Tukang

1.000 BH

Rp.
Jumlah (1)

0.500 OH
0.050 OH

x
x

Rp.
Rp.
Jumlah (2)

Jumlah (1) + (2)

Pt T-30-2000-C.6.1.1 bh Memasang engsel pintu


Bahan
Engsel pintu
Tenaga
Tukang Kayu
Kepala Tukang

1.000 PSG

Rp.
Jumlah (1)

0.100 OH
0.010 OH

x
x

Rp.
Rp.
Jumlah (2)

Jumlah (1) + (2)

Pt T-30-2000-C.6.1.1 bh Memasang engsel Jendela


Bahan
Engsel Jendela

1.000 PSG

Rp.
Jumlah (1)

Tenaga
Tukang Kayu
Kepala Tukang

0.100 OH
0.010 OH

x
x

Rp.
Rp.
Jumlah (2)

Jumlah (1) + (2)

Pt T-30-2000-C.6.2. 1 m2 Memasang kaca bening tebal 5 mm


Bahan
Kaca Tebal 5 mm

1.100 M2

Rp.
Jumlah (1)

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

0.160
0.160
0.016
0.008

x
x
x
x

Rp.
Rp.
Rp.
Rp.

OH
OH
OH
OH

Jumlah (2)

Jumlah (1) + (2)

SNI 03 -3436-1994 1- m

Memasang Atap seng Multiroof


Bahan
Seng Multiroof
Screw/baut Seng Multi Roof
Tenaga
Pekerja
Tukang
Kepala Tukang

1.000 M2
9.000 Bh

x
x

Rp.
Rp.
Jumlah (1)

0.200 OH
0.100 OH
0.010 OH

x
x
x

Rp.
Rp.
Rp.

Mandor

0.001 OH

Rp.
Jumlah (2)

Jumlah (1) + (2)

SNI 03 -3436-1994 1- m1

Memasang Rabung seng Multiroof


Bahan
Rabung Seng Multiroof
Screw/baut Seng Multi Roof
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

1.020 M1
9.000 Bh

0.250
0.150
0.015
0.013

OH
OH
OH
OH

x
x

Rp.
Rp.
Jumlah (1)

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (2)

Jumlah (1) + (2)

SNI 3434:2008 (6.11 M3 konstruksi kuda-kuda konvensional, kayu kelas I, II, III bentan
Bahan
Balok Kayu
Besi strip tebal 5 mm
Paku 12 cm
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

1.100
15.00
5.600

4.000
12.000
1.200
0.200

M3
Kg
Kg

OH
OH
OH
OH

x
x
x

Rp.
Rp.
Rp.
Jumlah (1)

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (2)

Jumlah (1) + (2)

SNI 3434:2008 (6.11 M3 konstruksi gordeng, kayu kelas II


Bahan
Balok Kayu
Paku 12 cm

1.100
3.000

Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

2.400
7.200
0.720
0.120

M3
Kg

OH
OH
OH
OH

x
x

Rp.
Rp.
Jumlah (1)

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (2)

Jumlah (1) + (2)

SNI 3434:2008 (6.21 M1 Lisplank Uk. 3 x 20 cm, kayu kelas II


Bahan
Papan Kayu
Paku 12 cm

1.020
0.050

Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

0.100
0.200
0.020
0.005

M1
Kg

OH
OH
OH
OH

x
x

Rp.
Rp.
Jumlah (1)

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (2)

Jumlah (1) + (2)

SNI 2839:2008.6.101 m'

List Langit - langit Kayu profil

Bahan
List kayu profil
Paku

1.100 M'
0.010 Kg

x
x

Rp.
Rp.

Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

0.050 Oh
0.050 Oh
0.005 Oh
0.003 Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (2)

Jumlah (1) + (2)

SNI 2839:2008.6.121 m

Memasang Plafond tripleks tebal 4 mm + rangka kayu

Bahan
Kayu kelas II
Paku biasa 2" - 5"
Paku Tripleks
Tripleks tebal 4 mm
Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor

0.023 M
0.060 Kg
0.030 Kg
0.390 Lbr

x
x
x
x

Rp.
Rp.
Rp.
Rp.

0.270 Oh
0.400 Oh
0.040 Oh
0.0135 Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (2)

Jumlah (1) + (2)

SNI 7395:2008.6.361 m Memasang Lantai Keramik 20 x 20 cm


Bahan
26.500
Keramik 20 x 20 cm
10.400
Semen PC
0.045
Pasir Pasang
1.620
Semen warna
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

0.700
0.350
0.035
0.035

Bh
Kg
M
Kg

x
x
x
x

Rp.
Rp.
Rp.
Rp.

OH
OH
OH
OH

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (2)

Jumlah (1) + (2)

SNI 7395:2008.6.651 m Memasang Dinding Keramik 20 x 25 cm


Bahan
21.000
Keramik 20 x 25 cm
9.300
Semen PC
0.018
Pasir Pasang
1.940
Semen warna
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

0.900
0.450
0.045
0.045

Bh
Kg
M
Kg

x
x
x
x

Rp.
Rp.
Rp.
Rp.

OH
OH
OH
OH

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (2)

Jumlah (1) + (2)

SNI 7395:2008.6.641 m Memasang Lantai Keramik 40 x 40 cm Polished


Bahan
6.500 Bh
Keramik 40 x 40 cm Polished
10.000 Kg
Semen PC
0.045 M
Pasir Pasang
1.500 Kg
Semen warna
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

0.700
0.350
0.035
0.035

OH
OH
OH
OH

x
x
x
x

Rp.
Rp.
Rp.
Rp.

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (2)

Jumlah (1) + (2)

SNI 7395:2008.6.641 m

Memasang Lantai Keramik 40 x 40 cm Unpolished


Bahan
6.500 Bh
Keramik 40 x 40 cm Unpolished
x
10.000 Kg
Semen PC
x
0.045 M
Pasir Pasang
x
1.500 Kg
Semen warna
x

Rp.
Rp.
Rp.
Rp.

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

0.700
0.350
0.035
0.035

OH
OH
OH
OH

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (2)

Jumlah (1) + (2)


Pt-T-38-2000-C.6.2

1 m

Membersihkan/mencuci cat tembok lama cara manual


Tenaga
Pekerja
0.080 Oh
Mandor
0.040 Oh

x
x

Rp.
Rp.
Jumlah

Pt-T-38-2000-C.6.8

1 m

Pengecatan bidang kayu baru


Bahan
Cat Menie
Plamir
Cat dasar
Cat Kayu
Kertas Pasir
Tenaga
Pekerja
Tukang cat
Kepala tukang
Mandor

0.200 Kg
0.150 Kg
0.170 Kg
0.260 Kg
0.500 Lbr

x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.
Jumlah (1)

0.070 Oh
0.009 Oh
0.0060 Oh
0.0025 Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)

Pt-T-38-2000-C.6.14

1 m

Pengecatan tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
Bahan
Plamir
0.100 Kg
x Rp.
Cat dasar
0.120 Kg
x Rp.
Cat Tembok 2 x
0.240 Kg
x Rp.
Kertas Pasir
0.200 Lbr
x Rp.
Jumlah (1)
Tenaga
Pekerja
0.020 Oh
x Rp.
Tukang cat
0.063 Oh
x Rp.
Kepala tukang
0.0063 Oh
x Rp.
Mandor
0.0025 Oh
x Rp.
Jumlah (2)
Jumlah (1) + (2)

Pt-T-38-2000-C.6.15

1 m

Pengecatan tembok lama (2 lapis cat penutup )


Bahan
Cat Tembok 2 x
Kertas Pasir

0.240 Kg
0.200 Lbr

x
x

Rp.
Rp.
Jumlah (1)

0.020 Oh
0.063 Oh
0.0063 Oh
0.0025 Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)

Pengecatan Plafond ( dempul + 2 lapis cat penutup )


Bahan
Plamir
0.100 Kg
Cat Tembok 2 x
0.240 Kg
Kertas Pasir
0.500 Lbr

x
x
x

Rp.
Rp.
Rp.
Jumlah (1)

Tenaga
Pekerja
Tukang cat
Kepala tukang
Mandor

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)

Tenaga
Pekerja
Tukang cat
Kepala tukang
Mandor

Pt-T-38-2000-C.6.16

1 m

0.080 Oh
0.063 Oh
0.0063 Oh
0.004 Oh

Singkil,
Konsultan Per
CV. HIKMAH CO

HILDA FAZL

ATUAN

1,830,000.00
14,160.00
2,440,800.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

21,960.00
283.20
17,085.60
39,328.80

45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,500.00
5,500.00
700.00
290.00
10,990.00
50,318.80
25,159.40

Jumlah

45,000.00 =
58,000.00 =
=

45,000.00
58,000.00
Jumlah

Rp
Rp
Rp

= Rp.
= Rp.
= Rp

4,500.00
2,900.00
7,400.00

33,750.00
1,450.00
35,200.00

45,000.00
58,000.00

=
=
=

Rp.
Rp.
Rp.

11,250.00
483.33
11,733.33

45,000.00
58,000.00
Jumlah

=
=
=

Rp.
Rp.
Rp.

22,500.00
2,900.00
25,400.00

74,160.00
Jumlah (1)

=
=

Rp.
Rp.

88,992.00
88,992.00

45,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

13,500.00
580.00
14,080.00
103,072.00

240,000.00
Jumlah (1)

=
=

Rp.
Rp.

288,000.00
288,000.00

45,000.00
58,000.00

=
=

Rp.
Rp.

11,250.00
1,450.00

Jumlah

Jumlah (2)
Jumlah (1) + (2)

=
=

Rp.
Rp.

12,700.00
300,700.00

96,408.00
Jumlah (1)

=
=

Rp.
Rp.

115,689.60
115,689.60

45,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

13,500.00
580.00
14,080.00
129,769.60

111,240.00
Jumlah (1)

=
=

Rp.
Rp.

133,488.00
133,488.00

45,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

13,500.00
580.00
14,080.00
147,568.00

279,600.00
1,480.00
108,000.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

335,520.00
241,240.00
56,160.00
632,920.00

45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

67,500.00
41,250.00
5,250.00
4,350.00
118,350.00
751,270.00

279,600.00
74,160.00
Jumlah (1)

=
=
=

Rp.
Rp.
Rp.

335,520.00
32,037.12
367,557.12

45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

35,100.00
21,450.00
2,730.00
2,262.00
61,542.00
429,099.12

+ 40% Batu Kali/Belah/Gunung


279,600.00
1,480.00
129,600.00
150,000.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

134,208.00
287,120.00
40,435.20
70,200.00
531,963.20

45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) +(2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

153,000.00
46,750.00
5,950.00
9,860.00
215,560.00
747,523.20

960.00
1,480.00
108,000.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

67,200.00
28,046.00
4,104.00
99,350.00

45,000.00
55,000.00
70,000.00

=
=
=

Rp.
Rp.
Rp.

13,500.00
5,500.00
700.00

58,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=

Rp.
Rp.
Rp.

870.00
20,570.00
119,920.00

960.00
1,480.00
108,000.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

67,200.00
21,267.60
4,320.00
92,787.60

45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

13,500.00
5,500.00
700.00
870.00
20,570.00
113,357.60

960.00
1,480.00
108,000.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

67,200.00
17,020.00
4,644.00
88,864.00

45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

13,500.00
5,500.00
700.00
870.00
20,570.00
109,434.00

1,480.00
108,000.00
Jumlah (1)

=
=
=

Rp.
Rp.
Rp.

15,131.52
2,160.00
17,291.52

45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

13,500.00
8,250.00
1,050.00
870.00
23,670.00
40,961.52

1,480.00
108,000.00
Jumlah (1)

=
=
=

Rp.
Rp.
Rp.

11,508.48
2,484.00
13,992.48

45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

13,500.00
8,250.00
1,050.00
870.00
23,670.00
37,662.48

1,480.00
108,000.00
Jumlah (1)

=
=
=

Rp.
Rp.
Rp.

9,235.20
2,592.00
11,827.20

45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

13,500.00
8,250.00
1,050.00
870.00
23,670.00
35,497.20

1,480.00
108,000.00
Jumlah (1)

=
=
=

Rp.
Rp.
Rp.

6,393.60
648.00
7,041.60

45,000.00

Rp.

13,500.00

55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

5,500.00
700.00
870.00
20,570.00
27,611.60

1,480.00
Jumlah (1)

=
=

Rp.
Rp.

4,921.00
4,921.00

45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

9,000.00
5,500.00
700.00
580.00
15,780.00
20,701.00

108,000.00
2,100.00
Jumlah (1)

=
=
=

Rp.
Rp.
Rp.

4,860.00
84,000.00
88,860.00

45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

27,900.00
19,250.00
2,450.00
1,740.00
51,340.00
140,200.00

108,000.00
2,100.00
Jumlah (1)

=
=
=

Rp.
Rp.
Rp.

4,860.00
16,800.00
21,660.00

45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

27,900.00
19,250.00
2,450.00
1,740.00
51,340.00
73,000.00

1,480.00
129,600.00
129,600.00
150.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

365,560.00
80,481.60
95,904.00
32,250.00
574,195.60

45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

74,250.00
15,125.00
1,960.00
4,814.00
96,149.00
670,344.60

1,480.00
129,600.00
129,600.00
150.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

442,520.00
74,001.60
97,588.80
32,250.00
646,360.40

45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

74,250.00
15,125.00
1,960.00
4,814.00
96,149.00
742,509.40

1,480.00
129,600.00
129,600.00
150.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

482,480.00
70,372.80
98,755.20
32,250.00
683,858.00

45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

74,250.00
15,125.00
1,960.00
4,814.00
96,149.00
780,007.00

11,280.00
14,400.00
Jumlah (1)

=
=
=

Rp.
Rp.
Rp.

118,440.00
2,160.00
120,600.00

45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)
Jumlah

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,150.00
3,850.00
490.00
232.00
7,722.00
128,322.00
12,832.20

1,830,000.00
14,160.00
12,000.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

73,200.00
4,248.00
1,200.00
78,648.00

45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)
Jumlah

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

23,400.00
14,300.00
1,820.00
1,508.00
41,028.00
119,676.00
39,892.00

1,830,000.00
14,160.00
12,000.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

82,350.00
4,248.00
1,200.00
87,798.00

45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)
Jumlah

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

23,400.00
14,300.00
1,820.00
1,508.00
41,028.00
128,826.00
42,942.00

1,830,000.00
14,160.00
12,000.00
1,830,000.00
162,000.00
24,720.00
Jumlah (1)

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

73,200.00
5,664.00
2,400.00
27,450.00
56,700.00
49,440.00
214,854.00

45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)
Jumlah

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

29,700.00
18,150.00
2,310.00
1,914.00
52,074.00
266,928.00
88,976.00

1,830,000.00
14,160.00
12,000.00
1,830,000.00
162,000.00
24,720.00
Jumlah (1)

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

73,200.00
5,664.00
2,400.00
32,940.00
56,700.00
49,440.00
220,344.00

45,000.00
55,000.00
70,000.00
58,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

29,700.00
18,150.00
2,310.00
1,914.00

Jumlah (2)
Jumlah (1) + (2)
Jumlah

=
=
=

Rp.
Rp.
Rp.

52,074.00
272,418.00
90,806.00

1,830,000.00
14,160.00
12,000.00
1,830,000.00
162,000.00
24,720.00
Jumlah (1)

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

73,200.00
5,664.00
2,400.00
27,450.00
56,700.00
148,320.00
313,734.00

45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)
Jumlah

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

29,700.00
18,150.00
2,310.00
1,914.00
52,074.00
365,808.00
121,936.00

45,000.00
Jumlah

= Rp.
= Rp.

90,000.00
90,000.00

780,007.00
12,832.20
42,942.00
90,000.00

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

780,007.00
2,266,337.62
500,990.00
90,000.00
3,637,334.62

780,007.00
12,832.20
88,976.00
90,000.00

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

780,007.00
2,686,587.41
1,186,346.67
90,000.00
4,742,941.08

780,007.00
12,832.20
88,976.00
90,000.00

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

780,007.00
2,323,463.43
1,368,861.54
90,000.00
4,562,331.97

780,007.00
12,832.20
90,806.00
90,000.00

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

780,007.00
2,458,649.52
1,303,881.03
90,000.00
4,632,537.55

780,007.00
12,832.20
90,806.00
90,000.00

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

780,007.00
2,323,463.43
1,397,015.38
90,000.00
4,590,485.82

780,007.00
12,832.20
121,936.00
90,000.00

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

780,007.00
1,392,293.70
1,646,136.00
90,000.00
3,908,436.70

### = Rp.
14,160.00 = Rp.
18,000.00 = Rp.

Jumlah

Jumlah

Jumlah

Jumlah

Jumlah

Jumlah

en jendela, Kayu kelas II

Jumlah (1)
45,000.00
55,000.00
70,000.00
58,000.00

Rp.

###
17,700.00
18,000.00
###

=
=
=
=

Rp.
Rp.
Rp.
Rp.

315,000.00
###
147,000.00
20,300.00

Jumlah (2)

Rp.

Jumlah (1) + (2)

Rp.

###
###

pis seng plat, Kayu kelas II


### = Rp.
18,000.00 = Rp.
108,000.00 = Rp.
Jumlah (1)

Rp.

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Jumlah (2)

Rp.

Jumlah (1) + (2)

Rp.

45,000.00
55,000.00
70,000.00
58,000.00

116,640.00
9,000.00
108,000.00
233,640.00
45,000.00
165,000.00
21,000.00
2,900.00
233,900.00
467,540.00

136,800.00 = Rp.
Jumlah (1)

Rp.

=
=

Rp.
Rp.

Jumlah (2)

Rp.

Jumlah (1) + (2)

Rp.

55,000.00
70,000.00

30,000.00 = Rp.
Jumlah (1)

Rp.

=
=

Rp.
Rp.

Jumlah (2)

Rp.

Jumlah (1) + (2)

Rp.

55,000.00
70,000.00

20,400.00 = Rp.
Jumlah (1)

Rp.

=
=

Rp.
Rp.

Jumlah (2)

Rp.

Jumlah (1) + (2)

Rp.

55,000.00
70,000.00

165,000.00 = Rp.
Jumlah (1)

Rp.

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Jumlah (2)

Rp.

Jumlah (1) + (2)

Rp.

45,000.00
55,000.00
70,000.00
58,000.00

75,000.00 = Rp.
300.00 = Rp.
Jumlah (1)
45,000.00
55,000.00
70,000.00

136,800.00
136,800.00
27,500.00
3,500.00
31,000.00
167,800.00

30,000.00
30,000.00
5,500.00
700.00
6,200.00
36,200.00

20,400.00
20,400.00
5,500.00
700.00
6,200.00
26,600.00

181,500.00
181,500.00
7,200.00
8,800.00
1,120.00
464.00
17,584.00
199,084.00

Rp.

75,000.00
2,700.00
77,700.00

=
=
=

Rp.
Rp.
Rp.

9,000.00
5,500.00
700.00

58,000.00

Rp.

Jumlah (2)

Rp.

Jumlah (1) + (2)

Rp.

30,000.00 = Rp.
300.00 = Rp.
Jumlah (1)

Rp.

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Jumlah (2)

Rp.

Jumlah (1) + (2)

Rp.

45,000.00
55,000.00
70,000.00
58,000.00

58.00
15,258.00
92,958.00

30,600.00
2,700.00
33,300.00
11,250.00
8,250.00
1,050.00
754.00
21,304.00
54,604.00

as I, II, III bentang 6 meter


3,048,000.00
18,500.00
14,160.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

3,352,800.00
277,500.00
79,296.00
3,709,596.00

45,000.00
55,000.00
70,000.00
58,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

180,000.00
660,000.00
84,000.00
11,600.00

Jumlah (2)

Rp.

935,600.00

Jumlah (1) + (2)

Rp.

4,645,196.00

1,830,000.00
14,160.00
Jumlah (1)

=
=
=

Rp.
Rp.
Rp.

2,013,000.00
42,480.00
2,055,480.00

45,000.00
55,000.00
70,000.00
58,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

108,000.00
396,000.00
50,400.00
6,960.00

Jumlah (2)

Rp.

561,360.00

Jumlah (1) + (2)

Rp.

2,616,840.00

15,000.00
14,160.00
Jumlah (1)

=
=
=

Rp.
Rp.
Rp.

15,300.00
708.00
16,008.00

45,000.00
55,000.00
70,000.00
58,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

4,500.00
11,000.00
1,400.00
290.00

Jumlah (2)

Rp.

17,190.00

Jumlah (1) + (2)

Rp.

33,198.00

12,000.00 = Rp.
14,160.00 = Rp.

13,200.00
141.60
13,341.60

Jumlah (1)
45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)

Rp.

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.

2,250.00
2,750.00
350.00
174.00
5,524.00

Rp.

18,865.60

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

42,090.00
849.60
424.80
25,350.00
68,714.40

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Jumlah (2)

Rp.

Jumlah (1) + (2)

Rp.

12,150.00
22,000.00
2,800.00
783.00
37,733.00
106,447.40

Jumlah (1) + (2)

###
14,160.00
14,160.00
65,000.00
Jumlah (1)
45,000.00
55,000.00
70,000.00
58,000.00

5,280.00
1,480.00
108,000.00
1,780.00

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

139,920.00
15,392.00
4,860.00
2,883.60
163,055.60

45,000.00
55,000.00
70,000.00
58,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Jumlah (2)

Rp.

Jumlah (1) + (2)

Rp.

31,500.00
19,250.00
2,450.00
2,030.00
55,230.00
218,285.60

6,240.00
1,480.00
108,000.00
1,780.00

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

131,040.00
13,764.00
1,944.00
3,453.20
150,201.20

45,000.00
55,000.00
70,000.00
58,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Jumlah (2)

Rp.

Jumlah (1) + (2)

Rp.

40,500.00
24,750.00
3,150.00
2,610.00
71,010.00
221,211.20

8,400.00
1,480.00
108,000.00
1,780.00

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

54,600.00
14,800.00
4,860.00
2,670.00
76,930.00

45,000.00
55,000.00
70,000.00
58,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Jumlah (2)

Rp.

Jumlah (1) + (2)

Rp.

31,500.00
19,250.00
2,450.00
2,030.00
55,230.00
132,160.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

56,940.00
14,800.00
4,860.00
2,670.00

8,760.00
1,480.00
108,000.00
1,780.00

Rp.

79,270.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Jumlah (2)

Rp.

Jumlah (1) + (2)

Rp.

31,500.00
19,250.00
2,450.00
2,030.00
55,230.00
134,500.00

=
=
=

Rp.
Rp.
Rp.

3,600.00
2,320.00
5,920.00

45,000.00
55,000.00
70,000.00
58,000.00

45,000.00
58,000.00
Jumlah

17,561.50
16,500.00
22,000.00
34,650.00
3,690.00
Jumlah (1)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,512.30
2,475.00
3,740.00
9,009.00
1,845.00
20,581.30

45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,150.00
495.00
420.00
145.00
4,210.00
24,791.30

16,500.00
22,000.00
30,800.00
3,690.00
Jumlah (1)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

1,650.00
2,640.00
7,392.00
738.00
12,420.00

45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

900.00
3,465.00
441.00
145.00
4,951.00
17,371.00

30,800.00
3,690.00
Jumlah (1)

=
=
=

Rp.
Rp.
Rp.

7,392.00
738.00
8,130.00

45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

900.00
3,465.00
441.00
145.00
4,951.00
13,081.00

16,500.00
30,800.00
3,690.00
Jumlah (1)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

1,650.00
7,392.00
1,845.00
10,887.00

45,000.00
55,000.00
70,000.00
58,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,600.00
3,465.00
441.00
232.00
7,738.00
18,625.00

lapis cat penutup )

Singkil,
2013
Konsultan Perencana :
CV. HIKMAH CONSULTANT

HILDA FAZLIANA
Direktris

PERHITUNGAN VOLUME BESI


Berat Jenis Besi
Tulangan Baja/Besi
Polos
Ulir
U6
P6
U8
P8
U9
P9
U 10
P 10
U 12
P 12
U 13
P 13
U 14
P 14
U 16
P 16
U 18
P 18
U 19
P 19
U 20
P 20
P
P
P
P

SLOOF

22
25
28
29

U
U
U
U

22
25
28
29

15 X
20
Tulangan Utama
Sengkang
Luas Penampang
Selimut Beton
Dalam 1 m3 Panjangnya
Luas Bekisting dalam 1m3
Jumlah Sengkang
Panjang 1 Sengkang
Berat Besi
Berat Besi
Jumlah Berat
KOLOM
15 X
15
Tulangan Utama
Sengkang
Luas Penampang
Selimut Beton
Dalam 1 m3 Panjangnya
Luas Bekisting dalam 1m3
Jumlah Sengkang
Panjang 1 Sengkang
Berat Besi
Berat Besi
Jumlah Berat

Luas
(cm2)
0.288
0.503
0.636
0.758
1.131
1.327
1.540
2.011
2.545
2.835
3.142

Berat
(kg/m)
0.222
0.395
0.499
0.617
0.888
1.040
1.210
1.580
2.000
2.230
2.470

3.801
4.909
6.157
6.605

2.980
3.850
4.830
5.190

CM
= 5
=
8
=
0.030
=
2.5
=
33.33
=
11.67
=
222
=
0.58
= 5
=
4
CM
= 4
=
8
=
0.023
=
3
=
44.44
=
13.33
=
296
=
0.44
= 4
=
8

12
Polos BJ
0.89
150 Polos BJ
0.40
m2
cm
m
m2
11.67
Buah
m
12
=
148.00 kg
150 =
28.61 kg
=
176.61 kg
12
Polos BJ
0.89
150 Polos BJ
0.40
m2
cm
m
m2
13.33
Buah
m
12
=
157.87 kg
150 =
51.50 kg
=
209.36 kg

KOLOM PRAKTIS
13 X
13
Tulangan Utama
Sengkang
Luas Penampang
Selimut Beton
Dalam 1 m3 Panjangnya
Luas Bekisting dalam 1m3
Jumlah Sengkang
Panjang 1 Sengkang
Berat Besi
Berat Besi
Jumlah Berat

CM
= 4
=
6
=
0.017
=
2.5
=
59.17
=
15.38
=
394
=
0.40
= 4
=
6

RING BALK
13 X
15
Tulangan Utama
Sengkang
Luas Penampang
Selimut Beton
Dalam 1 m3 Panjangnya
Luas Bekisting dalam 1m3
Jumlah Sengkang
Panjang 1 Sengkang
Berat Besi
Berat Besi
Jumlah Berat

CM
= 5
=
8
=
0.020
=
2.5
=
51.28
=
14.36
=
342
=
0.44
= 5
=
8

BALOK LATAI
13 X
13
Tulangan Utama
Sengkang
Luas Penampang
Selimut Beton
Dalam 1 m3 Panjangnya
Luas Bekisting dalam 1m3
Jumlah Sengkang
Panjang 1 Sengkang
Berat Besi
Berat Besi
Jumlah Berat

CM
= 4
=
8
=
0.017
=
2.5
=
59.17
=
15.38
=
394
=
0.40
= 4
=
8

10
Polos BJ
0.62
150 Polos BJ
0.22
m2
cm
m
m2
15.38
Buah
m
10
=
146.04 kg
150 =
35.03 kg
=
181.07 kg

10
Polos BJ
0.62
150 Polos BJ
0.22
m2
cm
m
m2
14.36
Buah
m
10
=
158.21 kg
150 =
33.39 kg
=
191.60 kg

10
Polos BJ
0.62
150 Polos BJ
0.22
m2
cm
m
m2
15.38
Buah
m
10
=
146.04 kg
150 =
35.03 kg
=
181.07 kg

BERAT BESI BETON POLOS/M'


Diameter Nominal Luas Penampang
(d)
Nominal (L)
(mm)
(cm2)
1
P.6
6
0.2826
2
P.8
8
0.5024
3
P.10
10
0.785
4
P.12
12
1.1304
5
P.14
14
1.5386
6
P.16
16
2.0096
7
P.19
19
2.8339
8
P.22
22
3.7994
9
P.25
25
4.9063
10
P.28
28
6.1544
11
P.32
32
8.0384
Sumber SNI 07-2052-2002
No.

Penamaan

Berat Nominal
per Meter
(kg/m)
0.222
0.395
0.617
0.888
1.12
1.58
2.23
2.98
3.85
4.83
6.32

4. Sloof 15/20 cm
B=
15 cm =
H=
20 cm =
Panjang Sloof/M3 Beton =
Panjang Tulangan Utama =
Jumlah Tulangan Utama =
Diameter Tulangan Utama
Berat Tulangan Utma/M' =
Jarak Beugel Tumpuan =
Jarak Beugel Lapangan =
Jumlah Beugel Tumpuan =
Jumlah Beugel Lapangan =
Panjang Beugel =
Diameter Beugel =
Berat Tulangan Beugel/M'
Berat Tulangan
Tulangan Utama
Beugel Tumpuan
Beugel Lapangan

Bekisting
B
0.150

H
0.200

0.150 M'
0.200 M'
33.333 M'
33.333 M'
4 Ptg
12 mm
0.888 Kg/M'
0.1 M'
0.15 M'
334.000 Bh
223.000 Bh
0.56 M'
8 mm
0.395 Kg/M'

L
Ptg
Berat/m'
33.333
4.000
0.888
0.560 334.000
0.395
0.560 223.000
0.395
Berat Total Tulangan/M3 =

L
33.333

Luas
13.333 M2

Berat
118.400
73.881
49.328
241.608

Sat
Kg
Kg
Kg
Kg/M3

4. Sloof 18/25 cm
B=
18 cm =
H=
25 cm =
Panjang Sloof/M3 Beton =
Panjang Tulangan Utama =
Jumlah Tulangan Utama =
Diameter Tulangan Utama
Berat Tulangan Utma/M' =
Jarak Beugel Tumpuan =
Jarak Beugel Lapangan =
Jumlah Beugel Tumpuan =
Jumlah Beugel Lapangan =
Panjang Beugel =
Diameter Beugel =
Berat Tulangan Beugel/M'
Berat Tulangan
Tulangan Utama
Beugel Tumpuan
Beugel Lapangan

Bekisting
B
0.180

H
0.250

0.180 M'
0.250 M'
22.222 M'
22.222 M'
4 Ptg
12 mm
0.888 Kg/M'
0.1 M'
0.15 M'
334.000 Bh
223.000 Bh
0.72 M'
8 mm
0.395 Kg/M'

L
Ptg
Berat/m'
22.222
4.000
0.888
0.720 334.000
0.395
0.720 223.000
0.395
Berat Total Tulangan/M3 =

L
22.222

Luas
11.111 M2

Berat
78.933
94.990
63.421
237.344

Sat
Kg
Kg
Kg
Kg/M3

5. Kolom 20x40 cm
B=
20 cm =
H=
40 cm =
Panjang Kolom/M3 Beton =
Panjang Tulangan Utama =
Jumlah Tulangan Utama =
Diameter Tulangan Utama
Berat Tulangan Utma/M' =
Jarak Beugel =
Jumlah Beugel =
Panjang Beugel =
Diameter Beugel =
Berat Tulangan Beugel/M'
Berat Tulangan
Tulangan Utama
Beugel

Bekisting
B
0.200

H
0.400

0.200 M'
0.400 M'
12.500 M'
12.500 M'
8 Ptg
12 mm
0.888 Kg/M'
0.15 M'
84.000 Bh
1.06 M'
8 mm
0.395 Kg/M'

L
Ptg
Berat/m'
12.500
8.000
0.888
1.060
84.000
0.395
Berat Total Tulangan/M3 =

L
12.500

Luas
15.000 M2

Berat
Sat
88.800 Kg
35.171 Kg
123.971 Kg/M3

5. Kolom 25x25 cm
B=
25 cm =
H=
25 cm =
Panjang Kolom/M3 Beton =
Panjang Tulangan Utama =
Jumlah Tulangan Utama =
Diameter Tulangan Utama
Berat Tulangan Utma/M' =
Jarak Beugel =
Jumlah Beugel =
Panjang Beugel =
Diameter Beugel =
Berat Tulangan Beugel/M'
Berat Tulangan
Tulangan Utama
Beugel

Bekisting
B
0.250

H
0.250

0.250 M'
0.250 M'
16.000 M'
16.000 M'
8 Ptg
12 mm
0.888 Kg/M'
0.15 M'
84.000 Bh
0.86 M'
8 mm
0.395 Kg/M'

L
Ptg
Berat/m'
16.000
8.000
0.888
0.860
84.000
0.395
Berat Total Tulangan/M3 =

L
16.000

Luas
16.000 M2

Berat
Sat
113.664 Kg
28.535 Kg
142.199 Kg/M3

8. Kolom 13x15 cm
B=
13 cm =
H=
15 cm =
Panjang Kolom/M3 Beton =
Panjang Tulangan Utama =
Jumlah Tulangan Utama =
Diameter Tulangan Utama
Berat Tulangan Utma/M' =
Jarak Beugel =
Jumlah Beugel =
Panjang Beugel =
Diameter Beugel =
Berat Tulangan Beugel/M'
Berat Tulangan
Tulangan Utama
Beugel

Bekisting
B
0.130

H
0.150

0.130 M'
0.150 M'
51.282 M'
51.282 M'
4 Ptg
12 mm
0.888 Kg/M'
0.15 M'
342.000 Bh
0.42 M'
8 mm
0.395 Kg/M'

L
Ptg
Berat/m'
51.282
4.000
0.888
0.420 342.000
0.395
Berat Total Tulangan/M3 =

L
51.282

Luas
13.333 M2

Berat
Sat
182.154 Kg
56.738 Kg
238.892 Kg/M3

9. Ring Balok 13/18 cm


B=
13 cm =
H=
18 cm =
Panjang Balok/M3 Beton =
Panjang Tulangan Utama =
Jumlah Tulangan Utama =
Diameter Tulangan Utama
Berat Tulangan Utma/M' =
Jarak Beugel Tumpuan =
Jarak Beugel Lapangan =
Jumlah Beugel Tumpuan =
Jumlah Beugel Lapangan =
Panjang Beugel =
Diameter Beugel =
Berat Tulangan Beugel/M'
Berat Tulangan
Tulangan Utama
Beugel Tumpuan
Beugel Lapangan

Bekisting
B
0.130

H
0.180

0.130 M'
0.180 M'
42.735 M'
42.735 M'
4 Ptg
12 mm
0.888 Kg/M'
0.1 M'
0.15 M'
214.000 Bh
143.000 Bh
0.48 M'
8 mm
0.395 Kg/M'

L
Ptg
Berat/m'
42.735
4.000
0.888
0.480 214.000
0.395
0.480 143.000
0.395
Berat Total Tulangan/M3 =

L
42.735

Luas
15.385 M2

Berat
151.795
40.574
27.113
219.482

Sat
Kg
Kg
Kg
Kg/M3

12. Balok Praktis 13/15 cm


B=
13 cm =
H=
15 cm =
Panjang Balok/M3 Beton =
Panjang Tulangan Utama =
Jumlah Tulangan Utama =
Diameter Tulangan Utama
Berat Tulangan Utma/M' =
Jarak Beugel Tumpuan =
Jarak Beugel Lapangan =
Jumlah Beugel Tumpuan =
Jumlah Beugel Lapangan =
Panjang Beugel =
Diameter Beugel =
Berat Tulangan Beugel/M'
Berat Tulangan
Tulangan Utama
Beugel Tumpuan
Beugel Lapangan

Bekisting
B
0.130

H
0.150

0.130 M'
0.150 M'
51.282 M'
51.282 M'
4 Ptg
12 mm
0.888 Kg/M'
0.15 M'
0.15 M'
171.000 Bh
171.000 Bh
0.42 M'
8 mm
0.395 Kg/M'

L
Ptg
Berat/m'
51.282
4.000
0.888
0.420 171.000
0.395
0.420 171.000
0.395
Berat Total Tulangan/M3 =

L
51.282

Luas
15.385 M2

Berat
182.154
28.369
28.369
238.892

Sat
Kg
Kg
Kg
Kg/M3

1 6.666667
13.33333
10.46667
0.08

12.5
130.8333

No
I.
1
2
3

Uraian Pekerjaan
Pekerjaan Persiapan
Pembersihan Lapangan
Pemasangan Bowplank
Administrasi dan dokumentasi

II.
1
2
3

Pekerjaan Tanah dan Pondasi


Galian pondasi penerus
Urugan kembali bekas galian
Urugan tanah bawah lantai

M3
M3
M3

Urugan Pasir bawah Lantai

III.
1
2
3

Pekerjaan Ponadsi
Mengurug Pasir Urug bawah Pondasi
Pas Batu kosong
Pas Batu Gunung

IV.
1
2
3
4
5
5

Pekerjaan Beton Bertulang


Sloof Uk. 15/20
Kolom Uk. 15/15
Kolom Praktis 13/13
Ring Balok 13/15
Balok Latai
Plat Dack

V.
1

Pekerjaan Lantai dan Dinding


Pasangan diding 1/2 Bata 1:4

2
3
4
5
6

Pasangan diding 1/2 Bata 1:4 pada tangga


Plesteran 1:4
Plesteran 1:2
Beton Rabat
Pas. Keramik 40x40 cm

Pas. Keramik 30x30 cm

VI.
1

Pekerjaan Kayu
Pintu P1
Kusen Pintu

Satuan

Panjang
(m)

Lebar (m) Tinggi (m)

Ls
Ls
Ls

21

0.5

0.5

4
1.5
0.8

4
1.75
1.1

0.35
0.35
0.35

M3

0.15

M3
M3
M3

21
21
21

0.5
0.5
0.4

0.05
0.1
0.5

M3
M3
M3
M3
M3
M3
M3

21
0.15
0.13
21
3.6
1.1
1.89

0.15
0.15
0.13
0.13
0.13
0.1
0.1

0.2
3.05
3.05
0.15
0.15
1.4
1.6

M2

13.5
2.67
0.2

M2
M2
M2
M3
M2

M3

3.05
5
1.5

3.91
3.82
1.57

3.91
3.82
1.32

1.2

3.1

0.13
0.13

0.05
0.05

0.05

5
1.78

Daun Pintu
Kaca

M2
M2

Jendela Kaca J1
Kusen Jendela

M3

2
3

Daun Jendela Kaca


Kaca

Jendela Kaca J2
Kusen Jendela

2
3

Daun Jendela Kaca


Kaca

VII.
1

M3

1.056
0.43

1
1.78

0.13
0.13

0.05
0.05

0.5
0.38

1.6
1.48

0.13
0.13

0.05
0.05

0.7
0.58

1.6
1.48

4.6
1.04

1.2
1.6

Pekerjaan Atap dan Plafond


Konstruksi Kuda-Kuda
- Balok Gapit bawah
- Balok Gapit atas
- Balok Skor
- Balok Sokong
- Balok Bint

M3
M3
M3
M3
M3

4
2.19
0.63
0.95
1.64

0.1
0.1
0.1
0.1
0.1

0.07
0.07
0.07
0.07
0.07

2
3
4
5
6

Gordeng
Atap Genteng Metal Multiroof tebal 0,25 mm
Rabung Seng
Kayu Lisplank
Rangka Plafond

M3
M2
M1
M1
M2

0.07
2.8

0.05

langit - Langit Tripleks tebal 4 mm

M2

69
3.2
12.8
5.6
4
1.5
4
1.5

VIII.
1
2
3
4
6

Pekerjaan Elektrikal
Pengadaan Listrik 4 Ampere
Box Zakering
Lampu Philips SL 18 Watt
Stop Kontak
Saklar Ganda

IX.
1
2
3
4
5

Pekerjaan Lain - Lain


Septic Tank
Resapan
Biaya Instalasi Listrik
Biaya Instalasi Air Bersih dan Kotor
Pengadaan Sanyo

4
4
1.75
4
1.75

X.

Pekerjaan Finishing
Pengecatan dinding Luar dalam
Pengecatan Kusen dan daun Pintu/jendela
- Daun Pintu
- Daun Jendela
- Kusen Pintu
- Kusen Jendela
Penecatan Lisplank
Pembersihan Lapangan

M2
M2
M2
M2

0.08
0.08
0.23
0.23

3.854
3.16
6.53
5.62

1.08
0.96

Kuantitas

Jumlah
1
1
1

5.25
1.75
5.04
8.26875
2.772
16.08075
1.9505

1.6
0.2625
0.088

0.8
0.13125
0.044

16
2.625
2.64

0.525
1.05
4.2

8
2

1
1

0.63
0.549
0.10309
0.4095
0.0702
0.154
0.3024
0.4564
27.435
13.35
0.3
44.46
3.375
78.0615
0.97525
14.5924
2.0724
16.6648
3.72

0.0325
0.01157

1.4

1.89
213.35
2.952

7.38

3.408

1.3

1.295

0.78

3.82

1.6

1.056
1

0.04407
0.2906
0.7654

6
6

0.0299
0.00676
0.03666
1.4256
3.3744

0.04407

0.21996

0.15
1.35
4.05

4.71
8.76
350

2
2

2
2
2
2
1

0.0078
0.0104
0.0182
0.5232
1.7168

0.056
0.03066
0.00882
0.0133
0.01148
0.12026

0.36078

0.2415
35.84
12.8
22.4
16
2.625
16
2.625
18.625 17.69375

21.32
17.92
13.92
9.92
5.92
69

13.76
22.8

6.83
0.78944
3.9552
1.6059
1.3706
7.72114

0.104
0.078

RENCANA ANGGARAN BIAYA (RAB)


PROGRAM
KEGIATAN
PEKERJAAN
LOKASI
INSTANSI
SUMBER DANA
TAHUN ANGGARAN

NO

:
:
:
:
:
:
:

PEMBUATAN MUSHALLA KANTOR DINAS KESEHATAN


KECAMATAN SINGKIL KABUPATEN ACEH SINGKIL
DINAS KESEHATAN KABUPATEN ACEH SINGKIL
APBK
2013

URAIAN PEKERJAAN

1
2
I. PEKERJAAN PERSIAPAN
1 Pekerjaan Pemasangan Bowlpank
2 Papan Nama Proyek
3 Administrasi dan dokumentasi

VOL.

SAT.

ANALISA

1.00
1.00
1.00

Ls
Unit
Ls

Taksir
Taksir
Taksir

5.25
1.75
16.08
1.95

M3
M3
M3
M3

SNI 2835:2008.6.1
SNI 2835:2008.6.9
SNI 2835:2008.6.16
SNI 2835:2008.6.11

II.
1
2
3
4

PEKERJAAN TANAH DAN GALIAN


Galian pondasi penerus
Urugan kembali bekas galian
Urugan tanah bawah lantai
Urugan pasir bawah lantai

III.
1
2
3

PEKERJAAN PONDASI
Urugan pasir bawah Pondasi
Pas Batu kosong
Pas Batu gunung

0.53
1.05
4.20

M3
M3
M3

SNI 2835:2008.6.11
SNI 2836:2008.6.9
SNI 2836:2008.6.2

IV.
1
2
3
4
5
6

PEKERJAAN BETON BERTULANG


Sloof Uk. 15/20
Kolom Uk. 15/15
Kolom Praktis 13/13
Ring Balok 13/15
Balok Latai 13/13
Plat Dack

0.63
0.55
0.10
0.41
0.07
0.46

M3
M3
M3
M3
M3
M3

Supl. SNI 7394:2008.2.b


Supl. SNI 7394:2008.3.a
Supl. SNI 7394:2008.3.b
Supl. SNI 7394:2008.4.a
Supl. SNI 7394:2008.4.b
Supl. SNI 7394:2008.5

V.
1
2
3
4
5

PEKERJAAN LANTAI DAN DINDING


Pasangan diding 1/2 Bata 1:4
Plesteran 1:4
Beton Rabat
Pasangan Keramik 40x40 cm
Pasangan Keramik 20x20 cm

44.46
78.06
0.98
16.66
3.72

M2
M2
M3
M2
M2

SNI 6897:2008.6.9
SNI 2837:2008.6.4
SNI 7394:2008.6.1
SNI 7395:2008.6.64.a
SNI 7395:2008.6.36

VI.
1
-

PEKERJAAN KAYU
Pintu Kaca P1
Kusen Pintu
Daun Pintu
Engsel

0.04
0.29
4.00

M3
M2
Bh

SNI 3434:2008.6.1
SNI 3434:2008.6.29
Pt T-30-2000-C.6.1.5

NO

URAIAN PEKERJAAN

1
- Kunci Tanam
- Kaca Tebal 5 mm
2
-

Jendela Kaca J1
Kusen
Daun Jendela Kaca
Engsel
Pegangan Jendela
Grendel
Hak angin
Kaca Tebal 5 mm

VOL.

SAT.

ANALISA

3
1.00
0.77

4
Bh
M2

5
Pt T-30-2000-C.6.1.2
Pt T-30-2000-C.6.2.3a

0.02
0.52
4.00
2.00
2.00
4.00
1.72

M3
M2
Bh
Bh
Bh
Bh
M2

SNI 3434:2008.6.1
SNI 3434:2008.6.29
Pt T-30-2000-C.6.1.5
Taksir
Taksir
Taksir
Pt T-30-2000-C.6.2.3a

NO
1
3
VII.
1
2
3
4
5
6
7

URAIAN PEKERJAAN

VOL.

SAT.

ANALISA

Jendela Kaca J2
Kusen
Daun Jendela Kaca
Engsel
Pegangan Jendela
Grendel
Hak angin
Kaca Tebal 5 mm

0.22
1.43
12.00
6.00
6.00
12.00
3.37

M3
M2
Bh
Bh
Bh
Bh
M2

SNI 3434:2008.6.1
SNI 3434:2008.6.29
Pt T-30-2000-C.6.1.5
Taksir
Taksir
Taksir
Pt T-30-2000-C.6.2.3a

PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP


Konstruksi Kuda-Kuda
Gordeng
Atap Genteng Metal tebal 0,25 mm
Rabung Seng
Kayu Lisplank
Rangka dan Plafond Tripleks
Kubah

0.36
0.24
35.84
12.80
22.40
17.69
1.00

M3
M3
M2
M1
M1
M2
Bh

SNI 3434:2008 (6.13)


SNI 3434:2008 (6.15)
SNI 03 -3436-1994 - 6.1
SNI 03 -3436-1994 - 6.1
SNI 3434:2008 (6.21)
SNI 2839:2008.6.12
Taksir

1.00
4.00
2.00
2.00

Bh
Bh
Bh
Bh

Taksir
Taksir
Taksir
Taksir

78.06
7.72
4.48
1.00

M2
M2
M2
Ls

Pt-T-38-2000-C.6.14
Pt-T-38-2000-C.6.8
Pt-T-38-2000-C.6.8
Taksir

VIII. PEKERJAAN ELEKTRIKAL


1 Box Zakering
2 Lampu Hemat energi 24 Watt
3 Stop Kontak
4 Saklar Ganda
IX.
1
2
3
4

PEKERJAAN PENGECATAN DAN FINISHING


Pengecatan dinding Luar dalam
Pengecatan Kusen dan daun Pintu/jendela
Pengecatan Lisplank
Pembersihan Lapangan

Singkil,
2
Konsultan Perencana :
CV. HIKMAH CONSULTAN

HILDA FAZLIANA
Direktris

(RAB)

HARGA
SATUAN
(Rp.)
6

JUMLAH
HARGA
(Rp.)
7

300,000.00
250,000.00
422,500.00
JUMLAH

300,000.00
250,000.00
422,500.00
972,500.00

35,200.00
11,733.33
129,769.60
103,072.00

184,800.00
20,533.33
2,086,792.50
201,041.94
2,493,167.76

JUMLAH
103,072.00
429,099.12
751,270.00
JUMLAH
3,637,334.62
4,742,941.08
4,562,331.97
4,632,537.55
4,590,485.82
3,908,436.70
JUMLAH
109,434.00
35,497.20
670,344.60
132,160.00
218,285.60

54,112.80
450,554.08
3,155,334.00
3,660,000.88
2,291,520.81
2,603,874.65
470,330.80
1,897,024.12
322,252.10
1,783,810.51
9,368,813.00

JUMLAH

4,865,435.64
2,770,964.68
653,753.57
2,202,419.97
812,022.43
11,304,596.29

4,880,600.00
467,540.00
36,200.00

215,088.04
135,867.12
144,800.00

HARGA
SATUAN
(Rp.)
6
167,800.00
199,084.00

JUMLAH
HARGA
(Rp.)
7
167,800.00
152,378.89

4,880,600.00
467,540.00
26,600.00
13,200.00
12,000.00
10,800.00
199,084.00

88,826.92
244,616.93
106,400.00
26,400.00
24,000.00
43,200.00
341,787.41

HARGA
SATUAN
(Rp.)
6

JUMLAH
HARGA
(Rp.)
7

4,880,600.00
467,540.00
26,600.00
13,200.00
12,000.00
10,800.00
199,084.00
JUMLAH

1,073,536.78
666,525.02
319,200.00
79,200.00
72,000.00
129,600.00
671,789.05
4,703,016.17

4,645,196.00
2,616,840.00
92,958.00
54,604.00
33,198.00
106,447.40
1,800,000.00
JUMLAH

1,675,893.81
631,966.86
3,331,614.72
698,931.20
743,635.20
1,883,453.68
1,800,000.00
10,765,495.48

60,000.00
42,000.00
18,000.00
32,400.00
JUMLAH

60,000.00
168,000.00
36,000.00
64,800.00
328,800.00

17,371.00
24,791.30
24,791.30
200,000.00
JUMLAH

1,356,006.32
191,417.10
111,065.02
200,000.00
1,858,488.44

JUMLAH
PPN 10 %
TOTAL
DI BULATKAN

Singkil,
2013
Konsultan Perencana :
CV. HIKMAH CONSULTANT

HILDA FAZLIANA
Direktris

45,454,878.02
4,545,487.80
50,000,365.82
50,000,000.00

RENCANA ANGGARAN BIAYA (RAB)


(REKAPITULASI)
PROGRAM
KEGIATAN
PEKERJAAN
LOKASI
INSTANSI
SUMBER DANA
TAHUN ANGGARAN

:
:
:
:
:
:
:

PEMBUATAN MUSHALLA KANTOR DINAS KESEHATAN


KECAMATAN SINGKIL KABUPATEN ACEH SINGKIL
DINAS KESEHATAN KABUPATEN ACEH SINGKIL
APBK
2013

NO

I.
II.
III.
IV.
V.
VI.
VII.
VIII.
IX.

TOTAL
JUMLAH
(Rp)

URAIAN PEKERJAAN

PEKERJAAN PERSIAPAN
PEKERJAAN TANAH DAN GALIAN
PEKERJAAN PONDASI
PEKERJAAN BETON BERTULANG
PEKERJAAN LANTAI DAN DINDING
PEKERJAAN KAYU
PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP
PEKERJAAN ELEKTRIKAL
PEKERJAAN PENGECATAN DAN FINISHING
JUMLAH
PPN 10 %
TOTAL
DIBULATKAN

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Terbilang : Lima Puluh Juta Rupiah,-

Disetujui :
PPTK DINAS KESEHATAN
KABUPATEN ACEH SINGKIL

MUNAWARSYAH
NIP. 19731122 199503 1 004

CV. HIKMAH CONSULTAN

Mengetahui / Menyetujui :
KEPALA DINAS KESEHATAN
KABUPATEN ACEH SINGKIL

EDY WIDODO, SKM, M.KES


NIP. 19670112 199103 1 004

N BIAYA (RAB)
ASI)

TOTAL
JUMLAH
(Rp)
972,500.00
2,493,167.76
3,660,000.88
9,368,813.00
11,304,596.29
4,703,016.17
10,765,495.48
328,800.00
1,858,488.44
45,454,878.02
4,545,487.80
50,000,365.82
50,000,000.00

Singkil,
2013
Konsultan Perencana :
CV. HIKMAH CONSULTANT

HILDA FAZLIANA
Direktris