Anda di halaman 1dari 7

BROADWAY/KEITH AVENUE TO GOLDEN GATE WAY BIKE/PEDESTRIAN PROJECT CALDECOTT TUNNEL SETTLEMENT

LEGEND
CONSTRUCTION NOTE NUMBER

FIRE HYDRANT

DETAIL NUMBER PER CALTRANS STD PLANS


Traffic lines as cardinal number
Arrows as roman numeral

BLUE FIRE HYDRANT MARKER


ETR

EXISTING TO REMAIN

TRAFFIC SIGNAL

LF

LINEAR FEET

CROSSWALK/LIMIT LINE (SOLID ONE FOOT


WHITE LINE), UNLESS OTHERWISE NOTED

SF

SQUARE FEET

PAINT CURB RED

NEW SIGN ON POLE (TYPE AS NOTED)


EXISTING SIGN

PAINT CURB YELLOW

CONSTRUCTION NOTES
BIKE LANE SYMBOL & ARROW
Install bike lane symbol and bike lane arrow markings 20 feet
after curb return (as measured from base of symbol) and/or
as noted. Space symbol and arrow 6 feet apart. See Detail.
GREEN BACK SHARROW
Install first sharrow marking 20 feet after curb return or as
noted. Install other sharrow markings as noted. See Detail C.
PARKING TEE AT 18' FROM FACE OF CURB
Install short stem toward curb, distance measured from
center of cross. Spacing between tees to be determined by
engineer. See City Standard Detail.
BIKE DETECTOR SYMBOL
Install bike detector pavement marking 1 foot from limit line
and centered in lane, or as noted. See Detail.
LADDER CROSSWALK
Install 2 foot stripes spaced 2 feet apart, bounded by
standard 1 foot crosswalk stripes, white unless otherwise
noted. See Detail D.
WHITE CYCLE TRACK BUFFER STRIPING
Install 6 inch white striping every 15 feet at 45 degree angle.
See Detail F.
YELLOW BUFFER STRIPING
Install 6 inch yellow striping every 8 feet at 45 degree angle, or
as noted.
REMOVE CONFLICTING STRIPING
REMOVE CONFLICTING MARKINGS
CONSTRUCT NEW TYPE A DIAGONAL CURB RAMP
CONSTRUCT NEW TYPE A DIRECTIONAL CURB RAMP
GRAVEL EPOXY TREATMENT See Detail A.
GREEN THEMOPLASTIC
BIKE CORRAL See Detail B.
INSTALL TWO-STAGE LEFT-TURN BOX
BUS STOP PAVEMENT MARKING
INSTALL NEW SIGN ON POLE See Detail E.
REMOVE EXISTING SIGN
EXISTING SIGN TO REMAIN

No.

CITY OF OAKLAND
BUREAU OF ENGINEERING AND
CONSTRUCTION
250 FRANK H. OGAWA PLAZA, SUITE 4344 * OAKLAND, CA 94612
(510) 238-3467 * FAX (510) 238-7415

TELEGRAPH AVENUE
COMPLETE STREETS PROJECT
CITY OF OAKLAND

BY

DATE

PROJECT NO.
C369640
PR# [TBD]

REFERENCE

CONSTRUCTION PLANS
CHECKED BY

RR

DESIGNED BY

RM/CN

DRAWN BY

LC/DD

NOTES, LEGEND,
AND DETAILS

SCALE:

SHEET NO.

AS SHOWN

DATE:
MAY 1, 2015

SS-1
OF 7

60 LF

170 LF

20'

80'

40'

MATCH LINE A

10'

CENTERED
ON LANE

MODIFIED
40 LF

MODIFIED
40 LF

3 TEES
475 SF

140 SF

205 SF

165 SF

165 SF

15 LF

139 SF

MATCH LINE A

44 LF

96 SF
75 LF

35 LF

60 LF
100 SF

35 LF

106 LF

15 LF

75 LF

MATCH LINE B

62 SF
266 SF

335 SF

96 SF

307 SF
65 LF

160 SF
220 SF

170 SF

MODIFIED
22 LF

170 SF

MODIFIED
44 LF

103 LF

TELEGRAPH AVE

112 SF
No.

CITY OF OAKLAND
BUREAU OF ENGINEERING AND
CONSTRUCTION
250 FRANK H. OGAWA PLAZA, SUITE 4344 * OAKLAND, CA 94612
(510) 238-3467 * FAX (510) 238-7415

TELEGRAPH AVENUE
COMPLETE STREETS PROJECT
CITY OF OAKLAND

BY

DATE

PROJECT NO.
C369640
PR# [TBD]

REFERENCE

CONSTRUCTION PLANS
CHECKED BY

RR

DESIGNED BY

RM/CN

DRAWN BY

LC/DD

SCALE:

SHEET NO.

AS SHOWN

DATE:
MAY 1, 2015

SS-2
OF 7

BROADWAY/KEITH AVENUE TO GOLDEN GATE WAY BIKE/PEDESTRIAN PROJECT CALDECOTT TUNNEL SETTLEMENT

GRAPHIC SCALE (IN FEET)

GRAPHIC SCALE (IN FEET)


10'

20'

80'

40'

MATCH LINE D

MATCH LINE C

MATCH LINE B

MATCH LINE C

TELEGRAPH AVE

No.

CITY OF OAKLAND
BUREAU OF ENGINEERING AND
CONSTRUCTION
250 FRANK H. OGAWA PLAZA, SUITE 4344 * OAKLAND, CA 94612
(510) 238-3467 * FAX (510) 238-7415

TELEGRAPH AVENUE
COMPLETE STREETS PROJECT
CITY OF OAKLAND

BY

DATE

PROJECT NO.
C369640
PR# [TBD]

REFERENCE

CONSTRUCTION PLANS
CHECKED BY

RR

DESIGNED BY

RM/CN

DRAWN BY

LC/DD

SCALE:

SHEET NO.

AS SHOWN

DATE:
MAY 1, 2015

SS-3
OF 7

BROADWAY/KEITH AVENUE TO GOLDEN GATE WAY BIKE/PEDESTRIAN PROJECT CALDECOTT TUNNEL SETTLEMENT

SEE SHEET SS-1 FOR CONSTRUCTION NOTES AND LEGEND

BROADWAY/KEITH AVENUE TO GOLDEN GATE WAY BIKE/PEDESTRIAN PROJECT CALDECOTT TUNNEL SETTLEMENT

SEE SHEET SS-1 FOR CONSTRUCTION NOTES AND LEGEND

MATCH LINE F

MATCH LINE E

MATCH LINE E

MATCH LINE D

TELEGRAPH AVE

TELEGRAPH AVE
No.

CITY OF OAKLAND
BUREAU OF ENGINEERING AND
CONSTRUCTION
250 FRANK H. OGAWA PLAZA, SUITE 4344 * OAKLAND, CA 94612
(510) 238-3467 * FAX (510) 238-7415

TELEGRAPH AVENUE
COMPLETE STREETS PROJECT
CITY OF OAKLAND

BY

DATE

PROJECT NO.
C369640
PR# [TBD]

REFERENCE

CONSTRUCTION PLANS
CHECKED BY

RR

DESIGNED BY

RM/CN

DRAWN BY

LC/DD

SCALE:

SHEET NO.

AS SHOWN

DATE:
MAY 1, 2015

SS-4
OF 7

SEE SHEET SS-1 FOR CONSTRUCTION NOTES AND LEGEND

GRAPHIC SCALE (IN FEET)


80'

MATCH LINE F

MATCH LINE G

22ND ST

40'

MATCH LINE G

20'

10'

No.

CITY OF OAKLAND
BUREAU OF ENGINEERING AND
CONSTRUCTION
250 FRANK H. OGAWA PLAZA, SUITE 4344 * OAKLAND, CA 94612
(510) 238-3467 * FAX (510) 238-7415

TELEGRAPH AVENUE
COMPLETE STREETS PROJECT
CITY OF OAKLAND

BY

DATE

PROJECT NO.
C369640
PR# [TBD]

REFERENCE

CONSTRUCTION PLANS
CHECKED BY

RR

DESIGNED BY

RM/CN

DRAWN BY

LC/DD

SCALE:

SHEET NO.

AS SHOWN

DATE:
MAY 1, 2015

SS-5
OF 7

BROADWAY/KEITH AVENUE TO GOLDEN GATE WAY BIKE/PEDESTRIAN PROJECT CALDECOTT TUNNEL SETTLEMENT

TELEGRAPH AVE

GRAPHIC SCALE (IN FEET)


20'

RIGHT LANE

MUST

40'

160'

80'

R3-7
R30(CA) "NO PARKING
TUE, THUR, SAT
12AM-3AM
EXCEPT HOLIDAYS"

TURN RIGHT

R30(CA) "NO PARKING


TUE, THUR,
SAT12AM-3AM
EXCEPT HOLIDAYS"

W11-2
R30(CA)
W1-1

R2-1 (25)

MATCH LINE I

R3-7

R30(CA) "NO PARKING


TUE, THUR, SAT
12AM-3AM
EXCEPT HOLIDAYS"

W16-7P

R13A(CA)
ON RED

R30(CA)

R30A(CA) MOD

W74 (CA)
R3-7 WITH "EXCEPT
BICYCLES" PLACARD

R32(CA)

R30(CA) "NO PARKING


MON, WED, FRI
12AM-3AM
EXCEPT HOLIDAYS"

R30(CA) "NO PARKING


MON, WED, FRI
12AM-3AM
EXCEPT HOLIDAYS"

"WELCOME TO
NORTHGATE BUSINESS
DISTRICT"

R30(CA) "NO PARKING


MON, WED, FRI
12AM-3AM
EXCEPT HOLIDAYS"

R30(CA) "NO PARKING 12AM


-3AM EXCEPT HOLIDAYS"
R3-1

R30(CA) "NO PARKING 3AM


-6AM EXCEPT HOLIDAYS"

R30(CA) "NO PARKING 3AM


-6AM EXCEPT HOLIDAYS"

R3-7
R32(CA)

R30(CA) "NO PARKING 3AM


-6AM EXCEPT HOLIDAYS"

R30(CA)

SENIOR
CITIZEN
FACILITY

SW50(CA)

R30(CA) "NO PARKING


MON, WED, FRI
12AM-3AM
EXCEPT HOLIDAYS"

MATCH LINE J

W74(CA)

MATCH LINE I

R3-2

R3-7

R13A(CA)

R30(CA)
R32(CA)
R2-1 (25)

R30(CA) "NO PARKING 12AM


-3AM EXCEPT HOLIDAYS"
R32(CA) "2 HOUR PARKING
8AM-6PM EXCEPT SUNDAYS
AND HOLIDAYS"

R30(CA) "NO PARKING 3AM


-6AM EXCEPT HOLIDAYS"

R30(CA) "NO PARKING 3AM


-6AM EXCEPT HOLIDAYS"

R30(CA) "NO PARKING 3AM -6AM


EXCEPT HOLIDAYS"
No.

CITY OF OAKLAND
BUREAU OF ENGINEERING AND
CONSTRUCTION
250 FRANK H. OGAWA PLAZA, SUITE 4344 * OAKLAND, CA 94612
(510) 238-3467 * FAX (510) 238-7415

TELEGRAPH AVENUE
COMPLETE STREETS PROJECT
CITY OF OAKLAND

BY

DATE

PROJECT NO.
C369640
PR# [TBD]

REFERENCE

CONSTRUCTION PLANS
CHECKED BY

RR

DESIGNED BY

RM/CN

DRAWN BY

LC/DD

SCALE:

SHEET NO.

AS SHOWN

DATE:
MAY 1, 2015

SS-6
OF 7

BROADWAY/KEITH AVENUE TO GOLDEN GATE WAY BIKE/PEDESTRIAN PROJECT CALDECOTT TUNNEL SETTLEMENT

SIGN LEGEND

GRAPHIC SCALE (IN FEET)


20'

RIGHT LANE

MUST

40'

160'

80'

R3-7

TURN RIGHT

R30(CA)

OM

FR

R30A(CA) MOD

R30(CA) "NO PARKING 3AM


-6AM EXCEPT HOLIDAYS"

R32(CA)

R13A(CA)

R30(CA)
"ILLEGAL TO LITTER"

R30(CA) "NO PARKING 3AM


-6AM EXCEPT HOLIDAYS"
R3-1

R30(CA) "NO PARKING 3AM


-6AM EXCEPT HOLIDAYS"

TO

R13A(CA)
ON RED

R3-7

MATCH LINE J

W16-7P

R30(CA) "NO PARKING 3AM


-6AM EXCEPT HOLIDAYS"

MATCH LINE K

TELEGRAPH AVE

W11-2

R13A(CA)
INSTALL ON EXISTING
TRAFFIC SIGNAL POLE

R30(CA) "NO PARKING 3AM


-6AM EXCEPT HOLIDAYS"

RELOCATE
R30(CA) "NO PARKING 3AM
-6AM EXCEPT HOLIDAYS"

REPLACE EXISTING
R30(CA) "NO PARKING 3AM
-6AM EXCEPT HOLIDAYS"

W74(CA)

SENIOR
CITIZEN
FACILITY

SW50(CA)

MATCH LINE K

R3-2

R30(CA) "NO PARKING 3AM


-6AM EXCEPT HOLIDAYS"

R30(CA) "NO PARKING 3AM


-6AM EXCEPT HOLIDAYS"

No.

CITY OF OAKLAND
BUREAU OF ENGINEERING AND
CONSTRUCTION
250 FRANK H. OGAWA PLAZA, SUITE 4344 * OAKLAND, CA 94612
(510) 238-3467 * FAX (510) 238-7415

TELEGRAPH AVENUE
COMPLETE STREETS PROJECT
CITY OF OAKLAND

BY

DATE

PROJECT NO.
C369640
PR# [TBD]

REFERENCE

CONSTRUCTION PLANS
CHECKED BY

RR

DESIGNED BY

RM/CN

DRAWN BY

LC/DD

SCALE:

SHEET NO.

AS SHOWN

DATE:
MAY 1, 2015

SS-7
OF 7

BROADWAY/KEITH AVENUE TO GOLDEN GATE WAY BIKE/PEDESTRIAN PROJECT CALDECOTT TUNNEL SETTLEMENT

SIGN LEGEND

Anda mungkin juga menyukai