Anda di halaman 1dari 5

SUKU DINAS PERUMAHAN DAN GEDUNG PEMDA

KOTA ADMINISTRASI JAKARTA PUSAT

RENCANA ANGGARAN BIAYA (RAB)


UNIT SATUAN KERJA

: SUKU DINAS PENDIDIKAN WILAYAH II


KOTA ADMINISTRASI JAKARTA PUSAT
: REHAB BERAT RUMAH DINAS JAGA
SDN JOHAR BARU 07
:
: 2015
: JALAN PERCETAKAN NEGARA II
: JOHAR BARU
: JOHAR BARU
: JAKARTA PUSAT

NAMA KEGIATAN
KODE REKENING
TAHUN ANGGARAN
LOKASI / JALAN
KELURAHAN
KECAMATAN
WILAYAH
No.
I
1
2
3
4
5

II

PEKERJAAN PENDAHULUAN
Papan nama proyek multiplek 8 mm
Foto proyek 3 phase colour
Sewa perancah / schafolding
Pembersihan lapangan
Buang puing Ex. Bongkaran keluar lokasi
Jumlah

Harga Satuan
( Rp. )

Volume

1.00
3.00
12.00
76.96
35.31

bh
set
unit
m2
m

615,441.50
65,200.00
43,270.70
18,187.05
100,419.52

137.60
137.60
137.60
137.60
17.20
42.40
17.20

m2
m2

11,871.01
27,945.58

m2
m2
m'
m'
m'

239,949.20
74,213.34
68,001.52
127,040.59
170,809.24

76.96
76.96

m2
m2

279,512.36

76.96
89.60

m2
m'

46,641.86
87,045.00

0.94
9.87

322,971.09
133,878.04

PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP


1
2
3
4
5
6
7

III

Nama Jenis Pekerjaan

Pembongkaran genteng (tidak dipakai kembali)


Pembongkaran rangka atap/ reng kaso (tidak dipakai kembali)
Pasang rangka atap galvalume untuk genteng biasa / metal
Pekerjaan pasang atap genteng metal
Pekerjaan pasang nok genteng metal
Pasang listplank kayu kamper 3/20
Pasang talang datar
Jumlah

PEKERJAAN PLAFOND
1 Pembongkaran plafond (bongkaran tidak dipakai kembali)
2 Pasang rangka langit-langit hollow 40.40.2 modul 60x60
3 Pekerjaan langit-langit gypsum board (120x240) tebal 9mm
4 Pekerjaan list langit-langit gypsum lebar 10 cm
Jumlah

IV
1
2
3
4
5

PEKERJAAN DINDING / SOPI-SOPI


Pembongkaran sopi-sopi
Pasang Batu Bata 1 pc : 4 ps

17,806.52

9.87
9.87
11.20

m2
m2
m2
m'

1 Bongkar keramik lantai ruang guru

29.60

m2

2 Pasang lantai keramik uk. 30x30 ruangan guru setara Roman

29.60

PEKERJAAN PENGECATAN
1 Mengikis/mengerok permukaan cat tembok lama

286.72

m2

17,277.10

128.00

57,774.31

158.72

m2

43,142.41

76.96

m2

44,399.41

Plesteran dinding 1 pc : 4 ps
Pekerjaan acian dinding
Pekerjaan ring balok beton bertulang (10 x 15) Cm
Jumlah

69,941.15
40,847.06
114,337.32

PEKERJAAN PASANGAN LANTAI & KERAMIK


2

6,725.01
239,559.00

Jumlah
VI

3
4

Cat Dinding Exterior (1 Lapis Plamur : 1 Lapis Cat Dasar : 2 Lapis Cat Exterior)
Cat Dinding Interior (1 Lapis Plamur : 1 Lapis Cat Dasar : 2 Lapis Cat Interior)
Pengecatan Plafond 2 Lapis Dengan Cat Tembok interior dgn Kuas Roll Termasuk
Plamur

Pengecatan listplank ( 1 Lapis Plamur : 1 Lapis Cat Dasar : 2 Lapis Cat penutup)
Jumlah

8.48

m2

43,180.52

CANA ANGGARAN BIAYA (RAB)


SUKU DINAS PENDIDIKAN WILAYAH II
KOTA ADMINISTRASI JAKARTA PUSAT
REHAB BERAT RUMAH DINAS JAGA

Jumlah Harga
( Rp. )

615,441.50
195,600.00
519,248.40
1,399,675.37
3,545,773.08
6,275,738.35

1,633,450.98
3,845,311.81
33,017,009.92
10,211,755.58
1,169,626.14
5,386,521.02
2,937,918.93
58,201,594.38

1,370,389.78
21,511,271.23
3,589,557.55
7,799,232.00
34,270,450.55

302,300.94
1,321,376.25
690,319.15
403,160.48
1,280,577.98
3,997,734.81

199,060.30
7,090,946.40
7,290,006.70

4,953,690.11
7,395,111.68
6,847,563.32
3,416,978.59

366,170.81
22,979,514.51

REKAPITULASI
RINCIAN ANGGARAN BIAYA (RAB)

UNIT/SATUAN KERJA

: SUKU DINAS PENDIDIKAN WILAYAH II


KOTA ADMINISTRASI JAKARTA PUSAT
:
: REHAB BERAT RUMAH DINAS JAGA
SDN JOHAR BARU 07
: 2015
: JALAN PERCETAKAN NEGARA II
: JOHAR BARU
: JOHAR BARU
: JAKARTA PUSAT

KODE REKENING
NAMA KEGIATAN
TAHUN ANGGARAN
LOKASI KEGIATAN
KELURAHAN
KECAMATAN
WILAYAH
NO.

URAIAN PEKERJAAN

I.
II.
III.
IV.
V.
VI.

JUMLAH (Rp.)

PEKERJAAN PENDAHULUAN
PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP
PEKERJAAN PLAFOND
PEKERJAAN DINDING / SOPI-SOPI
PEKERJAAN PASANGAN LANTAI & KERAMIK
PEKERJAAN PENGECATAN

Terbilang :

6,275,738.35
58,201,594.38
34,270,450.55
3,997,734.81
7,290,006.70
22,979,514.51

JUMLAH HARGA DASAR


PPn 10 %
JUMLAH HARGA

133,015,039.30
13,301,503.93
146,316,543.23

DIBULATKAN

146,317,000.00

Seratus empat puluh enam juta tiga ratus tujuh belas ribu Rupiah

Catatan :
1. RAB ini dihitung berdasarkan harga satuan yang tercantum di sistem E-Budgeting tahun anggaran 2015
2. Item dan Volume dalam RAB ini tidak mengikat dalam Pelelangan, yang mengikat dalam pelelangan/
pelaksanaan adalah gambar, RKS dan Berita Acara Aanwizjing
Jakarta,

2015

Disetujui oleh,
Suku Dinas Perumahan Dan Gedung Pemda
Kota Administrasi Jakarta Pusat

Dibuat Oleh
Kasie.Perencanaan Teknis
Suku Dinas Perumahan Dan Gedung Pemda
Kota Administrasi Jakarta Pusat

Drs. ZUHDI, M.Si


NIP. 19600309 198009 1 001

L.E. R GLORIA FEBRIANI, ST


NIP. 19780217 200604 2 015

Diketahui oleh,
Suku Dinas Pendidikan Wilayah II
Kota Administrasi Jakarta Pusat

MOHAMAD TAUFIK WIDRIS


NIP. 19600705 198602 1 008