SAP2000
AISC 360-10 STEEL SECTION CHECK
Units : N, mm, C

(Summary for Combo and Station)

Frame : 291
Length: 5250.000
Loc
: 5250.000

X Mid: 17000.000
Y Mid: 7875.000
Z Mid: 14133.000

Combo: 1.2 D + 1.6 L


Design Type: Beam
Shape: HSS101.6X50.8X4.8Frame Type: OMF
Class: Compact
Princpl Rot: 0.000 degrees

Provision: LRFD
D/C Limit=0.950
AlphaPr/Py=0.007

Analysis: Direct Analysis


2nd Order: General 2nd Order
AlphaPr/Pe=0.022 Tau_b=1.000

PhiB=0.900
PhiS=0.900

PhiC=0.900
PhiS-RI=1.000

PhiTY=0.900
PhiST=0.900

PhiTF=0.750

A=1220.000
J=1280000.000
E=200000.000
RLLF=1.000

I33=1520000.000
I22=508000.000
fy=290.000
Fu=500.000

r33=35.297
r22=20.406
Ry=1.308

S33=29803.922
S22=20000.000
z33=38300.000
z22=23400.000

HSS Welding: ERW

Reduce HSS Thickness? No

STRESS CHECK FORCES & MOMENTS (Combo 1.2 D + 1.6 L)


Location
Pu
Mu33
Mu22
5250.000
2422.903 5359331.741 1374145.302

Reduction: Tau-b Fixed


EA factor=0.800
EI factor=0.800

Vu2
-5192.803

Av3=449.072
Av2=901.680

Vu3
-2045.867

Tu
2395.558

B2
1.000
1.000

Cm
1.000
1.000

PMM DEMAND/CAPACITY RATIO


(H1.2,H1-1b)
D/C Ratio:
0.765 = 0.004 + 0.536 + 0.225
= (1/2)(Pr/Pc) + (Mr33/Mc33) + (Mr22/Mc22)
AXIAL FORCE & BIAXIAL MOMENT DESIGN
(H1.2,H1-1b)
Factor
L
K1
K2
Major Bending
1.000
1.000
1.000
Minor Bending
0.500
1.000
1.000
Lltb
0.500

Kltb
1.000

Cb
1.195

Pu
Force
2422.903

phi*Pnc
Capacity
85920.506

phi*Pnt
Capacity
318420.000

LTB

Axial

B1
1.000
1.000

Mu
phi*Mn
phi*Mn
Moment
Capacity
No LTB
Major Moment 5359331.741 9996300.000 9996300.000
Minor Moment 1374145.302 6107400.000

Torsion

Tu
Tn
phi*Tn
Moment
Capacity
Capacity
2395.558 6903304.325 6212973.893

SHEAR CHECK
Major Shear
Minor Shear

Vu
Force
5192.803
2045.867

phi*Vn
Capacity
122846.688
51968.273

Stress
Ratio
0.042
0.039

Status
Check
OK
OK

CONNECTION SHEAR FORCES FOR BEAMS


VMajor
VMajor
Left
Right
Major (V2)
5195.120
5192.803

D:\New folder (6)\LALA.sdb

11/14/2015 3:27 PM