NO.
I
1
URAIAN PEKERJAAN
SAT
VOL. AKTUAL
Vol. KONTINGENSI
KETERANGAN
M2
21,240
M3
8,496
13,275
M2
21,240
24,426
29,736
M3
II
1
Heater Treater
Galian Tanah
Urugan kembali
Tanah disposal
Beton Struktur F'c = 28 MPa
Beton Lantai Kerja F'c = 14 MPa
Penulangan
- Tulangan D16
- Tulangan 10
Pekerjaan Bekisting
Pre stressed pre-cast Spun Pile Diameter 300 mm,
panjang 12 m.
Firewater Tank
Galian Tanah
Urugan kembali
Tanah disposal
Beton Struktur F'c = 28 MPa
Beton Lantai Kerja F'c = 14 MPa
Penulangan
- Tulangan D16
- Tulangan 10
Pekerjaan Bekisting
Pre stressed pre-cast Spun Pile Diameter 300 mm,
panjang 12 m.
8.163
3.378
11.541
9.344
1.047
8.163
3.378
11.541
9.344
1.047
Ton
Ton
M2
0.473
0.079
11.000
0.473
0.079
11.000
M3
M3
M3
M3
M3
21.823
5.989
15.834
31.250
3.334
21.823
5.989
15.834
31.250
3.334
Ton
Ton
1.625
0.126
20.625
1.625
0.126
20.625
Nos
M3
M3
M3
M3
M3
71.469
13.728
57.741
114.522
11.934
Ton
Ton
M2
7.365
0.123
47.718
89.336
17.160
72.176
143.153
14.918
9.206
0.154
59.648
Nos
78
78
M3
M3
M3
M3
M3
23.823
4.576
19.247
38.174
3.978
2.455
0.041
15.906
29.779
5.720
24.059
47.718
4.973
3.069
0.051
19.883
26
26
Ton
Ton
2
Nos
M3
M3
M3
M3
M3
NO. GAMBAR
146549-11-CI-01-CD-003
(LP Production Sep. Fdn.
Dwg)
146549-11-CI-01-CD-004
(Heater Treater Fdn. Dwg)
146549-11-CI-01-CD-005
(Prod. Oil Tank Fdn. Dwg)
146549-11-CI-01-CD-006
(Fire Water Tank Fdn.
Dwg)