SCHEDULE POWER SHUTDOWN & POWER ENERGIZE

INDONESIA ENGINEERING
MESSRS

: PT. TSUCHIYA

PROJECT NAME

: TSUCHIYA NEW FACTORY PROJECT

WORK

: POWER SHUTDOWN AT TSUCHIYA PROJECT

NO

OKTOBER - NOVEMBER - DESEMBER 2013

WORK DESCRIPTION
28 29 30 31

PREPARATION

WIRING CABLE 20kV FROM EXISTING TO NEW ELECTRICAL ROOM

INCOMING TRAFO, PANEL MVMDB & LVMDB

SETTING TRAFO, PANEL MVMDB & LVMDB

WIRING CABLE 20kV FROM TRAFO TO INCOMING PANEL MVMDB

INSTAL SUPPORT & INSTAL CABLE RACK UILITY AREA

WIRING CABLE FROM PANEL LVMDB TO PANEL DISTRIBUTION

CEK FROM ANDALAN (STANDAR LAYAK OPERATIONAL ATAU SLO)

POWER SHUT DOWN MVMDB EXISTING

10

POWER SHUT DOWN SUBTATION CIKARANG LISTRINDO

11

TERMINATION CABLE 20Kv (RAYCHEM) - NEW & EXISTING ELECTRICAL ROOM

12

FINISHING AND CLEANING AREA ELECTRICAL ROOM NEW & EXISTING

13

POWER ENERGIZE

14
15
16
17
18
19
20
21

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

PREPARED BY :

TEUKU BACHTIAR

13

REMARKS

27 28 29 30