Anda di halaman 1dari 162

ASIAN STAR PROJECT SALES HANDBOOK

Hitachi Construction Machinery Co., Ltd.


www.hitachi-c-m.com
HO-EN008

09.03 (KA/KA,GT2)
Printed in Japan

ASIAN STAR PROJECT


SALES HANDBOOK

- Contents 1. Steel Industry

2. Scrap Industry

3. Magnet Machine

21

4. Material Handling Machine

37

5. High mount Cab

53

6. Base Machine for Mobile Shear

65

7. Mobile Shear (Maker:GENESIS)

73

8. Electric Material Handling Machines

91

9. Recycling Equipments

101

10. Mining & Quarry Equipment

131

11. Forestry Machines

155

12. Brochures List

161

1. Steel Industry

1-1. Basic Steel Production Methods


Blast Furnace
Blast
Furnace

Electric Arc Furnace

BOS
Furnace

Production

Volume

Variety

Large Facility

High efficiency

Raw

Iron oreCoal

Material

Limestone + scrap

Scrap

Heat

Pure oxygen

Electric Arc

Slag

Slag

Process

source
Byproduct

ZX

ZR

ZW

HITACHI

Product

ZW

ZX

1-2. Blast Furnace


Stock yard

Maintenance

Port handling

Variety of HITACHI
products working in
steel works

Recycling

1-3. Electric Arc Furnace


Recycling

Maintenance

Port handling

Variety of HITACHI
products working in
steel works

Stock yard

1-4. Supply of Raw Materials for


Electric Arc Furnace

Manufacture

Products

Scrap Dealer

Domestic
market

Steel
Manufacture
Port handling

Export
Scrap

Import
Scrap

2. Scrap Industry

2-1. Dividing and Sizing

Demolish

Retirement

Gus Cutting

Pressing

Shearing

Shredding

All materials will be


Treated

Steel
Manufacturer

Steel materials
using in construction

10

2-2. Outline of Scrap Yard


Shredder

Scrap Loader

Shearing

Scrap Yard

Magnet

Mobile Shear

11

Grapple

2-3. Scrap Grade (1)


Classifi
cation

Variety

Steel
Scrap

Heavy*

Grade

Specification ( m/ m )
Thickness

Press

Shredder

Width Height Length

Unit
Weight
(kg)

Densit
y (t/
m3 )

Cu %

HS

>6

<500 <700

<600

<=0.15

H1

>6

<500 <1200

<1000

<=0.20

H2

36

<500 <1200

<1000

H3

13

<500 <1200

<1000

H4

<1

<500 <1200

<1000

W+H+L<1800,with the max dimension


<800

W+H+L<1800,with the max dimension


<800

CS**

600<=W+H+L<1800,with the max


dimension <800

>=0.6

C*

600<=W+H+L<1800,with the max


dimension <800

>=0.6

AS

>=1.0

<=0.15

B
C
Steel
Sheet
Clipping

A ( Bundle of Steel
Sheet)

W+H+L<1800, with the max dimension


<800

B ( Bundle of Steel
Sheet)

W+H+L<1800, with the max dimension


<800

A ( Busheling , Steel
Sheet Clipping etc )
B ( Busheling , Steel
Sheet Clipping etc )
Turning

A
B

Pig
Iron
Scrap

Cast Iron
Iron
Boring

Press

W+H+L<1800, with the max dimension


< 800

Length of one dimension < 1200

<1000

Length of one dimension < 1200

<1000

A
B

* Not contaminated with plastic dust etc.


** CS & C are such items as not only pressed for each piece but formed as a solid cube unbreakable in handling
EXCEPTIONS
A. Hazardous or Hermetically Sealed Items ( Gun shells, bullets, high-pressurized containers, pipes with closed ends, shock-absorbers, door
controllers, Jacks, etc.)
B. Steel Alloy Scraps, Non-Ferrous Metals or those containing or contaminated with them (tin, cupper, zinc, lead, nickel, chromium, Aluminum,
manganese, etc )
C. Foreign materials or those containing or contaminated with them (enameled wares, welding rods, glass, plugs, textiles, vinyl or other plastics,
concrete, tar, scale, rubber, woodchip, oil/ grease, etc. )
D. Items difficult to handle in loading/ unloading( those ball-shaped and/or entangled steel bars or wires, those disturbing magnetic operations)
E. Those rusted and/or corroded heavily.
F. Those containing radioactive elements.
G. Containers not allowing to identify the contents therein specifically

12

2-3. Scrap Grade (2)


Classification

Variety

Grade

Remarks (Examples)

Steel
Scrap

Heavy*

HS

Steel plate, Wide Flange Beam, Angle, Channel,


Hot rolled Bars, Rail, Punching, Small Clipping,
Scrap of Heavy Machinery ( other than
Concrete Reinforcing Bars, sheet piles ) etc.

H1

Rail, Punching, Small Clipping, Wheels, Nuts &


Bolts, Pipes

H2

Steel plate, Angel, Channel, Scrap of Heavy


Machinery etc.

H3

Light Gavage, Steel Sheet, Steel Band, Auto


Wheel, Spring Plate etc.

H4

Steel Sheet, Wire, Wire rope, Steel Furniture,


Door Shutter, Bicycle etc.

Press

Shredder

Steel
Sheet
Clipping

Turning

Auto Body, Fender, Galvanized Sheet

Galvanized Sheet, Pressed Turing of mild steel,


Electric Household Appliance, motorcycles,
Bicycles etc.

CS**

Cans for food/drink, Cans in general( expect for


paint, chemicals or oil )

C*

Mixed cans of various types, including 18-liter


cans

AS

Auto Body, Fender, Clipping etc. especially not


contaminated with non-ferrous dusts.

Auto Body, Fender, Steel Furniture etc.

Galvanized Sheet, Electric Household


Appliance, Motorcycles, Bicycles etc.

Tin Plated Sheet, Mixed cans etc.

A ( Bundle of Steel Sheet)

Hot or Cold Sheet with no rust

B ( Bundle of Steel Sheet)

Hot or Cold Sheet with some rust, incl. Coated


Sheet without harm for steel making

A ( Busheling , Steel Sheet


Clipping etc )

Hot or Cold Sheet with no rust

B ( Busheling , Steel Sheet


Clipping etc )

Hot or Cold Sheet with some rust, incl. Coated


Sheet without harm for steel making

Turing of mild steel with no rust, in fine forms

Turning of mild steel with some rust, in various


forms

Press
Pig
Iron
Scrap

Cast Iron

Iron
Boring

Press grade added for new market

Machinery parts, Clean Auto Blocks etc.

Charging box cast, unstripped auto blocs

Iron boring of mild casting

Iron boring of mild casting with some rust

13

2-4. Scrap Processing Facility

Pressing

Shearing

Shreding

Reduce volume

Sizing

Dividing &Sizing

(Factory
bindle/Can/Car)

(H
beam/Pipe/Ship/etc)

(Ferrous/Aluminum/Co
pper/etc)

Our products

Our products

14

Our products

2-5. Scrap Handling Machine


Equipment
Front
1 Standard
2 High boss
3 Straight
4 Long

Cabin
1 Standard cabin
2 Fixed high cabin
3 Linkage high cabin

Engine
1 Diesel
2 Electric

Attachment
Undercarriage
1 Grouser *
2 Flat
3 Rubber pad
4 Wheel
5 Stationary ( high
post)

ZX330-3

15

1 Fork grapple
2 Magnet
3 Orange grapple
4 Shear

2-6. How to Select Attachment


ferrous

Non ferrous

mixture

Scrap handling
Popular
handling
attachment

Popular
machine size
20ton-30ton

Excavator
Simple

function

function

+ attachment

Volume

Process

Fork Grapple

Light weight
scrap handling

function
Usefully
and
Separate

Over size
On site

Magnet
Orange
Grapple
Easy to loading and
unloading from lorry.
Easy to picking up
from ground.

16

Shear

2-7. Characteristic Structure of Front


Hanging

Value
1.Wide working radius
2.Reduce front
damage

Weakness
1.Separating operation
2.pushing operation

Tilt Type

Value
1.Separating operation
2.pushing operation

Weakness
1.Front damage

High boss

Value
1.High working
radius/low cost

Weakness
1.Shallow working
radius

17

2-8. Characteristic Structure of


High Cab
Fixed

Value

1.0 m
1.5 m
2.0 m

1.Low initial cost


2.High stability
3.Low maintenance
cost

Weakness
1.Transportation with
reduction
high cab unit
2.unadjustment height

Value

Linkage

1.Higher eye point


level
2.easy transportation
3.adjustment height

Weakness
1.High initial cost
2.less stability
3.Need Maintenance for
Rink unit

18

2-9. Characteristic Structure of


Undercarriage
Value

Crawler

1.Reasonable initial
cost
2.Off road travel ability

1 Grouser *
2 Flat
3 Rubber
pad

Weakness
1.Slow traveling speed
2.Damage for Concrete Yard
3.High undercarriage
Operation cost

Value

Wheel

1.Large size yard


2.High traveling Speed
3.Low undercarriage
maintenance cost

Weakness
1.High initial cost
2.low off road travel ability

Stationary

Value
1.low operation cost
2.Saving space
3.wide operation reach

Weakness
1.Fixed operation
2.high initial cost

19

2-10. Characteristic Structure of


Power Source

Diesel Engine

Value
1.Low initial cost
2.Generale machine
3.Location free

Weakness
1.High operation cost
2.High CO2 discharge
3.Dirty exhaust guss

Value

Electric Motor

1.Low operation cost


2.Clean operation
3.Low noise

Weakness
1.High initial cost
2.limited location

20

3. Magnet Machine

21

3-1. Whats a Magnet Machine

It is a machine that
absorbs, loads the
iron scrap with the
electromagnet.

Motive
power

Power
transmission Generator

Power
supply
box

Electromagnet
Absorption &
Release

Iron scrap

22

3-2. Structure of Magnet


Bracket

Insulation

Check the wear on the magnet


bottom plate. Repair or
replace the inner and outer
poles according to the wear
limits shown in the table
below.
Magnet

Wear limit

LECHX11F6

10

LECHX13F6

15

LECHX15F6

15

Yoke

(portion H)

Coil

Iron core
Inner pole ring
1 stainless steel welding

Outer pole ring


Coil support
(non-magnetic,
stainless steel)

Use the magnet within the adsorption time ratio and


the continuous adsorption time.
For the magnet of 60% ED, the adsorption time to
attract scraps is 60% or less in one cycle, and the
continuous attraction time is 6 minutes or less.
In case the appearance of the magnet is excessively
deformed or the wear on the bottom surface becomes
remarkable, repair the magnet or replace the bottom
plate.

23

3-3. Engine: Magnet Machine


One Engine Type
Generator is work with Excavators engine
Reasonable Price
Easy Maintenance
Good Better Rear Visibility

Excavators
Engine

Much Fuel Consumption


=>High idling drive for engine
Heavy Engine Load

No Good

Two Engine Type


Generator is work with Engine - Generator unit
Engine
Generator
unit

Less Engine Load


Good

Excavators
Engine

High Price
Poor Rear Visibility
More Maintenance
Required
No Good
(for Two engines)

24

3-4. Power Transmission


Hydraulic Pump & Motor Drive
(HITACHI Genuine Magnet)
Generator
Engine

HYD.Motor

HYD. Pump
The Layout position
is free.

GoodBetter weight balance


Better performance by using hyd
system (Good heat balance).
Good stability (better than transmission).

V-Belt Drive (Local Magnet)


V-Belt

Engine

Cheap in Price
(but cheap in quality)

Generator

Good
Layout Space is Limited.
Frequent change of V-belt is necessary.
Life time of bearing is short.

No Good

Weight balance is bad


25

3-5. Advantage of Control System


Production is Different between HITACHI and Local
made.
Local magnet
Slow
response

Fixed Current Control


Magnetism
Curve

200V
Slow release

Slow Absorption

Absorption
Releasing time:
Approx.6 sec

current

Releasing point

Absorption point

HITACHI magnet Over excite Current Control!


Quick
response!!
Quick release

Absorption
Releasing time:
Approx.1 sec

Quick Absorption

current

Releasing point

Reverse
Excitation

26

3-6. HITACHI Magnet Machine


Engine
Power Transmission
Generator
Power Supply Box

1 Engine type
Hydraulic Pump & Motor Drive
3-phase A.C Generator
Over excitement & Reverse
excitation control type

Boom slow return vale


Magnet

Electric Cable

Base machine
Heavy
Counterweight
Grip Switch
(adsorption)
Instrument
Box
(Control
Switch Box)

Power
Supply
Box
Bracket, Cover for
Power supply box
& Generator

Grip
Switch
(release)
3-phase AC power
generator

Parts for Generator drive

27

3-7. ZAXIS-3 Model Magnet Machine


Control Panel

Magnet

(Power Supply Box)

Control switch
box

Additional
hydraulic
pump

Magnet
switch

Generator

Large sized
air filter

Hydraulic motor

28

3-8. Characteristics
Cable layout is between the upper side of the arm and the magnet.

Reduction of broken cable accidents.

Engine Controls
Engine speed when a magnet is used.
When the magnet main switch turns on, the engine speed switches to its rated
speed.

Improvement of operability.

Auto Idle Control


When magnet is not adsorbing and the machine is not operating any other
operation, the engine speed decreases to a specified speed.
Improvement of fuel consumption.
By comparison with ZX-1, about 15% less.
However fuel consumption vary by working conditions.

ZX200LCZX330LC Magnet Comparison


Scrap Absorption
MODEL

Gravity

MAGNET
0.7

1.3

ZX200LC/ZX240LC

1 370 mm

515-605 kg

815-920 kg

ZX330LC

1 570 mm

630-760 kg

990-1 130 kg

29

3-9. ZX200LC-3 Specification


Working Range

Unit : mm
Model

ZX200LC-3

A Max. working reach

8 680

B Max. working height

7 930

C Magnet height
(arm rolled-in)

3 370

Magnet outside diameter

1 370

A
30

3-10. ZX240LC-3 Specification


Unit : mm

Working Range

Model

ZX240LC-3

A Max. working reach

8 960

B Max. working height

8 050

C Magnet height
(arm rolled-in)

3 640

Magnet outside diameter

1 370

A
31

3-11. ZX330LC-3 Specification


Unit : mm

Working Range
Model

ZX330LC-3

A Max. working reach

9 730

B Max. working height

8 220

C Magnet height
(arm rolled-in)

3 600

Magnet outside diameter

1 570

A
32

3-12. Vs. Local Magnet : Warranty

Standard Machine

KOMASTU

Local
Modification

KOBELCO

USER

Machine
Trouble

NO
WARRANTY

Unstable
Counterweight

Engine Overheat

HCM Magnet Machine


with WARRANTY
*Selling Points

33

3-13. Vs. Local Magnet : Productivity

Volume of Magnet absorption


Absorption volume
Outside
Diameter

Duty
ratio

Weight

Pig Iron /
Crop Ends

HS1 Scrap
Steel /
Iron Chips

HITACHI
Magnet

1 570
mm

60%ED

3 120
kg

1 900 /
1 710 kg

1 250 /
1 120 kg

Local
magnet

1 500
mm

60%ED

3 000
kg

1 990 /
1 570 kg

1 150 /
940 kg

HS1 scrap steel 9-19 % More absorption


9 % More absorption
Pig iron
3600sec1
.185t
HITACHI
=185
magnet 23sec(cycle t/hr
time)

10% bigger volume against ZX-1 model.


due to bigger diameter.
Shorter turning radius (130mm) by 5%.

Local
magnet

Add. 5 sec for local magnet.

Loading volume

38% up!!
34

3600sec1.
045t
=134t
23+5sec(cyc /hr
le time)

3-14. Vs. Local Magnet : Selling Point

HITACHI genuine
magnet Machine

Include
Heavier
Counterweight

Good Stability
C/W : counter weight

Base machine Magnet size

ARM

Heavy C/W
(STD + ? Ton)

ZX200LCZX200LC-3

1 370

2.9m STD

1.5

ZX240LCZX240LC-3

1 370

2.96m STD

1.7

ZX330LCZX330LC-3

1 570

3.2m STD

2.2

Local Magnet Machine


Bad Stability
Cut out counterweight

Not Include
Heavier Counterweight
Unbalanced
*Many trouble cases
35

36

4. Material Handling Machine

37

4-1. Suggestion of Elimination


DOUBLE HANDLING
WORKS.

No Good
13 750 mm

8 000
mm

Double!!
Maintenance
Fuel
Labor Fee

5 750 mm

Change!!
HITACHI Material Handling
Machine WORKS.(EX.ZX240LC-3)

Good

OneOne-Half!!
Maintenance
Fuel

13 710 mm

Labor Fee

38

Can work
with One machine

4-2. Equipment

Arm Cyl.
Installed both
sides.

Piping
guard
plate

Clamping pipe :
Fixes with two bolts.
(Prevent loosing bolts)

Cab :
Standard Cab
HighHigh-Mount Cab
(Option)
Fixed Type
Type
Linkage Type

Counterweight :
heavier type
(reinforced main
frame)

End of piping
point with stop
valve

Front light :
Boom x 1
Arm x 2

39

4-3. Working Range (Arm Point)

Comparison

Material Handling
Machine

Excavator
(STD front)

40

4-4. ZX200LC-3 Specification


Working Range & Dimension
Unit : mm
Model
Operating weight
A Max. arm point reach

ZX200LC-3
23 000(kg)
11 000

B Max. arm point height

12 280

C Min. swing radius

3 190

D Max. arm point depth

5 680

E Max. arm point depth reach

6 150

F Overall length

9 520

G Length from swing center to


front end
H Overall height of boom

6 770
3 270

41

ZX200LC-3 ENGINE
Model

Isuzu AI-4HK1X

Type

4-cycle watercooled, intercooled

Rated
power

122kW(164HP)

Maximum
torque

At 2 000min-1(rpm)
655Nm(67kgfm)
At 1 500min-1(rpm)

4-5. ZX240LC-3 Specification


Working Range & Dimension
Unit : mm
Model

ZX240LC-3

ZX240LC-3 ENGINE

26 100(kg)

Model

Isuzu AI-4HK1X

A Max. arm point reach

12 500

Type

B Max. arm point height

13 710

4-cycle watercooled, intercooled

C Min. swing radius

3 770

Rated
power

132kW(177HP)

D Max. arm point depth

6 700

E Max. arm point depth reach

6 680

F Overall length

10 400

G Length from swing center to


front end

7 400

H Overall height of boom

3 400

Operating weight

42

Maximum
torque

At 2 000min-1(rpm)
673Nm(69kgfm)
At 1 500min-1(rpm)

4-6. ZX330LC-3 Specification


Working Range & Dimension
Unit : mm
Model

ZX330LC-3

ZX330LC-3 ENGINE

35 600(kg)

Model

Isuzu AI-6HK1X

A Max. arm point reach

14 200

Type

B Max. arm point height

15 660

4-cycle water-cooled,
intercooled

C Min. swing radius

3 850

202kW(271HP)

D Max. arm point depth

6 150

Rated
power

E Max. arm point depth reach

8 420

F Overall length

12 340

G Length from swing center to


front end

8 800

H Overall height of boom

2 690

Operating weight

43

At 1 900min-1(rpm)

Maximum 1 080Nm(110kgfm)
torque At 1 500min-1(rpm)

4-7. ZX450LC-3 Specification


Working Range & Dimension
Model
Operating weight
Max. arm point reach
Max. arm point height
Min. swing radius
Max. arm point depth
Max. arm point depth reach
Overall length
Length from swing center to front
end
Overall height of boom

Unit :mm
ZX450LC-3
50 700(kg)
16 200
17 500
5 300
7 210
9 370
13 420
9 900
3 370

44

ZX450LC-3 ENGINE
Model

Isuzu AH6WG1XYSA-01

Type

4-cycle water-cooled,
direct injection

Rated
power

260kW(349HP)
At 1 800min-1(rpm)

Maximum 1 580Nm(161kgfm)
torque At 1 500min-1(rpm)

4-8. Outline of Lifting Capacity


Lifting capacity Total weight of attachment and material
ZX200LCZX200LC-3

ZX240LCZX240LC-3

ZX330LCZX330LC-3

ZX450LCZX450LC-3

Max. Load
radius

11.0

12.5

14.2

16.2

Lifting
capacity
(at Max.
reach)

ton

2.3

2.1

3.2

4.1

Load radius
When selecting the
attachments, refer to Lifting
Capacities in Specification.
Take care to the weight of
the attachment and select
the attachment.

Lifting capacity
Prevent the front from
contacting the attachment.
When the front is raised, it is
possible that the attachment may
come in contact with the arm.
Operate the machine carefully when
the front is raised.

45

4-9. ZAXIS-3 Specifications


LIFTING CAPACITY( Unit :1000kg) & Load radius ( Rating over-front)
EX) Load point height 2m

Lifting capacity

MAX Working range


14200mm

MAX Working range


16200mm

MAX Working range


11000mm

MAX Working range


12500mm

Loading radius

ZX200LCZX450LC Main Spec Comparison


MODEL

Arm

Boom length Undercarriage Operating

length

length

weight

Engine rated power

ZX200LC-3

4950mm

6500mm

4470mm

23000kg

122kW (2000min-1)

ZX240LC-3

6000mm

7000mm

4640mm

26100kg

132kW(2000min-1)

ZX330LC-3

6200mm

8500mm

4940mm

35600kg

202kW(1900min-1)

ZX450LC-3

7300mm

9500mm

5470mm

50700kg

260kW(1900min-1)

46

4-10. ZX200LC-3 Lifting Capacity

47

4-11. ZX240LC-3 Lifting Capacity

48

4-12. ZX330LC-3 Lifting Capacity

49

ZX450LC-3

4-13. ZX450LC-3 Lifting Capacity

50

4-14. Comparison Data


Weight
Class
Manufacturer

Model

20t23

2330

HITACHI

LIEBHERR

HITACHI

LIEBHERR

CAT

KOMATSU

ZX200LC-3

R904C

ZX240LC3

R924B

320C MH

PC210LC- PC220LC7
8

23.0t

22.2t

26.1t

27t

25.5t

25.0t

Track

LC

HD-SL

LC

HD-SL

LC

LC

LC

Boom

6.5m

6.6m

7.0m

6.8m

6.5m

6.8m

7.2m

Arm

4.95m

5.0m

6.0m

6.0m

5.8m

4.0m

5.0m

Max. Reach

11.0m

11.5m

12.5m

12.7m

12.4m

12.45m

11.5m

Max. Height

12.28m

12.8m

13.7m

13.8m

13.7m

13.6m

11.8m

2.7t
(11m)

2.9t
(10.5m)

3.4t
(12m)

3.3t
(12m)

3.2t
(12.4m)

2.9t
(12.45m)

-t(-m)

Weight

Lifting
capacity

Weight Class
Manufacturer
Model
Weight

30t40t

27.4t

40t50t

HITACHI

LIEBHERR

CAT

ZX330LC-3

R934C(3A)

330C MH

KOMATSU

HITACHI

PC330LC-7 ZX450LC-3

LIEBHERR
R944C

35.6t

35.7t

38.4t

38.4t

50.7t

Track

LC

HD-SL

HDHW

LC

LC

EW

Boom

8.5m

7.6m

9.1m

10.5m

9.5m

9.5m

Arm

6.2m

6.0m

6.0m

6.8m

7.3m

7.3m

Max. Reach

14.2m

13.5m

14.1m

16.1m

16.2m

16.5m

Max. Height

15.6m

15.1m

14.4m

16.2m

17.5m

18.3m

Lifting
capacity

4.6t
(14m)

4.1t
(13.4m)

4.35t
(14.1m)

-t(-m)

4.0t
(16m)

3.7t
(16.5m)

HITACHI material handling machines are comparable to


competitors machines.

51

46.1t

52

5. High mount Cab


Fixed Cab
Linkage Cab

53

5-1. Fixed Type High Cab


Normal cabin is BAD VISIBILITY.
No Good

Operator cannot see loads from truck.


Difficult
Difficultto
toOperate
Operate
--Low
Productivity
Low Productivity

HIGH cabin is GOOD VISIBILITY.


Good

Wider
WiderWorking
WorkingRange
Range&&Better
BetterVisibility
Visibility
for
High
Productivity
for High Productivity

54

5-1-1. Operators Eye Point of Fixed


Cab
Example: ZX330LC-3 with 2.0m Fixed High-mount cabin

Advantages of Fixed high-mount cabin


Higher visibility allows Operators to see truck loading
position.
Lower capital maintenance cost

Eye point of Fixed cab

Eye point of Std cab

4 730

Truck Height

55

5-1-2. Kind of Extention Stand

Options of fixed high-mount cabin

1.0 m

1.5 m

2.0 m

Better Visibility = Better Operation !!

Side ladder type

Sidewalk stair type

56

5-1-3. Dimensions
Dimensions

ZX210LC-3
Extension stand

1.0
m

1.5
m

2.0
m

ZX240LC-3
1.0
m

1.5
m

2.0
m

ZX330LC-3
1.0
m

1.5
m

2.0
m

A Overall height of cab

3 990 4 490 4 990 4 010 4 510 5 010 4 160 4 660 5 160

B Operator's view

3 530 4 030 4 530 3 600 4 100 4 600 3 730 4 230 4 730

C Floor height

2 330 2 830 3 330 2 360 2 860 3 360 2 520 3 020 3 520

D Operator's view between


swing center
E Step height

480

370

370

530

420

420

640

530

530

2 090 2 590 2 570 2 160 2 660 2 660 2 290 2 790 2 790

57

5-2. Linkage Type High Cab


Better Visibility = More Safety & Efficient Operation

Cab Height

Operators Eye

About
35sec

Picture : ZX200-3 Magnet machine

58

5-2-1. Feature
Linkage cab has two cylinders.
Lock pin

Holding valve on
lift cylinder is
equipped

Enhancement of safety device


Emergency lowering switch is located both inside and outside the cab.

Push

59

5-2-2. Operators Eye Point of Linkage


Cab
Example ZX330LC-3
Advantages of 1 Link cabin
Higher visibility allows Operators to see the truck
loading position.
Cab height can be adjustable according to working
conditions.
Easier transportation.

Eye point of Linkage cab

Truck Height

5 180

Eye point of Std cab

60

5-2-3. Dimensions
Dimensions

Unit: mm
ZX200LC-3

ZX240LC-3

ZX330LC-3

A Overall height of cab

2 950 to 5 450 3 010 to 5 510 3 160 to 5 660

B Operator's view

2 500 to 5 000 2 570 to 5 070 2 700 to 5 180

C Floor height

1 300 to 3 800 1 360 to 3 860 1 490 to 3 990

D Operator's view between


swing center

1 270 to 1 330 1 320 to 1 380 1 430 to 1 490

61

5-2-4. Selling Point (1)


Customer (Malaysia): Purchased 1 Linkage Cab
Before purchasing ZX240LC-3 1 link high cabin
Model
: EX 220
40 ft / 16 wheels truck takes
metal scrap.
One day :

2 hrs loading 30 tons

truck loading only.

D
SE

A
XC

OR
T
A

62

R
FO

A
LO

NG
I
D

5-2-5. Selling Point (2)

Model

Less than 1
One day

NE

EX

ZX240LC-3 1 link high cabin

hr to load 30 tons scrap metal.


4 - 5 truck loading.

V
CA

OR
F
R
TO

63

G
N
I
AD
O
L

64

6. Base Machine for


Mobile Shear

65

6-1. Equipment

Item
Long crawler
Cab front guard (Lower & Upper)
Weight-added counterweight
Reinforced boom
Piping for Large flow volume exclusive use
2-Speed selector (auxiliary flow combining)
GENESIS shear

Reinforced boom
Cab front guard
Weight-added
counterweight

Piping for large flow


Volume Exclusive use

2-Speed selector

GENESIS shear

Long crawler

66

6-2. Recommended Base Machine List

Base Machine
(Boom
mounted)

ZX250LCK-3

ZX350LCK-3

ZX470LCH-3

Counter
weight
(t)

Shear
Model

shear
weight
(t)

Jaw
opening
(mm)

Jaw
depth
(mm)

Shear
force
(t)

GXP400R

5.4

711

737

980

GXP500

5.8

813

813

1 305

GXP500R

6.2

813

813

1 305

GXP700

6.3

889

889

1 460

GXP700R

7.7

889

889

1 460

GXP1000

7.2

965

965

1 750

6.5

8.2

9.2+2.5

at throat
34.3(MPa)

*R=Rotation

67

6-3. ZAXIS-3 Demolition Version :


K-Series

Lunched Model
ZX210K(LC)-3
ZX250K(LC)-3
ZX350K(LC)-3

Standard Equipment
(Difference with standard machine)
Example ZX350K-3

K-cab (CRES with


overhead window & guard)

Attachment basic
piping
Damage prevention
plate
Reinforced
link B

Front screen of fuel


cooler and air condenser

Twin
wiper

Kreinforced
bucket

8200kg
Counterweight
Reinforced
lower flange

Reinforced idler bracket


Front glass lower guard

600mm reinforced triple


grouser shoe

Track undercover
6.0mm thickness
undercover

68

6-4. K-Cab Specification


Twin wiper
switch

Overhead window

Head guard (ISO level 1)

Roof wiper , washer switch

Roof wiper

Twin wiper
Wipe area
69

6-5. K-series Standard Equipment


Front screen of fuel cooler
6.0mm Thickness undercover

Air condenser

Track center frame lower


flange thickness increase

Class
STD

200

240

330

14 mm 14 mm 22 mm

K-Series 19 mm 19 mm 28 mm

9.0 mm Thickness track undercover


70

6-6. ZAXIS-3 Heavy Duty Version :


H Series
ZX470(LC)H-3 Standard Equipment

Full track guard


Protect track links and lower rollers
from damage and deformation.

H/R Cab

*Heavy/Rock

H/R cab utilizes Reinforced front


window and FOPS at roof
for protection against falling
objects.
Front glass window,
made of straight-laminated,
is fixed to shut out dirt and debris

Reinforced boom and arm


4.5 mm thickness undercover
600 mm triple grouser shoes

71

72

7. Mobile Shear

Maker : GENESIS

73

7-1. Out Line of XP (GXP) Series

74

7-1-1. XP Series Performance Guide

75

7-2. Machanical Pulverizer (GMP)

76

7-3. Linkage Shear (GLS)

77

7-4. Rebar Shear (GRS)

78

7-5. Concrete Cracker (GCC)

79

7-6. Severe-Duty Grapple (GSD)

80

7-7. Image of Hydraulic Flow

81

7-8. Hydraulic Flows and Pressures

82

7-9. Genesis Shear Capability (1)


Base MachineZX450-1
Genesis ShearGPX700R
Cuttable Object: Construction debris at demolition site

Approx: 10mm

Approx: 9mm

Blade position is the Key for efficient cutting

83

7-10. Genesis Shear Capability (2)

84

7-11. Genesis Shear Capability (3)

85

7-12. Genesis Shear Capability (4)

86

7-13. Genesis Shear Capability (5)

87

7-14. Comparison :
Side Guard for Boss
GGENESIS
VS
LLabounty

More Reinforcement.
Easy to replace for Pin.
Little trouble reported.

Looks reinforced, but Difficult to


Remove it, after using long time.
Much trouble reported.

88

7-15. Comparison : Blade Edge


GGENESIS
VS
LLabounty

Not Invertible usage,


But, More reinforcement,
Can be used for Long time

Invertible usage,
But, Less reinforcement,
Cant be used for Long time

89

90

8. Electric Material Handling


Machines

Japanese electricity charge & diesel fuel charge in 2008.


Figures are different for your country & situation.

91

8-1. Market Needs


Crude oil (dollar/barrel)

Change of Material Costs


osts

CoalLNG
(yen/ton)

uranium (dollar/pound)

sts
Co
l
a
ri
at e
M
l
Al

Coal (yen/ton)

LNG (yen/ton)

ng
i
s
a
c re
n
I
idly
Ra p

Crude oil (dollar/barrel)

uranium (dollar/pound)

Total
TotalMachine
MachineRunning
RunningCost
Cost

Lease

Labor Fee

Fuel Cost
Maintenance

Maximum: Approx 70% of Total cost


Instead of Fuel (Diesel),
Another Power Source Required ==> Electricity

92

8-2. Introduce
Swing
Approx360
Approx360

Grabbed
Position

Power
Supply
Switch
Board

Scrap Slot

Fixed Type
No Need to
Travel
Travel

Way
Wayof
ofPower
PowerSupply
Supply
Fixed high post : 360Swing

Collector Ring
Switchboard

93

8-3. Feature

Cheap
Cheap in
in Cost
Cost

Good

Lessthan
thanEngine
EngineType
Type
20-35%
20-35% Less

1L=150Yen
**Diesel
Diesel 1L=150Yen

Better
Better for
for Environment
Environment

Emissionmaterial
material=>
=>CO2,
CO2,Nox
Nox,
etc
No
No Emission
, etc

Lower
Lower Noise
Noise

Lessthan
thanEngine
EngineType
Type
4-6dB
4-6dB Less

A
A Little
Little Slower
Slower Operation
Operation
No Good

Approx
Approx15-20%
15-20%Less)
Less)=>Full
=>FullMode
Mode

Travel
Travel Area
Area Limited
Limited
*Some
*SomeCustomers
Customersdont
dontrequire
requiretravel
travelfunction
function

94

8-4. Cost Performance


Ex.)
-3 Case
ZX200
Ex.)ZX200ZX200-3
Casein
inJapan
Japan
%QORCTKUQP4WPPKPI%QUV

-5 485 920Yen
/Year

Engine
Type

Terms of Cost Comparison


Normal Operation
8hours/ day
25days/month

Electric
Type

Engine Running Cost

Engine Maintenance(4times/year)
240 000Yen
Include in Engine Running Cost

14
12
10

Electric Running Cost

8
6

Modification Cost
For Electricity 8 000k
000k
Electric Driving Modification Recover within 1 year and half
Initial Cost (Approx):

4
2

5 Year

95

8-5. Sales Record: in Japan

Unitsyear

UnitYear

2002

2003

2004

2005

2006

2007

Total 35 units!!

Category Breakdown
Scrap
Rental
Steel
Industrial waste
Others

Approx 50% of Demand


Scarp & Steel Category

11units
9units
6units
5units
4units

96

8-6. Job Site Study : ZX200-3


ZX200-3
ZX200-3 Fork
Fork
200V-55KW
Mechanical Fork
Fixed Cabin

Scrap Handling (Guillotine Operation )


*Prior owned machine - Komatsu( Engine type)
Currently, new inquiry
- interchange from Komatsu 78U
Customer satisfy with cheaper running cost

Protection:
for Original Source Cable
(Customer need to purchase
Original cable
Swing 220(Base machine)

Wall blackened
by Engine

Cost Comparison

Hitachi

-482 000/M
(versus Engine)

Prior Machine
Fuel Cost8h/d 25days = 570 000/m (110/L)
Electricity Cost8h/d 25days = 88 000/m

97

8-7. Job Site Study : High Post Type


AC400V 60Hv
160kW
Grapple (Hanging type)
7m High Post

ZX450-3
ZX450-3 High
High Post
Post

ZX330
ZX330 High
High Post
Post

AC400V
177KW/1 900min-1
Fork (Rotation type)
Total Weight 31.0t

98

8-8. Check Point with Customer

Power Supply Voltage


Should be
(400/440V)

Operation AreaFix or Travel


Power supply Cable

Travel area is Limited


*Need to Check - Installation Location
Travel Area & Operation Area

Fetch Position: Electric Cable


Original power supply
-Customer need to set up
Fetch position (Cabinet panel)
-Need to Decide with Customer

99

100

9. Recycling Equipments

101

9-1. Product line

Soil recycler
Crusher

Screen

Shredder

Wood grinder

5 main recycling equipment product lines.

102

9-2. Position of Recycle Equipment


*For customer, recycle equipment is a facility for making money.
And money becomes an origin when the customer buy the next
machine.
So, recycle equipment is also important for customer site.
Recycle equipments

Products

Material

Money

*And the most important thing to sell or select the machine is


to know what the material is
and what the customer wants to make.

103

9-3. Track Mounted Crusher

Crusher

ZR950JC
Quarry
Mining

Civil engineering
(Dam)

High
versatility

Recycle

Landfill or
Illegal dumping

Demolition

104

Steel Slaggy

9-3-1. Feature : ZR950JC


More detail, please see product information.

High
Highperformance
performance
Jaw
Jawcrusher
crusher
featuring
featuringoverload
overload
protection
protectionsystem.
system.

Engine
Enginecomplies
complieswith
with
Tier
3
gas
Tier 3 gasemission
emission
regulation
regulation

e-Service
e-Serviceisisavailable
available
Easy
operation
:
7
inch
Easy operation : 7 inchwide
widedisplay
display

Over load protection


cylinder
Dimension

Applicable
Applicablematerial
material
Stone,
Stone,Concrete
Concrete

105

Length

With

Height

Weight

(mm)

(mm)

(mm)

(kg)

12 400

2 900

3 200

29 800

9-3-2. Job Site Study : ZR950JC (1)


Application reference at demolition site in Japan

Remove steal by
Magnet machine

Rough crushing
by breaker

Feed material into


crusher

Rough crushing
with
multi-purpose
boom

Crushing by
ZR950JC
Recycle as road
foundation material

Screen by VR408
(vibration screen)

Discharge material

Feed back over size


material
Feed material into
crusher

Crushing

Screening

Zaxis

ZR950JC

VR408

Product(0-40mm)

For more information,


please see application bulletin

106

9-3-3. Job Site Study : ZR950JC (2)


Application reference at quarry site in Australia

Material

:Concrete debris

Target size

:0-40mm

Loading machine

:ZX270HCA Demo fleet)

Crusher followed by :N/A

Material

:Basalt

Target size

:0-40mm

Loading machine

:ZX270 (HCA demo fleet)

Crusher followed by :HITACHI VR408

107

9-3-4. Competitors of Crushure

Hitachi ZR950JC

Sandvik EXTEC

Hartl

C-10+

PC1055J

TEREX-PEGSON

Metso

M-Trak

LT95

KOMATSU BR380JG

ZR950JC and Competitors

More detail, please see product information.

108

9-4. Track Mounted Screen

Screen

VR516FS
Quarry

Mining

Civil
engineering

High versatility

Recycle

Demolition

Steel Slaggy

Landfill or Illegal
dumping

VR408
109

9-4-1. Feature : VR516FS


More detail, please see product information.

Finger
Fingerscreen
screenisis
superior
superiorto
toscreen
screen
sticky
material
sticky materialthan
than
mesh
meshscreen
screen

Engine
Enginecomplies
complieswith
with
Tier
3
gas
Tier 3 gasemission
emission
regulation
regulation

Selectable
Selectable
screening
screening
mode
mode
Its
Its
possible
possibleto
to
select
2or
select 2or33
way
way
separation.
separation.

e-Service
e-Serviceisisavailable
available

Hydraulically
Hydraulicallyadjustable
adjustable
screen
screenbox
boxangle
angle
810
1214
1416
16

81012

Dimension

Applicable
Applicablematerial
material
Concrete
debris,
Top
soil,
Concrete debris, Top soil,Demolition
Demolitiondebris
debris
Industrial
Industrialwaste,
waste,Contaminated
Contaminatedsoil
soiletc.
etc.

110

Length

With

Height

Weight

(mm)

(mm)

(mm)

(kg)

16 030

7 370

5 030

27 500

9-4-2. Feature : VR408


More detail, please see product information.

Dimension
Length

With

Height

Weight

(mm)

(mm)

(mm)

(kg)

9 250

5 800

3 500

9 000

Adjustable
Adjustable
screen
screenbox
box

Both
Bothways
ways
rotation
rotation

High discharge
height

Superior
transportability

Applicable
Applicablematerial
material
Crushed
Crushedconcrete,
concrete,aggregate,
aggregate,
soil
soilincluding
includingpiece
pieceofofwood,etc
wood,etc

Equip
Equipsingle
singledeck
deckvibration
vibrationscreen
screenand
and
22discharge
dischargeconveyor
conveyorwith
withcompact
compactbody
body
Realize
Realizesuperior
superiorutility
utility

111

9-4-3. Job Site Study : VR408


*Shearing dust screening
Shearing Dust

Screening!

10%

90%

40mm over

Fines: under 40mm

Dumping /
Recycling

Resalable /
Reusable
In this Case,

About 10% of Shearing dust was valuable material such as metals, steels.
So, using Hitachi VR408,
10% of such valuable material was screened completely,
and disposal cost was reduced.

112

9-4-4. Job Site Study : VR516FS/VR408


More information, please see application bulletin

Application reference
Reference 1 : for mixed waste

VR516FS

:material

ZR900TS

Reference 2: for debris with topsoil

SR2000G

VR516FS

Reference 3: for soil improving

SR2000G

VR408

Reference 4: for Aggregate crushing

ZR950JC

VR408

113

ZR950JC

9-4-5. Competitors Crusher


Product map of Mobile Screen

1 or 2way 3ways (Finger type) 3ways

HITACHI

PowerScreen
TEREX

SANDVIC

SANDVIC

MetsoMinerals

VR408 COMPETITORS

VR516FS COMPETITORS

Competitors

3ways(Finger)

1or2way

3ways

SANDVIK-EXTEC
S-5

HITACHI VR408

HITACHI VR516FS
TEREX-FINLAY
694SUPERTRAK

TEREXPOWERSCREEN
POWERTRAK 600

TEREX-FINLAY
883

114

9-5. Track Mounted Wood Grinder

Wood grinder

ZR260HC
Deforestation

Forestry
Wood path

Recycle
Agriculture

Landfill /
Illegal dumping
Waste
management

115

9-5-1. Feature : ZR260HC


More detail, please see product information.

Dimension
Length

With

Height

Weight

(mm)

(mm)

(mm)

(kg)

11 200

2 980

3 200

24 000

High
Highgrinding
grinding
performance
performance

Easy
Easymaterial
material
feeding
feeding
The
Thehorizontal
horizontal
feeding
feedinghopper
hopper
excels
excelsat
at
processing
processingof
of
long
longmaterials.
materials.

Easy
Easymaintenance
maintenance
Replace
Replacescreen
screen
easily
easily

Auto
Autofeeder
feeder
The
Theauto
autofeeder
feeder
can
adjust
can adjustthe
the
amount
amountof
of
feeding
feeding
e-Service
is
available
e-Service is available materials.
materials.

Applicable
Applicablematerial
material
C&D
C&Dwaste,
waste,green
greenwaste,
waste,
cut
cutwood,
wood,bamboo,
bamboo,etc.
etc.

116

9-5-2. Job Site Study : ZR260HC


More information, please see application bulletin

At forestry site

At deforestation site

Material

Material

:Bamboo

:Log/Stump

Production :Primary grinding

Production :Primary grinding

Loading by :EX60-1 with grapple

Loading by :ZX120 with Grapple

At recycle site

At recycle site

Material

:Log/C&D waste etc

Material

:Green waste

Production :Chip for fuel/compost

Production :Compost

Loading by :ZX225USR

Loading by :CAT+ Grapple

with grapple
117

9-5-3. Competitors of Wood Grinder


(*Include upper size/class)

HITACHI ZR260HC

Vermeer HG365E

WILLIBALD MZA2400

MORBARK 950TUB

Precision Husky
PROGRIND1000

KOMATSU BR200T-2

118

9-6. Track Mounted Shredder

ZR900TS
*Suitable for disposal of
plastics, tires, vinyl, thin
metal, and so on.
*Not suitable for solid
materials
such as metals, slag,
rocks etc.

High versatility

Recycle (General )
Landfill or Illegal
dumping
Incinerator
Auto salvage

Disposal
station
Metal scrap
(Thin material)

Waste
management

119

9-6-1. Applicable Materials


Rubber

Tire

Pallet

Conveyor
belt

Wooden/ Fiber

Rubber
hose

Pallet

Tatami
mat

Urethan

Bumper

C&D
waste

Waste
textile

ZR900TS

Electric
base

Refrigerator

ZR900TS is the machine that


shred these kind of materials.
Bowling ball

Hard waste

Vinyl

Container
Soft waste

Plastic

pipe

Thin metal

Hard
waste

Waste

120

Sheet

9-6-2. Feature : ZR900TS


Specification

More detail, please see product information.

Length (mm)

With (mm)

Height (mm)

Weight (kg)

9 510

3 610

3 930

18 900

Feature
*Realize minimized cost.
-one-man operation by remote control can minimize labor cost.
-ZR900TS is all-in-one design. There is no need to prepare additional control
equipment.
-self clean up function can minimize machine downtime.
-maximum discharge height in 20t class can reduce the time of
carry-out material and use less fuel.
*Realize reducing maintenance cost.
-adopting mono-cutter can reduce maintenance cost.
(Cutters are reproduced about 3 times*.)
*Realize more efficiency shredding.
-adopting two axis shaft realize cutting sharpness.
-variable cutter and the spacer makes various size of cutting.
-easy layout change realize flexible placement.

121

9-6-3. Job Site Study : ZR900TS


Example of Tire shredding

About 1min/piece

Estimated Capacity & Distribution


-Condition
*Material weight :About 8Kg/Tire
*Number of tires: tires/Automobile
*Shredded automobile per day: 84
1.Estimated capacity
=8Kg5tires84auto/day3.36t/day

Fines

over

2.Distribution
*70%(2.36t)
70%(2.36t) was fine (under 50mm)=
50mm)= Resalable
*30%(1t)
30%(1t) was over (over 50mm) =Waste

70

30

In this case,
HITACHI ZR900TS could reduce 70% of disposal cost
and made 70% of valuable / resalable materials.

122

9-6-4. Competitors Shredders


Competitor 1:Fixed type
*Fixed type of shredder is made by many companies.
and sometimes, ZR900TS is preprocessor for Fixed type.
Competitor 2:Tack mounted & Stationary type
(*Include upper size/class)

HITACHI ZR900TS

KOMATSU BR300S

CAT MC220-S

HAMMEL VB650

Doppstadt DW2060

KOMPTECH
TERMINATOR

Forus
BZ171

123

9-7. Track Mounted Soil Recycler


Soil Recycler

SR2000G
Order recieved from
Australian customer
Disaster-relief

Erosion
control

High versatility

Recycle
Road
construction

Dredging
Contaminated treatment

124

9-7-1. Feature : SR2000G


More detail, please see product information.

Dimension
Length

With

Height

Weight

(mm)

(mm)

(mm)

(kg)

12 500

2 990

4 500

19 600

Note

-Structure-Structure-

-Flow-

Additive
Additive
hopper
hopper
Swing
Swing
Gate
Gate

Additive
Additive
Additivefeeder
feeder

Feeding
material

Discharge
Discharge
conveyor
conveyor

Improved/
Hopper
Hopper
Feeder
Feeder

Mixing
Mixing
chamber
chamber

Mixing

Treatmented
Soil

*Apply to higher moisturized material by Horizontal and wide feed hopper


*Realize stable material feeding without bridging by Swing Gate
*Continuous and direct measurement of feed material by Level roller
*Apply to various additive by Screw feeder
*Feed additive precisely by Precise additive feed control
*Realize higher mixing performance by Two shafts paddle mixer

125

9-7-2. Job Site Study (1)


More information, please see application bulletin

At disaster-relief site

At erosion control site

Aim to :Banking reinforcement

Aim to :Prevent mud flow

Material :Levee soil

Material : Soil with volcanic ash l

Additive :Cement

Additive :Cement

At Highway construction site

At VOCs contaminated site

Aim to : Recycle for road base

Aim to : Remediation

Material :Turned Soil

Material : Contaminated soil

Additive :Cement

Additive : Unknown

126

9-7-3. Job Site Study (2)


Application reference
Reference1:Dredged soil improvement

Digging by
Dredging
ship

Feed
dredged soil

Prescreening

Improve

Products

Separate stone

to VR408

from soil

by Soil
recycler

(Improved
soil)

Reference2:Soil Recycle
Pre screening by VR408
Digging by backhoe

Separate fine(0-20mm)
from over(20-100mm)

Improve by soil
recycler

Products(0-20mm)

Material

Backhoe

VR408

Soil recycler

127

Recycle
products

9-7-4. Competitors Soil Recycler

HITACHI SR2000G

KOMATSU
BZ210-1

3,500

128

9-7-5. Appendix :
Estimated Productivity
Note This information just shows estimated capacity.
HCM doesn't warrant any information on this sheet.
Estimated capacity depends much on
feeding material, condition and so on.

129

130

10. Mining & Quarry


Equipment

131

10-1. Process of Mine Development


Examination
Select of
mountain

Close
investigation

Product
Introduced
Crusher/Screen
Machines/Plants Conveyer/Mining

Examination of land surface


Examination by literature

machines

Elastic wave exploration

Introduced
each furnishing

Boring exploration

Digging of
raw stone

license
application

Blasting face/ road


/ stock yard / balancing
reservoir / detritus tank

Blasting work
Formation of Bench

Development
Processing
production
Wood grinding
clearing

Introduced
machines

Land cleaning

Custody
control

Backhoe & Dump &


Bulldozer

Product by product
custody

Acceptance of
order &
Shipment

Creation of Stock yard

Treatment
Finish of digging
treatment

Plant trees

Application of
vacant lot

Four components of Development of mine


Rock ( Blasted rocks )
Water (balancing reservoir / detritus tank )
Burden ( Stock yard ( capacity )
Equipment ( Machines & Plants

132

10-2. Products Line Up Aggregate

For road

Material for
concrete

Ballast

Broken stone

For paving
material

Aggregate is classified
into four products.
Aggregate
products

For road
Material for concrete
Ballast
Broken stone

For road

For surface &


Groundsill

For Base course


For upper or lower
material
For sub grade material

Material
for concrete

Coarse
aggregate

Fine
aggregate
For railroad stone

Other

Ballast

Broken stone

For lower stone

Products are classified into size and/or


grain by purpose and/or uses.
133

Dust & others

10-3. Specification Table of


General Rock
Various rare metals are included in many kinds of
rocks. Loading capacity estimation is based on the
chart below.
Refer to the chart below for silica level

Average density

name

silica

soil (overburden)

sedimentary
rock

metamorphic
rock

igneous
rock

Bankt/m3

low

Looset/m3

1.6

sandstone

high

2.5

1.5

graywacke

high

2.7

1.6

slate

low

2.6

1.6

schalstein

high

2.8

1.7

limestone

low

2.6

1.6

chert

high

2.6

1.6

coal

low

1.9

1.1

gneiss

high

2.7

1.6

amphibolite

medium

3.0

1.8

marble

low

3.0

1.8

andesite

medium

2.6

1.5

basalt

medium

3.0

1.8

porphyrite

medium

2.8

1.7

diabase

medium

3.0

1.8

granite

high

2.7

1.6

diorite

medium

2.9

1.7

gabbro

medium

3.0

1.8

serpentinite

low

3.0

1.8

134

10-4. Development of Mine in Japan (1)


Bench-cut

Stock yard

floor

(mountain top cutting)

bench

<Big limestone mine>


<Big quarry pit>
Related with TOP6 companies

<features>

vertical
shaft

1.Initial investment is huge.


mainly, construction costs
of vertical shaft & hauling
tunnel.
2.Production cost is
relatively stable,
because carrying distance
will not be so extended in
future.

Bench-cut
(mountain side cutting)

There is crusher and/or


feeder at bottom of
the shaft

carrying distance
is extended in
future

<Ordinary quarry pit>

Expanding
area

<features>

Finished wall
(rehabilitation)

bench

Stock yard

1.Initial investment is small.


2.Production cost will be
increased in future
because carrying distance
will be extended in
process.
Need to check Periodical
review of carrying volume
is required, especially
combination of machines

floor
Down road carrying
Plant
1st,2nd,3rd,

135

10-4. Development of Mine in Japan (2)


Bench-cut (down the hall)
<Rare-metal & Coal mine >
<features>
1.Initial investment is huge.
(boring examination, digging
up an overburden)

2.Production cost will be


increased in future 0by
increasing carrying distance
in process. Need to check
Periodical review.
3.In comparison with other
methods, fuel cost 0is at a
disadvantage by uphill
carrying of load

Russia diamond mine

Chili copper mine

Indonesia coal mine (KPC)


136

10-5. Marketing : Production of


Aggregate
Mt

Quarry &
1 200 gravel

Quarry Sand & gravel (sea/river)

Limestone Cement

For steel

Sand & gravel (land/mountain)

Quarry

Others

For chemical Others

1 000

800

Total Products

600

400

Main Target

200

0
71 73 75 77 79 81 83 85 87 89 91 93 95 97 99 01 03 05

year

137

10-6. Marketing : Produce of


Scale (1)

2008
Limestone
mines quarry
sites 1.369

More than 1 000kt / year

100500kt / year

Less than 100kt / year

5001 000kt / year

t/hr

Kt/year

m3

MODEL

100

172

1.0

ZX240H

200

343

1.41.5

ZX350H

600

1 030

5.0

EX1200

800

1 373

5.612.0

EX1200BE EX1900

1 000

1 716

12.0

EX1900

1 500

2 574

15.0

EX2500

2 000

3 432

22.029.0

EX3600 EX5500

2 500

4 290

29.0

EX5500

Supposed loading machine


6.5hr/day 22days/month
12months/year
Bucket Efficiency 90
Loading Efficiency 65

138

10-6. Marketing : Produce of


Scale (2)
ZX450 over Excavator sale records
<Period: 03 the first half of year08 the first half of the year>
(units)

100
NOT FOUND

80

14

14
4
2

CAT JAPAN

14

60

11
15

OTHERS

4
4
1

KOMATSU

19

11

HITACHI

13
30

11

35

40
36

35

31
31

29

27

40
26
32
44

20
28

31

29

32

29

32

36
30

23
13

0
'03/F '03/S '04/F '04/S '05/F '05/S '06/F '06/S '07/F '07/S '08/F

139

10-7. Strategy Making in Japan


Application range of our products

Main
Market

EXCAVATOR

WLIN PLANT

CRUSHER

t/hr

Kt/
year

100

172

ZX240H

3.2

ZW220

ZR950JC

200

343

ZX350H
ZX400

3.2

ZW220

ZR950JC

300

515

ZX470H
ZX520LCH

3.2
3.5

ZW220
ZW250

ZR950JC
LT105

400

686

ZX670H
ZX870H

4.0
5.0

ZW310
LX300

LT125

500

858

ZX870H
ZX870BEH

6.0

LX450

LT125 LT140

600

1 030

EX1200

LT140

800

1 373

EX1200BE
EX1900

LT160

1 000

1 716

EX1900

LT160

m3

MODEL

MODEL

Developed Quarry-model Developed quarry-model


Selecting customers &
Selecting customers & Demo
Demo

MODEL

Demo at customers site.


Attending to the Hi-OSS
demo site

Selection of main promotion Model


140

10-8. Production Process & Machines


in Japan (1)
Rough Crushing & Digging up (with breaker)

ZX850H

EX800H

After blasting operation need to crush rocks by hydraulic breaker.


Above crushing operation is quite heavily-loaded, HD spec is most suitable.

Digging up (after blasting)

Back break of blasting ZX520H

Back break of blasting ZX870H

pit

by bulldozer
by backhoe

The edge of blasting pit EX800H

The bottom of blasting face EX1200

On dangerous job site, Excavator is more suitable than Bulldozer considered


with safety issue.

141

10-8. Production Process & Machines


in Japan (2)
Shovel & Dump

Overburden ZX450H

Overburden
EX1200

Blasted rock
EX850H

Blasted rock ZW310

In SH&DP Work, blasted rocks are Loaded & Carried to Dump truck by big excavator & big WL.

Load & Carry


L&C ZW310

In L & C work, WL directly carries rocks or gravel to hopper.

142

10-8. Production Process & Machines


in Japan (3)
Crushing & Screening (Mobile Crusher & MCP ~Mobile Crushing Plant~)
ZR950JC&VR408(screen)
Producing Recycle Crusher-run

ZX450&Crusher
Primary crusher
Dump-less system

After first crushing next two steps crushing operation done.


After that above, by Screen the rocks separated by each size.

143

10-9. Information of ZAXIS R-Model


ZX520LCH (Back break of blasting)
2006/11 delivery 1 800hr

ZX870LCH (Rough Crushing)


2007/3 delivery 800hr

144

10-10. Wheel Loader Information


(ZW series)
ZW220~ZW330

Comfort-designed suspension seat

All round visibility panoramic cab


Adjustable steering column
Bushings

system

transmission

Hydraulically operated
cooling fan with HeatSensing system

ZW Selling point
Three works modes TT (Total Torque-control) system

Three work modes are selectable according to job needs and operators preference .In each
Work mode, TT system controls the total torque of the engine and pump for well matched
Penetration force and implement speed according to job needs. The three work modes can be
Optimally selected to suit materials to be handled for higher production.
P mode : Heavy-duty excavation N mode: Loading

L mode : Light-duty operation

Three driving modes L/N/H/M


The three driving modes can be selected according to job needs and operators preference.
Automatic shift
Driving modes
Shift timing
Recommend site
transmission
L

M
(manual mode)

nothing

Early

Long distance and/or flat terrain

Slow

Core working is diggingSloping road

Voluntarily

All

Selectable Clutch Cutoff timing


Clutch cutoff timing can be selected from three position to suit various job condition, including
Rapid operation on level ground , and surefooted operation on gradient.

145

10-11. Loading Method of Wheel


Loader (ZW series)
Material

Material

Type- Loading methodCross


Loading method

Type-V Loading method

Weld edge

Bucket Specification

Bolt-on Cutting edge (BOC)


Bolt-on cutting edge isnt
compatible with bolt on teeth.
(Weld edge is different.)

BOC

Teeth cant be attached to BOC


bucket.

Bolt-on Teeth (BOT)

Weld edge

146

10-12. Feature of Wheel Loader


(ZW series)
Extinguisher

With or Without of
Gumball machine

BOC or
Tooth
Selectable for custom

EX.)

9mm

9mm
25mm

Main work of WL by ZW310 class is loading to dump truck and feeding into hoppers
by bucket.
In case of carrying products, the bucket is not necessary to be reinforced. But in case
of loading to dump truck& throwing into hoppers, it needs to be reinforced.
Side, inner and bottom plates, and side edges are usually reinforced depending on
customers request.

147

10-13. Tire
Bias tire
Tire size

Tire for WL

pattern

L3/L4/L5

Radial tire

Section

Ply
Diameter of rim ( inch)

Height of
tire

Bias tire

Diameter
of rim

Outside
Diameter
of tire

Width of Tire ( inch)

Radial tire

Diameter of rim ( inch)


Width of Tire ( inch)

Bridgestone Bias tires pattern


Usually Europe and
America use radial
tire.

Michelin radial tires pattern



Michelin treat
only radial tire.

Contact
pressure
Deflection
Decay
durability
Cost

Feature

Radial

Bias

Low

High

Side wall is only bow, Tread face isnt


bowContact area is stabilized to load.

Side wall and Tread face are


bow. Contact area is fickleness.

Radial tire has several strong steel belts,


carcass. Steel belt be for tread faces stability
and guard. Carcass is steel code of one ply
that it is arranged radial pattern.

Bias tire is configured to nylon


codes that it is piled up carcass.

148

10-14. Matching of Dump & Excavator


Information (1)
Carrying methods of minerals are as followings.

Dump-Truck method
Dump-less method
In Japan, Dump method is usually went on to Shovel-Dump method that it combines
Hydraulic Excavator and Dump.

Advantages of Dump-Truck method


1.High general versatility. Applicable to
various sites
2.Damage would be smaller when trouble
happens
3.Managable by adjusting no. of units for
distance and/or amount of production change
4.High ability to handle various objects
5.Easier operation, less tiredness for operator
6.Easier maintenance
7.Lower cost for long distance carry comparing
with Bulldozer method & L & C method.

Carrying distance and Cost ( Polar example)


High
Wheel loader

Bulldozer

Dump

Cost
L & C method
( Load & Carry )
Bulldozer method

Low

Carrying distance
149

Shovel & Dump


method

10-14. Matching of Dump & Excavator


Information (2)
Dimensions of Excavator, Size of Dump and Matching
numbers of Unit should be considered.
Matching numbers of Loading machine & Dumping machine
Dumping clearance of Loading machine & Bessels Height of Dump
Dumping reach & Bessels Length of Dump
Bucket width & Bessel width
A :Rear-end swing radius
B : Dumping height
C : Dumping reach
D : MAX. digging reach
E : Bucket width
F : Bessel length
G : Inner Bessel width
H : Bessel height
(Standard Specification)

 Excavator (Bucket capacityISOunitmm)  


Bucket
A
B
C
D
Model code
capacity
ZX380HH
1.5 m3 3 320 2 680 3 650 11 020
ZX470H-3
1.9
3 645 2 990 3 410 12 060
ZX520LCH-3
1.9
3 645 3 070 3 410 12 000
ZX650H
2.9
3 850 3 240 4 310 13 280
ZX670LCH-3
ZX650H(BE)
3.3
3 850 3 200 4 520 11 800
ZX670LCH-3(BE)
ZX870LCH-3
3.5
4 600 4 000 4 590 14 100
ZX870LCH-3(BE)
4.3
4 600 3 770 4 620 12 340
EX1200-5C
5.0
4 850 3 220 7 000 15 340
EX1900-5
12.0
6 010 4 050 6 430 15 250
EX2500-5
15.0
6 290 4 250 7 580 17 050
EX3600-5
22.0
6 780 4 990 7 470 18 190

150

   

E
1 470
1 500
1 500
1 680
1 700
1 890
2 110
2 100
3 050
3 180
3 790

10-14. Matching of Dump & Excavator


Information (3)

(Standard Specification)
Bucket
capacity
(m3)

Cycle
tine
(sec)

11t
(7m3)

20t
(14m3)

32t
(24m3)

ZX450H

1.9

22

ZX650H

2.8

24

34
82
23
60

78
162
56
120

1213
278
89
206

ZX650BE

3.3

24

25
2

45
102

ZX850H

3.4

25

23
52

ZX850BE

4.3

25

12
40

EX1200-5

5.0

26

EX1900-5

12.0

28

EX2500-5

15.0

EX3600-5
EX5500-5

Model code

46t
(34m3)

55t
(40m3)

64t
(42m3)

90t
(60m3)

136t
(78m3)

78
174

1011
248

1213
290

45
102

78
176

1011
250

1112
294

34
82

56
140

78
198

910
232

23
72

45
124

67
176

78
192

89
218

23
56

23
80

34
94

34
98

56
140

67
182

29

23
66

23
78

23
82

34
116

56
150

22.0

30

12
50

12
58

23
62

23
88

34
114

29.0

32

12
44

12
46

23
66

23
86

Appropriate units of Dump per 1 lording machine is


calculated by the following formula.

Cm1
Cm2

Required units unit

Necessary time at 1 cycle of Dump ( second )


Necessary time at loading to Dump ( second )

151

10-15. Mobile System in Mine


VR516FS(Finger screen)

ZR260HC(Wood grinder)

Screening out usable


material from stockpile of
wastes in the stockyard

Woods & stubs are recycled by


wood grinder. (used as recycle
fuel or compost.)

SR2000G(Soil recycler)
Improving overburden for recycle.
(used as bank of road construction.)

152

10-16. Hearing seat to customer


Format of acquisition of information
Customers name

mining company

Business place/Job site

business place

Booklet/URL

Booklet Y

Rock quality

Coal ironstonelimestone

Amount of production

Monthly output 0000/month Annual output


84000/year

Condition of blast

6.0hr/day 22day/month 12month/year


1 584hr/year

Update term of
Operation license

Development of forest land by September,2009


Rock extraction April,2010per 5 years

Method of quarrying

Bench cut

Method of carrying

SH&DP one way 800m L&C one way 60m

URL Y

Open shoot

SH ZX470R

PC450

ZX210H

WL WA400 ZW310 966G


Ownership machines
DP HD2052 10tDP5
others
1stJoe crusherXinch
Plant/Equipment

etc.

2ndCone crusher

3rd

153

154

11. Forestry Machines

155

11-1. Dimensions : ZX130L


Dimensions/Working Range Diagram
Operating weight
Bucket capacity
(PCSA heaped)
Traction force
Gradeability
Ground pressure
Rated power

13 700 kg
0.5 m

130 kN
35(70%)
41 kPa
-1
P moed : 63/1950 kW/min
-1
HP moed : 66/2150 kW/min

156

11-2. Equipment (1)


ZX130L Forestry EQUIPMENT
Tropical
cover

High performance filter

Air cleaner
double
filters

Upperstructure
reinforced under
cover(4.5mm)

Std cab

Arm with damage


prevention plate
(Upper,Lower,Side)

Reinforced
under
carriage

Reinforced under carriage


Reinforced
under cover

Reinforced step

Two roller
guard

Distance between tumbles


L2990mm
STD2880mm

157

Traction force
15%UP
LkN
STD102kN

11-3. Equipment (2)

(Std:440mm)

(Std:890mm)

Min.ground clearance

Component comparison

Track link assembly


Travel motor
Upper rollers
Lower rollers
Idler assembly
Spring track assembly
Other
Hydraulic circuit
It is the same as std modelZX120.

Electric circuit
It is the same as std modelZX120.

158

ZX110M
ZX110M
ZX200
ZX200
ZX200
ZX110M

11-4. Attachments (1)


Processor
Device for
Branch cutting off
Transfer device for
Hanging wood

Measure
device

Grapple

Chain saw

Attachment for specializing in lopping branches off and


cross cutting(cut same size).
Composed of grapple(handling wood), blade
cutter(lopping branches), feed controlling device, and
chainsaw(cross cutting).
Human operation(lopping branches): 10minutes
Processor operation(lopping branches & cross cutting):
2minutes
Shotens operation time and reduces manpower

159

11-5. Attachments (2)


Feller Buncher

Attachment for felling trees for easy collection.


Lighter attachment weight than processor & harvester.
Can be fitted to Long front machine.
Harvester
Cut off device for Branch
Transfer device for
Hanging wood

Measure device
Grapple

Chain saw

Attachment for felling trees, cutting branches off,


cross cutting,
Different point(from Processor): Equipped with Tilt
system(for easy cutting down trees)

160

12. Brochures List


For Metal Recycling Machines Brochure
Scrap Metal Recycling Brochure

KA-EN077

Material Handling Machines Brochure

KA-EN078

Recycling Equipments Brochure


ZR260HC

KA-EN044

ZR125HC

KA-EN043

VR516FS

KA-EN061P

VR408

KA-EN082

ZR950JC
SR2000G

KA-EN020
KA-EN074

For Mining Machines Brochure


ZX400LCH-3

KS-EN044

ZX450-3 Series (450-3/450LC-3/470H-3/470LCH-3)

KS-EN060

ZX450-3 F Type Series

KS-EN073

ZX500LC-3 Series (500LC-3/520LCH-3)

KS-EN030

ZX500-3 F Type Series

KS-EN074

ZX650LC-3 Series (650LC-3/670LCH-3)

KS-EN031

ZX650LC-3 F Type Series

KS-EN075

ZX850-3 Series (850-3/850LC-3/870H-3/870LCH-3)

KS-EN059

ZX850-3 F Type Series

KS-EN076

ZX-R Series (400R-3/470R-3/520R-3/670R-3/870R-3)

KS-EN047

ZX-R F Type Series

KS-EN077

EX1200-6
EX1900-6
EX2500-6
EX3600-6
EX5500-6
EX8000-6

Brochure

KS-EN109

Spec.

KS-EN112

Brochure

KS-EN058

Spec.

KS-EN052Q

Brochure

KS-EN057P

Spec.

KS-EN051Q

Brochure

KS-EN056P

Spec.

KS-EN105

Brochure

KS-EN122

Spec.

KS-EN104

Brochure
Spec.

KS-EN125
KS-EN103

This information is the present in February, 2009.

161

Anda mungkin juga menyukai