Anda di halaman 1dari 6

o.

URAIAN

SATUAN VOLUME

A1 M' Pagar Sementara Dari Kayu Tinggi 2 m


01
Dolken Kayu 8-10 / 400
Btg
cm
Semen Portland
Kg
Pasir beton
M3
Koral Beton 2/3
M3
Kayu balok terentang
M3
Paku Biasa 2" - 5"
Kg
Residu
Kg
Pekerja
Oh
Tukang Kayu
Oh
Kepala Tukang
Oh
Mandor
Oh
Jumlah
Dibulatkan
A1 M' Pagar Sementara Seng Gelombang Tinggi 2 m
02
Dolken Kayu 8-10 / 400
Btg
cm
Semen Portland
Kg
Seng Gelombang BJLS-30
Lbr
Pasir beton
M3
Koral Beton 2/3
M3
Kayu balok terentang
M3
Paku Biasa 2" - 5"
Kg
Meni Besi
Kg
Pekerja
Oh
Tukang Kayu
Oh
Kepala Tukang
Oh
Mandor
Oh
Jumlah
Dibulatkan
A- 1 M' Pagar SementaraKawat Duri Tinggi
03 1,80 m
Dolken Kayu 8-10 / 400
Btg

1.2500

HARGA
SATUAN
(Rp)

HARGA
(Rp)

28,000.00

35,000.00

2.5000
1,406.00
0.0050 255,400.00
0.0090 211,100.00
0.0720 2,640,000.00
0.0600 23,400.00
0.4000
8,100.00
0.4000 42,000.00
0.2000 65,000.00
0.0200 75,000.00
0.0200 80,000.00

3,515.00
1,277.00
1,899.90
190,080.00
1,404.00
3,240.00
16,800.00
13,000.00
1,500.00
1,600.00
269,315.90
269,316.00

1.2500

28,000.00

35,000.00

2.5000
1,406.00
1.2000 62,900.00
0.0050 255,400.00
0.0090 211,100.00
0.0720 2,640,000.00
0.0600 23,400.00
0.4500 30,400.00
0.4000 42,000.00
0.2000 65,000.00
0.0200 75,000.00
0.0200 80,000.00

3,515.00
75,480.00
1,277.00
1,899.90
190,080.00
1,404.00
13,680.00
16,800.00
13,000.00
1,500.00
1,600.00
355,235.90
355,236.00

1.0000

28,000.00

28,000.00

A04

A05

cm
Semen Portland
Kawat Duri
Pasir beton
Koral Beton 2/3
Paku Biasa 2" - 5"
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah

Dibulatkan
1 M2 Pengukuran Dan Pasang
Bouwplank
Kayu kaso 5/7
Paku Biasa 2" - 5"
Kayu papan albasia
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
Dibulatkan
1 M2 Pembuatan Kantor Sementara dgn
Lantai Diplester
Dolken Kayu 8-10 / 400
cm
Kayu Balok terentang
Paku Biasa
Besi Strip
Semen Portland
Pasir Pasang
Pasir beton
Koral Beton2/3
Bata Merah
Seng Plat
Kawat harmonika
Kaca Polos 3mm

Kg
Kg
M3
M3
Kg
Oh
Oh
Oh
Oh

2.0000
1,406.00
2.5000 63,500.00
0.0050 255,400.00
0.0090 211,100.00
0.0600 23,400.00
0.3000 42,000.00
0.2000 65,000.00
0.0200 75,000.00
0.0200 80,000.00

2,812.00
158,750.00
1,277.00
1,899.90
1,404.00
12,600.00
13,000.00
1,500.00
1,600.00
222,842.90
222,843.00

M3
Kg
M3
Oh
Oh
Oh
Oh

0.0120 1,870,500.00
0.0200 23,400.00
0.0070 2,071,700.00
0.1000 42,000.00
0.1000 65,000.00
0.0100 75,000.00
0.0050 80,000.00

22,446.00
468.00
14,501.90
4,200.00
6,500.00
750.00
400.00
49,265.90
49,266.00

Btg

1.2500

28,000.00

35,000.00

M3
Kg
Kg
Kg
M3
M3
M3
Bh
m'
M2
M2

0.1800
0.8500
1.1000
35.0000
0.1500
0.1000
0.1500
30.0000
0.2500
2.0000
0.0800

2,640,000.00
23,400.00
26,800.00
1,406.00
233,400.00
255,400.00
211,100.00
775.00
15,815.00
35,900.00
87,400.00

475,200.00
19,890.00
29,480.00
49,210.00
35,010.00
25,540.00
31,665.00
23,250.00
3,953.75
71,800.00
6,992.00

Kunci Tanam
Plywood 120 x 240 x 0,4
cm
Pekerja
Tukang Kayu
Tukang Batu
Kepala Tukang
Mandor
Jumlah

Dibulatkan
A- 1 M2 Pembuatan Gudang Semen dan
06 Alat-alat
Dolken Kayu 8-10 / 400
cm
Kayu balok terentang
Paku Biasa
Semen Portland
Pasir Beton
Koral Beton 2/3
Seng Gelombang BJLS 30
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
Dibulatkan
A1 M2 Pembuatan Bedeng Buruh
07
Dolken Kayu 8-10 / 400
cm
Kayu balok terentang
Paku Biasa
Semen Portland
Pasir Beton
Koral Beton 2/3
Seng Gelombang BJLS 30
Pekerja
Tukang Kayu
Kepala Tukang

Bh

0.1500

94,500.00

14,175.00

Lbr

0.0600 140,000.00

8,400.00

Oh
Oh
Oh
Oh
Oh

2.0000
2.0000
1.0000
0.3000
0.0500

42,000.00
65,000.00
65,000.00
75,000.00
80,000.00

84,000.00
130,000.00
65,000.00
22,500.00
4,000.00
1,135,065.75
1,135,066.00

Btg

1.7000

28,000.00

47,600.00

0.2100 2,640,000.00
0.3000 23,400.00
10.5000
1,406.00
0.0300 255,400.00
0.0500 211,100.00
1.5000 62,900.00
1.0000 42,000.00
2.0000 65,000.00
0.2000 75,000.00
0.0500 80,000.00

554,400.00
7,020.00
14,763.00
7,662.00
10,555.00
94,350.00
42,000.00
130,000.00
15,000.00
4,000.00
927,350.00
927,350.00

M3
Kg
Kg
M3
M3
Lbr
Oh
Oh
Oh
Oh

Btg
M3
Kg
Kg
M3
M3
Lbr
Oh
Oh
Oh

1.2500

28,000.00

35,000.00

0.1860 2,640,000.00
0.3000 23,400.00
18.0000
1,406.00
0.0300 255,400.00
0.0500 211,100.00
1.5000 62,900.00
1.0000 42,000.00
2.0000 65,000.00
0.2000 75,000.00

491,040.00
7,020.00
25,308.00
7,662.00
10,555.00
94,350.00
42,000.00
130,000.00
15,000.00

Mandor
Jumlah

Oh

0.0500

80,000.00

4,000.00
861,935.00
861,935.00

0.1000
0.0500

42,000.00
80,000.00

4,200.00
4,000.00
8,200.00
8,200.00

0.1500 205,500.00
0.0900 196,000.00
0.0100 233,400.00
1.0000 42,000.00
0.0500 80,000.00

30,825.00
17,640.00
2,334.00
42,000.00
4,000.00
96,799.00
96,799.00

Dibulatkan
A1 M2 Membersihkan Lapangan dan Perataan
08
Pekerja
Oh
Mandor
Oh
Jumlah
Dibulatkan
A1M2 Pembuatan Jalan Sementara
09
Batu Belah 15/20
M3
Batu Pecah 5/7
M3
Pasir Pasang
M3
Pekerja
Oh
Mandor
Oh
Jumlah
Dibulatkan
A1 M3 Bongkaran Beton Bertulang
10
Pekerja
Oh
Mandor
Oh
Jumlah
Dibulatkan
A1 M3 Bongkaran Dinding Tembok Bata Merah
11
Pekerja
Oh
Mandor
Oh
Jumlah
Dibulatkan
A1 M Pagar beton Pracetak ( 5 x 50 x 213 ) cm
12
Panel Beton Pracetak
Lbr
Kolom Beton Pracetak
Btg
Pasir Beton
M3
Koral 2/3
M3
Semen abu - abu
Kg
Pekerja
Oh
Tukang Batu
Oh

6.6670
0.3330

42,000.00
80,000.00

280,014.00
26,640.00
306,654.00
306,654.00

6.6670
0.0330

42,000.00
80,000.00

280,014.00
2,640.00
282,654.00
282,654.00

0.9860
0.5250
0.0740
0.1460
45.0000
0.3750
0.1250

199,200.00
264,000.00
255,400.00
211,100.00
1,406.00
42,000.00
65,000.00

196,411.20
138,600.00
18,899.60
30,820.60
63,270.00
15,750.00
8,125.00

Kepala Tukang
Mandor
Jumlah

Oh
Oh

0.0120
0.0190

75,000.00
80,000.00

900.00
1,520.00
474,296.40
474,296.00

0.4340 14,900.00
6.7860 18,300.00
0.0424 18,300.00
4.0000
600.00
2.5000
1,406.00
0.0050 255,400.00
0.0090 211,100.00
0.3750 42,000.00
0.1250 65,000.00
0.0120 75,000.00
0.0190 80,000.00

6,466.60
124,183.80
775.92
2,400.00
3,515.00
1,277.00
1,899.90
15,750.00
8,125.00
900.00
1,520.00
166,813.22
166,813.00

0.4340 171,300.00
2.0000
1,406.00
2.5000 63,500.00
0.0050 255,400.00
0.0090 211,100.00
0.3750 42,000.00
0.1250 65,000.00
0.0120 75,000.00
0.0190 80,000.00

74,344.20
2,812.00
158,750.00
1,277.00
1,899.90
15,750.00
8,125.00
900.00
1,520.00
265,378.10
265,378.00

Dibulatkan
A1 M Pagar kawat ayam tiang besi L50.50.5, tinggi 1 m'
13
Kawat ram ayam
Lbr
Besi siku L 50.50.5
Kg
Besi pelat (1,2 x 3) mm
Kg
Baut
bh
Semen Portland
Kg
Pasir beton
M3
Koral Beton 2/3
M3
Pekerja
Oh
Tukang Batu
Oh
Kepala Tukang
Oh
Mandor
Oh
Jumlah
Dibulatkan
A1 M2 Pagar BRC lengkap dengan tiang
14
BRC lengkap dengan tiang
Lbr
Semen Portland
Kg
Kawat Duri
Kg
Pasir beton
M3
Koral Beton 2/3
M3
Pekerja
Oh
Tukang Batu
Oh
Kepala Tukang
Oh
Mandor
Oh
Jumlah
Dibulatkan
A1 M2 Steiger Werk / perancah dari Bambu
15
Bambu 6 - 10 (600) cm
btng
Tali ijuk
kg
Pekerja
org
Tukang kayu
org

1.0000
0.2500
0.2500
0.0170

25,000.00
23,400.00
42,000.00
65,000.00

25,000.00
5,850.00
10,500.00
1,105.00

Kepala tukang
Mandor
Jumlah

org
org

0.0020
0.0130

75,000.00
80,000.00

150.00
1,040.00
43,645.00
43,645.00

btng
org
org

1.2500
0.5000
0.0250

25,000.00
42,000.00
80,000.00

31,250.00
21,000.00
2,000.00
54,250.00
54,250.00

Dibulatkan
A1 M' Cerucuk Bambu
16
Bambu 7 -10 (400) cm
Pekerja
Mandor
Jumlah
Dibulatkan