Max. Marks: 70
Note: Question No.l is compulsory and it must be answered first in sequence at one place only
Answer any FOUR questions fi'om the remaining.
l.
Ansu,,er
( 10x
l:10)
a) List out the road classification as per third twenty years plan.
plan.
a) A bus is moving with a speed of 60 km/hr on two lane highway. It has to overtake a slow
moving vehicle having a speed of 45 km/hr. Calculate OSD, assume acceleration of
(8M)
overtaking vehicle as 4 seconds.
(8M)
b) What are the engineering surveys required for the location of highways? Explain briefly (7M)
b) Define transition curve, what are its objectives. Explain the types and methods for computing
(7M)
length of transition curve
4) a) Explain various types of road signs and their design specifications with neat sketches.
(8M)
b) Draw the components of flexible pavements. What are the design factors to be consider in
(7M)
design of flexible pavements?
a) The C.B.R. test carried out on a sub-grade soil gave the fbllowing readings:
Penetration. mm
Load, Kg
Penetration. mm
Load, Kg
0.0
0.0
3.0
s8.0
05
4.0
4.0
70.0
1.0
14.0
5.0
77.5
1.5
30.0
7.5
93.2
2.0
41.0
0.0
r02.5
2.5
50.0
t2.s
110.8
The different pavement materials available near the construction site are as follows.
(i)
l0o/o
6 a) Design the size and spacing of dowel bars at the Expansion joint of a CC pavement o1'
thickness 25 cm with radius of relative stiffness 80 cm, for a design wheel load of 500 kg.
Assume load capacity of the dowel systems as 40o/o of design wheel load. Joint width is 2.0
cr1l. Pemrissible shear, Flexural & bearing stresses in dowel bar are 1000 Kg/cmz. l4O0
Kg/cm2 and 100 Kgicm2 respectively. Assume the dia of bar as 2.5 cm.
(10M)
(sM)
Design the CC pavement thickness, expansion and contraction joint spacing. dowel and tie bars
for a wheel load of 5100kg. Present traffic intensity is 1050 cvpd. Maximum variation in
temperature between summer and winter is 35'C. Temperature differential values in the region
for slab thicknesses 15,20 and25 cm are 14.6.15.8 andl6.3'C respectively. Assume any other
data as per IRC recommendations.
(lsM)
Particulars
Capital
Drawin
Buildings
Furniture
Motor van
Bills Receivable
Interest
Debit Amount in Rs
1.00000
18,000
15.000
7,500
25.000
15"000
450
Sales
Purchases
Opening Stock
Management Expenses
Carriage inwards
Caniage Outwards
Bank Loan
Commission Received
Sundry debtors
Cash at Bank
Sundry creditors
Bad debts
Total
Credit Amount in Rs
1,00000
75.000
25,000
25.000
15,000
2.000
1.050
7.500
l'500
26.600
20,500
2,47,500
Adiustments
a) Closing stock was valued at Rs 25,000
b) Depreciate Buildins buv bv 107o
2,,47,500