Contents
1. Project location
2. Organization chart
3. Temporary facilities & Access roads
4. Working conditions
5. Construction schedule
6. Batching / mixing plan
7. Construction plan Upper dam
8. Construction plan Lower dam
9. Construction methology Water way
10. Construction methology P/H
() , .
UCPSPP project
1. Project location
() , .
1. Project location
() , .
1. Project location
LOWER DAM
TAILRACE TUNNEL
ADMINISTRATION
BUILDING
PENSTOCK
OUTLET
UNDER GROUND
POWERHOUSE
SURGE TANK
INTAKE
HEADRACE TUNNEL
UPPER DAM
() , .
UCPSPP project
2. Organization chart
() , .
2. Organization chart
Staff Plan
PD
COMMITTEE
LOT
1A
LOT
1B
1A +
1B
PM / DPM
Project Coordinator
QA / QC
Contract manager
Contract
Section manager
QA/QC
Site Activity
24
32
54
Cost
Administration
16
17
17
56
66
89
DEALIM
ASTALDI
WIKA
10
10
10
JV
36
46
69
PM
DPM
Project
Coordinator
Construction
Management
LOT 1A
Survey
Main Dams
Planning / Cost
Management
Planning
Schedule
Cost Control
Design
Administration
Administration
HSE
Equipment
LOT 1B
Survey
Waterway
PHC
Admin BLDG
Switch Yard
() , .
S/T
UCPSPP project
() , .
ACCESS ROAD #1
BY OTHER ( 5.4Km )
B/P
1A #1
C/P 1A
LOWERDAM
SITE OFFICE
EXPLOSIVES
MAGAZINES
TAR 1A #1
TAR 1B #2
MAIN OFFICE
B/P
1B#1
POWERHOUSE
SITE OFFICE
C/P
1B
TAR 1B #4
TAR 1B #3
TAR 1A #2
TAR 1B #6
TAR 1B #1
B/P
1A #2
TAR 1A #3
ACCESS ROAD #2
BY OTHER ( 2.0Km )
HEADRACE
SITE OFFICE
B/P
1B#2
TAR 1B #5
UPPERDAM
SITE OFFICE
LEGEND
LOT 1A
LOT 1B
() , .
TAR 1A #5
TAR 1A #4
PLAN
LOT 1A
Road Name
Location
TAR 1A #1 B=8m
L= 1,831m
TAR 1A #2 B=8m
L= 1,281m
TAR 1A #3 B=8m
L= 2,019m
TAR 1A #4 B=8m
L= 2,785m
TAR 1A #5 B=8m
L= 2,216m
TAR 1B #1 B=8m
L= 2,435m
TAR 1B #2 B=8m
L= 497m
To Switch Yard
TAR 1B #3 B=8m
L= 169m
To Administration Building
TAR 1B #4 B=8m
L= 979m
To Middle Adit
TAR 1B #5 B=8m
L= 540m
TAR 1B #6 B=8m
L= 896m
Access Road #1
B/P 1A #2
LOT 1B
() , .
UCPSPP project
4. Working conditions
() , .
4. Working conditions
Working time
Flood season
= 1,248 Hours)
= 1,248 Hours)
Dry season
= 2,080 Hours)
4,888 Hours
20days/month (10Hours/shift x 2shift/day x 20 days/month x 12month/year =
() , .
4,800 Hours
UCPSPP project
5. Construction schedule
() , .
5. Construction schedule
Construction Progress Schedule Lot 1A
2016
2015
10
11
12
10
11
12
M25
M26
M27
M28
M29
M30
M31
M32
M33
M34
M35
M36
M37
M38
M39
M40
M41
M42
M43
M44
3.3
RCC-Dam body
3.4
() , .
(M14~M25)
(M26~M33)
(M26~M34)
M55
M24
3.2
(M14~M16)
M55
M23
Diversion Tunnel
12
M22
3.1
M54
M21
Lower Dam
11
M20
3.
(M18~M24)
M52
M19
10
M18
2.5
(M16~M23)
M51
12
M17
RCC-Dam body
11
M16
2.4
(M6~M15)
M50
10
M15
M14
2.3
(M10~M11)
M49
M13
Diversion Channel
M12
2.2
(M1~M5.5)
M48
M11
Mobilization
M10
2.1
M47
M09
Upper Dam
M08
2.
M07
(M34)
M45
M06
M46
12
M05
(M26)
11
M04
10
1.1.2
M03
NTP
M02
1.1
Key-Dates
M01
1.
Description
2019
2018
No.
2017
(M45)
5. Construction schedule
Construction Progress Schedule Lot 1B
2015
10
11
12
10
11
12
10
11
12
10
11
12
10
11
12
M03
M04
M05
M06
M07
M08
M09
M10
M11
M12
M13
M14
M15
M16
M17
M18
M19
M20
M21
M22
M23
M24
M25
M26
M27
M28
M29
M30
M31
M32
M33
M34
M35
M36
M37
M38
M39
M40
M41
M42
M43
M44
M45
M46
M47
M48
M49
M50
M51
M52
M54
M55
M55
NTP
M02
1.1
Key-Dates
M01
1.
(M27)
2.1
Mobilization
2.2
Headrace Tunnel
2.3
Inspection Adit
2.4
Surge Tanks
2.5
Penstock Tunnel
3.
3.1
Ventilation Tunnel
3.2
3.3
Access Tunnel
3.4
Tailrace Tunnel
(M30.5)
(M30.5)
2019
Description
2018
No.
2017
2016
(M50)
(M11~M25)
(M11~M14)
(M12~M15
(Lining, M15~M17)
(M11~M26)
(M8~M10)
(M11~M14)
(Lining, M26~M35)
(Lining, M27~M34)
(M10~M27)
(M6~M14)
(M15~M17)
() , .
(Lining, M16~M29)
(Lining, M28~M41)
UCPSPP project
6. Batching/Mixing plan
() , .
CP#2
BP#3
BP#2
100m3/HR x 2units
for CVC
200m3/HR x 1unit,
Coarse aggregate
BP#1
150m3/HR x 2units for RCC
100m3/HR x 1unit for CVC
Quarry
U/G PH
<Lot1a>
CP#1 200/HR x 2units =100,000 ton/month
<Lot1b>
CP#1 200/HR x 1unit=50,000 ton/month
() , .
Crushing
Processing
Plan
Lot1a or Lot1b
Lot1a(Q=2,708,400ton)
Lot1a(Q=2,708,400ton)
CP (200ton/HR x 2units)
100,000ton/month x 27months
Location : Quarry
CP (200ton/HR x 2units)
100,000ton/month x 27months
Location : Quarry
Fine/ coarse aggregates
Lot1b(Q=674,000ton)
Lot1b(Q=674,000ton)
CP (200ton/HR x 1unit)
50,000ton/month x 14months
Location : Quarry
CP (200ton/HR x 1unit)
50,000ton/month x 14months
Location : at site
Only coarse aggregates
Quarry CP BP(L=27km)
Quarry CP BP (L=27km)
Site CP BP (L=2km)
Transportation
S/T
Combination
U$ 32,136,000
() , .
(253,000t+421,000t)
U$ 28,858,000 ( U$3,278,000)
Lot1a or Lot1b
Combination
Concrete
Volume
Lot 1a : 994,700 m3
Lot 1b : 316,500 m3
(RCC : 914,200 m3)
Lot 1a : 994,700 m3
Lot 1b : 316,500 m3
(RCC : 914,200 m3)
BP Operation
plan
Lot 1a
Cost
() , .
UCPSPP project
7. Construction plan
- Upper dam
() , .
Conveyor Belt
L=500m
Access Road
Inspection Road
L=1,200m W=8m
B/P
A=20,000
(150/hr 2unit)
Upper Dam
() , .
M16 / EL 735.6
2015
1
10
11
12
10
11
12
10
11
12
10
11
12
M07
M08
M09
M10
M11
M12
M13
M14
M15
M16
M17
M18
M19
M20
M21
M22
M23
M24
M25
M26
M27
M28
M29
M30
M31
M32
M33
M34
M35
M36
M37
M38
M39
M40
M41
M42
M43
M44
M45
M46
M47
M48
M49
M50
M51
M52
M54
M55
M55
M06
2.5
12
RCC-Dam body
M05
2.4
11
M04
2.3
10
Diversion Channel
M03
2.2
Mobilization
M02
2.1
Upper Dam
2019
M01
2.
2018
Description
2017
No.
2016
(M1~M5.5)
(M6~M15)
() , .
(M16~M23)
(M18~M24)
UCPSPP project
8. Construction plan
- Lower dam
() , .
Access Road
B/P
A=20,000
(150/hr 2unit)
Inspection Road
L=1,076m W=8m
Lower Dam
() , .
. Q = 520
M33 / EL 503.0
M26 / EL 417.0
2015
12
10
11
12
10
11
12
10
11
12
10
11
12
M06
M07
M08
M09
M10
M11
M12
M13
M14
M15
M16
M17
M18
M19
M20
M21
M22
M23
M24
M25
M26
M27
M28
M29
M30
M31
M32
M33
M34
M35
M36
M37
M38
M39
M40
M41
M42
M43
M44
M45
M46
M47
M48
M49
M50
M51
M52
M54
M55
M55
M05
3.4
11
RCC-Dam body
M04
3.3
10
M03
3.2
Diversion Tunnel
M02
3.1
Lower Dam
M01
3.
2019
Description
2018
No.
2017
2016
(M14~M16)
() , .
(M26~M33)
(M26~M34)
8. Construction plan
Detail
BP (150m3/HR, RCC)
BP (100m3/HR, CVC)
Conveyor belt system
Dump truck (15ton)
Fore mam
Operation for conveyor belt
Operation for equipment
Operation for BP
Driver
Skilled worker
Unskilled worker
Quantity
2units
1unit
1unit
3units
(50units)
1unit
3units
3units
5units
Sinohydro
Soma
Direct management
Peak : 1,184man
AVE. : 581man
2shift work
Equipment
Manpower
Remarks
() , .
UCPSPP project
9. Construction methology
Water way
() , .
HEADRACE TUNNEL
=8.6m
L1=1,217m
L2=1,157m
SURGE TANK
ID=15m, OD=17.5m
H=53m
Concrete lining
INSPECTION ADIT
B=8.5m, H=8.5m,
L=374m
Steel lining
PENSTOCK TUNNEL
=5.37m
L=385m
MIDDLE ADIT
B=4.5m, H=4.8m
() , .
BIFURCATION
TUNNEL
Headrace tunnel
(L=1,217m, 1,157m)
at 600m
Cross tunnel (L=40m)
Option I (Astaldi)
[ 3 Boom jumbo ]
Advance rate : 167m/month(AVE.)
Duration : 15months+2.5months
1 working crew
Headrace tunnel
(L1=600m, L2=600m)
Headrace tunnel
(L1=617m, L2=557m)
Option II (Subcontractor)
[ 3 Boom jumbo ]
Advance rate : 156m/month(AVE.)
Duration : 15months+2.5months
1 working crew
[ Leg drill ]
Advance rate : 90m/month(AVE.)
Duration : 14months+4.5months
2 working crew
() , .
Surge tank
Dimension (ID : 15m, OD : 17.5m, H=53.3m, 58.3m)
Method : Raise boring machine will be adapted in these vertical shaft
Phase I
Phase II
Enlargement(1400mm) along
pilot tunnel as shown above will
be performed.
() , .
Phase III
Penstock tunnel
Construction sequences
Middle adit
By jumbo drill
HEADRACE
TUNNEL
Upper part
PENSTOCK
TUNNEL
MIDDLE ADIT
TUNNEL
() , .
Penstock tunnel
1st phase
2nd phase
3rd phase
() , .
UCPSPP project
() , .
WORK 2 TUNNEL
B=7.0m, H=6.0m
ACCESS TUNNEL
B=7.0m, H=6.0m
POWERHOUSE
B=26m, H=51m,
L=165m
TRANSFORMER TUNNEL
B=7.0m, H=6.25m
TRANSFORMER
B=18m, H=6.5,
L=170m
VENTILATION
TUNNEL
B=5.4m, H=5.4m
AQUIFER TUNNEL
B=3.1m, H=3.3m
CABLE TUNNEL
B=4.1,m H=5.1m
TAILRACE TUNNEL
B=6.0m, H=6.0m
() , .
VENTILATION
TUNNEL
( EL 479 )
TAILRACE TUNNEL
( EL 433.85 )
ACCESS TUNNEL
VENTILATION
TUNNEL
TAILRACE TUNNEL
() , .
Access
Tunnel
1st stage
2nd stage
3rd stage
1A1B2A
3A
(V/T)
2B3B
(V/T)
47
(V/T or A/T)
6th stage
5th stage
4th stage
1213
(T/T)
111410
(T/T)
5689
(A/T)
7th stage
Tailrace
Tunnel
1516
(T/T)
() , .
* ( ) ; Mucking
V/T Ventilation tunnel
A/T Acess tunnel
T/T Tailrace tunnel
UCPSPP project
Appendix-1
Dam concrete work
: Conveyor belt systems
() , .
() , .
() , .
() , .
UCPSPP project
Appendix-2
Equipment lists
() , .
Item
Equipment Name
Size
Status
Required
Number
Partner
Aggregate
producing
CP
200ton/HR
Batching/
Mixing
BP (RCC)
BP (CVC)
Chiller Plant
Cement silo
150m3/HR
100m3/HR
3500ton
2
1
3
1
2
1
1
1
Transportation
Conveyor belt
Telescopic
conveyor system
540m
36m
1
1
1
1
Placing
Dozer
Vibro Roller
10~15ton
3
5
3
5
Others
Tower crane
Mobile crane
73m x 5ton
50ton
1
1
1
2
() , .
Subcon.
Others
Item
Drilling/
Blasting
Mucking
Supporting/
Lining
Others
Equipment Name
2 Boom Jumbo
3 Boom Jumbo
Surface drill
RBM
Size
Required
Number
Status
Partner
4
1
64~102mm
200m
4
1
4
2
Mini Excavator
Wheel loader
Articulated dumper
0.3m3
4.3m3
27ton
2
2
10
2
2
30m3/h
100m3/h
7m3
65m3/h
2
2
5
1
~198m2
Ventilation
Electric supply
() , .
1 L/S
1 L/S
Subcon.
Others
10
2
5
1
1 L/S
1 L/S
UCPSPP project