JANUARY 4, 2015
SUMMARY OF BORLOG
Project
Location
No.
1
: Security Building
: Kec. Batui, Kab.Luwuk
Type Soil,
Penetration,
N-SPT
BH.06
BH.07
1.00 - 2.00
1.00 - 2.00
1.00
1.00
33 - 39
37 - 44
2.00 - 4.00
2.00 - 9.00
Depth (meter)
2.00
7.00
N-SPT
3-4
2-3
4.00 - 9.00
4.00 - 9.00
Depth (meter)
5.00
5.00
N-SPT
8 - 20
8 - 44
9.00 - 15.00
9.00 - 12.00
6.00
3.00
22 - 41
33 - 44
GWL (meter)
Gravell Clay, (elevation,
meter)
Depth (meter)
N-SPT
Sandy Clay, (elevation,
meter)
Depth (meter)
N-SPT
SOIL INVESTIGATION, SOIL LABORATORY TESTING, SOIL TESTING EQUIPMENT SUPPLIER & TOPOGRAPHY.
BANDUNG : Jl. Terusan Batununggal, No. IA, Bojong, CP. 0878 2266 5264; 0813 9145 4460
SAMARINDA : JL. Wahid Hasyim No. 24 (Belakang Primagama) Sempaja, 75119, Telp. 0541 7761610; 0812 5827 2742
MAKASSAR : Jl. Todopulli 10 No. 67, CP. 0813 9145 4460; 081258272742
Email : geosindoutama@yahoo.com ; geo_sindo@yahoo.com ; gu_bdg@yahoo.com
BORING METHODE
G.W.L. (m)
THICKNESS (m)
DEPTH
(-m)
TOTAL DEPTH ( - m )
VISUAL DESCRIPTION
BOR MASTER/DRILLER
SOIL & MAT ENGINEER
SHEET NO.
brownish white
Greenish Grey
4
UDS 01
5
6
Grey
9
UDS 02
10
11
11
12
10
12
Grey
13
13
14
14
UDS 03
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
15
16
DATE COMPLETED
SPT No.
GROUND ELEVATION
BH-06
DATE COMMENCED
UNDISTURBED
SAMPLE
COORDINATE
COLOR
LOCATION
Security Building
Kec. Batui, Kab.Luwuk
X = 0453286 ; Y = 9861217
Rotary Core Drilling
15.00 m
SYMBOL
PROJECT
N VALUE
N.2
N.3
Cm
Cm
14
19
15
15
15
10
17
22
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
11
15
15
15
11
11
15
15
15
10
12
13
15
15
15
11
14
14
15
15
15
13
15
18
15
15
15
15
17
20
15
15
15
16
19
22
15
15
15
NUMBER OF BLOWS
0
0
33
-1
39
-2
-3
-4
-5
10
-6
12
-7
16
-8
20
-9
22
-10
25
-11
28
-12
33
-13
37
-14
41
-15
20
40
60
80
100
SOIL INVESTIGATION, SOIL LABORATORY TESTING, SOIL TESTING EQUIPMENT SUPPLIER & TOPOGRAPHY .
BANDUNG : Jl. Terusan Batununggal, No. IA, Bojong, CP. 0878 2266 5264; 0813 9145 4460
SAMARINDA : JL. Wahid Hasyim No. 24 (Belakang Primagama) Sempaja, 75119, Telp. 0541 7761610; 0812 5827 2742
MAKASSAR : Jl. Todopulli 10 No. 67, CP. 0813 9145 4460; 081258272742
Email : geosindoutama@yahoo.com ; geo_sindo@yahoo.com ; gu_bdg@yahoo.com
Security Building
Kec. Batui, Kab.Luwuk
X = 0453235 ; Y = 9861298
Rotary Core Drilling
DATE COMPLETED
BOR MASTER/DRILLER
SOIL & MAT ENGINEER
N.1
Cm
1
brownish white
Sandy clay
Greenish Grey
4
5
Grey
UDS 01
Grey
9
UDS 02
10
11
Grey
10
11
12
12
13
14
14
15
15
16
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
SPT No.
VISUAL DESCRIPTION
UNDISTURBED
SAMPLE
SHEET NO.
COLOR
SYMBOL
G.W.L. (m)
THICKNESS (m)
DEPTH (-m)
1
DATE COMMENCED
12.00 m
TOTAL DEPTH ( - m )
BH-07
N VALUE
N.2
N.3
Cm
Cm
10
16
21
15
15
15
15
19
25
15
15
15
45
45
45
15
15
15
15
15
15
15
15
15
15
15
15
10
15
15
15
10
10
11
15
15
15
11
11
15
15
15
12
15
18
15
15
15
14
19
25
15
15
15
NUMBER OF BLOWS
0
0
37
-1
44
-2
-3
-4
-5
12
-6
16
-7
19
-8
21
-9
22
-10
33
-11
44
-12
20
40
60
80
100
PROJECT
LOCATION
:
:
0 20 40 60 80
0
-1
-2
-3
-4
-1
-2
-3
-4
-5
-5
-6
-6
-7
-7
-8
-9
-9
-8
-10
-10
-11
-11
-12
-12
-13
-14
-15
BH.06
BH.07