GUP PLANNING FOR JULY- DECEMBER 2009

MONTH

JULY

AUGUST

SEPTEMBER

OCTOBER

NOVEMBER

Sampling
Lab Analysis
ACTIVITIES

Collection Of Data From PKD &


Pejabat Daerah
Compilation Of
All Data

1. Sampling Around Sepang and Kuala Langat => 5 sampling points, 2X sampling for each place.
2. Lab Analysis
a. Microbiological + Physicochemical Analysis July to Mid-August 2009
b. Heavy Metal + Pesticide Analysis Mid-August to September 2009 (Month of Ramadhan)
3. Collection of Data From PKD & Pejabat Daerah August to September 2009
4. Compilation of All Data collected October 2009
FIELD WORKS
15 July 2009 Sampling of Raw Water in Sepang (1st sampling)
20 July 2009 Kuala Langat Pre-Survey with PPKP from PKD Kuala Langat
30 July 2009 Kuala Langat Raw Water Pre-Survey
05 August 2009 Sampling at Kuala Langat (1st Sampling)
10 August 2009 Sampling at Sepang (2nd Sampling)
17 August 2009 Sampling at Sepang (loji)
19 August 2009 Sampling at Kuala Langat (2nd Sampling)