Item. No.
Material
Welding Electrode
Specification
Dia. 35 , Dia. 40, Dia. 50, Dia.60 cm
Dia. 3.2mm and Dia. 4mm
AND SUPPLIER
Supplier
PT Wika Beton
PT KOBE Steel
APPENDIX F
DESIGNATION OF SUB - CONTRACTORS
Item. No.
PT Wika Beton
PT KOBE Steel
No
1
Description
Rate
* Pile driver
1.00
Day
Rp
7,000,000.00
* Service Crane
1.00
Day
Rp
6,000,000.00
1.00
Day
Rp
1,500,000.00
4.00
Liter
Rp
40,000.00
140.00
Liter
Rp
11,000.00
* Operator
2.00
Day
Rp
150,000.00
* Rigger
4.00
Day
Rp
100,000.00
* Foreman
1.00
Day
Rp
200,000.00
1.00
Day
Rp
100,000.00
Unit
Piling Equipment
SAE Oil
Qty
Man Power
Overhead
Total
Production / day ( m )
Unit Rate
Rounded
60 CM
Total
Tenaga
Rp
7,000,000.00
Rp
6,000,000.00
Rp
1,500,000.00
Rp
160,000.00
Rp
1,540,000.00
Rp
300,000.00
Rp
400,000.00
Rp
200,000.00
Rp
100,000.00
Rp
17,200,000.00
216.00
Rp
79,629.63
Rp
80,000.00
Supervisor
200,000.00
Operator
150,000.00
HSDP
20,000,000.00
Service crane
12,000,000.00
Genset
500,000.00
Perkakas
100,000.00
200000
300000
20,000,000.00
12,000,000.00
500,000.00
100,000.00
32,600,000.00
APPENDIX E
SCHEDULE OF PRINCIPAL PLANT AND EQUIPMENT
INTENDED FOR THE PROJECT
Item. No.
Description
Quantity
Capacity / Size
Manufacture
30 Ton
Nishha - Japan
Diesel Hammer
5.3 Ton
DD - China
Service Crane
35 TON
Kobelco - Japan
Steel Plate
1.22X2.44 M
Genset
75 Kva
Miller - USA
Welding Machine
400 Amp
Miller - USA
QUIPMENT
Year of Manufacture
Owned / Hired
1998
Owned
2012
Owned
1998
Owned
2010
Owned
2010
Owned
2010
Owned
PT. BERDIKARI
PONDASI PERKASA
TANDA TERIMA
Kepada Yth Kepada
PT Valmet Technology Center
ANZ Tower, Lt. 9, Jl. Jendral Sudirman No. 33
Jakarta 10220
Attn.: Mr. Pekka Kivioja
No
Nama Dokumen
Banyaknya
CD BOQ
1 ( Satu )
Note :
Diterima tgl
Oleh :
Jakarta,04 September
Dikirim oleh
Ir. Mahmud
2015
APPENDIX C
LIST OF STAFF AND PERSONNEL
Personnel to be employed on the construction contract
Personnel
Engineers
Technician
Technical Competence
Qualifications
Number
Project Manager
Site Manager
Supervisor
Safety
Surveyor
Admin
Operator
Rigger
Mechanic
Driver
Welder
NO TAHUN
PROYEK
Lokasi
2010
Jakarta
2010
Bekasi
2011
2011
Kedutaan Korea
2011
Sepinggan
2012
Sepinggan
2012
Banten
2013
Jakarta
2013
L Maringgai
10
2013
Mall PS Palembang
Palembang
11
2013
Palembang
12
2013
Palembang
13
2014
Rusunawa Jatinegara
Jakarta
14
2014
Banten
15
2014
Apartemen Ciledug
Jakarta
16
2014
Jakarta
Tangerang
Jakarta
Lampung
UN TERAKHIR
CLIENT
PT CBM
PT Waskita
PT Adhimix
Kedutaan Korea
PT Wika
PT Wika
PT Toyo
PT Wika
PT Rekayasa
PT Waskita
PT PP
PT Adhi Karya
PT PP
PT Penta Ocean
PT Waskita
PT WIka
NO
URAIAN
SATUAN
HARGA SATUAN
Tenaga
1
Pekerja
Hr
100,000.00
Tukang
Hr
125,000.00
Mandor
Hr
200,000.00
Operator
Hr
150,000.00
Mekanik
Hr
150,000.00
Alat
1
Hr
20,000,000.00
Crane Service
Hr
10,000,000.00
KETERANGAN
120,000.00
3,360,000.00
1,000,000.00
28,000,000.00
240,000.00
6,720,000.00
1,200,000.00
33,600,000.00
1,200,000.00
33,600,000.00
8,000,000.00
Duration
No
Description
Qty
Unit
( Day )
1 Land Clearing
1.00
Ls
3.00
1.00
Ls
7.00
1.00
Ls
7.00
24.00 Points
14.00
24.00 Points
4.00
168.00 Points
14.00
168.00 Points
14.00
871.00 Points
28.00
II
III
IV
1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4
237.00 Points
587.00 Points
17.00 Points
30.00 Points
871.00 Points
43.00
24.00 Points
7.00
1.00
Ls
7.00
PT BERDIKARI PONDASI P
Remark
PROJECT MANAGER
Ir. Mahmud
SITE MANAGER
Ir. Harris
ADMIN / LOGISTIK
SUPERVISOR
SURVEYOR
Karno
Latif
Afifudin
WELDER
WELDER
MECHANIC
HELPER
TIME SCHEDULE
PILING WORK CIAWI - SUKABUMI TOLL ROAD PACKAGE 2 - PACKAGE 3
PT BERRDIKARI PONDASI PERKASA
No.
1
2
3
Description
Mobilization Work
Site Preparation
Package 2
1.000
Ls
1.000
m'
8,388.000
m'
341.000
Pcs
12.000
m'
263.000
m'
27,152.000
m'
1,392.000
PDA Test
Turap (sheet pile) Beton lengkap sampai pemancangan
(Concrete sheet piling)
Pcs
30.000
m'
263.000
Demobilization
Ls
1.000
Penyediaan & Pemancangan Tiang Pancang Beton Bulat Pretensioned, Pile Test,
dia 50 cm
(Provision & Piling of Round Pretensioned Concrete Pile, Pile Test, diameter 50 cm)
PDA Test
Turap (sheet pile) Beton lengkap sampai pemancangan
(Concrete sheet piling)
Package 3
STRUKTUR BETON (CONCRETE STRUCTURE)
Pemancangan Tiang Pancang Beton Bulat Pretensioned, dia 50 cm
(Piling of Round Pretensioned Concrete Pile, dia 50 cm)
Penyediaan & Pemancangan Tiang Pancang Beton Bulat Pretensioned, Pile Test,
dia 50 cm
(Provision & Piling of Round Pretensioned Concrete Pile, Pile Test, diameter 50 cm)
Qty
Ls
Unit
II
III
IV
VI
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
Remark