Anda di halaman 1dari 19

APPENDIX G

LIST OF MATERIAL, SPECIFICATION AND SUPPLIER

Item. No.

Material

Spun Pile K-600 ; L+/- 24 m

Welding Electrode

Specification
Dia. 35 , Dia. 40, Dia. 50, Dia.60 cm
Dia. 3.2mm and Dia. 4mm

AND SUPPLIER

Supplier
PT Wika Beton
PT KOBE Steel

APPENDIX F
DESIGNATION OF SUB - CONTRACTORS

Item. No.

Work to Sub - Let

Name and Adress of Proposed Sub - Contractor

Fabrication of Piling Material

PT Wika Beton

Fabrication of Welding Electrode

PT KOBE Steel

UNIT RATE ANALYSIS


PILING WORK FOR SPUN PILE DIA. 60 CM

Type of work : Piling


Location
: Cikarang

No
1

Description

Rate

* Pile driver

1.00

Day

Rp

7,000,000.00

* Service Crane

1.00

Day

Rp

6,000,000.00

* Diesel Hammer 5.3 Ton Capacity

1.00

Day

Rp

1,500,000.00

4.00

Liter

Rp

40,000.00

140.00

Liter

Rp

11,000.00

* Operator

2.00

Day

Rp

150,000.00

* Rigger

4.00

Day

Rp

100,000.00

* Foreman

1.00

Day

Rp

200,000.00

1.00

Day

Rp

100,000.00

Fuel & Lubrication


Fuel

Unit

Piling Equipment

SAE Oil

Qty

Man Power

Overhead

Total
Production / day ( m )
Unit Rate
Rounded

60 CM

Total

Tenaga

Rp

7,000,000.00

Rp

6,000,000.00

Rp

1,500,000.00

Rp

160,000.00

Rp

1,540,000.00

Rp

300,000.00

Rp

400,000.00

Rp

200,000.00

Rp

100,000.00

Rp

17,200,000.00
216.00

Rp

79,629.63

Rp

80,000.00

Supervisor

200,000.00

Operator

150,000.00

HSDP

20,000,000.00

Service crane

12,000,000.00

Genset

500,000.00

Perkakas

100,000.00

200000

300000

20,000,000.00

12,000,000.00

500,000.00

100,000.00
32,600,000.00

APPENDIX E
SCHEDULE OF PRINCIPAL PLANT AND EQUIPMENT
INTENDED FOR THE PROJECT

Item. No.

Description

Quantity

Capacity / Size

Manufacture

Pile Driver Nissha D308

30 Ton

Nishha - Japan

Diesel Hammer

5.3 Ton

DD - China

Service Crane

35 TON

Kobelco - Japan

Steel Plate

1.22X2.44 M

Genset

75 Kva

Miller - USA

Welding Machine

400 Amp

Miller - USA

QUIPMENT

Year of Manufacture

Owned / Hired

1998

Owned

2012

Owned

1998

Owned

2010

Owned

2010

Owned

2010

Owned

PT. BERDIKARI

PONDASI PERKASA

Jl.P.Tubagus Angke No.99 - Jakarta Barat

TANDA TERIMA
Kepada Yth Kepada
PT Valmet Technology Center
ANZ Tower, Lt. 9, Jl. Jendral Sudirman No. 33
Jakarta 10220
Attn.: Mr. Pekka Kivioja
No

Nama Dokumen

Banyaknya

Asli Dokumen Tender Pekerjaan Piling


NEW WORKSHOP AND SERVICE CENTER PROJECT - PT VALMET TECHNOLOGY

1 (Satu ) Set Asli

Copy Dokumen Tender Pekerjaan Piling


NEW WORKSHOP AND SERVICE CENTER PROJECT - PT VALMET TECHNOLOGY

2 ( Dua ) Set Copy

CD BOQ

1 ( Satu )

Note :

Diterima tgl
Oleh :

Jakarta,04 September
Dikirim oleh

Ir. Mahmud

(Nama jelas & stempel )

PT Valmet Technology Center


ANZ Tower, Lt. 9, Jl. Jendral Sudirman No. 33
Jakarta 10220
Attn.: Mr. Pekka Kivioja

2015

APPENDIX C
LIST OF STAFF AND PERSONNEL
Personnel to be employed on the construction contract

Personnel

Engineers

Technician

Technical Competence
Qualifications

Number

Project Manager

Site Manager

Supervisor

Safety

Surveyor

Admin

Operator

Rigger

Mechanic

Driver

Welder

DAFTAR PENGALAMAN PEKERJAAN JACKING PILE 5 TAHUN TERAKHIR


PT BERDIKARI PONDASI PERKASA

NO TAHUN

PROYEK

Lokasi

2010

Apartemen Sunter Park View

Jakarta

2010

Gedung Pemda Bekasi

Bekasi

2011

Apartemen Anami Sudirman

2011

Kedutaan Korea

2011

Bandara Sepinggan Tahap I

Sepinggan

2012

Bandara Sepinggan Tahap II

Sepinggan

2012

PBI BDE Cilegon

Banten

2013

Bandara Soekarno Hatta

Jakarta

2013

L Maringgai

10

2013

Mall PS Palembang

Palembang

11

2013

Gedung Bank Mandiri Palembang

Palembang

12

2013

Gedung HSE Pertamina

Palembang

13

2014

Rusunawa Jatinegara

Jakarta

14

2014

Chandra Asri Petrochemical Building

Banten

15

2014

Apartemen Ciledug

Jakarta

16

2014

Perluasan Terminal 3 Bandara Soetta

Jakarta

Tangerang
Jakarta

Lampung

UN TERAKHIR

CLIENT
PT CBM
PT Waskita
PT Adhimix
Kedutaan Korea
PT Wika
PT Wika
PT Toyo
PT Wika
PT Rekayasa
PT Waskita
PT PP
PT Adhi Karya
PT PP
PT Penta Ocean
PT Waskita
PT WIka

HARGA SATUAN UPAH

NO

URAIAN

SATUAN

HARGA SATUAN

Tenaga
1

Pekerja

Hr

100,000.00

Tukang

Hr

125,000.00

Mandor

Hr

200,000.00

Operator

Hr

150,000.00

Mekanik

Hr

150,000.00

Alat
1

Alat Pancang HSPD

Hr

20,000,000.00

Crane Service

Hr

10,000,000.00

KETERANGAN

120,000.00

3,360,000.00

1,000,000.00

28,000,000.00

240,000.00

6,720,000.00

1,200,000.00

33,600,000.00

1,200,000.00

33,600,000.00

8,000,000.00

PILING WORK SCHEDULE


NEW WORKSHOP AND SERVICE CENTER PROJECT - PT VALMET TECHNOLOGY

Duration
No

Description

Qty

Unit
( Day )

1 Land Clearing

1.00

Ls

3.00

2 Mobilization of Piling equipment

1.00

Ls

7.00

3 Preparation Work ( Setup equipment, setting out, etc )

1.00

Ls

7.00

4 Supply of Indicator Pile ; L=24m ( Based on drawing No.1733.0/1/P-01 )

24.00 Points

14.00

24.00 Points

4.00

6 Supply of CCSP; H=450mm, W=996mm, L=12m & L=10m

168.00 Points

14.00

7 Driving of CCSP; H=450mm, W=996mm, L=12m & L=10m

168.00 Points

14.00

8 Supply of Main Pile K-600 ; L 24m

871.00 Points

28.00

II

III

IV

1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4

Dia. 350 = 9 ; Dia. 400 = 12 ; Dia. 500 = 1 , Dia. 600 = 2


5 Driving Indicator Pile 24 Nos ; L=24m ( 9+9+6 )

* Dia. 350,Mcrack 3.71 Ton m

237.00 Points

* Dia. 400,Mcrack 5.5 Ton m

587.00 Points

* Dia. 500,Mcrack 10.5 Ton m

17.00 Points

* Dia. 600,Mcrack 17.5 Ton m

30.00 Points

9 Driving of Main Pile K-600 ; L 24m


10 PDA Test
11 Demobilization

Note : Amount of Piling Equipment = 2 Unit

871.00 Points

43.00

24.00 Points

7.00

1.00

Ls

7.00

PT BERDIKARI PONDASI P

ILING WORK SCHEDULE

VICE CENTER PROJECT - PT VALMET TECHNOLOGY

Remark

Production 8 point/day /rig


Production 12 point/day /rig

Production 10 point/day /rig

PT BERDIKARI PONDASI PERKASA

SITE ORGANIZATION CHART


Piling Work for New workshop dan Service Center
At Industrial Estate De ltamas Lot 71, Kitic
Cikarang Bekasi
PT BERDIKARI PONDASI PERKASA

PROJECT MANAGER
Ir. Mahmud

SITE MANAGER
Ir. Harris

ADMIN / LOGISTIK

SUPERVISOR

SURVEYOR

Karno

Latif

Afifudin

PILE DRIVER CREW


OPERATOR
RIGGER

PILE DRIVER 2 CREW


OPERATOR
RIGGER

SERVICE CRANE CREW


OPERATOR
RIGGER

TEST PILE CREW


FOREMAN
RECORDMEN

WELDER

WELDER

MECHANIC

HELPER

TIME SCHEDULE
PILING WORK CIAWI - SUKABUMI TOLL ROAD PACKAGE 2 - PACKAGE 3
PT BERRDIKARI PONDASI PERKASA

No.
1
2
3

Description
Mobilization Work
Site Preparation
Package 2

1.000

Ls

1.000

m'

8,388.000

m'

341.000

Pcs

12.000

m'

263.000

m'

27,152.000

m'

1,392.000

PDA Test
Turap (sheet pile) Beton lengkap sampai pemancangan
(Concrete sheet piling)

Pcs

30.000

m'

263.000

Demobilization

Ls

1.000

Penyediaan & Pemancangan Tiang Pancang Beton Bulat Pretensioned, Pile Test,
dia 50 cm
(Provision & Piling of Round Pretensioned Concrete Pile, Pile Test, diameter 50 cm)
PDA Test
Turap (sheet pile) Beton lengkap sampai pemancangan
(Concrete sheet piling)

Package 3
STRUKTUR BETON (CONCRETE STRUCTURE)
Pemancangan Tiang Pancang Beton Bulat Pretensioned, dia 50 cm
(Piling of Round Pretensioned Concrete Pile, dia 50 cm)
Penyediaan & Pemancangan Tiang Pancang Beton Bulat Pretensioned, Pile Test,
dia 50 cm
(Provision & Piling of Round Pretensioned Concrete Pile, Pile Test, diameter 50 cm)

Qty

Ls

STRUKTUR BETON (CONCRETE STRUCTURE)


Pemancangan Tiang Pancang Beton Bulat Pretensioned, dia 50 cm
(Piling of Round Pretensioned Concrete Pile, dia 50 cm)

Unit

Note : Piling Production +/- 200m / day/ rig

II

III

IV

VI

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

Remark

Anda mungkin juga menyukai