SELECTION
MINERAL RECOVERY ACTIVITIES :
1. Physical access development to
the mineralized zone
2. Ore Liberation from encl. host rock
3. Ore Transportation to surface
Excav. shapes
Excav. Sizes
Excav. Orientation
Excav. Function
- Ore sources/ stopes
- Stope access & service openings
or stope development
- Permanent access & service
openings
METODA
PENAMBANGAN
BAWAH TANAH
UNDERGROUND MINING METHODS
unsupported
naturally supported
artificially supported
Shrinkage stoping
VCR stoping
Sublevel caving
Longwall
mining
Block caving
SUBLEVEL OPEN
STOPING
KRITERIA APLIKASI :
METODA
YANG
EKONOMIS
& EFISIENSI
PENAMBANGAN
TINGGI.
KONDISI
KERJA BAIK,
VENTILASI
MUDAH
DIATUR.
BAHAYA
KEBAKARAN
KECIL.
ALAT
MEKANIS
TAMBANG
MUDAH
DIBAWA
KELUAR
MASUK
TAMBANG.
SHRINKAGE STOPING
KRITERIA APLIKASI :
1. Orebody berbentuk Vein, inclined
tabular dan orebody massive
2. Orebody dip 35 90 degrees
3. Orebody atau stope spans adalah
4 40 m tapi biasanya 10 12 m
4. Orebody atau country rock relatif kuat
5. Mining recovery relatif tinggi
SHRINKAGE STOPING
FUNGSI BROKEN ORE IN STOPE :
1.
2.
3.
4.
KEUNTUNGAN :
1.
2.
3.
4.
5.
6.
KERUGIAN :
1. 70 % ore masih tertinggal dalam stope
2. Bila ore terlalu lama dalam stope,
kemungkinan akan kompak kembali
3. Country rock akan mudah runtuh,
karena getaran peledakan (stope retak)
URUTAN OPERASI
PENAMBANGAN
KEADAAN STOPE SETELAH
VEIN WASTE DILEDAKKAN
DAN DIISIKAN KE MINEOUT,
LALU DITUTUP DENGAN
PAPAN.
ORE SIAP DILEDAKKAN.
CATATAN :
1. PRODUKSI PER MAIN SHIFT DENGAN INI RENDAH, TAPI ORE YANG DIDAPATKAN BERSIH
(TANPA DILUTION)
2. WALLS ROCK DAN ORE HARUS STAND VERY WELL (HARUS TERJAGA), KALAU PERLU
GUNAKAN STULLS TIMBER.
V. CAVING METHODS
5.1 BATASAN
CAVING METHODS ADALAH SUATU CARA PENAMBANGAN BIJIH
DIMANA PERTAMA MELAKUKAN PENGGALIAN BAGIAN BAWAH TANAH
(UNDERCUTTING) YANG KEMUDIAN AKAN MENYEBABKAN
RUNTUHNYA BIJIH DI BAGIAN ATASNYA KARENA BERATNYA SENDIRI
ATAU AKIBAT TEKANAN DARI SMAPING ATAU GABUNGAN DARI
KEDUANYA.
METODA INI DIGUNAKAN UNTUK PENAMBANGAN ENDAPAN BIJIH
YANG LEMAH ATAU SANGAT LEMAH.
ADA 4 CARA PENAMBANGAN YANG TERMASUK DALAM JENIS
METODA INI, YAITU :
1. TOP SLICING.
2. SUB LEVEL CAVING.
3. BLOCK CAVING.
4. LONG WALL.
V. CAVING METHODS
5.2 TOP SLICING
TOP SLICING ADALAH SUTU CARA PENAMBANGAN UNTUK ENDAPAN BIJIH DAN
COUNTRY ROCK TERUTAMA OVERBURDEN-NYA YANG SANGAT LEMAH.
PENAMBANGAN DILAKUKAN SELAPIS DEMI SELAPIS (SLICE BY SLICE) DARI ATAS KE
BAWAH PADA STOPE YANG DI SANGGA.
JIKA STOPE TELAH SELESAI DI GALI, MAKA MATERIAL DI ATASPENYANGGA DIBIARKAN
RUNTUH (TO CAVE) MENUTUPI STOPE YANG KOSONG.
V. CAVING METHODS
5.2.2 PEMAKAIAN METODA TOP SLICING
METODA INI UMUMNYA DIGUNAKAN UNTUK PENAMBANGAN ENDAPAN-ENDAPAN BIJIH SEBAGAI
BERIKUT :
1. ENDAPAN BIJIH DAN OVERBURDEN LEMAH SEHINGGA AKAN SEGERA RUNTUH SECARA
PERLAHAN BILA DIBUAT LOBANG GALIAN DIBAWAHNYA. ENDAPAN BIJIH TERSEBUT
DAPAT BERUPA VEIN YANG LEBAR ATAU ORE BODY YANG MASIF.
2. ENDAPAN BIJIH YANG BERUKURAN BESAR, LETAKNYA BOLEH MENDATAR ATAU DENGAN
DIPNYA YANG BESAR, HARUS MEMILIKI COUNTRY ROCK YANG AGAK KUAT, UNTUK
MENGHINDARI DILUTION YANG CUKUP SERIUS.
3. BENTUK ENDAPANNYA TERATUR DAN JELAS BATA-BATASNYA, SERTA TIDAK
MEMERLUKAN SELECTIVE MINING (ENDAPANNYA AGAK HOMOGIN).
4. NILAI BAHAN GALIAN CUKUP TINGGI, DAN DIPERLUKAN MINING RECOVERY TINGGI
SERTA DILUTION MINIMAL WALAUPUN ONGKOS PENAMBANGAN TINGGI.
5. DAPAT MENYEBABKAN SURFACE SUBSIDENCE, MAKA PADA PERMUKAAN TANAH
TIDAK BOLEH ADA BANGUNAN APAPUN.
6. UNTUK PENAMBANGAN YANG MEMENTINGKAN MENDAPATKAN ENDAPAN YANG BERSIH.
V. CAVING METHODS
5.2.3 KEUNTUNGAN & KERUGIAN PEMAKAIAN METODA TOP SLICING
KEUNTUNGAN :
1. MINING RECOVERY SANGAT TINGGI : 90 % - 98%.
2. PENAMBANGAN DAPAT CEPAT DENGAN PRODUKSI BESAR.
3. SUATU METODA PENAMBANGAN YANG SIMPEL DAN AMAN (SIMPLE & SAFE WORKING).
4. KEMUNGKINAN DILUTION SEDIKIT.
5. SAMPLING SECARA KONTINU DENGAN INTERVAL YANG AGAK RAPAT SELALU DAPAT
DILAKUKAN UNTUK MENGETAHUI BATAS-BATAS ENDAPAN.
KERUGIAN :
1. MEMERLUKAN TIMBER YANG BANYAK DAN BAHAYA KEBAKARAN BESAR.
2. MENGAKIBATKAN SURFACE SUBSIDANCE.
3. VENTILASI PADA TEMPAT KERJA KURANG BAIK.
4. BIAYA PENAMBANGAN MAHAL.
5. DEVELOPMENT PERIODE SANGAT LAMA.
V. CAVING METHODS
5.3 SUB-LEVEL CAVING
ADALAH SUATU METODA PENAMBANGAN DIMANA PENGAMBILAN BIJIH DI MULAI DARI
BAGIAN ATAS ORE BODY, MAJU MENGARAH LATERAL, DAN KE BAWAH (IDENTIK DENGAN
TOP SLICING)
PERBEDAANNYA DENGAN TOP SLICING, BAHWA KESELURUHAN DARI TEBAL BIJIH
DIANTARA SUB-LEVEL DI AMBIL SECARA CAVING. PERBANDINGAN ANTARA TOP SLICING
DAN SUBLEVEL CAVING SEPERTI TERLIHAT PADA GAMBAR DI BAWAH INI.
V. CAVING METHODS
V. CAVING METHODS
5.3.3 BEBERAPA CATATAN UNTUK SUBLEVEL CAVING
2. PADA SUB-LEVEL CAVING, HAL POKOK YANG PERLU DIINGAT BAHWA CAVING DALAM
HAL INI TO CAVE DALAM BLOK-BLOK DARI UKURAN SEDANG.
KEMUDIAN MEMBENTUK LENGKUNGAN-LENGKUNGAN PADA DAERAH YANG BIJIHNYA
TELAH DIAMBIL. HAL INI MEMBERIKAN WAKTU YANG CUKUP UNTUK PENGAMBILAN
BIJIH SECARA KESELURUHAN.
V. CAVING METHODS
5.3.3 BEBERAPA CATATAN UNTUK SUBLEVEL CAVING
3. SUBLEVEL INTERVAL YANG TERKECIL TERDAPAT PADA SLICING & STIPPING DAN
YANG TERBESAR TERDAPAT PADA STOPING & CAVING.
4. PADA SLICING & STIPPING KONTROL MERUPAKAN HAL YANG POKOK, SEDANGKAN
PADA STOPING & CAVING YANG UTAMA KITA TENTUKAN CARA UNTUK MENG-CAVING.
5. KEHILANGAN BIJIH BERVARIASI ANTARA 5 % - 30 % TERGANTUNG PADA JENIS
DEPOSITE YANG DITAMBANG.
6. METODA INI CUKUP EFISIEN DAN KECEPATAN PENAMBANGAN LEBIH MEMUNGKINKAN
DIBANDINGKAN TOP SLICING DAN BLOCK CAVING YAITU DENGAN PENAMBANGAN
PADA ARAH VERTIKAL.
V. CAVING METHODS
5.3.3 BEBERAPA CATATAN UNTUK SUBLEVEL CAVING
7. METODA SUB-LEVEL CAVING TIDAK DAPAT DIGUNAKAN BILA SUBSIDANCE TIDAK
DIIZINKAN.
V. CAVING METHODS
5.3.4 KEUNTUNGAN & KERUGIAN PEMAKAIAN METODA SUB-LEVEL
CAVING
KEUNTUNGAN :
1. METODA INI CUKUP EKONOMIS.
2. OUT PUT CUKUP BESAR.
3. VENTILASI CUKUP BAIK.
4. BAHAYA KEBAKARAN LEBIH KECIL.
5. JUMLAH TIMBER YANG DIGUNAKAN LEBIH KECIL.
KERUGIAN :
1. MEMERLUKANBIJIH YANG HILANG CUKUP BANYAK DAN DILUTION LEBIH BESAR.
2. KONTROL CAVING LEBIH SULIT.
3. SHORTING HAMPIR TIDAK MUNGKIN.
4. BAHAYA LEBIH BESAR.
5. PENGGUNAANNYA LEBIH KHUSUS.
V. CAVING METHODS
5.4 BLOCK CAVING
BLOCK CAVING ADALAH SUATU CARA PENAMBANGAN DIMANA
SUATU ORE YANG BERBENTUK BLOCK DIAMBIL BAGIAN
BAWAHNYA.
SEHINGGA AKIBAT TEKANAN DARI ATAS (CAPPING) DAN TEKANAN
DARI WALL ROCK BIJIH BERSAMA CAPPING TO CAVE,DAN BIJIH
PECAH MENJASI BLOCK-BLOCK YANG BESAR.
V. CAVING METHODS
5.4.1 PEMAKAIAN METODA BLOCK CAVING
1. BLOCK CAVING DIGUNAKAN UNTUK BLOCK ORE YANG BESAR DENGAN TEBAL
VERTIKAL > 35 m. WALAUPUN DEPOSITE TIDAK BEGITU KAYA DAN NILAINYA RENDAH
TETAPI KARENA ONGKOS PENAMBANGAN MURAH, MAKA MENGUNTUNGKAN.
2. DEPOSITE YANG IDEAL UNTUK BLOCK CAVING APABILA ORE BODY ITU DAPAT RUNTUH
SECARA MUDAH DARI WALL ROCK DAN PECAH-PECAH DENGAN UKURAN CUKUP KECIL,
SEDANGKAN LAPISAN ATASNYA TO CAVE SECARA TERATUR.
3. METODA INI TIDAK DAPAT DIGUNAKAN APABILA PERMUKAAN TIDAK BOLEH RUNTUH.
4. DIGUNAKAN PADA :
- TAMBANG-TAMBANG BESAR.
- ORE BODY YANG MENYEBAR LUAS SECARA HORIZONTAL.
- WEAK ORE BODY, DAN KALAU ORE BODY AGAK KERAS DAPAT JUGA DIGUNAKAN ASAL
DILUTION TIDAK BEGITU MERUGIKAN.
V. CAVING METHODS
5.5 RINGKASAN CAVING METHODS
1. SYARAT MUTLAK BERHASIL CAVING METHOD :
- OVERBURDEN HARUS TURUN MENGIKUTI KEMAJUAN
PENAMBANGAN/PENGAMBILAN BIJIH. CAVING YANG TERGANTUNG DAN JATUH
TIBA-TIBA SANGAT BERBAHAYA.
V. CAVING METHODS
5.5 RINGKASAN CAVING METHODS
BC
SC
TS
- CLEAN MINING
TS
SC
BC
- % EXTRACTION
TS
SC
BC
TS
SC
BC
-FLEXIBILITY
TS
SC
BC
TS
SC
BC
BC
SC
TS
- TIMBER CONSUMPTION
BC
SC
TS
- BATURAL VENTILATION
BC
SC
TS
- CONTROL OF CAVING
TS
SC
BC
BC
SC
TS