Anda di halaman 1dari 4

x001

x002
x003
x004
x005
x006
x007
x008
x009
x010
x011

Plan for loading trailer


Pipe Stringing Aroung Obstacle
Traffic Management Layout
Traffic Sign & Traffic Control Device
Traffic Management for stringing along Public Road
Stringing on Pipeline Route
Stringing on Top of Pipe Trench
LOWERING ON Pipeline Route
LOWERING ON NARROW AREA
LAYOUT BACKFILLING ACTIVITIES (FOR PIPELINE ROUTE )
LAYOUT BACKFILLING ACTIVITIES (FOR NARROW PIPE)

NE ROUTE )

19.1044
14.3283

10.24

50000
59.70125
16000 837.5034
12000
4000
4.7761 2.38805
1.194025
4070 4.859682 0.474578

7746.906
9.5522
16.1516

48
40

13527.02

4.8597
23.6792

1006.4
706.4

0.701908

0.205231

Anda mungkin juga menyukai